JP3016635B2 - Construction method of prefab toilet - Google Patents

Construction method of prefab toilet

Info

Publication number
JP3016635B2
JP3016635B2 JP3228285A JP22828591A JP3016635B2 JP 3016635 B2 JP3016635 B2 JP 3016635B2 JP 3228285 A JP3228285 A JP 3228285A JP 22828591 A JP22828591 A JP 22828591A JP 3016635 B2 JP3016635 B2 JP 3016635B2
Authority
JP
Japan
Prior art keywords
toilet
floor
unit
space
units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3228285A
Other languages
Japanese (ja)
Other versions
JPH0544347A (en
Inventor
博信 内田
和 渋谷
孝市 鍋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP3228285A priority Critical patent/JP3016635B2/en
Publication of JPH0544347A publication Critical patent/JPH0544347A/en
Application granted granted Critical
Publication of JP3016635B2 publication Critical patent/JP3016635B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)
  • Residential Or Office Buildings (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建築躯体内にプレファ
ブ式トイレを設置する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a prefabricated toilet in a building frame.

【0002】[0002]

【従来の技術】オフィスビル等の建築物内にトイレルー
ムを設置する場合、建築躯体の所望のスペース内にプレ
ファブ式のトイレルームを組み立て、トイレルーム内に
便器、手洗い台等を内装設置し、建築躯体の給水管、排
水管、電源等と内装機器、照明等を接続してトイレを設
置することが行なわれている。
2. Description of the Related Art When a toilet room is installed in a building such as an office building, a prefabricated toilet room is assembled in a desired space of a building frame, and a toilet, a hand-washing stand, etc. are installed inside the toilet room. 2. Description of the Related Art Toilet installation is performed by connecting a water supply pipe, a drain pipe, a power source, and the like of a building frame to interior equipment, lighting, and the like.

【0003】かかるプレファブ式トイレの組み立ては、
建築躯体内に個々の、多数の構成材料、機器、部品を搬
入し、作業としては、床部材を建築躯体の設置空間の床
部に敷設し、次に床部材の周囲上に多数の壁パネルを順
次建て込み、壁パネルの上端部間に補強材を架設し、例
えば該補強材に天井部材を吊り下げて天井を構成し、ト
イレルームを組み立て、設置する。
[0003] The assembly of such a prefabricated toilet is
A large number of individual components, equipment, and components are carried into the building frame, and work is performed by laying floor members on the floor of the installation space for the building frame, and then by placing a number of wall panels around the floor members. Are sequentially erected, and a reinforcing member is erected between the upper ends of the wall panels. For example, a ceiling member is suspended from the reinforcing member to form a ceiling, and a toilet room is assembled and installed.

【0004】次に得られたトイレルーム内をトイレスペ
ース、手洗いスペース等に画成し、各スペース内に便
器、間仕切り、手洗い台等を組み付け、設置し、更に、
床下や壁パネルの外壁等に給・排水の配管を行ない、壁
パネルや天井等に電気配線等を行なう。
[0004] Next, the obtained toilet room is defined as a toilet space, a hand-washing space, etc., and a toilet, a partition, a hand-washing stand, etc. are assembled and installed in each space.
Water supply / drainage piping is provided under the floor and on the outer wall of the wall panel, and electrical wiring is performed on the wall panel and the ceiling.

【0005】[0005]

【発明が解決しようとする課題】以上の従来技術は、先
ず、施工現場へ多数の床部材、壁パネル、天井部材、梁
部材等の細分化された極めて多数のトイレルーム構成部
材を搬入する必要があり、更に便器、間仕切り、手洗い
台等の構成機器、部品をも個々の状態で搬入する必要が
あり、搬入部品が極めて多く、搬送、搬入が面倒、煩雑
であること、又組み立てに際し、現場での解梱、部品等
の確認、点検、整合等の作業が面倒、且つ、煩雑であ
る。又、構成材料、機器、部品等の不揃い、不足、間違
い等が往々にして起こり易く、作業する際、これが判明
して作業の円滑を欠く等の事態は現場作業で往々にして
経験するところである。
In the above prior art, first, it is necessary to carry a large number of subdivided toilet room components such as a large number of floor members, wall panels, ceiling members, beam members and the like to a construction site. In addition, it is necessary to carry in components, such as toilets, partitions, and hand-washing basins, in an individual state, and the number of parts to be carried in is extremely large, and transporting and carrying in is troublesome and complicated. Work such as unpacking, confirmation of parts, inspection and alignment is troublesome and complicated. In addition, irregularities, shortages, mistakes, and the like of constituent materials, equipment, parts, and the like are often liable to occur, and when working, it is often found in workplace work that this is found and the work is lacking in smoothness. .

【0006】次に、上記した分解された極めて多数の部
材、部品を建築躯体内の設置空間内で組み立てる際、設
置空間が狭小であるので、組み立てに際し作業がし難
く、狭い空間内で、極めて多数の部材を、手順に従って
組み立てることには、甚だしく困難性を伴う。又、オフ
ィスビル等のトイレは、多人数利用式のものが多く、従
って、トイレルーム、これと一体に設けられる手洗いル
ームも大きく、床部材、壁パネル等は、規格化された所
定寸法の持運び易い小さいピースであることから、組み
立て作業工数も多く、設置空間が狭く、限られているこ
とから工事が困難、面倒、且つ、煩雑である。
Next, when assembling the above-mentioned disassembled and extremely large number of members and parts in the installation space in the building frame, the installation space is small, so that it is difficult to perform the assembly work. Assembling a large number of components according to a procedure is extremely difficult. In addition, many toilets in office buildings and the like are of a type that can be used by a large number of people. Therefore, the toilet room and the hand-washing room provided integrally therewith are large, and the floor members, wall panels, etc. have standardized predetermined dimensions. Since it is a small piece that is easy to carry, the number of assembling work steps is large, and the installation space is narrow and limited, so construction is difficult, troublesome, and complicated.

【0007】従って、組み立て、設置工事に要する時間
が長くかかり、且つ、作業員も多数を要し、部材、部
品、機器のコストに比較して施工費が高くなり、トータ
ルとしてコストが高くなり、一方、現場での作業員の確
保、就中熟練作業員の確保が困難である事情等と相俟っ
てプレファブトイレの建築現場での組み立て、設置の改
善が要望されるところである。
[0007] Accordingly, the time required for the assembly and installation work is long, the number of workers is large, the construction cost is higher than the cost of members, parts and equipment, and the total cost is high. On the other hand, it is demanded that assembly and installation of prefabricated toilets at construction sites be improved in combination with the situation where it is difficult to secure workers on site and skilled workers in particular.

【0008】本発明は、かかるプレファブトイレの建築
現場での組み立て、設置に関する上記した課題を解決す
べくなされたもので、その目的とする処は、プレファブ
トイレの建築現場での施工を簡易化し、現場での施工に
際し作業員を最少で足りるようにし、省力化を図り、併
せて熟練者によることなく可及的に簡易な作業のみで施
工し得るようにし、且つ、施工時間を大幅に短縮化し、
効率的、合理的なプレファブトイレの組み立て、設置を
企図するにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems relating to the assembly and installation of such a prefabricated toilet on a construction site, and an object thereof is to simplify the construction of the prefabricated toilet on the construction site. In order to minimize the number of workers for on-site construction, labor is saved, and at the same time, it is possible to perform construction with only the simplest possible work without skilled personnel, and to greatly reduce the construction time ,
The aim is to assemble and install an efficient and rational prefab toilet.

【0009】[0009]

【課題を解決するための手段】以上の課題を解決するた
めの手段は、本発明の主要な構成要件である請求項1で
は、下面にキャスターを着脱自在に取り付け、周囲に吊
り金具を取付けたフレーム及び該フレームの上に敷設さ
れ、該キャスター取付部位を開放部とした床板部材とか
らなる床部材に、壁パネルを建て込み、且つ、壁パネル
上部に天井を設けて複数のトイレルームユニットを形成
し、複数のトイレルームユニットの一方に便器等を内
装、設置してモジュール化したトイレスペースユニット
を組み立ててトイレスペースルームユニットを組み立て
る工程、及びトイレルームユニットの他方洗面台等を
内装、設置してモジュール化した手洗いスペースユニッ
トを組み立てて手洗いスペースユニットを組み立てる
程と、前記トイレスペースユニット及び手洗いスペース
ユニットを施工現場に搬送する工程と、前記トイレスペ
ースユニット及び手洗いスペースユニットを、施工現場
で上記吊り金具を介してクレーン等で吊下げ、建築躯体
の床面に夫々を載置する工程、及び各ユニットを設置
床面にキャスターを介して建築躯体の設置床面上を移動
させ、該各ユニットの建築躯体の床面上の設置位置を調
整する工程と、トイレスペースユニット及び手洗い
スペースユニットの各床部材のフレームの対向する接合
部を突き当て、該各ユニットの床部材をジャッキアップ
して設置床面から浮上させ、キャスターを取外し、且つ
床部材と設置床面間の高さを調節し、床面に据え付ける
工程と、前記トイレスペースユニット及び手洗いスペー
スユニットの各床部材のフレームの対向する接合部に設
けられた床板部材を敷設していない空間部を介して該ユ
ニットの各床部材の突合せたフレーム接合部を結合し、
結合後該空間部に床板部材を敷設して塞ぎ、各ユニット
の床板部材の突合せ端部間に目地材を介装し、各ユニッ
トの床板部材を接合する工程と、前記トイレスペースユ
ニット及び手洗いスペースユニットの接合する各壁パネ
ル間の隙間に目地材を介装し、該各壁パネル相互を接合
する工程、及び各ユニットの接合する天井板の接合端部
間の隙間に目地材を介装し、該各天井板を接合する工程
と、前記トイレスペースユニット及び手洗いスペースユ
ニットの水廻り機器の配管等の工程、必要に応じた室内
の内装等の仕上げ工程とからなるプレファブトイレの施
工方法である。
Means for solving the above problems are the main constituent features of the present invention.
Is a frame in which casters are detachably attached to the lower surface and hanging brackets are attached around the frame, and laying on the frame
Such as a floor plate member having the caster mounting portion opened.
A wall panel is erected on a floor member made of the above, and a ceiling is provided above the wall panel to form a plurality of toilet room units, and a toilet and the like are installed and installed in one of the plurality of toilet room units to be modularized. Assemble the toilet space unit and assemble the toilet space room unit
That step, and the other to the interior of the washstand and the like of the toilet room units, and engineering <br/> extent assembling the hand washing space unit assembled hand washing space units modularized installed, the toilet space unit and hand washing space unit a step of transporting the construction site, the Toiresupe
The Suyunitto and hand washing space unit, suspended by a crane or the like through the hanger at the construction site, placed respectively on the floor of the building skeleton step and architectural skeleton via a caster the respective units in the installation floor surface installation floor surface above is moved and a step of adjusting <br/> integer installation position on the floor of the building skeleton of respective units, before Symbol toilet space units and handwashing
Abutting the joint of the frame of each floor member of the space unit, and jacking up the floor member of each unit
Lift off the installation floor, remove the casters, and
Adjust the height between the floor member and the installation floor and install it on the floor
Process and the toilet space unit and hand washing space
At the opposite joints of the frame of each floor unit
Through a space in which the floorboard members are not laid.
Join the butted frame joints of each knit floor member,
After the connection, a floor plate member is laid and closed in the space, and each unit is closed.
A jointing material is interposed between the butting ends of the floor panel members of
Joining the floorboard members of the
Panel panels to be joined to knit and hand washing space units
Joints are interposed in the gaps between the panels, and the wall panels are joined to each other
Process and the joint end of the ceiling plate to be joined to each unit
A step of interposing a joint material between gaps and joining the respective ceiling panels
And a step of plumbing the plumbing equipment of the toilet space unit and the hand washing space unit, and finishing the interior of the room as necessary.

