KR20040110387A - Structure and method reinforcing the unbreakable head of high-stress concrete pile - Google Patents

Structure and method reinforcing the unbreakable head of high-stress concrete pile Download PDF

Info

Publication number
KR20040110387A
KR20040110387A KR1020030039704A KR20030039704A KR20040110387A KR 20040110387 A KR20040110387 A KR 20040110387A KR 1020030039704 A KR1020030039704 A KR 1020030039704A KR 20030039704 A KR20030039704 A KR 20030039704A KR 20040110387 A KR20040110387 A KR 20040110387A
Authority
KR
South Korea
Prior art keywords
pile
strength concrete
concrete pile
reinforcing
phc
Prior art date
Application number
KR1020030039704A
Other languages
Korean (ko)
Inventor
황문삼
Original Assignee
(주)피에스테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)피에스테크 filed Critical (주)피에스테크
Priority to KR1020030039704A priority Critical patent/KR20040110387A/en
Publication of KR20040110387A publication Critical patent/KR20040110387A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A reinforcement method for an unbreakable head of a high-strength concrete pile is provided to stabilize structurally by securing the strength of a high-strength concrete pile(PHC) by un-breaking, to exclude the use of filled concrete by securing strength and relaxation by heightening the adhesive strength of a reinforcing bar using a coupler, and to execute an eco-friendly and economical construction work by removing wastes and preventing the loss of piles. CONSTITUTION: The reinforcement method for an unbreakable head of a high-strength concrete pile(3) comprises the steps of perforating a pile fitting hole on the ground for constructing a building structure, filling up the pile fitting hole with cement milk grouting liquid, then fixing a high-strength concrete pile(PHC)(3) to the pile fitting hole, coupling many reinforcing bars(8) to a pile cap(4) coupled to a head of the high-strength concrete pile(PHC)(3) exposed to the appointed height, fixing the reinforcing bars(8) with many tie hoops(12), forming a screw part on the lower end of the reinforcing bar(8) and coupling to a screw hole of a pile cap(4) together with a coupler(10), locating a finishing plate on the front of the high-strength concrete pile(PHC)(3), then placing and curing concrete to complete a floor slab.

Description

고강도 콘크리트 말뚝의 무파쇄 두부 보강방법 및 그 보강구조 {Structure and method reinforcing the unbreakable head of high-stress concrete pile}Structural and method reinforcing the unbreakable head of high-stress concrete pile}

본 발명은 토목 또는 건축 구조물의 기초 지반에 근입되는 콘크리트 말뚝에 있어서, 특히 그 콘크리트 말뚝을 고강도 콘크리트 말뚝(PHC)으로 이용하되, 그 고강도 콘크리트 말뚝(PHC)의 두부(頭部)를 파쇄하지 아니하고도 효과적인 보강을 가능케 하여, 말뚝의 강도확보가 안정적이며, 속채움 콘크리트가 불필요하며, 작업이 신속하여 공기의 단축 및 인건비의 감소 효과가 있으며, 폐기물이 발생치 아니하므로 친환경적인 시공이 이루어지는 고강도 콘크리트 말뚝의 무파쇄 두부 보강방법 및 그 보강구조에 관한 것이다.The present invention, in the concrete piles in the foundation ground of civil engineering or building structures, in particular, using the concrete pile as a high-strength concrete pile (PHC), without breaking the head of the high-strength concrete pile (PHC) It also enables effective reinforcement, stable pile strength, no need for stuffed concrete, fast work, shorten the air and reduce labor cost, and high-strength concrete that is eco-friendly because no waste is generated. The present invention relates to a method for reinforcing crushed heads of piles and a reinforcing structure thereof.

일반적으로 토목, 건축 구조물이나 교량의 교각 또는 교대기초의 경우 지지층이 깊을 경우 구조물의 하중을 충분히 지지하기 위해 강관 말뚝 또는 콘크리트 말뚝들을 지지층까지 근입시켜 시공한 후 이들 말뚝 상부에 콘크리트 바닥슬래브를 형성한 후 그 상부에 각종 구조물을 시공하게 되는 것이다.In general, in the case of pier or alternating foundation of civil engineering, building structure or bridge, when the support layer is deep, steel pipe piles or concrete piles are built into the support layer to support the load of the structure, and then concrete floor slab is formed on the piles. After that the various structures will be constructed on top.

