JPH11100184A - Elevator installation method - Google Patents
Elevator installation methodInfo
- Publication number
- JPH11100184A JPH11100184A JP26643297A JP26643297A JPH11100184A JP H11100184 A JPH11100184 A JP H11100184A JP 26643297 A JP26643297 A JP 26643297A JP 26643297 A JP26643297 A JP 26643297A JP H11100184 A JPH11100184 A JP H11100184A
- Authority
- JP
- Japan
- Prior art keywords
- hoistway
- guide rails
- car
- hanging
- lifted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、エレベータの据付
工法に係わり、特に、高行程のエレベータの据付を効率
よく行うのに好適なエレベータの据付工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator installation method, and more particularly to an elevator installation method suitable for efficiently installing a high-stroke elevator.
【0002】[0002]
【従来の技術】既に提案されているこの種のエレベータ
の据付工法としては、例えば特開昭58−82976号
公報がある。この従来技術では、エレベータの据付のは
じめに乗かご用および吊合い錘用の最下部ガイドレール
を設置し、その最下部ガイドレール部に本設の乗かご枠
および吊合い錘を組込み、昇降路上部の機械室と前記乗
かご枠の上部とで、乗かご用および吊合い錘用の最上部
ガイドレール、中間部ガイドレールを電動ウインチによ
って順に吊り上げながら連結していき全行程のガイドレ
ールを一本化し、この一本化されたガイドレールの上端
部を機械室床に固定し、かつ下端部をはじめに設置して
ある最下部ガイドレールの上端部に固定し、前記ガイド
レールを案内としてかご枠を本設の巻上機によって上下
動してガイドレールブラケットの取付、ガイドレールの
芯出しを行い、次いで乗り場部品の取付、昇降路内器具
の取付および配管・配結線を行うことによってエレベー
タの据付を行うものである。2. Description of the Related Art Japanese Patent Laid-Open No. 58-82976 discloses an elevator installation method of this kind which has already been proposed. In this prior art, a lowermost guide rail for a car and a hanging weight is installed at the beginning of the elevator installation, and a permanently installed car frame and a hanging weight are incorporated in the lowermost guide rail portion, and the upper part of the hoistway is installed. In the machine room and the upper part of the car frame, the uppermost guide rail and the middle guide rail for the car and the hanging weight are connected while being sequentially lifted by the electric winch, so that one guide rail for the entire travel is provided. The upper end of this unified guide rail is fixed to the machine room floor, and the lower end is fixed to the upper end of the lowest guide rail installed first, and the car frame is guided using the guide rail as a guide. The hoisting machine moves up and down to mount the guide rail brackets and center the guide rails, then install the landing parts, mount the equipment in the hoistway, and perform piping and wiring. And performs installation of an elevator by.
【0003】なお、例えば特開平1−127585号公
報に記載されているように、昇降路の下部に仮設の電動
ウインチを設置し、この電動ウインチによって乗かご枠
を上下動させながら、別の電動ウインチによって吊り上
げたガイドレールを順次連結、昇降路に固定するように
したものも提案されている。As described in, for example, Japanese Patent Application Laid-Open No. 1-127585, a temporary electric winch is installed at the lower part of a hoistway, and another electric winch is moved while moving a car frame up and down by the electric winch. There has also been proposed one in which guide rails suspended by a winch are sequentially connected and fixed to a hoistway.
【0004】[0004]
【発明が解決しようとする課題】ところで、上述した従
来のエレベータの据付工法では、全行程のガイドレール
を一本化しこのガイドレールの上端部を機械室床に固定
する必要があるため、高階床および高行程のエレベータ
においては吊り上げ用の電動ウインチの容量を大きくす
る必要があり、据付現場内での運搬が大変になったり、
高価なものになるといった問題があった。By the way, in the above-mentioned conventional elevator installation method, it is necessary to unify the guide rails for all the steps and fix the upper end of the guide rails to the machine room floor. And for elevators with high stroke, it is necessary to increase the capacity of the electric winch for lifting, which makes transportation on the installation site difficult,
There was a problem that it became expensive.
【0005】後者の場合、いずれの電動ウインチの容量
も小さくできるが、電動ウインチが2台必要となること
や、またこの電動ウインチを昇降路の下部に搬入、設置
する作業や、取り外し・解体する作業などわずらわしい
作業が発生するという問題があった。In the latter case, the capacity of any of the electric winches can be reduced. However, two electric winches are required, and the work of loading and installing the electric winches in the lower part of the hoistway, and removing and dismantling the electric winches. There is a problem that troublesome work such as work occurs.
【0006】本発明はこのような従来技術における実情
に鑑みてなされたもので、その第1の目的は、大型のウ
インチを使用することなく昇降路の全行程におけるガイ
ドレールを連結・固定し効率良く高階床・高行程のエレ
ベータ据付を行うことのできるエレベータの据付工法を
提供するにある。The present invention has been made in view of such a situation in the prior art, and a first object of the present invention is to connect and fix guide rails in the entire travel of a hoistway without using a large winch to improve efficiency. An object of the present invention is to provide an elevator installation method capable of well performing an elevator installation on a high floor and a high stroke.
【0007】また、その第2の目的は、電動ウインチな
どの仮設品を極力少なくし、仮設材の設置・取り外しと
いったわずらわしい作業をなくすことのできるエレベー
タの据付工法を提供することにある。A second object of the present invention is to provide an elevator installation method capable of minimizing the number of temporary parts such as electric winches and eliminating troublesome operations such as installation and removal of temporary members.
