- Publication number
- JPH0829277B2 JPH0829277B2 JP1162400A JP16240089A JPH0829277B2 JP H0829277 B2 JPH0829277 B2 JP H0829277B2 JP 1162400 A JP1162400 A JP 1162400A JP 16240089 A JP16240089 A JP 16240089A JP H0829277 B2 JPH0829277 B2 JP H0829277B2
- Authority
- JP
- Japan
- Prior art keywords
- filter
- partition plate
- chamber
- air supply
- booth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は給気付塗装ブームに関し、特に、整流仕切板
を移動可能に形成したものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of use] The present invention relates to an air-supplying painting boom, and more particularly, to a rectifying partition plate that is movable.
[従来の技術] 第5図に給気付塗装ブースの一般的構造を示す。1は
給気室で、空調空気が送給される動圧室2及び静圧室3
が整流仕切板10を介して上下に連接形成されている。4
はワークWに塗装を施す塗装室であって給気室1に下方
にフィルタ30を介して配設されている。また、この塗装
室4の下方には塗装室4内の空気を塗装ミスト等ととも
に吸引して排出させる排気処理室5が配設されている。[Prior Art] Fig. 5 shows a general structure of a paint booth with air supply. Reference numeral 1 denotes an air supply chamber, which is a dynamic pressure chamber 2 and a static pressure chamber 3 to which conditioned air is fed.
Are vertically connected to each other via a flow control partition plate 10. Four
Is a coating chamber for coating the work W, and is disposed below the air supply chamber 1 via a filter 30. Further, below the coating chamber 4, an exhaust processing chamber 5 is arranged for sucking and discharging the air in the coating chamber 4 together with the coating mist and the like.
かかる塗装ブースでは、例えば、動圧室2が1.5〜2m,
静圧室3が2m,塗装室4が4〜5m,排気処理室5が2〜3m
とであるから4階建の総高約11〜15mとなる。したがっ
て、建家建設費,運用諸事情からして総高を低くするこ
とが有利である。また、建築制限がある場合や既存建家
を利用する場合等においては、その一部を地下式としな
ければならないので一層不利となる。In such a coating booth, for example, the dynamic pressure chamber 2 is 1.5-2 m,
Static pressure chamber 3 is 2m, coating chamber 4 is 4-5m, exhaust treatment chamber 5 is 2-3m.
Therefore, the total height of the four-story building is about 11 to 15m. Therefore, it is advantageous to lower the total amount from the viewpoint of building construction costs and operational circumstances. In addition, when there are building restrictions or when using an existing building, some of them must be underground, which is even more disadvantageous.
ここに、塗装室4,排気処理室5の高さは収納機器から
して制約がある。給気室1の動圧室2は整流効果保持の
ため必要以上に低くすることは許されない。一方、従来
静圧室3はフィルタ30の交換作業のために人間工学的見
地との妥協のもとに高さが決められている。フィルタ押
え31を引上げかつフィルタ30の敷設適宜のためであり、
整流乃至空気流動上に必須のものでない。Here, the heights of the coating chamber 4 and the exhaust treatment chamber 5 are limited by the storage equipment. The dynamic pressure chamber 2 of the air supply chamber 1 cannot be made lower than necessary to maintain the rectification effect. On the other hand, the height of the static pressure chamber 3 is conventionally determined by a compromise with the ergonomic viewpoint for the replacement work of the filter 30. It is for pulling up the filter retainer 31 and laying the filter 30 as appropriate.
It is not essential for rectification or air flow.
そこで、動圧室2と静圧室3とを総合的に勘案して給
気室1全体を低くすることが提案されている。例えば実
開昭61−33664号に開示された構造は、整流仕切板
(6)とフィルタ(9)とを接近配設しかつ整流仕切板
(6)を複数の跳上げ式仕切板構造(6a,6b,6c)とし、
各仕切板(6a等)を動圧室(7)に跳上げたときに、そ
の空間を利用してフィルタ押え(10)を開放するという
ものである。Therefore, it has been proposed to consider the dynamic pressure chamber 2 and the static pressure chamber 3 comprehensively to lower the entire air supply chamber 1. For example, in the structure disclosed in Japanese Utility Model Laid-Open No. 61-33664, a straightening partition plate (6) and a filter (9) are arranged close to each other, and the straightening partition plate (6) has a plurality of flip-up partition plate structures (6a , 6b, 6c),
When each partition plate (6a, etc.) is jumped up to the dynamic pressure chamber (7), the space is utilized to open the filter retainer (10).