상기한 강관 말뚝의 경우에는 주로 토목 건설 현장이나 교량 건설현장에서 주로 사용되는 것으로서, 항타기를 이용하여 말뚝 선단을 항타하는 방법으로 목적지반에 강관 말뚝을 근입시키는 것이며,In the case of the steel pipe piles, which are mainly used in civil engineering construction sites or bridge construction sites, the steel pipe piles are introduced into the destination panel by using the rudder to drive the pile tip.

콘크리트 말뚝의 경우에는 건축 구조물과 같이 시내 중심가에서 작업을 하여야 하는 경우 말뚝 천공장비를 이용하여 목적지반에 말뚝삽입공을 천공한 상태에서 그 천공에 콘크리트 말뚝을 삽입함으로서 소음 및 진동이 발생하지 않도록 하고 있는 것이다.In the case of concrete piles, when the work should be done in the city center, such as a building structure, by inserting the concrete piles in the drilled state with the pile insertion holes in the destination panel using the pile drilling equipment, noise and vibration are not generated. It is.

상기한 콘크리트 말뚝의 경우에는 도 7의 도시와 같이 지반(100)에 일정깊이로 콘크리트 말뚝(101)을 근입시키고, 지반(100)의 상부로 노출된 콘크리트 말뚝(101)의 머리부를 파쇄하여 말뚝 내부의 강선(102)이 노출되게 한 상태에서, 바닥슬래브를 위한 콘크리트를 타설하여 되는 것인데,In the case of the concrete piles, as shown in FIG. 7, the concrete piles 101 are inserted into the ground 100 to a certain depth, and the heads of the concrete piles 101 exposed to the upper portion of the ground 100 are crushed to piles. With the steel wire 102 exposed inside, the concrete for the floor slab is to be poured,

기초바닥을 위한 콘크리트의 타설 전, 근입된 말뚝(101)의 내부에 일정 높이로 메움토(103)를 채워, 콘크리트 말뚝(101)의 선단 내부에 일정 깊이로 속채움 콘크리트가 형성되도록 함으로서, 외력(휨모멘트 및 전단력)으로부터 보다 안정된 지지력을 갖게 함은 물론 상기 노출된 강선에 의해 말뚝과 기초간의 결합력이 증대되게 시공되어 지고 있는 것이다.Before pouring concrete for the foundation floor, filling the filling soil 103 to a certain height in the inside of the pile pile 101, to fill the concrete to a certain depth inside the tip of the concrete pile 101, the external force In addition to providing a more stable support force from (bending moment and shear force), the exposed steel wire is being constructed to increase the coupling force between the pile and the foundation.

그러나, 상기한 바와 같은 시공구조는 지반의 부등침하에 따라 콘크리트 말뚝이 하부과 확대기초 또는 전면기초와 결합성 저하의 문제점이 있는 것이며, 이러한 부등침하에 의한 말뚝과 기초 슬래브와의 결합력 저하는 건물이 기울어지거나 균열이 발생하는 요인으로 직접 작용하는 것으로서, 이러한 전단변형으로 인한 결합력 저하를 방지하기 위해서는 말뚝 선단부와 바닥슬래브간의 결합구조를 개선하여 견고한 결합이 이루어지도록 하여야 하는 것이다.However, the construction structure as described above has a problem that the concrete piles have a problem of deterioration of the bond with the lower and enlarged foundations or the front foundations according to the uneven settlement of the ground, and the decline of the coupling force between the pile and the foundation slab caused by such uneven settlements is tilted. As a factor that directly causes cracking or cracking, the coupling structure between the tip of the pile and the bottom slab should be improved to prevent the deterioration of the bonding force caused by the shear deformation.

