JPH10231533A - Pin structure in swing connection part in work machine - Google Patents

Pin structure in swing connection part in work machine

Info

Publication number
JPH10231533A
JPH10231533A JP3496697A JP3496697A JPH10231533A JP H10231533 A JPH10231533 A JP H10231533A JP 3496697 A JP3496697 A JP 3496697A JP 3496697 A JP3496697 A JP 3496697A JP H10231533 A JPH10231533 A JP H10231533A
Authority
JP
Japan
Prior art keywords
boom
pin
working machine
working
pins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3496697A
Other languages
Japanese (ja)
Inventor
Tokuji Nagasawa
篤司 永澤
Hiroshi Mizushima
宏 水島
Yoshimitsu Sakuma
宜光 佐久間
Kazunori Shukuzawa
一徳 宿澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP3496697A priority Critical patent/JPH10231533A/en
Publication of JPH10231533A publication Critical patent/JPH10231533A/en
Pending legal-status Critical Current

Links

Landscapes

  • Shovels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a pin structure for a swing connection part in which passages of pressure oil to an actuator can be secured for pins while restricting strength deterioration of the pins to the minimum, and without complicating structures of bearings to support the pins. SOLUTION: A work machine is provided with a bucket 9, a first boom 1, a second boom 3, and a third boom 5 connected by pins 2, 4 for oscillating it, an offset cylinder to drive them, and arm cylinder 14, and a bucket cylinder 17. In this case, through holes 21, 22 are formed in radial directions of the pins 2, 4 in the work machine to be passages to introduce pressure oil to the arm cylinder 14 and the bucket cylinder 17, thereby the passages of pressure oil for the pins 2, 4 can be secured while restricting deterioration of strength of the pins 2, 4 to the minimum, and without complicating structures of bearings to support the pins 2, 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は作業具及び複数の作
業リンクと、それらを油圧により駆動するための複数の
アクチュエータとを備えた作業機に係り、特にこの作業
機は油圧ショベルなどの油圧作業機械に適用されるもの
であって、作業機の各作業リンク間を接続するピン接続
部付近の配管の配置を良好にするために好適な作業機に
おける揺動接続部のピン構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a working machine having a working tool, a plurality of working links, and a plurality of actuators for hydraulically driving the working tools. The present invention relates to a pin structure of a swing connection portion in a working machine, which is applied to a machine and is suitable for improving the arrangement of piping near a pin connection portion connecting between respective working links of the working machine.

【0002】[0002]

【従来の技術】従来の油圧作業機械における作業機を、
オフセット式の作業機を備えた油圧ショベルを例にして
説明する。一般的なオフセット式油圧ショベルの作業機
は、図4乃至図6に示すように構成されており、基端側
が旋回体50にピン51により上下動可能に接続された
第1ブーム52と、その第1ブーム52の先端側にピン
53により左右動可能に接続された基端側を設けている
第2ブーム54と、その第2ブーム54の先端側にピン
55により左右動可能に接続された基端側を設けている
第3ブーム56と、その第3ブーム56の先端側にピン
57により上下動可能に接続された基端側を設けている
アーム58と、アーム58の先端側にピン59により揺
動可能に接続された作業具であるバケット60とを備
え、それらをそれぞれ駆動するための複数のアクチュエ
ータである各作動シリンダ61,62,63及び64を
備えている。各作動シリンダ61乃至64は、旋回体1
に配置された油圧ポンプからの圧油が各2本ずつで合計
8本(図では4本を示している)の配管(ゴム製などの
ホース)65を通して導かれることで駆動されるように
なっている。前記各配管65は、その配置によっては作
業において障害物との接触などが発生してしまうので、
それをできる限り避けるため作業機である第1ブーム5
2,第2ブーム54及び第3ブーム56に沿うように上
面又は側面に配置されている。しかし、このように構成
しても、特に各ピン接続部分の周りでは、第1〜3ブー
ム,アームなどの各作業リンクが相互に揺動した場合
に、配管が引っ張られないようにするゆるみが配管の配
設において必要であり、このゆるみ分だけ作業リンクか
ら出っ張ることとなる。このゆるみは、特にオフセット
式作業リンク機構の場合にはそのオフセット時に、配管
が第2ブーム54の先端部で側方に出っ張ることとな
る。このことを防止するための提案が、実公平7−56
364号に記載されている。この提案での作業機は、図
7乃至図9に示すように構成されており、旋回体に基端
側がピンにより上下動可能に接続された第1ブーム70
と、その第1ブーム70の先端側に上下に2分割された
ピン71,72により左右動可能に接続された基端側を
設けている第2ブーム73と、その第2ブーム73の先
端側に上下に2分割されたピン74,75により左右動
可能に接続された基端側を設けている第3ブーム76
と、その第3ブーム76の先端側にピン77により上下
動可能に接続された基端側を設けているアーム78と、
アーム78の先端側にピンにより揺動可能に接続された
作業具であるバケットとを備え、それらをそれぞれ駆動
するための複数のアクチュエータ(図ではブームシリン
ダが除かれている)であるオフセットシリンダ79,ア
ームシリンダ80及びバケットシリンダ81を備えてい
る。各アクチュエータは、旋回体に配置された油圧ポン
プからの圧油が2本ずつの合計8本の配管(ゴム製など
のホース)82を通して導かれることで駆動されるよう
になっている。前記8本の配管82のうちでオフセット
シリンダ79,アームシリンダ80及びバケットシリン
ダ81に接続される6本の配管82が、障害物との接触
をできる限り避けるために、作業機である第1ブーム7
0,第2ブーム73及び第3ブーム76に内装されてい
る。この場合にピン接続部分では、特に配置のための空
間確保が難しいため、特に第1ブーム70と第2ブーム
73とを接続するピン及び、第2ブーム73と第3ブー
ム76とを接続するピンを上述のように、それぞれ2分
割したピン71,72とピン74,75とし、各ピンの
軸方向間に空間を作り、そこで配管82を通すようにし
ている。
2. Description of the Related Art A working machine of a conventional hydraulic working machine is called
A hydraulic excavator equipped with an offset type working machine will be described as an example. A working machine of a general offset hydraulic excavator is configured as shown in FIGS. 4 to 6, and includes a first boom 52 whose base end is connected to a revolving unit 50 by a pin 51 so as to be vertically movable, A second boom 54 having a base end connected to the distal end of the first boom 52 so as to be able to move left and right by a pin 53, and a distal end of the second boom 54 is connected to be movable left and right by a pin 55. A third boom 56 having a proximal end, an arm 58 having a proximal end movably connected to the distal end of the third boom 56 by a pin 57, and a pin A bucket 60, which is a work tool, which is swingably connected by 59, is provided with a plurality of working cylinders 61, 62, 63, and 64, which are a plurality of actuators for driving them. Each of the working cylinders 61 to 64 is a revolving unit 1
Is driven by the pressure oil from the hydraulic pumps arranged in each being guided through a total of eight (four in the figure) piping (rubber or other hoses) 65 for each two. ing. Each of the pipes 65 may cause contact with an obstacle or the like during the operation depending on its arrangement.
First boom 5 which is a working machine to avoid it as much as possible
2, it is arranged on the upper surface or the side surface along the second boom 54 and the third boom 56. However, even with such a configuration, especially around each pin connection portion, when each of the working links such as the first to third booms and the arm swings with each other, there is a slack that prevents the pipe from being pulled. This is necessary in the arrangement of the pipes, and the projecting link will protrude from the work link by the amount of the slack. This looseness causes the piping to protrude laterally at the tip of the second boom 54 at the time of offsetting, particularly in the case of the offset type working link mechanism. Proposals to prevent this have been reported in
No. 364. The working machine according to this proposal is configured as shown in FIGS. 7 to 9, and has a first boom 70 whose base end is connected to a revolving body by a pin so as to be vertically movable.
A second boom 73 having a proximal end connected to the distal end side of the first boom 70 so as to be movable left and right by pins 71 and 72 divided into two vertically, and a distal end side of the second boom 73. Boom 76 having a base end side movably connected by pins 74 and 75 vertically divided into two parts.
An arm 78 having a proximal end connected to the distal end of the third boom 76 so as to be vertically movable by a pin 77;
A bucket, which is a working tool, which is swingably connected to the distal end of the arm 78 by a pin, includes a plurality of actuators (the boom cylinder is omitted in the figure) for driving the buckets. , An arm cylinder 80 and a bucket cylinder 81. Each actuator is driven by pressure oil from a hydraulic pump disposed on the revolving structure being guided through a total of eight pipes (hoses made of rubber or the like) 82 each. Of the eight pipes 82, six pipes 82 connected to the offset cylinder 79, the arm cylinder 80, and the bucket cylinder 81 are provided with a first boom as a working machine in order to avoid contact with an obstacle as much as possible. 7
0, the second boom 73 and the third boom 76. In this case, since it is particularly difficult to secure a space for arrangement at the pin connection portion, a pin for connecting the first boom 70 and the second boom 73 and a pin for connecting the second boom 73 and the third boom 76 are particularly provided. As described above, the pins 71 and 72 and the pins 74 and 75 are respectively divided into two, and a space is formed between the pins in the axial direction, and the pipe 82 is passed there.

【0003】[0003]

【発明が解決しようとする課題】上記の従来の作業機に
おけるピン構造では、配管を通すための空間を形成する
ためにピンを2分割としているが、これによりそれぞれ
のピンを別々に支持するための軸受の構造が複雑にな
り、またそれぞれのピン接続部分に作用する負荷を考慮
した場合に1つのピンの時よりも軸受の強度を上げなけ
ればならないので、結果としてピン接続部分が大きくな
り、作業機自体の重量が増すことで作業時の安定性が低
下してしまう。
In the above-described pin structure of the conventional working machine, the pins are divided into two in order to form a space for passing a pipe. The structure of the bearing becomes complicated, and in consideration of the load acting on each pin connection, the strength of the bearing must be increased as compared with the case of one pin. As a result, the pin connection becomes large, When the weight of the working machine itself increases, the stability at the time of working decreases.

【0004】本発明は上記課題に鑑みて成されたもの
で、その目的はピンの強度をできる限り低下させず、ま
たピンを支持する軸受の構造を複雑にしないでアクチュ
エータへの圧油の経路をピンに確保することが可能であ
る作業機における揺動接続部のピン構造を提供すること
にある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has as its object to reduce the strength of a pin as much as possible and to reduce the path of pressure oil to an actuator without complicating the structure of a bearing that supports the pin. It is an object of the present invention to provide a pin structure of a swing connection portion in a working machine that can secure a pin to a pin.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めに、作業具と、それを揺動するためにピンにより接続
された複数の作業リンクと、それらを駆動する複数のア
クチュエータとを備えた作業機であって、その基端側を
本体にピンにより揺動可能に取り付けた油圧作業機械に
おいて、上記作業機における上記ピンの径方向には、ア
クチュエータへ圧油を導く経路となる貫通孔を形成した
ものである。
In order to achieve the above object, a work implement, a plurality of work links connected by pins for swinging the work implement, and a plurality of actuators for driving them are provided. A hydraulic working machine, the base end of which is swingably mounted on a main body by means of a pin, wherein the working machine has a through-hole in a radial direction of the pin which serves as a path for guiding hydraulic oil to an actuator. Is formed.

【0006】また、上記作業機を構成する複数の作業リ
ンクは、少なくともブームもしくはアームの一方から成
っており、そのブームもしくはアームと他の作業リンク
とを接続する上記ピンの径方向には、アクチュエータへ
圧油を導く経路となる貫通孔を形成しても良い。
[0006] The plurality of working links constituting the working machine include at least one of a boom and an arm, and an actuator is provided in a radial direction of the pin connecting the boom or the arm to another working link. A through-hole serving as a path for guiding the pressurized oil may be formed.

【0007】また、上記作業機における上記ピンの径方
向に形成した貫通孔には、アクチュエータへ圧油を導く
配管を通しても良い。
Further, a pipe for guiding pressure oil to an actuator may be passed through a through hole formed in a radial direction of the pin in the working machine.

【0008】また、上記作業機を構成する複数の作業リ
ンクは、少なくとも第1ブーム,第2ブーム,第3ブー
ム及びアームから成るオフセット式作業リンク機構であ
り、本体に揺動可能に取り付けられた第1ブームに第2
ブームが左右動可能に、第2ブームに第3ブームが左右
動可能に、第3ブームにアームが上下動可能にそれぞれ
ピンにより接続されており、少なくとも第2ブームと第
3ブームとを接続する上記ピンの径方向に貫通孔を形成
し、この貫通孔に上記作業具を駆動するアクチュエータ
もしくはアームを駆動するアクチュエータの少なくとも
一方へ圧油を導く配管を通しても良い。
The plurality of working links constituting the working machine are offset type working link mechanisms including at least a first boom, a second boom, a third boom and an arm, and are swingably attached to the main body. Second in first boom
The boom is movable left and right, the second boom is movable left and right, the third boom is vertically movable and the arm is connected by pins, and at least the second boom and the third boom are connected. A through-hole may be formed in the radial direction of the pin, and a pipe for guiding pressure oil to at least one of an actuator for driving the work implement or an actuator for driving the arm may be passed through the through-hole.

【0009】また、作業具と、それを揺動するためにピ
ンにより接続された複数の作業リンクと、それらを駆動
する複数のアクチュエータとを備えた作業機であって、
その基端側を本体にピンにより揺動可能に取り付けた油
圧作業機械において、上記作業機における上記ピンの径
方向には、アクチュエータへ圧油を導く経路となる複数
の貫通孔を形成しても良い。
Also, there is provided a working machine comprising a working tool, a plurality of working links connected by pins for swinging the working tool, and a plurality of actuators for driving them.
In a hydraulic working machine whose base end side is swingably attached to a main body by a pin, a plurality of through holes serving as a path for guiding pressure oil to an actuator may be formed in a radial direction of the pin in the working machine. good.

【0010】さらにまた、上記ピンに形成した複数の貫
通孔における開口端部には、それぞれ配管接続用の接続
具が取り付けられており、その接続具に上記アクチュエ
ータへ圧油を導く配管を取付けても良い。
[0010] Furthermore, a connecting member for pipe connection is attached to each of the open ends of the plurality of through holes formed in the pin, and a pipe for guiding pressure oil to the actuator is attached to the connecting member. Is also good.

【0011】上記のように構成された作業機における揺
動接続部のピン構造では、ピンに圧油を導く経路を形成
したことで、作業機を重くすることなくしかも構造を複
雑にすることなく、ピン周辺の狭い部分での圧油の経路
が確保される。そして、作業機の作業具及び作業リンク
を接続するピンが一般的なものと同様に一つものから形
成されているので、支持する軸受に関してもピン上下の
二箇所で一般的なものと同様に支持することで良く、軸
受の構造が複雑になることがない。
[0011] In the pin structure of the swing connection portion in the working machine configured as described above, the path for guiding the pressure oil to the pin is formed, so that the working machine is not made heavy and the structure is not complicated. Thus, a path for the pressure oil in a narrow portion around the pin is secured. And, since the pins for connecting the working tool and the working link of the working machine are formed from one like the general one, the bearing to be supported is also similar to the general one at two places above and below the pin. It is sufficient to support, and the structure of the bearing does not become complicated.

【0012】また、この構成は作業機のリンク数、それ
を駆動するアクチュエータ数が多く、かつその作動中に
アクチュエータに圧油を導く配管のたわみ量が変化する
オフセット式作業リンク機構の場合には、特にそのピン
接続部の周囲が狭くなっているので、ピン自体にアクチ
ュエータへ圧油を導く経路を形成したことで、配管のた
わみ量の変化を小さくして、作業機からの配管の飛び出
しを少なくすることができる。
Further, this configuration is suitable for an offset type working link mechanism in which the number of links of the working machine and the number of actuators for driving the working machine are large, and the amount of deflection of a pipe for guiding hydraulic oil to the actuator during the operation is changed. In particular, since the area around the pin connection is narrow, the path for guiding the pressurized oil to the actuator is formed in the pin itself, reducing the change in the amount of deflection of the pipe and preventing the pipe from jumping out of the work equipment. Can be reduced.

【0013】以上のように、作業機における揺動接続部
のピンの径方向にアクチュエータに圧油を導く経路とな
る貫通孔を形成したことで、ピン自体は分割されること
なく1つであるため、支持するための軸受は通常の構成
でよく、また、ピンに作用する負荷に対してもピンが分
割されていないことから十分に耐久性を維持することが
できる。
As described above, since the through-hole serving as a path for guiding the pressure oil to the actuator in the radial direction of the pin of the swing connection portion in the working machine is formed, the pin itself is one without being divided. Therefore, the bearing for supporting may have a normal configuration, and sufficient durability can be maintained because the pins are not divided even with respect to the load acting on the pins.

【0014】[0014]

【発明の実施の形態】以下、本発明の第1の実施の形態
を図1及び図2により説明する。この図は、作業機がオ
フセット式作業リンク機構及び作業具であるバケットか
ら成っている構成を示しており、作業機の作業リンクと
しては、図示していない本体(例えば油圧ショベルの旋
回体)に基端側を横置きのピンにより上下動可能(俯仰
動可能)に取り付けられた第1ブーム(ロアブーム)1
と、その第1ブーム1の先端部に縦置きのピン2により
左右動可能に取り付けられた第2ブーム(アッパブー
ム)3と、第2ブーム3の先端部に縦置きのピン4によ
り左右動可能に取り付けられた第3ブーム(オフセット
ブーム)5と、第3ブーム5の先端部に横置きのピン6
により上下動可能(俯仰動可能)に取り付けられたアー
ム7とから成っており、アーム7の先端部には横置きの
ピン8により上下動可能(俯仰動可能)に前記バケット
9が取り付けられている。第1ブーム1の下面側には、
それを駆動するアクチュエータであるブームシリンダが
図示していない前記本体との間に取り付けられている。
また、第1ブーム1先端部の一側面に設けたブラケット
10には、第3ブーム5の一側面に設けたブラケット1
1との間に第2ブーム3と平行にロッド12が取り付け
られている。また第1ブーム1先端部の他側面に設けた
図示していないブラケットには、第2ブーム3の他側面
に設けた図示していないブラケットとの間にオフセット
シリンダ(オフセット用アクチュエータ)が取り付けら
れている。第3ブーム5の上方位置には、アーム7基端
側に設けたブラケット13にピストンロッド先端部が接
続されたアームシリンダ(アーム用アクチュエータ)1
4の筒状部(チューブ)が取り付けられている。アーム
7の上面側には、前記ブラケット13に筒状部が取り付
けられ、ピストンロッド先端部がアーム7先端部のリン
ク15,16を介してバケット9の背面部に接続された
バケットシリンダ(バケット用アクチュエータ)17が
配置されている。ブームシリンダに接続された2つの配
管は、本体から配設されており、オフセットシリンダへ
連通する2つの配管は、図示していないが第1ブーム1
の上面に沿って配設された後、第2ブーム3のオフセッ
トシリンダ側に曲げられてから接続されており、アーム
シリンダ14及びバケットシリンダ17の各2つの配管
18,19は、第1ブーム1の上面に沿って配設された
後、第1ブーム1先端部の前記ロッド12側に設けられ
た挿入口20を通して第2ブーム3内に導かれ、ピン
2,4の中間部の径方向に形成された貫通孔21,22
をそれぞれ通されて、第2ブーム3の先端部に設けた開
口部23から第3ブーム5内へ導かれ、そして第3ブー
ム5から出された後、アームシリンダ14へまたブラケ
ット13内を通されてからバケットシリンダ17へそれ
ぞれ接続されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a first embodiment of the present invention will be described with reference to FIGS. This drawing shows a configuration in which the working machine is composed of an offset type working link mechanism and a bucket which is a working tool. The working link of the working machine includes a main body (not shown) (for example, a revolving body of a hydraulic shovel). First boom (low boom) 1 attached to the base end side so as to be able to move up and down (possible to elevate) with a horizontal pin
A second boom (upper boom) 3 attached to the tip of the first boom 1 so as to be able to move left and right by means of a vertically placed pin 2, and a vertically movable pin 4 at the tip of the second boom 3 A third boom (offset boom) 5 attached to the
The arm 9 is attached to the arm 7 so as to be able to move up and down (up and down). I have. On the lower surface side of the first boom 1,
A boom cylinder, which is an actuator for driving the boom cylinder, is attached to the main body (not shown).
The bracket 1 provided on one side of the third boom 5 is provided on the bracket 10 provided on one side of the tip of the first boom 1.
1 and a rod 12 is attached in parallel with the second boom 3. An offset cylinder (offset actuator) is attached to a bracket (not shown) provided on the other side of the first boom 1 at the other side surface of the second boom 3. ing. An arm cylinder (arm actuator) 1 having a piston rod distal end connected to a bracket 13 provided on the base end side of the arm 7 is located above the third boom 5.
4 is attached. On the upper surface side of the arm 7, a cylindrical portion is attached to the bracket 13, and a tip end portion of a piston rod is connected to a back portion of the bucket 9 via links 15 and 16 at the tip end portion of the arm 7. Actuator) 17 is provided. The two pipes connected to the boom cylinder are provided from the main body, and the two pipes communicating with the offset cylinder are not shown in the first boom 1.
After being arranged along the upper surface of the second boom 3, the second boom 3 is connected to the offset cylinder side after being bent, and the two pipes 18 and 19 of the arm cylinder 14 and the bucket cylinder 17 are connected to the first boom 1 After being arranged along the upper surface of the first boom 1, it is guided into the second boom 3 through the insertion port 20 provided on the rod 12 side of the tip of the first boom 1, and is radially located at the intermediate portion between the pins 2 and 4. Formed through holes 21 and 22
Through the opening 23 provided at the distal end of the second boom 3 and into the third boom 5, and after being taken out of the third boom 5, the arm 23 is passed through the bracket 13. After that, they are connected to the bucket cylinders 17 respectively.

【0015】上記の構成により、バケットシリンダ17
及びアームシリンダ14へ圧油を導く配管18,19
を、第2ブーム3内にあってピン2,4に形成した圧油
を導く経路である貫通孔21,22を通すことで、作業
具であるバケット9に比較的近い位置となる配管18,
19が作業機から飛び出すことをできる限り防止してい
るので、作業中に配管が掘削物と接触することが少なく
なる。また、第1〜第3ブーム1,3,5,アーム7及
びバケット9などの作業機のリンク数、それを駆動する
ためのアクチュエータ数が多く、かつオフセット作動時
にオフセットシリンダに圧油を導く配管18のたわみ量
が変化するオフセット式作業リンク機構の場合には、特
にそのピン4の接続部の周囲が狭くなっているので、ピ
ン4自体にオフセットシリンダへ圧油を導く配管18を
通す経路を形成したことで、配管18を通すための空間
を確保することができ、またオフセット動作時の配管の
たわみ量の変化を少なくできるので、作業機からの配管
の飛び出しがあったとしてもきわめて少なくなる。ピン
2,4は、ともに一般的なピンと同様に1つの部材によ
って形成されているため、支持する軸受が第2ブーム3
における上下の二箇所となっているので、一般的な作業
機のピン支持構造と同様であり、軸受の構造が複雑にな
らない。
With the above configuration, the bucket cylinder 17
And pipes 18 and 19 for guiding pressure oil to arm cylinder 14
Through the through holes 21 and 22 in the second boom 3, which are paths for guiding the pressurized oil formed on the pins 2 and 4, so that the pipes 18, which are relatively close to the bucket 9 as the working tool,
Since the pipe 19 is prevented from jumping out of the work machine as much as possible, the pipe is less likely to come into contact with the excavated material during the work. In addition, the number of links of the working machine such as the first to third booms 1, 3, 5, 5 and the arm 7 and the bucket 9 and the number of actuators for driving the link are large, and piping for guiding the pressure oil to the offset cylinder at the time of the offset operation In the case of the offset type working link mechanism in which the amount of deflection of the pin 18 changes, the circumference of the connecting portion of the pin 4 is particularly narrow, so that the path through which the pipe 18 for guiding the pressurized oil to the offset cylinder to the pin 4 itself is provided. By forming the pipe, a space for passing the pipe 18 can be secured, and a change in the amount of deflection of the pipe at the time of the offset operation can be reduced, so that even if the pipe jumps out of the working machine, it is extremely reduced. . Since both pins 2 and 4 are formed by one member as in the case of a general pin, the bearing to be supported is the second boom 3.
, The upper and lower positions are the same as those of the conventional working machine, and the structure of the bearing is not complicated.

【0016】次に、本発明の第2の実施の形態を図3に
より説明する。この図は、図1に示したピン2,4の位
置に適用される各ピンの変形例を示しており、他の構成
については図1の構成と同様であるため、その説明を省
略する。ピン30,31には、それぞれ中間部の径方向
に4つの貫通孔32,33が上下方向に平行して形成さ
れており、各貫通孔32,33の両開口端部にはそれぞ
れ配管接続用の接続具であるニップル34,35を介し
てアームシリンダ14及びバケットシリンダ17に接続
される各2つの配管36,37が接続されている。この
ようにニップル34,35を用いてピン30,31に形
成した貫通孔32,33を直接圧油を導くための経路に
しても、上記第1の実施の形態と同様な作用となる。ま
た、貫通孔32,33の大きさとしては、圧油を通すた
めの必要最小限の穴径にすることができる。
Next, a second embodiment of the present invention will be described with reference to FIG. This figure shows a modified example of each pin applied to the positions of the pins 2 and 4 shown in FIG. 1, and other configurations are the same as those in FIG. Four through holes 32 and 33 are formed in the pins 30 and 31 in the radial direction of the intermediate portion, respectively, in parallel with the vertical direction. The two pipes 36 and 37 connected to the arm cylinder 14 and the bucket cylinder 17 via the nipples 34 and 35, respectively, are connected. As described above, even when the through holes 32 and 33 formed in the pins 30 and 31 by using the nipples 34 and 35 are used as paths for directly guiding the pressurized oil, the same operation as in the first embodiment is performed. Further, the size of the through holes 32 and 33 can be set to the minimum necessary hole diameter for passing the pressure oil.

【0017】次に、図示してはいないが他の応用例及び
他の変形例について、以下に説明する。
Next, although not shown, other application examples and other modifications will be described below.

【0018】上記の各実施の形態では作業リンクを比較
的多く備えたオフセット式作業リンクを例にしている
が、作業機を構成する複数の作業リンクが、少なくとも
ブームもしくはアームの一方から成っており、そのブー
ムもしくはアームと他の作業リンクとを接続する少なく
とも1つのピンの径方向に、作業リンクを駆動するアク
チュエータへ圧油を導く経路となる貫通孔を形成しても
よく、この場合の例としては、ブーム,アーム及びバケ
ットを備えた一般的な掘削作業機であり、さらに具体的
な例として油圧ショベルが挙げられる。
In each of the above embodiments, an offset type working link having a relatively large number of working links is taken as an example. However, a plurality of working links constituting a working machine are constituted by at least one of a boom or an arm. A through-hole may be formed in the radial direction of at least one pin connecting the boom or arm and another working link, as a path for guiding pressure oil to an actuator for driving the working link. In this case, Is a general excavator equipped with a boom, an arm, and a bucket, and a more specific example is a hydraulic excavator.

【0019】上記の各実施の形態では、配管18,19
及び配管36,37を第1ブーム1の先端部から第2ブ
ーム3へ内装する構成であったが、例えば第2ブーム3
の途中に形成した挿入口から内装して、第2ブーム3の
先端側のピン4,31に形成した貫通孔22,33を通
す構成、つまり第2ブーム3の先端側のピン4,31の
貫通孔22,33のみを通すようにしても良く、また従
来技術として挙げた実公平7−56364号と同様に第
1ブーム1を内装させた後、上記の各実施の形態で示し
た第2ブーム3を内装させるように構成しても良い。
In each of the above embodiments, the pipes 18, 19
And the pipes 36 and 37 are installed inside the second boom 3 from the distal end of the first boom 1.
And the through holes 22 and 33 formed in the pins 4 and 31 on the tip of the second boom 3, that is, the pins 4 and 31 on the tip of the second boom 3 are inserted. Only the through-holes 22 and 33 may be passed through, and after the first boom 1 is internally provided in the same manner as in Japanese Utility Model Publication No. 7-56364 described as the prior art, the second boom shown in each of the above-described embodiments is provided. You may comprise so that the boom 3 may be equipped.

【0020】上記の各実施の形態では、作業機内のピン
構造について示しているが、作業機と本体とを接続する
ピンについても同様に構成することができるので、例え
ば第1ブーム1の基端側を左右方向に旋回させて側溝堀
作業などを行ういわゆるスイング式油圧ショベルで適用
することで、本体のスイングポスト部分での配管の内装
化をピンの軸受構造を複雑にすることなく構成すること
ができる。
In each of the above embodiments, the pin structure in the working machine is shown. However, since the pin for connecting the working machine to the main body can be similarly configured, for example, the base end of the first boom 1 can be used. By applying a so-called swing type excavator that turns the side in the left and right direction to perform gutter work, etc., the interior of the piping at the swing post part of the main body can be configured without complicating the pin bearing structure Can be.

【0021】上記第1の実施の形態での変形例として
は、ピン2,4の径方向に2つの貫通孔を上下方向に平
行して形成し、それぞれに2つの配管18,19を組に
して通しても良い。もちろん、2つの配管18又は19
を通す貫通孔をピン2,4に形成して、アームシリンダ
14もしくはバケットシリンダ17のいずれか一方へ接
続する配管18又は19を通すようにしても良い。
As a modification of the first embodiment, two through-holes are formed in the radial direction of the pins 2 and 4 in parallel in the vertical direction, and two pipes 18 and 19 are respectively formed as a set. You can pass through. Of course, two pipes 18 or 19
It is also possible to form through holes in the pins 2 and 4 through which the pipes 18 and 19 connected to either the arm cylinder 14 or the bucket cylinder 17 pass.

【0022】上記第2の実施の形態での変形例として
は、ピン30,31の径方向に形成した4つの貫通孔3
2,33のそれぞれに配管36,37を通しても良い。
この場合には、ニップル34,35を用いなくても良い
が、各貫通孔32,33の径を配管36,37が通れる
大きさにする必要がある。
As a modification of the second embodiment, four through holes 3 formed in the radial direction of the pins 30 and 31 are provided.
The pipes 36 and 37 may be passed through the pipes 2 and 33, respectively.
In this case, the nipples 34 and 35 need not be used, but the diameters of the through holes 32 and 33 need to be large enough to allow the pipes 36 and 37 to pass through.

【0023】上記のように、ピン2,4及び30,31
に圧油を導く経路を形成したことで、作業機を重くする
ことなくしかも構造を複雑にすることなく、ピン周辺の
狭い部分での圧油の経路が確保される。そして、作業機
の作業具及び作業リンクを接続するピンを支持する軸受
は、ピン上下の二箇所で支持することで良く、一般的な
ピンの支持と同様であり、軸受の構造が複雑になること
がない。
As described above, pins 2, 4 and 30, 31
By forming the path for guiding the pressure oil to the pin, a path for the pressure oil in a narrow portion around the pin is secured without making the working machine heavy and without complicating the structure. And the bearing which supports the pin which connects the working tool and the working link of the working machine may be supported at two places above and below the pin, which is the same as general pin support, and the structure of the bearing becomes complicated. Nothing.

【0024】[0024]

【発明の効果】以上説明した本発明の作業機における揺
動接続部のピン構造によれば、作業機における揺動接続
部のピンの径方向にアクチュエータへ圧油を導く経路と
なる貫通孔を形成したことで、ピンの強度をできる限り
低下させず、またピンを支持する軸受の構造を複雑にし
ないでアクチュエータへの圧油の経路をピンに確保する
ことができる。
According to the pin structure of the swing connection portion in the working machine of the present invention described above, the through hole serving as a path for guiding the pressure oil to the actuator in the radial direction of the pin of the swing connection portion in the work machine is formed. By forming the pin, the path of the pressure oil to the actuator can be secured to the pin without reducing the strength of the pin as much as possible and without complicating the structure of the bearing that supports the pin.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施の形態を示し、作業機がオ
フセット式作業リンク機構及び作業具であるバケットか
ら成っている構成を示す説明用側面図である。
FIG. 1 is a side view for illustrating a first embodiment of the present invention, showing a configuration in which a working machine includes an offset type working link mechanism and a bucket as a working tool.

【図2】図1に示されているピン2,4の構造を説明す
るための説明用拡大図である。
FIG. 2 is an enlarged view for explaining a structure of pins 2 and 4 shown in FIG. 1;

【図3】本発明の第2の実施の形態を示し、図2と同様
に図1のピン2,4に置き換わるピン30,31の構造
を説明するための説明用拡大図である。
FIG. 3 is an explanatory enlarged view illustrating a second embodiment of the present invention and illustrating the structure of pins 30 and 31 replacing pins 2 and 4 of FIG. 1 similarly to FIG. 2;

【図4】従来のオフセット式油圧ショベルを示す説明用
斜視図である。
FIG. 4 is an explanatory perspective view showing a conventional offset hydraulic excavator.

【図5】図4の作業機を示し、配管を内装しない構造を
示す説明用側面図である。
5 is an explanatory side view showing the structure of the work machine of FIG. 4 without piping.

【図6】図5の作業機を上方から見た状態を示す説明用
上面図である。
6 is an explanatory top view showing a state where the work machine of FIG. 5 is viewed from above.

【図7】従来のオフセット式油圧ショベルの作業機であ
って、第1ブームと第2ブームとのピン接続部を中心に
構造を示しており、配管の内装構造を表した説明用断面
図である。
FIG. 7 is a cross-sectional view for explaining a working machine of a conventional offset hydraulic excavator, showing a structure centering on a pin connecting portion between a first boom and a second boom, and showing an internal structure of a pipe. is there.

【図8】図7に関連し、第1ブーム,第2ブーム及び第
3ブームとのピン接続部を中心に構造を示した説明用断
面図である。
FIG. 8 is an explanatory cross-sectional view related to FIG. 7, showing a structure centering on a pin connection portion between a first boom, a second boom, and a third boom.

【図9】図7に関連し、第2ブーム,第3ブーム及びア
ームとのピン接続部を中心に構造を示した説明用断面図
である。
FIG. 9 is an explanatory cross-sectional view related to FIG. 7, showing a structure centering on a pin connection portion between a second boom, a third boom, and an arm.

【符号の説明】[Explanation of symbols]

1 第1ブーム 2 ピン 3 第2ブーム 4 ピン 5 第3ブーム 6 ピン 7 アーム 8 ピン 9 バケット 14 アームシリンダ 17 バケットシリンダ 18 配管 19 配管 21 貫通孔 22 貫通孔 30 ピン 31 ピン 32 貫通孔 33 貫通孔 34 ニップル 35 ニップル 36 配管 37 配管 1 1 boom 2 pin 3 2nd boom 4 pin 5 3rd boom 6 pin 7 arm 8 pin 9 bucket 14 arm cylinder 17 bucket cylinder 18 piping 19 piping 21 through hole 22 through hole 30 pin 31 pin 32 pin 32 through hole 33 through hole 34 Nipple 35 Nipple 36 Piping 37 Piping

───────────────────────────────────────────────────── フロントページの続き (72)発明者 宿澤 一徳 茨城県土浦市神立町650番地 日立建機エ ンジニアリング株式会社内 ──────────────────────────────────────────────────続 き Continuing from the front page (72) Inventor Kazunori Sukuzawa 650, Kandamachi, Tsuchiura-shi, Ibaraki Prefecture Within Hitachi Construction Machinery Engineering Co., Ltd.

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 作業具と、それを揺動するためにピンに
より接続された複数の作業リンクと、それらを駆動する
複数のアクチュエータとを備えた作業機であって、その
基端側を本体にピンにより揺動可能に取り付けた油圧作
業機械において、上記作業機における上記ピンの径方向
には、アクチュエータへ圧油を導く経路となる貫通孔を
形成したことを特徴とする作業機における揺動接続部の
ピン構造。
1. A work machine comprising a work implement, a plurality of work links connected by pins for swinging the work implement, and a plurality of actuators for driving the work implement. A hydraulic working machine pivotally attached to the working machine, wherein a through hole is formed in a radial direction of the pin in the working machine so as to guide pressure oil to an actuator. Pin structure of connection part.
【請求項2】 上記作業機を構成する複数の作業リンク
は、少なくともブームもしくはアームの一方から成って
おり、そのブームもしくはアームと他の作業リンクとを
接続する上記ピンの径方向には、アクチュエータへ圧油
を導く経路となる貫通孔を形成したことを特徴とする請
求項1記載の作業機における揺動接続部のピン構造。
2. A plurality of working links constituting the working machine, each comprising at least one of a boom and an arm, and an actuator is provided in a radial direction of the pin connecting the boom or the arm to another working link. 2. The pin structure of a swing connection part in a working machine according to claim 1, wherein a through-hole serving as a path for guiding the pressurized oil is formed.
【請求項3】 上記作業機における上記ピンの径方向に
形成した貫通孔には、アクチュエータへ圧油を導く配管
を通したことを特徴とする請求項1又は2記載の作業機
における揺動接続部のピン構造。
3. The swing connection in a working machine according to claim 1, wherein a pipe for guiding pressure oil to an actuator is passed through a through hole formed in a radial direction of the pin in the working machine. Pin structure of the part.
【請求項4】 上記作業機を構成する複数の作業リンク
は、少なくとも第1ブーム,第2ブーム,第3ブーム及
びアームから成るオフセット式作業リンク機構であり、
本体に揺動可能に取り付けられた第1ブームに第2ブー
ムが左右動可能に、第2ブームに第3ブームが左右動可
能に、第3ブームにアームが上下動可能にそれぞれピン
により接続されており、少なくとも第2ブームと第3ブ
ームとを接続する上記ピンの径方向に貫通孔を形成し、
この貫通孔に上記作業具を駆動するアクチュエータもし
くはアームを駆動するアクチュエータの少なくとも一方
へ圧油を導く配管を通したことを特徴とする請求項1記
載の作業機における揺動接続部のピン構造。
4. A plurality of working links constituting said working machine are offset type working link mechanisms including at least a first boom, a second boom, a third boom and an arm.
A second boom is connected to the first boom swingably attached to the main body so that the second boom can move left and right, a second boom can move left and right, and an arm is connected to the third boom so that the arm can move up and down. Forming at least a through hole in the radial direction of the pin for connecting the second boom and the third boom,
2. The pin structure of a swing connection part in a working machine according to claim 1, wherein a pipe for guiding pressure oil to at least one of an actuator for driving the work implement and an actuator for driving the arm is passed through the through hole.
【請求項5】 作業具と、それを揺動するためにピンに
より接続された複数の作業リンクと、それらを駆動する
複数のアクチュエータとを備えた作業機であって、その
基端側を本体にピンにより揺動可能に取り付けた油圧作
業機械において、上記作業機における上記ピンの径方向
には、アクチュエータへ圧油を導く経路となる複数の貫
通孔を形成したことを特徴とする作業機における揺動接
続部のピン構造。
5. A work machine comprising a work implement, a plurality of work links connected by pins for swinging the work implement, and a plurality of actuators for driving the work implement, the base end of which is a main body. A hydraulic working machine pivotally mounted by a pin on the working machine, wherein a plurality of through holes serving as a path for guiding pressure oil to an actuator are formed in a radial direction of the pin in the working machine. Pin structure of swing connection.
【請求項6】 上記ピンに形成した複数の貫通孔におけ
る開口部には、それぞれ配管接続用の接続具が取り付け
られており、その接続具には上記アクチュエータへ圧油
を導く配管を取り付けたことを特徴とする請求項5記載
の作業機における揺動接続部のピン構造。
6. A connector for pipe connection is attached to each of the openings of the plurality of through holes formed in the pin, and a pipe for guiding pressure oil to the actuator is attached to the connector. The pin structure of the swing connection part in the work machine according to claim 5, characterized in that:
JP3496697A 1997-02-19 1997-02-19 Pin structure in swing connection part in work machine Pending JPH10231533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3496697A JPH10231533A (en) 1997-02-19 1997-02-19 Pin structure in swing connection part in work machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3496697A JPH10231533A (en) 1997-02-19 1997-02-19 Pin structure in swing connection part in work machine

Publications (1)

Publication Number Publication Date
JPH10231533A true JPH10231533A (en) 1998-09-02

Family

ID=12428896

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3496697A Pending JPH10231533A (en) 1997-02-19 1997-02-19 Pin structure in swing connection part in work machine

Country Status (1)

Country Link
JP (1) JPH10231533A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437388A (en) * 2013-09-11 2013-12-11 上海三一重机有限公司 Connecting structure of oil cylinder support base and pin roll as well as mechanical device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437388A (en) * 2013-09-11 2013-12-11 上海三一重机有限公司 Connecting structure of oil cylinder support base and pin roll as well as mechanical device

Similar Documents

Publication Publication Date Title
DE10158532A1 (en) Hydraulically driven machine
KR100483334B1 (en) Excavator
KR20080111053A (en) Boom for excavation machine
KR100969909B1 (en) Hydraulic piping structure for work vehicle
JPH09302706A (en) Working machine
AU775535B2 (en) Piping structure of working machine
JPH10231533A (en) Pin structure in swing connection part in work machine
JP6257829B1 (en) Pile driver
KR100320575B1 (en) Excavator
JPH10331184A (en) Working machine for hydraulic shovel
JPH10231534A (en) Pin structure in swing connection part in work machine
JP2009007760A (en) Construction machine
KR200254081Y1 (en) attachment for hydraulic crane cutting machine
JP2007231579A (en) Front device of construction machinery
JP2009133084A (en) Offset boom type front device
JP4556538B2 (en) Construction machinery
JPH10231535A (en) Pin structure in swing connection part in work machine
JP2935636B2 (en) Hydraulic excavator piping structure
JP4005429B2 (en) Swivel construction machine
JPH09296475A (en) Boom type construction machine
JP4648357B2 (en) Swivel construction machine
JP3762137B2 (en) Construction machinery
JP3344196B2 (en) Swing excavator
JP2000095476A (en) Bucket link with hook
JP3172936B2 (en) Construction machinery offset mechanism