したがって、静圧室(8)を大幅に低くすることがで
きる。Therefore, the static pressure chamber (8) can be significantly lowered.
[発明が解決しようとする課題] しかしながら、上記の従来構造には次のような問題点
がある。[Problems to be Solved by the Invention] However, the above conventional structure has the following problems.
一般的塗装ブースの幅Wは約6mで、長さLは約80m
にも及ぶ、このために開閉型のフィルタ押え31等は、第
5図に示すように幅W方向に開閉等するものとなる。こ
れに対して、フィルタ30は短寸のものを多枚数敷つめる
よりも比較的長寸の少枚数を用いた方が交換作業が容易
となる。したがって、第6図に示すように例えばブース
長手方向に4分割した1区画L1相当の長さ20mのフィル
タをブース長手方向に敷設することになる。The width W of a general coating booth is about 6 m, and the length L is about 80 m.
For this reason, the openable filter holder 31 and the like are opened and closed in the width W direction as shown in FIG. On the other hand, the filter 30 can be replaced more easily by using a relatively small number of filters than a large number of short filters. Therefore, as shown in FIG. 6, for example, a filter having a length of 20 m corresponding to one section L1 divided into four in the booth longitudinal direction is laid in the booth longitudinal direction.
しかし、この場合には、補強用横梁材7のほかにフィ
ルタ30支持のための複数の縦梁材8を配設する必要があ
る。すると、両梁材7,8の交点部分9を含む縦梁材8の
部分が盲状態となるので、その下流側に空気乱流が起り
いわゆる舞上り現象が生ずるから排気処理室5に逃すべ
き塗料ミストが停滞し次のワークの塗装品質に悪影響を
及ぼす。また、実質的空気清浄面積が挟小化し、空調設
備のファン大型化やフィルタ30の寿命を短縮してしまう
欠点がある。さらに、第7図に示す如く、横梁材7上で
かつ縦梁材8,8間にパレテーナ,金網31,32を設け、その
上にフィルタ30を敷設することになるから、高さを小さ
くするという目的からすると縦梁材8の高さ分だけ寸法
的に不利である。However, in this case, in addition to the reinforcing horizontal beam member 7, it is necessary to dispose a plurality of vertical beam members 8 for supporting the filter 30. Then, the portion of the vertical beam member 8 including the intersection portion 9 of the two beam members 7 and 8 becomes a blind state, and air turbulence occurs at the downstream side thereof, causing a so-called soaring phenomenon, which should be escaped to the exhaust treatment chamber 5. The paint mist is stagnant and the coating quality of the next work is adversely affected. Further, there is a drawback that the effective air cleaning area is narrowed down, the fan of the air conditioning equipment is enlarged, and the life of the filter 30 is shortened. Further, as shown in FIG. 7, the height is reduced because the palletizer and the wire nets 31, 32 are provided on the horizontal beam member 7 and between the vertical beam members 8, 8 and the filter 30 is laid on the palletizer. For that purpose, the height of the vertical beam member 8 is dimensionally disadvantageous.
塗装品質保障及び円滑運用等の点から、一般的には
少なくとも1〜3月に1回はフィルタ30を交換する必要
があるところ、その都度に仕切板(6a等)やフィルタ押
え31を開閉しなければならず作業煩雑で作業能率が悪
い。From the viewpoint of ensuring coating quality and smooth operation, it is generally necessary to replace the filter 30 at least once every 1 to 3 months, and the partition plate (6a etc.) and the filter retainer 31 are opened and closed each time. It has to be complicated and the work efficiency is poor.
しかも、具体的交換作業にあたって、作業者は嵩高
で高重量のフィルタ30を敷設箇所に荷運びしなければな
らず重労働かつ危険性を伴う。Moreover, in the case of the concrete replacement work, the worker has to carry the bulky and heavy filter 30 to the laying place, which causes heavy labor and is dangerous.
また、敷設作業は、1.5〜2mの動圧室2内で中腰姿勢
で行われるから長時間を必要とし疲労が激しい。In addition, since the laying work is performed in a mid-waist posture within the dynamic pressure chamber 2 of 1.5 to 2 m, it requires a long time and is very fatigued.
本発明の目的は、上記従来欠点の全てを一掃し、総高
を低くし、フィルタ交換作業を迅速、容易かつ安全に行
えるとともに長期に亘る円滑運転と塗装品質を保障でき
る給気付塗装ブースを提供することにある。An object of the present invention is to eliminate all of the above-mentioned conventional drawbacks, to reduce the total height, to perform a filter replacement work quickly, easily and safely, and to provide a supply booth with air supply capable of ensuring smooth operation and coating quality for a long period of time. To do.