따라서, 종래에는 콘크리트 말뚝의 머리부를 파쇄하여 노출된 강선에 다양한 체결부재를 결합하여 이에 의해 보강 결합이 이루어지도록 하고 있으나, 상기한 두부 파쇄공정에서 콘크리트 말뚝의 종방향 균열이 발생하여 말뚝의 기계적 강도를 크게 저하시킴은 물론 균열을 통해 말뚝 내부 강선의 부식을 촉진하여 구조적 안전성을 위협하고 있는 것이다.Therefore, in the related art, the head of the concrete pile is crushed to couple the various fastening members to the exposed steel wire, thereby making reinforcement coupling. However, in the head crushing process, longitudinal cracking of the concrete pile occurs, thereby causing mechanical strength of the pile. In addition to significantly lowering the pressure, the corrosion of the steel wire inside the pile through the crack is threatening structural safety.

따라서, 종래에는 콘크리트 말뚝을 사용하여 기초면을 결합하여야 함에도 불구하고 상기한 바와 같은 종방향 균열에 의한 문제점으로 콘크리트 말뚝을 이용한 보강결합이 거의 이루어지지 않고 있는 문제점이 있는 것이다.Therefore, in the related art, despite the need to combine the foundation surface using a concrete pile, there is a problem that the reinforcement coupling using the concrete pile is hardly made due to the problem caused by the longitudinal crack as described above.

또한, 상기한 방법과 같은 콘크리트 말뚝의 두부 보강방법은, 시멘트 밀크 그라우팅에 의해 말뚝 내부에 채워진 이물질을 제거한 후 속채움 콘크리트를 채워야 하므로 그 작업이 매우 번거롭고, 종방향 균열에 의해 콘크리트 말뚝의 강도확보가 매우 어려우며, 보강철근의 결합력이 떨어지면서도 파쇄된 말뚝의 두부는 폐기물로 분류되어 환경오염의 요인이 되는 것이며, 두부 파쇄시 발생하는 콘크리트 말뚝의 자재 손실로 인해 매우 비경제적인 문제점이 있는 것이다.In addition, the head reinforcement method of the concrete pile, such as the method described above, because it is necessary to fill the stuffed concrete after removing the foreign matter filled in the pile by cement milk grouting, the work is very cumbersome, secure the strength of the concrete pile by longitudinal cracking It is very difficult, and even though the binding force of the reinforcing bar is reduced, the head of the crushed pile is classified as waste, which is a factor of environmental pollution, and there is a very uneconomical problem due to the material loss of the concrete pile generated during the crushing of the head.

본 발명은 전기한 바와 같은 문제점을 제거코자 안출된 것으로서, 천공된 파일 삽입공에 고강도 콘크리트 말뚝(PHC)을 일정한 깊이로 근입시킨 후, 그 고강도 콘크리트 말뚝(PHC)의 선단 파일캡에 다수의 보강철근을 나사 결합하여 고정하되, 파일캡의 나사공과 보강철근의 나사부에는 별도의 커플러를 결합하여 그 고정력을 향상시킨 상태에서 바닥슬래브를 위한 콘크리트를 타설함으로서,The present invention was devised to eliminate the problems as described above, and after the high strength concrete pile (PHC) to the drilled pile insertion hole to a predetermined depth, a number of reinforcement to the tip pile cap of the high strength concrete pile (PHC) By screwing the reinforcing bars, but by adding a coupler to the screw hole of the pile cap and the thread of the reinforcing bars by placing concrete for the floor slab while improving the fixing force,

무파쇄에 따른 고강도 콘크리트 말뚝(PHC)의 강도확보가 확실하게 이루어져 구조적으로 안정됨은 물론 강도확보에 따라 속채움 콘크리트가 전혀 필요없으며, 커플러에 의해 보강철근의 고착력이 뛰어나 이완현상이 없고, 폐기물이 전혀 발생하지 않아 매우 친환경적이며, 파일자재의 손실이 전혀 없으므로 매우 경제적이고, 시공속도가 매우 신속하여 공사기간의 단축은 물론 인건비의 감소 효과가 뛰어난 고강도 콘크리트 말뚝의 무파쇄 두부 보강방법 및 그 보강구조를 제공함에 본 발명의 목적이 있는 것이다.The high strength concrete pile (PHC) is secured by no crushing, so it is structurally stable and there is no need for stuffed concrete according to the strength, and there is no loosening phenomenon because the coupler has excellent fixing force of rebar. It is very eco-friendly because it does not occur at all, and there is no loss of pile material, it is very economical, and the construction speed is very fast, which shortens the construction period and reduces the labor cost. It is an object of the present invention to provide a structure.

