JPH1111298A - Two-portion parallel boarding device for automatically circulating cableway - Google Patents

Two-portion parallel boarding device for automatically circulating cableway

Info

Publication number
JPH1111298A
JPH1111298A JP17889697A JP17889697A JPH1111298A JP H1111298 A JPH1111298 A JP H1111298A JP 17889697 A JP17889697 A JP 17889697A JP 17889697 A JP17889697 A JP 17889697A JP H1111298 A JPH1111298 A JP H1111298A
Authority
JP
Japan
Prior art keywords
rail
carrier
parallel
passenger
transporter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17889697A
Other languages
Japanese (ja)
Other versions
JP4101326B2 (en
Inventor
Toshimi Shibata
敏美 柴田
Shiyuuji Yamashina
周士 山科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Cable Co Ltd
Original Assignee
Nippon Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Cable Co Ltd filed Critical Nippon Cable Co Ltd
Priority to JP17889697A priority Critical patent/JP4101326B2/en
Publication of JPH1111298A publication Critical patent/JPH1111298A/en
Application granted granted Critical
Publication of JP4101326B2 publication Critical patent/JP4101326B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To board passengers in a vehicle in parallel at specified portions by providing rails in parallel to a main line on each of an arrival side/a departure side of a carrier, further providing a roughly U-shaped rail in the rear of the main line rail and forwarding and transferring the carrier by using a forwarding and transferring device. SOLUTION: Rail 9 is juxtaposed in parallel to a main line rail 4 in the rear of a carrier arrival side 30. At this tip part, a rail switching device 12 guiding an advancing carrier to the rail 9 is provided. On a carrier departure side 31, rail 11 is juxtaposed in parallel to the main line rail 4. At the tip part, a rail switching device 15 guiding the carrier to the rail 4 is provided. In the rear of the main line rail 4, a roughly U-shaped rail 10 is provided. In the connection part of the rails 9, 11, points 13, 14 are provided. Along the rails 9, 11, chain carrier forwarding devices 16, 17 are provided. At a stopping place constituted in this way, passenger standby locations 20, 21, passenger approaching lanes 22, 23 and passenger boarding locations 24, 25 are provided in parallel at two places in the direction substantially perpendicular to a cableway line.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術】本発明は、自動循環式索道、詳し
くはスキーリフト等の自動循環式リフトの停留場におい
て、乗車客を二箇所で並列に誘導、乗車させる装置に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for guiding passengers in parallel at two places at a stop of an automatic circulation type cableway, more specifically, at an automatic circulation type lift such as a ski lift.

【0002】[0002]

【従来の技術】自動循環式索道のうち、代表的な単線自
動循環式スキーリフトは、次のように構成され運行が行
われる。即ち、図6の如く両端の停留場50a,50b
にはそれぞれ滑車3a,3bが枢設され、これらの滑車
3a,3b間には索条1が無端状に巻回されて索道線路
2中に張架されている。それぞれの停留場50a,50
bには、搬器51を誘導するための本線軌条4a,4b
が搬器51の到着側から出発側に向かって、平面視ほぼ
U字状をなして配設されている。
2. Description of the Related Art A typical single-track automatic circulation ski lift of the automatic circulation type cableway is constructed and operated as follows. That is, as shown in FIG.
Are respectively provided with pulleys 3a and 3b, and between these pulleys 3a and 3b, a rope 1 is wound endlessly and stretched in a cableway 2. Each stop 50a, 50
b, main tracks 4a, 4b for guiding the transporter 51
Are generally U-shaped in plan view from the arrival side to the departure side of the transporter 51.

【0003】搬器51は、従来例の場合、握索機に搬器
チェアを懸垂した公知の構成である椅子式の搬器で、索
道線路2中においては握索機で索条1を握索して、該索
条1の移動と共に運行する。搬器51が一方の停留場5
0aに到着すると、握索機は索条1から離されて本線軌
条4aに導かれ転走を開始すると共に減速された後、緩
速で回送移送され乗車客扱いがおこなわれる。この後搬
器51は出発側に方向転向されて、次いで加速された
後、握索機が索条1を握索して、該索条1の移動と共に
索道線路2に出発する。図示においては、搬器が1台の
み例示されているが、実際には複数台ないし多数台の搬
器が用いられ、所定の間隔ごとに次々に運行される。
[0005] In the conventional example, the carriage 51 is a chair-type carriage having a known configuration in which a carriage chair is suspended from a towing machine. In the cableway line 2, the rope 1 is grasped by the towing line with the towing machine. It runs with the movement of the cable 1. Carriage 51 is one stop 5
When it arrives at 0a, the towing machine is separated from the rope 1 and guided by the main line rail 4a to start rolling and decelerated. Then, it is forwarded and transported at a slow speed to be treated as a passenger. After this, the carriage 51 is turned to the departure side and then accelerated, after which the towing machine grasps the rope 1 and moves to the cableway 2 with the movement of the rope 1. Although only one carrier is illustrated in the figure, a plurality or a plurality of carriers are used in practice and are operated one after another at predetermined intervals.

【0004】このような自動循環式索道ないし自動循環
式スキーリフトの停留場50aにおいて、これに乗客を
誘導するために、従来から一般的には、停留場50a後
方から乗客を乗客乗車位置54に誘導し乗車させる、い
わば前後方向誘導方式が用いられている。
In order to guide passengers to the stop 50a of such an automatic circulation type cableway or an automatic circulation ski lift, conventionally, in general, the passenger is moved from the rear of the stop 50a to the passenger boarding position 54. A so-called front-rear direction guiding system for guiding and riding is used.

【0005】前記、図6の場合においては、このような
乗客の前後方向誘導方式の場合を示したものである。即
ち、停留場50aにおいては、搬器51の出発側の延長
線上に索道線路2の方向とほぼ同方向の乗客進入レーン
52を設けて、乗客を矢印53方向に誘導し、乗客乗車
位置54付近で搬器チェアに着席乗車させるようにして
いる。
[0005] The case of FIG. 6 shows a case of such a passenger front-back direction guiding system. That is, at the stop 50a, a passenger approach lane 52 is provided on the extension line of the departure side of the carrier 51 in a direction substantially the same as the direction of the cableway 2, and the passengers are guided in the direction of the arrow 53, and the vicinity of the passenger boarding position 54. They are seated in the transport chair.

【0006】上述した自動循環式スキーリフトは、輸送
能力の大きいことから特に混雑するスキー場、ゲレンデ
で採用されている。このような設備において搬器は、通
常3人掛け、あるいは4人掛けの搬器が採用されてお
り、ヨーロッパにおいては、さらなる輸送力増強のため
に6人掛けの大型搬器も採用されている。
[0006] The automatic circulation type ski lift described above is employed particularly in ski areas and slopes which are particularly crowded due to its large transport capacity. In such a facility, a three- or four-person carrier is usually employed as a carrier, and in Europe, a large-sized six-person carrier is employed to further increase transport capacity.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、このよ
うに搬器が大型化すると、多数の乗客が待機位置から乗
車位置へと一度に移動するため、この移動に要する時間
に余裕をもたせて、乗客が安全に移動できるようにする
ことが必要となる。このために、搬器の出発する間隔は
長く設定され、従って一定時間内に出発する搬器は、小
型の搬器を使用する設備に比して少数となってしまい、
搬器の大型化が即輸送力の増強に効果をもたらすという
わけではない。
However, when the size of the transporter is increased as described above, a large number of passengers move from the standby position to the riding position at one time. It is necessary to be able to move safely. For this reason, the interval between departures of the transporters is set to be long, so that the number of transporters that depart within a certain period of time is smaller than that of equipment using a small transporter,
Increasing the size of the transporter does not necessarily have the effect of increasing transport capacity immediately.

【0008】本発明は、上記の事情の改善のためになさ
れたもので、大型搬器を用いた自動循環式スキーリフト
において、乗客を安全に且つ効率良く乗車させ、輸送能
力を向上させることを課題とする。
SUMMARY OF THE INVENTION The present invention has been made to improve the above situation, and an object of the present invention is to provide an automatic recirculating ski lift using a large-sized transporter, which allows passengers to get on safely and efficiently and to improve transport capacity. And

【0009】[0009]