[課題を解決するための手段] 本発明は、空調空気が送給される動圧室および静圧室
が整流仕切板を介して上下に連接形成された給気室と、
この給気室の下方にフィルタを介して配設された塗装室
と、この塗装室の下方に配設された排気処理室とからな
る給気付塗装ブースにおいて、 前記整流仕切板が、前記フィルタに接近かつ平行配設
された上部案内レールにそれぞれ移動可能に支持された
複数の上部整流仕切板と該上部案内レールの下方に接近
配設された下部案内レールにそれぞれ移動可能に支持さ
れた複数の下部整流仕切板とから構成されていることを
特徴とする。[Means for Solving the Problems] The present invention provides an air supply chamber in which a dynamic pressure chamber and a static pressure chamber to which conditioned air is supplied are vertically connected through a rectifying partition plate,
In a supply booth with an air supply consisting of a coating chamber disposed below the air supply chamber via a filter and an exhaust treatment chamber disposed below the coating chamber, the rectifying partition plate serves as the filter. A plurality of upper rectifying partition plates movably supported by upper guide rails arranged close to each other and a plurality of lower guide rails movably supported by the lower guide rails arranged below the upper guide rails. It is characterized by being composed of a lower flow straightening partition plate.
[作 用] 本発明では、整流仕切板をフィルタに接近かつ平行配
設しているので静圧室を挟小とし総高を低くできる。フ
ィルタ交換に際しては、上部及び下部整流仕切板の適数
を上部及び下部案内レールに沿って移動し敷設面を全面
的に露出できるからフィルタ交換作業が極めて容易かつ
迅速にできる。しかも、フィルタを整流仕切体に載置さ
せて搬送できるので過大労力を必要とすることなく安全
でもある。また作業者は整流仕切板に腰掛けてフィルタ
交換作業を行えるので作業容易である。[Operation] In the present invention, since the rectifying partition plate is arranged close to and parallel to the filter, the static pressure chamber can be made small and the total height can be reduced. When exchanging the filter, an appropriate number of upper and lower flow regulating partition plates can be moved along the upper and lower guide rails to expose the entire laying surface, so that the filter exchanging work can be performed very easily and quickly. Moreover, since the filter can be placed on the rectifying partition and transported, it is safe without requiring excessive labor. Further, the operator can sit down on the rectifying partition plate to perform the filter replacement work, which is easy.
一方、フィルタ交換後は、全整流仕切板を整列配設す
ることにより所期の整流効果を保障できる。フィルタ保
持用の従来縦梁材が必要ないので塗料ミストの舞上り現
象が極減されかつ実質空気清浄面積が大きいので長時間
に亘り空気抵抗の小さい円滑運転とこれによる高品質塗
装を行える。On the other hand, after the filter is replaced, the desired straightening effect can be guaranteed by arranging all the straightening partition plates in line. Since the conventional vertical beam material for holding the filter is not required, the phenomenon of paint mist rising is minimized and the effective air cleaning area is large, so that smooth operation with low air resistance for a long time and high quality coating can be performed.
[実施例] 以下、本発明の一実施例を図面に基づいて説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.
この実施例は第1図〜第3図に示される。塗装ブース
の基本的構成は従来構成と同じく、給気室1(動圧室2,
静圧室3)、塗装室4および排気処理室5からなる。し
たがって、これらについての説明は省略する。This embodiment is shown in FIGS. The basic structure of the coating booth is the same as the conventional structure, including the air supply chamber 1 (dynamic pressure chamber 2,
It consists of a static pressure chamber 3), a coating chamber 4 and an exhaust treatment chamber 5. Therefore, description of these is omitted.
ここに、本発明の技術的特徴は、整流仕切板10を移動
式としたことである。Here, the technical feature of the present invention is that the rectifying partition plate 10 is movable.
すなわち、整流仕切板10がフィルタ30に上下方向に接
近かつ平行配設された上部案内レール15にそれぞれ移動
可能に支持された複数の上部整流仕切板11とこの上部案
内レール15の下方に接近配設された下部案内レール25に
それぞれ移動可能に支持された複数の下部整流仕切板21
とから構成されている。That is, a plurality of upper rectifying partition plates 11 that are movably supported by upper guide rails 15 that are vertically movably close to the filter 30 and are arranged in parallel with the rectifying partition plate 10 are arranged below the upper guide rails 15. A plurality of lower rectifying partition plates 21 each movably supported by the lower guide rails 25 provided.