도 1은 본 발명에 따른 지반의 천공공정도1 is a drilling process diagram of the ground according to the present invention

도 2는 본 발명에 따른 천공지반에 시멘트 밀크 그라우팅 시공도Figure 2 is a cement milk grouting construction on the perforated ground according to the invention

도 3은 본 발명에 따른 천공에 고강도 콘크리트 말뚝을 근입한 상태도Figure 3 is a state diagram in which the high-strength concrete piles in the perforation according to the present invention

도 4a 및 도 4c는 본 발명에 따른 고강도 콘크리트 말뚝의 두부 보강상세도로서,4a and 4c is a head reinforcement detail of the high strength concrete pile according to the present invention,

도 4a는 노출된 말뚝 선단의 파일캡에 보강철근을 삽입하는 분리사시도Figure 4a is an exploded perspective view of inserting reinforcing bars in the pile cap of the exposed pile tip

도 4b는 노출된 말뚝 선단의 파일캡에 보강철근을 삽입하는 확대분리사시도Figure 4b is an enlarged exploded perspective view of inserting the reinforcing bar into the pile cap of the exposed pile tip

도 4c는 노출된 말뚝 선단의 파일캡에 보강철근이 결합된 확대단면도Figure 4c is an enlarged cross-sectional view of the reinforcing bar coupled to the pile cap of the exposed pile tip

도 5는 노출된 말뚝 선단의 캡에 보강철근이 결합된 전체사시도5 is an overall perspective view of the reinforcing bar coupled to the cap of the exposed pile tip

도 6은 두부 보강된 고강도 콘크리트 말뚝을 이용한 바닥슬래브 타설단면도6 is a sectional view of floor slab pouring using high strength concrete piles reinforced with head

도 7은 종래 콘크리트 말뚝을 이용한 바닥슬래브 타설단면도Figure 7 is a floor slab casting cross-sectional view using a conventional concrete pile

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 파일삽입공 2 : 시멘트 밀크 그라우팅1: pile insertion hole 2: cement milk grouting

3 : 고강도 콘크리트 말뚝 4 : 파일캡3: high strength concrete pile 4: pile cap

5 : 나사공 6 : PC강봉 고정공5: screw hole 6: PC steel rod fixing hole

7 : PC강봉 8 : 보강철근7: PC steel bar 8: Reinforcing bar

9 : 나사부 10 : 커플러9: threaded portion 10: coupler

11 : 요함부 12 : 띠철근11 essential part 12: strip reinforcing bar

13 : 마감판13: finish plate

이하, 본 발명의 바람직한 실시예를 설명한다.Hereinafter, preferred embodiments of the present invention will be described.

도 1의 도시와 같이 토목 또는 건축 구조물을 시공하기 위한 목적지반에 파일삽입공을 천공한 후, 상기 파일 삽입공에 도 2의 도시와 같이 시멘트 밀크 그라우팅을 충전한 상태에서 도 3의 도시와 같이 고강도 콘크리트 말뚝(PHC)을 근입시켜 고정시킨다.As shown in FIG. 1, after drilling a pile insertion hole in a destination panel for constructing a civil engineering or building structure as shown in FIG. 1, cement pile grouting is filled in the pile insertion hole as illustrated in FIG. 2. Secure by inserting high strength concrete pile (PHC).

이러한 상태에서 일정한 높이(지면으로부터 약 10cm 정도)로 노출된 고강도 콘크리트 말뚝(PHC)의 두부에 결합된 파일캡에 다수의 보강철근을 결합하되,In this state, a plurality of reinforcing bars are coupled to the pile cap coupled to the head of the high strength concrete pile (PHC) exposed at a constant height (about 10 cm from the ground),

상기 보강철근은 다수의 링상 띠철근에 의해 고정되게 하고, 상기 보강철근의 하단에는 나사부를 형성하여 이를 파일캡의 나사공에 결합하며,The reinforcing bar is to be fixed by a plurality of ring-shaped band reinforcing bars, the lower end of the reinforcing bar to form a screw portion is coupled to the screw hole of the pile cap,

상기 보강철근의 나사부에는 별도의 커플러를 결합하여 그 고정력이 크게 향상되게 하는 것이다.The screw portion of the reinforcing bar is to combine a separate coupler to greatly improve the fixing force.

이러한 상태에서 고강도 콘크리트 말뚝(PHC)의 선단 내측에 마감판을 위치한 상태에서 콘크리트를 타설, 양생시키면 바닥 슬래브가 완성되는 것이다.In such a state, when the concrete is placed and cured in the state where the finishing plate is placed inside the tip of the high strength concrete pile (PHC), the floor slab is completed.

이러한 시공공정에 의한 고강도 콘크리트 말뚝(PHC)의 두부 보강방법을 보다 상세히 설명하면,When explaining the head reinforcement method of the high strength concrete pile (PHC) by such a construction process in more detail,

먼저, 구조물이 시공되어질 지반에 파일을 근입시키기 위한 파일삽입공(1)을 천공한다.First, the pile insertion hole 1 for drilling the pile into the ground on which the structure is to be constructed is drilled.

파일삽입공(1)이 천공되어지면 그 파일삽입공(2) 내부에 시멘트 밀크 그라우팅(2)을 충전하고, 이에 고강도 콘크리트 말뚝(3)을 근입시킨다.When the pile insertion hole 1 is drilled, the cement milk grouting 2 is filled in the pile insertion hole 2, and the high strength concrete pile 3 is inserted therein.

이때, 파일삽입공(2) 내부의 시멘트 밀크 그라우팅(2)은 고강도 콘크리트 말뚝(3)의 측주면에 고르게 분포하면서 파일삽입공(1)과 고강도 콘크리트 말뚝(3)간의 틈새를 제거하면서 안정적인 위치를 갖도록 유도하게 되는 것이다.At this time, the cement milk grouting (2) inside the pile insertion hole (2) is distributed evenly on the side circumferential surface of the high strength concrete pile (3) while removing the gap between the pile insertion hole (1) and high strength concrete pile (3) stable position Will be induced to have.

이때, 상기한 고강도 콘크리트 말뚝(3)은 파일삽입공(1)을 일정한 깊이로 천공하여 지면으로부터의 노출높이가 대략 10cm정도가 유지되게 하는 것이 가장 이상적이다.At this time, the high-strength concrete pile (3) is most ideal to drill the pile insertion hole (1) to a certain depth so that the exposure height from the ground is maintained about 10 cm.

이렇게 노출된 고강도 콘크리트 말뚝(3)의 선단에 결합된 통상의 파일캡(4)에는 방사상으로 나사공(5)과 PC강봉 고정공(6)이 각각 연속하여 형성되어 있는데, 상기 나사공(5) 및 PC강봉 고정공(6)은 고강도 콘크리트 말뚝(3)의 양산과정에서 필요한 것으로서, 나사공(5)은 파일캡(4)을 고정하기 위한 목적으로 이용되며, 상기 PC강봉 고정공(6)은 콘크리트 말뚝의 내부에 강도 보강을 위한 PC강봉(7)의 선단을 걸어 고정하기 위한 것이다.In the conventional pile cap 4 coupled to the tip of the exposed high-strength concrete pile 3, a screw hole 5 and a PC steel rod fixing hole 6 are radially formed in succession, respectively. And PC steel rod fixing hole (6) is required in the mass production process of the high-strength concrete pile (3), the screw hole (5) is used for fixing the pile cap (4), the PC steel rod fixing hole (6 ) Is to hang the tip of the PC steel bar (7) for strength reinforcement inside the concrete pile.

따라서, 상기한 파일캡(4)의 나사공(5)에 도 4a 내지 도 4c의 도시와 같이 별도의 보강철근(8) 나사부(9)를 나사 결합하여 고정하면 되는 것으로서,Therefore, as the screw hole 5 of the pile cap 4, as shown in Figures 4a to 4c separate reinforcing reinforcement (8) screw portion 9 is to be fixed by screwing,

보강철근(8)의 하단부에는 상기 파일캡(4)의 나사공(5)과 일치되는 직경의 나사부(9)를 형성하여 이를 서로 결합하면 되는 것이다.The lower end of the reinforcing bar (8) is to form a threaded portion (9) of the diameter corresponding to the threaded hole (5) of the pile cap (4) to be combined with each other.

또한, 상기한 보강철근(8)의 나사부(9)에는 별도의 커플러(10)를 결합하여 그 보강철근(8)의 결합력이 보다 향상되게 할 수 있는 것인데,In addition, by coupling the coupler 10 to the threaded portion 9 of the reinforcing bar 8, the coupling force of the reinforcing bar 8 can be further improved.

상기한 커플러(10)는 도 4c의 도시와 같이 그 내측 하부에 일정 직경의 요함부(11)가 형성되어 있으므로, 보강철근(8)을 파일캡(4)의 나사공(5)에 결합한 상태에서 그 커플러(10)를 회전시켜 파일캡(4)의 표면에 밀착 고정시키면, 그 내측의 요함부(11)에 의해 축력이 증대되어 커플러(10) 및 보강철근(8)의 풀림이 방지되므로 보다 견고한 고정이 이루어지는 것이다.As shown in FIG. 4C, the coupler 10 has a recess 11 having a predetermined diameter formed at an inner lower portion thereof, so that the reinforcing bar 8 is coupled to the screw hole 5 of the pile cap 4. When the coupler 10 is rotated in close contact with the surface of the pile cap 4, the axial force is increased by the recess 11 in the inner side to prevent loosening of the coupler 10 and the reinforcing bar 8. More secure fixing is achieved.

따라서, 도 5의 도시와 같이 각각의 보강철근(8)을 커플러(10)에 의해 견고하게 고정하여 이를 다수의 띠철근(12)을 묶어 고정하면 보강철근(8)의 유동없이 콘크리트 파일의 견고한 두부 보강이 완성되는 것이다.Accordingly, as shown in FIG. 5, when each reinforcing bar 8 is firmly fixed by the coupler 10, and a plurality of band reinforcing bars 12 are bundled and fixed, the reinforcement of the concrete pile without the flow of the reinforcing bar 8 is secured. Tofu reinforcement is complete.

이러한 고강도 콘크리트 말뚝(3)의 두부 보강과정이 완료되면, 그 고강도 콘크리트 말뚝(3)의 상부면에 별도의 마감판(13)을 거치시킨 상태에서 콘크리트 타설하면 도 6의 도시와 같이 바닥슬래브가 완성되는 것이다.When the head reinforcement process of the high-strength concrete pile (3) is completed, when the concrete is placed in a state in which a separate closing plate 13 is mounted on the upper surface of the high-strength concrete pile (3), the floor slab is shown in FIG. It is finished.

그러므로, 종래와 같이 콘크리트 말뚝의 두부를 파쇄하지 않으므로 강도확보가 확실히 유지되어 보다 안정적이 시공이 가능할 뿐만 아니라, 말뚝 파쇄로 인한 종방향 균열 및 유효 프리스트레스 감소를 보완하기 위해 그 말뚝 내부에 속채움 콘크리트를 채우는 공정을 거쳐야 했으나, 강도확보에 따라 상기한 속채움 콘크리트가 전혀 필요없으므로 보다 신속하고 간결한 작업이 가능해지는 것이다.Therefore, since the head of the concrete pile is not crushed as in the related art, the strength is securely maintained and construction can be performed more stably, and the concrete filled inside the pile to compensate for the longitudinal cracking and effective prestress reduction caused by the pile crushing It was necessary to go through the process of filling, but as soon as the secured strength does not require any of the above filling concrete will be able to work faster and more concise.

또한, 우천시에도 작업이 가능하여 공사기간을 보다 단축할 수도 있으며, 숙련된 작업자가 아니어도 누구나 용이하게 작업할 수 있는 장점이 있는 것이다.In addition, it is possible to work even in the rain can shorten the construction period, there is an advantage that anyone can easily work without skilled workers.

특히, 무파쇄에 의한 두부 보강이 이루어지므로 파쇄에 따른 폐기물의 발생이 전혀 없으므로 매우 친환경적이고, 파일자재의 손실이 전혀 없으므로 매우 경제적인 것이다.In particular, since tofu reinforcement is made by no crushing, there is no waste generated by crushing, so it is very environmentally friendly and very economical because there is no loss of pile materials.

이상과 같은 본 발명 고강도 콘크리트 말뚝의 무파쇄 두부 보강방법 및 그보강구조는, 무파쇄에 따른 고강도 콘크리트 말뚝(PHC)의 강도확보가 확실하게 이루어져 구조적으로 안정됨은 물론 강도확보에 따라 속채움 콘크리트가 전혀 필요없으며, 커플러에 의해 보강철근의 고착력이 뛰어나 이완현상이 없고, 폐기물이 전혀 발생하지 않아 매우 친환경적이며, 파일자재의 손실이 전혀 없으므로 매우 경제적이고, 시공속도가 매우 신속하여 공사기간의 단축은 물론 인건비의 감소 효과가 뛰어난 것이다.As described above, the method of reinforcing the non-crushed head and the reinforcing structure of the high strength concrete pile according to the present invention ensure the strength of the high strength concrete pile (PHC) according to the no crushing, so that it is structurally stable and the filled concrete is secured according to the strength. It is not necessary at all, and the coupler has excellent fixing force of rebar, so there is no loosening phenomenon, no waste is generated and it is very eco-friendly, and there is no loss of pile material, so it is very economical and the construction speed is very fast and the construction period is shortened. Of course, the labor cost reduction effect is excellent.

Claims (3)

토목 또는 건축 구조물을 시공하기 위한 목적지반에 파일삽입공을 천공한 후, 상기 파일 삽입공에 시멘트 밀크 그라우팅을 충전한 상태에서 고강도 콘크리트 말뚝(PHC)을 파일 삽입공에 근입시켜 고정시킨 후,After drilling the pile insertion hole in the destination panel for the construction of civil engineering or building structure, and fixing the high strength concrete pile (PHC) in the pile insertion hole while filling the cement insert grouting with the pile insertion hole, 일정한 높이로 노출된 고강도 콘크리트 말뚝(PHC)의 두부에 결합된 파일캡에 다수의 보강철근을 결합하되,Combine multiple reinforcing bars to the pile cap coupled to the head of the high strength concrete pile (PHC) exposed to a constant height, 상기 보강철근은 다수의 링상 띠철근에 의해 고정되게 하고, 상기 보강철근의 하단에는 나사부를 형성하여 이를 커플러와 함께 파일캡의 나사공에 결합하여,The reinforcing bar is to be fixed by a plurality of ring-shaped band reinforcing bars, the lower end of the reinforcing bar is formed by screwing it together with the coupler to the screw hole of the pile cap, 고강도 콘크리트 말뚝(PHC)의 선단 내측에 마감판을 위치한 상태에서 콘크리트를 타설, 양생시켜 바닥 슬래브가 완성되게 함을 특징으로 하는 고강도 콘크리트 말뚝의 무파쇄 두부 보강방법.A method for reinforcing crushed heads of high strength concrete piles, characterized in that the floor slab is completed by placing and curing concrete in the state where the finishing plate is placed inside the tip of the high strength concrete pile (PHC). 선단의 파일캡(4)에 PC강봉(7)이 결합되어, 상기 PC강봉(7)이 매설되게 한 공지의 고강도 콘크리트 말뚝(3)의 상부 선단에, 수직 입설된 다수의 보강철근(8) 결합하되,A plurality of reinforcing bars (8) vertically installed at the upper end of the known high-strength concrete pile (3) to which the PC steel bar (7) is coupled to the pile cap (4) of the tip, and the PC steel bar (7) is embedded. Combine, 상기 보강철근(8)의 하단에는 나사부(9)를 형성하여, 그 나사부(9)를 파일캡(4)에 형성된 나사공(5)에 결합하고, 상기 나사부(9)에는 별도의 커플러(10)를 나사 결합하여 이에 의해 상기 보강철근(8)의 풀림이 방지되게 하며,The lower end of the reinforcing bar (8) is formed with a threaded portion (9), the threaded portion (9) is coupled to the threaded hole (5) formed in the pile cap (4), a separate coupler (10) to the threaded portion (9) Screwed) to thereby prevent loosening of the reinforcing bars (8), 상기 다수의 보강철근(8)에는 상하 일정간격의 띠철근(12)을 결합함을 특징으로 하는 고강도 콘크리트 말뚝의 무파쇄 두부 보강구조.The reinforcing bar reinforcement structure of the high strength concrete piles, characterized in that the plurality of reinforcing bars (8) is coupled to the band reinforcing bars 12 of the upper and lower predetermined intervals. 제 2항에 있어서,The method of claim 2, 커플러(10)의 하부 내측에는 요함부(11)를 형성하여 이에 의해 보강철근(8)이 보다 견고하게 고정되게 함을 특징으로 하는 고강도 콘크리트 말뚝의 무파쇄 두부 보강구조.The lower inner side of the coupler 10 to form a recess 11, thereby reinforcing reinforcement (8) is more crushed head reinforcement structure of the high-strength concrete pile, characterized in that it is more firmly fixed.
KR1020030039704A 2003-06-19 2003-06-19 Structure and method reinforcing the unbreakable head of high-stress concrete pile KR20040110387A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030039704A KR20040110387A (en) 2003-06-19 2003-06-19 Structure and method reinforcing the unbreakable head of high-stress concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030039704A KR20040110387A (en) 2003-06-19 2003-06-19 Structure and method reinforcing the unbreakable head of high-stress concrete pile

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0019338U Division KR200329142Y1 (en) 2003-06-19 2003-06-19 Reinforing structure of the unbreakable head of high-stress concrete pile

Publications (1)

Publication Number Publication Date
KR20040110387A true KR20040110387A (en) 2004-12-31

Family

ID=37382788

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030039704A KR20040110387A (en) 2003-06-19 2003-06-19 Structure and method reinforcing the unbreakable head of high-stress concrete pile

Country Status (1)

Country Link
KR (1) KR20040110387A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100650976B1 (en) * 2006-09-01 2006-11-30 주식회사 형제케이종합건축사사무소 Pile structure for building
CN109137900A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 It is CFG a kind of

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100650976B1 (en) * 2006-09-01 2006-11-30 주식회사 형제케이종합건축사사무소 Pile structure for building
CN109137900A (en) * 2018-10-23 2019-01-04 北京市城远市政工程有限责任公司 It is CFG a kind of

Similar Documents

Publication Publication Date Title
US11274412B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
KR100982951B1 (en) Reinforcement method of ground concrete being executed in advance
JP2009127231A (en) Continuous footing reinforcing structure, its construction method, and reinforcing metal
KR101341260B1 (en) Method of reinforcing existing concrete footing structure using micropile
JP2021017738A (en) Reinforcement structure and reinforcement method of masonry construction structure
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
KR20090016909A (en) Ground reinforcing method using pile and top pile reinforcing member
KR100570231B1 (en) Structure section extension equipment and an extension method of construction using ps steel materials and a steel plate
KR100444838B1 (en) A fiber reinforced earth retaining wall, a constructing method thereof, and a composite underground wall structure using thereof
KR101270697B1 (en) Precast Concrete Blocks and Remodeling Reinforcing Construction Methods for Low and Middle-rise Beam-column Buildings by Using that Blocks
JP7028728B2 (en) Joint structure of foundation pile and foundation slab
JP7085464B2 (en) How to build a retaining wall structure in the reverse striking method
KR200329142Y1 (en) Reinforing structure of the unbreakable head of high-stress concrete pile
KR20040110387A (en) Structure and method reinforcing the unbreakable head of high-stress concrete pile
KR100922121B1 (en) Construction Structure of Footing using Hybrid Pile having Various Cross-section
JP7257858B2 (en) Reinforcement structure and reinforcement method for masonry structure
KR100573371B1 (en) The site other opinion picket spatial-temporal method which applies the meritorious metal tubing
CN107023078A (en) Assemble cast-in-place combined type superposed box mesh-beam floor system and construction method
CN102121248A (en) Method for reinforcing and fixing sloping surface of prestressed anchorage element
JP4944521B2 (en) Shear reinforcement structure, shear reinforcement method, and composite capsule for shear reinforcement
CN205475207U (en) A construction equipment is pour to exposed basement rock or shallow overburden basement rock
US11885092B2 (en) Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same
KR20060042370A (en) Pile with an extended head reinforced cement paste or concrete
KR200253329Y1 (en) A fiber reinforced earth retaining wall, and a composite underground wall structure using thereof
JP7423218B2 (en) Reinforcement structure and reinforcement method for masonry structures

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application