JP3556107B2 - Integrated toilet unit structure - Google Patents
Integrated toilet unit structure Download PDFInfo
- Publication number
- JP3556107B2 JP3556107B2 JP31795998A JP31795998A JP3556107B2 JP 3556107 B2 JP3556107 B2 JP 3556107B2 JP 31795998 A JP31795998 A JP 31795998A JP 31795998 A JP31795998 A JP 31795998A JP 3556107 B2 JP3556107 B2 JP 3556107B2
- Authority
- JP
- Japan
- Prior art keywords
- wall
- toilet unit
- unit structure
- integrated toilet
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sanitary Device For Flush Toilet (AREA)
- Residential Or Office Buildings (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、一体型トイレユニット構造に関し、特に床面の開放された5面体のトイレユニット構造とそれに伴う技術に関する。
【0002】
【従来の技術】
従来、各種公共施設やオフィスビル等の、構造が比較的画一的で各階毎の階高や区画がほぼ統一されているといった建造物にあっては、かかる建造物内にトイレ設備や給湯設備などいわゆる水周り設備を設置する場合、現場施工の工程を低減することで施工効率を向上させ、また、同一スペックの設備を工場などで大量に製作することで、必要とする材料費や各種工賃を抑制し大幅なコストダウンを図る目的のもと、例えばトイレに関して言えば、シンク、洗面器及び便器等のトイレ機器や、トイレ全体を囲む壁部、天井部及び床部などを予め工場などで一体に形成した一体型トイレユニットを採用することが多かった。
【0003】
係る一体型トイレユニットは、その構造として、壁部、天井部、及び床部からなる箱形6面体で構成され、壁部内側には壁内装部材を、壁部近傍には各種配管類を、トイレユニット内部には各種トイレ機器をそれぞれ取付けることとなり、完成後はトラック等の運搬手段により施工現場まで運搬され設置されることとなっていた。
【0004】
また、特に近年では、上記の一体型トイレユニットの軽量化等を図る意味もあって床部を開放した5面体の構造をなすものも考案されている。
【0005】
【発明が解決しようとする課題】
しかしながら、上記のうち特に5面体をなす一体型トイレユニット構造によれば、まず、床部を構成する部材は皆無であるわけであるから、トイレユニット構造全体における床部についての構造強度はゼロであり、それがために壁部を構成するパネルなどの部材サイズを上げて構造強度を確保するといった措置を施す必要がある。
【0006】
したがって、壁部の部材サイズを上げることで一体型トイレユニット構造全体の重量が増大するとともに、壁厚が厚くなればトイレユニット内部の内空容積も減ずることになり、かつ、外形的にも仕上げ寸法が大きくなる。
【0007】
このことにより、一体型トイレユニットを運搬し施工する為の重機などの機器が大型化するとともに、一体型トイレユニットを設置するに要する領域も大きくなり、都市部など狭小な施工領域が求められる地域においては施工自体を非常に困難なものとし、施工効率の低下及びコスト上昇は避けがたいこととなる。
【0008】
また、一体型トイレユニット内をトイレ機器毎に区画する際には、ブースパネルと呼ばれる部材を壁部や天井部などに接合して種々の領域を形成することとなるが、従来の5面体構造である一体型トイレユニットは床部を備えないために、床部にてブースパネルを支持して容易に固定するといったことが難しく、そのため工場組立時にブースパネルまで取付けて施工現場に運搬するといったことは困難となり、煩雑な現場施工を強いられることとなる。
【0009】
さらに、シンク、洗面台、便器などといったトイレ機器に給水を行い、またそれらトイレ機器から生じる汚水を排水するといった各種配管類を収納する配管収納ユニットを一体型トイレユニットに取付ける必要があるが、一体型トイレユニットの床部が存在しない場合、上記と同様に、工場組立時に床部にて配管収納ユニットを支持し固定することは困難となり、現場施工により取付けを実施することとなって作業の煩雑さとそれに伴う作業効率低下とを招くのである。
【0010】
加えて、トイレ内部の内装の為、一体型トイレユニット壁部内側にビス止めパネルやプラスターボードなどの壁内装材を取付ける際には、各壁内装材の取付方法に応じた壁部上の取付構造を形成する必要があり、そのため、一体型トイレユニット製作時において、使用する部材と製作手順等とを統一することが困難であり、部材の購入コストと在庫の増大、及び組立工数の増加による製作効率の低下といったいわゆる多品種少量生産の弊に陥りやすい。
