Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same Download PDFInfo
- Publication number
- KR101189041B1 KR101189041B1 KR1020120045681A KR20120045681A KR101189041B1 KR 101189041 B1 KR101189041 B1 KR 101189041B1 KR 1020120045681 A KR1020120045681 A KR 1020120045681A KR 20120045681 A KR20120045681 A KR 20120045681A KR 101189041 B1 KR101189041 B1 KR 101189041B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- soundproof wall
- soundproof
- wall
- piles
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
- E01F8/0023—Details, e.g. foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/016—Flat foundations made mainly from prefabricated concrete elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2276—Clamping poles or posts on a stub
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
- E04H17/22—Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Sustainable Development (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
본 발명은 말뚝 일체형 방음벽 및 그 시공방법에 관한 것으로, 특히 현장에파일을 설치하고, 파일의 두부에 두부 결합장치에 의해 방음벽 지주를 직접 결합하고 프리캐스트된 방음벽 기초를 파일 사이에 조립하여 품질관리, 시공의 용이성 및 공정을 최소화할 수 있는 말뚝 일체형 방음벽 및 그 시공방법에 관한 것이다.
The present invention relates to a pile integrated soundproof wall and its construction method, in particular, to install piles in the field, and to directly couple the soundproof wall struts by the head coupling device to the head of the pile, and precast soundproof wall foundation between the piles for quality control The invention relates to a pile integrated soundproof wall and its construction method which can minimize the ease of construction and the process.
기존의 방음벽은 주로 알루미늄, 압출 성형 시멘트 판넬, 아크릴, 목재 방음벽 등이 설치되고 있으나, 이들은 도로변 등이나 방음벽이 설치되는 현장의 여건에 따라 설계에 의하여 기초 터파기를 한 후 지반이 약한 경우 말뚝을 설치하여 지반을 보강하고 기초 버림 콘크리트를 타설하고, 철근 배근 후 목수가 거푸집을 형성시켜 철근 콘크리트 구조물을 설치하고, 그 구조물 위에 지주를 앵커 볼트로 기둥을 설치하여 그 기둥 사이에 각종 방음판을 끼워서 방음벽을 시공해 왔다.Existing soundproof walls are mainly made of aluminum, extrusion cement panels, acrylic, wood soundproof walls, but they are piled up after designing foundations according to the conditions of the roadside or the site where the soundproof walls are installed. Reinforce the ground and pour the discarded concrete, and after the reinforcement, the carpenter forms the formwork, installs the reinforced concrete structure, installs pillars with anchor bolts on the structure, and inserts various soundproof panels between the pillars. It has been constructed.
이러한 방음벽의 설치는 현장에서 장비로 터파기로부터 철근배근, 기초콘크리트 타설, 거푸집 설치, 기둥을 세우기 위한 볼트앵커 설치, 구조물 콘크리트 타설, 거푸집 해체 등 공정이 복잡하고 동절기와 우천 등의 기후에도 영향을 받아 공기의 지연과 인건비의 상승 등으로 인한 공사비의 증가는 물론 완성된 기초 구조물 위에 기둥을 세우는데 앵커볼트 처리방법은 견고성을 저하시키는 등 다수의 문제점이 있었던 것이다.The installation of the soundproof wall is complicated in process such as reinforcing reinforcement, reinforcement of foundation concrete, installation of formwork, installation of bolt anchors to erect pillars, construction of structure concrete, and dismantling of formwork in the field. In addition to the increase in construction costs due to the delay of the air and the increase in labor costs, as well as the construction of the pillars on the completed base structure, the anchor bolt treatment method had a number of problems, such as lowering the robustness.
또한 위와 같은 방식도 신설도로 구간에서는 가능하나 이미 공용중인 도로에 추가로 방음벽을 시공할 경우, 터파기 등에 의해 공사면적이 크게 늘어나 교통통제, 우회 등으로 인한 추가공사비용 등의 문제가 발생한다.In addition, the above method can be used in the new road section, but if additional soundproof walls are already installed on the public road, the construction area is greatly increased due to the destruction, which causes problems such as additional control costs due to traffic control and detour.
도 1a는 종래기술에 의한 현장타설 말뚝벽식 옹벽에 단말뚝을 연결한 방음벽의 기초공법이 도시되고, 도 1b는 종래기술에 의한 옹벽을 현장에 타설하여 방음벽의 기초로 사용하는 기초공법이 도시된다.FIG. 1A shows a foundation method of a soundproof wall connecting a terminal pile to a site-casting pile wall retaining wall according to the prior art, and FIG. 1B illustrates a foundation method using a retaining wall according to the prior art as a foundation of a soundproof wall. .
도 1a를 참고하면 말뚝벽식 옹벽형 기초공법은 현장에서 타설한 옹벽에 단말뚝(예, 강관말뚝 등)을 연결하여 기초를 형성하는 공법이다. 이 공법은 지하매설물, 지장물, 대지경계 조건 등을 고려하여 기초설치부지가 협소한 곳에 유리하다.Referring to FIG. 1A, the pile wall retaining wall foundation method is a method of forming a foundation by connecting a terminal pile (eg, a steel pipe pile, etc.) to a retaining wall cast at a site. This construction method is advantageous in the place where the foundation installation site is narrow considering the underground burial, obstacle, and ground boundary conditions.
현장에서 연속적으로 기초를 타설하여 기초의 연결부에 대한 검토가 특별히 필요없으나, 피복두께, 연단거리 등의 제약조건을 확인해야 하므로, 말뚝, 현장타설 등 복합공정으로 비경제적이고, 지층별로 품질관리 및 안정성 평가가 필요하다. 또한 파일 항타시 소음 및 진동발생에 따라 민원이 우려된다.It is not necessary to review the connection part of the foundation by continuously laying the foundation in the field, but it is uneconomical for complex process such as pile and field casting, because it is necessary to check the constraints such as coating thickness and pore distance. Evaluation is necessary. In addition, complaints are arising due to noise and vibration generated during pile driving.
도 1b를 참고하면, 옹벽식 기초공법은 철근조립, 거푸집 설치, 콘크리트 타설, 양생 등 제반작업을 현장에서 시행하는 공법이다. 이 공법은 별도의 설치장비가 불필요하고, 일반적인 형식으로 구조가 단순하고 계산이 용이하여 특별공법에 대한 시공경험이 없이 시공할 수 있고, 지반 조건에 크게 영향을 받지 않는 기초공법이다.Referring to FIG. 1B, the retaining wall foundation method is a method for performing various operations such as reinforcing steel bars, formwork installation, concrete placing, and curing. This construction method requires no installation equipment and is simple in structure and easy to calculate in general form, so it can be installed without the construction experience of special construction method and it is a basic construction method that is not greatly affected by the ground conditions.
그러나 가설물, 구조물, 기타 노동집약적인 시공법이고 양생기간의 이원화로 공기가 많이 소요되고, 숙련전문 인력이 필요하여 인건비가 상승하고, 동절기 등 현장연건에 따른 품질관리의일관성 확보가 곤란한 문제가 있었다.However, there was a problem of temporary construction, structures, and other labor-intensive construction methods, which required a lot of air due to the dualization of the curing period, increased labor costs due to the need for skilled professionals, and difficulty in ensuring consistency of quality control according to on-site conditions such as winter.
도 1c는 종래의 기술에 의한 방음벽 구조로서 기단에 에이치빔이 세워지고, 상기 에이치빔에 플레이트를 피스로 부착하는 과정을 도시한 사시도이고, 도 1d는 종래의 기술에 의한 방음벽구조를 도시한 사시도이다.FIG. 1C is a perspective view illustrating a process of attaching a plate to a H-beam as a soundproof wall structure according to the prior art, and attaching the plate to the H beam as a piece, and FIG. 1D is a perspective view illustrating the soundproof wall structure according to the prior art. to be.
일반적으로 도로나 철로의 가에는 방음벽을 세워서 도로나 철로에서 차량이 주행하면서 발생하는 소음을 민가에 전달되지 않게 차단하기 위해 설치한다. In general, noise barriers are installed on roads and railroads to prevent noise from being driven while driving on roads or railroads.
도로가나 철로가에 차량의 주행방향을 따라 콘트리트로 성형된 기단(1)과, 상기 기단(1)의 상면에 수직으로 다수개 배열되어 고정되고 양측 개방부가 도로나 철로의 길이방향을 향하도록 배열되는 에이치빔(2)과, 상기 에이치빔(2)의 외측판(2a) 표면에 피스(P)로 부착되는 나무판(4)과, 상기 대향하는 에이치빔(2)의 개방부에 끼워지는 방음판(3)과, 상기 에이치빔(2)의 상단에 끼워지는 캡(5)으로 구성된다.A plurality of
상기 에이치빔(2)은 수직으로 길게 형성된 외측판(2a)과 상기 외측판(2a)을 이어주는 연결판(2b)으로 구성됨으로써 상기 연결판(2b) 양측방으로 개방부가 형성된다.
The
건축물의 말뚝기초에서 말뚝과 기초판을 연결하는 기존의 방법은 말뚝 내의 강선을 300mm 정도 돌출시키고, 말뚝내부를 일정깊이만큼 콘크리트로 채우는 방법(강선 남김방식)으로 건축공사에서 보편적으로 사용되어 온 방법이다.The existing method of connecting piles and foundation plates at the pile foundation of a building is a method commonly used in building construction by protruding steel wires in piles by about 300mm and filling the piles with concrete to a certain depth. to be.
하지만 이 방법은 시공성이 좋지 않고, 강선을 남기는 과정에서 말뚝두부에 파손 및 균열이 발생할 가능성이 높을 뿐만 아니라 현장 인명사고가 자주 발생하여 최근에는 이를 기피하는 추세이며, 대안적인 방법으로서 말뚝과 말뚝내의 강선을 완전히 절단하고 철근으로 보강하는 원커팅 방식이 제안되어 사용되고 있다.However, this method is poor in constructability, and there is a high possibility of breakage and cracks in the pile head in the process of leaving steel wires, and frequent accidents have occurred in the field. The one-cutting method of cutting the steel wire completely and reinforcing with rebar is proposed and used.
그러나 이러한 보강방법들은 역학적인 요구 성능에 맞도록 검증되어 적용된 방법이 아니며, 현장에서의 필요에 따라 시공성에 주안점을 두고 제안되어 사용되고 있는 방법으로서 역학적인 보강이 필요한 기초공법이다.
However, these reinforcement methods are not verified and applied to the required dynamic performance, and are proposed and used with the focus on the constructability according to the needs of the site.
본 발명은 위와 같이 종래 기술이 가지는 한계 및 문제점을 극복하기 위하여 개발된 것으로서, 본 발명의 목적은 원커팅된 말뚝 두부에 두부 결합장치의 금속 원통몸체를 씌우고 원통몸체를 조여 말뚝두부에 지지되도록 하여 말뚝의 내부채움 콘크리트가 굳기 전에 방음벽 지주를 설치하여 공기를 단축할 수 있는 말뚝 일체형 방음벽 및 그 시공방법을 제공하는 것이다.The present invention was developed in order to overcome the limitations and problems of the prior art as described above, the object of the present invention is to put a metal cylindrical body of the head coupling device to the one cut head to be supported on the pile head by tightening the cylindrical body It is to provide a pile-integrated soundproof wall and its construction method that can shorten the air by installing a soundproof wall strut before the concrete to solidify the pile.
본 발명의 다른 목적은 원커팅된 말뚝 두부에 두부 결합장치의 금속 원통몸체를 씌워서 조여주고 방음벽 지주를 결합함으로써 말뚝기초와 방음벽 지주의 연결부를 보강하여 말뚝기초와 방음벽 지주 사이의 지지력이 말뚝두부에 골고루 분산되어 할렬균열을 방지할 수 있는 말뚝 일체형 방음벽 및 그 시공방법을 제공하는 것이다.
Another object of the present invention is to tighten the one-cut pile head by covering the metal cylindrical body of the head coupling device and to combine the sound barrier wall support to reinforce the connection of the pile foundation and the sound wall wall support to the pile head and the sound wall wall support It is to provide a pile-integrated soundproof wall and its construction method that can be evenly distributed to prevent splitting cracks.
본 발명에서는 상기와 같은 목적을 달성하기 위하여, 본 발명에 의한 말뚝 일체형 방음벽은, 방음벽이 설치될 지반에 시공되는 다수의 말뚝과; 상기 다수의 말뚝의 두부에 씌워져 상기 말뚝과 결합되며 그 윗면에 방음벽 지주와 결합되는 두부 결합장치와; 사전에 공장이나 현장에서 제작되어 상기 다수의 말뚝 사이에 설치되는 다수의 방음벽 기초와; 상기 두부 결합장치에 결합되는 다수의 방음벽 지주와; 상기 다수의 방음벽 지주 사이에 설치되는 다수의 방음벽으로 구성된다.In the present invention, in order to achieve the above object, the pile integrated soundproof wall according to the present invention, a plurality of piles are constructed on the ground on which the soundproof wall is to be installed; A head coupling device which covers the head of the plurality of piles, is coupled to the pile, and coupled to a soundproof wall support on the upper surface thereof; A plurality of soundproof wall foundations which are manufactured at a factory or a site in advance and installed between the plurality of piles; A plurality of sound wall struts coupled to the head coupling device; It consists of a plurality of soundproof walls installed between the plurality of soundproof wall struts.
본 발명에 의한 두부 결합장치는 말뚝의 두부에 끼워지도록 하부가 개방된 원통몸체와; 상기 원통몸체의 윗면에 돌출되도록 설치되고 아래로 연장되어 상기 말뚝의 중공부에 일정한 깊이로 삽입되며 방음벽 지주와 결합되어 상기 방음벽 지주를 지지하고, 상기 말뚝의 중공부에 채워지는 콘크리트에 의해 고정되는 다수의 지주볼트와; 상기 원통몸체의 외주면을 따라 설치되고 일정한 간격으로 일정한 폭으로 벌어져 하단부로 개방되어 형성되는 다수의 사각형 수직홈과; 상기 사각형 수직홈의 좌우 양변에 판상으로 돌출되도록 설치되고 조임볼트가 삽입되는 볼트구멍을 구비하는 조임 돌출편으로 구성되는 조임부와; 상기 원통몸체의 윗면에 형성된 높이 조정구멍에 결합되어 상기 원통몸체의 수평과 높이를 조정하는 높이 조정볼트로 구성되는 것을 특징으로 한다.The head coupling device according to the present invention includes a cylindrical body whose lower part is opened to be fitted to the head of the pile; It is installed to protrude on the upper surface of the cylindrical body and extends downwardly is inserted into the hollow portion of the pile to a certain depth and is coupled with a soundproof wall strut to support the soundproof wall strut, and is fixed by concrete filled in the hollow portion of the pile A plurality of strut bolts; A plurality of rectangular vertical grooves installed along the outer circumferential surface of the cylindrical body and opened at a predetermined width at a predetermined interval and open to the lower end; A fastening part which is installed to protrude in a plate shape on both left and right sides of the rectangular vertical groove and comprises a fastening protrusion having a bolt hole into which a fastening bolt is inserted; Coupled to the height adjustment hole formed in the upper surface of the cylindrical body is characterized in that consisting of a height adjustment bolt for adjusting the horizontal and height of the cylindrical body.
본 발명에 의해 도로의 가장자리에 방음벽을 설치하는 경우, 도로를 향하는 면에만 방음벽 기초를 설치하고, 그 반대편은 방음벽 체결장치에 의해 말뚝에 방음벽 기초를 고정시키는 것을 특징으로 한다.When the soundproof wall is installed at the edge of the road according to the present invention, the soundproof wall foundation is installed only on the surface facing the road, and the opposite side is fixed to the pile by the soundproof wall fastening device.
본 발명에 의해 도로의 중앙선에 방음벽을 설치하는 경우, 사전에 공장이나 현장에서 제작된 서로 대칭인 2개의 방음벽 기초를 양쪽에서 함께 붙도록 설치하고 중간에 체결장치에 의해 체결하여 고정시키는 것을 특징으로 한다. In the case of installing the soundproof wall in the center line of the road according to the present invention, Two symmetrical soundproof wall foundations produced in the field are installed to be attached together on both sides, and are fastened by a fastening device in the middle.
본 발명에 의해 도로의 중앙선에 방음벽을 설치하는 경우, 사전에 공장이나 현장에서 제작된 하나의 몸체로 된 방음벽 기초를 크레인과 같은 장치로 들어올려 말뚝과 말뚝 사이에 끼워 설치하는 것을 특징으로 한다.In the case of installing the soundproof wall on the center line of the road according to the present invention, the soundproof wall foundation of one body manufactured in advance in the factory or the field is lifted by a device such as a crane, and is installed between the pile and the pile.
본 발명에 의한 말뚝 일체형 방음벽 시공방법은 방음벽을 시공할 위치의 지반에 말뚝을 천공하여 관입하거나 항타기에 의해 항타하여 일정한 간격으로 다수의 말뚝을 시공하는 단계; 상기 말뚝의 두부에 두부 결합장치를 덮어 씌워 설치한 후 앞서 설치한 다른 말뚝의 높이와 수평이 맞도록 높이를 조절하는 단계; 상기 두부결합장치의 주입구멍을 통해 상기 말뚝의 중공부에 속 채움 콘크리트를 주입하여 충진하는 단계; 상기 말뚝 주변의 지반을 다짐하여 지반의 강도를 개량하고, 상기 말뚝과 말뚝 사이에 공장이나 현장에서 조립한 방음벽 기초를 설치하는 단계; 상기 두부 결합장치에 방음벽 지주를 설치하는 단계; 상기 방음벽 지주 사이에 방음판을 끼워넣어 방음판을 설치하는 단계로 이루어진다. The pile integrated soundproof wall construction method according to the present invention comprises the steps of constructing a plurality of piles at regular intervals by punching through the pile into the ground of the position where the soundproof wall is to be constructed, or driving by driving. Adjusting the height to cover the head coupling device on the head of the pile and then leveling the height with the height of the other pile previously installed; Injecting and filling concrete filled into the hollow part of the pile through the injection hole of the head coupling device; Compacting the ground around the pile to improve the strength of the ground, and installing the soundproof wall foundation assembled at the factory or the site between the pile and the pile; Installing a sound barrier wall post to the head coupling device; The soundproof plate is inserted between the soundproof wall struts.
본 발명에 의해 말뚝 주변의 지표면을 다짐하고, 세굴현상을 막기 위해 세굴방지블록을 말뚝의 주변 지면에 설치하는 공정을 추가하는 것을 특징으로 한다.
The present invention is characterized by adding a step of compacting the ground surface around the pile, and installing the scour prevention block on the peripheral surface of the pile to prevent scour phenomenon.
본 발명에 의하면 두부결합장치가 말뚝의 두부에 견고하게 부착되어 고정되어 있기 때문에 말뚝의 속 채움 콘크리트가 완전히 굳기 전이라도 두부결합장치의 지주볼트에 방음벽 지주의 설치가 가능하고 사전에 공장에서 제작된 방음벽 기초를 말뚝과 말뚝 사이에 끼워 설치함으로써 현장에서 콘크리트를 타설하여 방음벽 기초를 설치하는 경우에 비해 시공기간을 대폭적으로 줄일 수 있다.According to the present invention, since the head coupling device is firmly attached and fixed to the head of the pile, the soundproof wall support can be installed on the support bolt of the head coupling device even before the filling of the pile is completely hardened. By installing the soundproof wall foundation between the pile and the pile, the construction period can be drastically reduced compared to the case of installing the soundproof wall foundation by placing concrete in the field.
또한 두부결합장치는 조임부의 조임력에 의해 원통몸체가 말뚝의 두부에 지지되도록 하여 원통몸체에 인가되는 하중이 말뚝의 두부에 고르게 분산되게 하여 어느 한 부분에 하중이 집중하여 발생하는 할렬파괴를 방지할 수 있는 효과가 있으며, 말뚝의 속채움 콘크리트 타설시 상부가 말뚝 밖으로 흘러넘치는 것을 방지하는 거푸집과 같은 효과가 있다.
In addition, the head coupling device allows the cylindrical body to be supported on the head of the pile by the tightening force of the tightening part so that the load applied to the cylindrical body is evenly distributed on the head of the pile to prevent splitting destruction caused by the concentration of the load in one part. There is an effect that can be, and the filling of the pile has the same effect as the formwork to prevent the upper portion from flowing out of the pile when pouring concrete.
도 1a는 종래기술에 의한 현장타설 말뚝벽식 옹벽에 단말뚝을 연결한 방음벽의 기초공법,
도 1b는 종래기술에 의한 옹벽을 현장에 타설하여 방음벽의 기초로 사용하는 기초공법,
도 1c는 종래의 기술에 의한 방음벽 구조로서 기단에 세워진 에이치빔에 플레이트를 피스로 부착하는 과정을 도시한 사시도,
도 1d는 종래의 기술에 의한 방음벽구조를 도시한 사시도
도 2는 본 발명에 의한 말뚝 일체형 방음벽의 정면도,
도 3은 본 발명에 의해 시공된 말뚝 일체형 방음벽의 말뚝,
도 4는 본 발명에 의한 두부 결합장치의 사시도,
도 5a는 본 발명에 의한 두부 결합장치의 주입구멍을 통해서 말뚝의 중공부에 주입된 속채움 콘크리트를 나타내는 종단면도,
도 5b는 본 발명에 의한 두부 결합장치가 결합된 말뚝 주변의 지면에 세굴방지블록을 설치한 상태를 나타내는 종단면도,
도 6a는 본 발명에 의해 방음벽이 설치되는 지반에 설치된 말뚝과 말뚝 사이에 방음벽 기초를 설치한 상태를 위에서 바라본 평면도,
도 6b는 본 발명에 의해 말뚝과 말뚝 사이에 방음벽 기초를 설치한 상태를 정면에서 바라본 정면도,
도 6c는 본 발명에 의해 말뚝과 말뚝 사이에 2개의 방음벽 기초를 양쪽에서 함께 붙도록 설치하는 상태를 나타내는 평면도,
도 6d는 본 발명에 의해 말뚝과 말뚝 사이에 하나의 몸체로 된 방음벽 기초를 설치하는 상태를 나타내는 평면도,
도 7은 본 발명에 의해 말뚝에 결합된 두부결합장치에 방음벽 지주를 설치하는 상태를 나타내는 정면도,
도 8은 본 발명에 의한 본 발명에 의한 말뚝 일체형 방음벽을 시공하는 방법을 나타내는 시공도이다.Figure 1a is a foundation method of the soundproof wall connecting the terminal pile to the site-placed pile wall retaining wall according to the prior art,
Figure 1b is a foundation method using a conventional retaining wall in the field to use as the basis of the soundproof wall,
1C is a perspective view illustrating a process of attaching a plate to a piece of H beam erected at the base as a soundproof wall structure according to the prior art;
Figure 1d is a perspective view showing a soundproof wall structure according to the prior art
2 is a front view of a pile integrated soundproof wall according to the present invention;
3 is a pile of the pile integrated soundproof wall constructed by the present invention,
4 is a perspective view of the head coupling device according to the present invention,
Figure 5a is a longitudinal sectional view showing the filling concrete injected into the hollow portion of the pile through the injection hole of the head coupling device according to the present invention,
Figure 5b is a longitudinal cross-sectional view showing a state in which the scour prevention block is installed on the ground around the pile coupled to the head coupling device according to the present invention,
6a is a plan view from above of a state in which a soundproof wall foundation is installed between a pile and a pile installed on a ground on which a soundproof wall is installed according to the present invention;
Figure 6b is a front view of the state in which the soundproof wall foundation is installed between the pile and the pile in accordance with the present invention,
6C is a plan view showing a state in which two soundproof wall foundations are installed together from both sides between a pile and a pile by the present invention;
6d is a plan view showing a state in which a soundproof wall foundation of one body is installed between a pile and a pile according to the present invention;
7 is a front view showing a state in which the sound wall wall is installed in the head coupling device coupled to the pile by the present invention,
8 is a construction diagram showing a method for constructing a pile integrated soundproof wall according to the present invention according to the present invention.
본 발명을 설명하기에 앞서 관련된 공지 기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그에 대한 상세한 설명은 생략한다. 본 발명의 구체적인 구성, 효과, 특징 및 이점들이 첨부된 도면과 이하의 바람직한 실시예를 통하여 명확히 설명한다.
In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail. Specific configurations, effects, features and advantages of the present invention will be apparent from the accompanying drawings and the following preferred embodiments.
이하, 첨부되는 도면과 관련하여 상기 과제를 해결하기 위한 본 발명의 구성과 방법을 살펴보면 다음과 같다. Hereinafter, with reference to the accompanying drawings, look at the configuration and method of the present invention for solving the above problems.
도 2에 본 발명에 의한 말뚝 일체형 방음벽의 정면도가 도시된다.2 is a front view of the pile integrated sound barrier according to the present invention.
본 발명에 의한 말뚝 일체형 방음벽(100)은 방음벽이 설치될 지반에 시공되는 다수의 말뚝(10)과; 상기 다수의 말뚝(10)의 두부에 씌워져 결합되는 두부 결합장치(20)와; 사전에 공장이나 현장에서 제작되어 상기 다수의 말뚝(10) 사이에 설치되는 다수의 방음벽 기초(30)와; 상기 두부 결합장치(20)에 결합되는 다수의 방음벽 지주(40)와; 상기 다수의 방음벽 지주(40) 사이에 설치되는 다수의 방음벽(50)으로 구성된다.
The pile integrated
도 3에 본 발명에 의한 말뚝 일체형 방음벽의 말뚝을 시공하는 시공도가 도시된다.3 is a view illustrating the construction of the pile of the pile integrated soundproof wall according to the present invention.
도시된 바와 같이 방음벽을 시공할 위치의 지반에 말뚝(10)을 천공하여 관입하거나 항타기에 의해 항타하여 일정한 간격으로 다수의 말뚝(10)을 시공하여 방음벽의 기초말뚝을 설치한다. As illustrated, the
이때 띠장 등과 같은 간격유지부재(11)를 부착하여 일정한 간격을 유지하도록 하고, 본 발명에 적용되는 말뚝은 PHC 말뚝 외에 RC 말뚝, 강관말뚝, 강관말뚝과 콘크리트 말뚝이 결합된 복합말뚝 등도 사용하여 시공가능하다.At this time, to maintain a constant interval by attaching the
상기 말뚝(10)의 두부는 확대 기초부와 결합될 수 있도록 예를 들면, 원컷팅 방식에 의해 두부정리가 된 상태이며, 이때 앞서 설치한 다른 말뚝(10)의 높이와 맞도록 높이를 조절하여 컷팅한다.The head of the
본 발명에서는 상기 시공된 말뚝(10)에 확대 기초부를 연결하지 않고 말뚝(10)의 두부에 두부 결합장치(20)를 결합하여 방음벽 지주(40)와 말뚝(10)을 연결한다.
In the present invention, the
도 4에 본 발명에 의한 두부 결합장치의 사시도가 도시된다.4 is a perspective view of the head coupling device according to the present invention.
본 발명에 의한 두부 결합장치(20)는 말뚝(10)의 두부에 끼워지도록 하부가 개방된 원통몸체(21)와; 상기 원통몸체(21)의 윗면에 돌출되도록 설치되고 아래로 연장되어 상기 말뚝(10)의 중공부에 일정한 깊이로 삽입되며 방음벽 지주(40)와 결합되어 상기 방음벽 지주(40)를 지지하고, 상기 말뚝(10)의 중공부에 채워지는 콘크리트에 의해 고정되는 다수의 지주볼트(22)와; 상기 원통몸체(21)의 외주면을 따라 일정한 간격으로 설치되고 일정한 폭으로 벌어져 하단부로 개방되어 형성되는 다수의 사각형 수직홈(23); 상기 사각형 수직홈(23)의 좌우 양변에 판상으로 돌출되도록 설치되고 조임볼트(24c)가 삽입되는 볼트구멍(241)을 구비하는 조임 돌출편(24a, 24b)으로 구성되는 조임부(24)와; 상기 원통몸체(21)의 윗면에 형성된 높이 조정구멍(21a)에 결합되어 상기 원통몸체(21)의 수평과 높이를 조정하는 높이 조정볼트(26)로 구성된다.The
본 발명에 의한 두부 결합장치(20)의 원통몸체(21)는 금속재질로 구성되며 더 좋게는 강철재질이 바람직하다. 상기 원통몸체(21)의 윗면은 막혀 있고 아랫면은 개방된 상태이고, 말뚝(10)의 두부를 덮어 씌어져 설치된 후, 말뚝(10)의 속 채움시에 콘크리트를 말뚝(10)의 중공부에 주입하기 위한 주입구멍(25)이 형성된다.
또한, 상기 원통몸체(21)의 윗면에 다수의 지주볼트(22)가 용접 등에 의해 부착되어 방음벽 지주(40)가 결합되어 지지받도록 되어 있으며, 상기 다수의 지주볼트(22)는 하부로 연장되어 상기 말뚝(10)의 속 채움 콘크리트에 결합되어 지지받게 된다.In addition, a plurality of
본 발명에 의한 두부 결합장치(20)의 원통몸체(21)의 외주면에는 일정한 간격(예를 들면, 2등분 간격, 4등분 간격, 6등분 간격 등)으로 사각형 수직홈(23)이 다수개 형성되어 있고, 사각형 수직홈(23)의 좌우 양측에 판형상의 돌출부(24a, 24b)가 용접 등에 의해 부착되어 있다.On the outer circumferential surface of the
판형상의 돌출부(24a, 24b)는 중앙에 볼트 구멍(241)을 구비하여 조임볼트(24c)와 조임너트(24d)의 체결에 의해 조여지게 되어 상기 사각형 수직홈(23)의 간격이 좁혀져서 원통몸체(21)가 말뚝(10)의 두부 측면을 압박하여 지지받도록 구성된다.The plate-shaped
따라서 두부결합장치(20)는 조임부(24)의 조임력에 의해 원통몸체(21)가 말뚝(10)의 두부에 지지되도록 하여 원통몸체(21)에 인가되는 하중이 말뚝(10)의 두부에 고르게 분산되게 하여 어느 한부분에 하중이 집중하여 발생하는 할렬파괴를 방지할 수 있다.
Therefore, the
원통몸체(21)의 윗면에는 높이 조정볼트(26)를 끼울 수 있는 높이 조정구멍(21a)이 다수개 뚫어져 있어서 상기 높이 조정구멍(21a)에 높이 조정볼트(26)를 끼워 조정함으로써 상기 두부결합장치(20)의 윗면과 말뚝(10)의 윗면의 간격을 조절하여 수평과 높이를 조정할 수 있다.
The upper surface of the
이와 같이 말뚝(10)의 두부에 두부 결합장치(20)가 결합된 상태에서 도 5a에 도시된 바와 같이 말뚝(10)의 속 채움시에 두부 결합장치(20)의 주입구멍(25)을 통해서 콘크리트를 말뚝(10)의 중공부(12)에 주입한다.As such, the
말뚝(10)의 중공부(12)에는 상기 원통몸체(21)의 윗면으로부터 다수의 지주볼트(22)가 연장되어 있으며, 상기 다수의 지주볼트(22)는 상기 말뚝(10)의 속 채움 콘크리트에 결합되어 지지받게 된다.
In the
두부결합장치(20)는 조임부(24)의 조임력에 의해 지지되므로 상기 말뚝(10)의 속 채움 콘크리트가 굳기 전이라도 두부결합장치(20)의 지주볼트(22)에 방음벽 지주(40)를 결합하여 고정시킬 수 있다. 그러므로 상기 말뚝(10)의 속 채움 콘크리트가 굳기 전에 방음벽 지주(40)가 설치되는 시간만큼 공기를 단축시킬 수 있다.The
원통몸체(21)의 윗면에는 높이 조정볼트(26)를 끼울 수 있는 높이 조정구멍(21a)이 다수개 뚫어져 있어서 상기 높이 조정구멍(21a)에 높이 조정볼트(26)를 끼워 조정함으로써 상기 두부결합장치(20)의 윗면과 말뚝(10)의 윗면의 간격을 조절하여 수평과 높이를 조정할 수 있다.
The upper surface of the
본 발명에 의한 두부결합장치(20)가 말뚝(10)의 두부에 결합된 상태에서 속채움 콘크리트를 주입구멍(25)을 통해 말뚝(10)의 중공부(12)에 주입하여 상기 두부결합장치(20)의 윗면까지 충진하여 타설한 후, 상기 말뚝(10) 주변의 지표면을 다짐하고, 장마나 우천시에 세굴(洗掘)현상을 막기 위해 도 5b에 도시된 바와 같이 세굴방지블록(27)을 말뚝(10)의 주변 지면에 설치하고, 방음벽 기초(30)를 상기 말뚝(10)과 말뚝(10) 사이에 설치한다.
The
도 6a는 본 발명에 의해 방음벽이 설치되는 지반에 설치된 말뚝(10)과 말뚝(10) 사이에 방음벽 기초(30)를 설치한 상태를 위에서 바라본 평면도이고, 도 6b는 본 발명에 의해 말뚝(10)과 말뚝(10) 사이에 방음벽 기초(30)를 설치한 상태를 정면에서 바라본 정면도이다. 6A is a plan view from above of a state in which a
도로의 가장자리에 방음벽을 설치하는 경우 도 6a 및 도 6b에 도시된 바와 같이 한면(도로를 향하는 면)에만 방음벽 기초(30)를 설치하고, 그 반대편은 방음벽 체결장치(35)에 의해 말뚝(10)에 방음벽 기초(30)를 고정시킨다.In the case of installing the soundproof wall at the edge of the road, as shown in FIGS. 6A and 6B, the
도로의 중앙선에 설치하는 경우 도 6c에 도시된 바와 같이 사전에 공장이나 현장에서 제작된 서로 대칭인 2개의 방음벽 기초(30a, 30b)를 양쪽에서 함께 붙도록 설치하고 중간에 볼트와 너트 같은 체결장치에 의해 체결하여 고정한다.In the case of installation at the center line of the road, as shown in FIG. Two symmetrical soundproof wall foundations (30a, 30b) manufactured in the field are installed to be attached together on both sides, and fastened by fastening by fastening devices such as bolts and nuts in the middle.
다른 실시예로서 도 6d에 도시된 바와 같이 사전에 공장이나 현장에서 제작된 하나의 몸체로 된 방음벽 기초(30c)를 크레인과 같은 장치로 들어올려 말뚝(10)과 말뚝(10) 사이에 끼워 설치할 수 있다. As another embodiment, as shown in FIG. 6D, a
이와 같이 사전에 공장에서 제작된 방음벽 기초(30, 30a, 30b, 30c)를 말뚝(10)과 말뚝(10) 사이에 끼워 설치함으로써 현장에서 콘크리트를 타설하여 방음벽 기초를 설치하는 경우에 비해 시공기간을 대폭적으로 줄일 수 있다.Thus, by installing the soundproof wall foundation (30, 30a, 30b, 30c) made in advance in the factory between the
방음벽 기초(30)가 설치된 후, 상기 두부 결합장치(20)의 지주볼트(22)에 방음벽 지주(40)를 끼워 도 7에 도시된 바와 같이 지주너트(41)로 체결하여 설치한다.After the
방음벽 지주(40)는 도시된 바와 같이 H 빔의 형태를 가지며 하단부가 지지판으로 막힌 형태이고 상기 지지판에는 상기 지주볼트(22)가 삽입될 수 있도록 지주볼트 구멍이 형성되어 있다.The sound
상기 방음벽 지주(40)를 세워 하단부에 형성된 지주볼트 구멍을 상기 두부결합장치(20)의 지주볼트(22)에 끼우고 지주너트(41)를 체결하여 방음벽 지주(40)를 설치한다.The
이때는 상기 말뚝(10)의 속 채움 콘크리트가 완전히 굳기 전이라도 본 발명에 의한 두부결합장치(20)가 상기 말뚝(10)의 두부에 견고하게 부착되어 고정되어 있기 때문에 상기 두부결합장치(20)의 지주볼트(22)에 방음벽 지주(40)의 설치가 가능하다.
In this case, the
도 8에 본 발명에 의한 본 발명에 의한 말뚝 일체형 방음벽을 시공하는 방법을 나타내는 시공도가 도시된다.The construction figure which shows the method of constructing the pile integrated sound insulation wall by this invention by FIG. 8 by this invention is shown.
단계 S10에서, 본 발명에 의한 말뚝 일체형 방음벽을 시공할 위치의 지반에 도 3에 도시된 바와 같이 말뚝(10)을 천공하여 관입하거나 항타기에 의해 항타하여 일정한 간격으로 다수의 말뚝(10)을 시공하여 방음벽의 기초를 설치한다.In step S10, as shown in Figure 3 to the pile of the pile integrated soundproof wall according to the present invention perforated
단계 S20에서, 상기 말뚝(10)의 중공부(12)에 지주볼트(22)가 결합된 두부 결합장치(20)의 원통몸체(21)가 상기 말뚝(10)의 두부를 덮어 씌우도록 설치한 후 앞서 설치한 다른 말뚝(10)의 높이와 수평이 맞도록 높이를 조절하고, 조임부(24)에 볼트와 너트를 끼우고 체결하여 상기 말뚝(10) 두부에 두부 결합장치(20)를 설치한다.In step S20, the
단계 S30에서, 본 발명에 의한 두부결합장치(20)가 말뚝(10)의 두부에 설치된 후, 상기 두부결합장치(20)의 주입구멍(25)을 통해 도 5에 도시된 바와 같이 상기 말뚝(10)의 중공부(12)에 속 채움 콘크리트를 주입하여 상기 두부결합장치(20)의 윗면까지 충진한다.In step S30, after the
따라서 상기 두부결합장치(20)의 지주볼트(22)가 상기 말뚝(10)의 중공부(12)까지 일정한 길이로 연장되어 있기 때문에 상기 말뚝(10)의 중공부(12)에 채워진 속 채움 콘크리트에 매립되어 견고하게 지지된다.Therefore, since the holding
단계 S40에서, 말뚝(10)이 설치된 주변의 지반을 다짐기계나 다른 장치를 이용하여 지표면을 다짐하여 지반의 강도를 개량하고, 말뚝(10)과 말뚝(10) 사이에 도 6a 및 도 6b에 도시된 바와 같이 공장이나 현장에서 조립한 방음벽 기초(30)를 방음벽 체결장치(35)에 의해 설치한다.In step S40, the ground of the ground is compacted by using a compaction machine or another device to improve the strength of the ground, and the
여기서 두부결합장치(20)가 결합된 말뚝(10)의 주변지반을 다짐한 후 도 5b에 도시된 바와 같이 홍수가 나거나 우천시에 세굴현상이 일어나는 것을 방지하기 위하여 말뚝(10)의 주변 지표면에 세굴방지블록(27)을 설치하는 공정을 추가할 수 있다.Here, after the
단계 S50에서, 상기 두부 결합장치(20)의 지주볼트(22)에 방음벽 지주(40)를 끼워 지주너트(41)로 체결하여 설치한다.In step S50, the
단계 S60에서, 방음벽 지주(40) 사이에 도 2에 도시된 바와 같이 방음판(50)을 끼워넣어 방음판(50)을 설치한다. 여기서 방음판(50)은 바람에 의해 풍압을 많이 받기 때문에 상기 말뚝(10)의 속 채움 콘크리트가 완전히 굳은 후에 설치하도록 한다.
In step S60, the
이상과 같이, 본 발명의 바람직한 실시예에 대하여 설명하였지만, 본 발명의 범위는 이것에 한정되는 것은 아니며, 당분야의 통상의 기술자에 의해 여러 가지 변경 및 변형이 가능할 수 있다.As mentioned above, although preferred embodiment of this invention was described, the scope of the present invention is not limited to this, A various change and a deformation | transformation may be possible by a person skilled in the art.
10: 말뚝 11: 간격유지부재
12: 중공부 20: 두부 결합장치
21: 원통몸체 22: 지주볼트
23: 사각형 수직홈 24: 조임부
25: 주입구멍 26: 높이 조정볼트
27: 세굴방지블록 30: 방음벽 기초
35: 방음벽 체결장치 40: 방음벽 지주
50: 방음판10: pile 11: spacing member
12: hollow portion 20: head coupling device
21: cylindrical body 22: holding bolt
23: square vertical groove 24: fastener
25: injection hole 26: height adjustment bolt
27: scour prevention block 30: soundproof wall foundation
35: soundproof wall fastening device 40: soundproof wall strut
50: soundproof panel
Claims (7)
상기 다수의 말뚝(10)의 두부에 씌워져 상기 말뚝(10)과 결합되며 그 윗면에 방음벽 지주(40)와 결합되는 두부 결합장치(20)와;
사전에 공장이나 현장에서 제작되어 상기 다수의 말뚝(10) 사이에 설치되는 다수의 방음벽 기초(30)와;
상기 두부 결합장치(20)에 결합되는 다수의 방음벽 지주(40)와;
상기 다수의 방음벽 지주(40) 사이에 설치되는 다수의 방음벽(50)으로 구성되는 것을 특징으로 하고,
상기 두부 결합장치(20)는 말뚝(10)의 두부에 끼워지도록 하부가 개방된 원통몸체(21)와; 상기 원통몸체(21)의 윗면에 돌출되도록 설치되고 아래로 연장되어 상기 말뚝(10)의 중공부에 일정한 깊이로 삽입되며 방음벽 지주(40)와 결합되어 상기 방음벽 지주(40)를 지지하고, 상기 말뚝(10)의 중공부에 채워지는 콘크리트에 의해 고정되는 다수의 지주볼트(22)와; 상기 원통몸체(21)의 외주면을 따라 일정한 간격으로 설치되고 일정한 폭으로 벌어져 하단부로 개방되어 형성되는 다수의 사각형 수직홈(23)과; 상기 사각형 수직홈(23)의 좌우 양변에 판상으로 돌출되도록 설치되고 조임볼트(24c)가 삽입되는 볼트구멍(241)을 구비하는 조임 돌출편(24a, 24b)으로 구성되는 조임부(24)와; 상기 말뚝(10)의 중공부(12)에 채워지는 콘크리트를 타설하기 위한 주입구멍(25)과; 상기 원통몸체(21)의 윗면에 형성된 높이 조정구멍(21a)에 결합되어 상기 원통몸체(21)의 수평과 높이를 조정하는 높이 조정볼트(26)로 구성되는 것을 특징으로 하는 말뚝 일체형 방음벽.A plurality of piles 10 installed on the ground on which the soundproof walls are to be installed;
A head coupling device 20 coupled to the head 10 of the plurality of piles 10 and coupled to the pile 10 and coupled to a soundproof wall support 40 on an upper surface thereof;
A plurality of soundproof wall foundations 30 which are manufactured in a factory or a site in advance and installed between the plurality of piles 10;
A plurality of sound wall struts 40 coupled to the head coupling device 20;
Characterized in that it consists of a plurality of soundproof walls 50 are installed between the plurality of soundproof wall struts 40,
The head coupling device 20 includes a cylindrical body 21 whose lower portion is opened to be fitted to the head of the pile 10; It is installed to protrude on the upper surface of the cylindrical body 21 and extends downward is inserted into the hollow portion of the pile 10 to a certain depth and coupled with the sound wall wall support 40 to support the sound wall wall support 40, A plurality of holding bolts 22 fixed by concrete filled in the hollow part of the pile 10; A plurality of rectangular vertical grooves 23 formed at regular intervals along the outer circumferential surface of the cylindrical body 21 and opened at a lower end with a predetermined width; Tightening portion 24 is composed of a tightening protrusions (24a, 24b) having a bolt hole 241 is installed to protrude in a plate shape on the left and right sides of the rectangular vertical groove 23 and the tightening bolt (24c) is inserted; ; An injection hole 25 for pouring concrete filled in the hollow part 12 of the pile 10; The pile integrated soundproof wall, characterized in that consisting of a height adjustment bolt 26 is coupled to the height adjustment hole (21a) formed on the upper surface of the cylindrical body 21 to adjust the horizontal and the height of the cylindrical body (21).
도로의 가장자리에 방음벽을 설치하는 경우, 도로를 향하는 면에만 방음벽 기초(30)를 설치하고, 그 반대편은 방음벽 체결장치(35)에 의해 말뚝(10)에 방음벽 기초(30)를 고정시키는 것을 특징으로 하는 말뚝 일체형 방음벽.The method of claim 2,
When installing the soundproof wall at the edge of the road, the soundproof wall foundation 30 is installed only on the side facing the road, the opposite side is characterized in that the soundproof wall foundation 30 is fixed to the pile 10 by the soundproof wall fastening device 35 Pile integrated soundproof wall made with.
도로의 중앙선에 방음벽을 설치하는 경우, 사전에 공장이나 현장에서 제작된 서로 대칭인 2개의 방음벽 기초(30a, 30b)를 양쪽에서 함께 붙도록 설치하고 중간에 체결장치에 의해 체결하여 고정시키는 것을 특징으로 하는 말뚝 일체형 방음벽.The method of claim 2,
In the case of installing the soundproof wall on the center line of the road, the two soundproof wall foundations 30a and 30b symmetrically made in advance in the factory or the field are installed to be bonded together at both sides, and fastened by a fastening device in the middle. Pile integrated soundproof wall made with.
도로의 중앙선에 방음벽을 설치하는 경우, 사전에 공장이나 현장에서 제작된 하나의 몸체로 된 방음벽 기초(30c)를 크레인과 같은 장치로 들어올려 말뚝(10)과 말뚝(10) 사이에 끼워 설치하는 것을 특징으로 하는 말뚝 일체형 방음벽.
The method of claim 2,
In the case of installing the soundproof wall on the center line of the road, the soundproof wall foundation 30c, which is made in advance in a factory or on the site, is lifted by a device such as a crane and installed between the pile 10 and the pile 10. The pile integrated soundproof wall, characterized in that.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120045681A KR101189041B1 (en) | 2012-04-30 | 2012-04-30 | Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120045681A KR101189041B1 (en) | 2012-04-30 | 2012-04-30 | Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101189041B1 true KR101189041B1 (en) | 2012-10-09 |
Family
ID=47287632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120045681A KR101189041B1 (en) | 2012-04-30 | 2012-04-30 | Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101189041B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101482501B1 (en) * | 2014-06-19 | 2015-01-14 | 이봉수 | Drilling guide system, drilling method and structure installation method using PC pile |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200362300Y1 (en) | 2004-06-10 | 2004-09-21 | 주식회사 대일휀스 | Assembling structure of Soundproof panel |
KR100950666B1 (en) * | 2007-10-24 | 2010-04-02 | 장정환 | Connection for Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure |
KR101130167B1 (en) * | 2011-05-27 | 2012-03-28 | 안창일 | Sound proof pannel and construction method using the same |
-
2012
- 2012-04-30 KR KR1020120045681A patent/KR101189041B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200362300Y1 (en) | 2004-06-10 | 2004-09-21 | 주식회사 대일휀스 | Assembling structure of Soundproof panel |
KR100950666B1 (en) * | 2007-10-24 | 2010-04-02 | 장정환 | Connection for Pile Head, Connection Structure and Method of Pile and Precast Concrete Pier Structure |
KR101130167B1 (en) * | 2011-05-27 | 2012-03-28 | 안창일 | Sound proof pannel and construction method using the same |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101482501B1 (en) * | 2014-06-19 | 2015-01-14 | 이봉수 | Drilling guide system, drilling method and structure installation method using PC pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140223851A1 (en) | Prefabricated reinforced concrete wall panel and installation method | |
JP3443739B2 (en) | Foundation construction method, footing foundation and foundation structure of elevated traffic route | |
JP2004100157A (en) | Retaining wall structure and its construction method | |
KR101189041B1 (en) | Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same | |
KR101270697B1 (en) | Precast Concrete Blocks and Remodeling Reinforcing Construction Methods for Low and Middle-rise Beam-column Buildings by Using that Blocks | |
KR20150102569A (en) | The noise barrier foundation and its construction method | |
JP6058470B2 (en) | Column base fixing structure for steel columns | |
KR200266040Y1 (en) | Precast Concrete Base Structure for Soundproof Wall | |
KR101483865B1 (en) | Construction Method of Underground Structure using Composite Wale | |
KR102413915B1 (en) | Noise barrier construction system using block module | |
KR101482523B1 (en) | Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof | |
KR101772938B1 (en) | Precast foundation structure buried support of road facility and method for constructing this same | |
KR100190277B1 (en) | A fabricated retaining wall apparatus | |
GB2320511A (en) | Supporting building floors | |
KR100964721B1 (en) | Block for road extension | |
CN220789842U (en) | Inclined-elevation type retaining wall top concrete foundation template | |
JP3241029U (en) | Post support structure for wire rope guard fences | |
KR101107784B1 (en) | Pile type protecting wall | |
CN210288108U (en) | Cast-in-place concrete guardrail | |
KR20130021918A (en) | Soundproof wall basic structure installation method using the precast concrete segment | |
KR102606899B1 (en) | Wall structure using combined precast foundation reinforcement network and precast wall using and its construction method | |
KR101971554B1 (en) | Method constructuring an underground structure using a temporary structure | |
KR101186563B1 (en) | Construction method and foundation structure used pile foundation of precast concrete for soundproofing fence | |
JP3629684B2 (en) | Sound insulation wall foundation block | |
KR101322420B1 (en) | Precast block wall, Cantilevered slab bridge using precast block wall and Construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20160928 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170928 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180928 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190930 Year of fee payment: 8 |