JPH06200625A - Frame method of arch truss construction - Google Patents

Frame method of arch truss construction

Info

Publication number
JPH06200625A
JPH06200625A JP4361095A JP36109592A JPH06200625A JP H06200625 A JPH06200625 A JP H06200625A JP 4361095 A JP4361095 A JP 4361095A JP 36109592 A JP36109592 A JP 36109592A JP H06200625 A JPH06200625 A JP H06200625A
Authority
JP
Japan
Prior art keywords
truss
arch
trusses
divided
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4361095A
Other languages
Japanese (ja)
Inventor
Taiyo Kinoshita
大洋 木下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP4361095A priority Critical patent/JPH06200625A/en
Publication of JPH06200625A publication Critical patent/JPH06200625A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To make unnecessary a large-sized heavy machine, to make it possible to safely frame efficiently and to save energy. CONSTITUTION:A plurality of divided trusses 2A-2D dividing an arch truss 1 in a longitudinal direction are assembled at a field in a state to connect adjacent divided trusses to each other in a vertically turnable manner. Truss tails 1a of the field assembled arch truss 1 are pulled to the insides of them by a winch 10, so that the arch truss 1 can be erected in a completed shape. After the erection, turnable connections 3 among the divided trusses 2A-2D are connected with bolts in an unturnable state. The connection of the turnable connections 3 is made by making use of a high-place working car or a rolling tower, etc. The truss tails la are arranged on truss erection guide rails 7, and resistance in the case of pulling-in can be reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、テント構造物や、そ
の他の種々のアーチトラス式構造物の架構方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of framing a tent structure and various other arch truss type structures.

【0002】[0002]

【従来の技術】アーチ式の構造物は、大空間を中柱なし
で形成するために、その架構には仮サポートをを使用
し、また地組を行って、クレーン等の重機で建起こす方
法が一般に採られる。図6は従来の工法例を示す。ま
ず、同図(A)に示すように、アーチ式トラスの半分の
長さの分割トラス51を地組する。これを同図(B)の
ようにクレーン52で建起こし、予め構築しておいたト
ラス受けサポート53上に仮固定する。この後、前記と
同様な方法で、同図(C)のように残り半分の分割トラ
ス51を建起こし、両分割トラス51,51の上端51
a同士をボルト等で接合する。このようにアーチ式トラ
ス50を組み立てた後、テント幕等の屋根材54を取付
け、また天井部の照明器具(図示せず)等の取付けを行
う。これらの作業に際しては、アーチ式トラス50の下
側に作業者55の落下防止のための安全ネット56を張
っておく。
2. Description of the Related Art In order to form a large space without a center pillar, an arch type structure uses a temporary support for the frame, and also erections with a heavy machine such as a crane. Is generally taken. FIG. 6 shows an example of a conventional construction method. First, as shown in FIG. 3A, a divided truss 51 having a half length of the arch truss is assembled. This is erected by a crane 52 as shown in FIG. 3B and temporarily fixed on a truss receiving support 53 which has been constructed in advance. After this, in the same manner as described above, the remaining half split truss 51 is erected as shown in FIG.
Join a with bolts or the like. After assembling the arch type truss 50 in this manner, a roof material 54 such as a tent curtain is attached, and a ceiling lighting device (not shown) is attached. During these operations, a safety net 56 for preventing the worker 55 from falling is stretched under the arch type truss 50.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記の架構方
法によると、クレーン52等の大型の重機が必要であ
り、狭小な市街地等では、クレーン52の配置場所が得
られないことがある。また、背の高い大型のトラス受け
サポート53が必要であり、その組立や資材運搬、解体
に手間がかかる。分割トラス51の上端51aをサポー
ト53に仮固定する作業や、両分割トラス51の上端5
1aを相互に接合する作業も、重量物の分割トラス51
をクレーン52で支持しながらの高所作業となるため、
作業性が悪く、手間がかかる。さらに、アーチ式トラス
50の組立後に屋根材54や照明器具の取付け等を行う
ため、安全確保のためのネット56やトラス受けサポー
ト53の仮設を長期間必要とする。しかも、高所での作
業量が多く、危険な作業となっている。
However, according to the above frame method, a large heavy machine such as the crane 52 is required, and the location of the crane 52 may not be obtained in a narrow urban area. In addition, a large, large truss support support 53 is required, and it takes time to assemble, transport materials and dismantle them. Temporarily fixing the upper end 51a of the split truss 51 to the support 53, or the upper end 5 of both split trusses 51.
The work of joining 1a to each other is also a division truss 51
Since it will be a high work while supporting the crane 52 with the crane 52,
Workability is poor and time-consuming. Furthermore, since the roof material 54 and the lighting fixtures are attached after the arch type truss 50 is assembled, it is necessary to temporarily install the net 56 and the truss receiving support 53 for ensuring safety. Moreover, the amount of work in high places is large, which is dangerous work.

【0004】この発明の目的は、大型の重機を必要とせ
ずに、安全に能率良く架構でき、かつ省力化が図れるア
ーチトラス式構造物の架構方法を提供することである。
An object of the present invention is to provide a method for framing an arch truss type structure which can safely and efficiently construct a structure without requiring a large heavy machine and save labor.

【0005】[0005]

【課題を解決するための手段】この発明の架構方法は、
次の過程で架構する方法である。まず、アーチ式トラス
を長手方向に区分した複数個の各分割トラスを、隣合う
分割トラス同士が上下回動自在に連結された状態に地組
みする。この地組みされたアーチ式トラスのトラス尻を
内側へ引き込むことにより、前記アーチ式トラスを完成
形状に建起こす。この建起し後に各分割トラス間の回動
自在な連結部を回動不能状態に接合する。
The frame method of the present invention comprises:
This is a method of framing in the following process. First, a plurality of divided trusses obtained by dividing the arch truss in the longitudinal direction are grounded so that adjacent divided trusses are vertically rotatably connected to each other. The arch truss is erected in a completed shape by pulling in the truss bottom of the arch truss that is grounded inward. After this construction, the rotatable connecting portions between the divided trusses are joined in a non-rotatable state.

【0006】[0006]

【作用】この架構方法によると、各分割トラスを回動自
在に連結しておき、トラス尻を内側へ引き込むことによ
り建起こすので、クレーン等の大型の重機を必要とせず
に架構が行える。また、大型の仮サポートも不要とな
る。建起し後の分割トラス連結部の接合は、高所作業車
やローリングタワー等を利用してボルト締め等により行
える。この場合の接合は、予め回動自在に連結された部
材同士の接合であるため、簡単に行える。したがって省
力化につながる。前記の高所作業車等は、分割トラスの
重量を負担するものではないため、小型のもので済む。
テント幕等の屋根材や照明器具等の天井設置機器の取付
けは、地組段階で行え、低位置で作業が行えるので安全
である。
According to this frame method, since the divided trusses are rotatably connected to each other and the truss butt is pulled inward to erection, the frame can be constructed without the need for a large heavy machine such as a crane. Also, a large temporary support is not required. After the construction, the joints of the divided trusses can be joined by bolting etc. using a work platform for high places or a rolling tower. The joining in this case is a joining of the members that are rotatably connected in advance, and thus can be easily performed. Therefore, it leads to labor saving. The aerial work vehicle and the like do not bear the weight of the divided trusses, and thus may be small in size.
It is safe to install roofing materials such as tent curtains and ceiling-mounted equipment such as lighting fixtures at the stage of subassembly and work at a low position.

【0007】[0007]

【実施例】この発明の一実施例を図1ないし図4に基づ
いて説明する。図1(A)に示すように、アーチ式トラ
ス1を長手方向に区分した複数個の各分割トラス2A〜
2Dを、隣合う分割トラス2A〜2D同士が連結部3で
回動自在に連結された状態に地組みする。トラス分割数
は、トラス長さ等に応じた適宜の数とする。図示の例で
は4個に分割してある。中央側の2個の分割トラス2
B,2Cは、その下方で作業者Aが立って作業を行える
程度の高さに、トラス受けサポート4〜6に連結部3を
各々載せて組立てる。両側のトラス尻1aは、地盤に敷
設したトラス建起しガイドレール7上にローラ8を介し
て内外へ移動自在に載せる。なお、各分割トラス2A〜
2D自体の組立は工場等で行い、現場で分割トラス2A
〜2Dのサポート4〜6上への配置および連結部3の連
結を行うようにしても良い。また、この地組の段階で、
アーチ式トラス1へのテント幕9や照明器具(図示せ
ず)等の取付けを行っておく。分割トラス2B,2Cの
下面には安全ネット12を張っておく。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to FIGS. As shown in FIG. 1 (A), the arch truss 1 is divided into a plurality of divided trusses 2A-
2D is grounded in a state in which the adjacent divided trusses 2A to 2D are rotatably connected by the connecting portion 3. The number of truss divisions shall be an appropriate number according to the truss length and other factors. In the illustrated example, it is divided into four. Two split trusses on the center side
B and 2C are assembled by mounting the connecting portions 3 on the truss receiving supports 4 to 6 at a height such that the worker A can stand and work under them. The truss butts 1a on both sides are mounted on a guide rail 7 laid on the ground so as to be movable in and out via rollers 8. In addition, each split truss 2A ~
2D itself is assembled at a factory, etc., and split truss 2A is used on site.
2D may be arranged on the supports 4 to 6 and the connecting portion 3 may be connected. Also, at the stage of this construction,
The tent curtain 9 and lighting equipment (not shown) are attached to the arch truss 1 in advance. A safety net 12 is stretched on the lower surfaces of the split trusses 2B and 2C.

【0008】この後、トラス中央で地盤上に配置してお
いたウインチ10に、両側のトラス尻1aをワイヤロー
プ11で連結し、トラス尻1aをトラス建起しガイドレ
ール7上で中央側へ引き込むことにより、アーチ式トラ
ス1を同図(B)のように最終形状に建起こす。この建
起し後に各分割トラス2A〜2D間の回動自在な連結部
3を回動不能状態にボルト接合する。このボルト接合作
業は、高所作業車またはローリングタワー(図示せず)
等を利用して行う。また、各トラス尻1aは、後述のよ
うに地盤に予め打設された基礎のアンカーボルト等に接
合する。前記のトラス受けサポート4〜6は、建起し後
に撤去する。
After this, the truss butt 1a on both sides is connected to the winch 10 placed on the ground at the center of the truss by the wire ropes 11, and the truss butt 1a is erected to the center side on the guide rail 7. By retracting, the arch truss 1 is erected in the final shape as shown in FIG. After this construction, the rotatable connecting portion 3 between the divided trusses 2A to 2D is bolted to the non-rotatable state. This bolt joining work is performed by an aerial work vehicle or rolling tower (not shown).
Etc. Further, each truss butt 1a is joined to a foundation anchor bolt or the like that is pre-cast in the ground as described later. The truss receiving supports 4 to 6 are removed after they have been built.

【0009】図2〜図4は、アーチ式トラス1およびト
ラス建起しガイドレール7等の各部の具体的構造例を示
す。アーチ式トラス1の各分割トラス2A〜2Dは、丸
パイプからなる2本の上弦材13と1本の下弦材14と
を断面三角形状に配置し、各弦材13,14間をラチス
材15で接合したものである。各分割トラス2A〜2D
の両端には、図4のように板状または枠状の分割トラス
端部材16を各弦材13,14に渡って接合し、この分
割トラス端部材16の各弦材13,14の延長位置に、
接合片17,18を溶接等で突設する。分割トラス2A
〜2D間の地組時の回動自在な連結は、対応する分割ト
ラスの上弦材13の接合片17を重ね合わせ、両接合片
17に設けられた接合孔19にボルト(図示せず)を挿
通して仮締めすることにより行われる。トラス尻1aで
は、分割トラス端部材16に代えて、ベースプレート2
0が各弦材13,14に渡って接合される。
2 to 4 show specific structural examples of the arch truss 1, the truss-raising guide rails 7 and the like. Each of the divided trusses 2A to 2D of the arch type truss 1 has two upper chord members 13 and one lower chord member 14 made of a round pipe arranged in a triangular cross section, and a lattice member 15 between each chord member 13 and 14. It was joined with. Each split truss 2A-2D
As shown in FIG. 4, the plate-like or frame-like divided truss end members 16 are joined to both ends of the chord members 13 and 14, and the extension positions of the chord members 13 and 14 of the divided truss end members 16 are joined. To
The joining pieces 17 and 18 are projected by welding or the like. Split truss 2A
The pivotable connection during grounding between ~ 2D is such that the joining pieces 17 of the upper chord members 13 of the corresponding split trusses are overlapped with each other, and bolts (not shown) are provided in the joining holes 19 provided in both joining pieces 17. It is performed by inserting it and temporarily tightening it. In the truss butt 1a, instead of the split truss end member 16, the base plate 2
0 is joined across the chord members 13 and 14.

【0010】前記ローラ8は、両端の分割トラス2A,
2Dにトラス尻1aで下弦材14に溶接したブラケット
21に取付けてある。ブラケット21は、ワイヤーロー
プ11の引っ掛け具を兼用するものであり、ロープ結合
孔21aが設けてある。
The roller 8 has split trusses 2A at both ends,
It is attached to a bracket 21 welded to the lower chord member 14 with a truss butt 1a in 2D. The bracket 21 also serves as a hook for the wire rope 11, and has a rope coupling hole 21a.

【0011】図2および図3に示すように、トラス建起
しガイドレール7は内部に前記ローラ8を移動自在に載
置する上向きの溝型部材からなり、地盤に設けたトラス
据付用の基礎22およびレール支持用コンクリート盤2
3に渡って上面に配置してある。トラス建起しガイドレ
ール7は、基礎22の近傍で2本に分割し、両者を片方
のレール7に溶接された接続プレート30を介してボル
ト31で接続してある。トラス建起しガイドレール7の
トラス外側端は、ローラ止めストッパ25が設けてあ
り、アンカーボルトまたはホールインアンカ等の固着具
24でコンクリート盤23に固定される。なお、アーチ
トラスが小型(スパン10M以下)の場合は、固着具2
4は省略しても良い。基礎22には、上端に長ナット2
6を有するナット付アンカーボルト27を埋め込み、天
端モルタル28の上面をトラス建起しガイドレール7の
上縁と同等以上の高さとしてある。天端モルタル28の
代りに、コンクリート版または金属板を設けてもよい。
前記のトラス尻1aのベースプレート20には各アンカ
ーボルト27と整合する固定用孔29が設けられてい
る。
As shown in FIGS. 2 and 3, the truss erection guide rail 7 is composed of an upward groove type member on which the roller 8 is movably mounted, and the truss installation base is provided on the ground. 22 and rail support concrete board 2
It is placed on the upper surface over three. The truss erection guide rail 7 is divided into two in the vicinity of the foundation 22, and both are connected by a bolt 31 via a connection plate 30 welded to one rail 7. A roller stop stopper 25 is provided at the outer end of the truss erection guide rail 7, and is fixed to the concrete board 23 by a fastener 24 such as an anchor bolt or a hole-in anchor. If the arch truss is small (span 10M or less), the fastener 2
4 may be omitted. The base 22 has a long nut 2 at the upper end.
An anchor bolt 27 with a nut having 6 is embedded, and the upper surface of the top mortar 28 is erected by a truss so that the height is equal to or higher than the upper edge of the guide rail 7. Instead of the top mortar 28, a concrete slab or a metal plate may be provided.
The base plate 20 of the truss butt 1a is provided with fixing holes 29 that are aligned with the anchor bolts 27.

【0012】地組時において、図4に示すようにトラス
尻1aはトラス建起しガイドレール7の外側端の近傍に
配置され、建起しが完了してトラス尻1aが基礎22上
の所定位置まで来ると、ベースプレート20をボルト3
1(図2)でアンカーボルト27の長ナット26に締付
け固定する。この後、外側のトラス建起しガイドレール
7は、ボルト31を外して撤去する。
At the time of erection, as shown in FIG. 4, the truss butt 1a is placed near the outer end of the guide rail 7 after the truss has been erected. When it reaches the position, attach the base plate 20 to the bolt 3
1 (FIG. 2), and fix it to the long nut 26 of the anchor bolt 27. After that, the outer truss erection guide rail 7 is removed by removing the bolt 31.

【0013】この架構方法によると、各分割トラス2A
〜2Dを回動自在に連結しておき、トラス尻1aをウイ
ンチ10で内側へ引き込むことにより建起こすので、ク
レーン等の大型の重機を必要とせずに架構が行える。ま
た、従来のような大型の仮サポートも不要となり、人の
高さ程度のトラス受けサポート4〜6だけで済む。建起
し後の分割トラス2A〜2Dの連結部3の接合は、高所
作業車やローリングタワー等を利用してボルト締めによ
り行える。この場合の接合は、予め回動自在に連結され
た部材同士の接合であるため、簡単に行える。したがっ
て省力化につながる。前記の高所作業車等は、分割トラ
ス2A〜2Dの重量を負担するものではないため、小型
のもので済む。
According to this frame method, each divided truss 2A is
2D are rotatably connected to each other, and the truss butt 1a is pulled up inward by the winch 10 to erection, so that the frame can be constructed without requiring a large heavy machine such as a crane. In addition, a large-scale temporary support as in the past is not necessary, and only the truss receiving supports 4 to 6 which are about the height of a person are sufficient. The joint portions 3 of the divided trusses 2A to 2D after being erected can be joined by bolting using an aerial work vehicle or a rolling tower. The joining in this case is a joining of the members that are rotatably connected in advance, and thus can be easily performed. Therefore, it leads to labor saving. The aerial work vehicle or the like does not bear the weight of the divided trusses 2A to 2D, and thus can be small in size.

【0014】また、テント幕9等の屋根材や照明器具等
の天井設置機器の取付けは、前記のように地組段階で行
え、低位置で作業が行えるので安全である。なお、アー
チ式トラス1が仮設用のものである場合は、逆の順序で
解体が行え、各部材が繰り返して使用できるので、経済
的である。
Further, as described above, the roof material such as the tent curtain 9 and the ceiling-mounted equipment such as the lighting equipment can be mounted at the ground assembly stage, and the work can be performed at a low position, which is safe. In addition, when the arch truss 1 is for temporary installation, it can be disassembled in the reverse order and each member can be repeatedly used, which is economical.

【0015】図5は他の実施例を示す。この例は、2本
のアーチ式トラス1,1を十字状に交差させて設けた場
合の例である。この場合、トラス頂部では、十字状の連
結部材32を用い、頂部に集まる各分割トラス33を各
々ボルト34で回動自在に連結する。2本のアーチ式ト
ラス1,1は、前記と同様に地組しておいて、対向する
トラス尻1aをワイヤーロープ11とウインチ10とで
内側へ引き込む。ただし、この場合、2本のアーチ式ト
ラス1,1の引き込みは同時に行う。この実施例は、2
本のアーチ式トラス1で方形の構造物を架構する場合の
例であるが、六角形,八角形,十六角形等の構造物とす
る場合も、図5の例と同様に行える。
FIG. 5 shows another embodiment. This example is an example in which two arch trusses 1 and 1 are provided so as to cross each other in a cross shape. In this case, a cross-shaped connecting member 32 is used at the top of the truss, and the divided trusses 33 gathering at the top are rotatably connected by bolts 34. The two arch type trusses 1 and 1 are grounded in the same manner as described above, and the opposing truss butts 1a are pulled inward by the wire rope 11 and the winch 10. However, in this case, the two arch trusses 1 and 1 are pulled in at the same time. In this example, 2
This is an example of a case in which a rectangular structure is framed by the arch type truss 1 of the book, but a hexagonal structure, an octagonal structure, a hexagonal structure, or the like can be performed in the same manner as the example of FIG.

【0016】なお、前記各実施例では独立基礎22にア
ーチ式トラス1を据え付ける場合につき説明したが、例
えばべた基礎にトラス建起しガイドレールをアンカーボ
ルト等で固定し、そのレール上にトラス尻を固定しても
良い。また、前記各実施例では両側のトラス尻1aを内
側へ引き込むようにしたが、片方のトラス尻1aを位置
固定とし、もう片方のトラス尻1aのみを内側へ引き込
むようにしても良い。
In each of the above-mentioned embodiments, the case where the arch type truss 1 is installed on the independent foundation 22 has been described. For example, a truss is erected on a solid foundation, a guide rail is fixed with anchor bolts, and the truss butt is mounted on the rail. May be fixed. Further, in each of the above-described embodiments, the truss butt 1a on both sides is pulled inward, but one truss butt 1a may be fixed in position, and only the other truss butt 1a may be pulled inward.

