JPH09256474A - Construction method for columnar structure - Google Patents

Construction method for columnar structure

Info

Publication number
JPH09256474A
JPH09256474A JP9183396A JP9183396A JPH09256474A JP H09256474 A JPH09256474 A JP H09256474A JP 9183396 A JP9183396 A JP 9183396A JP 9183396 A JP9183396 A JP 9183396A JP H09256474 A JPH09256474 A JP H09256474A
Authority
JP
Japan
Prior art keywords
pillar
column
layer structure
erection
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9183396A
Other languages
Japanese (ja)
Inventor
Katsumi Matsumoto
克己 松本
Shigeo Kamiyama
繁夫 神山
Hirotsugu Hayashi
洋次 林
Yukinobu Otani
行伸 大谷
Hiroshi Hanada
浩 花田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikken Industry Co Ltd
Original Assignee
Nikken Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikken Industry Co Ltd filed Critical Nikken Industry Co Ltd
Priority to JP9183396A priority Critical patent/JPH09256474A/en
Publication of JPH09256474A publication Critical patent/JPH09256474A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a construction method capable of eliminating a crane work or the like at an elevated place, and install each facility for a roof part safely as well as economically, regarding a columnar structure such as a canopy. SOLUTION: A column member has a jointed column structure made of a lower column 2A, an upper column 2B and an intermediate column 2C positioned between the lower and upper columns 2A and 2B. A structure is temporarily constructed, with the intermediate column 2C removed. Thereafter, the intermediate column 2C is jointed to the lower end of the upper column 2B with a pin, so as to be capable of being suspended, and an upper structure including the upper column 2B is erected on the operation of an erecting device. Then, each jointing part is fixed, with the intermediate column 25 positioned between the upper column 2B and the lower column 24.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は柱状の骨組み体よ
りなるいわゆる柱状構築物の構築方法に関し、特には、
給油所のキャノピーの構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a so-called columnar structure composed of a columnar framework, and in particular,
It relates to a method of building a canopy for a gas station.

【0002】[0002]

【従来の技術】給油所のキャノピーは、基礎に立設され
た柱上に屋根部を配し、この屋根部に給油に必要な諸設
備が収納されてなるものであり、キャノピー内に誘導さ
れる車輛の関係から高い柱をもって空間が確保される。
このため、屋根部は必然的に高い位置となり、この屋根
部への給油関連設備の設置は高所作業となり、大型の作
業機が必要となり、構築費用がかかるばかりでなく、危
険でもある。
2. Description of the Related Art A gas station canopy has a roof arranged on a pillar erected on a foundation, and various equipment necessary for refueling is housed in the roof. The space is secured with a high pillar due to the relationship with the vehicle.
For this reason, the roof portion is inevitably located at a high position, and installation of refueling-related equipment on this roof portion requires work at a high place, which requires a large working machine, which is not only expensive to construct but also dangerous.

【0003】[0003]

【発明が解決しようとする課題】本発明は上記実情に鑑
みなされたものであって、屋根部への給油関連設備の設
置が安全かつ経済的に実施できるキャノピーの構築方法
を提供することを目的とする。本発明は更にキャノピー
に限らず一般の柱状構造物の構築方法を提供することも
他の目的とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and an object thereof is to provide a method for constructing a canopy in which installation of refueling-related equipment on a roof portion can be carried out safely and economically. And Another object of the present invention is not only to provide a canopy, but also to provide a method for constructing a general columnar structure.

【0004】[0004]

【課題を解決するための手段】本発明の柱状構築物の構
築方法は上記目的を達成するため、以下の構成を採る。
すなわち、第1番目の主たる構成は、柱部材をもって上
層構造の荷重を支持する構築物において、前記柱部材
は、下層構造に連なる下部柱と、上層構造に連なる上部
柱と、これらの下部柱と上部柱との間に介装される中柱
との継ぎ柱構造を採り、前記中柱を抜いた状態で構築物
を仮構築し、しかる後、前記上部柱の下端にピンをもっ
て前記中柱を吊下げ可能に取り付け、扛上装置により前
記上部柱を含む上層構造を扛上し、前記中柱を前記上部
柱と前記下部柱との間に位置した状態で各接合部を固定
してなる、ことを特徴とする。第2番目の主たる構成
は、請求項1において、仮構築において、柱部は上部柱
と下部柱の端部に取り付けられたエレクションピース間
に連結板が固定され、上部柱の扛上において、中柱をそ
れらのエレクションピースにピンをもって吊り下げる、
ことを特徴とする。
In order to achieve the above object, the method for constructing a columnar structure of the present invention has the following constitution.
That is, the first main structure is a structure in which a column member supports a load of an upper layer structure, and the column member includes a lower column connected to the lower layer structure, an upper column connected to the upper layer structure, and these lower columns and upper parts. Adopting a joint pillar structure with a middle pillar that is interposed between the pillar and temporarily constructing a structure with the middle pillar removed, and then suspending the middle pillar with a pin at the lower end of the upper pillar It is attached so that the upper layer structure including the upper pillar is lifted by a lifting device, and each joint is fixed in a state where the middle pillar is located between the upper pillar and the lower pillar. Characterize. The second main configuration is, in claim 1, in the provisional construction, in the provisional construction, the connection part is fixed between the erection pieces attached to the end parts of the upper part pillar and the lower part pillar, and in the upper part of the upper part pillar, Hang columns on those erection pieces with pins,
It is characterized by the following.