【課題を解決するための手段】この目的に対応して本発
明は、両端の停留場間を循環する索条(1)を搬器に具
えた握索機で握索させて索道線路(2)中の搬器運行を
行い、前記停留場においては握索機から索条(1)を放
索させて本線軌条(4)に導き搬器を転走させると共に
減速区間(6)、回送区間(7)、及び加速区間(8)
を経て後再び索道線路(2)中に出発させるようにし、
前記回送区間(7)において乗降客扱いを行いこのよう
にして複数の搬器を次々に循環運行するようになした自
動循環式索道の停留場において、搬器到着側(30)に
前記本線軌条(4)と平行して設けられた軌条(9)
と、搬器出発側(31)に前記本線軌条(4)と平行し
て設けられた軌条(11)と、前記本線軌条(4)の後
方に設けられ略U字状をなした軌条(10)とを備え、
前記軌条(9)には前記本線軌条(4)から該軌条
(9)へと搬器を誘導するための軌条切換装置(12)
と、前記軌条(11)には該軌条(11)から前記本線
軌条(4)へと搬器を誘導するための軌条切換装置(1
5)と、前記軌条(10)には該軌条(10)と前記軌
条(9,11)とを接続するためのポイント装置(1
3,14)とを具え、前記軌条(9,10,11)に沿
っては搬器を回送移送するための回送移送装置(16,
17)を備え、前記軌条4の搬器通過経路に乗客乗車位
置25と、前記軌条10の搬器通過経路に乗客乗車位置
24とを設けて、乗車客が二箇所で並列に乗車するよう
になしたことを特徴とする自動循環式索道の二箇所並列
乗車装置として構成したものである。
SUMMARY OF THE INVENTION In response to this object, according to the present invention, a cable (1) circulating between stops at both ends is rigged by a cable rig provided with a carrier and a cableway (2). At the stop, the ropes (1) are unloaded from the cable truss and guided to the main track (4) to roll the transporter, and the deceleration section (6) and the forwarding section (7) , And acceleration section (8)
After that, start again into the cableway (2),
The main track (4) is provided at the arrival side (30) of the transporter at the stop of the automatic retrieving cableway, which handles passengers in the forwarding section (7) and thus circulates a plurality of transporters one after another. Rail provided in parallel with (9)
A rail (11) provided in parallel with the main rail (4) on the carrier departure side (31); and a substantially U-shaped rail (10) provided behind the main rail (4). With
A rail switching device (12) for guiding a carriage from the main rail (4) to the rail (9);
And a rail switching device (1) for guiding the carriage from the rail (11) to the main rail (4).
5) and a point device (1) for connecting the rail (10) and the rail (9, 11) to the rail (10).
3, 14) for transporting a transporter along the rail (9, 10, 11).
17), a passenger boarding position 25 is provided on the carriage passage of the rail 4 and a passenger boarding position 24 is provided on the carriage passage of the rail 10 so that the passengers can ride in two places in parallel. The present invention is configured as a two-point parallel riding device for an automatic circulation type cableway.

【0010】[0010]

【発明の実施の形態】図1は、自動循環式索道、特にス
キーリフトとして用いる自動循環式スキーリフトにおい
て、主として乗車の用に供する停留場に本発明の二箇所
並列乗車装置を適用したものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an automatic circulation type cableway, in particular, an automatic circulation type ski lift used as a ski lift, in which the two-point parallel riding apparatus of the present invention is mainly applied to a stop used for riding. is there.

【0011】索道線路2中に張架された索条1は停留場
内に導かれ、滑車3周縁部に巻掛けられてU字状に折り
返され、再び索道線路2中に誘導される。停留場内に
は、平面視ほぼU字状に本線軌条4が配設され、索道線
路2から停留場に到着した搬器は、該搬器の握索装置に
具えた走行ローラー等が前記本線軌条4に当接して誘導
され転走する。該本線軌条4に沿っては移送装置5が配
設される。該移送装置5は、従来から多用されている摩
擦押送式の構成であって、すなわち、本線軌条4に沿っ
て多数の移送輪を枢設し、この移送輪で搬器の握索機に
具えた押送板等を摩擦移送するようになしている。停留
場に到着した搬器は、索条1を放索した後、前記移送装
置5の減速区間6において減速させられて回送区間7へ
と移送され、回送区間内7において搬器は緩速で回送さ
れて加速区間8へと導かれ、その後、加速区間8で再び
加速されて索条1を握索し索道線路2へと出発する。こ
こまで記述した構成は、従来から多用されている構成で
ある。
The cable 1 stretched in the cableway 2 is guided into the stop, wound around the periphery of the pulley 3, folded back into a U-shape, and guided again into the cableway 2. In the stop, the main track 4 is disposed in a substantially U-shape in a plan view, and the transporter arriving at the stop from the cableway 2 is provided with a traveling roller or the like provided in a gripping device of the transporter on the main track 4. It is guided by contact and rolls. A transfer device 5 is provided along the main rail 4. The transfer device 5 is of a friction-feeding type that has been frequently used, that is, a plurality of transfer wheels are pivotally provided along the main rail 4, and the transfer wheels are mounted on a towing machine of a carrier. A pushing plate and the like are frictionally transferred. After arriving at the stop, after unloading the rope 1, the transporter is decelerated in the deceleration section 6 of the transfer device 5 and transferred to the transport section 7, where the transporter is transported at a slow speed in the transport section 7. After that, the vehicle is guided to the acceleration section 8 and then accelerated again in the acceleration section 8 to grasp the rope 1 and depart to the cableway line 2. The configuration described so far is a configuration that has been frequently used.

【0012】本発明の二箇所並列乗車装置においては、
前述の構成に加えて以下のように構成する。搬器到着側
30の減速区間6の途中から後方には、本線軌条4と並
行して軌条9を並設する。該軌条9の先端部には軌条切
換装置12を具えており、該軌条切換装置12を切換え
ることにより、進行する搬器を軌条9へと誘導すること
ができる。搬器出発側31においては、加速区間8より
後方部分に、本線軌条4と並行して軌条11を並設し、
該軌条11の先端部には軌条切換装置15を具え、該軌
条切換装置15を切換えることにより、軌条11に沿っ
て進行してきた搬器を本線軌条4へと誘導する。
[0012] In the two-point parallel riding device of the present invention,
The following configuration is provided in addition to the configuration described above. A rail 9 is arranged in parallel with the main rail 4 from the middle of the deceleration section 6 to the rear of the carriage arrival side 30. A rail switching device 12 is provided at the tip end of the rail 9, and a traveling carrier can be guided to the rail 9 by switching the rail switching device 12. On the carry-out departure side 31, the rail 11 is arranged side by side in parallel with the main rail 4 in a portion behind the acceleration section 8,
A rail switching device 15 is provided at the tip end of the rail 11, and the carriage that has traveled along the rail 11 is guided to the main line rail 4 by switching the rail switching device 15.

【0013】次に、本線軌条4の後方には平面視略U字
状をなした軌条10を配設し、該軌条10の端部、すな
わち、軌条9、11との接続部には、それぞれポイント
装置13、14を具える。該ポイント装置13、14の
構成は従来から公知の技術、例えば、公開実用新案公報
平2ー84770に開示されている技術であって、本
装置を回動させることによって、軌条9あるいは軌条1
1と、軌条10との接続、切り離しを行うようにしてい
る。
Next, a rail 10 having a substantially U-shape in plan view is disposed behind the main rail 4, and the ends of the rail 10, that is, the connecting portions with the rails 9 and 11, are provided respectively. Pointing devices 13 and 14 are provided. The configuration of the point devices 13 and 14 is a conventionally known technology, for example, a technology disclosed in Japanese Utility Model Publication No. Hei 2-84770. By rotating the device, the rail 9 or the rail 1 is rotated.
1 and the rail 10 are connected and disconnected.

【0014】次に、上述のように構成した軌条9、1
0、11に沿っては、チェーン式の搬器回送装置16、
17を配設する。該搬器回送装置16、17は、従来か
ら多用されているチェン式の回送装置であって、無端状
に循環するチェン40、41に複数の移送カム42、4
2、…を等間隔に枢着延出して、該チェン40、41を
循環駆動することにより、前記移送カム42、42、…
が搬器に当接して搬器の移送を行うものである。
Next, the rails 9, 1 constructed as described above are used.
Along 0 and 11, a chain type transport device 16,
17 is provided. The transporter transporting devices 16 and 17 are chain-type transporting devices that have been frequently used in the related art, and a plurality of transfer cams 42 and 4 are mounted on chains 40 and 41 circulating endlessly.
Are pivotally extended at equal intervals, and the chains 40, 41 are circulated to drive the transfer cams 42, 42,.
Abuts on the transporter to transfer the transporter.

【0015】次に、このように構成した停留場において
は、索道線路に対してほぼ直角方向に二箇所並列になし
た乗客待機位置20、21、乗客進入レーン22、2
3、及び、乗客乗車位置24、25を設ける。
Next, at the stop constructed as described above, the passenger waiting positions 20 and 21 and the passenger approach lanes 22 and 2 are arranged in parallel at two locations in a direction substantially perpendicular to the cableway.
3, and a passenger boarding position 24, 25 is provided.

【0016】以上のように構成した本発明の二箇所並列
乗車装置における運行方法を以下に説明する。図2は搬
器18a、19aが停留場に到着した状態を示すもので
ある。索道線路2から停留場内に到着した搬器18a、
19aは、索条1を放索した後本線軌条4に沿って誘導
され、移送装置5の減速区間6で減速される。先に到着
した搬器18aは、減速が完了する手前の位置で、軌条
切換装置12を切り換えることによって軌条9へと誘導
される。この時、搬器18aは移送装置5から離され
て、以後、搬器回送装置16により軌条9に沿って回送
移送される。搬器18aが軌条9へと誘導された後に、
前記軌条切換装置12は再び切り換えられ、後続の搬器
19aは本線軌条4に沿って減速されて進行し、減速が
完了した後、回送区間7へと進行して緩速で移送され
る。前記搬器回送装置16の搬器移送速度は、前記移送
装置5の回送区間7における搬器移送速度に比して、相
対的に速く移送するように設定されており、従って、両
搬器18a、19aの間隔は進行するに従い徐々に広げ
られる。
An operation method in the two-part parallel riding device of the present invention configured as described above will be described below. FIG. 2 shows a state where the transporters 18a and 19a have arrived at the stop. Cargo 18a arriving at the stop from cableway 2,
19a is guided along the main track 4 after the cable 1 is released, and is decelerated in the deceleration section 6 of the transfer device 5. The transporter 18a that has arrived first is guided to the rail 9 by switching the rail switching device 12 at a position just before the deceleration is completed. At this time, the transporter 18a is separated from the transfer device 5, and is subsequently transported along the rail 9 by the transporter transport device 16. After the transporter 18a is guided to the rail 9,
The rail switching device 12 is switched again, and the subsequent transporter 19a is decelerated and travels along the main rail 4, and after the deceleration is completed, it travels to the transport section 7 and is transported at a slow speed. The transport speed of the transport device 16 is set to be relatively faster than the transport speed of the transport device 7 in the transport section 7 of the transport device 5, and therefore, the distance between the transport devices 18a and 19a is set. Is gradually spread as it progresses.

【0017】次に、図3に示す如く軌条9に沿って進行
する搬器18aは、ポイント装置13を回動し軌条9と
軌条10を接続して、軌条10へと誘導される。前記ポ
イント装置13は、搬器18aが通過した後再び回動
し、本線軌条4に沿って進行してくる搬器19aと干渉
しないようにする。搬器回送装置17の搬器移送速度
は、移送装置5における回送区間7での移送速度とほぼ
同等であって、乗客が乗車するのに安全な緩速に設定さ
れており、搬器回送装置16によって移送されてきた搬
器18aは、搬器回送装置17に受け渡され緩速で移送
される。この時、乗客待機位置20に待機していた乗客
は、乗客進入レーン22を経て乗客乗車位置24へと進
入しており、一方、乗客待機位置21に待機する乗客
は、搬器18aが乗客進入レーン23を交差して通過し
た後に乗客乗車位置25へと移動を開始する。
Next, as shown in FIG. 3, the transporter 18a traveling along the rail 9 rotates the pointing device 13 to connect the rail 9 and the rail 10, and is guided to the rail 10. The point device 13 rotates again after the transporter 18a passes, so that it does not interfere with the transporter 19a traveling along the main rail 4. The transport speed of the transport device 17 is substantially the same as the transport speed of the transport device 5 in the transport section 7 and is set to a slow speed that is safe for passengers to get on. The transported device 18a is delivered to the transporter forwarding device 17 and transported at a slow speed. At this time, the passenger waiting at the passenger standby position 20 has entered the passenger entry position 24 via the passenger entry lane 22, while the passenger waiting at the passenger standby position 21 has the transporter 18 a having the passenger entry lane. After passing through 23, the vehicle starts moving to the passenger boarding position 25.

【0018】次に、図4に示す如く、搬器回送装置17
により緩速で移送されてきた搬器18aは、乗客乗車位
置24で乗客を乗車させ軌条10に沿ってさらに進行す
る。この時、次に乗車するために乗客待機位置20で待
機していた後続の乗客は、乗客乗車位置24への移動を
開始する。一方、次いで、本線軌条4に沿って進行して
きた搬器19aも乗客乗車位置25で乗客を乗車させ
る。又、搬器到着側30には、さらに後続の搬器18b
が到着し、前述した搬器18aと同様に軌条9へと誘導
される。
Next, as shown in FIG.
The transporter 18a transported at a low speed by the passenger travels along the rail 10 at the passenger riding position 24. At this time, the subsequent passenger who has been waiting at the passenger standby position 20 to get on the next vehicle starts moving to the passenger riding position 24. On the other hand, next, the transporter 19a that has traveled along the main rail 4 also allows the passenger to get on at the passenger getting on position 25. In addition, the transporter arrival side 30 further includes a subsequent transporter 18b.
Arrives and is guided to the rail 9 in the same manner as the above-described transporter 18a.

【0019】次に、図5にさらに搬器が進行した状態を
示す。乗客を乗せた搬器19aは、本線軌条4に沿って
出発側31へと移送される。この時、ポイント装置14
は回動して軌条10と軌条11は切り離された状態であ
って、従って、搬器19aは前記ポイント装置14と干
渉することなく通過が可能である。出発側31へと移送
された搬器19aは、移送装置5の加速区間8で加速さ
れて後、索条1を握索して索道線路2へと出発する。前
記ポイント装置14は、搬器19aがこの部分を通過し
た後に回動して、軌条10と軌条11が接続され、該軌
条10を進行してきた搬器18aは軌条11へと誘導さ
れる。この後に、軌条11を進行してきた搬器18a
は、軌条切換装置12を切り換えることにより本線軌条
4へと導かれ、前記搬器19aと同様に加速され索条1
を握索して索道線路2へと出発する。このように、搬器
到着側30に到着した搬器の順番と、搬器出発側での搬
器が出発する順番を入れ換えることにより、搬器18a
と搬器19aとの間隔は、出発する時には再び到着した
時の間隔と同じくなるように整えられる。
Next, FIG. 5 shows a state where the transporter is further advanced. The transporter 19a carrying the passenger is transported along the main rail 4 to the departure side 31. At this time, the point device 14
Is rotated so that the rail 10 and the rail 11 are separated from each other, so that the transporter 19a can pass without interfering with the pointing device 14. After being transported to the departure side 31, the transporter 19 a is accelerated in the acceleration section 8 of the transport device 5, then grabs the cable 1 and departs to the cableway 2. The point device 14 rotates after the transporter 19a passes through this portion, and the rail 10 and the rail 11 are connected. The transporter 18a that has traveled along the rail 10 is guided to the rail 11. After this, the transporter 18a that has advanced the rail 11
Is guided to the main line rail 4 by switching the rail switching device 12, and accelerated in the same manner as the transporter 19a, and the rope 1
And depart to cableway 2. In this way, by changing the order of the transporters arriving at the transport arrival side 30 and the order of departure of the transporters at the transport departure side, the transporter 18a
When the vehicle departs, the distance between it and the transporter 19a is adjusted to be the same as the distance when it arrives again.

【0020】このようにして、停留場に次々に到着する
搬器は、順次、本線軌条4と軌条9、10、11とに交
互に誘導され、2箇所の乗客乗車位置24、25で乗客
を乗車させ、繰り返し運行される。
In this way, the vehicles arriving one after another at the stop are sequentially guided alternately by the main rail 4 and the rails 9, 10 and 11, and the passengers are boarded at the two passenger riding positions 24 and 25. It is operated repeatedly.

【0021】[0021]

【発明の効果】上述したように、本発明の自動循環式索
道の二箇所並列乗車装置においては、大型搬器、例え
ば、6人乗り等の搬器を用いて、3人乗りあるいは4人
乗り搬器を用いた時と同様の搬器間隔で線路中の運行を
行っても、停留場においては乗客の乗車位置を2箇所設
置して、それぞれの乗車位置へと搬器を交互に誘導する
ことにより、乗客は時間的に余裕を持って安全に乗車位
置まで進むことができ、搬器の大型化によるスキーリフ
トの輸送力の増加を効率よく行うことができる。
As described above, in the two-parallel riding system of the automatic circulation cableway according to the present invention, a three-seater or four-seater carrier is mounted by using a large carrier, for example, a six-seater carrier. Even when operating on the track at the same carrier spacing as when used, the passengers can be installed at two places at the stop and alternately guided to the respective boarding positions, It is possible to travel to the boarding position safely with sufficient time, and the transport capacity of the ski lift can be efficiently increased by increasing the size of the transporter.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の二箇所並列乗車装置を示す平面図。FIG. 1 is a plan view showing a two-part parallel riding device of the present invention.

【図2】 搬器が停留場に到着した状態を示す平面図。FIG. 2 is a plan view showing a state where the transporter has arrived at a stop.

【図3】 搬器の進行状態を示す平面図。FIG. 3 is a plan view showing a traveling state of the transporter.

【図4】 搬器の進行状態を示す平面図。FIG. 4 is a plan view showing a traveling state of the transporter.

【図5】 搬器の進行状態を示す平面図。FIG. 5 is a plan view showing a traveling state of the transporter.

【図6】 従来の自動循環式索道設備における全体配設
関係を示す平面図。
FIG. 6 is a plan view showing the overall arrangement relationship in a conventional automatic circulation type cableway facility.

【符号の説明】[Explanation of symbols]

1 索条 2 索道線路 3、3a、3b 滑車 4、4a、4b 本線軌条 5 移送装置 6 減速区間 7 回送区間 8 加速区間 9,10,11 軌条 12,15 軌条切換装置 13,14 ポイント装置 16,17 搬器回送装置 18a,18b,19a,19b,51 搬器 20,21 乗客待機位置 22、23、52 乗客進入レーン 24、25、54 乗客乗車位置 30 搬器到着側 31 搬器出発側 40、41 チェン 42 移送カム 50a,50b 停留場 53 矢印 DESCRIPTION OF SYMBOLS 1 Cable 2 Cableway 3, 3a, 3b Pulley 4, 4a, 4b Main track 5 Transfer device 6 Deceleration section 7 Forwarding section 8 Acceleration section 9,10,11 Rail 12,15 Rail switching device 13,14 Point device 16, 17 Carrier forwarding device 18a, 18b, 19a, 19b, 51 Carrier 20, 21 Passenger waiting position 22, 23, 52 Passenger approach lane 24, 25, 54 Passenger boarding position 30 Carrier arrival side 31 Carrier departure side 40, 41 Chain 42 Transfer Cam 50a, 50b stop 53 arrow

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】両端の停留場間を循環する索条(1)を搬
器に具えた握索機で握索させて索道線路(2)中の搬器
運行を行い、前記停留場においては握索機から索条
(1)を放索させて本線軌条(4)に導き搬器を転走さ
せると共に減速区間(6)、回送区間(7)、及び加速
区間(8)を経て後再び索道線路(2)中に出発させる
ようにし、前記回送区間(7)において乗降客扱いを行
いこのようにして複数の搬器を次々に循環運行するよう
になした自動循環式索道の停留場において、搬器到着側
(30)に前記本線軌条(4)と平行して設けられた軌
条(9)と、搬器出発側(31)に前記本線軌条(4)
と平行して設けられた軌条(11)と、前記本線軌条
(4)の後方に設けられ略U字状をなした軌条(10)
とを備え、前記軌条(9)には前記本線軌条(4)から
該軌条(9)へと搬器を誘導するための軌条切換装置
(12)と、前記軌条(11)には該軌条(11)から
前記本線軌条(4)へと搬器を誘導するための軌条切換
装置(15)と、前記軌条(10)には該軌条(10)
と前記軌条(9,11)とを接続するためのポイント装
置(13,14)とを具え、前記軌条(9,10,1
1)に沿っては搬器を回送移送するための回送移送装置
(16,17)を備え、前記軌条4の搬器通過経路に乗
客乗車位置25と、前記軌条10の搬器通過経路に乗客
乗車位置24とを設けて、乗車客が二箇所で並列に乗車
するようになしたことを特徴とする自動循環式索道の二
箇所並列乗車装置。
1. A rope circulating between stops at both ends is gripped by a towing machine equipped with a carriage, and a carriage is operated on a cableway line. The cable (1) is unloaded from the machine, guided to the main track (4), and the carriage is rolled. After passing through the deceleration section (6), the forwarding section (7), and the acceleration section (8), the cableway ( 2) In the automatic circulation type cableway stop where passengers are handled in the forwarding section (7) and a plurality of carriages are circulated one after another in this way, the carriage arrival side ( 30) a rail (9) provided in parallel with the main rail (4), and a carriage starting side (31) on the main rail (4).
A rail (11) provided in parallel with the main rail (4), and a rail (10) provided substantially in a U-shape provided behind the main rail (4).
A rail switching device (12) for guiding a carriage from the main rail (4) to the rail (9); the rail (11) includes the rail (11); ) And a rail switching device (15) for guiding the carriage to the main rail (4), and the rail (10) includes the rail (10).
A point device (13, 14) for connecting the rail (9, 11) to the rail (9, 10, 1).
Along with 1), a transporting device (16, 17) for transporting a transporter is provided, and a passenger boarding position 25 is provided in the transporting route of the rail 4 and a passenger riding location 24 is provided in the transporting route of the rail 10. And a passenger is boarded at two places in parallel.
JP17889697A 1997-06-19 1997-06-19 Two-way parallel ride system for automatic circulation cableway Expired - Lifetime JP4101326B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17889697A JP4101326B2 (en) 1997-06-19 1997-06-19 Two-way parallel ride system for automatic circulation cableway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17889697A JP4101326B2 (en) 1997-06-19 1997-06-19 Two-way parallel ride system for automatic circulation cableway

Publications (2)

Publication Number Publication Date
JPH1111298A true JPH1111298A (en) 1999-01-19
JP4101326B2 JP4101326B2 (en) 2008-06-18

Family

ID=16056592

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17889697A Expired - Lifetime JP4101326B2 (en) 1997-06-19 1997-06-19 Two-way parallel ride system for automatic circulation cableway

Country Status (1)

Country Link
JP (1) JP4101326B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6912260B2 (en) 2001-01-03 2005-06-28 Vtech Communications, Ltd. System clock synchronization using phase-locked loop
US7027424B1 (en) 2000-05-24 2006-04-11 Vtech Communications, Ltd. Method for avoiding interference in a digital communication system
JP2007055408A (en) * 2005-08-24 2007-03-08 Nippon Cable Co Ltd Operation method for carriage of automatic circulation type cableway
JP2007055288A (en) * 2005-08-22 2007-03-08 Nippon Cable Co Ltd Temporarily stopping operation method for carriage on automatic circulation type cableway
JP2008132978A (en) * 2006-11-27 2008-06-12 Innova Patent Gmbh Aerial cableway installation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7027424B1 (en) 2000-05-24 2006-04-11 Vtech Communications, Ltd. Method for avoiding interference in a digital communication system
US6912260B2 (en) 2001-01-03 2005-06-28 Vtech Communications, Ltd. System clock synchronization using phase-locked loop
JP2007055288A (en) * 2005-08-22 2007-03-08 Nippon Cable Co Ltd Temporarily stopping operation method for carriage on automatic circulation type cableway
JP2007055408A (en) * 2005-08-24 2007-03-08 Nippon Cable Co Ltd Operation method for carriage of automatic circulation type cableway
JP2008132978A (en) * 2006-11-27 2008-06-12 Innova Patent Gmbh Aerial cableway installation

Also Published As

Publication number Publication date
JP4101326B2 (en) 2008-06-18

Similar Documents

Publication Publication Date Title
JPS61291264A (en) Ropeway conveyor
JPH1111298A (en) Two-portion parallel boarding device for automatically circulating cableway
JPS63162365A (en) Cable
JP3157264B2 (en) Pause operation method of the carriage in automatic circulation type cableway
JP3157263B2 (en) Pause operation method of automatic circulation type cableway carrier
JPH01109162A (en) Track device for car of conveyor, particularly, circulation type cable
JP2593675B2 (en) Intermediate transport device of cableway handholding machine
JPH018447Y2 (en)
JP2696409B2 (en) Switching operation method of different types of transport equipment in automatic circulation type cableway
JPH0110297Y2 (en)
JP3392891B2 (en) How to maintain the interval between the carriages of the automatic cableway
JP4097733B2 (en) Passenger car carrier for double single-line automatic circulation cableway
JP2645856B2 (en) Automatic recirculating cableway forwarding device
JP2007055288A (en) Temporarily stopping operation method for carriage on automatic circulation type cableway
JPH10138915A (en) Stop structure of duplex single track automatic circulating type cableway
JP2010221822A (en) Number of operating carriers adjusting system for auto circulation type cableway
JPH106977A (en) Man and/or cargo carrier
JP4994981B2 (en) Method of temporary suspension operation of a carrier in an automatic circulation type cableway
JP4949978B2 (en) Suspension operation method of automatic circulating cableway
JPH04331655A (en) Transfer chain of carrier for cableway
JP2550511Y2 (en) Cableway passenger guidance and indication device
JP6791497B2 (en) Intermediate stop of automatic circulation cableway
JPS60113761A (en) Regular interval operation method and device for automatic circulation type cable
JP4023636B2 (en) Cableway gate equipment
JP2007055408A (en) Operation method for carriage of automatic circulation type cableway

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040603

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20040603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070312

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070327

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070925

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071115

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080319

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

EXPY Cancellation because of completion of term