JP3802715B2 - Mounting structure of reinforced temporary material in room box - Google Patents

Mounting structure of reinforced temporary material in room box Download PDF

Info

Publication number
JP3802715B2
JP3802715B2 JP23153999A JP23153999A JP3802715B2 JP 3802715 B2 JP3802715 B2 JP 3802715B2 JP 23153999 A JP23153999 A JP 23153999A JP 23153999 A JP23153999 A JP 23153999A JP 3802715 B2 JP3802715 B2 JP 3802715B2
Authority
JP
Japan
Prior art keywords
floor
ceiling
room box
frame
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP23153999A
Other languages
Japanese (ja)
Other versions
JP2001055792A (en
Inventor
詔平 黒田
和夫 中原
幹貴 中林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP23153999A priority Critical patent/JP3802715B2/en
Publication of JP2001055792A publication Critical patent/JP2001055792A/en
Application granted granted Critical
Publication of JP3802715B2 publication Critical patent/JP3802715B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、ボックス式建築物を構成する部屋ボックスを補強するための補強仮設材の取付け構造に関する。
【0002】
【従来の技術】
近年、建築物の構築にあたって、現場作業の軽減による工期の短縮及び均一な施工を実現するために、予め設備の整った工場等において複数の箱形の部屋ボックスを製造し、これら部屋ボックスを現場で組み合わせて建築物を完成させるといった工法が採用されている。
【0003】
この種の部屋ボックスの中には、天井フレームに面材を取り付けてなる天井、床フレームに面材を取り付けてなる床、及び軸フレームに面材を取り付けてなる壁を複合化したものがある。
【0004】
【発明が解決しようとする課題】
一般に、上記のような部屋ボックスにおいては、特に天井と床の間に軸フレームが配されていない開放部を有する場合、単体で水平力、垂直力に耐えることができず、工場から現場への移送に際して、クレーンで吊り上げると、変形を生じてしまう虞がある。このため、部屋ボックスをクレーンで吊り上げるときには、特殊な大型治具を必要としていた。
【0005】
本発明は、上記に鑑み、クレーン吊り上げ時の変形を、簡単且つ確実に防止することができる補強仮設材の取付け構造を提供することを目的とする。
【0006】
【課題を解決するための手段】
そこで、上記課題を解決するため、この発明では、天井、床及び壁とからなる部屋ボックスにおいて、壁が設けられていない開放部に取り付けられる補強仮設材の取付け構造であって、天井の下面には、L字形接合金具の水平片部を、その垂直片部が下向きとなるようにして取り付けるとともに、床の上面には、同じくL字形接合金具の水平片部を、その垂直片部が上方に突出するようにして取り付け、前記補強仮設材は、前記部屋ボックスを吊り上げるクレーンワイヤーの作用方向に沿ってハ字型に配される一対の方杖と、これら方杖間のほぼ中央位置に配される仮設柱とからなり、これら方杖及び仮設柱の上端及び下端を、上下の垂直片部へそれぞれ接合するようにした。
【0007】
また、接合金具の垂直片部には、天井若しくは床の前記開放部側の端縁方向に沿って、それぞれ複数の取付け穴を形成した。
【0008】
さらに、接合金具を、天井フレーム又は床フレームに取り外し可能に取り付けるとともに、方杖及び仮設柱を、それら接合金具に取り外し可能に取り付けた。
【0009】
【発明の実施の形態】
以下、本発明の一実施形態を図面に基づいて詳細に説明する。図1は、本発明の一実施形態に係る部屋ボックスの一例を示す斜視図、図2は、同じくその分解斜視図である。
【0010】
本実施形態に係る部屋ボックス(2)は、予め設備の整った工場で製造されるもので、例えば図1及び図2に示すように、天井としての天井パネル(10)と、床としての床パネル(11)と、これら天井パネル(10)と床パネル(11)との間に差し渡した壁体(12)(13)(14)とから箱形に形成されている。
【0011】
天井パネル(10)は、天井フレーム(15)と、この天井フレーム(15)の下面に取り付けられたパーティクルボード及び内装面材からなる天板(16)とからなる。
【0012】
天井フレーム(15)は、軽量形鋼からなる一対の長尺横材(17)(17)と、同じく軽量形鋼からなる一対の短尺横材(18)(18)とを方形枠状に接合してなり、長尺横材(17)(17)間には、複数の横桟(19)(19)…が適宜間隔をあけて差し渡されている。そして、この天井フレーム(15)の枠内には、断熱材(20)(20)…が充填されている。また、天井フレーム(15)における一方の長尺横材(17)及び両方の短尺横材(18)(18)の側面には、一対のL字形の固定プレート(21)(21)が夫々取り付けられている。
【0013】
さらに、両方の長尺横材(17)(17)の上面には、紐状体である4本のクレーンワイヤー(28)(28)…を引っ掛ける一対のアイボルト(29)(29)が夫々取り外し可能に螺合されている。なお、アイボルト(29)(29)…に引っ掛けられた4本のクレーンワイヤー(28)(28)…は、天井パネル(10)の中央上方で1本に束ねられ、クレーンで引き上げられるようになっている。
【0014】
また、他方の長尺横材(17)には、その中央位置及び中央と両端とのほぼ中間の位置に、合計3個の接合金具(26)(26)…が取り外し可能に取り付けられている。
【0015】
この接合金具(26)は、図3に示すように、水平片部(22)と垂直片部(23)とからなるL字形のプレートで、これら水平片部(22)及び垂直片部(23)には、取付け穴としての3個のボルト穴(24)(24)…がそれぞれ形成されている。そして、天板(16)を切り欠くことによって、露出した他方の長尺横材(17)の下面に、接合金具(26)の水平片部(22)を当接させて、互いに一致した長尺横材(17)のボルト穴(25)(25)…と水平片部(22)のボルト穴(24)(24)…に下方から挿入したボルト(27)(27)…へ、ナット(70)(70)…を螺合して締め付けることで、接合金具(26)は、その垂直片部(23)が下向きになるようにして長尺横材(17)に取り付けられるようになっている。
【0016】
床パネル(11)は、床フレーム(30)と、この床フレーム(30)の上面に取り付けられたパーティクルボードからなる床板(31)とからなる。床フレーム(30)は、軽量形鋼からなる一対の長尺横材(32)(32)と、同じく軽量形鋼からなる一対の短尺横材(33)(33)とを方形枠状に接合してなり、長尺横材(32)(32)間には、複数の横桟(34)(34)…が適宜間隔をあけて差し渡されている。そして、床フレーム(30)における一方の長尺横材(32)及び両方の短尺横材(33)(33)には、一対のL字形の固定プレート(35)(35)…が夫々取り付けられている。
【0017】
また、他方の長尺横材(32)のには、その中央位置及び両端位置に、合計3個の接合金具(36)(36)…が取り外し可能に取り付けられている。
【0018】
この接合金具(36)は、図4に示すように、水平片部(37)と垂直片部(38)とからなるL字形のプレートで、これら水平片部(37)及び垂直片部(38)には、取付け穴としての3個のボルト穴(39)(39)…がそれぞれ形成されている。そして、床板(31)を切り欠くことによって、露出した他方の長尺横材(32)の上面に、接合金具(36)の水平片部(37)を当接させて、互いに一致した長尺横材(32)のボルト穴(42)(42)…と水平片部(37)のボルト穴(39)(39)…に上方から挿入したボルト(55)(55)…へ、ナット(56)(56)…を螺合して締め付けることで、接合金具(36)は、その垂直片部(38)が上向きになるようにして長尺横材(32)に取り付けられるようになっている。
【0019】
壁体(12)は、建築物の外壁を構成するもので、軸フレーム(40)と、この軸フレーム(40)の外面側に取り付けられた外壁材(41)と、軸フレーム(40)の内面側に断熱内壁枠(43)を介して取り付けられた内壁材(44)とからなる。軸フレーム(40)は、軽量形鋼からなる上下一対の横材(45)(45)と、同じく軽量形鋼からなる左右一対の縦材(46)(46)とを方形枠状にピン接合してなり、その上側の横材(45)が天井フレーム(15)における短尺横材(18)の固定プレート(21)(21)に固定され、その下側の横材(45)が床フレーム(30)における短尺横材(33)の固定プレート(35)(35)に固定され、これによって壁体(12)は、天井パネル(10)と床パネル(11)の短手方向に沿った一端部間に跨って配されている。
【0020】
壁体(13)は、建築物の間仕切り壁を構成するもので、壁体(12)に対向して天井パネル(10)と床パネル(11)の短手方向に沿った他端部間に跨って配されている。この壁体(13)は、方形枠状の軸フレーム(50)のみによって構成されているが、工場又は現場作業おいてその内面側に適宜内壁材(44)が取り付けられるようになっている。なお、この軸フレーム(50)も、壁体(12)の軸フレーム(40)と同様に軽量形鋼の横材(51)(51)及び縦材(52)(52)を方形枠状にピン接合してなり、その横材(51)(51)が対応する上下の固定プレート(21)(21)(35)(35)に夫々固定されている。
【0021】
壁体(14)は、壁体(12)と同様に建築物の外壁を構成するもので、並設された軸フレーム(57)(58)(59)と、これら軸フレーム(57)(58)(59)の外面側に取り付けられた外壁材(41)と、軸フレーム(57)(58)(59)の内面側に断熱内壁枠(43)を介して取り付けられた内壁材(44)とからなる。これら軸フレーム(57)(58)(59)は、壁体(12)の軸フレーム(40)と同様に軽量形鋼の横材及び縦材を方形枠状にピン接合してなるが、そのうちの1つの軸フレーム(57)の枠内には、ブレース(66)(66)が差し渡されて、この軸フレーム(57)部分が耐力壁を構成している。なお、軸フレーム(57)(58)(59)は、図示しないボルトによって互いに横綴りされている。
【0022】
そして、この壁体(14)は、その軸フレーム(58)(59)の上下端が、天井フレーム(15)における一方の長尺横材(17)及び床フレーム(30)の一方の長尺横材(32)の固定プレート(21)(21)…に夫々固定されて、天井パネル(10)と床パネル(11)の長手方向に沿った一端部間に跨って配されている。
【0023】
従って、上記構成の部屋ボックス(2)は、天井パネル(10)と床パネル(11)との間に、コ字型に並んだ壁体(12)(13)(14)を配置した構造となっており、天井パネル(10)と床パネル(11)の長手方向に沿った他端部間の面は開放されている。このような構造の場合、それ単体で構造的に独立して水平力や垂直力に耐えることができず、工場から現場への移送に際して、天井フレーム(15)のアイボルト(29)(29)…にクレーンワイヤー(28)(28)…を引っ掛けて、部屋ボックス(2)を吊り上げると、変形を生じる虞がある。
【0024】
そこで、部屋ボックス(2)の開放部(60)側には、部屋ボックス(2)の変形を防止するための補強仮設材(61)を取り付けるようにしている。この補強仮設材(61)は、吊り上げ時の開放部(60)側のクレーンワイヤー(28)(28)の作用方向に沿って、ハ字型に設けられた軽量形鋼からなる一対の方杖(62)(62)と、これら方杖(62)(62)間のほぼ中央位置に設けられた軽量形鋼からなる仮設柱(63)とから構成されている。
【0025】
これら方杖(62)(62)及び仮設柱(63)の上端は、図5に示すように、天井パネル(10)側の接合金具(26)の垂直片部(23)へ外側から当接した状態で、互いに一致した垂直片部(23)のボルト穴(24)と仮設材側のボルト穴(71)に外側から挿入したボルト(72)へ、ナット(73)を螺合して締め付けることで、取り外し可能に取り付けられている。また、下端は、床パネル(11)側の接合金具(36)の垂直片部(38)へ外側から当接した状態で、互いに一致した垂直片部(38)のボルト穴(39)と仮設材側のボルト穴(74)に外側から挿入したボルト(75)へ、ナット(76)を螺合して締め付けることで、取り外し可能に取り付けられている。
【0026】
この取付状態において、接合金具(26)(36)…の垂直片部(23)(38)…には、天井パネル(10)若しくは床パネル(11)の開放部(60)側の端縁方向、すなわち他方の長尺横材(17)(32)方向に沿ってボルト穴(24)(39)…が形成されているので、方杖(62)(62)や仮設柱(63)の取付位置をその方向に沿って微調節することができるようになっている。
【0027】
なお、上記の部屋ボックス(2)は、複数種類のうちの1つのタイプに過ぎず、この他にも各種タイプが用意されており、例えば、壁体(12)を外壁材(41)無しの間仕切り壁としたタイプ、或いは長手方向の壁体(14)を設けることなくその部分を開放部としたタイプ等がある。また。部屋ボックス(2)の適用場所に応じて、例えば、台所部分であればシステムキッチンを設置したり、洗面部分であれば洗面台やユニットバス等を設置する等、各種の内装が施されている。
【0028】
しかし、いずれのタイプも、ボックスとしての形状及び移送に際しての剛性を最低限確保できるように、天井フレーム(15)と床フレーム(30)との間に、少なくとも互いに対向する一対の軸フレームを差し渡した構造となっている点では共通している。
【0029】
このようにして工場で製造した各種の部屋ボックス(2)(2)…は、クレーンワイヤー(28)(28)…で順次吊り上げられてトラックに積載される。この吊り上げ時には、図1及び図6に示すように、クレーンワイヤー(28)(28)…が天井パネル(10)の中央上方からアイボルト(29)(29)…に向かって放射状に張られており、これらクレーンワイヤー(28)(28)…の引張力は、各軸フレーム(40)(50)(57)(58)(59)を介して床パネル(11)側に伝達されるだけでなく、開放部(60)側においても、方杖(62)(62)及び仮設柱(63)を介して床パネル(11)側に伝達される。従って、クレーンワイヤー(28)(28)…の引張力は、部屋ボックス(2)全体にまんべんなく分散されることになり、これによって部屋ボックスの(2)変形が防止される。
【0030】
特に、方杖(62)(62)をクレーンワイヤー(28)(28)の作用方向に沿ってハ字型に配置しているので、強度の弱い開放部(60)側においても、クレーンワイヤー(28)(28)の引張力を効率良く床パネル(11)側に伝達することができるとともに、クレーンワイヤー(28)(28)が引っ掛けられるアイボルト(29)(29)間に仮設柱(63)が存在するので、天井フレーム(15)の長尺横材(17)の座屈を確実に防止することができる。しかも、吊り上げた状態からトラックへ積載時、或いはトラックによる移送時に、部屋ボックス(2)に衝撃が加わっても、開放部(60)側には方杖(62)(62)及び仮設柱(63)があるので、ボックスとしての形状を確実に維持することができる。
【0031】
そして、トラックによって現場まで運搬された部屋ボックス(2)(2)…は、再びクレーンワイヤー(28)(28)…で吊り上げられて基礎上に順次設置される。そして、部屋ボックス(2)(2)…から方杖(62)(62)、仮設柱(63)、及び各種接合金具(26)(36)を取り外し、それら部屋ボックス(2)(2)…の上側に、構造梁、2階部分を構成する部屋ボックス(2)(2)…及び小屋組等を順次積み重ねることによって、建築物が構築されるようになっている。
【0032】
なお、本発明は、上記実施形態に限定されるものではなく、本発明の範囲内で上記の実施形態において多くの修正変更を加え得ることは勿論である。
【0033】
【発明の効果】
以上の説明から明らかなように、本発明の部屋ボックスによると、開放部側に補強仮設材をL字形接合金具を介して簡単に取り付けているので、枠状フレームを組み合わせた強度的に弱い構造であっても、従来のように大型の治具を用いることなく、クレーンワイヤーによる吊り上げ時の変形を防止することができる。
【0034】
また、接合金具の垂直片部には、天井若しくは床の端縁方向に沿って、複数の仮設材取付用の取付け穴が形成されているので、仮設材の取付位置を端縁方向に微調節することができ、仮設材を精度良く取り付けることができる。
【0035】
さらに、接合金具や補強仮設材は、取り外すことができるので、設計の妨げにならず、別の部屋ボックスの移送時には再度利用することも出来る。
【図面の簡単な説明】
【図1】本発明の一実施形態に係る部屋ボックスの一例を示す斜視図である。
【図2】同じくその分解斜視図である。
【図3】天井フレームへの接合金具の取付状態を示す分解斜視図である。
【図4】床フレームへの接合金具の取付状態を示す分解斜視図である。
【図5】天井フレームと接合金具の接合部、及び、床フレームと接合金具の接合部を示す断面図である。
【図6】クレーンワイヤーと方杖及び仮設柱との位置関係を示す図である。
【符号の説明】
(2) 部屋ボックス
(10) 天井
(11) 床
(12)(13)(14) 壁
(15) 天井フレーム
(26)(36) L字形接合金具
(22)(37) 水平片部
(23)(38) 垂直片部
(24)(39) 取付け穴
(30) 床フレーム
(60) 開放部
(61) 補強仮設材
(62) 方杖
(63) 仮設柱
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a structure for attaching a reinforcing temporary material for reinforcing a room box constituting a box-type building.
[0002]
[Prior art]
In recent years, when building a building, in order to shorten the work period by reducing the work on site and to achieve uniform construction, a plurality of box-shaped room boxes are manufactured in a factory equipped with facilities in advance, and these room boxes are installed on the site. The method of construction is completed by combining in order to complete the building.
[0003]
Among this type of room box, there is a composite of a ceiling in which a face material is attached to the ceiling frame, a floor in which the face material is attached to the floor frame, and a wall in which the face material is attached to the shaft frame. .
[0004]
[Problems to be solved by the invention]
In general, in a room box such as the above, especially when it has an open part where the shaft frame is not arranged between the ceiling and the floor, it cannot withstand horizontal force and vertical force by itself, and when transferring from the factory to the field If it is lifted by a crane, there is a risk of deformation. For this reason, when lifting the room box with a crane, a special large jig was required.
[0005]
In view of the above, it is an object of the present invention to provide an attachment structure for a reinforcing temporary member that can easily and reliably prevent deformation during crane lifting.
[0006]
[Means for Solving the Problems]
Therefore, in order to solve the above-mentioned problem, in the present invention, in a room box composed of a ceiling, a floor, and a wall, there is a mounting structure for a reinforcing temporary member that is attached to an open portion that is not provided with a wall. Install the horizontal piece of the L-shaped fitting so that the vertical piece is facing downward, and the horizontal piece of the L-shaped fitting on the upper surface of the floor. The reinforcing temporary member is mounted so as to protrude, and the reinforcing temporary member is disposed at a substantially central position between a pair of wands arranged in a C shape along the direction of operation of the crane wire that lifts the room box. The upper and lower ends of these wands and temporary columns were joined to the upper and lower vertical pieces, respectively.
[0007]
In addition, a plurality of attachment holes were formed in the vertical piece portion of the joining metal fitting along the edge direction of the open side of the ceiling or floor.
[0008]
Furthermore, the joining bracket was detachably attached to the ceiling frame or the floor frame, and the cane and the temporary pillar were detachably attached to the joining bracket.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a perspective view showing an example of a room box according to an embodiment of the present invention, and FIG. 2 is an exploded perspective view of the same.
[0010]
The room box (2) according to the present embodiment is manufactured in a factory equipped in advance. For example, as shown in FIGS. 1 and 2, a ceiling panel (10) as a ceiling and a floor as a floor are provided. It is formed in a box shape from the panel (11) and the wall bodies (12), (13), and (14) passed between the ceiling panel (10) and the floor panel (11).
[0011]
The ceiling panel (10) includes a ceiling frame (15) and a top plate (16) made of particle board and interior surface material attached to the lower surface of the ceiling frame (15).
[0012]
The ceiling frame (15) consists of a pair of long horizontal members (17) (17) made of lightweight steel and a pair of short horizontal members (18) (18) also made of lightweight steel in a square frame shape. Thus, a plurality of horizontal rails (19), (19),... Are passed between the long horizontal members (17), (17) at appropriate intervals. The ceiling frame (15) is filled with heat insulating materials (20) (20). A pair of L-shaped fixing plates (21) and (21) are attached to the side surfaces of one long cross member (17) and both short cross members (18) and (18) in the ceiling frame (15), respectively. It has been.
[0013]
Further, a pair of eyebolts (29) and (29) for hooking the four crane wires (28), (28), which are string-like bodies, are removed from the upper surfaces of both long horizontal members (17), (17), respectively. It is screwed together. The four crane wires (28), (28) ... that are hooked on the eyebolts (29), (29), are bundled together at the upper center of the ceiling panel (10) and can be pulled up by the crane. ing.
[0014]
In addition, a total of three joint fittings (26), (26),... Are removably attached to the other long horizontal member (17) at the center position and a position substantially in the middle between the center and both ends. .
[0015]
As shown in FIG. 3, the joint metal fitting (26) is an L-shaped plate comprising a horizontal piece portion (22) and a vertical piece portion (23). These horizontal piece portion (22) and vertical piece portion (23 ) Are formed with three bolt holes (24), (24),... As mounting holes. Then, by cutting out the top plate (16), the horizontal piece portion (22) of the joint fitting (26) is brought into contact with the lower surface of the other exposed long horizontal member (17), so that the lengths coincide with each other. To the bolts (27), (27), which are inserted from below into the bolt holes (25), (25) of the horizontal cross member (17) and the bolt holes (24), (24) of the horizontal piece (22), 70) (70) ... are screwed and tightened so that the joining bracket (26) can be attached to the long cross member (17) with its vertical piece (23) facing downward. Yes.
[0016]
The floor panel (11) includes a floor frame (30) and a floor board (31) made of particle boards attached to the upper surface of the floor frame (30). The floor frame (30) has a pair of long cross members (32) (32) made of lightweight steel and a pair of short cross members (33) (33), also made of lightweight steel, joined in a square frame shape. Thus, a plurality of cross rails (34), (34),... Are passed between the long cross members (32), (32) at appropriate intervals. A pair of L-shaped fixing plates (35), (35),... Are attached to one long cross member (32) and both short cross members (33), (33) in the floor frame (30). ing.
[0017]
In addition, a total of three joint fittings (36), (36),... Are detachably attached to the other long horizontal member (32) at the center position and both end positions.
[0018]
As shown in FIG. 4, the joint metal fitting (36) is an L-shaped plate composed of a horizontal piece (37) and a vertical piece (38), and the horizontal piece (37) and the vertical piece (38). ) Are formed with three bolt holes (39), (39),... As mounting holes. Then, by cutting out the floor plate (31), the horizontal piece portion (37) of the joining bracket (36) is brought into contact with the upper surface of the other exposed long horizontal member (32), and the long pieces that coincide with each other Nut (56) to the bolts (55) (55) ... inserted from above into the bolt holes (42) (42) ... of the cross member (32) and the bolt holes (39) (39) ... of the horizontal piece (37) ) (56) ... are screwed and tightened so that the joining bracket (36) can be attached to the long cross member (32) with its vertical piece (38) facing upward. .
[0019]
The wall body (12) constitutes the outer wall of the building. The shaft frame (40), the outer wall material (41) attached to the outer surface side of the shaft frame (40), and the shaft frame (40) It consists of an inner wall material (44) attached to the inner surface side via a heat insulating inner wall frame (43). The shaft frame (40) has a pair of upper and lower cross members (45) (45) made of lightweight steel and a pair of left and right vertical members (46) (46) made of light steel in a square frame shape. The upper cross member (45) is fixed to the fixing plate (21) (21) of the short cross member (18) in the ceiling frame (15), and the lower cross member (45) is the floor frame. Fixed to the fixing plate (35) (35) of the short cross member (33) in (30), whereby the wall (12) is along the short direction of the ceiling panel (10) and the floor panel (11). It is arranged across one end.
[0020]
The wall body (13) constitutes a partition wall of the building, and faces the wall body (12) between the other end portions along the short direction of the ceiling panel (10) and the floor panel (11). It is arranged across. The wall body (13) is constituted only by a rectangular frame-shaped shaft frame (50), and an inner wall material (44) is appropriately attached to the inner surface side in a factory or field work. The shaft frame (50) is also made of light-weight shaped steel cross members (51) (51) and vertical members (52) (52) in a rectangular frame shape, similar to the shaft frame (40) of the wall body (12). The cross members (51) and (51) are fixed to the corresponding upper and lower fixing plates (21), (21), (35) and (35), respectively.
[0021]
The wall body (14) constitutes the outer wall of the building in the same manner as the wall body (12), and the shaft frames (57) (58) (59) arranged side by side and these shaft frames (57) (58) ) (59) The outer wall material (41) attached to the outer surface side, and the inner wall material (44) attached to the inner surface side of the shaft frame (57) (58) (59) via the heat insulating inner wall frame (43) It consists of. These shaft frames (57), (58), and (59) are formed by pin-joining light-weight steel cross members and vertical members in a rectangular frame shape, similar to the shaft frame (40) of the wall body (12). Braces (66) and (66) are inserted in the frame of one shaft frame (57), and the shaft frame (57) portion constitutes a bearing wall. The shaft frames (57), (58), and (59) are laterally bound to each other by bolts (not shown).
[0022]
The wall body (14) has upper and lower ends of the shaft frames (58) and (59), one of the long horizontal members (17) of the ceiling frame (15) and one of the long frames of the floor frame (30). .. Are fixed to the fixing plates (21), (21),... Of the cross member (32), and are arranged across one end portions along the longitudinal direction of the ceiling panel (10) and the floor panel (11).
[0023]
Therefore, the room box (2) configured as described above has a structure in which U-shaped wall bodies (12) (13) (14) are arranged between the ceiling panel (10) and the floor panel (11). The surface between the other end portions along the longitudinal direction of the ceiling panel (10) and the floor panel (11) is open. In the case of such a structure, it cannot withstand horizontal and vertical forces independently structurally as a single unit, and when transferring from the factory to the site, the eyebolts (29), (29) of the ceiling frame (15)… If the room box (2) is lifted by hooking the crane wires (28), (28).
[0024]
Therefore, a reinforcing temporary member (61) for preventing deformation of the room box (2) is attached to the open portion (60) side of the room box (2). This reinforced temporary member (61) is a pair of cane made of lightweight steel provided in a C shape along the direction of action of the crane wire (28) (28) on the open part (60) side when lifted (62) (62) and a temporary column (63) made of a lightweight section steel provided at a substantially central position between these canes (62) (62).
[0025]
As shown in FIG. 5, the upper ends of these wands (62) and (62) and the temporary pillar (63) abut on the vertical piece (23) of the joint fitting (26) on the ceiling panel (10) side from the outside. In this state, the nut (73) is screwed into the bolt (72) inserted from the outside into the bolt hole (24) of the vertical piece portion (23) and the bolt hole (71) on the temporary material side that are aligned with each other, and tightened. So that it can be removed. In addition, the lower end is temporarily connected to the bolt hole (39) of the vertical piece (38) that is in contact with the vertical piece (38) of the joint fitting (36) on the floor panel (11) side from the outside. The nut (76) is screwed and fastened to the bolt (75) inserted from the outside into the bolt hole (74) on the material side, so that it can be removed.
[0026]
In this mounted state, the vertical pieces (23), (38) of the joint fittings (26), (36), etc. have an edge direction on the opening (60) side of the ceiling panel (10) or floor panel (11). That is, since the bolt holes (24) (39) are formed along the direction of the other long horizontal member (17) (32), the mounting of the cane (62) (62) and the temporary pillar (63) The position can be finely adjusted along that direction.
[0027]
The room box (2) is just one of a plurality of types, and various other types are available. For example, the wall (12) has no outer wall material (41). There are a type with a partition wall, a type with an open portion without providing a longitudinal wall (14), and the like. Also. Depending on the place where the room box (2) is applied, various interiors such as a system kitchen for the kitchen part and a wash basin or unit bath for the wash part are provided. .
[0028]
However, in both types, at least a pair of shaft frames facing each other are passed between the ceiling frame (15) and the floor frame (30) so that the shape as a box and the rigidity during transportation can be secured at a minimum. They are common in that they have a different structure.
[0029]
The various room boxes (2) (2)... Manufactured in the factory in this way are sequentially lifted by crane wires (28) (28). At the time of lifting, as shown in FIGS. 1 and 6, the crane wires (28), (28) are radiated from the upper center of the ceiling panel (10) toward the eyebolts (29) (29). The tensile force of these crane wires (28), (28) ... is not only transmitted to the floor panel (11) side through the shaft frames (40) (50) (57) (58) (59). Also on the open part (60) side, the signal is transmitted to the floor panel (11) side through the cane (62) (62) and the temporary pillar (63). Accordingly, the tensile force of the crane wires (28), (28),... Will be evenly distributed throughout the room box (2), thereby preventing (2) deformation of the room box.
[0030]
In particular, because the wand (62) (62) is arranged in a C shape along the direction of operation of the crane wire (28) (28), the crane wire ( 28) The tensile force of (28) can be efficiently transmitted to the floor panel (11) side, and the temporary pillar (63) between the eyebolts (29) and (29) on which the crane wires (28) and (28) are hooked Therefore, the buckling of the long cross member (17) of the ceiling frame (15) can be reliably prevented. Moreover, even when an impact is applied to the room box (2) when loaded on the truck from the lifted state or transported by the truck, the cane (62) (62) and the temporary pillar (63 ), The shape of the box can be reliably maintained.
[0031]
The room boxes (2) (2)... Transported to the site by the truck are again lifted by the crane wires (28) (28). Then, the wands (62), (62), the temporary pillars (63), and the various fittings (26), (36) are removed from the room boxes (2), (2), and the room boxes (2), (2),. A building is constructed by sequentially stacking structural beams, room boxes (2), (2).
[0032]
In addition, this invention is not limited to the said embodiment, Of course, many correction changes can be added in said embodiment within the scope of the present invention.
[0033]
【The invention's effect】
As is clear from the above description, according to the room box of the present invention, the reinforcing temporary member is simply attached to the open portion side via the L-shaped joint metal fitting, so that the structure is weak in combination with the frame-shaped frame. Even so, it is possible to prevent deformation at the time of lifting with a crane wire without using a large jig as in the prior art.
[0034]
In addition, a plurality of mounting holes for attaching temporary materials are formed along the edge of the ceiling or floor on the vertical piece of the joint metal fitting, so the position of temporary materials can be finely adjusted in the direction of the edges. The temporary material can be attached with high accuracy.
[0035]
Furthermore, since the joint fitting and the reinforcing temporary material can be removed, the design is not hindered and can be reused when another room box is transferred.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an example of a room box according to an embodiment of the present invention.
FIG. 2 is an exploded perspective view of the same.
FIG. 3 is an exploded perspective view showing an attachment state of the joint fitting to the ceiling frame.
FIG. 4 is an exploded perspective view showing an attachment state of the joining metal fitting to the floor frame.
FIG. 5 is a cross-sectional view showing a joint portion between a ceiling frame and a joint fitting, and a joint portion between a floor frame and the joint fitting.
FIG. 6 is a diagram showing a positional relationship between a crane wire, a cane, and a temporary pillar.
[Explanation of symbols]
(2) Room box
(10) Ceiling
(11) Floor
(12) (13) (14) Wall
(15) Ceiling frame
(26) (36) L-shaped fitting
(22) (37) Horizontal piece
(23) (38) Vertical piece
(24) (39) Mounting hole
(30) Floor frame
(60) Open part
(61) Reinforced temporary material
(62) Staff
(63) Temporary pillar

Claims (4)

天井、床及び壁とからなる部屋ボックスにおいて、壁が設けられていない開放部に取り付けられる補強仮設材の取付け構造であって、天井の下面には、L字形接合金具の水平片部を、その垂直片部が下向きとなるようにして取り付けるとともに、床の上面には、同じくL字形接合金具の水平片部を、その垂直片部が上方に突出するようにして取り付け、前記補強仮設材は、前記部屋ボックスを吊り上げるクレーンワイヤーの作用方向に沿ってハ字型に配される一対の方杖と、これら方杖間のほぼ中央位置に配される仮設柱とからなり、これら方杖及び仮設柱の上端及び下端を、上下の垂直片部へそれぞれ接合するようにしたことを特徴とする部屋ボックスにおける補強仮設材の取付け構造。In a room box composed of a ceiling, a floor and a wall, it is a mounting structure of a reinforcing temporary material that is attached to an open portion where no wall is provided, and a horizontal piece portion of an L-shaped joint fitting is provided on the lower surface of the ceiling. The vertical piece is attached so that it faces downward, and on the upper surface of the floor, the horizontal piece of the same L-shaped fitting is attached so that the vertical piece protrudes upward . A pair of wands arranged in a C shape along the direction of operation of the crane wire that lifts the room box, and a temporary pillar arranged at a substantially central position between these wands. A structure for attaching a reinforcing temporary member in a room box, characterized in that the upper end and the lower end of each are joined to upper and lower vertical pieces, respectively. 接合金具の垂直片部には、天井若しくは床の前記開放部側の端縁方向に沿って、それぞれ複数の取付け穴を形成した請求項1記載の部屋ボックスにおける補強仮設材の取付け構造。  The structure for mounting a reinforcing temporary member in a room box according to claim 1, wherein a plurality of mounting holes are formed in the vertical piece portion of the joint fitting along the edge direction of the open side of the ceiling or floor. 接合金具は、天井フレーム又は床フレームに取り外し可能に取り付けられるものである請求項1又は2記載の部屋ボックスにおける補強仮設材の取付け構造。  The attachment structure of the reinforcing temporary member in the room box according to claim 1 or 2, wherein the joining metal fitting is detachably attached to the ceiling frame or the floor frame. 方杖及び仮設柱は、接合金具に取り外し可能に取り付けられるものである請求項1乃至3のいずれかに記載の部屋ボックスにおける補強仮設材の取付け構造。The mounting structure of the reinforcing temporary member in the room box according to any one of claims 1 to 3, wherein the cane and the temporary pillar are detachably attached to the joint fitting.
JP23153999A 1999-08-18 1999-08-18 Mounting structure of reinforced temporary material in room box Expired - Fee Related JP3802715B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23153999A JP3802715B2 (en) 1999-08-18 1999-08-18 Mounting structure of reinforced temporary material in room box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23153999A JP3802715B2 (en) 1999-08-18 1999-08-18 Mounting structure of reinforced temporary material in room box

Publications (2)

Publication Number Publication Date
JP2001055792A JP2001055792A (en) 2001-02-27
JP3802715B2 true JP3802715B2 (en) 2006-07-26

Family

ID=16925091

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23153999A Expired - Fee Related JP3802715B2 (en) 1999-08-18 1999-08-18 Mounting structure of reinforced temporary material in room box

Country Status (1)

Country Link
JP (1) JP3802715B2 (en)

Also Published As

Publication number Publication date
JP2001055792A (en) 2001-02-27

Similar Documents

Publication Publication Date Title
CZ313599A3 (en) Elevator cabin
US6018921A (en) Transverse truss for building structure
JP3756269B2 (en) Expansion unit mounting structure
JP3802715B2 (en) Mounting structure of reinforced temporary material in room box
JP3847030B2 (en) Box building room box
JPH04136341A (en) Construction method for unit house
JP3847029B2 (en) Box-type building
JP5439084B2 (en) Fixing structure of bay window and its construction method
JP3764020B2 (en) Steel frame structure
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JP4044676B2 (en) Unit building
JPS6349442Y2 (en)
JPH10131508A (en) Material transport device of temporarily set curing body
JPH11172770A (en) Building unit without column and beam, its building method, and unit building
JPH08239928A (en) Non-scaffolding contruction method for exterior wall material
JP6875120B2 (en) Floor panels, floor structures, floor construction methods and building skeleton reuse methods
JPH10121567A (en) Mount structure of handrail wall panel
JP2001040774A (en) Box type building and room box thereof
JP4381631B2 (en) Unit building shed structure
JP3012545B2 (en) Housing unit
JP3154889B2 (en) Unit buildings and building units
JP3072063B2 (en) Housing unit
JPH10121568A (en) Handrail wall panel
JPH06235237A (en) Structure for fitting outer wall panel of building unit
JPH1193269A (en) Unit-type building having carport

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040507

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20050623

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060310

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060404

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060428

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090512

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120512

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees