JPH0848489A - Installation of rear post supporting cable in jib crane - Google Patents
Installation of rear post supporting cable in jib craneInfo
- Publication number
- JPH0848489A JPH0848489A JP18374994A JP18374994A JPH0848489A JP H0848489 A JPH0848489 A JP H0848489A JP 18374994 A JP18374994 A JP 18374994A JP 18374994 A JP18374994 A JP 18374994A JP H0848489 A JPH0848489 A JP H0848489A
- Authority
- JP
- Japan
- Prior art keywords
- rear post
- cylinder
- boom
- cable
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Jib Cranes (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、ジブクレーンに関す
るものであり、特に、リヤポストを設けたジブクレーン
に於けるリヤポスト支持ケーブルの組付け方法に関する
ものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jib crane, and more particularly to a method of assembling a rear post support cable in a jib crane having a rear post.
【0002】[0002]
【従来の技術】従来のジブクレーンに於けるリヤポスト
支持ケーブルの組付け方法を説明する。先ず、ジブクレ
ーンの組立に際して走行機体等に枢着されているブーム
を水平状態に倒回する。続いて、ブームヘッドに枢着し
たリヤポストをほぼ垂直に起立させてリヤポストとブー
ムとにリヤポスト支持ストラットを介装する。リヤポス
ト支持ストラットは摺動自在な二重管に圧縮コイルばね
が介装されて圧縮荷重を支持するように形成されてい
る。そして、予めリヤポストの先端部位にリヤポスト支
持ケーブルの一端部を取付け、補助クレーンにてリヤポ
スト支持ケーブルをブームの基部方向へ引張り、ブーム
の基部近傍に設けたケーブルリンクへリヤポスト支持ケ
ーブルの他端部を係止した後にブームを所定角度へ起立
させて作業姿勢としている。2. Description of the Related Art A method of assembling a rear post supporting cable in a conventional jib crane will be described. First, at the time of assembling the jib crane, the boom pivotally attached to the traveling machine body is tilted horizontally. Then, the rear post pivotally attached to the boom head is erected almost vertically, and the rear post supporting strut is interposed between the rear post and the boom. The rear post supporting strut is formed so that a compression coil spring is interposed in a slidable double tube to support a compression load. Then, attach one end of the rear post support cable to the tip of the rear post in advance, pull the rear post support cable toward the base of the boom with an auxiliary crane, and attach the other end of the rear post support cable to the cable link provided near the base of the boom. After locking, the boom stands up to a predetermined angle and is in a working position.
【0003】[0003]
【発明が解決しようとする課題】従来は、リヤポスト支
持ケーブルの組付けに際し、補助クレーンにてリヤポス
ト支持ケーブルをリヤポスト支持ストラットの反撥力に
抗して横方向へ引張り、リヤポスト支持ケーブルの端部
をブームへ結合しており、ケーブルの引張作業及び結合
作業に労力を要するとともに、危険性の高い作業のため
事故発生の虞れがある。そこで、リヤポスト支持ケーブ
ルの組付け作業を容易化して作業性を向上し、且つ、危
険性を解消するために解決すべき技術的課題が生じてく
るのであり、本発明は上記課題を解決することを目的と
する。Conventionally, when assembling the rear post support cable, the auxiliary post crane pulls the rear post support cable laterally against the repulsive force of the rear post support strut so that the end portion of the rear post support cable is pulled. Since it is connected to the boom, labor is required for pulling and connecting the cables, and there is a risk of accidents due to high-risk work. Therefore, there is a technical problem to be solved in order to facilitate the work of assembling the rear post support cable, improve the workability, and eliminate the risk, and the present invention solves the above problem. With the goal.
【0004】[0004]
【課題を解決するための手段】この発明は、上記目的を
達成するために、ジブクレーンのリヤポストとブームと
に油圧シリンダを介装して前記リヤポストを回動自在と
し、二分割されたリヤポスト支持ケーブルの一方のリヤ
ポスト支持ケーブルの一端部をリヤポストの先端部に係
止し、他方のリヤポスト支持ケーブルの一端部を前記ブ
ームのケーブル取付部に係止し、前記油圧シリンダを収
縮状態としてリヤポストをブーム側に倒回し、前記二本
のリヤポスト支持ケーブルを連結した後に前記油圧シリ
ンダを伸長し、前記リヤポストを所定角度へ起立させて
前記リヤポスト支持ケーブルを架設するジブクレーンに
於けるリヤポスト支持ケーブルの組付け方法を提案する
ものである。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention has a rear post of a jib crane and a boom, wherein a hydraulic cylinder is interposed between the rear post and the rear post so that the rear post is rotatable and the rear post support cable is divided into two parts. One end of one rear post support cable is locked to the tip of the rear post, and one end of the other rear post support cable is locked to the boom cable attachment part, and the hydraulic cylinder is contracted to bring the rear post to the boom side. After assembling the rear post support cable in the jib crane, the hydraulic cylinder is extended after connecting the two rear post support cables, and the rear post is erected at a predetermined angle. It is a proposal.
【0005】[0005]
【作用】本発明は、リヤポスト及びジブ俯仰ロープ等の
荷重を支持すべくリヤポストとブームとに介装されるリ
ヤポスト支持装置として油圧シリンダを用いている。リ
ヤポスト支持ケーブルを組付ける際は、リヤポスト支持
シリンダを収縮させて、水平状態のブームに対して起立
しているリヤポストを傾斜させる。これによって、リヤ
ポストの先端部とブームのケーブル取付部位との距離が
接近し、リヤポストとブームとに夫々係止したリヤポス
ト支持ケーブルを容易に連結することができる。そし
て、ケーブル接続後にリヤポスト支持シリンダを伸長す
れば、リヤポストが所定角度に起立してリヤポスト支持
ケーブルが張架される。According to the present invention, a hydraulic cylinder is used as a rear post supporting device interposed between the rear post and the boom to support the load of the rear post and the jib / elevation rope. When assembling the rear post support cable, the rear post support cylinder is contracted to tilt the rear post standing upright with respect to the boom in the horizontal state. As a result, the distance between the tip of the rear post and the cable attachment portion of the boom is reduced, and the rear post support cables locked to the rear post and the boom can be easily connected. When the rear post support cylinder is extended after connecting the cables, the rear post stands up at a predetermined angle and the rear post support cable is stretched.
【0006】[0006]
【実施例】以下、この発明の一実施例を図に従って詳述
する。図1はジブクレーン1を示し、走行機体2の上部
旋回体3にタワーブーム4が枢着され、起立したタワー
ブーム4のブームヘッド5にジブ6、フロントポスト7
及びリヤポスト8が枢着されている。リヤポスト8とブ
ームヘッド5とにはテレスコピック形のリヤポスト支持
シリンダ9が介装され、リヤポスト8の先端部とタワー
ブーム4の基部近傍のケーブルリンク10とは2本のリ
ヤポスト支持ケーブル11,12を直列接続して連結さ
れている。また、ジブ6の先端部とフロントポスト7は
ジブ支持ケーブル13によって連結されており、フロン
トポスト7とリヤポスト8の夫々の先端部位に設けられ
た滑車装置14,15にジブ俯仰ロープ16が巻回さ
れ、ジブ俯仰ロープ16の端部は上部旋回体3のジブ起
伏ドラム17に止着されている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to the drawings. FIG. 1 shows a jib crane 1, in which a tower boom 4 is pivotally attached to an upper revolving structure 3 of a traveling body 2, and a boom head 5 of the tower boom 4 which has stood upright has a jib 6 and a front post 7.
And the rear post 8 is pivotally attached. A telescopic type rear post support cylinder 9 is interposed between the rear post 8 and the boom head 5, and two rear post support cables 11 and 12 are connected in series with a tip end of the rear post 8 and a cable link 10 near the base of the tower boom 4. Connected and linked. Further, the front end of the jib 6 and the front post 7 are connected by a jib support cable 13, and the jib elevation rope 16 is wound around the pulley devices 14 and 15 provided at the front end portions of the front post 7 and the rear post 8, respectively. The end of the jib raising / lowering rope 16 is fixed to the jib undulating drum 17 of the upper swing body 3.
【0007】リヤポスト支持シリンダ9は、外部シリン
ダ18に内部シリンダ19が内嵌され、内部シリンダ1
9は油圧によって伸縮自在となっている。また、内部シ
リンダ19に遊嵌されたピストン及びピストンロッド2
0は油圧系から遮断されており、外力に応じて伸縮す
る。In the rear post supporting cylinder 9, the inner cylinder 19 is fitted in the outer cylinder 18, and the inner cylinder 1
9 is expandable and contractible by hydraulic pressure. Further, the piston and piston rod 2 loosely fitted in the internal cylinder 19
0 is cut off from the hydraulic system and expands and contracts according to external force.
【0008】次に、ジブクレーン1の組立て工程におけ
るリヤポスト支持ケーブル11,12の組付け方法を説
明する。先ず、水平状態に倒回したタワーブーム4のブ
ームヘッド5にリヤポスト8、フロントポスト7、ジブ
6を取付ける。そして、リヤポスト8の先端部には一方
のリヤポスト支持ケーブル11の一端部を結合する。ま
た、タワーブーム4のケーブルリンク10に他方のリヤ
ポスト支持ケーブル12の一端部を接続し、このリヤポ
スト支持ケーブル12をタワーブーム4上に敷いてその
他端部をリヤポスト8側に配置しておく。Next, a method of assembling the rear post support cables 11 and 12 in the assembly process of the jib crane 1 will be described. First, the rear post 8, the front post 7, and the jib 6 are attached to the boom head 5 of the tower boom 4 which has been tilted horizontally. Then, one end of one rear post support cable 11 is coupled to the tip of the rear post 8. Further, one end of the other rear post support cable 12 is connected to the cable link 10 of the tower boom 4, the rear post support cable 12 is laid on the tower boom 4, and the other end is arranged on the rear post 8 side.
【0009】図2に示すように、リヤポスト8の中間部
にはリヤポスト支持シリンダ9のピストンロッド20が
枢着されており、リヤポスト支持シリンダ9は収縮状態
でリヤポスト8に収納されている。そして、油圧ユニッ
トをリヤポスト支持シリンダ9に接続し、リヤポスト支
持シリンダ9を補助クレーンまたは走行機体のウインチ
にて支持しつつ内部シリンダ19を伸長し、リヤポスト
支持シリンダ9に枢着されているリンク21の端部をリ
ヤポスト8に結合してリヤポスト支持シリンダ9を所定
角度に保持させる。As shown in FIG. 2, a piston rod 20 of a rear post support cylinder 9 is pivotally attached to an intermediate portion of the rear post 8, and the rear post support cylinder 9 is housed in the rear post 8 in a contracted state. Then, the hydraulic unit is connected to the rear post support cylinder 9, the inner cylinder 19 is extended while the rear post support cylinder 9 is supported by the auxiliary crane or the winch of the traveling machine body, and the link 21 pivotally attached to the rear post support cylinder 9 is connected. The end portion is connected to the rear post 8 to hold the rear post support cylinder 9 at a predetermined angle.
【0010】次に、図3及び図4に示すように、ジブ俯
仰ロープ16を繰出してフロントポスト7の水平姿勢を
維持しつつ、補助クレーン22またはウインチにてリヤ
ポスト8をほぼ垂直に吊上げ、リヤポスト支持シリンダ
9のボトムをブームヘッド5に枢着する。そして、更に
ジブ俯仰ロープ16を繰出しながら油圧ユニット21に
よりリヤポスト支持シリンダ9を収縮し、図4中、鎖線
で示すようにリヤポスト8を45度程度後傾させる。こ
れにより、リヤポスト8に係止したリヤポスト支持ケー
ブル11の下端部がタワーブーム4側のリヤポスト支持
ケーブル12の先端部に接近して2本のリヤポスト支持
ケーブル11,12を接続できる状態となる。ここで、
前記リヤポスト支持ケーブル11,12を接続して、リ
ヤポスト支持シリンダ9を伸長し、図4中、実線で示す
ようにリヤポスト8をタワーブーム4に対して所定角度
(85°±3°程度)に起立させてリヤポスト支持ケー
ブル11,12を架設する。そして、リヤポスト支持シ
リンダ9に接続されている油圧ユニット23からのホー
スを取外し、リヤポスト支持シリンダ9の収縮側ポート
をブームヘッド5に設けた予備タンク24に接続した後
に、タワーブーム4を起立させて図1に示す作業姿勢と
する。Next, as shown in FIG. 3 and FIG. 4, the jib elevation rope 16 is extended to maintain the horizontal position of the front post 7, and the rear post 8 is lifted up substantially vertically by the auxiliary crane 22 or winch. The bottom of the support cylinder 9 is pivotally attached to the boom head 5. Then, the rear post support cylinder 9 is contracted by the hydraulic unit 21 while further feeding out the jib raising and lowering rope 16, and the rear post 8 is tilted backward about 45 degrees as shown by a chain line in FIG. As a result, the lower end of the rear post support cable 11 locked to the rear post 8 approaches the tip of the rear post support cable 12 on the tower boom 4 side, and the two rear post support cables 11 and 12 can be connected. here,
The rear post support cables 11 and 12 are connected to extend the rear post support cylinder 9, and the rear post 8 is erected at a predetermined angle (about 85 ° ± 3 °) with respect to the tower boom 4 as shown by the solid line in FIG. Then, the rear post support cables 11 and 12 are installed. Then, after removing the hose from the hydraulic unit 23 connected to the rear post support cylinder 9 and connecting the contraction side port of the rear post support cylinder 9 to the spare tank 24 provided in the boom head 5, the tower boom 4 is raised. The work posture is shown in FIG.
【0011】作業姿勢においては、リヤポスト8、リヤ
ポスト支持ケーブル11,12及びジブ俯仰ロープ16
の重量がリヤポスト支持シリンダ9によって支持され、
リヤポスト支持シリンダ9のピストンロッド20は荷重
によって収縮状態となっており、ピストンロッド20を
介して内部シリンダ19に荷重が加わる。この荷重によ
って外部シリンダ18の伸長側油室の圧力油が圧縮され
るが、収縮側ポートは予備タンク24に連通しているた
め荷重変動による負圧は発生しない。In the working posture, the rear post 8, the rear post supporting cables 11 and 12, and the jib elevation rope 16 are provided.
Is supported by the rear post support cylinder 9,
The piston rod 20 of the rear post support cylinder 9 is contracted by the load, and the load is applied to the internal cylinder 19 via the piston rod 20. This load compresses the pressure oil in the expansion-side oil chamber of the external cylinder 18, but since the contraction-side port communicates with the auxiliary tank 24, negative pressure due to load fluctuation does not occur.
【0012】揚重作業時においては、吊荷の荷重によっ
てジブ支持ケーブル13、ジブ俯仰ロープ16及びリヤ
ポスト支持ケーブル11,12が伸び、リヤポスト8が
起立方向へ回動するが、このとき、リヤポスト支持シリ
ンダ9のピストンロッド20はリヤポスト8の回動に伴
って伸長し、リヤポスト8の動きを阻害せず、リヤポス
ト8及びリヤポスト支持シリンダ9に過負荷が加わるこ
とはない。During lifting work, the jib supporting cable 13, the jib raising and lowering rope 16 and the rear post supporting cables 11 and 12 are stretched by the load of the suspended load, and the rear post 8 rotates in the upright direction. The piston rod 20 of the cylinder 9 extends along with the rotation of the rear post 8, does not hinder the movement of the rear post 8, and the rear post 8 and the rear post support cylinder 9 are not overloaded.
【0013】そして、吊荷を解放したときは、前記ジブ
支持ケーブル13、ジブ俯仰ロープ16及びリヤポスト
支持ケーブル11,12の収縮に伴ってリヤポスト8が
下降方向へ回動し、リヤポスト支持シリンダ9のピスト
ンロッド20が最収縮位置へ戻り、初期状態に復帰す
る。When the suspended load is released, the rear post 8 pivots in the descending direction as the jib supporting cable 13, the jib raising and lowering rope 16 and the rear post supporting cables 11 and 12 contract, and the rear post supporting cylinder 9 moves. The piston rod 20 returns to the most contracted position and returns to the initial state.
【0014】尚、本発明は上記一実施例に限定されるべ
きものではなく、本発明の精神を逸脱しない限り種々の
改変をなすことができ、本発明がそれらの改変されたも
のに及ぶことは当然である。The present invention should not be limited to the above-mentioned embodiment, but various modifications can be made without departing from the spirit of the present invention, and the present invention covers those modifications. Is natural.
【0015】[0015]
【発明の効果】この発明は、上記一実施例において詳述
したように、油圧シリンダであるリヤポスト支持シリン
ダを収縮してリヤポストを傾動し、リヤポストの先端部
とブームのリヤポスト支持ケーブル取付部との距離を接
近させることにより、リヤポスト支持ケーブルの接続を
極めて容易に行える。また、従来の補助クレーン等によ
るリヤポスト支持ケーブルの緊張工程を不要としたた
め、接続作業時の危険性が解消され、作業性並びに安全
性の向上に寄与できる。As described in detail in the above-mentioned embodiment, the present invention contracts the rear post supporting cylinder which is a hydraulic cylinder to tilt the rear post, and thereby the tip of the rear post and the rear post supporting cable mounting portion of the boom are connected. By making the distances closer, the rear post support cable can be connected very easily. Further, since the tensioning process of the rear post supporting cable by the conventional auxiliary crane is not necessary, the danger at the time of connecting work is eliminated, and it is possible to contribute to the improvement of workability and safety.
【図1】ジブクレーンの側面図。FIG. 1 is a side view of a jib crane.
【図2】リヤポスト支持シリンダの組付工程を示し、シ
リンダ装着前の状態を示す解説図。FIG. 2 is an explanatory view showing a process of assembling the rear post support cylinder, showing a state before the cylinder is attached.
【図3】リヤポスト支持シリンダの組付工程を示し、シ
リンダ装着後の状態を示す解説図。FIG. 3 is an explanatory view showing a process of assembling the rear post support cylinder, showing a state after the cylinder is attached.
【図4】リヤポスト支持ケーブルの接続及び緊張工程を
示す解説図。FIG. 4 is an explanatory diagram showing a connection and tension process of a rear post support cable.
1 ジブクレーン 4 タワーブーム 5 ブームヘッド 6 ジブ 8 リヤポスト 9 リヤポスト支持シリンダ 10 ケーブルリンク 11,12 リヤポスト支持ケーブル 13 ジブ支持ケーブル 16 ジブ俯仰ロープ 18 外部シリンダ 19 内部シリンダ 20 ピストンロッド 21 リンク 23 油圧ユニット 24 予備タンク 1 Jib Crane 4 Tower Boom 5 Boom Head 6 Jib 8 Rear Post 9 Rear Post Support Cylinder 10 Cable Link 11, 12 Rear Post Support Cable 13 Jib Support Cable 16 Jib Depth Rope 18 External Cylinder 19 Inner Cylinder 20 Piston Rod 21 Link 23 Hydraulic Unit 24 Spare Tank
───────────────────────────────────────────────────── フロントページの続き (72)発明者 久野 正夫 愛知県大府市朝日町6丁目1番地 住友建 機株式会社名古屋工場内 (72)発明者 桑森 誠一郎 愛知県大府市朝日町6丁目1番地 住友建 機株式会社名古屋工場内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Masao Kuno, 6-1, Asahi-machi, Obu-shi, Aichi Prefecture Sumitomo Construction Machinery Co., Ltd. Nagoya factory (72) Inventor, Seiichiro Kuwamori 6-1-1, Asahi-cho, Obu-shi, Aichi Sumitomo Construction Machinery Co., Ltd. Nagoya factory
Claims (1)
油圧シリンダを介装して前記リヤポストを回動自在と
し、二分割されたリヤポスト支持ケーブルの一方のリヤ
ポスト支持ケーブルの一端部をリヤポストの先端部に係
止し、他方のリヤポスト支持ケーブルの一端部を前記ブ
ームのケーブル取付部に係止し、前記油圧シリンダを収
縮状態としてリヤポストをブーム側に倒回し、前記二本
のリヤポスト支持ケーブルを連結した後に前記油圧シリ
ンダを伸長し、前記リヤポストを所定角度へ起立させて
前記リヤポスト支持ケーブルを架設するジブクレーンに
於けるリヤポスト支持ケーブルの組付け方法。1. A rear cylinder and a boom of a jib crane are equipped with a hydraulic cylinder to allow the rear cylinder to freely rotate, and one end of one of the rear cylinder support cables divided into two is attached to the tip of the rear cylinder. Stop, one end of the other rear post support cable is locked to the cable attachment portion of the boom, the hydraulic cylinder is contracted, the rear post is tilted to the boom side, and after connecting the two rear post support cables, A method of assembling a rear post support cable in a jib crane, wherein a hydraulic cylinder is extended, the rear post is erected at a predetermined angle, and the rear post support cable is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18374994A JP2726239B2 (en) | 1994-08-04 | 1994-08-04 | Assembling method of rear post supporting cable in jib crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP18374994A JP2726239B2 (en) | 1994-08-04 | 1994-08-04 | Assembling method of rear post supporting cable in jib crane |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0848489A true JPH0848489A (en) | 1996-02-20 |
JP2726239B2 JP2726239B2 (en) | 1998-03-11 |
Family
ID=16141310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP18374994A Expired - Fee Related JP2726239B2 (en) | 1994-08-04 | 1994-08-04 | Assembling method of rear post supporting cable in jib crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2726239B2 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007290782A (en) * | 2006-04-20 | 2007-11-08 | Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd | Tower crane |
JP5295417B1 (en) * | 2012-08-27 | 2013-09-18 | Ihi建機株式会社 | crane |
EP3098193A1 (en) | 2015-05-27 | 2016-11-30 | Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd. | Crane |
JP2017154845A (en) * | 2016-02-29 | 2017-09-07 | 日立住友重機械建機クレーン株式会社 | Post driving device |
JP2018048015A (en) * | 2016-09-23 | 2018-03-29 | コベルコ建機株式会社 | Method for assembling mobile crane |
JP2018048014A (en) * | 2016-09-23 | 2018-03-29 | コベルコ建機株式会社 | Method for assembling mobile crane |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104355249A (en) * | 2014-11-10 | 2015-02-18 | 武桥重工集团股份有限公司 | Foldable device capable of preventing suspension arm from tilting backwards for large luffing crane |
JP6179559B2 (en) * | 2015-06-19 | 2017-08-16 | コベルコ建機株式会社 | Strut raising method and crane |
-
1994
- 1994-08-04 JP JP18374994A patent/JP2726239B2/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007290782A (en) * | 2006-04-20 | 2007-11-08 | Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd | Tower crane |
JP5295417B1 (en) * | 2012-08-27 | 2013-09-18 | Ihi建機株式会社 | crane |
US8863964B2 (en) | 2012-08-27 | 2014-10-21 | IHI Construction Machinery Limited | Crane |
EP3098193A1 (en) | 2015-05-27 | 2016-11-30 | Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd. | Crane |
JP2016222359A (en) * | 2015-05-27 | 2016-12-28 | 日立住友重機械建機クレーン株式会社 | crane |
US10099905B2 (en) | 2015-05-27 | 2018-10-16 | Hitachi Sumitomo Heavy Industries Construction Crane Co., Ltd. | Crane |
JP2017154845A (en) * | 2016-02-29 | 2017-09-07 | 日立住友重機械建機クレーン株式会社 | Post driving device |
JP2018048015A (en) * | 2016-09-23 | 2018-03-29 | コベルコ建機株式会社 | Method for assembling mobile crane |
JP2018048014A (en) * | 2016-09-23 | 2018-03-29 | コベルコ建機株式会社 | Method for assembling mobile crane |
Also Published As
Publication number | Publication date |
---|---|
JP2726239B2 (en) | 1998-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2542828C2 (en) | Method for assembling, dismantling and transportation of mobile crane | |
JP5475960B2 (en) | Mast raising structure and process for high capacity mobile lift crane | |
JP6348453B2 (en) | crane | |
US4953720A (en) | Crane and method for using crane | |
US4976361A (en) | Mobile crane comprising a telescopic boom | |
JP2883860B2 (en) | Crane jib overhang and storage device and its overhang and storage method | |
JPH0848489A (en) | Installation of rear post supporting cable in jib crane | |
JP2017137164A (en) | Method for mounting jib of crane | |
CN206185355U (en) | High altitude (HA) scope is with welding auxiliary machinery arm | |
JP3946897B2 (en) | Tower crane with telescopic boom | |
JP4835209B2 (en) | Crane winch removal method and upper swing body | |
JP4422845B2 (en) | Counterweight mounting method and frame support means | |
CN114105000A (en) | Hoisting assembly and tower crane | |
JP3566418B2 (en) | Mobile crane with luffing jib | |
JP2824032B2 (en) | Boom head attachment / detachment device | |
CN220564168U (en) | Tower crane | |
JP3182333B2 (en) | Pile driver leader lifting suspension equipment | |
JPH10120371A (en) | Bridle moving device | |
JP7234811B2 (en) | A crane strut, a method for folding a crane strut, and a method for assembling a crane strut | |
JPH09240989A (en) | Auxiliary jib | |
CN117307930B (en) | Intelligent security monitoring device of building | |
JPH078628Y2 (en) | Front frame undulation device for excavators | |
JP2726236B2 (en) | Jib crane rear post support device | |
JP4848094B2 (en) | Roughing jib equipment for self-propelled crane | |
JP6816647B2 (en) | Jib pull-in device and jib pull-in method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20081205 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20081205 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091205 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20101205 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101205 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 14 Free format text: PAYMENT UNTIL: 20111205 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111205 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121205 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121205 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 16 Free format text: PAYMENT UNTIL: 20131205 |
|
LAPS | Cancellation because of no payment of annual fees |