JPH11140884A - Method for constructing footing beam, and support - Google Patents

Method for constructing footing beam, and support

Info

Publication number
JPH11140884A
JPH11140884A JP24871498A JP24871498A JPH11140884A JP H11140884 A JPH11140884 A JP H11140884A JP 24871498 A JP24871498 A JP 24871498A JP 24871498 A JP24871498 A JP 24871498A JP H11140884 A JPH11140884 A JP H11140884A
Authority
JP
Japan
Prior art keywords
support
foundation beam
concrete
foundation
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24871498A
Other languages
Japanese (ja)
Inventor
Jun Kobayashi
潤 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP24871498A priority Critical patent/JPH11140884A/en
Publication of JPH11140884A publication Critical patent/JPH11140884A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To perform an above-ground operation to increase the safety and efficiency of construction work by reducing surplus soil which is disposed of as industrial waste, and eliminating a foundation scaffold. SOLUTION: A bottom surface 18 which is narrower than that employed in conventional methods is excavated and graded (a). Supports 12 are placed (b) on the bottom surface 18 at predetermined intervals along the longitudinal direction of beams. The support 12 are obtained (b) by placing support columns 4 upright in parallel on a base material 1, providing fill 36 at each of the projecting ends of the base material 1, and locking a sheet pile iron plate 22 between the support columns 4 of the adjacent supports 12. The outside of the sheet pile iron plate 22 is backfilled, soil is graded, and blinding concrete 25 is placed (c). A reinforcing cage 29 for a footing beam is constructed within the sheet pile iron plate 22 and is held at its upper end against a horizontal member 10, and concrete is placed within the sheet pile iron plate 22 to construct a footing beam 30 and a slab 31.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、建築物の基礎梁
を構築する方法及びこの構築方法に使用する支持具に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a foundation beam of a building and a support used for the method.

【0002】[0002]

【従来の技術】従来、基礎梁30を構築する際には、以
下の手順で行なわれていた(図12)。
2. Description of the Related Art Conventionally, when a foundation beam 30 is constructed, the following procedure has been performed (FIG. 12).

【0003】(1) 基礎梁30の構築位置に合わせて、地
盤を掘削して掘削凹部40を形成して、残土を排出す
る。この際、作業スペースも考慮して、構築予定の基礎
梁30の幅W0 よりも両側に夫々D1 (少なくとも40
〜50cm程度)広くした幅W1 で掘削凹部40の底面
41を形成するように掘削する(図12(a))。前記
1 は、基礎梁の構築に際し、地足場43や型枠45を
仮設、解体する際に、作業上必要不可欠な長さであっ
た。
(1) The ground is excavated in accordance with the construction position of the foundation beam 30 to form an excavation recess 40, and the remaining soil is discharged. At this time, in consideration of the working space, D 1 (at least 40) is provided on both sides of the width W 0 of the foundation beam 30 to be constructed.
Drilling so as to form a bottom surface 41 of the drilling recess 40 in ~50cm about) widely width W 1 (FIG. 12 (a)). Wherein D 1, upon construction of the foundation beam, temporary the ground anchorage 43 and the mold 45, when dismantling, was working on the essential length.

【0004】(2) 構築予定の基礎梁30に沿って、掘削
凹部40の底面41に捨てコンクリート42を打設する
と共に、作業用の地足場43を構築する(図12
(a))。
(2) Along with the foundation beam 30 to be constructed, a dumping concrete 42 is poured into the bottom surface 41 of the excavation recess 40, and a working scaffold 43 is constructed (FIG. 12).
(A)).

【0005】(3) 鉄筋を組み、所定の鉄筋籠29を形成
して、掘削凹部41の捨てコンクリート42上に配置
し、底面から所定の高さに保持する為、鉄筋籠29の下
縁と捨てコンクリート42の上面42aにブロックを介
装する。あるいは、ブロックに代え、又はブロックと共
に鉄筋籠29を保持する棒状の受け金物を立設してい
た。
(3) Reinforcing bars are formed to form a predetermined reinforcing rod cage 29, disposed on the discarded concrete 42 in the excavation recess 41, and maintained at a predetermined height from the bottom surface. A block is interposed on the upper surface 42a of the waste concrete 42. Alternatively, instead of the block, or together with the block, a bar-shaped receiving member for holding the rebar basket 29 is erected.

【0006】(4) 続いて、鉄筋籠29の両側に所定の梁
幅W0 に合わせて、型枠板(通常は合板)44、44を
配置して、打設するコンクリートの側圧に十分耐えられ
るように、セパレーター、フォームタイ、クランプ等で
これを緊結して型枠45を構築する(図12(b))。
[0006] (4) Subsequently, in accordance with the predetermined beam width W 0 on both sides of the reinforcing bar cage 29, (usually plywood) mold plate by placing 44, sufficient withstand lateral pressure of concrete for pouring As shown in FIG. 12 (b), a mold 45 is constructed by tightening these together with a separator, a foam tie, a clamp or the like.

【0007】(5) 続いて、型枠内にコンクリートを打設
する。
(5) Subsequently, concrete is poured into the formwork.

【0008】(6) 地足場を解体し取り外す。(6) The ground scaffold is dismantled and removed.

【0009】(7) 型枠を解体し、取り外す(図12
(c))。尚、(6) と(7) は作業順が前後する場合もあ
った。
(7) The mold is dismantled and removed (FIG. 12)
(C)). In some cases, (6) and (7) were performed in a different order.

【0010】(8) 掘削凹部40の、基礎梁30の周りに
土を埋め戻す。この際、多くの場合、外部から土を搬入
していた。
(8) The soil is buried around the foundation beam 30 in the excavation recess 40. At this time, soil was often brought in from outside.

【0011】(9) 梁の間の埋め戻した土を整地して、ス
ラブ用の捨てコンクリート47を打設する(図12
(d))。
(9) The backfilled soil between the beams is leveled, and a discarded concrete 47 for slab is poured (FIG. 12).
(D)).

【0012】(10)捨てコンクリート47の上方に、スラ
ブ用の鉄筋を構築して、スラブ用のコンクリートを打設
して、スラブ48を構築する。
(10) A slab rebar is constructed above the waste concrete 47, and concrete for the slab is cast to construct a slab 48.

【0013】[0013]

【発明が解決しようとする課題】前記従来例において
は、地足場構築など作業用に、基礎梁の周囲の地盤を広
く掘削するので、掘削及び埋め戻し作業が多くなる問題
点があった。更に、敷地の狭い構築現場では掘削した残
土の留置場所がなく、場外に排出し(産業廃棄物として
処理する)、埋め戻しの際には、更に埋め戻し用に土を
搬入する(通常は別途購入する)という手間と費用を要
していた。
In the above-mentioned prior art, the ground around the foundation beam is widely excavated for work such as construction of a ground scaffold, so that there is a problem that digging and backfilling work is increased. Furthermore, there is no place to store the excavated soil at the narrow construction site, and it is discharged outside (treated as industrial waste). At the time of backfilling, the soil is further carried in for backfilling (usually separately. Purchase) was required.

【0014】また、梁用の鉄筋や型枠の搬入、組み立て
作業は地足場上で行なわれる為に不安定であり、作業効
率も悪い問題点があった。また、コンクリートの強度発
現後まで、型枠や足場の取り外しができない為、工期の
短縮の妨げとなる問題点があった。
Also, the loading and assembling work of the reinforcing bars and the formwork for the beam is performed on the ground scaffolding, so that it is unstable and the working efficiency is poor. Further, since the formwork and the scaffold cannot be removed until after the strength of the concrete is developed, there is a problem that the shortening of the construction period is hindered.

【0015】[0015]

【課題を解決するための手段】然るにこの発明は、鉄筋
籠を保持できる支持具を使用し、支持具間に捨て型枠を
係止するので、前記問題点を解決した。
However, the present invention has solved the above-mentioned problems by using a support capable of holding a reinforcing bar cage and locking a discarding formwork between the supports.