【0017】[0017]

【発明の効果】この発明のアーチトラス式構造物の架構
方法は、各分割トラスを回動自在に連結しておき、トラ
ス尻を内側へ引き込むことにより建起こすので、大型の
重機や、仮支持用の高いトラス受けサポートが不要とな
る。また、地組時に各分割トラスを回動自在に連結して
おくので、建起し後はその連結された箇所のボルト等に
よる接合だけで済み、接合作業が簡単に行える。これら
のため、高所作業が少なく、安全に作業が行え、省力化
にもつながる。さらに、地組時にテント幕等のトラス付
設物を取付けておくこともでき、これにより高所作業を
より一層少なくして安全性,作業性の向上を図ることが
できる。
According to the frame truss method of the arch truss type structure of the present invention, since each divided truss is rotatably coupled and the truss butt is pulled inward, the construction is carried out. No need for high truss support. In addition, since the divided trusses are rotatably connected at the time of assembly, after the construction, it is only necessary to connect the connected portions with bolts or the like, and the connecting work can be performed easily. For these reasons, work in high places is small, work can be performed safely, and labor is saved. Furthermore, a truss-attached structure such as a tent curtain can be attached during the grounding, which can further reduce the work at height and improve the safety and workability.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例を示す架構過程の説明図で
ある。
FIG. 1 is an explanatory view of a frame process showing an embodiment of the present invention.

【図2】そのトラス建起しガイドレールの周辺部分の破
断側面図である。
FIG. 2 is a cutaway side view of a peripheral portion of the truss erection guide rail.

【図3】同部分の破断平面図である。FIG. 3 is a cutaway plan view of the same portion.

【図4】同部分の地組状態を示す縮小破断側面図であ
る。
FIG. 4 is a reduced cutaway side view showing an assembled state of the same portion.

【図5】他の実施例の概略平面図、およびその部分拡大
平面図である。
FIG. 5 is a schematic plan view of another embodiment and a partially enlarged plan view thereof.

【図6】従来の架構方法の説明図である。FIG. 6 is an explanatory view of a conventional frame method.

【符号の説明】[Explanation of symbols]

1…アーチ式トラス、1a…トラス尻、2A〜2D…分
割トラス、3…連結部、4〜6…トラス受けサポート、
7…トラス建起しガイドレール、8…ローラ、9…テン
ト幕、10…ウインチ、11…ワイヤロープ
1 ... Arch type truss, 1a ... Truss butt, 2A-2D ... Split truss, 3 ... Connection part, 4-6 ... Truss receiving support,
7 ... Truss erection guide rail, 8 ... Roller, 9 ... Tent curtain, 10 ... Winch, 11 ... Wire rope

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 アーチ式トラスを長手方向に区分した複
数の各分割トラスを、隣合う分割トラス同士が上下回動
自在に連結された状態に地組みする過程と、この地組み
されたアーチ式トラスのトラス尻を内側へ引き込んで前
記アーチ式トラスを完成形状に建起こす過程と、この建
起し後に各分割トラス間の回動自在な連結部を回動不能
状態に接合する過程とを含むアーチトラス式構造物の架
構方法。
1. A process of grounding a plurality of split trusses obtained by partitioning an arch truss in the longitudinal direction into a state in which adjacent split trusses are vertically rotatably connected to each other, and this ground arched truss It includes a process of pulling the truss butt of the truss inward to erected the arch type truss into a completed shape, and a process of rotatably connecting the rotatable joints between the divided trusses after the erection. Frame truss structure method.
JP4361095A 1992-12-29 1992-12-29 Frame method of arch truss construction Pending JPH06200625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4361095A JPH06200625A (en) 1992-12-29 1992-12-29 Frame method of arch truss construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4361095A JPH06200625A (en) 1992-12-29 1992-12-29 Frame method of arch truss construction

Publications (1)

Publication Number Publication Date
JPH06200625A true JPH06200625A (en) 1994-07-19

Family

ID=18472179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4361095A Pending JPH06200625A (en) 1992-12-29 1992-12-29 Frame method of arch truss construction

Country Status (1)

Country Link
JP (1) JPH06200625A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196122A (en) * 1997-01-07 1998-07-28 Taisei Corp Arch supporting assembling system and assembling method
JP2001032574A (en) * 1999-07-23 2001-02-06 Shimizu Corp Open-close type simple hood
JP2004156388A (en) * 2002-11-08 2004-06-03 Toda Constr Co Ltd Construction method of arch structure, dome structure and its construction method
JP2004183363A (en) * 2002-12-04 2004-07-02 Yoshinori Fukada Construction method for temporary building and building
JP2009068296A (en) * 2007-09-14 2009-04-02 Nippon Steel Engineering Co Ltd Roof frame constructing method and roof frame
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN105178607A (en) * 2015-08-20 2015-12-23 中国建筑第八工程局有限公司 Construction method for large radial arc-shaped frame body structure
CN105781209A (en) * 2016-05-09 2016-07-20 常熟风范电力设备股份有限公司 Communication tower
JP2018044353A (en) * 2016-09-14 2018-03-22 大和ハウス工業株式会社 Formation method and framework of arched structure
CN114482381A (en) * 2022-02-17 2022-05-13 中建八局新型建造工程有限公司 Method for mounting parts of dome steel structure
CN114809649A (en) * 2022-03-14 2022-07-29 隆恩建设工程有限公司 Overhanging type pipe truss and mounting method of supporting rod thereof
KR102445930B1 (en) * 2022-01-21 2022-09-21 최희준 Pipe for framework

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196122A (en) * 1997-01-07 1998-07-28 Taisei Corp Arch supporting assembling system and assembling method
JP2001032574A (en) * 1999-07-23 2001-02-06 Shimizu Corp Open-close type simple hood
JP2004156388A (en) * 2002-11-08 2004-06-03 Toda Constr Co Ltd Construction method of arch structure, dome structure and its construction method
JP2004183363A (en) * 2002-12-04 2004-07-02 Yoshinori Fukada Construction method for temporary building and building
JP2009068296A (en) * 2007-09-14 2009-04-02 Nippon Steel Engineering Co Ltd Roof frame constructing method and roof frame
CN104986663A (en) * 2015-05-21 2015-10-21 中交一航局安装工程有限公司 Lifting installation technology for steel structure arched door
CN105178607A (en) * 2015-08-20 2015-12-23 中国建筑第八工程局有限公司 Construction method for large radial arc-shaped frame body structure
CN105781209A (en) * 2016-05-09 2016-07-20 常熟风范电力设备股份有限公司 Communication tower
JP2018044353A (en) * 2016-09-14 2018-03-22 大和ハウス工業株式会社 Formation method and framework of arched structure
KR102445930B1 (en) * 2022-01-21 2022-09-21 최희준 Pipe for framework
CN114482381A (en) * 2022-02-17 2022-05-13 中建八局新型建造工程有限公司 Method for mounting parts of dome steel structure
CN114482381B (en) * 2022-02-17 2024-04-16 中建八局新型建造工程有限公司 Method for installing parts for dome steel structure
CN114809649A (en) * 2022-03-14 2022-07-29 隆恩建设工程有限公司 Overhanging type pipe truss and mounting method of supporting rod thereof

Similar Documents

Publication Publication Date Title
JPH102018A (en) Building unit, unit building, and its constructing method
JP2010065378A (en) Hanging scaffold and method for erecting the same
JPH06200625A (en) Frame method of arch truss construction
JPH04111829A (en) Method for constructing large-span roof
US7325362B1 (en) Steel roof truss system
JP2002356297A (en) Steel tower constructing crane and steel tower construction method using crane
GB2037838A (en) A Foldable Prefabricated Building Structure
CN212201400U (en) Assembled steel structure external hanging type protective frame
JP3072214B2 (en) Temporary shed
JP2573545B2 (en) Construction method of temporary tent for construction
JP2764356B2 (en) Temporary roof and its construction method
JP2585174B2 (en) How to fix scaffolding for temporary tents
JP3247749B2 (en) Construction method of long span truss beams
JP2919827B1 (en) All-weather temporary scaffolding device and method of using all-weather temporary scaffolding device
JP2779998B2 (en) Lifting device for temporary tents
JPH08113982A (en) Device for joining column and beam of steel framed building
JP3100574B2 (en) Suspended scaffold and its erection method
JPH09317185A (en) Construction method of housing
JP2888736B2 (en) Roof structure
JP2552986Y2 (en) Lifting piece for lifting temporary tent
JP3252675B2 (en) All-weather temporary roof
JPH09221917A (en) All weather type temporary roof equipment
JP3271479B2 (en) Construction method of warehouse equipment
JP2994205B2 (en) Structural assembly method
CN117145043A (en) Assembled type corridor, corridor end connection structure and construction method

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040302