【0010】[0010]

【作用】上記手段によれば、搬送、建築現場に搬入し易
い大きさのモジュール化したトイレルームユニットとし
てトイレルームを工場で予め組み立て、各モジュール化
したトイレルームユニット内に予め間仕切り、便器、手
洗い台等を組込、設置して内装し、モジュール化した完
成せるトイレスペースユニット、手洗いスペースユニッ
トを得、これを建築現場に搬送し、設置床面に搬入する
ので、現場での作業は設置床面への移動、ジャッキアッ
プ、据え付け、モジュール化されたユニット相互の接
続、配管接続、配線等でトイレが組み立て、設置され
る。
According to the above-mentioned means, a toilet room is pre-assembled in a factory as a modular toilet room unit having a size that is easy to carry and carry into a construction site, and a partition, a toilet, and a handwash are preliminarily installed in each modular toilet room unit. A stand, etc. is installed, installed and furnished, and a modularized toilet space unit and hand washing space unit are obtained, transported to the construction site, and transported to the installation floor surface. Toilets are assembled and installed by moving to the surface, jacking up, installing, connecting modularized units, connecting pipes, and wiring.

【0011】[0011]

【実施例】次に本発明の一実施例を添付した図面に従っ
て詳述する。図1は本発明の方法を説明する模式図、図
2はモジュール化されたトイレスペースユニット等を建
築物に搬入する状態を説明する図、図3は上記ユニット
の吊り下げ状態を示す説明的斜視図、図4は図3の要部
の拡大縦断側面図、図5はキャスター部分の斜視図、図
6は吊り金具部分の斜視図、図7は床部材のフレームを
示す平面図、図8はトイレスペースユニットの平面図、
図9は手洗いスペースユニットの平面図、図10はキャ
スターを取外すべくユニットをジャッキアップした状態
を示す説明図、図11はキャスターを取外し、高さ調節
を行なう状態を示した説明図、図12は据え付け状態の
説明図、図13はトイレスペースユニットと手洗いスペ
ースユニットの接合を示す説明的斜視図、図14は同接
合部を示す平面図、図15は床部材の接合を示す要部拡
大断面図、図16は接合してトイレを構成した平面図、
図17は壁パネルの接合の一例を示す拡大断面図、図1
8は天井部の接合の一例を示す拡大断面図、図19は同
他の例を示す拡大断面図、図20は上記ユニットを3個
組合せた例を示す模式的平面図、図21は他の例を示す
模式的説明図、図22は上記ユニットを4個組合せた例
を示す模式的説明図、図23は同他の例を示す模式的説
明図、図24は同他の例を示す模式的説明図、図25は
同更なる他の例を示す模式的説明図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 is a schematic diagram illustrating the method of the present invention, FIG. 2 is a diagram illustrating a state where a modularized toilet space unit or the like is carried into a building, and FIG. 3 is an explanatory perspective view illustrating a suspended state of the unit. FIG. 4, FIG. 4 is an enlarged vertical sectional side view of a main part of FIG. 3, FIG. 5 is a perspective view of a caster part, FIG. 6 is a perspective view of a hanging metal part, FIG. 7 is a plan view showing a frame of a floor member, and FIG. Plan view of a toilet space unit,
9 is a plan view of the hand washing space unit, FIG. 10 is an explanatory view showing a state in which the unit is jacked up to remove the casters, FIG. 11 is an explanatory view showing a state in which the casters are removed and the height is adjusted, and FIG. FIG. 13 is an explanatory perspective view showing the joint between the toilet space unit and the hand washing space unit, FIG. 14 is a plan view showing the joint, and FIG. 15 is an enlarged cross-sectional view of the main part showing the joint of the floor member. , FIG. 16 is a plan view of a toilet constructed by joining.
FIG. 17 is an enlarged sectional view showing an example of the joining of the wall panels, and FIG.
8 is an enlarged cross-sectional view showing an example of joining a ceiling portion, FIG. 19 is an enlarged cross-sectional view showing another example, FIG. 20 is a schematic plan view showing an example in which three units are combined, and FIG. FIG. 22 is a schematic explanatory view showing an example in which four units are combined, FIG. 23 is a schematic explanatory view showing another example, and FIG. 24 is a schematic illustration showing another example. FIG. 25 is a schematic explanatory view showing still another example.

【0012】図1は本発明にかかる方法を模式的に示し
たもので、工場Aでモジュール化した複数のトイレルー
ムユニット、便器、間仕切り、手洗い台等を組込んだト
イレスペースユニット、手洗いスペースユニットからな
るユニット1を個々に予め組み立て、形成する。工場で
得られたユニット1をトラックTで建築現場に搬送し、
建築物の設置フロアB1の床面Fに図1、図2に示すよ
うにクレーンCで建築躯体Bのスラブ等を利用して吊り
下げ、搬入する。図2では設置床面Fの下のフロアB2
の床面F1には、既にトイレTRが設置されている状態
を示し、上のフロアFでは工事中の状態を示している。
FIG. 1 schematically shows a method according to the present invention. A toilet space unit incorporating a plurality of toilet room units, toilet bowls, partitions, hand wash stands, etc. modularized in a factory A, a hand wash space unit. Are individually assembled in advance and formed. The unit 1 obtained at the factory is transported to the construction site by truck T,
As shown in FIGS. 1 and 2, the building is suspended by a crane C using a slab or the like of a building frame B on a floor surface F of an installation floor B1 of the building. In FIG. 2, floor B2 below the installation floor F
The floor F1 shows a state where the toilet TR is already installed, and the upper floor F shows a state under construction.

【0013】内装する機器が便器等と手洗い台等が異な
るだけで、モジュール化したトイレ、手洗いの各スペー
スユニットを工場Aで組み立てるので、先ずトイレスペ
ースユニットの組み立てから説明する。トイレルームユ
ニット1は図3、図8に示す如くで、図8に示すように
平面視長方形の規格化された寸法の床部材2を有する。
床部材2のフレーム3は図7に示すように平面視長方形
をなし、長い左右のメンバー3―1,3―1、これの前
後端部を繋ぐ前後のメンバー3―2,3―2、左右のメ
ンバー間に架設された複数の補強メンバー3―3…、前
後のメンバー間に架設された補強メンバー3―4…から
なり、これ等は枠状をなし、鋼材や鋼板で形成される。
[0013] The modular toilet and hand-washing space units are assembled at the factory A, except that the equipment to be installed is different from the toilet bowl and the hand-washing stand. The assembly of the toilet space unit will be described first. As shown in FIGS. 3 and 8, the toilet room unit 1 has a floor member 2 having a standardized rectangular shape in plan view as shown in FIG.
As shown in FIG. 7, the frame 3 of the floor member 2 has a rectangular shape in a plan view, and has long left and right members 3-1 and 3-1 and front and rear members 2-2 and 3-2 connecting the front and rear ends thereof. , And a plurality of reinforcing members 3-4... Provided between the front and rear members, which are formed in a frame shape and are formed of a steel material or a steel plate.

【0014】フレーム3の四隅には三角形のコーナープ
レート3―5…が接合され、四隅を補強し、又、左右の
メンバー3―1,3―1と、この間に架設された補強メ
ンバー3―3の中間部のものの接合部には、三角形の補
強、兼支持プレート3―6…が固設され、支持プレート
3―6…は左右に2ヵ所ずつ前後に離間して配設されて
いる。かかる支持プレート3―6…の下面には、図4、
図5、図7で明示したようにキャスター4が垂下、取付
けられている。キャスター4は、図5で示したように状
部の基板4―1を支持プレート3―6にボルト止めし、
支持プレート3―6から取外すことができるように構成
されている。かかるキャスター4…は、4枚の支持プレ
ート3―6…の夫々に設けられ、従って、建築躯体の設
置床面には4個のキャスターで安定して転動自在に支持
されることとなる。
A triangular corner plate 3-5 is joined to the four corners of the frame 3 to reinforce the four corners, and the left and right members 3-1 and 3-1 and the reinforcing members 3-3 installed between them are provided. Are fixed at the joints of the intermediate parts, and the support plates 3-6 are fixedly provided at two places on the left and right and separated from each other. On the lower surface of such support plates 3-6,.
As shown in FIGS. 5 and 7, the casters 4 are suspended and mounted. As shown in FIG. 5, the caster 4 bolts the base plate 4-1 to the support plate 3-6,
It is configured to be removable from the support plate 3-6. The casters 4 are provided on each of the four support plates 3-6. Therefore, the casters 4 are stably and freely rolled on the installation floor of the building frame by the four casters.

【0015】一方、上記したフレーム3の左右のメンバ
ー3―1,3―1には、前後に離間して吊り金具5…を
取付ける。吊り金具5は図3、図4、図6に示す如く
で、L型の本体の縦片5―1をメンバー3―1の外側
面、横片5―2をメンバー3―1の底面にボルト6…で
取外し可能に接合し、縦片5―1の外側に突設した突片
5―3を吊り具7に連結する。以上の吊り金具5…は、
左右のメンバー3―1,3―1に前後に離間して各2ヵ
所、計4ヵ所設ける。
On the other hand, hanging members 5 are attached to the left and right members 3-1 and 3-1 of the frame 3 so as to be separated from each other in the front and rear directions. As shown in FIG. 3, FIG. 4, and FIG. 6, the hanging piece 5 has a vertical piece 5-1 of the L-shaped main body bolted to the outer surface of the member 3-1 and a horizontal piece 5-2 bolted to the bottom face of the member 3-1. 6 and removably joined together, and the protruding piece 5-3 protruding outside the vertical piece 5-1 is connected to the hanging member 7. The above-mentioned hanging hardware 5 ...
A total of four locations will be provided on each of the left and right members 3-1 and 3-1 at two locations apart from each other.

【0016】以上のキャスター4…、吊り金具5…を取
付けたフレーム3の上面に基板、表面材からなる床板部
材8…を敷設し、図8の如く床部材2を構成する。かか
る床板部材8…の敷設に際し、上記した支持プレート3
―6の…の部分は、後にキャスター4…の取外し、ユニ
ット1の高さ調節を行なう際に床板部材が邪魔になるの
で、工場で組み立てる際、床板部材8の未敷設状態と
し、開放部2―1…としておく。図8の2―1で示した
部分は開放部を示す。
A floor plate member 8 composed of a substrate and a surface material is laid on the upper surface of the frame 3 on which the above-mentioned casters 4 and the hanging members 5 are mounted, and the floor member 2 is constructed as shown in FIG. When the floor plate members 8 are laid, the support plate 3
In the part of -6, the floor plate member becomes a hindrance when the casters 4 are later removed and the height of the unit 1 is adjusted. Therefore, when assembling at the factory, the floor plate member 8 is not laid and the open portion 2 ―1… The portion indicated by 2-1 in FIG. 8 indicates an open portion.

【0017】以上の床部材2上の外端部周を囲むように
壁パネル9―1…を建て込んで周壁9を形成し、内部に
トイレブース10―1を画成するための仕切パネル10
…を立設する。壁パネル9―1…は、床部材2の周囲に
建て込むが、図3、図8に示すように出入口部や並設す
る手洗いスペースユニットとの間の通路部9―2,9―
3の部分には設けない。
A wall panel 9-1 is erected around the outer edge of the floor member 2 to form a peripheral wall 9, and a partition panel 10 for defining a toilet booth 10-1 therein.
… Stand up. The wall panels 9-1 are built around the floor member 2, but as shown in FIGS. 3 and 8, passageways 9-2 and 9- 9 between the entrance and the hand washing space unit arranged side by side.
It is not provided in the part of 3.

【0018】そして、図4に示すように、建て込んだ壁
パネル9―1…で形成される周壁9の上部延出部9―4
間に継手11を介して補強梁12…等を架設し、一方、
壁パネル9―1のパネル9―5の上端部間に継手13等
を介して天井板14を敷設し、天井板14は不図示の吊
り金具等で補強梁12に吊り下げ、連結し、パネル9―
3の天井板14の取付けを補強する。
Then, as shown in FIG. 4, the upper extending portion 9-4 of the peripheral wall 9 formed by the built-in wall panels 9-1.
Reinforcing beams 12 ... are erected through joints 11 between them.
A ceiling plate 14 is laid between the upper end portions of the panel 9-5 of the wall panel 9-1 via a joint 13 or the like, and the ceiling plate 14 is hung on the reinforcing beam 12 by a not-shown hanging bracket or the like, and connected to the panel. 9-
Third, the mounting of the ceiling plate 14 is reinforced.

【0019】以上で得られたトイレルーム15の内部に
構成機器、即ち便器等を内装、設置し、図8で示される
ように、上記した仕切パネル10で画成されたトイレブ
ース10―1,10―1内には洋風便器16を配管ユニ
ット17とともに各組み付け、設置する。一方、これと
反対側の壁面内側には小便器18を配管ユニット19と
ともに組み付け、設置し、小便器18は実施例では2連
装とし、これの背面に配管ユニット19が配設されてい
る。以上によりトイレスペースユニット1を構成する。
Inside the toilet room 15 obtained above, components such as a toilet bowl are installed and installed, and as shown in FIG. 8, the toilet booth 10-1, defined by the partition panel 10 described above. The Western-style toilet 16 is assembled and installed together with the piping unit 17 in 10-1. On the other hand, a urinal 18 is assembled and installed together with the piping unit 19 on the inner wall surface on the opposite side. In the embodiment, the urinal 18 is provided in two units, and the piping unit 19 is disposed on the back surface thereof. The toilet space unit 1 is configured as described above.

【0020】図9は手洗いスペースユニット51を示
し、このユニット51は、上記と同様の床部材2、壁パ
ネル9―1…を建て込んで形成した周壁9、天井からな
り、手洗いルーム52を構成し、床部材2のフレーム3
も同様に構成され、床板部材8…の未敷設部分の開放部
2―1をフレーム3の支持プレート3―6…の部分に備
え、キャスター、吊り金具を上記と同様に備え、上記ト
イレルーム15と全く同様に手洗いルーム52は規格化
され、モジュール化されて製作される。
FIG. 9 shows a hand washing space unit 51. The unit 51 comprises a floor member 2, a peripheral wall 9 formed by embedding a wall panel 9-1... And the frame 3 of the floor member 2
Is provided in the same manner as above, the open portion 2-1 of the unlaid portion of the floor plate members 8 is provided in the portion of the support plate 3-6 of the frame 3, the casters and the hanging brackets are provided in the same manner as above, and the toilet room 15 is provided. The hand washing room 52 is standardized, modularized and manufactured in exactly the same manner.

【0021】手洗いルーム52の周壁9の図の右側には
上記した通路2―3と対応する通路52―3が設けら
れ、反対側には出入口52―2が設けられている。内部
には、通路52―3の反対側の壁面内側で、出入口52
―2を避けて手洗い台53が組込、設置され、手洗い台
53はカウンター53―1上に手洗い器52―2を連装
して備えるタイプを実施例では用い、手洗い台53の出
入口側には仕切板54が設けられている。工場におい
て、上記トイレスペースユニットと同様に、手洗いルー
ムを組み立て、これ等を組込、設置した状態で手洗いス
ペースユニット51を組み立て、製作しておく。
A passage 52-3 corresponding to the passage 2-3 described above is provided on the right side of the peripheral wall 9 of the hand-washing room 52 in the figure, and an entrance 52-2 is provided on the opposite side. Inside, the entrance 52 is located inside the wall opposite to the passage 52-3.
In the embodiment, a hand wash basin 53 is incorporated and installed avoiding -2, and the hand wash basin 53 is provided with a hand wash basin 52-2 connected to a counter 53-1 in the embodiment. A partition plate 54 is provided. In the factory, a hand-washing room is assembled, and the hand-washing space unit 51 is assembled and manufactured in a state where the hand-washing room is assembled and installed in the same manner as the toilet space unit.

【0022】以上の各ユニット1,51は工場で組み立
て、製作し、従って部品は周囲にあり、部品の補給等は
即座になされ、部材、部品、機器等の調整、補修等は即
座に行なえ、又、工場の組み立て易い、組み立てに最適
な組み立てライン、開放されたスペース内で組み立てる
ので、組み立て作業は容易であり、迅速に、効率的に、
合理的になされる。そして、床部材、壁パネル、天井部
材、機器等の製作誤差等に起因する調整等は、工場でな
されるので、極めて容易に、且つ迅速になされ、品質管
理等も行届き、品質の優れたプレハブトイレスペースユ
ニット1、手洗いスペースユニット51がモジュール化
されて得られる。更に、上記ユニット1,51は、工場
で予め組み立て、製作するので、現場での組み立て作業
員が不要となる。
Each of the above units 1 and 51 is assembled and manufactured in a factory. Therefore, parts are in the surrounding area, and parts are replenished immediately, and adjustment, repair, etc. of members, parts, devices, etc. can be performed immediately. Also, the assembly line is easy to assemble in a factory, and the assembly line is optimal for assembly.Assembling is performed in an open space, the assembling work is easy, quick and efficient.
Made reasonably. Since adjustments and the like caused by manufacturing errors of floor members, wall panels, ceiling members, equipment, and the like are performed at the factory, they are extremely easily and quickly performed, quality control and the like are also performed, and excellent quality is achieved. The prefabricated toilet space unit 1 and the hand washing space unit 51 are obtained as a module. Further, since the units 1 and 51 are assembled and manufactured in advance in a factory, an assembly worker on site is not required.

【0023】以上で得られた各モジュール化された各ス
ペースユニット1,51をトラックT等に積載し、建築
現場に搬送する。搬送後、トラックTの荷台から上記し
たユニット1,51をクレーンCで吊り上げ、建築躯体
Bのスラブ等を利用して図1、図2の如く設置フロアB
1に搬入し、設置床面Fに設置する。
Each of the modularized space units 1 and 51 obtained above is loaded on a truck T or the like and transported to a construction site. After the transportation, the units 1 and 51 described above are lifted from the bed of the truck T by the crane C, and the slab of the building frame B is used as shown in FIGS.
1 and installed on the installation floor F.

【0024】上記したトイレスペースユニット1のクレ
ーンによる吊り下げは、上記した床部材2の左右2ヵ
所、計4ヵ所に設けた吊り金具5…にターンバックル、
チエン、ロッド等からなる吊り具7…を介して上位の吊
り枠20に吊り下げることによりなされる。吊り枠20
は、図3、図4に示す如くで、吊り枠20は図3に示す
如くユニット1の平面形状と同様の長方形の枠状をな
し、対角線上にX字型に補強杆20―1を有する。吊り
枠20の左右のメンバーの上記吊り金具5…と対応する
部位には、支持部20―2…が設けられ、この部分と上
記吊り金具5…を吊り具7…で繋ぎ、吊り枠20の四隅
に立方錐状にチエン、ロッド等の吊り杆21を連結し、
クレーンCのフックC1でこれを吊り下げ、ユニット1
を図1、図2、図3、図4の如く吊り下げる。手洗いス
ペースユニット51も、これと同様に吊り下げて建築躯
体B1の設置フロアの床面Fに搬入する。
The above-mentioned toilet space unit 1 is suspended by a crane by turning buckles on suspension fittings 5 provided at two places on the left and right sides of the floor member 2, a total of four places.
This is achieved by suspending from a suspending member 20 composed of a chain, a rod, or the like, to an upper suspending frame 20. Hanging frame 20
As shown in FIGS. 3 and 4, the suspension frame 20 has a rectangular frame shape similar to the planar shape of the unit 1 as shown in FIG. 3, and has an X-shaped reinforcing rod 20-1 on a diagonal line. . At the portions of the left and right members of the suspension frame 20 corresponding to the above-mentioned hanging metal fittings 5, support portions 20-2 are provided, and this portion and the above-mentioned hanging metal fittings 5 are connected with the hanging metal fittings 7. At the four corners, hanging rods 21 such as chains and rods are connected in a cubic pyramid shape,
This is suspended by the hook C1 of the crane C, and the unit 1
Is suspended as shown in FIG. 1, FIG. 2, FIG. 3, and FIG. Similarly, the hand washing space unit 51 is also suspended and carried to the floor F of the installation floor of the building frame B1.

【0025】ユニット1は、目的とするフロアB1の床
面Fに降ろすと、キャスター4…が床面に接地し、爾
後、吊り枠21を吊り具7から外し、続いて床部材2の
フレーム3の左右のメンバー3―1から吊り金具5…を
取外す。これを図6で示し、ボルト6…を抜脱すること
により吊り金具5…はフレーム3から除去される。接合
する手洗いスペースユニット51も、同様の作業で床部
材の吊り金具を取外す。
When the unit 1 is lowered onto the floor F of the target floor B1, the casters 4 contact the floor, and then the hanging frame 21 is removed from the hanging member 7, and then the frame 3 of the floor member 2 is moved. Remove the hanging fittings 5 from the left and right members 3-1. This is shown in FIG. 6, and the bolts 6 are removed from the frame 3 by removing the bolts 6. The hand washing space unit 51 to be joined also removes the hanging member of the floor member by the same operation.

【0026】次に、各ユニット1,51の搬入位置と設
置位置とが離れているので、キャスター4…を介してユ
ニット1,51を床面F上を転動させて移動させ、設置
床面Fまで移動し、設置床面の正規の場所まで移動して
微調整を行なう。尚、ユニット1,51は、前後して搬
入し、先に搬入したユニットから移動させ、正規の場所
まで移動して微調整を行なう。
Next, since the carry-in position and the installation position of each unit 1 and 51 are far from each other, the units 1 and 51 are rolled and moved on the floor F via the casters 4. Move to F and move to a proper place on the installation floor to make fine adjustments. The units 1 and 51 are carried in before and after, moved from the unit carried in earlier, and moved to a regular place to perform fine adjustment.

【0027】床面Fの正規の位置に移動後、床部材2と
床面F間にジャッキ22を介在させ、床部材2を上昇さ
せる。ジャッキ22は、図5に示す如くで、図8に示す
ように上記した支持プレート3―6…の部位に設けられ
た4ヵ所の開放部2―1…から床面上に載置し、ジャッ
キ22はリフトアーム22―1を介して左右のメンバー
3―1,3―1の下面に当てがい、かかるジャッキ22
…は上記に従って4ヵ所となり、ジャッキ22…で床部
材2をキャスター4…よりも高位まで上昇させる。これ
を図10で示した。尚、図7ではフレーム3を裸で示し
たが、併せてジャッキ22の配置を示すべくジャッキ2
2を付加して示した。かかるジャッキアップ作業は、ユ
ニット1の床上からジャッキ22をセットし、床下に手
を差し入れたり、作業者が床下に臨むことなくなされ、
安全上極めて有利であり、安全確保の点で極めて好まし
いこととなる。
After moving to the proper position on the floor F, the jack 22 is interposed between the floor member 2 and the floor F, and the floor member 2 is raised. As shown in FIG. 5, the jacks 22 are placed on the floor from the four open portions 2-1 provided at the portions of the support plates 3-6 as shown in FIG. Reference numeral 22 denotes a jack 22 which abuts on the lower surfaces of the left and right members 3-1 and 3-1 via the lift arm 22-1.
Are four places in accordance with the above, and the floor members 2 are raised by the jacks 22 to a higher position than the casters 4. This is shown in FIG. Although the frame 3 is shown naked in FIG. 7, the jack 2 is also shown to show the arrangement of the jack 22.
2 is added. Such jack-up work is performed without setting the jack 22 from above the floor of the unit 1 and putting a hand under the floor, and without the worker facing under the floor,
This is extremely advantageous in terms of safety and extremely favorable in terms of ensuring safety.

【0028】ジャッキアップ作業後、キャスター4を図
5のように取外し、取外し作業はユニット1内の床上か
ら行なえ、従って、上記と同様に床下に手を差し入れた
り、作業者が床下に臨むことなくキャスター4の取外し
が行なえ、上記と同様に極めて安全にキャスターの取外
し作業が行なえる。
After the jack-up operation, the casters 4 are removed as shown in FIG. 5, and the removal operation can be performed from above the floor in the unit 1. Therefore, as described above, the hands can be inserted under the floor, and the operator does not face under the floor. The casters 4 can be removed, and the casters can be removed very safely in the same manner as described above.

【0029】上記したキャスター4の取外しとともに、
上記した床フレーム3の支持プレート3―6には高さ調
節ボルト23を縦設、螺合し、ボルト23の下方への突
出量を調節し、設定された突出量でジャッキ22を降下
させ、高さ調節ボルト23を床面Fに接地させ、爾後、
ジャッキ22を取外す。この作業も上記と同様に床上か
ら行なえる。これを図11で示した。尚、作業後開放部
2―1に床板部材8を敷設し、開放部2―1を塞ぐ。但
し、後述するユニット1,51の接合部側の空間部は、
接合作業後に床板部材を敷設する。
With the removal of the casters 4 described above,
Height adjusting bolts 23 are vertically installed and screwed on the support plate 3-6 of the floor frame 3 to adjust the amount of protrusion of the bolts 23 downward, and the jack 22 is lowered by the set amount of protrusion. The height adjustment bolt 23 is grounded to the floor F, and thereafter,
Remove the jack 22. This operation can also be performed from the floor as described above. This is shown in FIG. After the operation, the floor plate member 8 is laid on the opening 2-1 to close the opening 2-1. However, a space on the joint side of the units 1 and 51 described below is
After the joining operation, the floorboard members are laid.

【0030】続いて、上記した4ヵ所のボルト23…を
調節し、ユニット1の床部材2の高さ、水平度を調節
し、一方、左右のメンバー3―1の下面と行け面Fとの
間にはスペーサ24…を介在させ、ユニット1の床部材
2を床面Fに据え付ける。これを図12で示した。
Subsequently, the above-mentioned four bolts 23 are adjusted to adjust the height and the level of the floor member 2 of the unit 1, while the lower surface of the left and right members 3-1 and the running surface F are adjusted. The floor member 2 of the unit 1 is installed on the floor surface F with spacers 24 interposed therebetween. This is shown in FIG.

【0031】以上のようにトイレスペースユニット1を
床面Fに据え付け、次にこれと接合する手洗いスペース
ユニット51を同様にキャスターを介して設置床面に移
動し、ユニット1にユニット51の床部材を突き当て、
近接するように配置し、ユニット1と同様の手順でジャ
ッキアップし、キャスターを取外し、続いてジャッキを
取外し、高さ調節、水平度を調節し、スペーサを噛まし
て据え付ける。尚、手洗いスペースユニット51は、図
9に示すように開放部2―1の一部のものが手洗い台5
3で塞がれ、従って、この場合には手洗い台53の前面
板を取外し、この空間部を利用して開放部から作業行な
う。
As described above, the toilet space unit 1 is installed on the floor F, and the hand washing space unit 51 to be joined therewith is similarly moved to the installation floor via a caster. ,
They are arranged close to each other, jacked up in the same procedure as in the unit 1, removed the casters, subsequently removed the jacks, adjusted the height and level, adjusted the spacers, and installed them. As shown in FIG. 9, the hand washing space unit 51 includes a part of the opening 2-1 and the hand washing stand 5 as shown in FIG.
In this case, the front plate of the hand basin 53 is removed, and the work is performed from the open portion using this space.

【0032】以上のようにトイレスペースユニット1、
手洗いスペースユニット51を高さ調節して水平レベル
を合せ、各床部材2,2のフレーム3,3の接合側メン
バー相互が突き当て状態となるようにユニット1,51
を床面F上に配置する。これを図13、図14で示し
た。
As described above, the toilet space unit 1
The height of the hand washing space unit 51 is adjusted to adjust the horizontal level so that the joining members of the frames 3 and 3 of the floor members 2 and 2 come into contact with each other.
Is placed on the floor F. This is shown in FIG. 13 and FIG.

【0033】上記したユニット1,51の突き当て状態
で夫々の対向するフレーム3,3の外向きチャンネル材
からなる左右のメンバー3―1の一方3―11,3―1
2は、図15の如く夫々のこの部分に支持板3―11
a,3―12aを溶接等してこの部分を断面角筒状をな
す如くし、メンバー3―11,3―12の各支持板3―
11a,3―12aは対面し、各外側部3―11a,3
―12a間にボルト24…を通し、メンバー3―11,
3―12を結着する。かかるボルト結着部は図14で示
すように複数ケ所とし、ボルト結着は、上記した空間部
2―1の部分を利用して行ない、従って、床上からボル
ト挿入、締付作業を行なうことができ、床部材2,2相
互が突き当て状態にあっても床下に手を差し入れたり、
作業員が床下に潜ったりすることなく、ユニット1,5
1の床部材2,2の接合作業が行なえる。
One of the left and right members 3-1 and 3-1 made of the outward channel material of the facing frames 3 and 3 in the state where the units 1 and 51 abut against each other.
2 has a support plate 3-11 on each of these portions as shown in FIG.
a, 3-12a are welded or the like so that this portion has a rectangular cross section, and each support plate 3--3 of the members 3-11 and 3-12 is formed.
11a, 3-12a face each other, and each outer portion 3-11a, 3
Pass bolts 24 ... between members 12-11a, and make members 3-11,
Bond 3-12. As shown in FIG. 14, a plurality of such bolt connection portions are provided, and the bolt connection is performed using the space 2-1 described above. Therefore, it is possible to insert and tighten bolts from the floor. Even if the floor members 2 and 2 are in contact with each other,
Units 1 and 5 can be used without the worker going under the floor.
The joining work of the floor members 2 and 1 can be performed.

【0034】実施例ではユニット2個を接合してプレフ
ァブトイレを組み立てる例を示しているが、ユニットを
3個、4個、或いはそれ以上連装する場合には、床部材
2,2の反対側の側部メンバーを利用して接合するもの
とし、図13に示す如くユニット1,51の床部材2,
2の開放側の空間部2―1はそのままとし、上から床板
部材8…で塞いでいる。
In the embodiment, an example is shown in which two units are joined to assemble a prefabricated toilet. However, when three, four or more units are connected in series, a prefabricated toilet is connected. As shown in FIG. 13, the floor members 2 of the units 1 and 51 are joined by using the side members.
2 is left as it is, and is closed with floor plate members 8 from above.

【0035】以上のようにユニット1,51の床部材
2,2を接合後、接合に用いた空間部2―1…は床板部
材8…を敷設して塞ぎ、接合部の床板部材8…の突き合
わせ端部間には目地材25を介装し、かかるユニット
1,51の接合により、通路部9―3,52―3が接続
されてトイレルーム15と手洗いルーム52とが連通さ
れ、ユニット1,51は接続されることとなる。
After the floor members 2 and 2 of the units 1 and 51 are joined as described above, the spaces 2-1 used for the joining are laid by closing the floor plate members 8. A joint material 25 is interposed between the butt ends, and by joining the units 1 and 51, the passages 9-3 and 52-3 are connected, and the toilet room 15 and the hand-washing room 52 are communicated. , 51 are connected.

【0036】ユニット1,51相互の、接合側の部屋端
部の直線状に並ぶ壁パネル9―11,9―12は、突き
当て端部9―11a,9―12a間に隙間Sが発生し、
隙間Sは図17の如く接合する。即ち、隙間Sの室内側
に偏平角チャンネル型の目地材26を臨ませ、目地材2
6の裏面に支持材26―1を設け、これに逆チャンネル
状のクリップ材26―2を固設し、一方、壁パネル9―
11,9―12の端部間の裏面に同様のクリップ27,
27を固設し、目地材26のクリップ26―2、壁パネ
ル9―11,9―12のクリップ27を外側から断面逆
L型のホルダー28,18で把持し、クリップ26―
2,27とホルダー28,28とをビス29…で結着し
た。ホルダー28…は上下に離間して配設されている。
尚、クリップ26―2の裏面には、弾性作用を有する爪
片30,30をホルダー28…に合せて上下に離間して
臨ませ、夫々を各クリップ26―2,26―2の外側面
に係止し、爪片30は調節ビス31でホルダー28に螺
合させ、目地材26を弾性的に壁パネル9―11,9―
12の突き合わせ端部の室内側から当接させ、端部相互
のズレを調整することができるように構成されている。
In the unit 1, 51, the wall panels 9-11 and 9-12 which are arranged linearly at the end of the room on the joining side have a gap S between the abutting ends 9-11a and 9-12a. ,
The gap S is joined as shown in FIG. That is, the flat channel type joint material 26 faces the indoor side of the gap S, and the joint material 2
6, a support member 26-1 is provided on the back surface, and an inverted channel-shaped clip member 26-2 is fixed to the support member 26-1.
A similar clip 27, on the back surface between the ends of 11, 9-12
27, and the clips 26-2 of the joint material 26 and the clips 27 of the wall panels 9-11 and 9-12 are gripped from outside by holders 28 and 18 having an inverted L-shaped cross section.
2, 27 and holders 28, 28 were connected with screws 29. The holders 28 are vertically separated from each other.
In addition, on the back surface of the clip 26-2, the nail pieces 30, 30 having an elastic action are vertically separated from each other so as to match with the holder 28, and each of them is placed on the outer surface of each of the clips 26-2, 26-2. The nail piece 30 is screwed into the holder 28 with the adjusting screw 31 to resiliently join the joint material 26 to the wall panels 9-11, 9-.
The abutting ends of the twelve are abutted from the indoor side, so that the deviation between the ends can be adjusted.

【0037】一方、ユニット1,51の通路9―3,5
2―3に臨むユニット1,51の各壁パネル9―13,
9―14は、夫々の外側面が極めて近接、或いは当接し
て平行に配設され、この部分では壁パネルは二重とな
る。このように平行し、二重の壁パネルとなる部分の通
路9―3,52―3に臨む端部9―13a,9―14a
には、高さ方向全域に亘り化粧材を兼ねる目地材32を
貼設し、この間の隙間を図16の如く塞ぐ。
On the other hand, passages 9-3, 5 of units 1 and 51
Each of the wall panels 9-13 of the unit 1 and the unit 51 facing the 2-3,
9-14, the respective outer surfaces are disposed in close proximity or in abutment in parallel, and the wall panel is doubled in this portion. The end portions 9-13a and 9-14a facing the passages 9-3 and 52-3 of the portion which becomes parallel and become a double wall panel in this way.
, A joint material 32 also serving as a decorative material is attached over the entire area in the height direction, and a gap therebetween is closed as shown in FIG.

【0038】以上の他、図16に示すように出入口9―
2には開閉扉33を、又トイレブース10―1の出入口
には開閉扉34を設け、手洗いルーム側の出入口52―
2は開放したままとした。
In addition to the above, as shown in FIG.
2 is provided with an opening / closing door 33, and an opening / closing door 34 is provided at the entrance of the toilet booth 10-1.
2 was left open.

【0039】図18はユニット1,51の天井板14,
14の接合を示し、天井板14,14の接合端部14―
1,14―1間には隙間S1が発生する。図18はユニ
ット1,51の通路部の天井接続部を示す。天井板1
4,14の上方には補強梁12,12の端部12―1,
12―1が隙間をもって対向し、補強梁12,12の端
部12―1,12―1の下面にはブラケット35,35
を垂下し、ブラケット35,35に図示しない壁パネル
の縦枠部が結合され、補強梁12,12と壁パネルを接
続する。一方、補強梁12,12の下方には天井板1
4,14は端部14―1,14―1間に隙間S1をもっ
て対向し、隙間S1を塞ぐ目地板36をこの間に配設す
る。具体的には、各天井板14,14の対向する端部1
4―1,14―1横向きコ字型の係止部材37,37を
対称的に取付け、これに対称的に突設する棚部37―
1,37―1を設け、一方、隙間S1を塞ぐ断面凹型の
目地板36を用意し、これの左右に係止部36―1,3
6―1を突設し、各係止部36―1を係止部材37の棚
部37―1上に載置し、目地板36を係止し、天井板1
4,14間の隙間S1を塞いだ。
FIG. 18 shows the ceiling plate 14 of the units 1 and 51,
14 shows the joints of the ceiling plates 14, 14.
A gap S1 is generated between 1, 14-1. FIG. 18 shows a ceiling connection portion of the passage section of the units 1 and 51. Ceiling board 1
Above 4 and 14, the end 12-1 of the reinforcing beam 12, 12
12-1 are opposed to each other with a gap, and brackets 35, 35 are provided on the lower surfaces of the ends 12-1, 12-1 of the reinforcing beams 12, 12.
And the vertical frames of the wall panel (not shown) are connected to the brackets 35, 35 to connect the reinforcing beams 12, 12 to the wall panel. On the other hand, the ceiling plate 1 is located below the reinforcing beams 12 and 12.
4 and 14 face each other with a gap S1 between the ends 14-1 and 14-1, and a joint plate 36 for closing the gap S1 is disposed therebetween. More specifically, the opposite end 1 of each ceiling plate 14
4-1 and 14-1 The U-shaped locking members 37 and 37 are symmetrically mounted, and the shelf 37 protrudes symmetrically therefrom.
1, 37-1, and a joint plate 36 having a concave cross section for closing the gap S1 is provided.
6-1 is protrudingly provided, each locking portion 36-1 is placed on the shelf 37-1 of the locking member 37, the joint plate 36 is locked, and the ceiling plate 1 is locked.
The gap S1 between 4, 14 was closed.

【0040】図19は天井板の接合の他の部分を示し、
目地材136の上部を延長して下方が左右に膨出した断
面がU字型とし、これの左右の上部を補強梁12,12
の端部12―1,12―1から垂下したブラケット3
5,35に連結し、目地材136の下部左右に天井板1
4,14の端部14―1,14―1が臨み、端部14―
1,14―1と目地材136の下部左右間には狭い隙間
S2,S2が発生する。この隙間を塞ぐべく、隙間S
2,S2間には樹脂等で形成した断面略C型の目地充填
材137,137を介装し、隙間S2,S2を塞いだ。
以上ユニット1,51の天井部分の隙間を塞ぐ目地構造
を説明したが、構造は上記に限られず任意である。
FIG. 19 shows another part of the joining of the ceiling plate.
The upper portion of the joint material 136 is extended to form a U-shaped cross section in which the lower portion bulges to the left and right.
3 hanging from the ends 12-1 and 12-1 of the bracket
5 and 35, and the ceiling plate 1
The end portions 14-1, 14-1 of the four and fourteen faces, and the end portion 14-
Narrow gaps S2 and S2 are generated between 1, 14-1 and the lower left and right of the joint material 136. To close this gap, the gap S
Joint fillers 137, 137 having a substantially C-shaped cross section formed of a resin or the like are interposed between S2 and S2 to close gaps S2 and S2.
The joint structure that closes the gap between the ceiling portions of the units 1 and 51 has been described above, but the structure is not limited to the above and is arbitrary.

【0041】以上のように、ユニット1,51の床部材
2,2相互を接合し、壁パネルを接合し、天井板を接合
してユニット1,51を一体化し、爾後、便器16,1
8の配管ユニット17,19、手洗い台53の給・排水
管の配管、接続、他の内装部品の組み付け、電気配線、
仕上げ等の作業を行なってプレファブトイレは完成す
る。このように、本発明においては、建築現場でのプレ
ファブトイレルームの組み立て、便器、手洗い台等の構
成機器の組み付け作業は一切無い。分割してモジュール
化した各ユニットを現場の設置フロアに搬入し、移動
し、キャスター、吊り金具の取外し、高さ、水平レベル
の調整、ユニット相互の床部材の接続、壁パネル、天井
の接続、機器の配管、配線工事のみで建築躯体内にプレ
ファブ式トイレを設置することができる。
As described above, the floor members 2 and 2 of the units 1 and 51 are joined to each other, the wall panels are joined, the ceiling plates are joined, and the units 1 and 51 are integrated.
8, the piping units 17 and 19, the plumbing and drainage pipes of the hand basin 53, connection, assembly of other interior parts, electric wiring,
After finishing and other operations, the prefab toilet is completed. Thus, in the present invention, there is no work of assembling the prefabricated toilet room and assembling the constituent devices such as the toilet bowl and the hand basin at the construction site. Each divided and modularized unit is transported to the installation floor at the site, moved, casters, hanging brackets removed, height and horizontal level adjustment, floor unit connection between units, wall panel, ceiling connection, A prefabricated toilet can be installed in the building skeleton only by equipment piping and wiring work.

【0042】図20乃至図25は、本発明にかかるプレ
ファブトイレのレイアウトの例を示し、図20は3個の
ユニット61,71,81を横に並設、接合した例で、
ユニット61は女子用トイレで便器を備えたトイレブー
ス62…を4個備える。これに隣接して手洗い台72、
掃除用流し73を設置したユニット71を接合し、さら
にユニット71に手洗い台82を有するユニット81を
並設、接合したものである。
FIGS. 20 to 25 show examples of the layout of a prefabricated toilet according to the present invention. FIG. 20 shows an example in which three units 61, 71 and 81 are arranged side by side and joined.
The unit 61 is provided with four toilet booths 62... Next to this is a hand wash basin 72,
A unit 71 provided with a cleaning sink 73 is joined, and a unit 81 having a hand washing stand 82 is juxtaposed and joined to the unit 71.

【0043】図21は、上記と同様の女子用ユニット6
1に、1個の手洗い台92、壁面にカウンター93等を
備えるユニット91を、又これに掃除用流し台102、
手洗い台103、隣接するカウンター部分の延長上にグ
ルーミングルーム104を備えるユニット101を接合
したものである。
FIG. 21 shows a female unit 6 similar to the above.
1, a unit 91 provided with one hand washbasin 92, a counter 93 on the wall surface, and a cleaning sink 102,
The hand washing stand 103 is formed by joining a unit 101 having a grooming room 104 on an extension of an adjacent counter portion.

【0044】図22はユニットを4個並設、接合してト
イレを構成した例を示し、実施例は男子用トイレを示
す。同タイプのユニット111,121を隣接して並設
し、ユニット111,121には洋風便器を備えるトイ
レブース112,122を備え、且つ小便器113,1
23を備える。ユニットの一方111に手洗い台13
2、掃除用流し133を設けたユニット131を並設
し、更に手洗い台142、仕切パネル143を備えるユ
ニット141を連設、並設したものである。
FIG. 22 shows an example in which four units are juxtaposed and joined to constitute a toilet, and the embodiment shows a men's toilet. Units 111 and 121 of the same type are juxtaposed and juxtaposed. Units 111 and 121 are provided with toilet booths 112 and 122 each having a Western-style toilet, and urinals 113 and 1 are provided.
23. Hand wash basin 13 on one side 111 of the unit
2. Units 131 provided with a cleaning sink 133 are arranged side by side, and a unit 141 provided with a hand wash basin 142 and a partition panel 143 are connected and arranged side by side.

【0045】図23は図22と同様のタイプのもので、
上記と同様のユニット111,121を並設し、ユニッ
ト121と141との間のユニットをユニット151と
し、ユニット151は手洗い台152が上記と異なり、
掃除用流し台153を備えるものである。
FIG. 23 is of the same type as FIG.
Units 111 and 121 similar to the above are arranged side by side, and a unit between the units 121 and 141 is referred to as a unit 151.
A cleaning sink 153 is provided.

【0046】図24はユニットを4個並設したタイプの
他の実施例を示し、上記と同様のユニット111にユニ
ット161を並設し、ユニット161は、トイレブース
162を1個とし、これに隣接して掃除用流し163を
設け、反対側の壁面内側には小便器164を配設し連設
したユニット171は手洗い台172を備え、これに並
設したユニット181は幅が小さく、上記手洗い台17
2と接続する1個の手洗い台182を備え、且つ仕切パ
ネル183を備える。
FIG. 24 shows another embodiment in which four units are arranged side by side. A unit 161 is arranged side by side with the same unit 111 as described above, and the unit 161 has one toilet booth 162, and A cleaning sink 163 is provided adjacently, and a urinal 164 is disposed on the inner wall surface on the opposite side. A unit 171 provided continuously has a hand washing stand 172, and a unit 181 arranged side by side has a small width. Stand 17
1 is provided with one hand washing basin 182 connected to the second washing machine 2 and a partition panel 183 is provided.

【0047】図25はユニットを4個並設したタイプの
更なる他の実施例を示す。ユニット111にユニット1
91を並設し、ユニット191は、1個のトイレブブー
ス192、小便器193を備え、掃除用流し194、手
洗い台195を備える。隣接して並設するユニット20
1は、上記手洗い台195と接続する手洗い台202、
仕切パネル203を備え、反対側の壁面に2連装の手洗
い台204を備える。ユニット201の外側に幅の小さ
いユニット211を並設し、このユニットは出入口ユニ
ットで、仕切パネル212を備える。
FIG. 25 shows still another embodiment of the type in which four units are juxtaposed. Unit 1 to Unit 111
The unit 191 includes one toilet booth 192, a urinal 193, a cleaning sink 194, and a hand washing stand 195. Units 20 juxtaposed side by side
1 is a hand basin 202 connected to the hand basin 195,
A partition panel 203 is provided, and a double hand wash basin 204 is provided on the opposite wall surface. A unit 211 having a small width is arranged outside the unit 201. This unit is an entrance / exit unit and includes a partition panel 212.

【0048】以上のようにユニット内の機器のレイアウ
トは自由とし、適宜数のユニットを組合せて必要、最適
のプレファブトイレを形成する。
As described above, the layout of the equipment in the unit is free, and an appropriate number of units are combined to form an optimal prefab toilet.

【0049】[0049]

【発明の効果】以上で明らかなように本発明によれば、
本発明の主要な構成要件である請求項1では、 下面にキ
ャスターを着脱自在に取り付け、周囲に吊り金具を取付
けたフレーム及び該フレームの上に敷設され、該キャス
ター取付部位を開放部とした床板部材とからなる床部材
に、壁パネルを建て込み、且つ、壁パネル上部に天井を
設けて複数のトイレルームユニットを形成し、複数のト
イレルームユニットの一方に便器等を内装、設置してモ
ジュール化したトイレスペースユニットを組み立ててト
イレスペースルームユニットを組み立てる工程、及びト
イレルームユニットの他方に洗面台等を内装、設置して
モジュール化した手洗いスペースユニットを組み立てて
手洗いスペースユニットを組み立てる工程と、トイレス
ペースユニット及び手洗いスペースユニットを施工現場
に搬送する工程と、トイレスペースユニット及び手洗い
スペースユニットを、施工現場で吊り金具を介してクレ
ーン等で吊下げ、建築躯体の床面に夫々を載置する工
程、及び該各ユニットを設置床面にキャスターを介して
建築躯体の設置床面上を移動させ、該各ユニットの建築
躯体の床面上の設置位置を調整する工程と、トイレスペ
ースユニット及び手洗いスペースユニットの各床部材の
フレームの対向する接合部を突き当て、該各ユニットの
床部材をジャッキアップして設置床面から浮上させ、キ
ャスターを取外し、且つ床部材と設置床面間の高さを調
節し、床面に据え付ける工程と、トイレスペースユニッ
ト及び手洗いスペースユニットの各床部材のフレームの
対向する接合部に設けられた床板部材を敷設していない
空間部を介して該ユニットの各床部材の突合せたフレー
ム接合部を結合し、結合後該空間部に床板部材を敷設し
て塞ぎ、各ユニットの床板部材の突合せ端部間に目地材
を介装し、各ユニットの床板部材を接合する工程と、ト
イレスペースユニット及び手洗いスペースユニットの接
合する各壁パネル間の隙間に目地材を介装し、該各壁パ
ネル相互を接合する工程、及び各ユニットの接合する天
井板の接合端部間の隙間に目地材を介装し、該各天井板
を接合する工程と、トイレスペースユニット及び手洗い
スペースユニットの水廻り機器の配管等の工程、必要に
応じた室内の内装等の仕上げ工程とでプレファ ブトイレ
を施工方法するようにした。 従って、建築物の内部にプ
レファブトイレを設置する際、トイレルームを所定の大
きさにモジュール化し、これを複数のユニットとして便
器や間仕切りを備えるトイレブース、手洗い台等を内装
してユニット化して工場で予め組み立て、現場に搬送し
て建築物の内部に搬入し、モジュール化された必要とす
るユニットを並設、接合してトイレを設置するようにし
ことで、先ず、現場での狭い環境下での複雑、面倒な
組み立て作業が無くなり、作業は吊り金具、キャスター
の取外し、高さ調節、開口部の床貼り、床相互の接合、
壁パネルの連結、天井の連結、配管、配線等の工事のみ
となり、現場での作業、工事が極めて少なくなり、且つ
簡易化し、従来に比し作業、工事の大幅な簡素化、省力
化が図れ、又工期も極めて短くなり、工期の大幅な短縮
が図れる。
As apparent from the above, according to the present invention,
In claim 1, which is a main component of the present invention, a key is provided on the lower surface.
Attachments can be attached and detached, and hanging brackets are attached around
Girder frame and the cascade
Floor member consisting of a floor plate member with an opening at the mounting part
A wall panel, and a ceiling above the wall panel
To form multiple toilet room units and multiple
A toilet is installed and installed on one side of the
Assemble the joule toilet unit
The process of assembling the ile space room unit, and
Install and install a wash basin etc. on the other side of the Ile room unit
Assemble a modular hand wash space unit
The process of assembling the hand washing space unit and the toilet
Pace unit and hand washing space unit at construction site
To the toilet space unit and hand washing
At the construction site, the space unit is
And hanging them on the floor of the building frame
And each unit is installed on the floor via a caster.
Move the building frame on the floor, and
Adjusting the installation position of the building on the floor,
Floor unit and hand washing space unit
Abut the opposite joints of the frame, and
Jack up the floor members, lift them up from the installation floor,
Remove the caster and adjust the height between the floor member and the installation floor.
And the floor installation process, and the toilet space unit
Of the floor and frame of each floor member of the hand washing space unit
Do not lay the floorboard members provided at the facing joints
The butted frame of each floor member of the unit via a space
After joining, a floor plate member is laid in the space.
Between the butted ends of the floor panel members of each unit.
Interposing the floor panel members of each unit,
Connection of the erase space unit and hand wash space unit
Joints are interposed in the gaps between the wall panels to be joined, and
The process of joining the panels and the ceiling of each unit
A joint material is interposed in the gap between the joint ends of the well plate, and each ceiling plate
And the toilet space unit and hand washing
Necessary processes such as piping of space unit water supply equipment
In the finishing process of the interior, such as the corresponding indoor Purefa Butoire
The construction method was used. Therefore, when installing a prefabricated toilet inside a building, the toilet room is modularized to a predetermined size, and the unit is constructed as a plurality of units with a toilet booth equipped with toilets and partitions, a hand wash basin, etc. By assembling in advance, transporting it to the site and carrying it inside the building, juxtaposing the necessary modularized units, joining and installing the toilet , first of all, in a narrow environment at the site The complicated and troublesome assembling work is eliminated, and the work is performed by removing the hanging bracket, removing the casters, adjusting the height, attaching the floor to the opening, joining the floor,
Only wall panel connection, ceiling connection, plumbing, wiring, etc. are required, and the work and construction on site is extremely reduced and simplified, and the work and construction are greatly simplified and labor-saving compared to the past. Also, the construction period becomes extremely short, and the construction period can be greatly reduced.

【0050】次に、ユニットは工場で予め組み立てるの
で、部品の調達、組み立て時の調整等が容易であり、且
つ建築現場と異なり、広い、作業し易い環境下で組み立
て作業が行なえ、能率的、合理的な組み立て作業が行な
え、又これにより品質管理等が行届き、品質に優れたプ
レファブトイレを製作することができ、現場での作業員
が削減することができること、工場で組み立てるので組
み立てが容易であること等からコストダウンが図れる
他、モジュール化したユニットを多数用意することによ
り、各種のバリエーションに富んで、又利用状況、設置
現場に最適なプレファブトイレが容易に得られる等の多
大の利点がある。
Next, since the unit is pre-assembled at the factory, it is easy to procure parts, adjust at the time of assembling, etc. and, unlike the construction site, can perform assembling work in a wide and easy-to-work environment. Reasonable assembling work can be performed, quality control etc. can be reached by this, and prefab toilets with excellent quality can be manufactured, the number of workers at the site can be reduced, and assembling is easy at the factory. In addition to being able to achieve cost reductions due to the fact that there are many advantages, such as preparing a large number of modularized units, it is possible to easily obtain a prefab toilet that is rich in various variations and that is optimal for the use situation and installation site There is.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の方法を説明する模式図FIG. 1 is a schematic diagram illustrating the method of the present invention.

【図2】モジュール化されたトイレスペースユニット等
を建築物に搬入する状態を説明する図
FIG. 2 is a diagram illustrating a state in which a modularized toilet space unit and the like are carried into a building.

【図3】上記ユニットの吊り下げ状態を示す説明的斜視
FIG. 3 is an explanatory perspective view showing a suspended state of the unit.

【図4】図3の要部の拡大縦断側面図4 is an enlarged vertical sectional side view of a main part of FIG. 3;

【図5】キャスター部分の斜視図FIG. 5 is a perspective view of a caster portion.

【図6】吊り金具部分の斜視図FIG. 6 is a perspective view of a hanging bracket.

【図7】床部材のフレームを示す平面図FIG. 7 is a plan view showing a frame of a floor member.

【図8】トイレスペースユニットの平面図FIG. 8 is a plan view of the toilet space unit.

【図9】手洗いスペースユニットの平面図FIG. 9 is a plan view of a hand washing space unit.

【図10】キャスターを取外すべくユニットをジャッキ
アップした状態を示す説明図
FIG. 10 is an explanatory view showing a state where a unit is jacked up to remove a caster;

【図11】キャスターを取外し、高さ調節を行なう状態
を示した説明図
FIG. 11 is an explanatory view showing a state in which casters are removed and height adjustment is performed.

【図12】据え付け状態の説明図FIG. 12 is an explanatory view of an installed state.

【図13】トイレスペースユニットと、手洗いスペース
ユニットとの接合を示す説明的斜視図
FIG. 13 is an explanatory perspective view showing the connection between the toilet space unit and the hand washing space unit.

【図14】同接合部を示す平面図FIG. 14 is a plan view showing the joint.

【図15】床部材の接合を示す要部拡大断面図FIG. 15 is an enlarged sectional view of a main part showing the joining of floor members.

【図16】接合してトイレを構成した平面図FIG. 16 is a plan view of a toilet constructed by joining.

【図17】壁パネルの接合の一例を示す拡大断面図FIG. 17 is an enlarged sectional view showing an example of joining of wall panels.

【図18】天井部の接合の一例を示す拡大断面図FIG. 18 is an enlarged cross-sectional view showing an example of bonding of a ceiling portion.

【図19】同他の例を示す拡大断面図FIG. 19 is an enlarged sectional view showing another example.

【図20】上記ユニットを3個組合せた例を示す模式的
平面図
FIG. 20 is a schematic plan view showing an example in which three units are combined.

【図21】他の例を示す模式的説明図FIG. 21 is a schematic explanatory view showing another example.

【図22】上記ユニットを4個組合せた例を示す模式的
説明図
FIG. 22 is a schematic explanatory view showing an example in which four units are combined.

【図23】同他の例を示す模式的説明図FIG. 23 is a schematic explanatory view showing another example.

【図24】同他の例を示す模式的説明図FIG. 24 is a schematic explanatory view showing another example.

【図25】同更なる他の例を示す模式的説明図FIG. 25 is a schematic explanatory view showing still another example.

【符号の説明】[Explanation of symbols]

1,51,61,71,81,91,101,111,
121,131,141,151,161,171,1
81,191,201…ユニット、 2,2a…床部
材、 2−1…空間部、 3…フレーム、 4…キャス
ター、 5…吊り金具、 8…床板部材、 9―1…壁
パネル、 9―2,53―2…出入口、9―3,53―
3…通路、 14…天井、 16…便器、 18…小便
器、 23…高さ調節ボルト、 24…据え付け用スペ
ーサ、 26…目地材、 36,137…目地材、
3…手洗い台 A…工場、 T…搬送用トラック、 C
…クレーン。
1,51,61,71,81,91,101,111,
121, 131, 141, 151, 161, 171, 1
81, 191, 201 unit, 2, 2a floor member, 2-1 space part, 3 frame, 4 casters, 5 hanging bracket, 8 floor plate member, 9-1 wall panel, 9-2 , 53-2 ... Entrance, 9-3,53-
3 ... passage, 14 ... ceiling, 16 ... toilet bowl, 18 ... urinal, 23 ... height adjustment bolt, 24 ... installation spacer, 26 ... joint material, 36,137 ... joint material, 5
3 ... hand wash basin A: factory, T: transport truck, C
…crane.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 鍋田 孝市 福岡県北九州市小倉北区中島2丁目1番 1号 東陶機器株式会社内 (56)参考文献 特開 平1−127765(JP,A) 特開 昭62−269890(JP,A) 特開 昭57−24747(JP,A) (58)調査した分野(Int.Cl.7,DB名) E04H 1/12 E04B 1/348 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Takashi Nabeta 2-1-1 Nakajima, Kokurakita-ku, Kitakyushu-shi, Fukuoka Prefecture Totoki Co., Ltd. (56) References JP-A-1-127765 (JP, A JP-A-62-269890 (JP, A) JP-A-57-24747 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) E04H 1/12 E04B 1/348

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 下面にキャスターを着脱自在に取り付
け、周囲に吊り金具を取付けたフレーム及び該フレーム
の上に敷設され、該キャスター取付部位を開放部とした
床板部材とからなる床部材に、壁パネルを建て込み、且
つ、壁パネル上部に天井を設けて複数のトイレルームユ
ニットを形成し、複数のトイレルームユニットの一方に
便器等を内装、設置してモジュール化したトイレスペー
スユニットを組み立ててトイレスペースルームユニット
を組み立てる工程、及びトイレルームユニットの他方に
洗面台等を内装、設置してモジュール化した手洗いスペ
ースユニットを組み立てて手洗いスペースユニットを組
み立てる工程と、 前記トイレスペースユニット及び手洗いスペースユニッ
トを施工現場に搬送する工程と、前記トイレスペースユニット及び手洗いスペースユニッ
トを、 施工現場で上記吊り金具を介してクレーン等で吊
下げ、建築躯体の床面に夫々を載置する工程、及び
ユニットを設置床面にキャスターを介して建築躯体の
置床面上を移動させ、該各ユニットの建築躯体の床面上
の設置位置を調整する工程と、トイレスペースユニット及び手洗いスペースユニッ
トの各床部材のフレームの対向する接合部を突き当て、
該各ユニットの床部材をジャッキアップして設置床面か
ら浮上させ、キャスターを取外し、且つ床部材と設置床
面間の高さを調節し、床面に据え付ける工程と、 トイレスペースユニット及び手洗いスペースユニッ
トの各床部材のフレームの対向する接合部に設けられた
床板部材を敷設していない空間部を介して該ユニットの
各床部材の突合せたフレーム接合部を結合し、結合後該
空間部に床板部材を敷設して塞ぎ、各ユニットの床板部
材の突合せ端部間に目地材を介装し、各ユニットの床板
部材を接合する工程と、 トイレスペースユニット及び手洗いスペースユニッ
トの接合する各壁パネル間の隙間に目地材を介装し、該
各壁パネル相互を接合する工程、及び各ユニットの接合
する天井板の接合端部間の隙間に目地材を介装し、該各
天井板を接合する工程と、 前記 トイレスペースユニット及び手洗いスペースユニッ
トの水廻り機器の配管等の工程、必要に応じた室内の内
装等の仕上げ工程と、 からなることを特徴とするプレファブトイレの施工方
法。
1. A caster is detachably mounted on a lower surface .
Frame with hanging metal fittings around it , and the frame
And the caster mounting part was made an open part
A wall panel is erected on a floor member composed of a floor panel member, and a ceiling is provided above the wall panel to form a plurality of toilet room units, and a toilet or the like is installed and installed in one of the plurality of toilet room units. Assembling the modularized toilet space unit and toilet space room unit
The process of assembling, and assembling and installing a hand wash space unit with a wash basin installed and installed on the other side of the toilet room unit and assembling the hand wash space unit
A step that make viewing, and the step of conveying the toilet space unit and hand washing space unit to the construction site, the toilet space unit and hand washing space unit
Preparative, hung by a crane or the like through the hanger at the construction site, the step of placing the respective floor surface of the building skeleton, and setting of the building skeleton via a caster the respective units to the installation floor <br /> Move the floor on the floor and move it on the floor of the building frame of each unit.
And adjusting the installation position of the front Symbol toilet space unit and hand washing space unit
Abut the opposite joint of the frame of each floor member of the
Jack up the floor member of each unit and install it on the floor.
From the floor, remove the casters, and the floor member and installation floor
Adjust the height between the surfaces, the step of installing the floor, before Symbol toilet space unit and hand washing space unit
Provided at the opposite joint of the frame of each floor member
Of the unit through a space where no floorboard member is laid
Join the butted frame joints of each floor member, and after joining
Lay and close the floor panel members in the space, and
A jointing material is interposed between the butt ends of the materials, and the floor panel of each unit
And bonding the members, before Symbol toilet space unit and hand washing space unit
Joints between the wall panels to be joined
The process of joining each wall panel and joining each unit
Joint material is interposed in the gap between the joining ends of the ceiling plate to be
And bonding the ceiling plate, the process of piping of water around devices of the toilet space unit and hand washing space unit, and finishing of the interior or the like of the room as needed, to consist of the construction of prefab toilet, characterized in Method.
【請求項2】 記トイレスペースユニットは、トイレ
ルームユニット内にトイレブースを画成する仕切パネ
ル、便器、必要に応じて壁パネルの一部に出入口、通路
を設けた請求項1のプレファブトイレの施工方法。
2. A pre-Symbol toilet space unit, toilet room unit divider panel defining a toilet booth in toilet, entrance to the part of the wall panels as required, Prefab toilet of claim 1 provided with a passage Construction method.
【請求項3】 記手洗いスペースユニットは、トイレ
ルームユニット内に手洗い台、仕切パネル等を備え、必
要に応じて壁パネルの一部に出入口、通路を設けた請求
項1のプレファブトイレの施工方法。
3. A pre-Symbol handwashing space units, hand washing stand in the toilet room unit, provided with a partition panel or the like, entrance to the part of the wall panels as required, the construction of the pre-fab toilet of claim 1 provided with a passage Method.
【請求項4】 記トイレスペースユニット、手洗いス
ペースユニットは前者が複数個、後者が少なくとも1個
以上用意し、夫々を並設して接合し、多人数利用式の建
築物内のプレファブパブリックトイレを組み立てるよう
にした請求項1のプレファブトイレの施工方法。
4. Before SL toilet space units, hand washing space units plurality is the former, the latter is provided at least one or more, and joined side by side respectively, Prefab public toilet in building multiplayer use formula The method for constructing a prefabricated toilet according to claim 1, wherein the prefabricated toilet is assembled.
JP3228285A 1991-08-13 1991-08-13 Construction method of prefab toilet Expired - Lifetime JP3016635B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3228285A JP3016635B2 (en) 1991-08-13 1991-08-13 Construction method of prefab toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3228285A JP3016635B2 (en) 1991-08-13 1991-08-13 Construction method of prefab toilet

Publications (2)

Publication Number Publication Date
JPH0544347A JPH0544347A (en) 1993-02-23
JP3016635B2 true JP3016635B2 (en) 2000-03-06

Family

ID=16874080

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3228285A Expired - Lifetime JP3016635B2 (en) 1991-08-13 1991-08-13 Construction method of prefab toilet

Country Status (1)

Country Link
JP (1) JP3016635B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6360597B1 (en) * 2017-06-12 2018-07-18 株式会社エポスカード Mobile IC card issuance booth
JP7042472B2 (en) * 2017-06-20 2022-03-28 Sus株式会社 Buildings and construction methods
CN108331372A (en) * 2018-04-17 2018-07-27 苏州重明鸟厕所文化发展股份有限公司 Modularization closet system
CN108678431A (en) * 2018-06-06 2018-10-19 北京平突科技有限公司 A kind of mounting device and its installation method for monolithic architecture module in building
JP7392114B2 (en) * 2020-03-31 2023-12-05 株式会社日立製作所 Production system and its assembly method

Also Published As

Publication number Publication date
JPH0544347A (en) 1993-02-23

Similar Documents

Publication Publication Date Title
US5724773A (en) Building module providing readily accessible utility connections
EP3889374B1 (en) Method for constructing buildings
JPS62164970A (en) Building apparatus for multistair building
NZ548289A (en) Building system
JP3016635B2 (en) Construction method of prefab toilet
US3924279A (en) Hanger and support structure for toilet bowls and the like
JP2750833B2 (en) House with earthquake-resistant evacuation room
JP3016633B2 (en) Construction method of prefab toilet
JP2587052Y2 (en) Suspension structure of prefabricated building
JP2563136Y2 (en) Prefabricated building unit wall connection structure
AU2011201797B2 (en) Prefabricated Room Assembly
JP2024039168A (en) Toilet forming unit and toilet forming method
JPH0335769Y2 (en)
JPH0717729Y2 (en) Back wall reinforcement
JP3019502U (en) House with earthquake-resistant evacuation room
JP2571347Y2 (en) Ceiling connection structure of prefabricated building unit
JPH06158878A (en) Dwelling unit variable housing system
JPH0542139Y2 (en)
JPH0754371Y2 (en) Toilet bowl installation structure
JP2890520B2 (en) How to fix the piping unit
JPS6355272A (en) Large toilet room
DE3334315A1 (en) Fitting system for bathrooms and sanitary facilities
JPH0335770Y2 (en)
JP2537256B2 (en) How to assemble a prefabricated toilet
JPH0928476A (en) Installing method for kitchen equipment and equipment/ member to be used for the same

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19991214