JPH09221908A - Method of installation construction of elevator - Google Patents

Method of installation construction of elevator

Info

Publication number
JPH09221908A
JPH09221908A JP2807396A JP2807396A JPH09221908A JP H09221908 A JPH09221908 A JP H09221908A JP 2807396 A JP2807396 A JP 2807396A JP 2807396 A JP2807396 A JP 2807396A JP H09221908 A JPH09221908 A JP H09221908A
Authority
JP
Japan
Prior art keywords
floor
elevator
floors
hoistway
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2807396A
Other languages
Japanese (ja)
Inventor
Yutaka Nagamine
裕 長峯
Tatsuro Hodaka
達朗 保高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2807396A priority Critical patent/JPH09221908A/en
Publication of JPH09221908A publication Critical patent/JPH09221908A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To improve workability by successively constructing upper floors from lower layer floors as lifting an uppermost floor while mounting a hanging scaffold on an elevator shaft formed from the lower layer floors in succession and executing elevator construction works. SOLUTION: When a building 2 is constructed successively from lower layer floors while elevating an uppermost floor 3 by a hydraulic jack 5, a hanging scaffold 8 corresponding to a plurality of floors is suspended from an elevator shaft in a floor 6 just under the uppermost floor 3 through a support beam 7. Fire-resistive covering construction works, temporary installation of articles for an elevator, the centering of the articles and final installation are executed respectively in the upper floor 9a, intermediate floor 9b and lowermost floor 9c of the scaffold 8. When a plurality of the elevators are mounted in a crosswise arranged manner, the same floors of the floors 9a, 9b, 9c set up in each elevator shaft are connected by a movable flight of steps being freely housed, and operators are moved freely and the same kind of operations are executed simultaneously. Accordingly, the elevator can be installed safely in the short term of works as being synchronized with the construction of the building while the elevator can be centered accurately and easily.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は建物の最上階部を組
立て、次いで各下層階を順に構築する建物へのエレベー
タの据付工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing an elevator in a building in which the uppermost floor of the building is assembled and then the lower floors are sequentially constructed.

【0002】[0002]

【従来の技術】従来のエレベータの据付は建築躯体の施
工完了後着手するのが普通であった。鉄骨構造の建築を
例にとって説明すると、基礎工事完了後下層階から順に
鉄骨を立て、縦柱と横梁により構造部材の施工が完了す
る。このときこの鉄骨建ての進行に従って各階の床スラ
ブを施工し、昇降路を構成する壁を構築し、昇降路内に
露出する鉄骨部分に耐火被覆を吹付け、最終的に最上階
まで昇降路が完成し、更に機械室を完成させた後、エレ
ベータの施工に着手する工法で行っていた。
2. Description of the Related Art Conventional installation of an elevator is usually started after the construction of a building frame is completed. Taking the construction of a steel frame structure as an example, after the foundation work is completed, the steel frames are erected in order from the lower floors, and the construction of the structural members is completed by the vertical columns and the horizontal beams. At this time, according to the progress of this steel frame construction, floor slabs on each floor were constructed, the walls that make up the hoistway were constructed, and the fire-resistant coating was sprayed on the steel frame exposed in the hoistway, and finally the hoistway to the top floor. After it was completed and the machine room was completed, the construction of the elevator was started.

【0003】上記据付工法で行う理由は、最上階の機械
室まで完了しないと雨水等が昇降路内に侵入して、エレ
ベータの機器を損ねること、また据付の芯出しは機械室
よりピアノ線を降ろして位置決めをするからである。さ
らに、昇降路の耐火被覆を行ってからでないとエレベー
タの機器を損なう可能性があるからである。
The reason for performing the above-mentioned installation method is that rainwater and the like will enter the hoistway and damage the elevator equipment unless the machine room on the uppermost floor is completed, and the installation centering will be performed using the piano wire from the machine room. This is because it is lowered and positioned. In addition, the elevator equipment may be damaged unless the hoistway is fireproofed.

【0004】[0004]

【発明が解決しようとする課題】しかし、上述したエレ
ベータの据付工法は、建物の最上階の機械室まで完了し
なければ、エレベータの据付に着手することが出来ない
のでエレベータの建設工期が長くなり、エレベータの完
成に長期間を要する等の問題があった。
However, in the elevator installation method described above, installation of the elevator cannot be started unless the machine room on the uppermost floor of the building is completed, which increases the construction period of the elevator. However, there was a problem that it took a long time to complete the elevator.

【0005】特に近年、建築の自動化施工方法について
も改良が進められ、建物の最上階を先に組立て、その下
方で各下層階を順に床と壁面を完成させながら構築する
自動建築工法によるとき、建物の最上階に達してからエ
レベータの施工をせねばならない工法であると、高層建
物の建設工期が大幅に長期化する結果となり、折角の高
速施工手段のメリットが損なわれることになる。
In particular, in recent years, improvements have also been made in the automated construction method of construction. When the automatic construction method is used in which the uppermost floor of a building is first assembled and the lower floors are sequentially constructed thereunder to complete floors and wall surfaces, If it is a construction method that requires the construction of an elevator after reaching the top floor of the building, the construction period of a high-rise building will be significantly extended, and the merit of the high-speed construction means will be impaired.

【0006】本発明は、上述した問題を解決するため
に、建物の最上階部を先に組立て、次いで下層階から順
に構築する建物において、エレベータの据付を各下層階
の構築の進捗状況に合わせて行い、効率的かつ安全にエ
レベータを据付出来る据付工法を得ることを目的として
いる。
In order to solve the above-mentioned problems, the present invention adjusts the installation of elevators to the progress of the construction of each lower floor in a building in which the uppermost floor of the building is first assembled and then the lower floors are constructed in order. The purpose is to obtain an installation method that allows efficient and safe elevator installation.

【0007】[0007]

【課題を解決するための手段】建物の最上階部を先に組
立て、これを支える油圧ジャッキを設けて前記最上階部
を持上げながら下層階から順に構築する建物建設工法に
おいて、上記下層階に天井クレーン(必要に応じて長さ
の調節可能なもの)を用いて昇降路を構成し、昇降路の
上部に支持ビームを取付、その支持ビームで吊り足場を
吊して、この吊り足場により昇降路内の耐火被覆工事を
行い、芯出装置を用いて芯出をしながら、ガイドレー
ル、出入口装置等の取付および昇降路の配線を行ってい
く。
[Means for Solving the Problems] In a building construction method in which the uppermost floor of a building is assembled first, a hydraulic jack for supporting the same is provided, and the uppermost floor is lifted to build sequentially from the lower floors, a ceiling is formed on the lower floors. A hoistway is constructed using a crane (the length of which can be adjusted if necessary), a support beam is attached to the upper part of the hoistway, and the suspension scaffold is hung by the support beam. We will perform fireproof coating work inside, and while performing centering using a centering device, we will install guide rails, entrance and exit devices, etc. and wire the hoistway.

【0008】また、吊り足場を昇降路のバンク毎に設
け、これら同階床の吊り足場間をタラップでつないで各
足場床間を作業者が行き来できるようにする。
Further, a suspended scaffold is provided for each bank of the hoistway, and the suspended scaffolds on the same floor are connected by a trap so that an operator can move between the scaffold floors.

【0009】なお、建屋が下階から順に構築していくの
に合せて昇降路も構築し、吊り足場を同期させながら持
上げていく。
[0009] As the building is constructed in order from the lower floor, a hoistway is also constructed and the suspension scaffold is lifted while being synchronized.

【0010】このような構成による工法によれば、各階
層の構築の進捗状況に同期させてエレベータを据付でき
るので、建築工期を短縮して建物の完成を早期に完了す
ることになる。
According to the construction method having such a structure, the elevator can be installed in synchronism with the progress of the construction of each layer, so that the construction period can be shortened and the completion of the building can be completed early.

【0011】また、複数台の吊り足場を横並びさせるこ
とにより、横並びの平面作業でエレベータ据付(出入
口、ガイドレールの芯出作業および据付作業等)、建築
側の耐火被覆工事もできる。従って、エレベータ据付作
業が安全で効率的にできることになる。
Further, by arranging a plurality of suspension scaffolds side by side, it is possible to perform elevator installation (entrance / exit, guide rail centering work and installation work, etc.) and fireproof coating work on the building side by side-by-side plane work. Therefore, the elevator installation work can be performed safely and efficiently.

【0012】[0012]

【発明の実施の形態】最上階部を先に組立て、下層階を
順に構築する高層建物の自動建築工法に本発明によるエ
レベータの据付工法を適用した場合を図1〜図4に示す
実施の形態に基づいて説明する。
1 to 4 show the case where the elevator installation method according to the present invention is applied to an automatic construction method of a high-rise building in which the uppermost floor is assembled first and the lower floors are constructed in order. It will be described based on.

【0013】先ず、下層階を順に構築する高層建物の前
記自動建築工法の概略は次のようである。
First, the outline of the automatic construction method for a high-rise building in which lower floors are sequentially constructed is as follows.

【0014】基礎1に3〜4階床建屋2を施工し、その
上に屋根に相当する最上階3を組立る。この最上階3に
は水平方向に走行する天井クレーン4を設けておく。
A 3rd to 4th floor building 2 is constructed on the foundation 1, and a top floor 3 corresponding to a roof is assembled on it. An overhead crane 4 traveling horizontally is provided on the top floor 3.

【0015】また、最上階3には油圧ジャッキ5を取付
けて、その油圧ジャッキ5により最上階3を持ち揚げ
(このとき梁に当たるので天井クレーンはその長さを縮
めて移動する)、これにより生じた空間部分に建屋2を
組上げていって下層階を順に構築していくのである。
Further, a hydraulic jack 5 is attached to the uppermost floor 3, and the uppermost floor 3 is lifted by the hydraulic jack 5 (at this time, since the ceiling crane hits the beam, the length of the overhead crane is shortened and moved). The building 2 is assembled in the open space and the lower floors are constructed in sequence.

【0016】このような建築工法に本発明によるエレベ
ータの据付工法をつぎのように適用する。
The elevator installation method according to the present invention is applied to such a construction method as follows.

【0017】A.エレベータの最上階3の直下階床6の
昇降路部に支持ビーム7を取付、このビーム7の下に吊
り足場8を吊り下げる。
A. A support beam 7 is attached to a hoistway portion of a floor 6 directly below the uppermost floor 3 of the elevator, and a suspension scaffold 8 is suspended under the beam 7.

【0018】B.吊り足場8に複数階床9(9a,9
b、9c)を設ける。
B. Multiple floors 9 (9a, 9)
b, 9c) are provided.

【0019】C.上部床9aは昇降路内10の耐火被覆
工事に使用し、中間床9bは、出入口11、がごレール
12、カウンターレール13、昇降路スイッチ14等エ
レベータの用品を仮設置する。最下階床9cは、仮設置
された用品をかごレール12の中心線に合わせて芯出し
し最終据付を行う。また、昇降路配線を行うために配線
繰り出し装置15を設け配線も行っていくようにする。
C. The upper floor 9a is used for fireproof coating work in the hoistway 10, and the intermediate floor 9b temporarily installs elevator articles such as a doorway 11, a cage rail 12, a counter rail 13, and a hoistway switch 14. The lowest floor 9c performs the final installation by aligning the temporarily installed supplies with the center line of the car rail 12. In addition, a wiring feeding device 15 is provided for wiring the hoistway, and wiring is also performed.

【0020】D.尚、かごレール芯は昇降路のピット1
6に基準かごレール12aを垂直に立て、また吊り足場
8は支持ビーム7を最上階3の直下階床6に水平に固定
し、また最下階の足場床9c付近をかごレール12に固
定装置18を介して固定する。又、吊り足場の支持ビー
ム7の上に水平方向の調整が出来るテンプレート17を
設置し、テンプレート17はかごレール芯よりの各用品
の位置を出せる形状にしておく。このようにすることに
より基準かごレール12aの芯とテンプレート17の芯
を下げ振りまたはレーザ等により合わせることによって
各用品の芯出しが出来ることになる。
D. In addition, the car rail core is the pit 1 of the hoistway.
6, a reference car rail 12a is vertically set up, a suspension scaffold 8 horizontally fixes a support beam 7 to a floor 6 directly below the uppermost floor 3, and a device for fixing a scaffold floor 9c on the lowermost floor to the car rail 12 Secure via 18. Further, a template 17 that can be adjusted in the horizontal direction is installed on the supporting beam 7 of the suspension scaffold, and the template 17 is shaped so that the position of each article can be brought out from the car rail core. By doing so, the core of the reference car rail 12a and the core of the template 17 can be centered for each product by swinging down or aligning them with a laser or the like.

【0021】E.また高層建物は、複数台のエレベータ
を横並びに設ける場合、吊り足場8をそれぞれの昇降路
に設け、これを横並びに同じ階床に設置し、吊り足場8
間をフレーム19で連結する。
E. Further, in a high-rise building, when a plurality of elevators are installed side by side, a suspension scaffold 8 is provided in each hoistway, and the suspension scaffolds 8 are installed side by side on the same floor.
The frames are connected by a frame 19.

【0022】E.更に、吊り足場8の床9間には、収納
自在な床(タラップ)20を設ける。昇降路と吊り足場
8の間の隙間部分(開口)にもこれを塞ぐように収納自
在な床21を設ける。なお、収納自在の床は、床9と床
20、21を丁番等で連結し、吊り足場8を吊り上げる
時収納出来る構成にする(図4参照)。
E. Further, between the floors 9 of the suspended scaffolding 8, a storable floor 20 is provided. In the gap (opening) between the hoistway and the suspension scaffold 8, a floor 21 that can be stored is provided so as to close it. The floor that can be stored has a structure in which the floor 9 and the floors 20 and 21 are connected by a hinge or the like so that the floor can be stored when the suspension scaffold 8 is lifted (see FIG. 4).

【0023】F.このような上記の方法により、建築耐
火被覆工事およびエレベータ据付作業を行う場合、収納
床(タラップ)20をそれぞれ引き出して、足場を横並
びに床を合わせ、吊り足場間を作業員が移動できるよう
にする。また収納床21によりそれぞれの床9の昇降路
との開口部を塞ぐことにより上下作業も同時にできるよ
うにする。
F. When the building fireproof coating work and the elevator installation work are performed by the above method, the storage floors (traps) 20 are respectively pulled out, the scaffolds are aligned side by side, and the floors are aligned so that the worker can move between the suspended scaffolds. To do. Further, the storage floor 21 closes the openings of the respective floors 9 and the hoistway, so that vertical work can be performed simultaneously.

【0024】なお、横並びに並んだ場合上記にように行
うが、対面にならんだ場合も同じように吊り足場の床9
が同じ階になるようにし、出入口より作業員が移動でき
るようにしておく。
Although the above is performed in the case of lining up side by side, the same applies to the case of facing each other in the same manner.
Should be on the same floor and workers should be able to move from the entrance.

【0025】このようにして建物及びエレベータを構築
して行くので、この工法には次のような効果、利点が得
られる。
Since the building and the elevator are constructed in this manner, the following effects and advantages can be obtained by this construction method.

【0026】先ず最上階3を組立て、この最上階3の下
側に天井クレーン4を設けて下層階を順に構築する高層
建物に対して、下層階を建築できる順に揚げていき、そ
の構築にあわせて、吊り足場を用いたエレベータ据付に
おいては、上部床9aでは昇降路内の耐火被覆工事がで
き、中間床9bではエレベータの仮据付ができ、最下階
床9cでは芯出し最終据付が行われることになる。
First, the top floor 3 is assembled, and the ceiling crane 4 is provided on the lower side of the top floor 3 to construct a lower floor in order. In the elevator installation using the suspended scaffolding, the fireproof coating work in the hoistway can be performed on the upper floor 9a, the elevator can be temporarily installed on the intermediate floor 9b, and the centering final installation can be performed on the lowermost floor 9c. It will be.

【0027】芯出し作業は吊り足場8が支持ビーム7と
足場固定装置18で固定し、支持ビーム7の上においた
テンプレート17により容易に各部の芯出しが可能とな
り、エレベータの据付作業の向上となりエレベータの性
能も向上する。
In the centering work, the suspension scaffold 8 is fixed by the support beam 7 and the scaffold fixing device 18, and the template 17 placed on the support beam 7 enables easy centering of each part, which improves the elevator installation work. Elevator performance is also improved.

【0028】また、吊り足場8が複数個フレーム19で
連結され、また収納自在な床(タラップ)20により吊
り足場間の床9を連結することにより、作業員が横(水
平)方向に吊り足場を移動でき、また昇降路と吊り足場
8の開口部を収納自在の床21により塞ぐことにより、
横並びに且つ同時に同じ作業(夫々上部床9aでは耐火
被覆工事を行い、中間床9bではエレベータの仮据付、
最下階床9cでは最終据付などをすること)が行え効率
的作業ができる。
Further, a plurality of hanging scaffolds 8 are connected by a frame 19, and a floor 9 between the hanging scaffolds is connected by a retractable floor 20 so that a worker can suspend the scaffolding horizontally (horizontally). By closing the hoistway and the opening of the suspension scaffold 8 with the floor 21 that can be stored,
Side by side and at the same time (the upper floor 9a performs fireproof coating work, and the intermediate floor 9b temporarily installs the elevator,
The bottom floor 9c can be used for final installation, etc., and efficient work can be performed.

【0029】従って、1台の吊り足場では上下,号機ご
とに繰返し作業となる、このように、横並びに同じ作業
ができ、階床ごとに作業員を分散することにより一度に
工程別に作業ができて、安全でなおかつ効率的にエレベ
ータの据付ができる。
Therefore, in one suspension scaffold, the work is repeated up and down and for each machine. In this way, the same work can be performed side by side, and the work can be performed for each process at a time by distributing the workers for each floor. Therefore, the elevator can be installed safely and efficiently.

【0030】このことにより、建物が最上階に達した時
には機械室の据付のみを残しエレベータの据付が完了し
ているため早期にエレベータを完成することになる。
As a result, when the building reaches the top floor, only the installation of the machine room is left and the installation of the elevator is completed, so that the elevator is completed early.

【0031】なお、この説明では吊り足場の床を3段
(階床)で説明したが、据付時間建屋工程等により4段
複数階でもかまわない。
In this description, the floor of the suspended scaffold has been described in three steps (floors), but it may be four steps and a plurality of steps depending on the installation time building process and the like.

【0032】また、上記説明では下層階の構築方法は、
上方に継ぎ足していく方法で、吊り足場を揚げていく場
合であったが、下層階の組立を、逆に上階から下階に構
築して行く方法の場合は、吊り足場を下げていってやれ
ば同様な効果が得られる。
In the above description, the method of constructing the lower floor is
In the case of hoisting the suspended scaffolding with the method of connecting upwards, in the case of assembling the lower floors, on the contrary, from the upper floor to the lower floor, lower the suspension scaffolding. The same effect can be obtained by doing.

【0033】[0033]

【発明の効果】本発明により、最上階部を組立後、下層
階を順に構築する高層建物に対し、エレベータの据付を
複数台の吊り足場と、その吊り足場に設けた左右上下に
連絡した床と、さらに芯出し装置などにより、建物と同
期して安全で効率的なエレベータの据付ができ、建物の
完成工期の短縮に役立つ。また、エレベータの芯出し作
業が容易で精度も良くでき、エレベータの性能向上も得
られることになる。
EFFECTS OF THE INVENTION According to the present invention, for a high-rise building in which the uppermost floor is assembled and the lower floors are sequentially constructed, a plurality of suspension scaffolds for elevator installation and floors connected to the left, right, up and down provided on the suspension scaffolds are installed. Moreover, by using a centering device, etc., the elevator can be installed safely and efficiently in synchronization with the building, which helps to shorten the completion period of the building. Further, the centering work of the elevator can be easily performed with high accuracy, and the performance of the elevator can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のエレベータの据付工法の説明図、FIG. 1 is an explanatory view of an elevator installation method of the present invention,

【図2】図1のエレベータ据付の進行による変化図、FIG. 2 is a diagram showing changes in the installation of the elevator shown in FIG.

【図3】図1の平面図、FIG. 3 is a plan view of FIG.

【図4】図1の部分動作の説明図。FIG. 4 is an explanatory diagram of a partial operation of FIG.

【符号の説明】[Explanation of symbols]

1 基礎 12 かごレ
ール 2 建屋 13 カウン
ターレール 3 最上階 14 昇降路
スイッチ 4 天井クレーン 15 配線繰
り出し装置 5 油圧ジャッキ 16 ピット 6 最上階の直下床 17 テンプ
レート 7 ビーム 18 固定装
置 8 吊り足場 19 連結フ
レーム 9,9a,9b,9c 吊り足場床 20,21
収納床(タラップ) 10 昇降路 11 出入口
1 Foundation 12 Car Rail 2 Building 13 Counter Rail 3 Top Floor 14 Hoistway Switch 4 Ceiling Crane 15 Wiring Feeding Device 5 Hydraulic Jack 16 Pit 6 Directly Under Floor on the Top Floor 17 Template 7 Beam 18 Fixing Device 8 Suspension Scaffolding 19 Connecting Frame 9, 9a, 9b, 9c Suspended scaffolding floor 20, 21
Storage floor (Trap) 10 Hoistway 11 Doorway

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 建物の最上階部を組立後、前記最上階部
の下側に下層階を順に構築していく建物において、 前記下層階の昇降路部の頂部に設けた支持ビームの下方
に据付作業員用の吊り足場を設け、前記支持ビーム及び
吊り足場を天井昇降装置により昇降させて、下層階の構
築に従って順次前記吊り足場を移動させながらエレベー
タの昇降路を構築していくことを特徴とするするエレベ
ータの据付工法。
1. In a building in which a lower floor is built under the uppermost floor after assembling the uppermost floor of the building, in the lower part of a support beam provided at the top of the hoistway portion of the lower floor. A suspending scaffold for installation workers is provided, and the supporting beam and the suspending scaffold are raised and lowered by a ceiling lifting device, and an elevator hoistway is constructed while sequentially moving the suspended scaffold according to the construction of a lower floor. Elevator installation method
【請求項2】 前記支持ビームにエレベータの芯出装置
を設け、これと昇降路ピットに設けた基準かごレールと
をガイドに、エレベータの芯出しを行うことを特徴とす
る請求項1に記載のエレベータの据付工法。
2. The elevator centering device is provided on the supporting beam, and the elevator centering is performed by using the elevator car centering device and a reference car rail provided in the hoistway pit as a guide. Elevator installation method.
【請求項3】 複数階床分に相当する大きさの吊り足場
を用いて、複数階床分の昇降路を同時に構築していくこ
とを特徴とする請求項1に記載のエレベータの据付工
法。
3. The elevator installation method according to claim 1, wherein a hoistway for a plurality of floors is simultaneously constructed by using a suspension scaffolding having a size corresponding to a plurality of floors.
【請求項4】 前記吊り足場を複数本の各昇降路に設け
て昇降路を構築していくことを特徴とする請求項1に記
載のエレベータの据付工法。
4. The elevator installation method according to claim 1, wherein the hoistway is constructed by providing the suspension scaffolding on each of a plurality of hoistways.
【請求項5】 前記吊り足場同士を横に連結し、更に、
各足場の階床を、同一床面同士及び上下床同士を夫々
に、収納出来るタラップで連結し、各吊り足場間を作業
員が移動出来るようにしたことを特徴とする請求項4に
記載のエレベータの据付工法。
5. The suspension scaffolds are laterally connected to each other, and further,
The floor of each scaffolding is connected to the same floor surface and the upper and lower floors respectively by a trap that can be stored so that a worker can move between the suspension scaffolds. Elevator installation method.
【請求項6】 前記吊り足場に配線繰出装置を設けて昇
降路内の配線を行うことを特徴とする請求項1に記載の
エレベータの据付工法。
6. The elevator installation method according to claim 1, wherein a wiring feeding device is provided on the suspension scaffolding to perform wiring in the hoistway.
JP2807396A 1996-02-15 1996-02-15 Method of installation construction of elevator Pending JPH09221908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2807396A JPH09221908A (en) 1996-02-15 1996-02-15 Method of installation construction of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2807396A JPH09221908A (en) 1996-02-15 1996-02-15 Method of installation construction of elevator

Publications (1)

Publication Number Publication Date
JPH09221908A true JPH09221908A (en) 1997-08-26

Family

ID=12238603

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2807396A Pending JPH09221908A (en) 1996-02-15 1996-02-15 Method of installation construction of elevator

Country Status (1)

Country Link
JP (1) JPH09221908A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963425A (en) * 2015-06-25 2015-10-07 中建三局第二建设工程有限责任公司 Construction method of suspended elevator shaft of seismic isolation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963425A (en) * 2015-06-25 2015-10-07 中建三局第二建设工程有限责任公司 Construction method of suspended elevator shaft of seismic isolation system

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
JPH09221908A (en) Method of installation construction of elevator
JP2878936B2 (en) Elevator installation method
JPH08245116A (en) Installation engineering of elevator
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
JP2612258B2 (en) Elevator installation construction method
JP2000226169A (en) Elevator erection method
JP3920527B2 (en) Elevator for construction
JP2019167214A (en) Modification method of elevator
JPH0776473A (en) Apparatus and method for installing elevator
JP3253441B2 (en) Elevator installation method
JP3214325B2 (en) Elevator installation method
JPH021066B2 (en)
JP6833070B2 (en) Elevator and its repair method
JPH0747453B2 (en) Elevator installation method
JPH10218527A (en) Temporary elevator and installing method thereof
JP2674392B2 (en) Hydraulic elevator installation method
JP6868342B2 (en) Effective use of vertical hole space in the construction process of multi-story buildings
JP2022149393A (en) lifting system
JPS61127586A (en) Method of installation construction of skew elevator
JPH05201648A (en) Installation of elevator
JPH0840666A (en) Method for installing elevator
JPS5912064A (en) Method of construction of installation of elevator
JPH01256484A (en) Installation practice for elevator
JP2003253887A (en) Construction equipment and construction method