【0011】
そこで、本発明は、このような従来の課題に着目してなされたもので、床部が開放された5面体の一体型トイレユニット構造においても6面体のものと少なくとも同様の構造強度を有し、かつ部材サイズ及び重量ともに低減可能であり、また、ブースパネルや配管収納ユニットの取付けを工場製作時に行うことができるとともに、壁内装材の種類によらずにいずれの壁内装材であっても容易に取付けられる壁部上の取付構造を備え、それにより製作と施工の両面でのコスト低減及び施工効率の向上を図ることを可能ならしめる一体型トイレユニット構造を提供するものである。
【0012】
【課題を解決するための手段】
この発明は、上記目的を達成するためになされたもので、シンク、洗面器及び便器等のトイレ機器と、トイレ全体を囲む壁部及び天井部とを予め工場などで一体に形成し、床部の開放された5面体をなした一体型トイレユニット構造において、前記一体型トイレユニット構造の底面を補強する補強枠を、着脱自在な複数の連結具をもって前記一体型トイレユニット壁部下端に固設させることで前記一体型トイレユニット構造底部と当接固定するとともに、前記一体型トイレユニット構造全体のレベル調整用ボルトを前記補強枠構造下部の少なくとも角隅部各々に設けることを特徴とする。
【0013】
また、前記一体型トイレユニット構造の壁部と、該壁部と接合固定させることで前記一体型トイレユニット構造内部を区画するブースパネルとを備え、係るブースパネルと、このブースパネルと接合固定する前記壁部またはブースパネルとのいずれか一方に、下方に向けた突出部を備えるフックを設け、他方、係るフックと嵌合固定自在な連結孔または逆フックを設けるとともに、ボルト連通孔を備えるブースパネル吊り固定用レールを前記天井部に設け、前記ボルト連通孔と、該ボルト連通孔と挿通可能な前記ブースパネル上端部に設けられたボルト連通孔とにボルトを挿通し締結することで、前記ブースパネル吊り固定用レールとブースパネルとを互いに固定可能であることを特徴とする。
【0014】
さらに、前記トイレ機器に給排水を行う配管を収納し、側断面略コ字型の枠形状をなすユニットフレームにて構成される配管収納ユニットを、前記壁部上の配管収納ユニット設置箇所と対向する壁部外側に取付けられた補強プレートと、係る補強プレート、壁部及びユニットフレームを挿通し一体に締結する締結具とをもって前記壁部上の配管収納ユニット設置箇所に係止固定することを特徴とする。
【0015】
加えて、前記壁部内側に取付けられる壁内装材を、前記一体型トイレユニット構造を構成する壁部及び天井部の外殻部と結合固定され、略角管状である取付用下地材に、締結具を挿通させ互いに締結固定するか、もしくは、壁内装材に、並列した少なくとも2つの長孔状開口部を設け、前記取付用下地材径とほぼ等しい径を有して互いに着脱自在である開口部を有し断面略コ字型で、かつ前記長孔状開口部に嵌合可能な形状及び大きさのフックを、前記取付用下地材が前記フック開口部内に挟持されるべく前記長孔状開口部に挿入嵌合し、係るフックと取付用下地材とを、締結具を挿通し互いに締結固定することにより、前記壁内装材の取付けが行われることを特徴とする。
【0016】
【発明の実施の形態】
以下、本発明の好ましい実施の形態につき、添付図面を参照して詳細に説明する。
【0017】
図1は、本発明の補強枠10を取付けた一体型トイレユニット構造Tの実施形態を示す説明図である。ただしここでは説明の為、一体型トイレユニット構造T全体のうち、ブースパネルPで囲まれた一区画のみを便宜的に示している。
【0018】
本発明の補強枠10とは一体型トイレユニット構造Tを形成する工場において予め製作されるもので、補強枠10を構成する補強部材11同士の連結部における取り合いを考慮し、例えば鋼製角パイプを用いて形成されるものであり、かかる補強部材11は、部材サイズに合わせた連結金具12(例えばL字型)にて矩形格子状に互いに結合されている。
【0019】
また、上記の補強枠10は、必要とされる構造強度を確保するに十分な強度を有する枠組み構造と、補強部材サイズとを事前に考慮しつつ、なおかつ可能な限りの軽量化をも図られて製作されるものとする。
【0020】
さらに、補強枠10の大きさとしては、その上部に載置固定される、ブースパネルPにより構成された一区画、または、一体型トイレユニット構造T全体の底部外形と比較し、図1に示す如く、少なくとも補強枠10に取付ける押え金具13のL字底面程度は外方に拡大されているものとする。
【0021】
図中では、矩形格子状に枠組みされた補強枠10を示しているが、必要強度を発現することが可能で、上部に載置する一体型トイレユニット構造壁部WおよびブースパネルPの下端との押え金具13による接合が適切に行われるものであればいずれの格子形状のものでもよいし、各種連結具を用いて補強部材11を連結形成したものでなく、当初より一体成型された補強枠でもよい。
【0022】
本発明の補強枠10上に、組立済みの壁部W及びブースパネルPの下端部適宜位置を挟持するごとくに、例えばチャネル材などを加工して製作した断面略L字型の押え金具13を、壁部W及びブースパネルPを中心に挟みつつ対向配置する。
【0023】
また、係る押え金具13の補強枠10との当接部においては、壁部W及びブースパネルPを十分に挟持するよう押え金具13の位置決めがなされた後に、スクリューボルトなどを挿通し、補強枠10と強固に締結固定されることとなる。
【0024】
その際、組み立てられた一体型トイレユニット構造Tは、予め本発明の補強枠10上に載置されているものとするが、これに限らず、一体型トイレユニット構造Tを重機やジャッキ等によってリフトアップし、その下に補強枠10を挿入載置してもよい。
【0025】
上述のように、一体型トイレユニット構造Tに補強枠10が十分に固定された後、かかる一体型トイレユニットは、設置予定の建造物Bまで運搬され、例えば、建造物B各階の躯体が打設される毎にクレーン等の重機を用いて設置位置に搬入固定されるのである。
【0026】
設置に際しては、必要に応じて補強枠10下部の角隅部各々に設けられたレベル調整用ボルト(図示しない)を適宜回転させ、一体型トイレユニット構造Tの水平レベルを微調整することとなる。
【0027】
設置位置での一体型トイレユニットの位置決めが終了し、補強枠10の担っていた一体型トイレユニット床部補強の役割が果たされれば、連結金具12、押え金具13及びボルトなどを補強部材11から除去し、補強枠10は解体され撤去転用されることとなる。
【0028】
図2は本発明のフック及びブースパネル吊り固定用レールにより、一体型トイレユニット構造TのブースパネルPと壁部Wとを固定する実施形態の一例を示す説明図である。
【0029】
本発明の一体型トイレユニット構造Tにおける壁部WとブースパネルPとの連結接合は、図のように、一体型トイレユニット構造壁部Wに本発明のフック20を壁目地21などを利用して適宜位置に取付けるとともに(図示しないが、例えばブースパネルP1枚につき3箇所程度取り付ける)、かかるフック20と対向位置のブースパネルP側端部に設けられた連結孔22が、壁部Wのフック20と嵌合するようブースパネルPを壁部Wに当接させ、フック20が連結孔22に嵌合後、適宜上方にブースパネルPをスライドさせて結合を確実なものとする。
【0030】
その作業と平行して、ボルト連通孔23を備えるブースパネル吊り固定用レール24を、前記フック20が取付けられた壁部W直上端と、かかる壁部Wに相対する壁部W上端とに載架固定し、さらに、ブースパネルP上端部に設けられたボルト連通孔23と、ブースパネル吊り固定用レール24とをボルト25で挿通し締結固定する。
【0031】
ここで本発明のフック20とは、例えば金属製で、下方に突出部20aを備え、突出部20aをブースパネルPの連結孔22に嵌合固定した際に要求される強度を確保する構造、材質のものである。
【0032】
また、本実施形態においてはフック20をブースパネルP1枚につき3箇所取り付けるとしたが、それに限らず、ブースパネルPのサイズ及び重量などに応じて加減可能である。
【0033】
さらに、ブースパネル吊り固定用レール24と、ブースパネルP上端部とに設けられたボルト連通孔23の数もブースパネルPのサイズや重量などに応じて適宜設定することができる。
【0034】
図3は本発明の配管収納ユニットを一体型トイレユニット構造壁部W上に係止固定する実施形態の一例を示す説明図である。
【0035】
シンク、洗面台、便器などといったトイレ機器の給排水を担う各種配管類を収納する本発明の配管収納ユニット30は、一体型トイレユニット構造壁部W内側に係止されるが、まずその構造としては、一体型トイレユニット構造壁部Wに当接される横架材31を平行2列に備え、かかる横架材31から立ち上がった門型で側断面略コ字型であるユニットフレーム32により構成されており、材質としては例えば軽量型鋼等を適宜組み合わせて製作されるものである。
【0036】
配管収納ユニット30設置箇所と対向する壁部W外側には、補強プレート33を当接させ、対向する壁部W内側の横架材31と互いにボルト34等にて連通させ、ユニットフレーム32、一体型トイレユニット構造壁部W、及び補強プレート33の3者を一体に締結する。
【0037】
これにより配管収納ユニット30を一体型トイレユニット構造壁部Wに係止固定するのである。
【0038】
図4は本発明の下地材用フック40と、壁内装材の取付用下地材41とにより壁内装材42の取付けが行われる様子を示した説明図である。
【0039】
一体型トイレユニット構造T内部は、壁部W内側に壁内装材42が取付けられその後仕上げが行われることとなる。
【0040】
その際、取付けられる壁内装材42がビス止め式固定鋼板パネルやプラスターボードであれば、略角管状である取付用下地材41(例えばアルミ角管など)を一体型トイレユニット構造Tを構成する壁部W及び天井部とボルト締結その他の適宜手段により結合固定し、続いて壁内装材42端部を係る取付用下地材41に当接係止しビスなどの締結具43を両者に挿通させ互いに締結固定する。
【0041】
また、壁内装材42がフック式固定鋼板パネル44であれば、図に示すごとく、かかるフック式固定鋼板パネル44に、並列した長孔状開口部44aを例えば2箇所設け、取付用下地材41径とほぼ等しい径を有して互いに着脱自在である開口部40aを有し断面略コ字型で、かつ長孔状開口部44aに嵌合可能な形状及び大きさの下地材用フック40を、取付用下地材41が下地材用フック開口部40a内に挟持されるべく長孔状開口部44aに挿入嵌合し、その後、係る下地材用フック40と取付用下地材41とに締結具43を挿通し互いに締結固定するのである。
【0042】
本実施形態においては、長孔状開口部44aを並列に2箇所設けた例を示したがそれに限らず、嵌合される下地材用フック40の形状や数に応じて適宜変更可能である。
【0043】
また、下地材用フック40に関し、取付用下地材41の長さや重量、また、取付けられる壁内装材42の重量などによりその数を増減させることができるものとする。
【0044】
【発明の効果】
以上詳細に説明したように、本発明の一体型トイレユニット構造によれば、床部が開放された5面体をなす一体型トイレユニット構造であっても、トイレユニット構造全体における床部についての構造強度がゼロであり、それがために壁部を構成するパネルなどの部材サイズを上げて構造強度を確保する必要があるといった問題は解消され、壁部の部材サイズを上げることなく構造強度を確保して一体型トイレユニット構造全体の重量増大を抑制するとともに、かかるトイレユニット内部の内空容積も従来の6面体の一体型トイレユニットと比較して減少するといったこともない。
【0045】
しかも、外形的にも仕上げ寸法の増大を招くこともなく、従来の狭小な施工領域においても適用可能である上、本発明の補強枠は、一体型トイレユニット設置後に容易に撤去及び転用可能であり、高い施工効率とコスト低減とを同時に図ることができる。
【0046】
また、一体型トイレユニット内を区画するブースパネルは、本発明のフック及びブースパネル吊り固定用レールにより壁部や天井部に適切かつ確実に接合されるから、床部を備えないために工場組立時のブースパネル取付けが困難で煩雑な現場施工を強いられるといったこともない上、取付方法も簡便で製作及び施工効率も向上するのである。
【0047】
さらに、シンク、洗面台、便器などといったトイレ機器と給排水管とを結んだ各種配管類を収納する配管収納ユニットを一体型トイレユニットに取付ける際には、上記と同様に、一体型トイレユニットの工場製作時に取付作業を実施することが出来、現場施工による煩雑な作業を行う必要もなくなって作業効率を改善できることに加え、一体型トイレユニット内の配管は全て工場にて取付ることが可能となって複雑な配管施工を狭小な作業空間で行うといった問題も解消される。
【0048】
加えて、一体型トイレユニット壁部内側にビス止めパネルやプラスターボードなどの壁内装材を取付ける際には、本発明の取付用下地材を用いて、ビスなどの締結具や下地材用フック等により締結固定を行えば、種々の壁内装材の取付方法それぞれに対応し壁部上の取付構造を形成するといった煩雑かつ非効率的な作業を行う必要はなくなり、一体型トイレユニット製作時において、使用する部材と製作手順等とを統一し、工程手順の標準化と、部品点数の低減によるトイレユニット全体の軽量化とにつながって、部材購入コストの低下と製作効率の向上とを図ることができる。
【図面の簡単な説明】
【図1】本発明の補強枠を取付けた一体型トイレユニット構造の実施形態を示す説明図である。
【図2】本発明のフック及びブースパネル吊り固定用レールにより、一体型トイレユニット構造のブースパネルと壁部とを固定する実施形態の一例を示す説明図である。
【図3】本発明の配管収納ユニットを一体型トイレユニット構造壁部上に係止固定する実施形態の一例を示す説明図である。
【図4】本発明の下地材用フックと、壁部内装材の取付用下地材とにより壁内装材の取付けが行われる様子を示した説明図である。
【符号の説明】
T 一体型トイレユニット構造
W 一体型トイレユニット構造壁部
P ブースパネル
10 補強枠
11 補強部材1
12 連結金具
13 押え金具
20 フック
21 壁目地
22 連結孔
23 ボルト連通孔
24 ブースパネル吊り固定用レール
30 配管収納ユニット
32 ユニットフレーム
40 下地材用フック
41 取付用下地材
42 壁内装材[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an integrated toilet unit structure, and more particularly, to a pentahedral toilet unit structure with an open floor and a technique associated therewith.
[0002]
[Prior art]
Conventionally, in buildings such as various public facilities and office buildings, the structures of which are relatively uniform and the floor heights and sections of each floor are almost uniform, toilet facilities and hot water supply facilities are included in such buildings. When installing so-called water-related facilities, the construction efficiency is improved by reducing the number of on-site construction processes, and the necessary material costs and various labor costs are achieved by mass-producing facilities with the same specifications in factories and the like. For example, in the case of toilets, toilet equipment such as sinks, washbasins, and toilets, and walls, ceilings, and floors that surround the entire toilet, should be stored in factories, etc. In many cases, an integrally formed toilet unit was employed.
[0003]
Such an integrated toilet unit has, as its structure, a box-shaped hexahedron composed of a wall, a ceiling, and a floor, a wall interior member inside the wall, various pipes near the wall, Various toilet devices were to be installed inside the toilet unit, and after completion, they were transported to the construction site by trucks or other transport means and installed.
[0004]
In recent years, in particular, a pentahedral structure with an open floor has been devised for the purpose of reducing the weight of the integrated toilet unit.
[0005]
[Problems to be solved by the invention]
However, according to the pentahedral integrated toilet unit structure in particular, since there is no member constituting the floor, the structural strength of the floor in the entire toilet unit structure is zero. In order to do so, it is necessary to take measures such as increasing the size of members such as panels constituting the wall to secure structural strength.
[0006]
Therefore, by increasing the wall member size, the weight of the entire integral toilet unit structure increases, and as the wall thickness increases, the inner volume inside the toilet unit decreases, and the exterior finish is improved. The dimensions increase.
[0007]
This will increase the size of heavy equipment and other equipment for transporting and constructing the integrated toilet unit, as well as increasing the area required to install the integrated toilet unit, such as urban areas where a narrow construction area is required. In this case, the construction itself is extremely difficult, and a decrease in construction efficiency and an increase in cost are inevitable.
[0008]
When partitioning the interior of the integrated toilet unit for each toilet device, a member called a booth panel is joined to a wall or a ceiling to form various regions. Because the integrated toilet unit does not have a floor, it is difficult to support and easily fix the booth panel on the floor, so it is necessary to attach it to the booth panel during factory assembly and transport it to the construction site Will be difficult, and complicated on-site construction will be forced.
[0009]
In addition, it is necessary to install a plumbing storage unit for supplying water to toilet equipment such as sinks, wash basins, and toilets, and for storing various plumbing such as draining sewage generated from the toilet equipment, in an integrated toilet unit. If the floor of the body-type toilet unit does not exist, it becomes difficult to support and fix the piping storage unit on the floor at the time of assembling the factory, as described above, and installation will be performed by on-site construction, and work will be complicated This leads to a reduction in work efficiency.
[0010]
In addition, when installing wall interior materials such as screws and plaster boards inside the wall of the integrated toilet unit for the interior of the toilet, the mounting structure on the wall according to the mounting method of each wall interior material Therefore, it is difficult to unify the members to be used and the manufacturing procedure when manufacturing an integrated toilet unit, and the manufacturing cost is increased due to an increase in the purchase cost and inventory of the members and an increase in the number of assembly steps. It is easy to fall into the negative effects of so-called high-mix low-volume production, such as reduced efficiency.
[0011]
Therefore, the present invention has been made in view of such a conventional problem, and the pentahedral integrated toilet unit structure having an open floor has at least the same structural strength as that of the hexahedral toilet unit. In addition, it is possible to reduce both the member size and the weight, and it is possible to mount the booth panel and the piping storage unit at the time of factory production, and to use any wall interior material regardless of the type of wall interior material. It is an object of the present invention to provide an integrated toilet unit structure having a mounting structure on a wall portion which can be easily mounted, thereby making it possible to reduce costs in both production and construction and improve construction efficiency.
[0012]
[Means for Solving the Problems]
The present invention has been made in order to achieve the above object, and a toilet device such as a sink, a basin and a toilet, and a wall and a ceiling surrounding the entire toilet are integrally formed in advance in a factory or the like, and a floor portion is formed. Pentahedral integrated toilet unit structure, wherein a reinforcing frame for reinforcing a bottom surface of the integrated toilet unit structure is fixed to a lower end of the integrated toilet unit wall with a plurality of detachable connecting tools. In this way, the integrated toilet unit structure is fixed in contact with the bottom of the integrated toilet unit structure, and a level adjusting bolt for the entire integrated toilet unit structure is provided at least at each corner of the lower part of the reinforcing frame structure.
[0013]
Also, a wall portion of the integrated toilet unit structure, and a booth panel that is joined and fixed to the wall portion to partition the inside of the integrated toilet unit structure are provided, and the booth panel is joined and fixed to the booth panel. A booth provided with a hook having a downwardly projecting portion on one of the wall and the booth panel, and a connecting hole or a reverse hook which can be fitted and fixed to the hook and a bolt communication hole. By providing a panel suspension fixing rail on the ceiling portion, inserting and fastening a bolt into the bolt communication hole and a bolt communication hole provided at the upper end of the booth panel that can be inserted into the bolt communication hole, The booth panel suspension fixing rail and the booth panel can be fixed to each other.
[0014]
Furthermore, the piping for supplying and draining water is stored in the toilet equipment, and the piping storage unit configured by a unit frame having a substantially U-shaped frame in side section faces the piping storage unit installation location on the wall. The reinforcing plate attached to the outside of the wall portion, and a fastener for inserting the reinforcing plate, the wall portion and the unit frame to fasten the unit frame integrally, are locked and fixed to the pipe storage unit installation location on the wall portion. I do.
[0015]
In addition, the wall interior material attached to the inside of the wall portion is fastened to an outer shell portion of the wall portion and the ceiling portion constituting the integrated toilet unit structure and fixed to a substantially square tubular mounting base material. Or at least two elongated openings parallel to each other are provided in the wall interior material, and the openings have a diameter substantially equal to the diameter of the mounting base material and are detachable from each other. A hook having a substantially U-shaped cross section and having a shape and a size that can be fitted into the elongated hole-like opening, so that the mounting base material is sandwiched in the hook opening. The fitting of the wall interior material is performed by inserting and fitting the hook and the mounting base material into the opening and fastening and fixing the hook and the mounting base material to each other by inserting a fastener.
[0016]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0017]
FIG. 1 is an explanatory view showing an embodiment of an integrated toilet unit structure T to which a reinforcing
[0018]
The reinforcing
[0019]
In addition, the above-described reinforcing
[0020]
Further, the size of the reinforcing
[0021]
In the figure, the reinforcing
[0022]
On the reinforcing
[0023]
In addition, in the abutting portion of the holding
[0024]
At this time, it is assumed that the assembled integral toilet unit structure T is previously mounted on the reinforcing
[0025]
As described above, after the reinforcing
[0026]
At the time of installation, if necessary, the level adjusting bolts (not shown) provided at each of the lower corners of the reinforcing
[0027]
When the positioning of the integrated toilet unit at the installation position is completed and the role of reinforcing the floor of the integrated toilet unit, which was carried by the reinforcing
[0028]
FIG. 2 is an explanatory view showing an example of an embodiment in which the booth panel P and the wall W of the integrated toilet unit structure T are fixed by the hooks and the booth panel suspension fixing rails of the present invention.
[0029]
In the integrated toilet unit structure T of the present invention, the connection between the wall portion W and the booth panel P is performed by using the
[0030]
In parallel with this work, the booth panel
[0031]
Here, the
[0032]
Further, in the present embodiment, the
[0033]
Further, the number of bolt communication holes 23 provided in the booth panel
[0034]
FIG. 3 is an explanatory view showing an example of an embodiment in which the pipe storage unit of the present invention is locked and fixed on a wall portion W of an integrated toilet unit structure.
[0035]
The
[0036]
A reinforcing
[0037]
As a result, the
[0038]
FIG. 4 is an explanatory view showing the manner in which the wall interior material 42 is mounted by the
[0039]
Inside the integrated toilet unit structure T, the wall interior material 42 is attached to the inside of the wall portion W, and then finishing is performed.
[0040]
At this time, if the wall interior material 42 to be attached is a screw-fixed fixed steel plate panel or a plaster board, a substantially square tubular mounting base material 41 (for example, an aluminum square tube or the like) is used as a wall constituting the integrated toilet unit structure T. Then, the end of the wall interior material 42 is abutted against the mounting
[0041]
If the wall interior material 42 is a hook-type fixed steel plate panel 44, as shown in the figure, for example, two parallel
[0042]
In the present embodiment, an example in which the long hole-shaped
[0043]
The number of the base material hooks 40 can be increased or decreased depending on the length and weight of the mounting
[0044]
【The invention's effect】
As described in detail above, according to the integrated toilet unit structure of the present invention, even if the integrated toilet unit structure has a pentahedron with an open floor, the structure of the floor in the entire toilet unit structure The problem that the strength is zero and it is necessary to secure the structural strength by increasing the size of the members such as the panels that make up the wall is solved, and the structural strength is secured without increasing the size of the wall Thus, the increase in the weight of the entire integral toilet unit structure is suppressed, and the inner space volume inside the toilet unit is not reduced as compared with the conventional hexahedral integral toilet unit.
[0045]
Moreover, the reinforcing frame of the present invention can be easily removed and diverted after the installation of the integrated toilet unit, in addition to being applicable to the conventional narrow construction area without causing an increase in the external dimensions and finish dimensions. Yes, high construction efficiency and cost reduction can be achieved at the same time.
[0046]
Also, the booth panel that partitions the inside of the integrated toilet unit is properly and securely joined to the wall or ceiling by the hook and the booth panel suspension fixing rail of the present invention. The installation of the booth panel at the time is not difficult, so that complicated on-site construction is not required, and the mounting method is simple and the production and construction efficiency are improved.
[0047]
Furthermore, when installing a pipe storage unit for storing various pipes connecting the toilet equipment such as a sink, a sink, a toilet bowl, and a plumbing pipe to the integrated toilet unit, as described above, the factory of the integrated toilet unit is used. Installation work can be carried out at the time of production, which eliminates the need for complicated work on site and improves work efficiency.In addition, all piping in the integrated toilet unit can be installed at the factory. The problem of performing complicated and complicated piping work in a small work space is also solved.
[0048]
In addition, when installing the wall interior material such as a screw stop panel or plaster board inside the wall of the integrated toilet unit, use the mounting base material of the present invention, and use fasteners such as screws or hooks for the base material. By fastening and fixing, there is no need to perform complicated and inefficient work such as forming a mounting structure on the wall corresponding to each mounting method of various wall interior materials, and it is used when manufacturing an integrated toilet unit. By unifying the members to be manufactured and the manufacturing procedure, it is possible to standardize the process procedure and reduce the weight of the entire toilet unit by reducing the number of parts, thereby achieving a reduction in member purchasing costs and an improvement in manufacturing efficiency.
[Brief description of the drawings]
FIG. 1 is an explanatory view showing an embodiment of an integrated toilet unit structure to which a reinforcing frame according to the present invention is attached.
FIG. 2 is an explanatory view showing an example of an embodiment in which a booth panel and a wall of an integrated toilet unit structure are fixed to each other by a hook and a booth panel hanging fixing rail of the present invention.
FIG. 3 is an explanatory view showing an example of an embodiment in which the pipe storage unit of the present invention is locked and fixed on a wall portion of an integrated toilet unit structure.
FIG. 4 is an explanatory view showing a state in which a wall interior material is attached by a foundation material hook of the present invention and a wall interior material attaching base material.
[Explanation of symbols]
T Integrated toilet unit structure W Integrated toilet unit structure wall
DESCRIPTION OF
Claims (4)
前記一体型トイレユニット構造の底面を補強する補強枠を、補強枠材を着脱自在な複数の連結具をもって格子状に形成し、前記一体型トイレユニット壁部下端に着脱可能な押え金具によって固設させることで前記一体型トイレユニット構造底部と当接固定するとともに、前記一体型トイレユニット構造全体のレベル調整用ボルトを前記補強枠構造下部の少なくとも角隅部各々に設け、レベル調整状態において前記補強枠を解体・撤去可能に形成してなることを特徴とする一体型トイレユニット構造。In an integrated toilet unit structure in which a sink, a basin and a toilet, and a wall and a ceiling surrounding the entire toilet are integrally formed in advance in a factory or the like, and a pentahedron with an open floor is formed,
A reinforcing frame for reinforcing the bottom surface of the integrated toilet unit structure is formed in a lattice shape with a plurality of detachable connecting members of the reinforcing frame material, and is fixed to a lower end of the wall of the integrated toilet unit by a removable holding metal. causes contact fixing said integrated toilet unit structure bottom by a, the integrated toilet unit structure overall level adjustment bolt is provided on at least corner portions each of said reinforcing frame structure bottom, the reinforcement in the level adjustment state integrated toilet unit structure, characterized in Rukoto such was disassembled and removal can form a frame.
前記一体型トイレユニット構造の底面を補強する補強枠を、補強枠材を着脱自在な複数の連結具をもって前記一体型トイレユニット壁部下端に固設させることで前記一体型トイレユニット構造底部と当接固定するとともに、前記一体型トイレユニット構造全体のレベル調整用ボルトを前記補強枠構造下部の少なくとも角隅部各々に設け、
前記一体型トイレユニット構造の壁部と、該壁部と接合固定させることで前記一体型トイレユニット構造内部を区画するブースパネルとを備え、係るブースパネルと、このブースパネルと接合固定する前記壁部またはブースパネルとのいずれか一方に、下方に向けた突出部を備えるフックを設け、他方、係るフックと嵌合固定自在な連結孔または逆フックを設けるとともに、
ボルト連通孔を備えるブースパネル吊り固定用レールを前記天井部に設け、前記ボルト連通孔と、該ボルト連通孔と挿通可能な前記ブースパネル上端部に設けられたボルト連通孔とにボルトを挿通し締結することで、前記ブースパネル吊り固定用レールとブースパネルとを互いに固定可能であることを特徴とする一体型トイレユニット構造。 In an integrated toilet unit structure in which a sink, a basin and a toilet, and a wall and a ceiling surrounding the entire toilet are integrally formed in advance in a factory or the like, and a pentahedron with an open floor is formed,
A reinforcing frame for reinforcing the bottom surface of the integrated toilet unit structure is fixed to the lower end of the integrated toilet unit wall with a plurality of detachable connecting members with a reinforcing frame material, so that the reinforcing frame material is in contact with the bottom of the integrated toilet unit structure. Attached and fixed, and a level adjusting bolt for the entire integral toilet unit structure is provided at least at each corner of the lower part of the reinforcing frame structure,
A wall portion of the integrated toilet unit structure, and a booth panel for partitioning the interior of the integrated toilet unit structure by joining and fixing to the wall portion; the booth panel; and the wall joined and fixed to the booth panel. A hook provided with a downwardly projecting portion is provided on one of the section and the booth panel, and a connection hole or a reverse hook is provided which can be fitted and fixed to the hook.
A booth panel suspension fixing rail having a bolt communication hole is provided on the ceiling, and a bolt is inserted through the bolt communication hole and a bolt communication hole provided at an upper end of the booth panel that can be inserted through the bolt communication hole. The integrated toilet unit structure, wherein the booth panel suspension fixing rail and the booth panel can be fixed to each other by fastening.
もしくは、壁内装材に、並列した少なくとも2つの長孔状開口部を設け、前記取付用下地材径とほぼ等しい径を有して互いに着脱自在である開口部を有し断面略コ字型で、かつ前記長孔状開口部に嵌合可能な形状及び大きさのフックを、前記取付用下地材が前記フック開口部内に挟持されるべく前記長孔状開口部に挿入嵌合し、係るフックと取付用下地材とを、締結具を挿通し互いに締結固定することにより、前記壁内装材の取付けが行われることを特徴とする請求項1に記載の一体型トイレユニットシステム構造。A fastener is inserted through a wall base material attached to the inside of the wall portion, which is fixedly connected to an outer shell portion of a wall portion and a ceiling portion constituting the integrated toilet unit structure, and is a substantially square tubular mounting base material. Or fasten to each other,
Alternatively, the wall interior material is provided with at least two long hole-shaped openings arranged side by side, and has an opening which has a diameter substantially equal to the diameter of the mounting base material and is detachable from each other, and has a substantially U-shaped cross section. And a hook having a shape and a size that can be fitted into the elongated opening is inserted and fitted into the elongated opening so that the mounting base material is sandwiched in the hook opening. 2. The integrated toilet unit system structure according to claim 1, wherein the wall interior material is attached by inserting and fastening a fastener and a mounting base material to each other. 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31795998A JP3556107B2 (en) | 1998-11-09 | 1998-11-09 | Integrated toilet unit structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31795998A JP3556107B2 (en) | 1998-11-09 | 1998-11-09 | Integrated toilet unit structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000145179A JP2000145179A (en) | 2000-05-26 |
JP3556107B2 true JP3556107B2 (en) | 2004-08-18 |
Family
ID=18093915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31795998A Expired - Fee Related JP3556107B2 (en) | 1998-11-09 | 1998-11-09 | Integrated toilet unit structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3556107B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510725B (en) * | 2013-10-22 | 2014-08-20 | 广州鸿力复合材料有限公司 | Integral bathroom |
-
1998
- 1998-11-09 JP JP31795998A patent/JP3556107B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2000145179A (en) | 2000-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5724773A (en) | Building module providing readily accessible utility connections | |
US3924279A (en) | Hanger and support structure for toilet bowls and the like | |
JP3556107B2 (en) | Integrated toilet unit structure | |
JP2990434B1 (en) | How to assemble the plumbing unit of the building to the frame by the frame wall method | |
JP2004211365A (en) | Frame | |
JP6775138B2 (en) | Building unit | |
JP3235077U (en) | Assembled equipment | |
JPH0519446U (en) | Suspended structure of prefabricated building | |
JP3062810B2 (en) | Assembling method of plumbing unit in building and plumbing unit | |
JPH09262724A (en) | Manufacture of housing equipment unit body | |
JPH10131298A (en) | Unit box for house | |
JPH0715909Y2 (en) | Urinal screen | |
JP2000336812A (en) | Space unit | |
JPH047791B2 (en) | ||
JPH0995989A (en) | Execution tool for fitting device | |
JP4478120B2 (en) | Remaining formwork framework method | |
JPH0696916B2 (en) | Construction method of partition wall wall panel for extension | |
JP2024039168A (en) | Toilet forming unit and toilet forming method | |
JP3320041B2 (en) | Mounting structure of the face plate to the base beam | |
JP3325958B2 (en) | Installation work of plumbing equipment for building units | |
JPS6331676Y2 (en) | ||
JPH09302965A (en) | Unit room and method for carrying in the same | |
JP2002188205A (en) | Method for forming frame structure | |
JP2008115623A (en) | Reinforced floor structure | |
JPH1162077A (en) | Installation of wall panel and fixture therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040106 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040308 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040413 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040511 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080521 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090521 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100521 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees | ||
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |