JPH10331172A - Dwelling house foundation structure with precast concrete - Google Patents

Dwelling house foundation structure with precast concrete

Info

Publication number
JPH10331172A
JPH10331172A JP18021697A JP18021697A JPH10331172A JP H10331172 A JPH10331172 A JP H10331172A JP 18021697 A JP18021697 A JP 18021697A JP 18021697 A JP18021697 A JP 18021697A JP H10331172 A JPH10331172 A JP H10331172A
Authority
JP
Japan
Prior art keywords
foundation
concrete
precast concrete
precast
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18021697A
Other languages
Japanese (ja)
Inventor
Shoichi Wada
章一 和田
Takashi Obinata
孝 小日向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SELECT KK
Original Assignee
SELECT KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SELECT KK filed Critical SELECT KK
Priority to JP18021697A priority Critical patent/JPH10331172A/en
Publication of JPH10331172A publication Critical patent/JPH10331172A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate site works and save labor therein by forming a precast concrete foundation to suit the room layout of a dwelling house being constructed. SOLUTION: In the rising footing of a foundation for a dwelling house, straight members and two-directional, three-directional, and four-directional intersection members are prepared using precast concrete, and their main bars are connected together so that consolidation as foundation is established. In the direction of crossing them, top bars 6 and belly bars 8 are installed, and in the vertical direction, two to four legs 2 per piece with the bottom of the footing partially left missing are furnished on the body 1 where reinforcing bars are installed appropriately, and a plurality of concrete projections as the belly 3 are furnished in the missing part between the legs 2 so that a foundation structure is accomplished. The mat foundation itself is made in the precast structure, and one end of the bottom part of foundation is made in precast concrete previously, and the exposed bars in the other end part are used to generate fixation to the mat foundation members, and between them the body is hung down from above using a winch, etc., and is installed so that the consolidation of the foundation is achieved.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、住宅建設の基礎工事に
用いられ、特に日本の風土に適した木造住宅の乾式化に
貢献するとともに、プレキャストとしてあらかじめ工場
での大量生産と品質管理が見込まれ、高耐久・高性能の
ニーズに対応することが可能である。
BACKGROUND OF THE INVENTION The present invention is used for foundation work of house construction, and contributes to the drying of a wooden house particularly suited to the climate of Japan, and is expected to be mass-produced and quality controlled in a factory in advance as a precast. It is possible to meet the needs of high durability and high performance.

【0002】[0002]

【従来の技術】従来、一般に在来工法と呼ばれる住宅等
の基礎の施工は、床堀・割栗石転圧・捨コン打設の後、
それぞれの部位の主筋・補強筋等を組み上げてから型枠
を設置し、この型枠内にコンクリートを打設するもの
で、コンクリート打設後一定の養生期間を経てから型枠
を取外し、基礎を完成させるというものであった。
2. Description of the Related Art Conventionally, the construction of a foundation for a house or the like, which is generally called a conventional construction method, is performed after a floor moat, a split rock compaction, and a dumping machine.
After assembling the main reinforcing bars and reinforcing bars of each part, formwork is installed and concrete is poured into this formwork.After a certain curing period after concrete placement, the formwork is removed and the foundation is removed. It was to be completed.

【0003】更に、工期短縮と高耐久・高性能規格とし
て、住宅等のプレキャストコンクリートによる基礎構造
の本体の形状並びに継手の工夫等について、これまでに
数種類の方法が各公報に開示されているが、法の求める
基礎の一体化という視点から見るとそれぞれに優劣があ
る。
[0003] In addition, several methods have been disclosed in each gazette so far as the shortening of the construction period and the high durability and high performance standards, regarding the shape of the main body of the foundation structure made of precast concrete for houses and the like and the invention of joints, etc. From the perspective of integrating the fundamentals required by the law, there are advantages and disadvantages.

【0004】即ち、布部と底盤部を一体とし、長さ方向
で鉄筋の定着長さを確保するか、又は機械継手によって
全体の一体化を図っているものや、反対に布部と底盤部
を別体とし、現場でのそれぞれの付け合わせによって全
体の一体化を図っているものがある。
[0004] That is, the cloth portion and the bottom portion are integrated, and the fixing length of the reinforcing bar is secured in the length direction, or the whole is integrated by a mechanical joint. There is a type that separates and integrates the whole by attaching each at the site.

