JPH09228450A - Installation method of sanitary facility unit - Google Patents

Installation method of sanitary facility unit

Info

Publication number
JPH09228450A
JPH09228450A JP6553296A JP6553296A JPH09228450A JP H09228450 A JPH09228450 A JP H09228450A JP 6553296 A JP6553296 A JP 6553296A JP 6553296 A JP6553296 A JP 6553296A JP H09228450 A JPH09228450 A JP H09228450A
Authority
JP
Japan
Prior art keywords
frame
unit
sanitary
constructing
sanitary equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6553296A
Other languages
Japanese (ja)
Inventor
Yoshichika Tanaka
義親 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inax Corp
Original Assignee
Inax Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inax Corp filed Critical Inax Corp
Priority to JP6553296A priority Critical patent/JPH09228450A/en
Publication of JPH09228450A publication Critical patent/JPH09228450A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sanitary Device For Flush Toilet (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

PROBLEM TO BE SOLVED: To simplify the installation work and lessen rubbish like packing materials generated in the installation site as much as possible, when a unit provided with sanitary tools like toilet seats, a unit frame as a skeleton frame member assembled to form a frame, various pipes, and decoration plates arranged at the top and front faces of the unit frame is installed at the construction site. SOLUTION: Sanitary tools 14 are assembled in advance at every plurality of pieces on a unit frame 12 together with corresponding front plates 50 as the fitting face for the sanitary tools and pipes 34A, 34B. And a frame body 54 for transportation is integrally fitted to the preliminarily assembled body 52. The preliminarily assembled body 52 is hauled in the installation site together with the frame body for transportation to finally assemble the sanitary facilities unit.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、便器等衛生器具
と、配管スペース形成用且つ衛生器具の取付支持用のユ
ニットフレームと、配管スペース内に収容される配管
と、配管スペースを隠蔽するようにユニットフレームの
上面及び前面に配置される化粧プレートとをユニット化
して成る衛生設備ユニットの施工方法に関する。
TECHNICAL FIELD The present invention relates to a sanitary appliance such as a toilet bowl, a unit frame for forming a piping space and for mounting and supporting the sanitary appliance, a pipe housed in the piping space, and a pipe space. The present invention relates to a method for constructing a sanitary facility unit, which is configured by uniting a top surface and a decorative plate on the front surface of a unit frame.

【0002】[0002]

【従来の技術】壁パネル,衛生設備ユニット,ブース等
トイレ構成部材を工場で予め生産し、それらを現場に搬
入して組立施工し、所望のトイレ空間を構築できるよう
にしたシステムトイレがビルのトイレ等において広く用
いられている。
2. Description of the Related Art Toilet components such as wall panels, sanitary equipment units, booths, etc. are produced in advance in a factory, and they are brought to the site and assembled to construct a desired toilet space in a building. Widely used in toilets, etc.

【0003】ここで衛生設備ユニットは、便器等衛生器
具と、フレーム材を組んで成り、壁の前部に衛生器具用
の配管スペースを形成するとともに衛生器具を取付・支
持するための骨格部材としてのユニットフレームと、配
管スペース内に収容される配管と、配管スペースを隠蔽
するようにユニットフレームの上面及び前面に配置され
る化粧プレートとを予めユニット化したものである。
Here, the sanitary equipment unit is composed of a sanitary appliance such as a toilet bowl and a frame member, forms a piping space for the sanitary appliance in the front part of the wall, and serves as a skeletal member for mounting and supporting the sanitary appliance. The unit frame, the pipe housed in the piping space, and the decorative plates arranged on the upper surface and the front surface of the unit frame so as to conceal the piping space are unitized in advance.

【0004】図9はこの種衛生設備ユニットの従来の一
例を施工完了状態で示したものである。同図は衛生設備
ユニットとしての大便器ユニットの例を示したもので、
図中200は矩形箱体状をなすユニットフレーム、20
2は大便器である。
FIG. 9 shows a conventional example of this type of sanitary equipment unit in a completed construction state. This figure shows an example of a toilet unit as a sanitary equipment unit.
In the figure, 200 is a unit box in the shape of a rectangular box, 20
2 is a toilet bowl.

【0005】ユニットフレーム200は、その前面上
端,前面下端,後面上端,後面下端にそれぞれ横設され
たアングル状の横フレーム材204を、壁216に沿っ
て左右方向に所定間隔で複数配置した補強枠、即ち前後
の一対の縦フレーム材(支柱)206とそれらの上端,
下端を前後に連結する前後フレーム材208とから成る
矩形枠状の補強枠にて連結した形態の、全体として箱体
状を成す部材であって、下端の前後フレーム材208の
中間部においてアンカーボルト210により床212に
固定されるとともに、上端部においてはユニットフレー
ム200を前後方向に貫通する長いボルト214にて壁
216に固定されている。
The unit frame 200 is reinforced by arranging a plurality of angle-shaped horizontal frame members 204 laterally provided at the upper end of the front surface, the lower end of the front surface, the upper end of the rear surface, and the lower end of the rear surface at predetermined intervals along the wall 216 in the left-right direction. Frame, that is, a pair of front and rear vertical frame members (posts) 206 and their upper ends,
A member having a box-like shape as a whole, which is connected by a rectangular frame-shaped reinforcing frame composed of front and rear frame members 208 for connecting front and rear ends thereof, and an anchor bolt at an intermediate portion of the front and rear frame members 208 at the lower end. It is fixed to the floor 212 by 210, and is fixed to the wall 216 at the upper end by a long bolt 214 that penetrates the unit frame 200 in the front-rear direction.

【0006】このユニットフレーム200の内部には、
具体的には前側の支柱206と後側の支柱206との間
において、配管スペース222が形成されており、そこ
に横引配管された排水配管,給水配管,脱臭配管,通気
配管等の各種配管224が配置収容されている。このユ
ニットフレーム200の上面と前面とには、配管スペー
ス222を隠蔽するようにして化粧板としての甲板21
8と前板220とが取り付けられており、その前板22
0を介して上記大便器202がユニットフレーム200
に取付・支持されている。
Inside the unit frame 200,
Specifically, a piping space 222 is formed between the front strut 206 and the rear strut 206, and various pipes such as drain pipes, water supply pipes, deodorizing pipes, and ventilation pipes that are horizontally drawn. 224 are arranged and housed. On the upper surface and the front surface of the unit frame 200, a deck 21 as a decorative board is provided so as to cover the piping space 222.
8 and a front plate 220 are attached to the front plate 22.
The toilet bowl 202 is connected to the unit frame 200
It is attached and supported by.

【0007】この種衛生設備ユニットの従来の施工方法
は、予め工場でユニットフレームに配管を組み付けてお
き、その配管付きのユニットフレームと甲板,前板,衛
生器具とを別々に現場に搬入し、そこで先ずユニットフ
レームを床,壁等に固定した上で、前板を介して衛生器
具をユニットフレームに取り付けるといったものであっ
た。
The conventional construction method for this type of sanitary equipment unit is that the piping is assembled to the unit frame in advance at the factory, and the unit frame with the piping, the deck, the front plate and the sanitary equipment are carried into the site separately, Therefore, first, after fixing the unit frame to the floor, wall, etc., the sanitary ware is attached to the unit frame via the front plate.

【0008】[0008]

【発明が解決しようとする課題】しかしながらこの場
合、配管付きのユニットフレーム,甲板,前板,衛生器
具をそれぞれ別々に梱包した状態で何回かに分けて施工
現場に搬入することが必要であって、必要搬入回数が多
くなり、また現場で梱包を解いた後に梱包材等のごみが
多量に発生する問題があり、また搬入回数が多いことか
ら施工に要する期間も長くなるといった問題があった。
In this case, however, it is necessary to carry the unit frame with piping, the deck, the front plate and the sanitary ware separately packed into the construction site several times. Therefore, there is a problem that the required number of times of transportation increases, and a large amount of dust such as packing materials is generated after unpacking at the site, and that the number of times of transportation requires a long period of time for construction. .

【0009】[0009]

【課題を解決するための手段】本願の発明の施工方法は
このような課題を解決するために案出されたものであ
る。而して本願の発明の施工方法は、便器等衛生器具
と、フレーム材を枠状に組んで成り、壁の前部に該衛生
器具用の配管スペースを形成するとともに該衛生器具を
取付支持するための骨格部材としてのユニットフレーム
と、前記配管スペースに収容配置される配管と、該配管
スペースを隠蔽するように該ユニットフレームの上面及
び前面に配置される化粧プレートとを備えた衛生設備ユ
ニットの施工方法であって、前記衛生器具を予め複数個
単位で該衛生器具の取付面となる、対応する化粧プレー
ト及び配管と共に対応するユニットフレームに組み付け
ておき、該予備組付体を施工現場に搬入して、該施工現
場で該ユニットフレームの床,壁等の取付面への取付固
定を含む衛生設備ユニットの最終組付けを行うことを特
徴とする(請求項1)。
The construction method of the invention of the present application has been devised to solve such problems. Thus, the construction method of the present invention comprises a sanitary device such as a toilet bowl and a frame member assembled in a frame shape to form a piping space for the sanitary device in the front part of the wall and to attach and support the sanitary device. Of a sanitary equipment unit including a unit frame as a skeletal member for, a pipe accommodated and arranged in the piping space, and a decorative plate arranged on the upper surface and the front surface of the unit frame so as to conceal the piping space. As a construction method, a plurality of the sanitary appliances are assembled in advance on a corresponding unit frame together with a corresponding decorative plate and piping, which are mounting surfaces of the sanitary appliances, and the preliminary assembly is carried into a construction site. Then, the sanitary equipment unit is finally assembled at the construction site including mounting and fixing the unit frame to a mounting surface such as a floor or a wall (Claim 1).

【0010】本願の別の発明の施工方法は、請求項1に
おいて、前記予備組付体を施工現場で左右方向に連結し
て全体の衛生設備ユニットを構築することを特徴とする
(請求項2)。
A construction method according to another invention of the present application is characterized in that, in claim 1, the entire preparatory assembly is connected in a left-right direction at a construction site to construct an entire sanitary equipment unit (claim 2). ).

【0011】本願の更に別の発明の施工方法は、請求項
1又は2において、前記予備組付体に対して枠材を固定
して箱組状の搬送用枠体を該予備組付体と一体的に構築
し、該予備組付体を該搬送用枠体とともに搬送した後、
施工現場において該搬送用枠体を取り除くことを特徴と
する(請求項3)。
According to still another aspect of the present invention, in the construction method according to claim 1 or 2, a frame member is fixed to the pre-assembled body to form a box-shaped transport frame body as the pre-assembled body. After being constructed integrally and carrying the preliminary assembly together with the carrying frame,
The carrying frame is removed at the construction site (claim 3).

【0012】本願の更に別の発明の施工方法は、請求項
3において、前記ユニットフレームを前記搬送用枠体の
一部枠材として兼用させることを特徴とする(請求項
4)。
A construction method according to still another invention of the present application is characterized in that, in claim 3, the unit frame is also used as a part of a frame member of the carrying frame body (claim 4).

【0013】本願の更に別の発明の施工方法は、請求項
3又は4において、前記搬送用枠体の上部には吊り具が
固設されていることを特徴とする(請求項5)。
A construction method according to still another invention of the present application is characterized in that, in claim 3 or 4, a suspending tool is fixedly provided on an upper portion of the carrying frame (claim 5).

【0014】本願の更に別の発明の施工方法は、請求項
3,4,5の何れかにおいて、前記搬送用枠体の下部に
キャスターを固設して前記予備組付体を該搬送用枠体と
ともに横移動させるか又はキャスター付台車にて横移動
させることを特徴とする(請求項6)。
According to still another aspect of the present invention, in the construction method according to any one of claims 3, 4 and 5, a caster is fixed to a lower portion of the carrying frame body to fix the preliminary assembly to the carrying frame. It is characterized in that it is laterally moved together with the body or laterally by a trolley with casters (claim 6).

【0015】[0015]

【作用及び発明の効果】上記のように請求項1の発明
は、衛生器具を予め複数個単位で対応する化粧プレー
ト,配管,ユニットフレームと共に組み付けておき、そ
の予備組付体の状態でこれを施工現場に搬入してユニッ
トフレームの取付面への取付固定を行い、最終の衛生設
備ユニットを構築するもので、本発明によれば、衛生設
備ユニットを従来よりも完成に近い状態で施工現場に搬
入することができるため、施工現場への必要な搬入回数
を減らすことができ、また施工現場において発生する梱
包材等のごみの量を少なくすることができる。また必要
な搬入回数が少なくて済むことから、衛生設備ユニット
を設置するために必要な工期を短縮化することができ
る。
As described above, according to the first aspect of the present invention, a plurality of sanitary appliances are previously assembled together with corresponding decorative plates, pipes, and unit frames, and the sanitary appliances are assembled in the state of the preliminary assembly. The final sanitary equipment unit is constructed by carrying it to the construction site and fixing it to the mounting surface of the unit frame.According to the present invention, the sanitary equipment unit can be installed on the construction site in a state closer to completion than before. Since it can be carried in, it is possible to reduce the necessary number of times of carrying in to the construction site, and it is possible to reduce the amount of dust such as packaging materials generated at the construction site. Further, since the required number of times of carrying in is small, it is possible to shorten the construction period required for installing the sanitary equipment unit.

【0016】上記予備組付体は、これを施工現場におい
て左右方向に複数連結して全体の衛生設備ユニットを構
築することができ、この場合、衛生器具の連設個数の多
い大きなトイレ空間をも容易に構築することができる
(請求項2)。
[0016] The above-mentioned pre-assembled body can be connected to a plurality of left-right directions at the construction site to construct the entire sanitary equipment unit. In this case, even a large toilet space in which a large number of sanitary appliances are connected is provided. It can be easily constructed (claim 2).

【0017】請求項3の発明は、上記予備組付体に対し
て搬送用枠体を一体的に固設し、予備組付体を搬送用枠
体とともに施工現場に搬送した上でその搬送用枠体を外
すもので、本発明によれば、予備組付体を搬送用枠体に
よって変形等を生ぜしめることなく安定的に搬送するこ
とが可能となる。
According to a third aspect of the present invention, a carrying frame body is integrally fixed to the preliminary assembly body, the preliminary assembly body is carried together with the carrying frame body to a construction site, and then the carrying frame body is carried. According to the present invention, the frame body is removed, and the preliminary assembly body can be stably transported without being deformed by the transport frame body.

【0018】請求項4の発明は、上記ユニットフレーム
を搬送用枠体の一部枠材として兼用させるもので、本発
明によれば、搬送用枠体構成のための必要部材数を少な
くすることができるとともに、搬送用枠体の組付けの手
間を節減することができる。
According to a fourth aspect of the present invention, the unit frame is also used as a part of a frame member of the carrying frame body. According to the present invention, the number of necessary members for constructing the carrying frame body is reduced. In addition, it is possible to reduce the labor for assembling the transport frame body.

【0019】請求項5の発明は、上記搬送用枠体の上部
に吊り具を設けたもので、このようにすることによって
予備組付体を搬送用枠体と共に容易にクレーン等で吊り
上げることができ、施工現場への搬入が容易化する。
According to a fifth aspect of the present invention, a suspending tool is provided on the upper portion of the carrying frame body. By doing so, the preliminary assembly can be easily lifted together with the carrying frame body by a crane or the like. It is possible and easy to carry into the construction site.

【0020】請求項6の発明は、搬送用枠体の下部にキ
ャスターを設けて予備組付体を搬送用枠体とともに横移
動させるか、またはキャスター付台車にこれらを載せて
横移動させるもので、このようにすれば予備組付体を容
易に搬送することができる。
According to the invention of claim 6, a caster is provided at the bottom of the carrying frame to move the preliminary assembly together with the carrying frame laterally, or these are mounted on a trolley with casters and laterally moved. By doing so, the preliminary assembly can be easily transported.

【0021】[0021]

【実施例】次に本発明の実施例を図面に基づいて詳しく
説明する。図1及び図2は衛生設備ユニットを施工完了
状態で示したもので、図中10はシステムトイレの壁を
構成する壁パネルであり、12は壁パネル10との間に
配管スペース13を形成するとともに前面側に衛生器具
としての小便器14が取り付けられ、これを支持する骨
格部材としてのユニットフレームである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, embodiments of the present invention will be described in detail with reference to the drawings. 1 and 2 show the sanitary equipment unit in a completed construction state, in which 10 is a wall panel forming a wall of the system toilet, and 12 is a piping space 13 formed between the wall panel 10 and the wall panel 10. At the same time, a urinal 14 as a sanitary device is attached to the front side, which is a unit frame as a skeletal member for supporting the urinal 14.

【0022】本例においてこのユニットフレーム12は
平面枠構造のもので、図に示しているように上端のLア
ングル状の横フレーム材16と下端のLアングル状の横
フレーム材16とに対して、左右方向に所定間隔で配置
した複数の縦フレーム材(支柱18)の上端部と下端部
とを溶接接合した形態をなしており、その上端部が壁パ
ネル10に横設されたレール部材24に対して、前後固
定部材としての長ボルト22及び固定金具20,26に
て固定されている。
In this example, the unit frame 12 has a plane frame structure, and as shown in the figure, the L-angle-shaped horizontal frame member 16 at the upper end and the L-angle-shaped horizontal frame member 16 at the lower end are provided. The rail member 24 has a configuration in which the upper end portion and the lower end portion of a plurality of vertical frame members (struts 18) arranged at a predetermined interval in the left-right direction are welded to each other, and the upper end portion is laterally provided on the wall panel 10. On the other hand, it is fixed by long bolts 22 as front and rear fixing members and fixing metal fittings 20, 26.

【0023】また一方下端部は、床28に固設された床
固定バー30に対して、ビス等締結部材により締結固定
されている。ここで支柱18は、図1に示しているよう
に角パイプから成る支柱本体18Aと、これに固設され
たLアングル状の補助部材18Bとから成っている。
On the other hand, the lower end portion is fastened and fixed to a floor fixing bar 30 fixed to the floor 28 by a fastening member such as a screw. As shown in FIG. 1, the pillar 18 is composed of a pillar body 18A made of a square pipe and an L-angle-shaped auxiliary member 18B fixed to the pillar body 18A.

【0024】尚、このユニットフレーム12の下端部に
はアジャストボルト32が下向きに螺合されており、そ
のアジャストボルト32の回転操作によってユニットフ
レーム12が全体的に高さ調整されるようになってい
る。
An adjusting bolt 32 is screwed downward at the lower end of the unit frame 12, and the height of the unit frame 12 can be entirely adjusted by rotating the adjusting bolt 32. There is.

【0025】配管スペース13の内部には、排水配管3
4A,給水配管,脱臭配管,通気配管等各種配管34B
が横引配管されており、それぞれが配管支持部36A,
36Bによって支持されている。ここで配管支持部36
Bは、支柱18、具体的には補助部材18Bにナットで
締結されて横向き(前後方向向き)に突出する支持ボル
ト38と、その先端部に設けられた開閉可能なリング状
の保持部40とから成っており、それら保持部40にお
いて配管34Bの外周面を掴む状態にこれらを保持して
いる。
Inside the piping space 13, the drainage pipe 3
4A, various piping 34B such as water supply piping, deodorizing piping, ventilation piping
Is laterally piped, and each of them is a pipe support portion 36A,
It is supported by 36B. Here, the pipe support 36
B is a support bolt 38 which is fastened to the support column 18, specifically, the auxiliary member 18B with a nut, and which projects laterally (in the front-rear direction), and an openable / closable ring-shaped holding portion 40 provided at the tip thereof. The holding parts 40 hold the pipes 34B in a state of gripping the outer peripheral surface of the pipes 34B.

【0026】一方配管支持部36Aは、補助部材18B
にボルト,ナットにて締結されたL字状のサポート部材
42と、その先端部に下向きにナットにて締結された吊
ボルト44と、その下端部のリング状の開閉可能な保持
部46とから成っており、その保持部46において排水
配管34Aを吊下状態に保持している。
On the other hand, the pipe support portion 36A has an auxiliary member 18B.
An L-shaped support member 42 fastened with a bolt and a nut, a suspension bolt 44 fastened downward with a nut to the tip of the L-shaped support member 42, and a ring-shaped openable and closable holding portion 46 at the lower end thereof. The holding portion 46 holds the drainage pipe 34A in a suspended state.

【0027】ユニットフレーム12の上面と前面とに
は、配管スペース13を隠蔽するようにして化粧プレー
トとしての甲板48及び前板50が配置されており、こ
の前板50を介して前記小便器14がユニットフレーム
12に取り付けられている。
A deck 48 and a front plate 50 as a decorative plate are arranged on the upper surface and the front surface of the unit frame 12 so as to conceal the piping space 13, and the urinal 14 is interposed via the front plate 50. Are attached to the unit frame 12.

【0028】図3及び図4は上記衛生設備ユニットの施
工方法の要部工程を示している。図に示しているように
本例の方法では、小便器14を予め複数個単位(この例
では3個単位)で、その取付面となる小便器14に対応
した前板50と配管34A,34B及びそれらの接続器
具,水栓器具等とともに対応するユニットフレーム12
に組み付けておき、その予備組付体52の状態でこれを
施工現場に搬入して最終の組付施工を行う。尚、図3に
示しているように各小便器14の左右隣接部の前板は除
いた状態としておく。
3 and 4 show the main steps of the method of constructing the sanitary equipment unit. As shown in the figure, in the method of this example, a plurality of urinals 14 (in this example, three urinals) are arranged in advance, and the front plate 50 and the pipes 34A, 34B corresponding to the urinals 14 serving as the mounting surfaces thereof. And the corresponding unit frame 12 together with their connecting device, faucet device, etc.
Is assembled to the construction site, and the spare assembly body 52 is brought into the construction site for final assembly work. As shown in FIG. 3, the front plates of the left and right adjacent portions of each urinal 14 are removed.

【0029】図3及び図4において、54は予備組付体
52の搬送用枠体であって、上端及び下端の前後枠材5
6,前部の上下枠材58及び前部の左右枠材60を箱体
状に組んで、これを予備組付体52に一体的に組み付け
てある。
In FIGS. 3 and 4, reference numeral 54 is a carrying frame for the pre-assembled body 52, which is the front and rear frame members 5 at the upper and lower ends.
6. The front upper and lower frame members 58 and the front left and right frame members 60 are assembled in a box shape and are integrally assembled to the preliminary assembly body 52.

【0030】本例においては、図から明らかなようにユ
ニットフレーム12が搬送用枠体54における後部の上
下枠材及び左右枠材を兼用している。尚、61は搬送用
枠体54の補強用の筋交いである。ここで搬送用枠体5
4の下面にはキャスター62が取り付けてあり、また上
面には吊り具としてのアイボルト64が取り付けられて
いる。
In this example, as is apparent from the figure, the unit frame 12 also serves as the upper and lower frame members and the left and right frame members at the rear portion of the carrying frame body 54. Reference numeral 61 is a bracing for reinforcing the transport frame 54. Here, the transport frame 5
A caster 62 is attached to the lower surface of 4, and an eyebolt 64 as a suspending tool is attached to the upper surface.

【0031】図5に示しているように上記前後枠材5
6,上下枠材58,左右枠材60及び後側の枠材を兼用
するユニットフレーム12は、それぞれボルト68,ナ
ット70にて重ね合わせ状態で互いに締結されており、
また上記吊り具としてのアイボルト64は、横フレーム
材16及び左右枠材60の下面の溶接ナット72に対し
て下向きに螺合されている。
As shown in FIG. 5, the front and rear frame members 5 are
6, the unit frame 12 that also serves as the upper and lower frame members 58, the left and right frame members 60, and the rear frame member are fastened to each other by bolts 68 and nuts 70 in an overlapping state.
Further, the eyebolt 64 as the above-mentioned hanging tool is screwed downward to the welding nuts 72 on the lower surfaces of the horizontal frame member 16 and the left and right frame members 60.

【0032】上記のように本例では、小便器14を複数
個単位で予め対応する前板50、配管34A,34B、
ユニットフレーム12等とともに組み付けておき、そし
てその予備組付体52に対して搬送用枠体54を一体に
取り付けた状態で、それらを共に生産工場から施工現場
に搬入する。
As described above, in this embodiment, the urinals 14 corresponding to a plurality of units in advance, the front plate 50, the pipes 34A and 34B,
After being assembled together with the unit frame 12 and the like, and with the carrying frame body 54 integrally attached to the pre-assembled body 52, they are carried together from the production factory to the construction site.

【0033】その際、搬送用枠体54の下面にはキャス
ター62が設けてあり、また上面には吊り具としてのア
イボルト64が取り付けられているため、予備組付体5
2を搬送用枠体54とともに施工現場に搬入するに際し
てこれを容易に移動させ、或いはクレーン等にて吊り上
げるなどして施工現場に搬入することができる。
At this time, the caster 62 is provided on the lower surface of the carrying frame 54, and the eyebolt 64 as a suspending tool is attached to the upper surface of the carrier frame 54.
When 2 is carried into the construction site together with the transfer frame 54, it can be easily moved, or can be lifted by a crane or the like and carried into the construction site.

【0034】そしてその予備組付体52を施工現場に搬
入した後に搬送用枠体54を取り外し、そしてユニット
フレーム12を壁パネル10,床28等の取付面に取付
固定し、更に除かれている前板50を取り付けたり必要
に応じて予備組付体52を左右方向に連結したりするこ
とで、衛生設備ユニットを最終組付け施工する。
After the preliminary assembly 52 is carried into the construction site, the carrying frame 54 is removed, and the unit frame 12 is mounted and fixed on the mounting surface of the wall panel 10, the floor 28, etc., and is further removed. The sanitary equipment unit is finally assembled by mounting the front plate 50 or connecting the preliminary assembly bodies 52 in the left-right direction as required.

【0035】かかる本例の方法によれば、衛生設備ユニ
ットを従来よりも完成に近い状態で施工現場に搬入する
ことができるため、施工現場への必要な搬入回数を減ら
すことができ、また施工現場において発生する梱包材等
のごみの量を少なくすることができる。また必要な搬入
回数が少なくて済むことから、衛生設備ユニットを設置
するために必要な工期を短縮化することができる。
According to the method of this example, since the sanitary equipment unit can be carried into the construction site in a state closer to completion than before, it is possible to reduce the number of times of transportation required to the construction site and to carry out the construction. It is possible to reduce the amount of dust such as packing materials generated on site. Further, since the required number of times of carrying in is small, it is possible to shorten the construction period required for installing the sanitary equipment unit.

【0036】また本例では、上記予備組付体52に対し
て搬送用枠体54を一体的に固設し、予備組付体52を
搬送用枠体54とともに施工現場に搬入した上でその搬
送用枠体54を外すようにしていることから、予備組付
体52を変形等を生ぜしめることなく安定的に搬送する
ことができる。
Further, in this example, the carrying frame body 54 is integrally fixed to the preliminary assembly body 52, and the preliminary assembly body 52 is carried into the construction site together with the carrying frame body 54, and then the construction is carried out. Since the transport frame 54 is removed, the preliminary assembly 52 can be stably transported without causing deformation or the like.

【0037】更に本例では、上記ユニットフレーム12
を搬送用枠体54の一部枠材として兼用させるようにし
ているため、搬送用枠体54構成のための必要部材数を
少なくすることができるとともに、搬送用枠体54の組
付けの手間も節減することができる。
Further, in this example, the unit frame 12 is
Is used also as a part of the frame member of the transport frame body 54, the number of necessary members for configuring the transport frame body 54 can be reduced, and the labor for assembling the transport frame body 54 can be reduced. Can also be saved.

【0038】図6は本発明の他の実施例を示している。
この例は箱体状のユニットフレーム68、即ち前面上端
と前面下端及び後面上端と後面下端の横フレーム材70
を矩形の補強枠、つまり前後の縦フレーム材としての支
柱72の各上端部と下端部とを前後フレーム材74にて
連結した形態の矩形の補強枠にて、左右方向の複数箇所
を連結した形態の箱体状のユニットフレーム68を備え
た衛生設備ユニットに本発明を適用した場合の例で、6
9は予備組付体を示している。尚、この例においてもユ
ニットフレーム68が搬送用枠体54における後部の枠
材を兼用している。
FIG. 6 shows another embodiment of the present invention.
In this example, a box-shaped unit frame 68, that is, a horizontal frame member 70 at the front upper end and the front lower end and the rear upper end and the rear lower end is used.
Is a rectangular reinforcing frame, that is, a rectangular reinforcing frame in which the upper and lower ends of the columns 72 as the front and rear vertical frame members are connected by the front and rear frame members 74. 6 is an example in which the present invention is applied to a sanitary equipment unit including a box-shaped unit frame 68 of
Reference numeral 9 indicates a preliminary assembly. Also in this example, the unit frame 68 also serves as a frame member at the rear portion of the carrying frame body 54.

【0039】本例においても、上記実施例と同様の効果
を奏することができる。尚、図6において76はサポー
ト部材であって、各種配管34A,34Bはこれらサポ
ート部材76に載置状態でUボルト78により固定され
ている。
Also in this example, the same effect as that of the above-mentioned embodiment can be obtained. In FIG. 6, reference numeral 76 denotes a support member, and the various pipes 34A and 34B are mounted on these support members 76 and fixed by U bolts 78.

【0040】次に図7,図8は衛生器具として洗面器8
0の取り付けられた衛生設備ユニット(洗面器ユニッ
ト)に対して本発明を適用した場合の例を示している。
図に示しているように本例の方法では、衛生器具として
の洗面器80を複数個単位(この例では2個単位)で、
対応する化粧プレートとしてのカウンター84及び前板
86と共に矩形箱体状のユニットフレーム82に対し
て、対応する配管34A,34Bとともに予め組み付け
て予備組付体88となし、その状態でこれを施工現場に
搬入する。
Next, FIGS. 7 and 8 show a washbasin 8 as a sanitary device.
The example when the present invention is applied to the sanitary equipment unit (washbasin unit) to which 0 is attached is shown.
As shown in the figure, in the method of this example, a plurality of washbasins 80 as sanitary appliances (in this example, two washbasins) are used.
Preliminarily assembled together with the corresponding pipes 34A, 34B to the unit box 82 in the shape of a rectangular box together with the counter 84 and the front plate 86 as the corresponding decorative plates to form the pre-assembled body 88, and in this state, this is the construction site. Bring to.

【0041】図7において90,92はそれぞれ予備組
付体88の搬送用の平面構造の枠体であって、下部の搬
送用枠体92にはキャスター62が取り付けられてい
る。これら上下一対の平面構造の搬送用枠体90及び9
2には、それぞれ下面と上面とにアイボルト64が取り
付けられており、それら上下に対応するアイボルト64
が連結材94にて連結されている。
In FIG. 7, reference numerals 90 and 92 respectively denote frame bodies having a planar structure for transporting the preliminary assembly 88, and casters 62 are attached to the lower transport frame body 92. A pair of upper and lower plane-structured transport frames 90 and 9
2, eyebolts 64 are attached to the lower surface and the upper surface, respectively.
Are connected by a connecting member 94.

【0042】本例においても、上記と同様の手法によっ
て容易に衛生設備ユニットとしての洗面器ユニットを施
工現場に搬入し、そこにおいて衛生設備ユニットを最終
組付施工することができる。
Also in this example, the washbasin unit as the sanitary equipment unit can be easily carried in to the construction site by the same method as described above, and the sanitary equipment unit can be finally assembled there.

【0043】以上本発明の実施例を詳述したがこれはあ
くまで一例示である。例えば上例では衛生設備ユニット
としての洗面器ユニットが予備組付体の状態で自立可能
な箱組状をなしていることから、図7に示すような搬送
用枠体にてこれを搬送するようにしているが、場合によ
って小便器ユニットの例で示すように、予備組付体88
に対して立体的な箱体状をなす搬送用枠体を一体的に組
み付けて、その状態で予備組付体88を搬送するように
なすことも勿論可能である。尚、洗面器ユニットはそれ
自身自立可能なことが多く、従って搬送用枠体を用いず
にユニットフレームに直接キャスターを取り付けて横移
動させるようにすることができる。この場合吊り具は使
用せず、キャスターによる移動のみにて洗面器ユニット
を搬送することとなる(2階以上の上階への移動はエレ
ベーターを利用して行うことができる)。
Although the embodiment of the present invention has been described in detail above, this is merely an example. For example, in the above example, since the washbasin unit as the sanitary equipment unit is in the form of a box that can stand by itself in the state of the preliminary assembly, it should be transported by the transport frame as shown in FIG. However, depending on the case, as shown in the example of the urinal unit, the preliminary assembly 88
It is, of course, possible to integrally mount a three-dimensional box-shaped transport frame body and transport the preliminary assembly body 88 in that state. In most cases, the washbasin unit itself can stand on its own, and therefore, the caster can be directly attached to the unit frame and moved laterally without using the transport frame. In this case, the hanging device is not used, and the basin unit is transported only by the movement by the casters (the movement to the upper floors of the second floor and above can be performed by using the elevator).

【0044】或いはまた、特に洗面器ユニットが非自立
性のものである場合において、上記のような立体の箱組
状の搬送用枠体を組み付けて搬送するといったことも可
能である。その他本発明は、その主旨を逸脱しない範囲
において種々変更を加えた態様で実施可能である。
Alternatively, particularly when the washbasin unit is non-self-supporting, it is possible to assemble and transport the above-mentioned three-dimensional box-shaped transport frame body. Others The present invention can be implemented in variously modified modes without departing from the spirit of the invention.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の適用対象である衛生設備ユニットの一
例を施工完了状態で示す一部切欠斜視図である。
FIG. 1 is a partially cutaway perspective view showing an example of a sanitary facility unit to which the present invention is applied in a completed construction state.

【図2】図1の衛生設備ユニットの施工完了状態の断面
図である。
2 is a sectional view of the sanitary equipment unit of FIG. 1 in a completed construction state.

【図3】図1及び図2の衛生設備ユニットの施工方法の
要部工程を示す図である。
FIG. 3 is a diagram showing a main part process of a construction method of the sanitary equipment unit of FIGS. 1 and 2.

【図4】図3における予備組付体を搬送用枠体とともに
示す側面図である。
FIG. 4 is a side view showing the pre-assembled body in FIG. 3 together with a carrying frame body.

【図5】図4における搬送用枠体の組付構造を一部分解
して示す斜視図である。
5 is a perspective view showing a partially disassembled structure for assembling the transport frame body in FIG. 4. FIG.

【図6】本発明の他の実施例方法の要部工程を示す図で
ある。
FIG. 6 is a diagram showing a main part process of a method according to another embodiment of the present invention.

【図7】本発明の更に他の実施例方法の要部工程の図で
ある。
FIG. 7 is a diagram showing a main part process of a method according to still another embodiment of the present invention.

【図8】図7に示す予備組付体と搬送用枠体とともに示
す平面図である。
FIG. 8 is a plan view showing together with the pre-assembled body and the carrying frame body shown in FIG.

【図9】本発明の背景説明のための説明図である。FIG. 9 is an explanatory diagram for explaining the background of the present invention.

【符号の説明】[Explanation of symbols]

10 壁パネル 12,68,82 ユニットフレーム 13 配管スペース 14 小便器 16,70 横フレーム材 18,72 支柱 18A 支柱本体 18B 補助部材 28 床 34A,34B 配管 48 甲板 50,86 前板 52,69,88 予備組付体 54,90,92 搬送用枠体 56 前後枠材 58 上下枠材 60 左右枠材 64 アイボルト 74 前後フレーム材 80 洗面器 84 カウンター 94 連結材 10 Wall Panels 12, 68, 82 Unit Frame 13 Piping Space 14 Urinal 16,70 Horizontal Frame Material 18,72 Support 18A Support Main Body 18B Auxiliary Member 28 Floor 34A, 34B Piping 48 Deck 50, 86 Front Plate 52, 69, 88 Preliminary assembly 54, 90, 92 Transport frame 56 Front / rear frame material 58 Up / down frame material 60 Left / right frame material 64 Eye bolts 74 Front / rear frame material 80 Washbasin 84 Counter 94 Connecting material

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 便器等衛生器具と、フレーム材を枠状に
組んで成り、壁の前部に該衛生器具用の配管スペースを
形成するとともに該衛生器具を取付支持するための骨格
部材としてのユニットフレームと、前記配管スペースに
収容配置される配管と、該配管スペースを隠蔽するよう
に該ユニットフレームの上面及び前面に配置される化粧
プレートとを備えた衛生設備ユニットの施工方法であっ
て前記衛生器具を予め複数個単位で該衛生器具の取付面
となる、対応する化粧プレート及び配管と共に対応する
ユニットフレームに組み付けておき、該予備組付体を施
工現場に搬入して、該施工現場で該ユニットフレームの
床,壁等の取付面への取付固定を含む衛生設備ユニット
の最終組付けを行うことを特徴とする衛生設備ユニット
の施工方法。
1. A sanitary device such as a toilet bowl and a frame member are assembled in a frame shape to form a piping space for the sanitary device in the front part of a wall and as a skeletal member for mounting and supporting the sanitary device. A method of constructing a sanitary equipment unit comprising a unit frame, piping arranged to be housed in the piping space, and decorative plates arranged on the upper surface and the front surface of the unit frame so as to conceal the piping space, the method comprising: A plurality of sanitary appliances are previously attached to the corresponding unit frame together with the corresponding decorative plate and piping that will be the mounting surface of the sanitary appliances, and the preliminary assembly is carried into the construction site and A method for constructing a sanitary equipment unit, characterized in that final mounting of the sanitary equipment unit is performed, including mounting and fixing the unit frame to a mounting surface such as a floor or a wall.
【請求項2】 請求項1において、前記予備組付体を施
工現場で左右方向に連結して全体の衛生設備ユニットを
構築することを特徴とする衛生設備ユニットの施工方
法。
2. The method for constructing a sanitary equipment unit according to claim 1, wherein the entire prefabricated assembly is laterally connected at a construction site to construct an entire sanitary equipment unit.
【請求項3】 請求項1又は2において、前記予備組付
体に対して枠材を固定して箱組状の搬送用枠体を該予備
組付体と一体的に構築し、該予備組付体を該搬送用枠体
とともに搬送した後、施工現場において該搬送用枠体を
取り除くことを特徴とする衛生設備ユニットの施工方
法。
3. The preparatory assembly according to claim 1, wherein a frame member is fixed to the preparatory assembly to form a box-shaped transport frame body integrally with the preparatory assembly. A method for constructing a sanitary facility unit, comprising removing the transport frame body at a construction site after transporting the attached body together with the transport frame body.
【請求項4】 請求項3において、前記ユニットフレー
ムを前記搬送用枠体の一部枠材として兼用させることを
特徴とする衛生設備ユニットの施工方法。
4. The method for constructing a sanitary facility unit according to claim 3, wherein the unit frame is also used as a part of a frame member of the carrying frame body.
【請求項5】 請求項3又は4において、前記搬送用枠
体の上部には吊り具が固設されていることを特徴とする
衛生設備ユニットの施工方法。
5. The method for constructing a sanitary facility unit according to claim 3 or 4, wherein a suspending tool is fixedly provided on an upper portion of the carrying frame.
【請求項6】 請求項3,4,5の何れかにおいて、前
記搬送用枠体の下部にキャスターを固設して前記予備組
付体を該搬送用枠体とともに横移動させるか又はキャス
ター付台車にて横移動させることを特徴とする衛生設備
ユニットの施工方法。
6. The caster according to claim 3, 4 or 5, wherein a caster is fixed to a lower portion of the carrying frame to laterally move the preliminary assembly together with the carrying frame. A method for constructing a sanitary equipment unit, which is characterized by lateral movement by a trolley.
JP6553296A 1996-02-26 1996-02-26 Installation method of sanitary facility unit Pending JPH09228450A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6553296A JPH09228450A (en) 1996-02-26 1996-02-26 Installation method of sanitary facility unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6553296A JPH09228450A (en) 1996-02-26 1996-02-26 Installation method of sanitary facility unit

Publications (1)

Publication Number Publication Date
JPH09228450A true JPH09228450A (en) 1997-09-02

Family

ID=13289726

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6553296A Pending JPH09228450A (en) 1996-02-26 1996-02-26 Installation method of sanitary facility unit

Country Status (1)

Country Link
JP (1) JPH09228450A (en)

Similar Documents

Publication Publication Date Title
JPH09228450A (en) Installation method of sanitary facility unit
JP2587052Y2 (en) Suspension structure of prefabricated building
JP3016633B2 (en) Construction method of prefab toilet
JP3016635B2 (en) Construction method of prefab toilet
JP3325958B2 (en) Installation work of plumbing equipment for building units
JP2563136Y2 (en) Prefabricated building unit wall connection structure
JP3060862B2 (en) Sanitary equipment room module
JP2571347Y2 (en) Ceiling connection structure of prefabricated building unit
JP3802715B2 (en) Mounting structure of reinforced temporary material in room box
JP2011032747A (en) Bay window fixing structure and construction method of bay window
JP3232474B2 (en) Floorless sanitary equipment room
JPH102017A (en) Building unit and its constructing method
JP3556107B2 (en) Integrated toilet unit structure
JPH05505433A (en) modular building
JPH07317339A (en) Module for plumbing equipment
JP2000336748A (en) Erection method of two-story house
JP2024039168A (en) Toilet forming unit and toilet forming method
JPH0738501Y2 (en) Prefabricated partition wall
JP2537255B2 (en) How to assemble a prefabricated toilet
JP3105133B2 (en) Inlet wall structure
JP2549132B2 (en) How to assemble a prefabricated toilet
JP2528505Y2 (en) Unit bus opening reinforcement structure
JPH0438269B2 (en)
JP2001065049A (en) Roof balcony unit
JP2537256B2 (en) How to assemble a prefabricated toilet

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20040618

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20041012

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050308