It consists of and.
第1図は要部の拡大図であり、通常運転状態を示す。
7は補強用横梁材であり、前出第6図に示した状態と同
じく例えば1650mmごとのピッチで配設されている。この
ピッチに上部整流板11と下部整流板21との各1枚が対応
するものとされている。そして、1枚のフィルタ30は、
長さLfがブース幅W(例えば6m)と同じで、幅Wfが上記
ピッチと同じとされ、第2図の天井ビーム28,28間に渡
架されたパレテーナ31,金網32上に、ブースの幅方向た
るX方向に敷設されるものと形成されている。天井ビー
ム28,28はブース側壁にブース長手方向たるY方向に延
在配設されている。FIG. 1 is an enlarged view of a main part and shows a normal operation state.
Reference numeral 7 is a reinforcing cross beam, which is arranged at a pitch of, for example, 1650 mm as in the state shown in FIG. One of each of the upper straightening plate 11 and the lower straightening plate 21 corresponds to this pitch. And one filter 30 is
The length Lf is the same as the booth width W (for example, 6 m), the width Wf is the same as the above pitch, and the booth is placed on the palletizer 31 and the wire net 32 that are bridged between the ceiling beams 28 and 28 in FIG. It is formed to be laid in the X direction which is the width direction. The ceiling beams 28, 28 are arranged on the side wall of the booth so as to extend in the Y direction which is the longitudinal direction of the booth.
隙間排除のためフィルタ30の両側端は、第1図に示す
如く各固定金具37,ワンタッチ式のストッパ36,可動金具
35によって横梁材7,7に気密係合される。To eliminate the gap, both ends of the filter 30 are fixed metal fittings 37, one-touch type stopper 36, movable metal fittings as shown in FIG.
35 is airtightly engaged with the cross beam members 7, 7.
さて、上部(下部)整流仕切板11(21)は、一定ピッ
チで配設された複数の固定チャンネル12(22)と各固定
チャンネル12(22)の図示しないバカ穴にY方向に相対
移動可能に係合されかつボルト14(24)で当該固定チャ
ンネル12(22)に位置固定可能な調整板材13(26)とか
らなり、全体としてローラ16(26)を介しブース側壁に
固定された上部(下部)案内レール15(25)にY方向に
移動可能である。By the way, the upper (lower) rectifying partition plate 11 (21) can be relatively moved in the Y direction to a plurality of fixed channels 12 (22) arranged at a constant pitch and unillustrated stupid holes of each fixed channel 12 (22). And an adjustment plate member 13 (26) which is engaged with the bolt and can be positionally fixed to the fixed channel 12 (22) by a bolt 14 (24), and which is fixed to the booth side wall via rollers 16 (26) as a whole ( It can be moved in the Y direction to the lower guide rail 15 (25).
したがって、各整流仕切板11,21を第1図の如く静止
配設すれば、各固定チャンネル12(22)間(詳しくは、
調整板材13で幅調整した隣接固定チャンネル12との間)
が空気流路Rとなり、そのY方向寸法は調整板材13(2
6)の位置変更により調整できる。Therefore, if the respective rectifying partition plates 11 and 21 are statically arranged as shown in FIG. 1, between the fixed channels 12 (22) (specifically,
Between the adjacent fixed channel 12 whose width is adjusted by the adjusting plate 13)
Is the air flow path R, and the dimension in the Y direction is the adjustment plate material 13 (2
It can be adjusted by changing the position in 6).
なお、各整流仕切板11,21の長さは、ブース幅W(6
m)と同じ寸法の一枚板構造としたが、必要によって2
分割板構造等の適宜な形態とすることができる。また、
幅も横梁材7,7間ピッチの半分でなくとも実施できる。
各整流仕切板11,21の移動方向のおよびフィルタ30の敷
設方向もブースの形態・大きさ等により適宜に選択決定
すればよい。In addition, the length of each straightening partition plate 11, 21 is the booth width W (6
m) same size as single plate, but if necessary 2
An appropriate form such as a dividing plate structure can be adopted. Also,
The width can be implemented even if it is not half the pitch between the horizontal beam members 7.
The moving direction of each rectifying partition plate 11 and 21 and the laying direction of the filter 30 may be appropriately selected and determined depending on the shape and size of the booth.