【0008】[0008]
【課題を解決するための手段】上記第1の目的を達成す
るため、本発明の請求項1に係る発明は、昇降路内を昇
降する昇降体の昇降を案内するガイドレールの据付けを
行うエレベータの据付工法において、仮設の揚重機を、
その揚重ロープが前記昇降路頂部から垂下するように設
置し、この仮設の揚重機にて揚重可能な複数のガイドレ
ールを連結した状態で、これらのガイドレールの下端部
から上端部までの長さの倍数に相当する昇降路底部から
の高さ位置に作業足場を設置した後、前記仮設の揚重機
の揚重ロープ端に前記複数のガイドレールを連結してこ
れらのガイドレールを吊上げ、前記昇降路底部にて前記
複数のガイドレールの下端部を、そして前記作業足場か
ら前記複数のガイドレールの上端部を前記昇降路壁に固
定した後、さらに複数のガイドレールを連結して吊上
げ、その下端部を前記複数のガイドレールの上端部に前
記作業足場にて連結することにより順次上方に向けてガ
イドレールの連結を行い、その後、最上部のガイドレー
ル頂部を、昇降路頂部の機械室からこの機械室近傍の部
材に固定することにより前記昇降体の全昇降行程でガイ
ドレールの連結を行う構成にしてある。In order to achieve the first object, an invention according to a first aspect of the present invention is an elevator for installing a guide rail for guiding the elevating body that moves up and down in a hoistway. In the installation method, the temporary lifting machine
The lifting rope is installed so as to hang from the top of the hoistway, and a plurality of guide rails that can be lifted by this temporary lifting machine are connected to each other, from the lower end to the upper end of these guide rails. After installing a work scaffold at a height from the hoistway bottom corresponding to a multiple of the length, connecting the plurality of guide rails to the lifting rope end of the temporary lifting machine and lifting these guide rails, The lower end of the plurality of guide rails at the bottom of the hoistway, and after fixing the upper end of the plurality of guide rails to the hoistway wall from the work platform, further linking and lifting a plurality of guide rails, By connecting the lower ends of the guide rails to the upper ends of the plurality of guide rails at the work platform, the guide rails are sequentially connected upward, and then the top of the uppermost guide rail is connected to the top of the hoistway. By the machine room is fixed to the member of the machine room near are the configuration for connecting the guide rails at all lifting stroke of the lifting body.
【0009】上記のように構成した本発明の請求項1に
係る発明では、電動ウインチの容量に応じた本数のガイ
ドレールを吊り上げ、これらのガイドレールの下端部か
ら上端部までの長さの倍数に相当する昇降路底部からの
高さ位置に作業足場を予め設置しておくことによって、
大型のウインチを使用することなく昇降路の全行程にお
けるガイドレールを連結・固定し効率良く高階床・高行
程のエレベータ据付を行うことができる。In the invention according to the first aspect of the present invention, a number of guide rails corresponding to the capacity of the electric winch are lifted, and a multiple of the length from the lower end to the upper end of these guide rails. By pre-installing the work scaffold at a height position from the hoistway bottom corresponding to
The guide rails can be connected and fixed on all the steps of the hoistway without using a large winch, and the elevator can be efficiently installed on the high floor and high stroke.
【0010】また、上記第1、第2の目的を達成するた
め、本発明の請求項2に係る発明は、昇降体である本設
の乗かご枠と吊合い錘とをメインロープにて釣瓶式に連
結し、このメインロープを機械室に設置した本設用の巻
上機により駆動し、前記昇降体をガイドレールに案内さ
せて昇降路内で昇降させ、前記乗かご枠を足場として前
記昇降路内に設置される機器の据付け作業を行うエレベ
ータの据付工法において、仮設の揚重機を、その揚重ロ
ープが前記昇降路頂部から垂下するように設置し、この
仮設の揚重機にて揚重可能な複数のガイドレールを連結
した状態で、これらのガイドレールの下端部から上端部
までの長さの倍数に相当する昇降路底部からの高さ位置
に作業足場を設置した後、吊合い錘用および乗かご用の
最下部ガイドレールを立設して昇降路底部にて昇降路壁
に固定し、これらの最下部ガイドレールに吊合い錘およ
び乗かご枠を組込み、前記仮設の揚重機の揚重ロープ端
に前記複数本数に相当する吊合い錘用ガイドレールを連
結して吊上げ、前記乗かご枠からこれら複数の吊合い錘
用ガイドレールの下端部と前記最下部の吊合い錘用ガイ
ドレールの上端部を連結し、前記作業足場から前記複数
の吊合い錘用ガイドレールの上端部を前記昇降路壁に固
定した後、さらに別の複数の吊合い錘用ガイドレールを
連結して吊上げ、その下端部を前記複数の吊合い錘用ガ
イドレールの上端部に前記作業足場にて連結することに
より順次上方に向けて吊合い錘用ガイドレールの連結を
行い、最上部の吊合い錘用ガイドレール頂部を、昇降路
頂部の機械室からこの機械室近傍の部材に固定すること
により前記吊合い錘の全昇降行程で吊合い錘用ガイドレ
ールの連結を行った後、前記吊合い錘を昇降路頂部近傍
まで吊上げ、この吊上げた吊合い錘と前記乗かご枠とを
前記メインロープにより前記本設用の巻上機を介して連
結し、この巻上機を駆動することにより前記乗かご枠を
昇降させ、この乗かご枠を足場として前記昇降路内に設
置される機器の据付け作業を行う構成にしてある。In order to achieve the first and second objects, the invention according to a second aspect of the present invention is directed to a fishing bottle including a main car frame and a hanging weight, which is a lifting / lowering body, connected to a main rope. The main rope is driven by a permanent hoist installed in a machine room, the elevating body is guided by a guide rail, and is moved up and down in a hoistway, and the car frame is used as a scaffold. In an elevator installation method for installing equipment installed in a hoistway, a temporary lifting machine is installed such that its lifting rope hangs down from the top of the hoistway, and the temporary lifting machine is used for lifting. After connecting a plurality of loadable guide rails and installing a work platform at a height from the hoistway bottom corresponding to a multiple of the length from the lower end to the upper end of these guide rails, Lower guide rails for weights and cars Erected and fixed to the hoistway wall at the bottom of the hoistway, incorporating a hanging weight and a car frame into these lowermost guide rails, corresponding to the plurality of pieces at the end of the lifting rope of the temporary hoisting machine Connecting the guide rails for the suspended weights to be lifted, and connecting the lower end portions of the plurality of suspended weight guide rails and the upper end portions of the lowermost suspended weight guide rails from the car frame, After fixing the upper end portions of the plurality of hanging weight guide rails to the hoistway wall from a scaffold, further connecting and lifting another plurality of hanging weight guide rails, and lowering the lower end portions of the plurality of hanging weight guide rails. By connecting to the upper end of the weight guide rail on the work scaffold, the suspension weight guide rail is sequentially connected upward and the top of the top suspension weight guide rail is connected to the machine at the top of the hoistway. From the machine room After connecting the guide rails for the suspended weight in the entire lifting and lowering process of the suspended weight by fixing the suspended weight to the vicinity of the top of the hoistway, the suspended suspended weight and the car are lifted. The main rope is connected to the frame via the main hoist, and the hoist is driven to raise and lower the car frame, and the car frame is used as a scaffold in the hoistway. It is configured to perform the installation work of the equipment to be installed.