【0005】[0005]

【発明考案が解決しようとする課題】前述したように、
在来工法と比較すればプレキャストコンクリートによる
基礎構造の優位性は歴然である。
As described above, as described above,
Compared with the conventional method, the superiority of the precast concrete foundation structure is obvious.

【0006】従って、開示されている既存のプレキャス
トコンクリートによる基礎構造の課題をクリアしていく
ことが本発明の課題となる。
[0006] Accordingly, it is an object of the present invention to solve the problem of the disclosed foundation structure using precast concrete.

【0007】まず、布部と底盤部を一体とした場合、製
造工場から建設現場までの搬送の際に、形状の不均一よ
る荷積みの不具合と一体当たりの重量が大きくなってし
まうので、影響が大きいという問題点がある。
[0007] First, when the cloth part and the bottom part are integrated, when transporting from the manufacturing factory to the construction site, the load due to uneven shape and the weight per unit become large. Is large.

【0008】又、比較的大きな面を持つ底盤部は、現場
で設置の際に十分なる配慮をしないと、施工の基準とな
る水平を割り出すことが困難である。それは本体が重量
物であり、接触の大きい面部分の水平確保が厄介である
故で、この面が水平にならないと基礎天端が絶対に水平
にならない。
[0008] Further, it is difficult to determine the horizontal level, which is a reference for construction, of a bottom portion having a relatively large surface unless sufficient consideration is given to installation at the site. This is because the main body is heavy and it is troublesome to secure the level of the surface with large contact, so if this surface is not horizontal, the top of the base will never be horizontal.

【0009】次に布部と底盤部を別体とした場合、それ
ぞれが単体の版状となるので、搬送時の荷積みの不具合
や重量が大きくなることは避けられるが、肝心の基礎の
一体化という部分で疑問があり、組み上げて設置してか
らの基礎としての性能に不安が残る。
Next, when the cloth portion and the bottom portion are separated from each other, since each of them becomes a single plate, it is possible to avoid troubles in loading and increase in weight at the time of transportation, but it is essential to integrate the essential foundation. There is a doubt in the part of the construction, and there is anxiety about the performance as a basis after assembling and installing.

【0010】更に布部だけプレキャストコンクリートに
するという方法もあるが、工期の短縮・現場での省力化
等を前提にするならば、やはり底盤部やベタ基礎にまで
視野を拡げるべきである。
Further, there is a method in which only the cloth portion is made of precast concrete. However, if it is assumed that the construction period is shortened and labor is saved on site, the field of view should be expanded to the bottom portion and the solid foundation.

【0011】一方鉄筋の継手に関して、定着長さを見込
んだ鉄筋を側端部より跳ね出したものと、機械継手によ
って対応するため側端部からの鉄筋の跳ね出しがないも
のとあるが、搬送と現場での省力化からすれば、機械継
手を推奨すべきである。
On the other hand, as for the joints of the reinforcing bars, there are two types, one in which the reinforcing bar is projected from the side end in anticipation of the fixing length, and the other in which the reinforcing bar does not jump out from the side end to cope with the mechanical joint. From the viewpoint of labor saving at the site, mechanical joints should be recommended.

【0012】そこで、鉛直方向では土台を留めるアンカ
ーボルトのため基礎本体にインサート5を用意し、水平
方向では機械継手のため貫通インサート又は高ナットを
用意したが、いずれも芯振りとした事により部材の収ま
りと継ぎの関係が向上した。
Therefore, in the vertical direction, an insert 5 was prepared on the base body for anchor bolts for fixing the base, and in the horizontal direction, a penetrating insert or a high nut was prepared for a mechanical joint. The relationship between the fit and the joint has been improved.

【0013】[0013]

【課題を解決するための手段】形状の不均一よる荷積み
の不具合と一体当たりの重量が大きくなることは致命的
なので、本発明は布部と底盤部を別体としている。従っ
て基礎としての一体性が問われるが、請求項1により、
その脚部2の間の欠いた部分に現場打ちコンクリートが
充填されることと、請求項2により、底盤4の両端部を
あらかじめプレキャストコンクリートとしたその間部分
に、同様に現場打ちコンクリートが充填されることによ
り、布部1と底盤部4の一体化が図れる。
According to the present invention, the cloth portion and the bottom portion are separated from each other, because it is fatal that the load per unit and the weight per unit due to the uneven shape and the weight per unit are fatal. Therefore, the integrity as a basis is questioned.
Cast-in-place concrete is filled in the missing portion between the legs 2, and the cast-in-place concrete is similarly filled in a portion between both ends of the base 4 which is precast concrete in advance. Thereby, the cloth part 1 and the bottom part 4 can be integrated.

【0014】又、同時に現場打ちコンクリートとの馴染
みと横方向のすべり対応のために、脚部2の間の欠いた
部分に、腹部3として突起物を用意している。
At the same time, a projection as an abdomen 3 is provided in a lacking portion between the legs 2 in order to be familiar with cast-in-place concrete and to cope with lateral slippage.

【0015】更に現場での水平割り出しにおいて、脚部
2の下端の接地面積は極小なので、この部分での水平を
維持すれば、全体の水平は確保されることになる。つま
り、布部1と底盤部4が必ずしも厳密な垂直でなくて
も、基礎天端は水平を容易に確保することができる。
Further, in the horizontal indexing at the site, since the ground contact area at the lower end of the leg portion 2 is extremely small, if the horizontal level is maintained at this portion, the entire horizontal level is secured. That is, even if the cloth portion 1 and the bottom plate portion 4 are not necessarily strictly vertical, the horizontal top of the foundation can be easily secured.

【0016】[0016]

【作用】布部1と底盤部4を別体としているので個々の
重量も相対的に小さくなり、各モデュールに合わせた直
線材を中心にしていることと、コーナー・交点等の役物
も統一していることで扱い易くなっている。
[Function] Since the cloth part 1 and the bottom part 4 are separate bodies, the weight of each part is also relatively small, and the center material is a straight material that matches each module, and the unified objects such as corners and intersections Doing so makes it easier to handle.

【0017】[0017]

【実施例】次に、図面を用いて本発明の実施例を詳細に
説明する。最初に、住宅の基礎伏図に基づいてプレキャ
ストコンクリート基礎の割付図を作成する。この時、モ
デュールに合わせてプレキャストコンクリート基礎の個
々の長さを決定しているので、数種類の長さを組み合わ
せることになる
Next, an embodiment of the present invention will be described in detail with reference to the drawings. First, a layout drawing of the precast concrete foundation is created based on the floor plan of the house. At this time, each length of the precast concrete foundation is determined according to the module, so several lengths will be combined

【0018】これを施工の手順で説明すると、次のよう
になる。
This will be described in the procedure of construction as follows.

【0019】所定の深さの床堀後、土質に応じて必要な
厚さで十分に割栗石を転圧し、その上面で概ねの水平を
測定する。
After the floor moat has a predetermined depth, the split rock is sufficiently compacted to a required thickness according to the soil properties, and the horizontal level is measured on the upper surface thereof.

【0020】その後、想定したポイントにおいて部分的
にモルタル等を落として、通り芯を割り出すために地墨
を引く。地墨完了後、脚部2の設置位置を明確にし、レ
ベラー等を使って、脚部2の設置位置での水平を確保す
る。但し本発明では水平確保のための調整高さの限度を
20mm程度としている。
Thereafter, the mortar or the like is partially dropped at the assumed points, and the ground ink is drawn to determine the wick. After completion of the black ink, the installation position of the leg 2 is clarified, and the level at the installation position of the leg 2 is secured using a leveler or the like. However, in the present invention, the limit of the adjustment height for securing horizontality is set to about 20 mm.

【0021】本発明では、特に従来の捨てコンの工程を
省略することを前提としているので、プレキャスト部の
形状を配慮し、打設されるコンクリートと割栗石がうま
く馴染むように図っている。
In the present invention, since it is assumed that the step of the conventional disposable concrete is omitted, the shape of the precast portion is taken into consideration so that the concrete to be cast and the split stone can be blended well.

【0022】次に地墨に従って、請求項2による底盤の
両端部をあらかじめプレキャストコンクリートとした底
盤部4を、基本的に基礎の外周部分から慎重に設置す
る。
Next, in accordance with the ground ink, the bottom part 4 in which both ends of the base according to claim 2 are precast concrete in advance is basically carefully installed from the outer peripheral part of the foundation.

【0023】設置後、継ぎ目には継ぎ目を中央にして双
方に定着が足りる長さ分の同径の鉄筋を、底盤部主筋1
0の上に置く。
After the installation, a reinforcing bar having the same diameter as the joint and having a length sufficient for fixing both sides with the seam at the center is attached to the bottom main reinforcing bar 1.
Put it on 0.

【0024】次に請求項1の布部1を、前段の脚部2の
設置される脚部位置指定線13を確認しながら双方一致
するように重機等によって上から吊り降ろして、基本的
に基礎の外周部分から慎重に設置する。但し設置の直前
において、布部1の上端筋6用及び下端筋7用機械継手
の貫通インサート又は高ナットを、接続部のどちらか一
方に装着しておく。請求項1の布部を全て設置した後、
貫通インサート又は高ナットを所定の位置まで巻き戻す
ように調整し、上端筋6及び下端筋7の継ぎ手を完了さ
せる。
Next, the cloth portion 1 of the first embodiment is suspended from above by a heavy machine or the like so as to be coincident with each other while checking the leg position designation line 13 where the front leg portion 2 is installed. Carefully install from the outer periphery of the foundation. However, immediately before installation, the penetrating insert or high nut of the mechanical joint for the upper reinforcement 6 and the lower reinforcement 7 of the cloth portion 1 is attached to one of the connection portions. After installing all the cloth parts of claim 1,
The penetrating insert or high nut is adjusted to be rewound to a predetermined position, and the joint of the upper end line 6 and the lower end line 7 is completed.

【0025】本発明は基礎を完全プレキャスト化したも
のなので、型枠を必要としない。従って、布部1の上端
筋の継手完了後、速やかに底盤部4からコンクリートを
打設することができる。
Since the present invention is a completely precast base, no formwork is required. Therefore, concrete can be poured from the bottom part 4 immediately after the joint of the upper end of the cloth part 1 is completed.

【0026】底盤部4の打設が概ね終了したら、次に布
部1の継ぎ目の上部から、シャーコッタ12等への充填
を意識しながら順次コンクリート又は無収縮モルタル等
を流し込む。この時基礎本体の天端をコンクリートで汚
さないように留意する。
When the placing of the bottom part 4 is substantially completed, concrete or non-shrink mortar or the like is sequentially poured from above the seam of the cloth part 1 while paying attention to filling in the shacotter 12 or the like. At this time, be careful not to contaminate the top end of the foundation body with concrete.

【0027】布部1のプレキャストの継ぎ目は目地11
であり必要なコーキングをする。尚、その継ぎ目を目立
たせないために、等間隔の目地11を全体に配置する。
The joint of the precast of the cloth part 1 is joint 11
And do the necessary coking. In order to make the joints inconspicuous, joints 11 at equal intervals are arranged on the whole.

【0028】[0028]

【発明の効果】以上詳細に説明したように本発明は基礎
工事において、構造的な所定の耐力を維持したまま、施
工の簡便さと省力化を最大の効果としている。
As described in detail above, the present invention maximizes simplicity of construction and labor saving in foundation work while maintaining a predetermined structural strength.

【0029】とかくコンクリート二次製品の寸法は、製
造過程における許容誤差の関係から定まりにくいが、工
場での製造と品質の精密管理によって、寸法の誤差を最
小限に止めることにより、現場での対応がより簡便とな
る。
The dimensions of secondary concrete products are difficult to determine due to the tolerances in the manufacturing process, but by minimizing the dimensional errors through precise manufacturing and quality control at the factory, Is more convenient.

【0030】従って、長さ方向へのコンクリート打ち継
ぎ部を解消したので、現場での型枠が一切不要になり、
施工の簡便さと省力化に大きく貢献している。
Therefore, since the concrete joint in the length direction is eliminated, no formwork is required on site,
It greatly contributes to simple construction and labor saving.

【0031】更に簡便でありながら、布部1と底盤部4
の空隙に対して、布部1の腹突起物3・下端筋7・補助
鉄筋9と底盤部の主筋10、そして割栗石等がコンクリ
ートによって一体化することが、基礎の構造上最も優れ
ている。
The cloth portion 1 and the bottom plate portion 4 are further simplified.
It is the most excellent in terms of the foundation structure that the abdominal projections 3, the lower end bar 7, the auxiliary reinforcing bar 9 and the main bar 10 of the base plate, and the splitter stone, etc. are integrated by concrete with the voids of the cloth part 1. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の請求項1及び請求項2における、住
宅のプレキャストコンクリートの直線材による基礎構造
の斜視図
FIG. 1 is a perspective view of a foundation structure of a precast concrete house made of a straight member according to claims 1 and 2 of the present invention.

【図2】 本発明の請求項1及び請求項2における、住
宅のプレキャストコンクリートの二方向交点材による基
礎構造の斜視図
FIG. 2 is a perspective view of the foundation structure of the precast concrete of the house according to claims 1 and 2 of the present invention, which is made of two-way intersection members.

【図3】 本発明の請求項1及び請求項2における、住
宅のプレキャストコンクリートの三方向交点材による基
礎構造の斜視図
FIG. 3 is a perspective view of the foundation structure of the precast concrete of the house according to claim 1 and claim 2 of the present invention using a three-way intersection member.

【図4】 本発明の請求項1及び請求項2における、住
宅のプレキャストコンクリートの四方向交点材による基
礎構造の斜視図
FIG. 4 is a perspective view of the foundation structure of the precast concrete of the house according to claim 1 and claim 2 of the present invention using the four-way intersection members.

【図5】 直線材の正面図FIG. 5 is a front view of a straight member.

【図6】 直線材の背面図FIG. 6 is a rear view of a straight member.

【図7】 直線材の上面図FIG. 7 is a top view of a straight member.

【図8】 直線材の底面図FIG. 8 is a bottom view of a straight member.

【図9】 直線材の側面図FIG. 9 is a side view of a straight member.

【図10】 二方向交点材の正面図FIG. 10 is a front view of a two-way intersection material.

【図11】 二方向交点材の側面図FIG. 11 is a side view of a two-way intersection material.

【図12】 二方向交点材の上面図FIG. 12 is a top view of a two-way intersection material.

【図13】 二方向交点材の底面図FIG. 13 is a bottom view of the bidirectional intersection material.

【図14】 三方向交点材の正面図FIG. 14 is a front view of a three-way intersection material.

【図15】 三方向交点材の背面図及び四方向交点材の
側面図
FIG. 15 is a rear view of the three-way intersection material and a side view of the four-way intersection material.

【図16】 三方向交点材の上面図FIG. 16 is a top view of a three-way intersection material.

【図17】 三方向交点材の底面図FIG. 17 is a bottom view of the three-way intersection material.

【図18】 四方向交点材の上面図FIG. 18 is a top view of a four-way intersection material.

【図19】 四方向交点材の底面図FIG. 19 is a bottom view of the four-way intersection material.

【図20】 直線材対応の底盤材の正面図FIG. 20 is a front view of a base material corresponding to a straight material.

【図21】 直線材対応の底盤材の上面図FIG. 21 is a top view of a base material corresponding to a straight material.

【図22】 直線材対応の底盤材の底面図FIG. 22 is a bottom view of a base material corresponding to a straight material.

【図23】 直線材対応の底盤材の側面図FIG. 23 is a side view of a base material corresponding to a straight material.

【図24】 二方向交点材対応の底盤材の上面図FIG. 24 is a top view of a base material corresponding to a two-way intersection material.

【図25】 二方向交点材対応の底盤材の側面図FIG. 25 is a side view of a base material corresponding to a two-way intersection material.

【図26】 三方向交点材対応の底盤材の上面図FIG. 26 is a top view of a base material corresponding to a three-way intersection material.

【図27】 四方向交点材対応の底盤材の上面図FIG. 27 is a top view of a base material corresponding to a four-way intersection material.

【図28】 本発明の請求項1と請求項3と請求項4に
よる基礎構造の組み合わせを示す断面図
FIG. 28 is a sectional view showing a combination of the basic structures according to claims 1, 3, and 4 of the present invention.

【図29】 直線材・ベタ基礎対応の底盤材の上面図FIG. 29 is a top view of a base material corresponding to a straight material and a solid foundation.

【図30】 直線材・ベタ基礎対応の底盤材の正面図FIG. 30 is a front view of a base material for straight materials and solid foundations.

【図31】 直線材・ベタ基礎対応の底盤材の側面図FIG. 31 is a side view of a base material corresponding to a straight material and a solid foundation.

【図32】 ベタ基礎(3穴)の上面図FIG. 32 is a top view of a solid foundation (three holes).

【図33】 ベタ基礎(3穴)の正面図FIG. 33 is a front view of a solid foundation (3 holes).

【図34】 ベタ基礎(3穴)の側面図FIG. 34 is a side view of a solid foundation (three holes).

【図35】 ベタ基礎(9穴)の上面図FIG. 35 is a top view of a solid foundation (9 holes).

【図36】 ベタ基礎(9穴)の正面図FIG. 36 is a front view of a solid foundation (9 holes).

【符号の説明】[Explanation of symbols]

1 基礎本体 2 脚部 3 腹部 4 底盤部 5 インサート 6 主筋(上端筋) 7 主筋(下端筋) 8 補助鉄筋(腹筋) 9 補助鉄筋(スターラップ) 10 底盤主筋 11 目地 12 シャーコッタ 13 脚部位置指定線 14 面取り 15 ベタ基礎部 16 コンクリート充填用穴 17 現場打ちコンクリート DESCRIPTION OF SYMBOLS 1 Base main body 2 Leg part 3 Abdomen 4 Bottom part 5 Insert 6 Main muscle (upper muscle) 7 Main muscle (lower muscle) 8 Auxiliary reinforcement (abdominal muscle) 9 Auxiliary reinforcement (sterlap) 10 Bottom major reinforcement 11 Joint 12 Shark cotter 13 Leg position designation Wire 14 Chamfer 15 Solid foundation 16 Hole for concrete filling 17 Cast-in-place concrete

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 基礎の立上り布部において、プレキャス
トコンクリートによる直線材を適宜必要長さで、又、二
方向交点・三方向交点・四方向交点部分にも同様にプレ
キャストコンクリートによる役物を用意し、それぞれの
主筋を機械継手によって接続することにより基礎として
の一体化を計ったもので、その横方向には上端筋と腹筋
を配置し、縦方向には適宜補強筋を配置した本体に、布
部の底部の一部を欠いて一体に付き2箇所〜4箇所の脚
部を設け、更にその脚部の間の欠いた部分に、腹部とし
てコンクリートの突起物を数か所設置した形状の住宅の
基礎構造。
1. In the rising cloth portion of the foundation, a straight material of precast concrete is appropriately prepared for a required length, and a cast of precast concrete is similarly prepared at a two-way intersection, a three-way intersection, and a four-way intersection. The main muscles are connected by mechanical joints to measure the integration as a foundation.The upper end and the abdominal muscles are arranged in the horizontal direction, and the reinforcing muscles are arranged appropriately in the vertical direction. A house with a shape in which two to four legs are integrally provided without a part of the bottom of the part and two or more concrete projections are installed as abdomen in the missing part between the legs. Foundation structure.
【請求項2】 基礎の底盤部において、請求項1の長さ
に応じて、底盤の両端部分をあらかじめプレキャストコ
ンクリートとし、その間に請求項1記載の本体を施工現
場において重機等により上から吊り降ろして設置し、そ
の空隙に現場でコンクリートを打設することによって、
基礎の一体化を図った住宅の基礎構造。
2. At the bottom portion of the foundation, both ends of the bottom plate are precast concrete in advance according to the length of claim 1, and the main body according to claim 1 is suspended from above by a heavy machine or the like at a construction site. By placing concrete on site at the gap,
The basic structure of a house that integrates the foundation.
【請求項3】 基礎の底盤部において、請求項1の長さ
に応じて、底盤の一端部をあらかじめプレキャストコン
クリートとし、他の一端部の露出した鉄筋をべタ基礎部
材との定着に活用し、その間に請求項1記載の本体を重
機等により上から吊り降ろして設置し、その空隙にコン
クリートを打設することによって、基礎の一体化を図っ
た住宅の基礎構造。
3. In the bottom of the foundation, one end of the bottom is precast in advance according to the length of claim 1, and the exposed reinforcing bar at the other end is used for fixing to the solid foundation member. A basic structure of a house in which the main body according to claim 1 is suspended from above by means of a heavy machine or the like, and the concrete is poured into the gap, thereby integrating the foundation.
【請求項4】 ベタ基礎部分をプレキャスト化し、それ
と立上り布部と底盤部とを定着長さの確保により堅結し
て、その空隙に現場でコンクリートを打設することによ
って、基礎の一体化を図った住宅の基礎構造。
4. The solid foundation portion is precast, and the rising fabric portion and the bottom portion are firmly connected to each other by securing the fixing length, and concrete is poured into the gap at the site to integrate the foundation. The basic structure of the planned house.
JP18021697A 1997-06-03 1997-06-03 Dwelling house foundation structure with precast concrete Pending JPH10331172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18021697A JPH10331172A (en) 1997-06-03 1997-06-03 Dwelling house foundation structure with precast concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18021697A JPH10331172A (en) 1997-06-03 1997-06-03 Dwelling house foundation structure with precast concrete

Publications (1)

Publication Number Publication Date
JPH10331172A true JPH10331172A (en) 1998-12-15

Family

ID=16079441

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18021697A Pending JPH10331172A (en) 1997-06-03 1997-06-03 Dwelling house foundation structure with precast concrete

Country Status (1)

Country Link
JP (1) JPH10331172A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008175036A (en) * 2007-01-19 2008-07-31 Grundage Corp Concrete foundation beam member and method for constructing mat foundation by connecting concrete foundation beam connecting members

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008175036A (en) * 2007-01-19 2008-07-31 Grundage Corp Concrete foundation beam member and method for constructing mat foundation by connecting concrete foundation beam connecting members

Similar Documents

Publication Publication Date Title
JP2011006849A (en) Method for constructing foundation
JP2000064305A (en) Foundation structure of steel tower and construction thereof
US4976087A (en) Method of forming footing and laying first course of block
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JPH05311747A (en) Pole-beam structure
JP2020094443A (en) Method for constructing foundation of building
JPH10331172A (en) Dwelling house foundation structure with precast concrete
JPH0586630A (en) Construction for jointing steel pipe pile filled with concrete and steel pipe column filled up with concrete
JPH02164930A (en) Foundation structure for building
JPH0533351A (en) Steel column base of steel frame structure and execution thereof
JPH0643240Y2 (en) Prefabricated retaining wall
JP3322562B2 (en) Floating body construction method
JPH0327072Y2 (en)
JP3002026B2 (en) Structure of residential continuous foundation
JP2784450B2 (en) Reinforced concrete foundation
JPH05112947A (en) Execution method of foundation
JPH07279184A (en) Floating underground beam foundation for building
JPH0452815B2 (en)
JP3776544B2 (en) Building basic structure
JP2547497Y2 (en) Precast foundation material for rectangular section concrete cloth foundation
JP2603427B2 (en) Foundation structure of reinforced concrete building
KR20010054238A (en) Precast concrete segment for arch type culvert and construction method using this segment
JPS63251527A (en) Construction of independent foundation and foundation block used therefor
JPS5846610B2 (en) assembly basics
JPH0416630A (en) Residence base construction method