【0005】(作用)構築物の仮構築において、上層構
造は低い位置での仕上げがなされる。上層構造の扛上に
伴い、中柱も連動して吊り下げされ、上部柱と下部柱と
の間への挿入が自動的になされる。
(Operation) In the temporary construction of the construct, the upper layer structure is finished at a low position. As the upper structure is lifted up, the middle pillar is also hung in an interlocking manner and automatically inserted between the upper pillar and the lower pillar.

【0006】[0006]

【発明の実施の形態】本発明の柱状構築物の構築方法の
実施の形態を図面に基づいて説明する。 (第1実施形態)図1〜図11はその一実施形態(第1
実施形態)を示し、給油所いわゆるガソリンスタンドに
おけるキャノピーへの適用例を示す。図1及び図2はキ
ャノピーの構築終了状態を示し、図3〜図11はその施
工工程の各態様を示す。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a method for constructing a columnar structure of the present invention will be described with reference to the drawings. (First Embodiment) FIGS. 1 to 11 show one embodiment (first embodiment).
Embodiment) and an application example to a canopy in a gas station, a so-called gas station. 1 and 2 show the completed construction of the canopy, and FIGS. 3 to 11 show each aspect of the construction process.

【0007】図1及び図2において、このキャノピーK
は、地盤Eに設置された基礎部1と、該基礎部1上に建
て込まれた柱部2と、該柱部2上に設置された屋根部3
と、からなる。図2におけるLは扛上装置であって4か
所に配される。基礎部1は、キャノピー内に大型車輌を
含め各種の車輌が走行するものであり、舗装9とともに
十分な強度をもって構築される。柱部2は、基礎部1に
接続される下部柱2Aと、屋根部3に接続される上部柱
2Bと、これらの柱2A,2B間に介装される中柱2C
とからなり、これらの各柱2A,2B,2Cによる継ぎ
柱を構造を採る。該柱部2は、下部柱2A、上部柱2
B、中柱2Cとも、同一の箱状断面をなし、それらの当
接部は以下の図例で示す接合部S構造を採るとともに、
該当接部の外側面には組付け時に使用され、後で撤去さ
れる後記するエレクションピース13が固設される。更
に、上部柱2Bには後記する取付けリブ22が固設され
る。屋根部3は、梁部材5を構造主体として構成される
とともに、給油設備、配管を含め各種の設備が設置さ
れ、また天井板等の化粧材及び屋根板が施される。梁部
材5は大梁5Aを井桁状に、剛接し、該大梁5A間に小
梁5Bを架け渡すとともに水平ブレース5Cより緊結し
て骨組み体が形成される。6は、この骨組み体の外周に
配される枠体である。
In FIGS. 1 and 2, this canopy K is used.
Is a foundation part 1 installed on the ground E, a pillar part 2 built on the foundation part 1, and a roof part 3 installed on the pillar part 2.
And consisting of L in FIG. 2 is a lifting device, which is arranged at four places. The foundation 1 is for running various vehicles including large vehicles in the canopy, and is constructed with the pavement 9 with sufficient strength. The pillar 2 includes a lower pillar 2A connected to the foundation 1, an upper pillar 2B connected to the roof 3, and a middle pillar 2C interposed between the pillars 2A and 2B.
And the joint columns by these columns 2A, 2B, 2C are adopted. The pillars 2 are a lower pillar 2A and an upper pillar 2
Both B and the middle pillar 2C have the same box-shaped cross section, and their abutting portions have a joint portion S structure shown in the following example,
An erection piece 13, which will be described later, is fixed to the outer surface of the abutting portion, which is used during assembly and is removed later. Further, a mounting rib 22 which will be described later is fixed to the upper pillar 2B. The roof portion 3 is mainly composed of the beam members 5, is provided with various equipment such as oil supply equipment and piping, and is provided with a decorative material such as a ceiling board and a roof board. The beam member 5 rigidly contacts the large beams 5A in a cross beam shape, bridges the small beams 5B between the large beams 5A, and tightly connects them with the horizontal braces 5C to form a frame structure. Reference numeral 6 is a frame body arranged on the outer periphery of the frame body.

【0008】以下、施工手順に従って説明する。この施
工態様においては柱部3に上下2か所の接合部を有する
態様を示す。 (1) 基礎部1の構築 図3に示すように、地盤Eを掘り下げ、整地した後、柱
部2の設置位置に基礎部1としてフーチング基礎を構築
する。該フーチング基礎1は鉄筋コンクリート製で、下
方の広い台部1aとその上の台座部1bとからなり、該
台座部1bにアンカーボルト10が植設される。
The construction procedure will be described below. In this construction mode, a mode in which the pillar portion 3 has two upper and lower joint portions is shown. (1) Construction of Foundation 1 As shown in FIG. 3, after excavating the ground E and leveling it, a footing foundation is constructed as the foundation 1 at the installation position of the pillar 2. The footing foundation 1 is made of reinforced concrete, and is composed of a wide pedestal portion 1a below and a pedestal portion 1b above the pedestal portion 1b. Anchor bolts 10 are planted on the pedestal portion 1b.

【0009】(2) 下部柱2Aの設置 更に、図3・図4に示すように、フーチング基礎1上に
アンカープレート12を設置し、下部柱2Aを建て込
む。アンカープレート12はアンカーボルト10に定着
される。アンカープレート12と下部柱2Aとは一体形
を採る。下部柱2Aの上端にはエレクションピース13
Aが固設されている。 (エレクションピース13)(図6、図7、図9、図1
0参照) エレクションピース13は、各柱2A,2B,2Cに所
定の距離を保って固設されており、下部柱2Aの上端に
はエレクションピース13Aが、上部柱2Bの上端には
エレクションピース13Bが、中柱2Aの上端及び下端
にはエレクションピース13Cが、それぞれ固設され
る。該エレクションピース13には、取付け孔14が所
定の関係をもって開設される。すなわち、エレクション
ピース13Aと13B、13Aと13C、13Bと13
Cがそれぞれ対応関係を採り、各柱2A,2B,2Cが
当接され接合位置にあるとき、各取付け孔14は定間隔
を保つ。更に、フーチング基礎1の台部1aに扛上装置
用の増しコンクリート15が打設される。該増しコンク
リート15の上面は平坦に仕上げられる。該増しコンク
リート15は後で撤去されるものであるので、無筋とさ
れる。
(2) Installation of lower pillar 2A Further, as shown in FIGS. 3 and 4, the anchor plate 12 is installed on the footing foundation 1 and the lower pillar 2A is built. The anchor plate 12 is fixed to the anchor bolt 10. The anchor plate 12 and the lower pillar 2A have an integral shape. The erection piece 13 is provided on the upper end of the lower pillar 2A.
A is fixed. (Erection piece 13) (FIGS. 6, 7, 9, and 1)
The erection piece 13 is fixed to each of the columns 2A, 2B, and 2C with a predetermined distance, and the erection piece 13A is provided at the upper end of the lower column 2A and the erection piece 13B is provided at the upper end of the upper column 2B. However, the erection pieces 13C are fixed to the upper end and the lower end of the center pillar 2A, respectively. Mounting holes 14 are opened in the erection piece 13 in a predetermined relationship. That is, the erection pieces 13A and 13B, 13A and 13C, 13B and 13
C has a corresponding relationship, and when the columns 2A, 2B, 2C are in contact with each other at the joining position, the mounting holes 14 maintain a constant interval. Further, the additional concrete 15 for the lifting device is placed on the base 1a of the footing foundation 1. The upper surface of the additional concrete 15 is finished flat. Since the additional concrete 15 is to be removed later, it is made unreinforced.

【0010】(3) 屋根部3の構築 次いで、図5に示すように、屋根部3の上部柱2Bを基
礎部1の下部柱2A上に建て込み、そのエレクションピ
ース13Bを利用して下部柱2Aに接合する。図6・図
7は下部柱2Aと上部柱2Bとの結合状態を示す。すな
わち、連結板17を上下のエレクションピース13A,
13Bに跨がって配し、締結用ボルト・ナット18をも
って緊結する。これにより、上部柱2Bは下部柱2Aに
強固に固定され、引き続き構築される屋根部3は安定的
に支持される。 (接合部S)図6、更には図9において、Sは接合部を
示し、上位の柱2B,2Cの下端にはそれぞれ柱体の下
端より突出し溶接代を確保する裏当て金19が配され、
下位の柱2C,2Aの上端にはそれぞれ柱体の上端と面
一となる裏当て金20が配される。裏当て金19は裏当
て金20に衝接され、これらは最終的には溶接接合され
る。 (3A)この状態で、上部柱2Bを基準に屋根部3を構築す
る。すなわち、梁部材5により骨組み体が形成され、外
周に枠体6が配置される。その後、給油設備、配管を含
め各種の設備が設置され、また、天井板等の化粧材及び
屋根板が施される。このとき、屋根部3は地上より低い
位置にあり、屋根部3の構築はもとより、給油関連設備
の設置及び屋根部3の仕上げ工事は、格別の大型機械を
要せず通常の機器で済み、加えて、高所での作業が無く
なり、安全な施工が可能である。 (3B)持上げ梁の設置 上記(3A)と並行して、上部柱3Aに予め固設されている
取付けリブ22に持上げ梁23が架け渡される。図6・
図7を参照して、取付けリブ22の下面にH形材よりな
る持上げ梁23のフランジが当接され、それらを適宜の
固定手段(通常にはボルト・ナット締め、場合によって
は溶接接合)をもって固定する。
(3) Construction of roof part 3 Next, as shown in FIG. 5, the upper pillar 2B of the roof part 3 is built on the lower pillar 2A of the foundation part 1, and the erection piece 13B is utilized to form the lower pillar. Join to 2A. 6 and 7 show a state in which the lower pillar 2A and the upper pillar 2B are connected. That is, the connecting plate 17 is connected to the upper and lower erection pieces 13A,
13B and straddle 13B, and tighten with fastening bolts and nuts 18. As a result, the upper pillar 2B is firmly fixed to the lower pillar 2A, and the subsequently constructed roof portion 3 is stably supported. (Joined portion S) In FIG. 6 and further in FIG. 9, S indicates a jointed portion, and a backing metal 19 is provided at the lower ends of the upper columns 2B and 2C so as to project from the lower ends of the columns and secure a welding margin. ,
A backing plate 20 that is flush with the upper ends of the pillars is disposed on the upper ends of the lower pillars 2C and 2A. The backing plate 19 is abutted against the backing plate 20 and these are finally welded together. (3A) In this state, the roof portion 3 is constructed based on the upper pillar 2B. That is, a frame member is formed by the beam members 5, and the frame member 6 is arranged on the outer circumference. After that, various equipments such as refueling equipment and piping are installed, and decorative materials such as ceiling boards and roof boards are applied. At this time, the roof portion 3 is located at a lower position than the ground, and not only the construction of the roof portion 3 but also the installation of the refueling-related equipment and the finishing work of the roof portion 3 do not require any special large machine and can be performed by normal equipment. In addition, work in high places is eliminated, and safe construction is possible. (3B) Installation of Lifting Beam In parallel with the above (3A), the lifting beam 23 is bridged to the mounting rib 22 fixedly fixed to the upper pillar 3A in advance. Figure 6
With reference to FIG. 7, a flange of a lifting beam 23 made of an H-shaped member is brought into contact with the lower surface of the mounting rib 22, and they are fixed with appropriate fixing means (usually bolt / nut tightening, and in some cases welding joining). Fix it.

【0011】(4) 扛上装置Lの設置並びに中柱2Cの設
置 図8に示すように、扛上装置Lを基礎部1の増しコンク
リート15と持上げ梁23との間に介装設置するととも
に、中柱2Cを上部柱2Bにそれらのエレクションピー
ス13B,13Cに取り付けられる本実施態様に特有の
吊り板25を利用して設置する。 (吊り板25)吊り板25は本実施の形態に特有の構成
を採るものであり、図9〜図11に示されるように、所
定厚さを持つ矩形平板状をなし、上半部に2つの取付け
孔26a,26bが開設され、下半部に2つの取付け孔
26c,26dが開設される。この内、取付け孔26d
(これを下端取付け孔もしくはルーズホールという)は
特別の形状をなす。すなわち、該下端取付け孔26d
は、細長円形もしくは小判形をなし、他の取付け孔26
の径をd1、当該下端取付け孔26dの径をd2とすれ
ば、d2−d1の遊びβを生じ、この遊びβは上部柱2
Bと中柱2Cとのクリアランスαを吸収する(すなわ
ち、α<β=d2−d1)。
(4) Installation of lifting device L and installation of center pillar 2C As shown in FIG. 8, the lifting device L is installed between the additional concrete 15 of the foundation 1 and the lifting beam 23. The middle pillar 2C is installed on the upper pillar 2B by using the suspension plate 25 that is attached to the erection pieces 13B and 13C and is unique to this embodiment. (Hanging Plate 25) The hanging plate 25 has a configuration peculiar to the present embodiment, and as shown in FIGS. 9 to 11, has a rectangular flat plate shape with a predetermined thickness, and has an upper half portion 2 One mounting hole 26a, 26b is opened, and two mounting holes 26c, 26d are opened in the lower half part. Of these, the mounting hole 26d
The lower end mounting hole or loose hole has a special shape. That is, the lower end mounting hole 26d
Has an oval shape or an oval shape, and other mounting holes 26
Let d1 be the diameter of the lower end mounting hole 26d, and d2 be the diameter of the lower end mounting hole 26d.
It absorbs the clearance α between B and the center pillar 2C (ie, α <β = d2-d1).

【0012】(4A)扛上装置Lの設置 扛上装置Lは、基礎部1の増しコンクリート15に設置
され、その上端を持上げ梁23の下面に当接させて配さ
れる。該扛上装置Lは複数箇所(本実施形態では4箇
所)に設置され、同期して作動される。また、該扛上装
置Lは、十分なストロークを有するものであり、本発明
の方法の目的に合致するものであれば、その形式、構造
を問わないが、段毎に介装体を差し入れ、順次該介装体
を基点として尺取り式に持ち上げる構造のものが好適な
ものとして採用される。 (4B)中柱2Cの取付け 下部柱2Aと上部柱2Bとのエレクションピース13
A,13B間に介装されていた連結板17を取り外し、
上部柱2Bのエレクションピース13Bと中柱2Cのエ
レクションピース13Cとに吊り板25を当接するとと
もに吊りボルト27介して中柱2Cを吊り下げる。吊り
ボルト27は上位のエレクションピース13Bに配され
る1本の上部吊りボルト27aと下位のエレクションピ
ース13Cに配される1本の下部吊りボルト27bとか
らなる。各中柱2Cは外方向に傾斜をもって吊り下げら
れた状態となり、このとき、柱頭部は下部柱2Aに当た
らないようにされ、また、柱脚部においてはそのエレク
ションピース13Cが破損を受けないように支持され
る。このため、中柱2Cはその下端部で外方向へ適宜の
手段をもって引張り力が付与され、また、下端部のエレ
クションピース13Cは異物との衝突を阻止する保護対
策が施される。
(4A) Installation of the lifting device L The lifting device L is installed on the reinforced concrete 15 of the foundation part 1, and its upper end is placed in contact with the lower surface of the lifting beam 23. The lifting device L is installed at a plurality of locations (four locations in this embodiment) and is operated in synchronization. Further, the lifting device L has a sufficient stroke, so long as it meets the purpose of the method of the present invention, its form and structure are not limited, but an interposer is inserted in each step, A structure having a structure in which the interposer is sequentially lifted in a standard manner is preferably adopted. (4B) Installation of the middle pillar 2C The erection piece 13 of the lower pillar 2A and the upper pillar 2B.
Remove the connecting plate 17 interposed between A and 13B,
The hanging plate 25 is brought into contact with the erection piece 13B of the upper pillar 2B and the erection piece 13C of the middle pillar 2C, and the middle pillar 2C is hung via the hanging bolt 27. The suspension bolt 27 includes one upper suspension bolt 27a arranged on the upper erection piece 13B and one lower suspension bolt 27b arranged on the lower erection piece 13C. Each of the middle pillars 2C is in a state of being suspended outwardly with an inclination, and at this time, the pillar head is prevented from hitting the lower pillar 2A, and the erection piece 13C of the pillar base portion is not damaged. Supported by. For this reason, a pulling force is applied to the center column 2C at the lower end portion by an appropriate means in the outward direction, and the erection piece 13C at the lower end portion is protected so as to prevent collision with foreign matter.

【0013】(5) 扛上装置Lによる屋根部3の持上げ及
び中柱2Cの吊下げ 扛上装置Lを作動し、持上げ梁23を介して屋根部3及
びこれに一体となっている上部柱2Bを持ち上げる。こ
れに伴い、上部柱2Bに吊り板25に吊り下げられた中
柱2Cは順次立ち上がってゆく。一方、中柱2Cの下端
部はすべり可能に支持されるとともに、外方への引張り
力が付与され、中柱2Cの妄動を阻止する。
(5) Lifting of the roof part 3 by the lifting device L and suspension of the middle pillar 2C The lifting device L is operated, and the roof part 3 and the upper pillar integrated with the roof part 3 are lifted via the lifting beam 23. Lift 2B. Along with this, the middle pillar 2C suspended from the upper pillar 2B by the hanging plate 25 gradually rises. On the other hand, the lower end of the center column 2C is supported so as to be slidable, and an outward pulling force is applied to prevent the center column 2C from moving.

【0014】(5A)中柱2Cの垂設 上部柱2Bが持ち上げられ、下部柱2Aとの間に中柱2
Cが入り込むまでに至り、いわゆる上げ超し状態とし、
扛上を停止するとともに、中柱2Cを人手作業を介して
鉛直状態に保持し、この状態で他側のエレクションピー
ス13B,13Cにも吊り板25を装着する。これによ
り、中柱2Cは上部柱2Bの中心軸と一致して垂設さ
れ、また、該中柱2Cの下端は下部柱2Aと適宜空間を
存する。図9・図10はこの状態を示し、上部柱2Bと
中柱2Cとのクリアランスαをなす。 (5B)しかる後、扛上装置Lを扛下し、中柱2Cの下端部
を下部柱2Aの上端部に当接し、扛下を一旦停止する。
このとき、当該接合部Sにおいて、下方の裏当て金20
の内面に固設され上方へ突出する鞘管を設け、嵌合の案
内をなす態様を採ると接合作業は容易となる。当該下部
柱接合部において、エレクションピース13A,13B
間に連結板17をもって固定する。 (5C)更に、扛上装置Lを扛下させ、上部柱2Bの下端部
が中柱2Cの上端部に当接し、扛下を停止する。このと
き、下部吊りボルト27bは下端取付け孔26d内を滑
動し、クリアランスαを吸収する。
(5A) Vertically arranging the middle pillar 2C The upper pillar 2B is lifted up, and the middle pillar 2 is located between the upper pillar 2B and the lower pillar 2A.
By the time C enters, it is in a so-called over-raised state,
While suspending lifting, the center pillar 2C is held in a vertical state by manual work, and in this state, the hanging plate 25 is also attached to the erection pieces 13B and 13C on the other side. As a result, the middle pillar 2C is vertically installed so as to coincide with the central axis of the upper pillar 2B, and the lower end of the middle pillar 2C has an appropriate space with the lower pillar 2A. 9 and 10 show this state, and a clearance α between the upper pillar 2B and the middle pillar 2C is formed. (5B) Then, the lifting device L is lowered, the lower end of the middle pillar 2C is brought into contact with the upper end of the lower pillar 2A, and the lowering is temporarily stopped.
At this time, in the joint S, the lower backing plate 20
If a sheath pipe that is fixed to the inner surface of the casing and that protrudes upward is provided to guide the fitting, the joining work becomes easy. At the lower pillar joint, the erection pieces 13A, 13B
The connecting plate 17 is fixed in between. (5C) Further, the lifting device L is lowered, and the lower end of the upper pillar 2B abuts on the upper end of the middle pillar 2C to stop the lifting. At this time, the lower suspension bolt 27b slides in the lower end mounting hole 26d to absorb the clearance α.

【0015】(6) 柱部2の接合仕上げ 柱部2の上部及び下部の各接合部Sを溶接をもって剛接
し、柱部2の一体化をなす。併せて、エレクションピー
ス13を溶断し、撤去する。
(6) Joining finish of the column portion 2 The upper and lower joint portions S of the column portion 2 are rigidly welded to each other so that the column portion 2 is integrated. At the same time, the erection piece 13 is melted and removed.

【0016】(7) しかる後、持上げ梁21の取付けリブ
20との固定を解除し、扛上装置Lを縮小させ、該扛上
装置L並びに持上げ梁21を撤去し、更には、取付けリ
ブ20を撤去する。
(7) Then, the fixing of the lifting beam 21 to the mounting rib 20 is released, the lifting device L is reduced, the lifting device L and the lifting beam 21 are removed, and the mounting rib 20 is further removed. To remove.

【0017】以上の工程が終了すれば、増しコンクリー
ト15の撤去、キャノピー下土間コンクリートPの打
設、その余の残存工事がなされ、作業は終了する。
When the above steps are finished, the additional concrete 15 is removed, the concrete P under the canopy is poured, and the remaining remaining work is carried out, and the work is finished.

【0018】本実施形態の施工方法は叙上の手順をもっ
て実施されるものであり、下部柱2A上に上部柱2Bを
介して屋根部3が載置されるので、屋根部3は地上の低
い位置に置かれ、この結果、地上で屋根部3への各種設
備の設置がなされ、かつ仕上げ工事が実施されるので、
高所でのクレーン作業等が無くなり、安全であるととも
に、施工効率の向上を図ることができる。また、中柱2
Cはエレクションピース13を利用して吊り下げられる
ので、精確な吊下げ位置を保持することができ、更に
は、上部柱2Bの持上げとともに該中柱2Cは上部柱2
Bと下部柱2Cとの間へ自動的に挿入設置される。
The construction method of this embodiment is carried out according to the above procedure, and since the roof portion 3 is placed on the lower pillar 2A through the upper pillar 2B, the roof portion 3 is low on the ground. It is placed in a position, and as a result, various equipment is installed on the roof part 3 on the ground, and finishing work is performed,
Crane work at high places is eliminated, and it is safe and the construction efficiency can be improved. Also, the middle pillar 2
Since C is hung by using the erection piece 13, it is possible to maintain an accurate hanging position, and further, when the upper pillar 2B is lifted, the middle pillar 2C is changed to the upper pillar 2C.
It is automatically inserted and installed between B and the lower pillar 2C.

【0019】本実施の形態においては持上げ梁23を上
部柱2Bの取付けリブ22を介して取り付けたが、取付
けリブ22を介さず、直接上部柱2Bに取り付けてもよ
く、更には、他の部位に取り付けてもよい。更には、持
上げ梁23を設けず、扛上装置Lを屋根部3の下面、具
体的には大梁5Aの下面に当接させてもよい。また、本
実施の形態においては、2つの中柱2Cをともに外方
へ、換言すれば相対向する方向へ吊り下げて配置したも
のであるが、図12に示すように、ともに内方へ配置す
る態様(図12a)、あるいは、相平行して配置する態
様(図12b)を採ることは本実施の形態に包含される
態様である。
In the present embodiment, the lifting beam 23 is attached via the attachment rib 22 of the upper column 2B, but it may be attached directly to the upper column 2B without the attachment rib 22. May be attached to. Further, the lifting beam 23 may not be provided, and the lifting device L may be brought into contact with the lower surface of the roof portion 3, specifically, the lower surface of the girder 5A. Further, in the present embodiment, the two middle pillars 2C are arranged so as to be hung outwards, in other words, hung in the opposite directions, but as shown in FIG. 12, both are arranged inward. The embodiment (FIG. 12a) or the arrangement in parallel (FIG. 12b) is included in this embodiment.

【0020】(第2実施形態)図13は本発明の柱状構
築物の構築方法の他の実施の形態(第2実施形態)を示
す。本実施の形態では、下部柱2Aが省略され、中柱2
Cが直接的に基礎部1に締着されるものである。換言す
れば、接合部が1か所である態様を示す。この形態で
は、下部柱2Aに替わって仮設柱脚2Dが用意される
が、該仮設柱脚2Dは大体において下部柱2Aに準じ、
下部柱2Aより丈高が低く、かつ、基礎部1との基礎ア
ンカーボルト10とは仮止めされる。中柱2Cは下端部
に下部柱2Aのアンカープレート12を有する。
(Second Embodiment) FIG. 13 shows another embodiment (second embodiment) of the method for constructing a columnar structure of the present invention. In the present embodiment, the lower pillar 2A is omitted and the middle pillar 2
C is directly fastened to the foundation 1. In other words, it shows a mode in which there is one joint. In this embodiment, a temporary column base 2D is prepared in place of the lower column 2A, but the temporary column base 2D generally corresponds to the lower column 2A,
It is lower in height than the lower pillar 2A, and is temporarily fixed to the foundation anchor bolt 10 with the foundation portion 1. The middle pillar 2C has the anchor plate 12 of the lower pillar 2A at the lower end.

【0021】施工手順の要部を説明する。 (1) 基礎部1の構築は第1実施形態に準じる。 (2) 基礎部1に仮設柱脚2Dが設置され、アンカーボル
ト10に後で取り外されるように仮止めされる。 (3) 上部柱2Bを仮設柱脚2D上に、それらのエレクシ
ョンピース13を介して建込み、屋根部3を構築する。
また、持上げ梁を設置する。 (4) 扛上装置Lを設置し、中柱2Cを上部柱2Bに吊り
板25を介して吊り下げる。 (5) 扛上装置Lにより屋根部3を持ち上げるとともに、
中柱2Cを立ち上げてゆく。中柱2Cが上げ超し状態と
なったとき、扛上を停止し、仮設柱脚2Dを撤去する。
しかる後、扛上装置Lを扛下し、中柱2Cのアンカープ
レート12をアンカーボルト10に挿入し、仮締め付け
をなす。更に扛上装置Lを扛下させ、上部柱2Bの下端
を中柱2Cの上端に接合させる。 (6) アンカーボルト10を本締めするとともに、柱部2
の接合部Sを溶接接合する。 以後は、第1実施形態の工程に準じる。
The main part of the construction procedure will be described. (1) The foundation 1 is constructed in the same manner as in the first embodiment. (2) A temporary column base 2D is installed on the foundation part 1 and temporarily fixed to the anchor bolt 10 so that it can be removed later. (3) The upper pillar 2B is built on the temporary pillar base 2D through the erection pieces 13 to construct the roof portion 3.
In addition, a lifting beam will be installed. (4) The lifting device L is installed, and the middle pillar 2C is hung on the upper pillar 2B via the hanging plate 25. (5) While lifting the roof part 3 with the lifting device L,
Start up 2C of the middle pillar. When the middle pillar 2C is lifted up and over, the lifting is stopped and the temporary pillar base 2D is removed.
Then, the lifting device L is lowered, the anchor plate 12 of the center pillar 2C is inserted into the anchor bolt 10, and temporary tightening is performed. Further, the lifting device L is lowered, and the lower end of the upper pillar 2B is joined to the upper end of the middle pillar 2C. (6) Fully tighten the anchor bolts 10 as well as the pillar 2
The joint S of is welded. The subsequent steps are based on the steps of the first embodiment.

【0022】この第2実施形態によれば、仮設柱脚を何
度も使用することができ、経済的である。
According to the second embodiment, the temporary column base can be used many times, which is economical.

【0023】本発明は叙上の実施の形態にのみ限定され
るものではなく、本発明の基本的技術思想の範囲内で種
々設計変更が可能である。すなわち、以下の態様は本発
明の技術的範囲内に包含される。 柱部2において箱状断面の部材に限定されず、例えば
H形鋼材、更には円形断面部材の使用を防げるものでは
ない。 リフトLは4か所に限らず、それ以上あるいは屋根部
3の平衡が得られれば3か所でもよい。 本発明は更に、キャノピーに限定されず、その他の柱
状構造物への適用がなされうる。
The present invention is not limited to the above embodiments, and various design changes can be made within the scope of the basic technical idea of the present invention. That is, the following embodiments are included in the technical scope of the present invention. The column portion 2 is not limited to a member having a box-shaped cross section, and does not prevent the use of, for example, an H-shaped steel material, or a member having a circular cross section. The lifts L are not limited to four places, and may be more than three places or three places as long as the roof portion 3 can be balanced. The present invention is not limited to the canopy, and may be applied to other columnar structures.

【0024】[0024]

【発明の効果】本発明の柱状構築物の構築方法によれ
ば、下部柱上に上部柱を介して屋根部が載置されるの
で、屋根部は地上の低い位置に置かれ、この結果、地上
で屋根部への各種設備の設置がなされ、かつ仕上げ工事
が実施されるので、高所でのクレーン作業等が無くな
り、安全であるとともに、施工効率の向上を図ることが
できる。また、中柱はエレクションピースを利用して吊
り下げられるので、精確な吊下げ位置を保持することが
でき、更には、上部柱の持上げとともに該中柱は上部柱
と下部柱との間へ自動的に挿入設置される。
According to the method for constructing a pillar structure of the present invention, since the roof portion is placed on the lower pillar via the upper pillar, the roof portion is placed at a lower position on the ground, and as a result, Since various equipment is installed on the roof and finishing work is performed, crane work at high places is eliminated, which is safe and construction efficiency can be improved. In addition, since the middle pillar is hung using the erection piece, it is possible to maintain an accurate hanging position. Furthermore, when the upper pillar is lifted, the middle pillar automatically moves between the upper pillar and the lower pillar. Is inserted and installed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の柱状構築物の構築方法が適用されるキ
ャノピーの全体の側断面図。
FIG. 1 is an overall side sectional view of a canopy to which a method for constructing a columnar structure of the present invention is applied.

【図2】図1のII方向矢視図。FIG. 2 is a view on arrow II in FIG.

【図3】基礎部の施工工程図。FIG. 3 is a construction process diagram of the foundation portion.

【図4】基礎部の詳細断面図。FIG. 4 is a detailed sectional view of a base portion.

【図5】屋根部の取付け施工工程図。[Fig. 5] Fig. 5 is a view showing a process of mounting and installing a roof portion.

【図6】接合部の拡大図。FIG. 6 is an enlarged view of a joint portion.

【図7】図6のVII-VII 線矢視図。7 is a view taken along the line VII-VII in FIG.

【図8】中柱の設置状態を示す工程図。FIG. 8 is a process diagram showing an installation state of a center pillar.

【図9】中柱の垂設状態図。FIG. 9 is a diagram showing a vertically extending state of the center pillar.

【図10】図9のX線矢視図。10 is an X-ray arrow view of FIG.

【図11】吊り板の詳細図。FIG. 11 is a detailed view of a hanging plate.

【図12】中柱の吊り状態を示す他の態様図。FIG. 12 is another aspect view showing a suspended state of the center pillar.

【図13】本発明の柱状構築物の構築方法の他の実施形
態を示す図。
FIG. 13 is a view showing another embodiment of the method for constructing the columnar structure of the present invention.

【符号の説明】[Explanation of symbols]

K…柱状構築物(キャノピー)、1…基礎部、2…柱
部、2A…下部柱、2B…上部柱、2C…中柱、2D…
仮設柱脚、3…屋根部、13…エレクションピース、1
7…連結板、25…吊り板、27…吊りボルト
K ... pillar structure (canopy), 1 ... foundation part, 2 ... pillar part, 2A ... lower pillar, 2B ... upper pillar, 2C ... middle pillar, 2D ...
Temporary column base, 3 ... Roof part, 13 ... Erection piece, 1
7 ... Connection plate, 25 ... Hanging plate, 27 ... Hanging bolt

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大谷 行伸 東京都目黒区東山3丁目5番5号 日建工 業株式会社内 (72)発明者 花田 浩 東京都目黒区東山3丁目5番5号 日建工 業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yukinobu Otani 3-5-5 Higashiyama, Meguro-ku, Tokyo Within Nikken Kogyo Co., Ltd. (72) Inventor Hiroshi Hanada 3-5-5 Higashiyama, Meguro-ku, Tokyo Nikken Kogyo Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】柱部材をもって上層構造の荷重を支持する
構築物において、 前記柱部材は、下層構造に連なる下部柱と、上層構造に
連なる上部柱と、これらの下部柱と上部柱との間に介装
される中柱との継ぎ柱構造を採り、 前記中柱を抜いた状態で構築物を仮構築し、 しかる後、前記上部柱の下端にピンをもって前記中柱を
吊下げ可能に取り付け、 扛上装置により前記上部柱を含む上層構造を扛上し、 前記中柱を前記上部柱と前記下部柱との間に位置した状
態で各接合部を固定してなる、ことを特徴とする柱状構
築物の構築方法。
1. A structure in which a pillar member supports a load of an upper layer structure, wherein the pillar member has a lower pillar connected to the lower layer structure, an upper pillar connected to the upper layer structure, and between the lower pillar and the upper pillar. Adopting a joint pillar structure with the intermediate pillar to be inserted, the building is temporarily constructed with the middle pillar removed, and then the middle pillar is attached to the lower end of the upper pillar so that it can be suspended. An upper layer structure including the upper pillar is lifted by an upper device, and each joint is fixed in a state in which the middle pillar is located between the upper pillar and the lower pillar, and the pillar structure is characterized in that How to build.
【請求項2】請求項1において、仮構築において、柱部
は上部柱と下部柱の端部に取り付けられたエレクション
ピース間に連結板が固定され、上部柱の扛上において、
中柱をそれらのエレクションピースにピンをもって吊り
下げる、ことを特徴とする柱状構築物の構築方法。
2. The provisional construction according to claim 1, wherein the pillar portion has a connecting plate fixed between the erection pieces attached to the end portions of the upper pillar and the lower pillar, and
A method for constructing a pillar structure, comprising suspending a middle pillar with a pin on those erection pieces.
【請求項3】柱部材をもって上層構造の荷重を支持する
構築物において、 前記柱部材は、下層構造に連なる架設柱と、上層構造に
連なる上部柱と、これらの架設柱と上部柱との間に介装
される中柱との継ぎ柱構造を採り、 前記中柱を抜いた状態で構築物を仮構築し、 しかる後、前記上部柱の下端にピンをもって前記中柱を
吊下げ可能に取り付け、 扛上装置により前記中柱が前記架設柱を超えるまで前記
上部柱を含む上層構造を扛上し、 前記架設柱を撤去した後、前記中柱を前記上部柱と前記
下層構造との間に位置した状態で接合部を固定してな
る、ことを特徴とする柱状構築物の構築方法。
3. A structure in which a pillar member supports a load of an upper layer structure, wherein the pillar member includes an erection column connected to the lower layer structure, an upper column connected to the upper layer structure, and between the erection column and the upper column. Adopting a joint pillar structure with the intermediate pillar to be inserted, the building is temporarily constructed with the middle pillar removed, and then the middle pillar is attached to the lower end of the upper pillar so that it can be suspended. The upper device lifts the upper layer structure including the upper column until the middle column exceeds the erection column, and after removing the erection column, the middle column is located between the upper column and the lower layer structure. A method for constructing a columnar structure, characterized in that the joint portion is fixed in a state.
JP9183396A 1996-03-22 1996-03-22 Construction method for columnar structure Pending JPH09256474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9183396A JPH09256474A (en) 1996-03-22 1996-03-22 Construction method for columnar structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9183396A JPH09256474A (en) 1996-03-22 1996-03-22 Construction method for columnar structure

Publications (1)

Publication Number Publication Date
JPH09256474A true JPH09256474A (en) 1997-09-30

Family

ID=14037607

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9183396A Pending JPH09256474A (en) 1996-03-22 1996-03-22 Construction method for columnar structure

Country Status (1)

Country Link
JP (1) JPH09256474A (en)

Similar Documents

Publication Publication Date Title
JP5097313B2 (en) Suspended scaffold and its installation method
JPH102018A (en) Building unit, unit building, and its constructing method
JPH04111829A (en) Method for constructing large-span roof
JP6831714B2 (en) Tower crane foundation and tower crane
JPH06200625A (en) Frame method of arch truss construction
JP3179138U (en) Scaffolding support for leg head construction
JPH09256474A (en) Construction method for columnar structure
JP3049300B2 (en) Construction method of beam truss in building with overhead traveling crane
JP2021116153A (en) Supporting platform for tower crane and climbing method using the same
JP2002371723A (en) Upper foundation structure for base-isolation building
JP3671061B2 (en) Suspension staircase and its temporary method
JP2003056186A (en) H-shape steel frame construction method in sill lifting and hauling work of wooden building using h-shape steel, specially-made anchor fitting and specially-made fine adjustment fitting in conformity with structural characteristic of wooden building
JP3546225B2 (en) How to build building structures
JP2002275830A (en) Scaffold device for subsidiary work and subsidiary work method of elevated bridge
CN211080982U (en) Multifunctional steel structure construction platform
JPH08114302A (en) Boiler installing method and boiler installation structural body
JP2000248632A (en) Floor climbing method of tower crane
JP3214407B2 (en) Connection method of beam members and scaffolding equipment for work at height
JP2022177571A (en) Construction method of structure
JP3807142B2 (en) Support method of superstructure in seismic isolation work of existing building
JP2006307506A (en) Scaffolding
JP2575796Y2 (en) External curing frame
JP2021085147A (en) Base isolation upper footing beam construction method
JPS6137426B2 (en)
JP3124152B2 (en) Collapse prevention frame