【0011】また、上記第1、第2の目的を達成するた
め、本発明の請求項3に係る発明は、請求項2に係る発
明において、仮設の揚重機を、その揚重ロープが前記昇
降路頂部から垂下するように設置し、この仮設の揚重機
にて揚重可能な複数のガイドレールを連結した状態で、
これらのガイドレールの下端部から上端部までの長さの
倍数に相当する昇降路底部からの高さ位置に作業足場を
設置した後、吊合い錘用および乗かご用の最下部ガイド
レールを立設して昇降路底部にて昇降路壁に固定し、こ
れらの最下部ガイドレールに吊合い錘および乗かご枠を
組込み、前記仮設の揚重機の揚重ロープ端に前記複数本
数に相当する吊合い錘用及び乗かご用ガイドレールを連
結して吊上げ、前記乗かご枠からこれら複数の吊合い錘
用および乗かご用ガイドレールの下端部と前記最下部の
吊合い錘用および乗かご用ガイドレールの上端部を連結
し、前記作業足場から前記複数の吊合い錘用および乗か
ご用ガイドレールの上端部を前記昇降路壁に固定した
後、さらに別の複数の吊合い錘用および乗かご用ガイド
レールを連結して吊上げ、その下端部を前記複数の吊合
い錘用および前記乗かご用ガイドレールの上端部に前記
作業足場にて連結することにより順次上方に向けて吊合
い錘用および前記乗かご用ガイドレールの連結を行い、
最上部の吊合い錘用および前記乗かご用ガイドレール頂
部を、昇降路頂部の機械室からこの機械室近傍の部材に
固定することにより前記吊合い錘の全昇降行程で吊合い
錘用および前記乗かご用ガイドレールの連結を行った
後、前記吊合い錘を昇降路頂部近傍まで吊上げ、この吊
上げた吊合い錘と前記乗かご枠とを前記メインロープに
より前記本設用の巻上機を介して連結し、この巻上機を
駆動することにより前記乗かご枠を昇降させ、この乗か
ご枠を足場として前記昇降路内に設置される機器の据付
け作業を行う構成にしてある。In order to achieve the first and second objects, the invention according to a third aspect of the present invention is directed to the invention according to the second aspect, wherein the temporary lifting machine is provided with the lifting rope and the lifting rope. In a state where it is installed so as to hang down from the road top and a plurality of guide rails that can be lifted by this temporary lifting machine are connected,
After installing a work platform at a height from the bottom of the hoistway that is a multiple of the length from the lower end to the upper end of these guide rails, set up the bottom guide rails for the hanging weight and the car. And fixed to the hoistway wall at the bottom of the hoistway, and a hanging weight and a car frame are incorporated in these lowermost guide rails. The guide rails for the counterweight and the car are connected and lifted, and the lower end portions of the plurality of guide rails for the weights and the car and the lowermost guides for the weights and the cage are lifted from the car frame. After connecting the upper ends of the rails and fixing the upper ends of the guide rails for the plurality of suspension weights and the car to the hoistway wall from the work platform, further another plurality of suspension weights and the car For connection and suspension Connecting the lower ends thereof to the upper ends of the plurality of hanging weights and the car guide rails at the working scaffold so that the hanging weights and the car guide rails are sequentially turned upward. Consolidate,
The uppermost suspended weight and the top of the car guide rail are fixed from the machine room at the top of the hoistway to a member near this machine room, so that the suspended weight and the car After connecting the car guide rails, the hanging weight is lifted up to near the top of the hoistway, and the lifted weight and the car frame are lifted by the main rope using the main hoist. The elevator car is driven up and down by driving the hoist, and the equipment installed in the hoistway is installed using the car frame as a foothold.
【0012】また、上記第1、第2の目的を達成するた
め、本発明の請求項4に係る発明は、請求項1、2、3
に係る発明において、作業足場はメインロープ、吊合い
錘、吊合い錘用ガイドレール、乗かご用ガイドレール、
乗り場部品据付用基準線および乗かご用ガイドレール据
付用基準線が貫通できる切り欠き部を有する構成にして
ある。Further, in order to achieve the first and second objects, the invention according to claim 4 of the present invention is directed to claims 1, 2, 3
In the invention according to the invention, the work scaffold is a main rope, a hanging weight, a guide rail for a hanging weight, a guide rail for a car,
It has a cut-out portion through which a landing part installation reference line and a car guide rail installation reference line can penetrate.
【0013】上記のように構成した本発明では、吊合い
錘用ガイドレールを全行程に渡って連結・固定すること
によって本設の巻上機によって乗かごを上下動させるこ
とができ、電動ウインチなどの仮設品を極力少なくで
き、仮設材の設置・取り外しといったわずらわしい作業
をなくすことができる。In the present invention constructed as described above, the car can be moved up and down by the hoisting machine by connecting and fixing the guide rails for the hanging weights over the entire stroke, and the electric winch is provided. And the like, temporary products can be reduced as much as possible, and troublesome work such as installation and removal of temporary materials can be eliminated.
【0014】[0014]
【発明の実施の形態】以下、本発明のエレベータの据付
工法の実施の形態を図に基づいて説明する。図1ないし
図2は本発明に係るエレベータの据付工法の一実施形態
を示す図で、図1は上部作業足場及び中間作業足場を備
えた昇降路の側面図、図2は中間作業足場の上面図であ
る。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of an elevator installation method according to the present invention will be described below with reference to the drawings. 1 and 2 are views showing an embodiment of an elevator installation method according to the present invention. FIG. 1 is a side view of a hoistway having an upper working platform and an intermediate working platform, and FIG. 2 is a top view of the intermediate working platform. FIG.
【0015】図中、1は昇降路、2は機械室、3は最上
階床面に設置されたエレベータ部品揚重用の電動ウイン
チ、4、5および6は揚重ロープ7を昇降路1の頂部か
ら垂下させるための滑車、8は昇降路1の壁面にブラケ
ット9a、9bにて固定されている最下部の乗かご用ガ
イドレール、10は昇降路1の壁面にブラケット11
a、11bにて固定されている最下部の吊合い錘用ガイ
ドレール、12はブラケット9a、9b、11aおよび
11bを取り付けるための下部仮設足場、13、14は
電動ウインチ3で揚重可能な複数本の連結されたガイド
レール8a、10aの上端部から下端部までの長さの倍
数に相当する、最下部ガイドレール8、10の上端部か
らの高さ位置の建屋床面に設置した中間作業足場および
上部作業足場、15、16は中間および上部作業足場1
3、14上に複数段組み立てた中間および上部仮設足
場、17は図示しない乗り場部品や昇降路全行程にわた
る乗かご用ガイドレール20を据え付ける際に基準とな
る図示しない基準線を昇降路頂部から垂下させるための
上部テンプレート、18は前記図示しない基準線の下端
部を固定する下部テンプレート、19a、19bは吊り
上げた複数本の連結されたガイドレール8a、10aを
仮固定するための固定具、21は乗かご枠、22は吊合
い錘、23は機械室2内に設置されメインロープ24を
介して乗かご枠21および吊合い錘22を駆動する本設
用の巻上機である。In the figure, 1 is a hoistway, 2 is a machine room, 3 is an electric winch for lifting elevator parts installed on the top floor, and 4, 5 and 6 are lifting ropes 7 at the top of the hoistway 1. A pulley 8 for hanging from a hoistway, 8 is a guide rail for a lowermost car which is fixed to a wall of the hoistway 1 with brackets 9a and 9b, and 10 is a bracket 11 on a wall of the hoistway 1.
The lowermost guide rails for hanging weights fixed at a and 11b, 12 are lower temporary scaffolds for mounting brackets 9a, 9b, 11a and 11b, and 13 and 14 are a plurality of liftable by electric winch 3. Intermediate work installed on the floor of the building at a height from the upper end of the lowermost guide rails 8, 10 corresponding to a multiple of the length from the upper end to the lower end of the connected guide rails 8a, 10a of the book Scaffolding and upper working scaffold, 15 and 16 middle and upper working scaffold 1
Intermediate and upper temporary scaffolds, which are assembled in a plurality of stages on 3 and 14, a hanging line (not shown) from the top of the hoistway is a reference line (not shown) which is used as a reference when installing the guide rails 20 for the car parts (not shown) and the hoistway throughout the entire travel. An upper template 18 for fixing the lower end of the reference line (not shown), 19a and 19b fixing tools for temporarily fixing a plurality of linked guide rails 8a and 10a, 21 A car frame, 22 is a hanging weight, and 23 is a main hoist installed in the machine room 2 for driving the car frame 21 and the hanging weight 22 via a main rope 24.
【0016】なお、前記中間作業足場13および上部作
業足場14は同様の形状であり、図2に示すように、乗
り場部品据付用基準線を通す第1の穴部31、32、乗
かご用ガイドレールおよび乗かご用ガイドレール据付用
基準線を通す第2の穴部33、34、乗かご枠21及び
吊合い錘22を連結するメインロープ24を通す第3の
穴部35、吊合い錘22および吊合い錘用ガイドレール
を通す第4の穴部36を有している。The intermediate work scaffold 13 and the upper work scaffold 14 have the same shape, and as shown in FIG. 2, the first hole portions 31 and 32 through which the landing part installation reference line passes, and the car guide. The second holes 33 and 34 for passing the rail and the guide line for the guide rails for the car, the third hole 35 for passing the main rope 24 connecting the car frame 21 and the hanging weight 22, and the hanging weight 22 And a fourth hole 36 through which the guide rail for hanging weight passes.
【0017】この実施形態の据付工法にあっては、次の
ような手順でエレベータ部品を据付けるようになってい
る。In the installation method of this embodiment, the elevator parts are installed in the following procedure.
【0018】まず、図1において、最上階の床面から上
部作業足場14を設置する。この上部作業足場14は例
えば建屋の床のコンクリートの受け部材であるデッキプ
レートを流用すればよく、予め建築側に昇降路部分を切
り落さないように要求しておけばよい。この場合は現地
で作業者が図2に示すそれぞれの穴部31ないし36を
加工する。また、専用のものを設置する際には、昇降路
1内の各階の床位置にある建屋強度部材上に設置する。First, in FIG. 1, an upper work platform 14 is installed from the floor of the top floor. The upper work scaffold 14 may use, for example, a deck plate which is a concrete receiving member of the floor of the building, and may request the building side not to cut off the hoistway in advance. In this case, the worker processes the holes 31 to 36 shown in FIG. 2 locally. In addition, when installing a dedicated one, it is installed on a building strength member at a floor position of each floor in the hoistway 1.
【0019】次いで最上階の床に電動ウインチ3を設置
し、併せて滑車4、5、6をそれぞれ取付け、揚重ロー
プ7を昇降路1の頂部から垂下させる。この後、上部作
業足場上に上部仮設足場16を昇降路1の頂部に届くよ
う設置し、昇降路1の頂部に上部テンプレート17を設
置する。Next, the electric winch 3 is installed on the floor of the top floor, pulleys 4, 5, and 6 are respectively attached thereto, and the lifting rope 7 is hung from the top of the hoistway 1. Thereafter, the upper temporary scaffold 16 is set on the upper working scaffold so as to reach the top of the hoistway 1, and the upper template 17 is set on the top of the hoistway 1.
【0020】次いで中間階に中間作業足場13を設置す
るが、この設置位置は電動ウインチ3が揚重可能な複数
本連結されているガイドレール8aの上端部から下端部
までの長さに相当する高さ位置であり、昇降路1の高さ
に応じて複数個設置し、この上に中間仮設足場15をガ
イドレール8aの上端部を仮固定するのに必要な高さ分
設置する。Next, an intermediate work platform 13 is installed on the intermediate floor. This installation position corresponds to the length from the upper end to the lower end of the guide rail 8a to which the electric winch 3 can be lifted. A plurality of intermediate temporary scaffolds 15 are installed on this at a height necessary for temporarily fixing the upper end of the guide rail 8a.
【0021】次いで昇降路1の底部にて図示しない乗か
ごおよび吊合い錘用緩衝器、下部テンプレート18を設
置し、図示しない基準線を上部テンプレート17から垂
下し下部テンプレート18にて固定する。更に、下部仮
設足場12を組み立て、この上で予め昇降路1内に搬入
しておいた乗かご用最下部ガイドレール8を基準線を基
に芯出しし、ブラケット9a、9bにて固定する。この
時、吊合い錘用最下部ガイドレール10はブラケット1
1a、11bにて昇降路1の壁面に仮固定する。Next, at the bottom of the hoistway 1, a car and a buffer for hanging weight (not shown) and a lower template 18 are installed, and a reference line (not shown) hangs down from the upper template 17 and is fixed by the lower template 18. Further, the lower temporary scaffold 12 is assembled, and the lowermost guide rail 8 for the car, which has been previously loaded into the hoistway 1, is centered on the basis of the reference line, and is fixed by the brackets 9a and 9b. At this time, the lowermost guide rail 10 for the hanging weight is the bracket 1
At 1a and 11b, it is temporarily fixed to the wall surface of the hoistway 1.
【0022】次いで吊合い錘22は吊合い錘用最下部ガ
イドレール10に組み込み、下部仮設足場12を解体し
て乗かご枠21を、乗かご用最下部ガイドレール8に組
み込む。Next, the suspension weight 22 is incorporated into the lowermost guide rail 10 for suspension weight, the lower temporary scaffold 12 is disassembled, and the car frame 21 is assembled into the lowermost guide rail 8 for car.
【0023】次いで、図3においてこの乗かご枠21上
で、電動ウインチ3で揚重可能な本数分を連結した吊合
い錘用ガイドレール10aを電動ウインチ3の揚重ロー
プ7を掛けて揚重し、その下端部を最下部ガイドレール
10の上端部と連結し、上端部は中間作業足場13上で
建屋部材40にブラケット11cにて仮固定する。この
作業を全ガイドレールを連結するまで繰り返し行い、吊
合い錘用のガイドレールをすべて一本化し、その上端部
を機械室2の床面に固定する。Next, in FIG. 3, on the car frame 21, the guide rails 10a for hanging weights, which are connected by the number that can be lifted by the electric winch 3, are lifted by the lifting rope 7 of the electric winch 3. Then, the lower end is connected to the upper end of the lowermost guide rail 10, and the upper end is temporarily fixed to the building member 40 on the intermediate work platform 13 with the bracket 11 c. This operation is repeated until all the guide rails are connected, so that all the guide rails for the hanging weight are unified, and the upper end is fixed to the floor of the machine room 2.
【0024】次いで図4において揚重ロープ7を吊合い
錘22に掛けて最上階まで揚重し、建屋部材42等を利
用し固定する。このとき電動ウインチ3の容量によって
吊合い錘22に積み込む図示しない錘の枚数に制限がで
きるが、この場合最上階まで揚重した後上部作業足場1
4から積み込めばよい。Next, in FIG. 4, the lifting rope 7 is hung on the hanging weight 22, lifted to the top floor, and fixed using the building member 42 and the like. At this time, the number of weights (not shown) to be loaded on the hanging weight 22 can be limited by the capacity of the electric winch 3.
You only have to load from 4.
【0025】次いで揚重ロープ7を乗かご用ガイドレー
ル8側におろすよう段取り替えし、乗かご枠21上で、
電動ウインチ3で揚重可能な本数分を連結した乗かご用
ガイドレール8aを電動ウインチ3の揚重ロープ7を掛
けて揚重し、その下端部を最下部ガイドレール8の上端
部と連結し、上端部は中間作業足場13上で建屋部材4
1にブラケット9cに仮固定する。また、予め昇降路1
内に搬入してある図示しない残りの乗かご用ガイドレー
ルも、電動ウインチ3で揚重可能な本数分を連結した乗
かご用ガイドレール8aと同じ長さに連結して昇降路1
内に仮置きしておく。Next, the setup is changed so that the lifting rope 7 is lowered to the guide rail 8 for the car, and on the car frame 21,
The guide rails 8a for the cars, which are connected to the number that can be lifted by the electric winch 3, are lifted by hanging the lifting rope 7 of the electric winch 3, and the lower end thereof is connected to the upper end of the lowermost guide rail 8. , The upper end is on the intermediate work scaffold 13 and the building member 4
1 is temporarily fixed to the bracket 9c. In addition, hoistway 1
The remaining car guide rails (not shown) carried into the elevator car 1 are connected to the same length as the car guide rails 8a to which the electric winch 3 is capable of lifting, and are connected to the hoistway 1.
Put it temporarily inside.
【0026】次いで図5において、吊合い錘22および
乗かご枠21をメインロープ24にて巻上機23を介し
て連結し、この巻上機23によって乗かご枠21および
吊合い錘22の上下動を可能とする。この状態で乗かご
枠21上に作業床60を取り付け、乗かご枠21を移動
しながら乗かごおよび吊合い錘用ガイドレール8a、1
0、10aを芯出し固定していく。中間作業足場13の
直下まで作業を終了したら、中間作業足場13上の中間
仮設足場15を解体すると共に、中間作業足場13を撤
去し、作業床60上で電動ウインチ3で揚重した別のガ
イドレール8bの下端部をガイドレール8aの上端部と
連結し、ガイドレール8bの上端部は図示しない別の中
間作業足場または上部作業足場14にて仮固定する。Next, in FIG. 5, the hanging weight 22 and the car frame 21 are connected by a main rope 24 via a hoisting machine 23, and the hoisting machine 23 moves the car frame 21 and the hoisting weight 22 up and down. Movement. In this state, the work floor 60 is mounted on the car frame 21, and the car and the guide rails 8a, 1
Centering and fixing 0, 10a. When the work has been completed to just below the intermediate work scaffold 13, the intermediate temporary scaffold 15 on the intermediate work scaffold 13 is disassembled, the intermediate work scaffold 13 is removed, and another guide lifted by the electric winch 3 on the work floor 60. The lower end of the rail 8b is connected to the upper end of the guide rail 8a, and the upper end of the guide rail 8b is temporarily fixed to another intermediate work platform or an upper work platform 14 (not shown).
【0027】以上の作業を繰り返すことによって図6に
示すように昇降路1の全行程に渡って一本化された乗か
ごおよび吊合い錘用ガイドレール20、50の芯出し固
定を終えることができる。By repeating the above operation, the centering and fixing of the unified car and the guide rails 20 and 50 for the suspended weight can be completed over the entire travel of the hoistway 1 as shown in FIG. it can.
【0028】次いでこの一本化され、芯出し固定された
乗かごおよび吊合い錘用ガイドレール20、50を案内
として上下動しながらエレベータの他の部品の取付を行
い据え付け作業を終了する。Next, the elevator and other components are mounted while moving up and down with the unified and centered and fixed car and hanging weight guide rails 20 and 50 as guides, thereby completing the installation work.
【0029】[0029]
【発明の効果】本発明は以上のように構成したため、電
動ウインチの容量に応じた本数のガイドレールを吊り上
げ、これらのガイドレールの下端部から上端部までの長
さの倍数に相当する昇降路底部からの高さ位置に作業足
場を予め設置しておくことによって、大型のウインチを
使用することなく昇降路の全行程におけるガイドレール
を連結・固定し効率良く高階床・高行程のエレベータ据
え付けを行うことができ、また、吊合い錘用ガイドレー
ルを全行程に渡って連結・固定することによって本設の
巻上機によって乗かごを上下動させることができ、電動
ウインチなどの仮設品を極力少なくでき、仮設材の設置
・取り外しといったわずらわしい作業をなくすことがで
きる。As described above, according to the present invention, a number of guide rails corresponding to the capacity of the electric winch are lifted, and a hoistway corresponding to a multiple of the length from the lower end to the upper end of these guide rails. By installing the work platform in advance at the height from the bottom, the guide rails can be connected and fixed on the entire path of the hoistway without using a large winch, and the elevator installation on the high floor and high stroke can be efficiently performed. In addition, by connecting and fixing the guide rails for hanging weights over the entire stroke, the car can be moved up and down by the built-in hoisting machine, and temporary products such as electric winches can be minimized. It is possible to reduce the troublesome work such as installation and removal of temporary materials.
【図1】上部作業足場及び中間作業足場を備えた昇降路
の側面図である。FIG. 1 is a side view of a hoistway provided with an upper work platform and an intermediate work platform.
【図2】中間作業足場の上面図である。FIG. 2 is a top view of the intermediate work scaffold.
【図3】吊合い錘用ガイドレールを昇降路に仮固定する
側面図である。FIG. 3 is a side view for temporarily fixing a hanging weight guide rail to a hoistway.
【図4】かご用ガイドレールを昇降路に仮固定する側面
図である。FIG. 4 is a side view for temporarily fixing a car guide rail to a hoistway.
【図5】吊合い錘および乗かご枠が連結され、昇降路に
位置する側面図である。FIG. 5 is a side view in which the hanging weight and the car frame are connected and located on the hoistway.
【図6】一本化された乗かご及び吊合い錘用ガイドレー
ルが昇降路に位置する側面図である。FIG. 6 is a side view in which a unified car and guide rails for hanging weights are located in a hoistway.
1 昇降路 2 機械室 3 電動ウインチ 4 滑車 5 滑車 6 滑車 7 揚重ロープ 8 乗かご用ガイドレール 9a ブラケット 9b ブラケット 10 吊合い錘用ガイドレール 11a ブラケット 11b ブラケット 12 下部仮設足場 13 中間作業足場 14 上部作業足場 15 中間仮設足場 16 上部仮設足場 17 上部テンプレート 18 下部テンプレート 19a 固定具 19b 固定具 21 乗かご 22 吊合い錘 23 本設用の巻上機 31 乗り場部品据付用基準線を通す穴部 32 乗り場部品据付用基準線を通す穴部 33 乗かご用ガイドレールおよび乗かご用ガイドレー
ル据付用基準線を通す穴部 34 乗かご用ガイドレールおよび乗かご用ガイドレー
ル据付用基準線を通す穴部 35 乗かご枠および吊合い錘を連結するメインロープ
を通す穴部 36 吊合い錘および吊合い錘用ガイドレールを通す穴
部DESCRIPTION OF SYMBOLS 1 Hoistway 2 Machine room 3 Electric winch 4 Pulley 5 Pulley 6 Pulley 7 Lifting rope 8 Guide rail for car 9a Bracket 9b Bracket 10 Guide rail for hanging weight 11a Bracket 11b Bracket 12 Lower temporary scaffold 13 Intermediate work scaffold 14 Upper part Work scaffolding 15 Intermediate temporary scaffolding 16 Upper temporary scaffolding 17 Upper template 18 Lower template 19a Fixing tool 19b Fixing tool 21 Cage 22 Hanging weight 23 Hoisting machine for main installation 31 Hole section through which reference line for mounting of landing component 32 passes Hole for passing the reference line for component installation 33 Hole for passing the guide rail for the car and guide rail for the car 34 Hole for passing the guide line for the car and the guide line for the guide rail for the car 35 Hole for passing the main rope connecting the car frame and the hanging weight 6 hole through which hanging mutual weight and hanging mutual weight guide rails
Claims (4)
するガイドレールの据付けを行うエレベータの据付工法
において、 仮設の揚重機を、その揚重ロープが前記昇降路頂部から
垂下するように設置し、この仮設の揚重機にて揚重可能
な複数のガイドレールを連結した状態で、これらのガイ
ドレールの下端部から上端部までの長さの倍数に相当す
る昇降路底部からの高さ位置に作業足場を設置した後、
前記仮設の揚重機の揚重ロープ端に前記複数のガイドレ
ールを連結してこれらのガイドレールを吊上げ、前記昇
降路底部にて前記複数のガイドレールの下端部を、そし
て前記作業足場から前記複数のガイドレールの上端部を
前記昇降路壁に固定した後、さらに複数のガイドレール
を連結して吊上げ、その下端部を前記複数のガイドレー
ルの上端部に前記作業足場にて連結することにより順次
上方に向けてガイドレールの連結を行い、その後、最上
部のガイドレール頂部を、昇降路頂部の機械室からこの
機械室近傍の部材に固定することにより前記昇降体の全
昇降行程でガイドレールの連結を行うことを特徴とする
エレベータの据付工法。In an elevator installation method for installing a guide rail for guiding the elevating body that moves up and down in a hoistway, a temporary hoisting machine is mounted so that a hoisting rope thereof hangs from the top of the hoistway. Installed, and with a plurality of guide rails that can be lifted by this temporary lifting machine connected, a height from the bottom of the hoistway equivalent to a multiple of the length from the lower end to the upper end of these guide rails After installing the work scaffold in the position,
The plurality of guide rails are connected to the lifting rope end of the temporary lifting machine, and these guide rails are lifted.The lower ends of the plurality of guide rails are lifted at the bottom of the hoistway, and the plurality of guide rails are moved from the work platform. After fixing the upper end of the guide rail to the hoistway wall, the plurality of guide rails are further connected and lifted, and the lower end is sequentially connected to the upper end of the plurality of guide rails by the work scaffold. The guide rails are connected upward, and then the top of the top guide rail is fixed from the machine room at the top of the hoistway to a member near this machine room, so that the guide rails can be moved up and down in the entire up-and-down stroke of the hoist. An elevator installation method characterized by connecting.
とをメインロープにて釣瓶式に連結し、このメインロー
プを機械室に設置した本設用の巻上機により駆動し、前
記昇降体をガイドレールに案内させて昇降路内で昇降さ
せ、前記乗かご枠を足場として前記昇降路内に設置され
る機器の据付け作業を行うエレベータの据付工法におい
て、 仮設の揚重機を、その揚重ロープが前記昇降路頂部から
垂下するように設置し、この仮設の揚重機にて揚重可能
な複数の前記ガイドレールを連結した状態で、これらの
ガイドレールの下端部から上端部までの長さの倍数に相
当する昇降路底部からの高さ位置に作業足場を設置した
後、吊合い錘用および乗かご用の最下部ガイドレールを
立設して昇降路底部にて昇降路壁に固定し、これらの最
下部ガイドレールに吊合い錘および乗かご枠を組込み、
前記仮設の揚重機の揚重ロープ端に前記複数本数に相当
する吊合い錘用ガイドレールを連結して吊上げ、前記乗
かご枠からこれら複数の吊合い錘用ガイドレールの下端
部と前記最下部の吊合い錘用ガイドレールの上端部を連
結し、前記作業足場から前記複数の吊合い錘用ガイドレ
ールの上端部を前記昇降路壁に固定した後、さらに別の
複数の吊合い錘用ガイドレールを連結して吊上げ、その
下端部を前記複数の吊合い錘用ガイドレールの上端部に
前記作業足場にて連結することにより順次上方に向けて
吊合い錘用ガイドレールの連結を行い、最上部の吊合い
錘用ガイドレール頂部を、昇降路頂部の機械室からこの
機械室近傍の部材に固定することにより前記吊合い錘の
全昇降行程で吊合い錘用ガイドレールの連結を行った
後、前記吊合い錘を昇降路頂部近傍まで吊上げ、この吊
上げた吊合い錘と前記乗かご枠とを前記メインロープに
より前記本設用の巻上機を介して連結し、この巻上機を
駆動することにより前記乗かご枠を昇降させ、この乗か
ご枠を足場として前記昇降路内に設置される機器の据付
け作業を行うことを特徴とするエレベータの据付工法。2. A main elevator car body frame and a hanging weight are connected in a fishing bottle manner with a main rope, and the main rope is driven by a main hoist installed in a machine room. In the elevator installation method for performing the work of installing the equipment installed in the hoistway using the car frame as a scaffold, by guiding the hoisting body on a guide rail to lift the hoistway, The lifting rope is installed so as to hang down from the top of the hoistway, and a plurality of the guide rails that can be lifted by the temporary lifting machine are connected to each other. After installing a work platform at a height from the bottom of the hoistway equivalent to a multiple of the length of the hoistway, the lowermost guide rails for the hanging weight and the car are erected and the hoistway at the bottom of the hoistway Secure these bottom guides to the wall. Built the weight and power of the car frame each other hanging in Le,
A plurality of guide rails for hanging weights corresponding to the plurality are connected to the lifting rope ends of the temporary lifting machine and lifted, and the lower end portion and the lowermost portion of the plurality of guide rails for hanging weights are lifted from the car frame. After connecting the upper end portions of the guide rails for hanging weights and fixing the upper end portions of the guide rails for the plurality of hanging weights to the hoistway wall from the work platform, another guide for the hanging weights is further provided. The rails are connected and lifted, and the lower ends thereof are connected to the upper ends of the plurality of hanging weight guide rails on the work scaffold, thereby sequentially connecting the hanging weight guide rails upward. After connecting the guide rails for hanging weights in the entire lifting stroke of the hanging weights by fixing the top of the guide rails for hanging weights at the top from the machine room at the top of the hoistway to members near this machine room , The hanging weight The hoisting weight is lifted up to the vicinity of the top of the descending road, and the lifted hanging weight and the car frame are connected by the main rope via the main hoist, and the car is driven by driving the hoist. An elevator installation method, comprising raising and lowering a frame, and performing installation work of equipment installed in the hoistway using the car frame as a scaffold.
とをメインロープにて釣瓶式に連結し、このメインロー
プを機械室に設置した本設用の巻上機により駆動し、前
記昇降体をガイドレールに案内させて昇降路内で昇降さ
せ、前記乗かご枠を足場として前記昇降路内に設置され
る機器の据付け作業を行うエレベータの据付工法におい
て、 仮設の揚重機を、その揚重ロープが前記昇降路頂部から
垂下するように設置し、この仮設の揚重機にて揚重可能
な複数の前記ガイドレールを連結した状態で、これらの
ガイドレールの下端部から上端部までの長さの倍数に相
当する昇降路底部からの高さ位置に作業足場を設置した
後、吊合い錘用および乗かご用の最下部ガイドレールを
立設して昇降路底部にて昇降路壁に固定し、これらの最
下部ガイドレールに吊合い錘および乗かご枠を組込み、
前記仮設の揚重機の揚重ロープ端に前記複数本数に相当
する吊合い錘用および乗かご用ガイドレールを連結して
吊上げ、前記乗かご枠からこれら複数の吊合い錘用およ
び乗かご用ガイドレールの下端部と前記最下部の吊合い
錘用および乗かご用ガイドレールの上端部を連結し、前
記作業足場から前記複数の吊合い錘用および乗かご用ガ
イドレールの上端部を前記昇降路壁に固定した後、さら
に別の複数の吊合い錘用および乗かご用ガイドレールを
連結して吊上げ、それらの下端部を前記複数の吊合い錘
用および前記乗かご用ガイドレールの上端部に前記作業
足場にて連結することにより順次上方に向けて吊合い錘
用および前記乗かご用ガイドレールの連結を行い、最上
部の吊合い錘用および前記乗かご用ガイドレール頂部
を、昇降路頂部の機械室からこの機械室近傍の部材に固
定することにより前記吊合い錘の全昇降行程で吊合い錘
用および前記乗かご用ガイドレールの連結を行った後、
前記吊合い錘を昇降路頂部近傍まで吊上げ、この吊上げ
た吊合い錘と前記乗かご枠とを前記メインロープにより
前記本設用の巻上機を介して連結し、この巻上機を駆動
することにより前記乗かご枠を昇降させ、この乗かご枠
を足場として前記昇降路内に設置される機器の据付け作
業を行うことを特徴とするエレベータの据付工法。3. The main car frame and the hanging weight, which are elevating bodies, are connected in a fishing bottle manner with a main rope, and the main rope is driven by a main hoist installed in a machine room. In the elevator installation method for performing the work of installing the equipment installed in the hoistway using the car frame as a scaffold, by guiding the hoisting body on a guide rail to lift the hoistway, The lifting rope is installed so as to hang down from the top of the hoistway, and a plurality of the guide rails that can be lifted by the temporary lifting machine are connected to each other. After installing a work platform at a height from the bottom of the hoistway equivalent to a multiple of the length of the hoistway, the lowermost guide rails for the hanging weight and the car are erected and the hoistway at the bottom of the hoistway Secure these bottom guides to the wall. Built the weight and power of the car frame each other hanging in Le,
The guide ropes for the plurality of suspended weights and the car corresponding to the plurality are connected to the lifting rope ends of the temporary lifting machine and lifted, and the plurality of guides for the suspended weights and the car are lifted from the car frame. A lower end of a rail is connected to an upper end of the lowermost suspended weight and the guide rail for the car, and an upper end of the plurality of suspended weights and the guide rail for the car are moved from the work platform to the hoistway. After being fixed to the wall, another plurality of hanging weights and a guide rail for the car are connected and lifted, and the lower ends thereof are connected to the upper end of the guide rails for the plurality of hanging weights and the car. By connecting at the working scaffold, the hanging rail and the guide rail for the car are sequentially connected upward and the top of the top hanging rail and the guide rail for the car are connected to the top of the hoistway. Machine After coupling of all the lifting stroke in and for suspending mutual weight the passenger cage guide rail of the weight mutually hanging said by fixing the chamber to a member of the machine room near
The hanging weight is lifted to near the top of the hoistway, and the lifted hanging weight and the car frame are connected by the main rope via the main hoist, and the hoist is driven. An elevator installation method, wherein the elevator car frame is raised and lowered, and the equipment installed in the hoistway is installed using the elevator car frame as a foothold.
合い錘用ガイドレール、乗かご用ガイドレール、乗り場
部品据付用基準線および乗かご用ガイドレール据付用基
準線が貫通できる切り欠き部を有することを特徴とする
請求項1、2または3記載のエレベータの据付工法。4. The work scaffold has a cutout through which a main rope, a hanging weight, a guide rail for a hanging weight, a guide rail for a car, a reference line for installing a landing part, and a reference line for installing a guide rail for a car can be penetrated. The elevator installation method according to claim 1, 2 or 3, wherein:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26643297A JP3301948B2 (en) | 1997-09-30 | 1997-09-30 | Elevator installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP26643297A JP3301948B2 (en) | 1997-09-30 | 1997-09-30 | Elevator installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11100184A true JPH11100184A (en) | 1999-04-13 |
JP3301948B2 JP3301948B2 (en) | 2002-07-15 |
Family
ID=17430861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP26643297A Expired - Fee Related JP3301948B2 (en) | 1997-09-30 | 1997-09-30 | Elevator installation method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3301948B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012051698A (en) * | 2010-09-02 | 2012-03-15 | Kajima Corp | Elevator installation method |
CN113753716A (en) * | 2021-09-10 | 2021-12-07 | 崔晓江 | Method for installing guide rail of elevator arraying crane with machine room |
-
1997
- 1997-09-30 JP JP26643297A patent/JP3301948B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012051698A (en) * | 2010-09-02 | 2012-03-15 | Kajima Corp | Elevator installation method |
CN113753716A (en) * | 2021-09-10 | 2021-12-07 | 崔晓江 | Method for installing guide rail of elevator arraying crane with machine room |
CN113753716B (en) * | 2021-09-10 | 2022-12-23 | 崔晓江 | Method for installing guide rail of elevator arraying crane with machine room |
Also Published As
Publication number | Publication date |
---|---|
JP3301948B2 (en) | 2002-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109153539B (en) | Elevator traction machine installation method | |
CN115190862A (en) | Elevator arrangement and method for building an elevator | |
CN112566864B (en) | Application method of lift extension technology of elevator | |
JPH061568A (en) | Erection method for elevator counter weight and counter weight | |
JP3301948B2 (en) | Elevator installation method | |
JP3844944B2 (en) | Demolition method of construction elevator | |
JP2001335255A (en) | Elevator installation construction method, and elevator installation unit | |
JP3348018B2 (en) | Elevator installation method | |
JP2878936B2 (en) | Elevator installation method | |
JP2000226169A (en) | Elevator erection method | |
JP2000335847A (en) | Elevator installation device | |
JPH082850A (en) | Work method in elevator shaft | |
JP2006001739A (en) | Installation method of rise-up elevator | |
JP4312590B2 (en) | Lower assembly method for elevator upper equipment | |
JP3519009B2 (en) | Elevator installation method | |
JPH07237848A (en) | Installation method of elevator | |
JPH021066B2 (en) | ||
JPH11292424A (en) | Installation method for small size elevator | |
JP2930911B2 (en) | Elevator installation method | |
JP2001163546A (en) | Construction method for installation work for machine- roomless elevator | |
JPH0859132A (en) | Lifting of load | |
JPH09235082A (en) | Elevator modification method | |
JPH0747453B2 (en) | Elevator installation method | |
JP2000351555A (en) | Method for replacing elevator main rope | |
JPH0840666A (en) | Method for installing elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |