JPH10301604A5 - - Google Patents

Info

Publication number
JPH10301604A5
JPH10301604A5 JP9-105743A JP10574397A JPH10301604A5 JP H10301604 A5 JPH10301604 A5 JP H10301604A5 JP 10574397 A JP10574397 A JP 10574397A JP H10301604 A5 JPH10301604 A5 JP H10301604A5
Authority
JP
Japan
Prior art keywords
items
sub
item
calculation means
mrp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9-105743A
Other languages
English (en)
Japanese (ja)
Other versions
JPH10301604A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP10574397A priority Critical patent/JPH10301604A/ja
Priority claimed from JP10574397A external-priority patent/JPH10301604A/ja
Priority to EP98914075A priority patent/EP0992868B1/en
Priority to PCT/JP1998/001774 priority patent/WO1998048331A1/ja
Priority to US09/381,099 priority patent/US6535773B1/en
Priority to DE69826126T priority patent/DE69826126T2/de
Publication of JPH10301604A publication Critical patent/JPH10301604A/ja
Publication of JPH10301604A5 publication Critical patent/JPH10301604A5/ja
Pending legal-status Critical Current

Links

JP10574397A 1997-04-23 1997-04-23 資材所要量計算装置および資材所要量計算方法 Pending JPH10301604A (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP10574397A JPH10301604A (ja) 1997-04-23 1997-04-23 資材所要量計算装置および資材所要量計算方法
EP98914075A EP0992868B1 (en) 1997-04-23 1998-04-17 Device and method for calculating required quantity of material
PCT/JP1998/001774 WO1998048331A1 (en) 1997-04-23 1998-04-17 Device and method for calculating required quantity of material
US09/381,099 US6535773B1 (en) 1997-04-23 1998-04-17 Device and method for calculating required quantity of material
DE69826126T DE69826126T2 (de) 1997-04-23 1998-04-17 Verfahren und vorrichtung zur berechnung einer erforderlichen werkstoffmenge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10574397A JPH10301604A (ja) 1997-04-23 1997-04-23 資材所要量計算装置および資材所要量計算方法

Publications (2)

Publication Number Publication Date
JPH10301604A JPH10301604A (ja) 1998-11-13
JPH10301604A5 true JPH10301604A5 (enExample) 2002-06-07

Family

ID=14415752

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10574397A Pending JPH10301604A (ja) 1997-04-23 1997-04-23 資材所要量計算装置および資材所要量計算方法

Country Status (5)

Country Link
US (1) US6535773B1 (enExample)
EP (1) EP0992868B1 (enExample)
JP (1) JPH10301604A (enExample)
DE (1) DE69826126T2 (enExample)
WO (1) WO1998048331A1 (enExample)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10105205A (ja) * 1996-09-27 1998-04-24 Hitachi Ltd 資材所要量計算方法およびシステム
US6223094B1 (en) 1998-08-21 2001-04-24 Sap Aktiengesellschaft Multi-tiered structure for storing and displaying product and process variants
JP3764139B2 (ja) * 2000-09-12 2006-04-05 本田技研工業株式会社 積層リングの組立装置
WO2002022305A1 (en) * 2000-09-12 2002-03-21 Honda Giken Kogyo Kabushiki Kaisha Assembly device for stacked ring
US20020143669A1 (en) * 2001-01-22 2002-10-03 Scheer Robert H. Method for managing inventory within an integrated supply chain
US7117164B2 (en) * 2001-01-26 2006-10-03 I2 Technologies Us, Inc. System and method of demand planning for intermediate and by-products
US7036123B2 (en) * 2001-04-25 2006-04-25 Sun Microsystems, Inc. System using fair-share scheduling technique to schedule processes within each processor set based on the number of shares assigned to each process group
US7640180B1 (en) * 2002-03-19 2009-12-29 I2 Technologies Us, Inc. Demand planning using exchange balances
US7529686B2 (en) * 2002-10-16 2009-05-05 International Business Machines Corporation Supply planning system and method utilizing constrained and unconstrained explosion and implosion of flagged demand statements
ATE317145T1 (de) * 2003-09-09 2006-02-15 Sap Ag Verfahren und rechnersystem für die verminderung der ausführungszeit eines rechnerprogramms zur berechnung einer erforderlichen werkstoffmenge
JP2005135280A (ja) * 2003-10-31 2005-05-26 Fujitsu Ltd 生産計画立案方法及び装置
US20090307026A1 (en) * 2008-06-10 2009-12-10 International Business Machines Corporation Priority-based system for netting available coverage
CN110458327B (zh) * 2019-07-09 2023-04-18 浙江墨煌信息科技有限公司 应急物资调度方法及其系统
CN111080148A (zh) * 2019-12-20 2020-04-28 Oppo(重庆)智能科技有限公司 Erp系统的净值计算方法、装置、电子设备以及存储介质
CN111768048A (zh) * 2020-07-04 2020-10-13 浙江锐制软件技术有限公司 预测物料数量的精准计算方法及其系统
JP7392070B1 (ja) * 2022-09-26 2023-12-05 三菱電機Itソリューションズ株式会社 計画立案支援装置、計画立案支援方法、および計画立案支援プログラム

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4646238A (en) * 1984-10-26 1987-02-24 Analog Devices, Inc. Material requirements planning system and procedures for use in process industries
AU4543993A (en) 1992-07-01 1994-01-31 Maspar Computer Corporation Systems and methods for planning and simulation
JP2526399B2 (ja) * 1993-08-03 1996-08-21 工業技術院長 並列計算機における負荷分散方法
JP3230628B2 (ja) * 1993-08-06 2001-11-19 トヨタ自動車株式会社 発注量算出方法とそのための装置
US5630070A (en) * 1993-08-16 1997-05-13 International Business Machines Corporation Optimization of manufacturing resource planning
US5796614A (en) * 1994-04-21 1998-08-18 Nec Corporation Level-by-level explosion method for material requirements planning
US5787000A (en) * 1994-05-27 1998-07-28 Lilly Software Associates, Inc. Method and apparatus for scheduling work orders in a manufacturing process
US5764519A (en) * 1995-03-08 1998-06-09 Hitachi, Inc. Method and device for computing material requirements
JP3621467B2 (ja) * 1995-05-26 2005-02-16 株式会社日立製作所 資材所要量計算の負荷分散方法及び装置
JP3408012B2 (ja) * 1995-03-08 2003-05-19 株式会社日立製作所 資材所要量計算方法および装置
WO1996029666A1 (en) * 1995-03-17 1996-09-26 Hitachi, Ltd. Method and apparatus for parallel processing a calculation of a required amount of material
JP3610681B2 (ja) * 1996-06-28 2005-01-19 株式会社日立製作所 生産計画方法及び生産計画システム
US5943484A (en) * 1997-09-26 1999-08-24 International Business Machines Corporation Advanced material requirements planning in microelectronics manufacturing

Similar Documents

Publication Publication Date Title
Baker Scheduling groups of jobs in the two-machine flow shop
TW345649B (en) Method for executing different sets of instructions that cause a processor to perform different data type operations
JPH0934511A5 (enExample)
EP0877327A3 (en) Method and apparatus for performing a join query in a database system
SG77192A1 (en) Server-side asynchronous form management
SE9503339D0 (sv) Method of synchronization allowing state transfer
WO2002031614A3 (en) Automated multi-level marketing system
ATE343175T1 (de) Dateitransfersystem, vorrichtung, verfahren und computerlesbares medium, das ein dateitransferprogramm speichert
WO2007064896A3 (en) Data exchange system and method
WO1997042575A3 (en) System and method for handling technical information
JPH096661A5 (enExample)
JPH08220438A5 (enExample)
EP0781002A3 (en) Optimizing performance in a packet slot priority packet transport system
EP0872989A3 (en) Communication processing system and method
JPH0887509A5 (enExample)
JPH1188423A5 (enExample)
Colin et al. Scheduling Tasks with Communication Delays on Multi-Levels Clusters.
JPH0965155A5 (enExample)
Zhang et al. Data partition: a practical parallel evaluation of Datalog programs
Chen et al. A distributed adaptive routing algorithm(in message and packet-switched computer-communication networks)
JPH10143411A5 (enExample)
JP2002132624A5 (enExample)
EP0774712A3 (en) Interleaving block operations in a computer system
JPH10326329A5 (enExample)
JPH09128448A5 (enExample)