【0016】即ちこの発明は、構築予定の基礎梁に応じ
た底面の根切りをし、該底面を整地し、前記底面に、梁
構築予定位置に沿って所定間隔毎に、捨て型枠板にかか
る土圧を支える支持具を載置し、該支持具間に、山留め
用の矢板となる基礎梁用の捨て型枠板を立設係止し、該
捨て型枠板の外側に掘削土を埋め戻し、前記捨て型枠板
内に、基礎梁用の鉄筋籠を構築し、該鉄筋籠の上部を支
持具に保持して、捨て型枠板内にコンクリートを打設し
て基礎梁を構築することを特徴とした基礎梁の構築方法
である。
That is, according to the present invention, a bottom is cut off according to a foundation beam to be constructed, the bottom is leveled, and a discarded form plate is formed on the bottom at predetermined intervals along a beam construction position. A support for supporting the earth pressure is placed, and a discarded formwork plate for a foundation beam serving as a sheet pile for mountain retaining is erected between the supports, and excavated soil is placed outside the discarded formwork plate. Backfilling, constructing a reinforced cage for the foundation beam in the discarded form plate, holding the upper part of the reinforced cage in the support, and casting concrete into the discarded form plate to construct the foundation beam It is a method of constructing a foundation beam characterized by performing.

【0017】また、前記において、捨て型枠板の外側に
掘削土を埋め戻した後、スラブ構築予定位置の土を整地
して、スラブ用の捨てコンクリートを打設し、続いて、
前記捨て型枠板内に、基礎梁用の鉄筋籠を構築し、該鉄
筋籠の上部を支持具に保持し、捨て型枠内及びスラブ用
の捨てコンクリートの上面に、基礎梁及び基礎スラブ用
のコンクリートを打設して基礎梁を構築することを特徴
とした基礎梁の構築方法である。
Further, in the above, after the excavated soil is back-filled to the outside of the waste form plate, the soil at the slab construction planned position is leveled, and slab waste concrete is poured.
In the discarded form plate, a reinforcing bar for a foundation beam is constructed, the upper part of the reinforcing bar is held by a support, and the foundation beam and the foundation slab are disposed in the discarding form and on the upper surface of the discarded concrete for the slab. This is a method for constructing a foundation beam, which comprises constructing a foundation beam by casting concrete.

【0018】また、この発明は、コンクリート製の基礎
梁を構築する際に、鉄筋籠及び型枠を保持する支持具で
あって、構築予定の基礎梁の幅方向に対応させて、根切
りした凹部の底面に載置できる基材上に、捨て型枠板の
側縁を係止できる支持柱を基礎梁の幅に対応させた間隔
で並列して立設し、前記両支持柱の上端部に、支持柱を
保持する横架材を設けたことを特徴とする支持具であ
る。更に、前記において、基材の両端部は、構築予定の
基礎梁の梁せいの「8分の1」乃至「5分の1」の長さ
宛て支持柱より外側に突出させたことを特徴とする支持
具である。
Further, the present invention is a support for holding a reinforcing bar and a formwork when constructing a concrete foundation beam, and the support is cut off corresponding to the width direction of the foundation beam to be constructed. On the base material that can be placed on the bottom surface of the concave portion, support columns that can lock the side edges of the discarded form plate are erected in parallel at intervals corresponding to the width of the foundation beam, and the upper ends of both support columns A supporting member for holding a supporting column. Further, in the above, both end portions of the base material are projected outward from the support pillar to a length of "1/8" to "1/5" of the beam of the foundation beam to be constructed. Support.

【0019】[0019]

【実施の態様】構築予定の基礎梁の幅方向に配置される
基材上に、捨て型枠板の側縁を係止できる支持柱を基礎
梁の幅に対応させた間隔で並列して立設する。基材の両
端部は、構築予定の基礎梁の梁せいの「8分の1」乃至
「5分の1」の長さ宛て支持柱より外側に突出させる。
両支持柱の上端部に、支持柱を保持する横架材を設けて
支持具を構成する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS On a base material arranged in the width direction of a foundation beam to be constructed, support pillars capable of locking the side edges of the discarded form plate are arranged in parallel at intervals corresponding to the width of the foundation beam. Set up. Both ends of the base material are projected outward from the support columns for a length of "1/8" to "1/5" of the beam of the foundation beam to be constructed.
At the upper end of both support columns, a horizontal member holding the support columns is provided to form a support.

【0020】構築予定の基礎梁に応じた底面の根切りを
し、底面を整地して捨てコンクリートを打設する。捨て
コンクリート上に、梁構築予定位置に沿って所定間隔毎
に、支持具を載置し、支持具の基材の両端部に盛り土す
ると共に、隣接する支持具の支持柱間に捨て型枠板を立
設係止する。捨て型枠板の外側に掘削土を埋め戻し、土
を整地して、スラブ用の捨てコンクリートを打設する。
捨てコンクリート上で作業をして、捨て型枠板内に、基
礎梁用の鉄筋籠を構築し、鉄筋籠の上部を支持具に保持
する。捨て型枠板内にコンクリートを打設して基礎梁を
構築する。
The bottom is cut off according to the foundation beam to be constructed, the bottom is leveled, and discarded concrete is poured. The support is placed on the discarded concrete at predetermined intervals along the beam construction planned position, and the embankment is filled on both ends of the base material of the support, and the discard form plate is placed between the support columns of the adjacent support. To stand upright. The excavated soil is back-filled outside the discarded formwork, the soil is leveled, and discarded concrete for the slab is cast.
Work on abandoned concrete, build a reinforced cage for the foundation beam in the abandoned formwork, and hold the upper part of the reinforced cage on the support. The foundation beam is constructed by casting concrete into the discarded formwork.

【0021】[0021]

【作用】鉄筋籠を保持する支持具に捨て型枠板を係止で
きるので、土や打設したコンクリート圧力に抗して、基
礎用型枠を保持でき、鉄筋籠を構築する前に捨て型枠板
の外側に根切りした土を埋め戻しできる。
[Function] Since the discarded form plate can be locked to the support for holding the reinforcing cage, the foundation form can be held against the pressure of the soil and the concrete poured in. The soil that has been cut off can be backfilled outside the frame plate.

【0022】支持具に捨て型枠板を係止し、鉄筋籠を捨
て型枠板内の所定位置に保持できるので、根切りの底面
に、地足場などの仮設物の設置スペースや作業スペース
を必要としない。
Since the discarding form plate can be locked to the support and the reinforcing bar cage can be held at a predetermined position in the discarding form plate, the installation space and working space for temporary objects such as ground scaffolds can be provided on the bottom of the root cutting. do not need.

【0023】[0023]

【実施例1】図1に基づき、この発明の支持具の実施例
を説明する。
Embodiment 1 An embodiment of a support according to the present invention will be described with reference to FIG.

【0024】構築予定の基礎梁の幅W0 よりも、両側に
1 (20〜30cm程度)程度長い、長さLの断面略
H字状の基材1をフランジ2、3を上下に配置する。基
材1上に、梁幅W0 に対応させた所定間隔を空けて、断
面略H字状の2本の支持柱4、4を立設固定する。この
際、支持柱4、4のウエブ5を基礎梁の幅方向(基材1
の長さ方向)に沿って配置する。
A base material 1 having a length L and a substantially H-shaped cross section, which is longer than the width W 0 of the foundation beam to be constructed by about L 1 (about 20 to 30 cm) on both sides, is disposed above and below the flanges 2 and 3. I do. On the substrate 1, at predetermined intervals to correspond to the beam width W 0, erected secure the two support pillars 4,4 of cross section H-shape. At this time, the webs 5 of the support columns 4 and 4 are placed in the width direction of the foundation beam (the
Along the length direction).

【0025】前記において、L1 は通常は、構築予定の
梁せいの「8分の1」〜「5分の1」程度とする。即
ち、例えば、梁せい200cmで、15〜40cm程度
となる。基礎梁の断面面内での支持具の回動を防止し、
かつ作業性を確保する為である。
In the above description, L 1 is usually set to “about 8” to “分 の” of the beam to be constructed. That is, for example, when the beam is 200 cm, it is about 15 to 40 cm. Preventing rotation of the support in the cross-sectional plane of the foundation beam,
In addition, it is for ensuring workability.

【0026】また、前記において基材1、支持柱4は、
断面H字状としたが、通常は断面コ字状の型材をH字状
となるように張り合わせて使用するが、同様の断面形状
となれば、H型鋼など他の構成の型鋼の単独又は組合わ
せとすることもできる(図示していない)。
In the above, the substrate 1 and the support columns 4 are
Although the cross section is H-shaped, a cross section of a U-shaped cross section is usually used by bonding together so as to form an H-shape. They can also be combined (not shown).

【0027】支持柱4、4の対向したフランジ6、6の
内面8、8間に、型枠板が係止されるようになり、該内
面8を夫々当接面8とする。従って、フランジの内面
8、8間の距離が梁幅W0 となる。また、基材1で、支
持柱4から外方への突出した両端部1a、1aが、長さ
1 となっている。
The form plate is locked between the inner surfaces 8, 8 of the opposed flanges 6, 6 of the support columns 4, 4, and the inner surfaces 8 are respectively abutting surfaces 8. Accordingly, the distance between the inner surfaces 8, 8 of the flange is the beam width W 0. Further, in the substrate 1, both end portions 1a of the support column 4 projecting outwardly, 1a has a length L 1.

【0028】前記支持柱4、4の上端部9、9間に、土
圧などから支持柱を保持すると共に、鉄筋籠を保持する
横架材10を架設固定する。また、基材1の上フランジ
2に、前記支持柱4の型枠板の当接面8に対応させて、
型枠板を係止する切欠11、11を形成する。また、前
記横架材10は、鉄筋籠の上端の主鉄筋を載置するの
で、該上端の主鉄筋の高さに合わせて、設置する。
Between the upper ends 9, 9 of the support columns 4, 4, the support columns are held by earth pressure or the like, and a horizontal member 10 for holding the reinforcing bar cage is erected and fixed. Further, the upper flange 2 of the base material 1 is made to correspond to the contact surface 8 of the form plate of the support column 4,
Notches 11, 11 for locking the form plate are formed. In addition, since the main reinforcing bar at the upper end of the reinforcing bar cage is placed on the horizontal member 10, it is installed in accordance with the height of the main reinforcing bar at the upper end.

【0029】以上のようにして、この発明の支持具12
を構成する(図1(a)(b))。
As described above, the support 12 of the present invention
(FIGS. 1A and 1B).

【0030】前記において、基礎梁に連結する柱構築予
定位置に連設して使用される支持具では、基礎梁用の型
枠板に対して、斜めに型枠板が配置される。この場合、
支持具の支持柱4をC型鋼とし、斜に配置される型枠を
係止できるようにL型鋼からなる係止杆14を支持柱4
に沿って固定した支持具15を使用する(図4)。ま
た、柱用の型枠板が、基礎梁用の型枠に対して直角に配
置される場合には、前記係止杆14を対応させた位置に
固定する(図示していない)。
[0030] In the above, in the support tool which is used in a continuous manner at a position where the pillar is to be connected to the foundation beam, the form plate is arranged obliquely with respect to the form plate for the foundation beam. in this case,
The supporting column 4 of the supporting tool is made of C-shaped steel, and the locking rod 14 made of L-shaped steel is fixed to the supporting column 4 so as to be able to lock the formwork arranged obliquely.
(FIG. 4). When the form plate for the pillar is arranged at right angles to the form for the foundation beam, the locking rod 14 is fixed at a corresponding position (not shown).

【0031】前記実施例において、基材1、支持柱4は
断面H字状としたが、鉄筋籠29を保持できる横架材1
0を支持して、矢板鉄板22を係止できる構造であれ
ば、他の断面形状とすることもできる。
In the above embodiment, the base material 1 and the support columns 4 have an H-shaped cross section.
Any other cross-sectional shape may be used as long as it can support the sheet metal 0 and lock the sheet metal plate 22.

【0032】[0032]

【実施例2】続いて、この発明の支持具12の使用、即
ちこの発明の基礎梁の構築方法について説明する。
Embodiment 2 Next, the use of the support 12 of the present invention, that is, the method of constructing the foundation beam of the present invention will be described.

【0033】 構築現場の基礎梁構築予定位置に、梁
幅W0 よりD2 (片側20cm程度)づつ広く、幅W2
の底面18となるように、掘削して掘削凹部(根切り)
17を形成する。前記D2 は、捨てコンクリート打ち、
墨出しができる長さで十分であるので、従来に比して大
幅に狭くできる。従って、この際、残土処分量は従来の
3分の1程度と少なくなり、埋め戻し用の土は、基礎梁
間の地盤(スラブ予定位置)に盛土19しておくことも
できる。
At the position where the foundation beam is to be constructed at the construction site, the beam width W 2 is wider than the beam width W 0 by D 2 (about 20 cm on one side), and the width W 2
Excavation so that it becomes the bottom surface 18 of the excavation (root cutting)
17 is formed. Said D 2 is dumping concrete,
Since the length at which ink can be extracted is sufficient, the width can be significantly reduced as compared with the related art. Accordingly, at this time, the amount of the remaining soil disposal is reduced to about one third of the conventional amount, and the backfill soil can be filled in the ground (planned slab position) 19 between the foundation beams.

【0034】 掘削凹部の底面18の周辺を幅W2
整地し、必要ならば、割りくりなどを施した後に、捨て
コンクリート20を打設する(図2(a))。
The surroundings of the bottom surface 18 of the excavation concave portion are leveled with a width W 2 , and if necessary, the concrete is divided, and then the discarded concrete 20 is poured (FIG. 2A).

【0035】 捨てコンクリート20上に墨出し、支
持具12、15を配置し、釘等で基材1を仮止めする。
この際、梁位置と支持柱4、4の当接面8が対応するよ
うに配置する。また、梁の長さ方向で、支持具12、1
2の配置間隔は、梁幅、梁せいにもよるが、梁幅W0
0cm、梁せい200cm程度の基礎梁で、140cm
前後の間隔で配置する。通常は100〜160cm程度
とする。所定間隔で支持具12を並べれば、間隔が確定
でき、矢板鉄板22を予め所定長さに切っておくことも
容易である。
[0035] The ink is marked out on the discarded concrete 20, the supports 12 and 15 are arranged, and the base material 1 is temporarily fixed with nails or the like.
At this time, the beam position and the contact surface 8 of the support columns 4 and 4 are arranged so as to correspond to each other. Also, in the length direction of the beam, the supports 12, 1
The arrangement interval of 2 depends on the beam width and beam, but the beam width W 05
0cm, foundation beam of about 200cm, 140cm
Arrange them at the front and back intervals. Usually, it is about 100 to 160 cm. If the supports 12 are arranged at predetermined intervals, the intervals can be determined, and it is easy to cut the sheet pile iron plate 22 to a predetermined length in advance.

【0036】 続いて、縦方向に波が連続する波鉄板
からなる矢板鉄板(型枠板)22(図1(a))を隣接
する支持具12、12の支持柱4、4の当接面8、8間
に配置すると共に、矢板鉄板22の下端部23を基材1
の切欠11、11に係止してビス止めする(図2
(b))。
Subsequently, the sheet pile iron plate (form plate) 22 (FIG. 1A) made of a corrugated iron plate in which waves continuously extend in the vertical direction is brought into contact with the support pillars 12, 12 and the support pillars 4, 4. 8 and the lower end 23 of the sheet metal plate 22
2 and are screwed (see FIG. 2).
(B)).

【0037】また、支持具12の垂直性を保持する為
に、支持具12の基材1の端部1a、1aを盛土36を
して固め、あるいは土の中に埋むことが望ましい。ま
た、梁の長さ方向は、隣接する矢板鉄板22と支持具1
2とを係止することにより梁型枠として保持される。
In order to maintain the verticality of the support 12, it is preferable that the ends 1a, 1a of the base material 1 of the support 12 be hardened by embankment 36 or buried in the soil. In addition, the length direction of the beam is the same as that of the adjacent sheet iron plate 22 and the support 1.
2 is retained as a beam formwork by locking with 2.

【0038】 全ての矢板鉄板22、22aの取付け
が完了したならば(図3)、掘削した土24を矢板鉄板
22の外側まで埋め戻す。埋め戻した土のスラブ下にあ
たる土の上面を整地して、スラブ用の捨てコンクリート
25を打設する(図2(c))。
When all the sheet pile iron plates 22 and 22 a have been attached (FIG. 3), the excavated soil 24 is buried back to the outside of the sheet pile iron plate 22. The top surface of the soil under the slab of the backfilled soil is leveled, and a slab waste concrete 25 is poured (FIG. 2 (c)).

【0039】 矢板鉄板22、22間に、基礎梁用の
鉄筋(上下主鉄筋26、27、あばら筋28など)を組
み、鉄筋籠29とする。この際、鉄筋籠29の上主鉄筋
26、26は横架材10上に載置固定される。また、鉄
筋籠29の下主鉄筋27、27は、支持具12の基材1
上に載置され、あるいは、上方に浮いた状態で保持され
る。従って、横架材10及び基材1(あるいはブロッ
ク)により、鉄筋籠29は所定位置に配置保持される
(図2(d))。また、この際、必要ならば(鉄筋のか
ぶり厚を更に必要とする等)基材2上あるは、底面18
上にブロック等を配置して、該ブロック上に下主鉄筋2
7、27を載置する(図示していない)。
Reinforcing bars (upper and lower main reinforcing bars 26, 27, stirrups 28, etc.) are assembled between the sheet iron plates 22, 22 to form a reinforcing bar basket 29. At this time, the upper main reinforcing bars 26, 26 of the reinforcing bar cage 29 are placed and fixed on the horizontal member 10. In addition, the lower main reinforcing bars 27, 27 of the reinforcing bar cage 29 are
It is placed on the top or held in a state of floating above. Therefore, the reinforcing rod basket 29 is arranged and held at a predetermined position by the horizontal member 10 and the base material 1 (or block) (FIG. 2D). At this time, if necessary (for example, the rebar cover thickness is further required),
Arrange a block or the like on the upper part, and place the lower main reinforcing bar 2 on the block.
7 and 27 are placed (not shown).

【0040】また、これらの鉄筋組み立て作業は、平坦
なスラブ用の捨てコンクリート25上でできるので、作
業効率が極めて良好である。
Further, since these rebar assembling operations can be performed on the flat slab waste concrete 25, the operation efficiency is extremely good.

【0041】 続いて、スラブ用の鉄筋を配置し(図
示していない)、基礎梁用及びスラブ用のコンクリート
を打設する。コンクリートの強度発現後に、基礎梁30
と基礎スラブ31とが一体の構造を構築できる(図2
(d)、図3)。
Subsequently, slab reinforcing bars are arranged (not shown), and concrete for foundation beams and slabs is cast. After the concrete strength is developed, the foundation beam 30
And the foundation slab 31 can form an integral structure (FIG. 2).
(D), FIG. 3).

【0042】図3中、33は柱構築予定位置の下に埋設
されている杭、34は矢板鉄板22a、22aを杭33
に保持する為の押え材である。また、図3中、35は小
梁用の型枠であり、矢板鉄板22を切欠いて、溝型に加
工した鉄板を矢板鉄板の切欠に係止して構成する。
In FIG. 3, reference numeral 33 denotes a pile buried beneath the column construction planned position, and reference numeral 34 denotes a pile 33 for the sheet pile iron plates 22a, 22a.
It is a holding material for holding in. In FIG. 3, reference numeral 35 denotes a formwork for a small beam, which is formed by notching the sheet metal plate 22 and locking the grooved iron plate in the cutout of the sheet metal plate.

【0043】前記実施例において、スラブ下の捨てコン
クリート25の形成は、梁用の鉄筋籠29の構築後にす
ることもできる。この場合には、埋め戻したスラブ下の
土の上を整地してその上で、鉄筋の組み立て作業をす
る。
In the above embodiment, the formation of the waste concrete 25 under the slab can be performed after the construction of the reinforcing bar cage 29 for the beam. In this case, leveling is performed on the soil under the backfilled slab, and rebar assembling work is performed thereon.

【0044】また、前記実施例において、支持具12、
15を使用することが作業効率上で、望ましいが、矢示
鉄板22を係止して矢板鉄板22が受ける土やコンクリ
ートの圧力を支える機能を有する装置、及び鉄筋籠29
を保持する機能を有する装置、を夫々使用することもで
きる(図示していない)。
Further, in the above embodiment, the support member 12,
Although it is desirable from the viewpoint of work efficiency to use the steel sheet 15, an apparatus having a function of locking the arrow iron plate 22 and supporting the pressure of the soil or concrete received by the sheet iron 22, and the reinforcing cage 29
Can be used (not shown).

【0045】また、前記実施例において、矢板鉄板22
として、縦方向に波が連続した鉄板を使用することが、
作業効率や強度上で望ましいが、捨て型枠板として使用
できる板材であれば、他の材質・形状の部材を使用する
こともできる(図示していない)。
In the above embodiment, the sheet metal plate 22
It is possible to use an iron plate with continuous waves in the vertical direction
Although it is desirable in terms of work efficiency and strength, a member of another material and shape can be used as long as it can be used as a discarded form plate (not shown).

【0046】また、前記実施例において、支持具設置位
置に合わせて、墨出し又は支持具の仮止め用に、捨てコ
ンクリート20の上面に予め、支持具仮止め用のベニヤ
板21を埋設しておくこともできる(図2(a))。
In the above embodiment, a veneer plate 21 for temporarily fixing the support is previously buried on the upper surface of the discarded concrete 20 so as to mark or temporarily fix the support in accordance with the installation position of the support. (FIG. 2A).

【0047】[0047]

【実施例3】図6乃至図11に基づき、この発明の支持
具の他の実施例を説明する。この実施例は、実施例1の
基材を異なる断面形状とした実施例である。
Embodiment 3 Another embodiment of the support according to the present invention will be described with reference to FIGS. This embodiment is an embodiment in which the substrate of the first embodiment has a different cross-sectional shape.

【0048】(1)一般位置用 構築予定の基礎梁の幅W0 よりも、両側にL1 (20〜
30cm程度)程度長い、長さLの基材51を配置す
る。前記基材51は断面L状で、横材53、縦材52か
らなる一体形状で形成されている。
(1) For general position L 1 (20 to 20) on both sides of the width W 0 of the foundation beam to be constructed
The base material 51 having a length L about 30 cm) is disposed. The base member 51 has an L-shaped cross section and is formed in an integral shape including a horizontal member 53 and a vertical member 52.

【0049】前記基材51の横材53上に、梁幅W0
対応させた所定間隔を空けて、断面略コ字状(溝型鋼)
の2本の支持柱54、54を立設固定する。この際、支
持柱54、54のウエブ55を基礎梁の幅方向(基材1
の長さ方向)に沿って配置し、下端部を基材51の縦材
52の一面52aに固着する。また、前記各支持柱54
の、ウエブ55を対向させて、他の支持柱54aを配置
して、他の支持柱54aのウエブ55の下端部を基材5
2の他面52bに固着する。
[0049] On the horizontal member 53 of the substrate 51, at a predetermined interval to correspond to the beam width W 0, substantially U-shaped cross section (groove type steel)
The two support columns 54, 54 are erected and fixed. At this time, the webs 55 of the support columns 54, 54 are placed in the width direction of the foundation beam (the base material 1).
Along the length direction), and the lower end portion is fixed to one surface 52 a of the vertical member 52 of the base material 51. In addition, each of the support columns 54
The other support pillar 54a is arranged with the web 55 facing the other, and the lower end of the web 55 of the other support pillar 54a is
2 is fixed to the other surface 52b.

【0050】前記において、L1 は実施例1と同様に、
通常は、構築予定の梁せいの「8分の1」〜「5分の
1」程度とする。即ち、例えば、梁せい200cmで、
15〜40cm程度となる。形成予定の基礎梁の断面面
内での支持具の回動を防止し、かつ作業性を確保する為
である。
In the above, L 1 is the same as in Example 1,
Normally, the distance is set to “分 の” to “5” of the beam to be constructed. That is, for example, at a beam of 200 cm,
It is about 15 to 40 cm. This is to prevent rotation of the support within the cross-sectional plane of the foundation beam to be formed, and to ensure workability.

【0051】前記支持柱54、54の上端部59、59
間に、支持柱54、54が受ける土圧に対向すると共
に、鉄筋籠を保持する横架材60を架設固定する。横架
材60は、断面コ字状であり、縦片60aが対向した支
持柱54、54aに接着され、支持具全体の変形を抑制
している。
The upper ends 59, 59 of the support columns 54, 54
In the meantime, a horizontal member 60 for holding the reinforcing bar and facing the earth pressure received by the support columns 54, 54 is erected and fixed. The horizontal member 60 has a U-shaped cross section, and the vertical pieces 60a are adhered to the opposing support columns 54, 54a to suppress deformation of the entire support.

【0052】以上のようにして、この発明の支持具62
を構成する(図6(a)(b))。
As described above, the support 62 of the present invention
(FIGS. 6A and 6B).

【0053】前記実施例において、断面略コ字状の2本
の支持柱54、54aを使用したが、一方の支持柱54
aを外側のフランジを省略した断面略L字状とすること
もできる(図7)。この場合には、対向する支持具6
2、62間に矢板鉄板22を設置する際に容易である。
例えば、矢板鉄板22の一側を一方の支持具62のコ字
状の支持柱54のフランジ間に係止し、続いて他側を他
方の支持具62のL字状の支持柱54aに当接できる。
In the above embodiment, two support columns 54, 54a having a substantially U-shaped cross section are used.
“a” may be formed into a substantially L-shaped cross section in which the outer flange is omitted (FIG. 7). In this case, the opposite support 6
It is easy to install the sheet pile iron plate 22 between 2 and 62.
For example, one side of the sheet pile iron plate 22 is locked between the flanges of the U-shaped support columns 54 of one support 62, and the other side is then contacted with the L-shaped support columns 54a of the other support 62. I can contact you.

【0054】(2)柱構築位置用 前記において、基礎梁に連結する柱構築予定位置に連設
して使用される支持具では、基礎梁用の型枠板に対し
て、斜めに型枠板が配置される。この場合、支持具の支
持柱54のみを使用し、支持柱54aは省略し、斜に配
置される型枠を係止できるようにL型鋼からなる係止杆
64を支持柱54に沿って固定した支持具65を使用す
る(図9)。
(2) For Pillar Construction Position In the above, the support tool used to be continuously connected to the pillar construction planned position to be connected to the foundation beam is formed at an angle to the foundation beam form plate. Is arranged. In this case, only the support column 54 of the support is used, the support column 54a is omitted, and a locking rod 64 made of L-shaped steel is fixed along the support column 54 so as to be able to lock the formwork arranged obliquely. The supporter 65 used is used (FIG. 9).

【0055】また、通常柱構築予定位置では、捨てコン
クリート20の面20bは基礎梁の配置される位置の面
20aより、高さH(通常150mm程度)だけ下がっ
て形成されている。従って、柱構築予定位置の捨てコン
クリート20の面20bに支持具65を載置し、基礎梁
側の捨てコンクリート20の面20aに載置した両側に
リブ67を形成した受け板66の一側を載置し、他側を
支持具65の支持柱54、54間に嵌挿して、リブ6
7、67を支持柱54の内側のフランジ66の外面に固
着する(図8(a)(b))。また、支持柱54、54
間で受け板66の下側には、該部の開口を塞ぐように鉄
板を配置する(図示していない)。
In addition, at the position where the normal pillar is to be constructed, the surface 20b of the discarded concrete 20 is formed to be lower than the surface 20a at the position where the foundation beams are arranged by a height H (normally about 150 mm). Accordingly, the support 65 is placed on the surface 20b of the discarded concrete 20 at the position where the pillar is to be constructed, and one side of the receiving plate 66 having the ribs 67 formed on both sides placed on the surface 20a of the discarded concrete 20 on the foundation beam side. It is placed, and the other side is inserted between the support columns 54
7 and 67 are fixed to the outer surface of the flange 66 inside the support column 54 (FIGS. 8A and 8B). Also, the support columns 54, 54
An iron plate is arranged below the receiving plate 66 so as to close the opening of the portion (not shown).

【0056】また、柱用の型枠板が、基礎梁用の型枠に
対して直角や他の角度に配置される場合には、前記係止
杆54を対応させた位置に固定する(図示していな
い)。
When the pillar form plate is disposed at a right angle or another angle with respect to the foundation beam form plate, the locking rod 54 is fixed at a corresponding position (FIG. Not shown).

【0057】また、支持柱54に、矢板鉄板22の端部
を係止して支持できる溝を形成する部材を固着しておく
こともできる(図示していない)。これは他の実施例の
支持柱54、54aについても同様に可能である。
Further, a member that forms a groove that can hold and support the end of the sheet metal plate 22 can be fixed to the support column 54 (not shown). This is also possible for the support columns 54 and 54a of other embodiments.

【0058】(3)小梁用 また、前記において、小梁を架設する位置に使用する支
持具について説明する。
(3) For small beams In addition, the support used in the position where the small beams are erected will be described.

【0059】支持柱54のみから構成した支持具65で
あって、係止杆64、受け板66を省略した構造の支持
具65aを、対向する基材51の縦材52、52間をW
3 宛て離して並列する(図10(b))。前記におい
て、幅W3 は構築予定の小梁の梁幅に対応してある。ま
た、前記支持具65に係止杆64を設けることもできる
(図示していない)。
A support member 65a composed of only the support columns 54 and having a structure in which the locking rod 64 and the receiving plate 66 are omitted, a W is provided between the vertical members 52, 52 of the base member 51 facing each other.
3 and are arranged in parallel (FIG. 10B). In the above, the width W 3 is are corresponding to the beam width of the small beams of the planned construction. Further, a locking rod 64 may be provided on the support 65 (not shown).

【0060】前記支持具65a、65aの支持柱54間
に、構築予定の小梁の断面に対応して鋼板などを溝型に
屈曲して形成してなる小梁用の型枠68を固定し、該型
枠68の底板69の下側を塞ぐように、塞ぎ板70を前
記支持具65a、65aの支持柱54の内側のフランジ
56、56に固着する。
Between the supporting columns 54 of the supporting members 65a, 65a, a beam frame 68 for a beam made of a steel plate or the like bent in a groove shape corresponding to the cross section of the beam to be constructed is fixed. The closing plate 70 is fixed to the flanges 56, 56 inside the supporting columns 54 of the supporting tools 65a, 65a so as to cover the lower side of the bottom plate 69 of the formwork 68.

【0061】以上のようにして、小梁架設部分の支持具
71を構成する(図10(a)(b))。
As described above, the support 71 for the part where the small beam is erected is constituted (FIGS. 10A and 10B).

【0062】また、小梁の中間部分の支持は、小梁用の
型枠68の底板69の外面に沿った溝型鋼からなる基材
72の両端部に、小梁用の型枠68の側板69aの外面
に沿った溝型鋼からなる支持柱73、73を立設して構
成する支持具74により行う(図11(a))。
Further, the intermediate portion of the beam is supported on both ends of a base 72 made of channel steel along the outer surface of the bottom plate 69 of the frame 68 for the beam, and the side plates of the frame 68 for the beam. This is performed by a support member 74 which is formed by erecting support columns 73, 73 made of channel steel along the outer surface of 69a (FIG. 11A).

【0063】また、前記実施例において、小梁用の型枠
68は鋼板などを溝型に屈曲して形成したが、鉄板等を
底板69、側板69a、69aの各部材の1つ又は2つ
からなる部材を組み合わせて、溝型に形成することもで
きる。この場合、側板69a、69aを矢板鉄板22と
同様の波型の鉄板類を使用、底板69を通常の鉄板類と
するすることもできる(図11(b))。また、底板6
9を省略し、側板69a、69aのみから小梁用の型枠
68を構成することもできる。
In the above-described embodiment, the formwork 68 for the small beam is formed by bending a steel plate or the like into a groove shape. However, an iron plate or the like is formed by one or two members of the bottom plate 69 and the side plates 69a and 69a. It is also possible to form a groove shape by combining members consisting of In this case, the side plates 69a, 69a may be formed of corrugated iron plates similar to the sheet metal plate 22, and the bottom plate 69 may be formed of ordinary iron plates (FIG. 11B). Also, the bottom plate 6
9 can be omitted, and the formwork 68 for the small beam can be constituted by only the side plates 69a, 69a.

【0064】[0064]

【実施例4】続いて、図2等に基づき実施例3の支持具
62、65、71、74の使用、即ちこの発明の基礎梁
の構築方法について説明する。
Embodiment 4 Next, the use of the supports 62, 65, 71 and 74 of Embodiment 3, that is, a method of constructing a foundation beam of the present invention will be described with reference to FIG.

【0065】 構築現場の基礎梁構築予定位置に、梁
幅W0 よりD2 (片側20cm程度)づつ広く、幅W2
の底面18となるように、掘削して掘削凹部(根切り)
17を形成する。前記D2 は、捨てコンクリート打ち、
墨出しができる長さで十分であるので、従来に比して大
幅に狭くできる。従って、この際、残土処分量は従来の
3分の1程度と少なくなり、埋め戻し用の土は、基礎梁
間の地盤(スラブ予定位置)に盛土19しておくことも
できる。
At the position where the foundation beam is to be constructed at the construction site, the beam width W 2 is wider than the beam width W 0 by D 2 (about 20 cm on one side), and the width W 2
Excavation so that it becomes the bottom surface 18 of the excavation (root cutting)
17 is formed. Said D 2 is dumping concrete,
Since the length at which ink can be extracted is sufficient, the width can be significantly reduced as compared with the related art. Accordingly, at this time, the amount of the remaining soil disposal is reduced to about one third of the conventional amount, and the backfill soil can be filled in the ground (planned slab position) 19 between the foundation beams.

【0066】 掘削凹部の底面18の周辺を幅W2
整地し、必要ならば、割りぐりなどを施した後に、捨て
コンクリート20を打設する(図2(a))。この際、
一般に底面18の全体に捨てコンクリートを打設する
が、各支持具が予め所定形状に加工してあるので、支持
具固定用に支持具設置予定位置にのみ捨てコンクリート
20を打設することもできる。
The periphery of the bottom surface 18 of the excavation concave portion is leveled with a width W 2 , and if necessary, the concrete is divided and the discarded concrete 20 is poured (FIG. 2A). On this occasion,
Generally, discarded concrete is cast on the entire bottom surface 18. However, since each support is processed into a predetermined shape in advance, the discarded concrete 20 can be cast only at the position where the support is to be installed for fixing the support. .

【0067】 捨てコンクリート20上に墨出し、支
持具62等を配置し、釘等で基材51を仮止めする。こ
の際、梁位置と支持柱54、54の内側のフランジ56
位置が対応するように配置する。また、この実施例では
補強金具76を使用するので、支持具62の配置間隔
は、梁幅、梁せいにもよるが、梁幅W0 40cm、梁せ
い140cm程度の基礎梁で、220cm前後の間隔で
配置する。所定間隔で支持具62を並べれば、間隔が確
定でき、矢板鉄板22を予め工場で所定長さに切ってお
くことも容易である。
The ink is printed on the discarded concrete 20, the support 62 and the like are arranged, and the base material 51 is temporarily fixed with nails or the like. At this time, the position of the beam and the flange 56 inside the support columns 54, 54
Arrange them so that the positions correspond. Moreover, because it uses metal fitting 76 in this embodiment, the arrangement interval of the support 62, beam width, although depending on the Sei Ryo, the beam width W 0 40 cm, with footing beams of about Sei Ryo 140cm, 220 cm before and after Place at intervals. If the supports 62 are arranged at predetermined intervals, the intervals can be determined, and it is easy to cut the sheet pile iron plate 22 to a predetermined length in advance at a factory.

【0068】また、柱構築予定位置では、支持具65を
配置してある。また、小梁と梁が交わる位置には、支持
具71を配置する(図5)。
Further, a support 65 is arranged at the column construction planned position. Further, a support 71 is arranged at a position where the small beam intersects with the beam (FIG. 5).

【0069】 続いて、縦方向に波が連続する波鉄板
からなる矢板鉄板(型枠板)22(図6(a))を隣接
する支持具65、62、71の支持柱54、54のフラ
ンジ56、56間に配置する(図2(b))。また、支
持具62、62、65間の矢板鉄板22、22間に、構
築予定の梁の下端部(土圧が最も大きくなる)の断面形
状に沿った溝型形状の補強金具76、76を嵌挿する
(図6(a))。また、前記の矢板鉄板22は、土圧に
抵抗できれば、既製の波型又は平板状のプレート類など
とすることもできる(図示していない)。
Subsequently, the sheet pile iron sheet (form plate) 22 (FIG. 6A) made of a corrugated iron sheet in which waves continuously extend in the vertical direction is connected to the flanges of the support columns 54, 54 of the adjacent support members 65, 62, 71. It is arranged between 56 and 56 (FIG. 2B). In addition, between the sheet pile iron plates 22 between the supports 62, 62, 65, reinforcing metal members 76, 76 having a groove shape along the cross-sectional shape of the lower end portion (earth pressure becomes maximum) of the beam to be constructed are provided. Insert (FIG. 6A). In addition, the sheet iron plate 22 may be a pre-made corrugated or flat plate (not shown) as long as it can resist earth pressure.

【0070】また、支持具62等の垂直性を保持する為
に、支持具62等の基材1の端部を盛土36をして固
め、あるいは土の中に埋めてから、全体の埋め戻しをす
ることが望ましい(図2(b))。また、梁の長さ方向
は、隣接する矢板鉄板22と支持具62、65、71と
を係止することにより梁型枠として保持される。
Further, in order to maintain the verticality of the support 62 or the like, the end of the base material 1 such as the support 62 is hardened by embankment 36 or buried in the soil, and then the whole is backfilled. (FIG. 2B). Further, the beam length direction is held as a beam form by locking the adjacent sheet pile iron plate 22 and the supports 62, 65, 71.

【0071】 大梁用の矢板鉄板22、22aの取付
けが完了したならば(図5)、掘削した土24を矢板鉄
板22の外側まで埋め戻す。並行して小梁用の型枠を配
置するための溝を掘り、掘った土を矢板鉄板22の外側
の埋め戻しに利用すれば、残土の搬出・搬入に要する作
業量及び費用の削減を図ることができる。
When the attachment of the sheet pile iron plates 22 and 22 a for the girder is completed (FIG. 5), the excavated soil 24 is buried back to the outside of the sheet pile iron plate 22. By digging a groove for arranging a formwork for small beams in parallel and using the digged soil for backfilling the outside of the sheet pile iron plate 22, it is possible to reduce the amount of work and cost required to carry out and carry in the remaining soil. be able to.

【0072】 続いて、小梁用の溝内に小梁用の型枠
68、68を支持具71、71間に架設する。ここで、
型枠68の中間位置には支持具74、74が配置されて
いる。
Subsequently, the formwork 68 for the small beam is erected between the support members 71 in the groove for the small beam. here,
Supports 74, 74 are arranged at an intermediate position of the mold frame 68.

【0073】 続いて、埋め戻した土のスラブ下にあ
たる土の上面を整地して、スラブ用の捨てコンクリート
25を打設する(図2(c))。
Subsequently, the upper surface of the soil below the slab of the backfilled soil is leveled, and a slab waste concrete 25 is poured (FIG. 2C).

【0074】 矢板鉄板22、22間に、基礎梁用の
鉄筋(上下主鉄筋26、27、あばら筋28など)を組
み、鉄筋籠29とする。この際、鉄筋籠29の上主鉄筋
26、26は横架材60上に載置固定される。また、鉄
筋籠29の下主鉄筋27、27は、支持具62等の基材
51より所定距離(7cm程度。下主鉄筋27のかぶり
厚程度)上方に浮いた状態で保持される(図6
(a))。従って、横架材60により、鉄筋籠29は所
定位置に配置保持される(図2(d))。
Reinforcing bars (upper and lower main reinforcing bars 26, 27, stirrups 28, etc.) are assembled between the sheet iron plates 22, 22 to form a reinforcing bar cage 29. At this time, the upper main reinforcing bars 26, 26 of the reinforcing bar cage 29 are placed and fixed on the horizontal member 60. Also, the lower main reinforcing bars 27, 27 of the reinforcing bar cage 29 are held in a state of floating above the base material 51 such as the support 62 by a predetermined distance (about 7 cm; about the cover thickness of the lower main reinforcing bar 27) (FIG. 6).
(A)). Therefore, the reinforcing rod basket 29 is arranged and held at a predetermined position by the horizontal member 60 (FIG. 2D).

【0075】また、これらの鉄筋組み立て作業は、平坦
なスラブ用の捨てコンクリート25上でできるので、作
業効率が極めて良好である。
Further, since these rebar assembling operations can be performed on the flat slab waste concrete 25, the operation efficiency is extremely good.

【0076】 続いて、スラブ用の鉄筋を配置し(図
示していない)、基礎梁用及びスラブ用のコンクリート
を同時に打設する。コンクリートの強度発現後に、基礎
梁20と基礎スラブ31とが一体の構造を構築できる
(図2(d))。
Subsequently, a slab reinforcing bar is arranged (not shown), and concrete for the foundation beam and the slab are simultaneously poured. After the strength of the concrete is developed, the foundation beam 20 and the foundation slab 31 can form an integral structure (FIG. 2D).

【0077】図5中、33は柱構築予定位置の下に埋設
されている杭である。
In FIG. 5, reference numeral 33 denotes a stake buried under the column construction planned position.

【0078】また、前記実施例における各支持具、矢板
鉄板22の他の実施例は実施例2と同様である(図示し
ていない)。
Further, other embodiments of each support and sheet pile iron plate 22 in the above embodiment are the same as those in the second embodiment (not shown).

【0079】[0079]

【発明の効果】鉄筋籠を保持する支持具に捨て型枠板を
係止できるので、鉄筋籠を構築する前に捨て型枠板の外
側に根切りした土を埋め戻しでき、埋め戻した地盤上で
作業ができるので、従来のような鉄筋・型枠材等の運搬
用の地足場を不要とし、鉄筋の運搬、組み立て作業の安
全を確保し、作業効率を高めることができる効果があ
る。また、埋め戻した地盤を整地、捨てコンクリートを
予め打設すれば、基礎梁と基礎スラブのコンクリートを
一緒に打設することができ、工期の短縮を図ると共に、
基礎梁と基礎スラブとに打ち継ぎがない一体の構造とす
ることができる効果がある。
According to the present invention, since the discarded form plate can be locked to the support for holding the reinforcing bar cage, the soil that has been rooted outside the discarded form plate can be backfilled before the reinforcing bar cage is constructed, and the ground that has been backfilled can be used. Since the work can be performed on the above, there is no need for the conventional scaffolding for transporting reinforcing bars, formwork materials, etc., and there is an effect that the safety of transporting and assembling the reinforcing bars can be ensured, and the working efficiency can be improved. In addition, if the ground that has been backfilled is leveled and the concrete thrown away is cast in advance, the concrete of the foundation beam and the foundation slab can be cast together, shortening the construction period,
There is an effect that the foundation beam and the foundation slab can be formed into an integrated structure without splicing.

【0080】また、支持具に捨て型枠板を係止し、鉄筋
籠を捨て型枠板内の所定位置に保持できるので、根切り
底面に作業スペースを必要とせず、地盤の掘削量を大幅
に削減できる効果がある。また、掘削残土を埋め戻し用
の土として、構築予定の基礎の周辺に盛っておけるの
で、別途購入する埋め戻し用の土を再搬入する必要がな
い。従って、掘削及び埋め戻しに要する工期と経費を削
減し、産業廃棄物として処理される残土を削減できる効
果がある。
Further, since the discarding form plate is locked to the support and the reinforcing steel cage can be held at a predetermined position in the discarding form plate, no working space is required on the bottom of the root cutting, and the amount of excavation of the ground can be greatly reduced. There is an effect that can be reduced. In addition, since the excavated soil can be piled up as a backfill soil around the foundation to be constructed, there is no need to re-import separately purchased backfill soil. Therefore, there is an effect that the construction period and cost required for excavation and backfilling can be reduced, and the remaining soil treated as industrial waste can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の実施例1の支持具で(a)は正面
図、(b)は(a)のA−A線における断面図である。
FIG. 1A is a front view of a support according to a first embodiment of the present invention, and FIG. 1B is a cross-sectional view taken along line AA of FIG.

【図2】(a)乃至(d)は、この発明の構築方法を説
明する概略した縦断面図である。
FIGS. 2A to 2D are schematic longitudinal sectional views illustrating a construction method according to the present invention.

【図3】この発明の実施例1の支持具と型枠板の配置を
表す概略した平面図である。
FIG. 3 is a schematic plan view illustrating an arrangement of a support and a mold plate according to the first embodiment of the present invention.

【図4】この発明の実施例1の支持具と型枠板の係止を
説明する拡大横断面図である。
FIG. 4 is an enlarged cross-sectional view illustrating locking of the support and the formwork plate according to the first embodiment of the present invention.

【図5】(a)はこの発明の実施例3の支持具により構
築された基礎梁用型枠の該略した平面図で、(b)は
(a)のB−B線における断面図である。
FIG. 5A is a schematic plan view of a foundation beam formwork constructed by the support according to the third embodiment of the present invention, and FIG. 5B is a cross-sectional view taken along line BB of FIG. is there.

【図6】この発明の実施例3の支持具(中間用)で
(a)は正面図、(b)は(a)のC−C線における断
面図である。
FIG. 6A is a front view of a support (intermediate) according to a third embodiment of the present invention, and FIG. 6B is a cross-sectional view taken along line CC of FIG.

【図7】他の支持具を表す、図6(a)のC−C線にお
ける断面図である。
FIG. 7 is a cross-sectional view taken along line CC of FIG. 6A, illustrating another support tool.

【図8】同じく実施例3の支持具(柱構築位置用)で
(a)は左側面図、(b)は正面図である。
8 (a) is a left side view and FIG. 8 (b) is a front view of the support tool (for a column construction position) according to the third embodiment.

【図9】同じく係止具を取付けた状態の支持具(柱構築
位置用)の平面図である。
FIG. 9 is a plan view of a support tool (for a column construction position) in a state where a locking tool is attached.

【図10】同じく実施例3の支持具(小梁用)で(a)
は縦断面図、(b)は(a)のD−D線における断面図
である。
FIG. 10 is a view similar to FIG.
Is a longitudinal sectional view, and (b) is a sectional view taken along line DD of (a).

【図11】同じく実施例3の支持具(小梁の中間支持
用)の正面図である。
FIG. 11 is a front view of a support tool (for intermediate support of a small beam) according to the third embodiment.

【図12】(a)乃至(d)は、従来例の基礎梁の構築
方法を説明する概略した縦断面図である。
12 (a) to 12 (d) are schematic longitudinal sectional views for explaining a conventional method of constructing a foundation beam.

【符号の説明】[Explanation of symbols]

1 基材 4 支持柱 8 当接面(支持柱) 10 横架材 11 切欠(基材) 12 支持具 15 支持具 17 掘削凹部 18 底面 29 鉄筋籠 30 基礎梁 31 スラブ 40 掘削凹部(従来例) 41 底面(従来例) 43 地足場(従来例) 44 型枠板(従来例) 45 型枠(従来例) 51 基材 54 支持柱 54a 支持柱 60 横架材 62 支持具 65 支持具 71 支持具 74 支持具 DESCRIPTION OF SYMBOLS 1 Base material 4 Support pillar 8 Contact surface (support pillar) 10 Horizontal material 11 Notch (base material) 12 Support tool 15 Support tool 17 Excavation concave part 18 Bottom surface 29 Reinforcing cage 30 Foundation beam 31 Slab 40 Excavation concave part (conventional example) 41 bottom surface (conventional example) 43 ground scaffold (conventional example) 44 formwork plate (conventional example) 45 formwork (conventional example) 51 base material 54 support column 54a support column 60 horizontal member 62 support member 65 support member 71 support member 74 Support

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 構築予定の基礎梁に応じた底面の根切り
をし、該底面を整地し、前記底面に、梁構築予定位置に
沿って所定間隔毎に、捨て型枠板にかかる土圧を支える
支持具を載置し、該支持具間に、山留め用の矢板となる
基礎梁用の捨て型枠板を立設係止し、該捨て型枠板の外
側に掘削土を埋め戻し、前記捨て型枠板内に、基礎梁用
の鉄筋籠を構築し、該鉄筋籠の上部を支持具に保持し
て、捨て型枠板内にコンクリートを打設して基礎梁を構
築することを特徴とした基礎梁の構築方法。
An earth pressure applied to a discarded form plate at a predetermined interval along a planned beam construction position on the bottom surface at a predetermined interval along a planned beam construction position. A support tool for supporting the pile is placed, and a discarded formwork plate for a foundation beam serving as a sheet pile for retaining is erected and locked between the supports, and excavated soil is backfilled outside the discarded formwork plate. In the discarded form plate, constructing a reinforcing bar for a foundation beam, holding the upper part of the reinforcing bar in a support, and casting concrete in the discarded form plate to construct a foundation beam. Construction method of the foundation beam which was the feature.
【請求項2】 捨て型枠板の外側に掘削土を埋め戻した
後、スラブ構築予定位置の土を整地して、スラブ用の捨
てコンクリートを打設し、続いて、前記捨て型枠板内
に、基礎梁用の鉄筋籠を構築し、該鉄筋籠の上部を支持
具に保持し、捨て型枠内及びスラブ用の捨てコンクリー
トの上面に、基礎梁及び基礎スラブ用のコンクリートを
打設して基礎梁を構築することを特徴とした請求項1記
載の基礎梁の構築方法。
2. After backfilling excavated soil outside the waste form plate, the soil at the slab construction planned position is leveled, and concrete for the slab is poured, and then the waste form material is placed inside the waste form plate. Then, a reinforcing bar for the foundation beam is constructed, the upper part of the reinforcing bar is held by the support, and the concrete for the foundation beam and the foundation slab is poured into the disposal formwork and the upper surface of the disposal concrete for the slab. The method for constructing a foundation beam according to claim 1, wherein the foundation beam is constructed by means of:
【請求項3】 コンクリート製の基礎梁を構築する際
に、鉄筋籠及び型枠を保持する支持具であって、構築予
定の基礎梁の幅方向に対応させて、根切りした凹部の底
面に載置できる基材上に、捨て型枠板の側縁を係止でき
る支持柱を基礎梁の幅に対応させた間隔で並列して立設
し、前記両支持柱の上端部に、支持柱を保持する横架材
を設けたことを特徴とする支持具。
3. A supporting tool for holding a reinforcing cage and a formwork when constructing a concrete foundation beam, the support tool being provided on a bottom surface of a root-cut recess corresponding to a width direction of the foundation beam to be constructed. On the base material that can be placed, support pillars that can lock the side edges of the waste form plate are erected in parallel at intervals corresponding to the width of the foundation beam, and support pillars are provided at the upper ends of the two support pillars. A support member provided with a horizontal member for holding the support.
【請求項4】 基材の両端部は、構築予定の基礎梁の梁
せいの「8分の1」乃至「5分の1」の長さ宛て支持柱
より外側に突出させたことを特徴とする請求項3記載の
支持具。
4. The method according to claim 1, wherein both ends of the base material are projected outward from the support pillars at a length of "1/8" to "1/5" of the beam of the foundation beam to be constructed. 4. A support according to claim 3, wherein
JP24871498A 1997-09-03 1998-09-02 Method for constructing footing beam, and support Pending JPH11140884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24871498A JPH11140884A (en) 1997-09-03 1998-09-02 Method for constructing footing beam, and support

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP23834797 1997-09-03
JP9-238347 1997-09-03
JP24871498A JPH11140884A (en) 1997-09-03 1998-09-02 Method for constructing footing beam, and support

Publications (1)

Publication Number Publication Date
JPH11140884A true JPH11140884A (en) 1999-05-25

Family

ID=26533652

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24871498A Pending JPH11140884A (en) 1997-09-03 1998-09-02 Method for constructing footing beam, and support

Country Status (1)

Country Link
JP (1) JPH11140884A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016536A (en) * 2022-01-05 2022-02-08 中国化学工程第十三建设有限公司 Method for building large-volume concrete bearing platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016536A (en) * 2022-01-05 2022-02-08 中国化学工程第十三建设有限公司 Method for building large-volume concrete bearing platform
CN114016536B (en) * 2022-01-05 2022-03-29 中国化学工程第十三建设有限公司 Method for building large-volume concrete bearing platform

Similar Documents

Publication Publication Date Title
KR100584701B1 (en) A method of construction for temporary retaining wall
JPH06272267A (en) Method for utilizing soil cement post lined wall to built composite underground skeleton
KR100383268B1 (en) method for underground construction of building by using permanent structural member as strut for support retaining wall
JP4037187B2 (en) Underground structure construction method and underground structure
JP3893056B2 (en) Construction method of underground structure
KR200370107Y1 (en) Forms for edge girder construction
KR200383309Y1 (en) Form system for construction of underground slab
JP3166007B2 (en) Underground structure and its construction method
JP2979117B2 (en) Building foundation method
KR200370135Y1 (en) Forms for edge girder construction
JPH11140884A (en) Method for constructing footing beam, and support
JP3057466B2 (en) How to build underground structures
JPH0754364A (en) Construction method of basement floor
JPH03199528A (en) Steel frame foundation of construction
JP2628080B2 (en) Formwork method for forming concrete foundation
JP2794330B2 (en) Method of erection of girder beam for underground structure
JP3245260B2 (en) Foundation structure and construction method
JP3593752B2 (en) Retaining wall structure and built flat land structure or built road structure on steep slopes
JP3776280B2 (en) Mountain fastening method
JPH04293824A (en) Construction method for large span underground structure
JP2620035B2 (en) Construction method and structure of gas station office building
JP3567387B2 (en) How to build an underground skeleton
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
JP2002021081A (en) Earth retaining wall using soil cement and construction method therefor
JP2572680B2 (en) Underground structure by reverse strike method