かかる構造とすることにより、静圧室3の高さを20〜
80cmにも低くすることができる。この実施例では腰掛作
業便宜のために30〜60cmとしている。With such a structure, the height of the static pressure chamber 3 is 20 to
It can be as low as 80 cm. In this embodiment, the length is 30 to 60 cm for convenience of sitting work.
次に、作用を説明する。 Next, the operation will be described.
(通常運転) 各上部(下部)整流仕切板11(21)を第1図に示す態
様により整列配設させ、整流仕切板10をセットする。整
流効果は、各調整板材13(23)の位置調整により均一化
すればよい。(Normal operation) The upper (lower) rectifying partition plates 11 (21) are aligned in the manner shown in FIG. 1, and the rectifying partition plate 10 is set. The rectifying effect may be made uniform by adjusting the position of each adjusting plate member 13 (23).
したがって、動圧室2からの空気は、整流仕切板10で
均一整流され、フィルタ30を通し塗装室4へ給気され
る。Therefore, the air from the dynamic pressure chamber 2 is uniformly rectified by the rectifying partition plate 10 and is supplied to the coating chamber 4 through the filter 30.
(フィルタ交換) 適数の上部(下部)整流仕切板11(21)を、上部(下
部)案内レール15(25)に沿って第1図でY方向に移動
させる。移動後にフィルタ30面では動圧室2に露出す
る。ここに、作業者は、第4図に示す如く、上部整流仕
切板11に腰掛けた楽な姿勢で可動金具35,35を外し使用
済フィルタ30を取外・巻回して後方上部(下部)整流仕
切板11(21)上に載置し、引続き、別の上部(下部)整
流仕切板11(21)上に載置搬送してきた新たなフィルタ
30を一気に横梁材7,7間でX方向に敷設し可動金具35,35
をもってシールセットすればよい。(Replacement of Filter) An appropriate number of upper (lower) rectifying partition plates 11 (21) are moved in the Y direction in FIG. 1 along the upper (lower) guide rails 15 (25). After the movement, the filter 30 surface is exposed to the dynamic pressure chamber 2. Here, as shown in FIG. 4, the worker removes the movable metal fittings 35, 35 in a comfortable posture while sitting on the upper rectifying partition plate 11, removes and winds the used filter 30 to rectify the upper rear (lower) rectification. A new filter placed on the partition plate 11 (21) and then placed on another upper (lower) rectifying partition plate 11 (21) and conveyed.
30 is installed at a stretch in the X direction between the cross beam members 7,7 and movable metal fittings 35,35
You only have to set the seal.
このようにして、上部(下部)整流仕切板11(21)を
他所へ移動しかつ復元移動しつつブース長手方向のフィ
ルタ30を順次交換する。一度に数箇所,数十箇所で同時
作業もできる。In this way, the upper (lower) rectifying partition plate 11 (21) is moved to another place and restored, and the filters 30 in the longitudinal direction of the booth are sequentially replaced. You can work simultaneously at several or dozens of locations at the same time.
しかして、この実施例によれば、整流仕切板10が複数
の上部(下部)整流仕切板11(21)からなり、フィルタ
30に接近しかつ平行配設された上部(下部)案内レール
15(25)にそれぞれ移動可能とされているので、従来の
整流板・フィルタ押えの回転作業という煩雑・重労働が
一掃できフィルタ30の交換作業を迅速かつ容易に行え
る。Thus, according to this embodiment, the straightening partition plate 10 is composed of a plurality of upper (lower) straightening partition plates 11 (21),
Upper (lower) guide rails close to 30 and arranged in parallel
Since they can be moved to 15 (25) respectively, the complicated work and heavy labor such as the conventional work of rotating the current plate and the filter holder can be eliminated, and the replacement work of the filter 30 can be performed quickly and easily.
また、上部(下部)整流仕切板11(21)は、適所の適
数だけ移動できるから、新旧のフィルタ30の搬送を安全
かつ迅速に行え、フィルタ30の交換作業も腰掛けた楽な
姿勢で行えるので快適に高能率作業できる。しかも、一
度に数箇所において平行作業が行えるから一段と高能率
にできる。Further, since the upper (lower) rectifying partition plate 11 (21) can be moved by an appropriate number of places, the old and new filters 30 can be transported safely and quickly, and the replacement work of the filters 30 can be carried out in a comfortable posture. So you can work comfortably and efficiently. Moreover, since parallel work can be performed at several places at once, the efficiency can be further improved.
また、上部(下部)整流仕切板11(21)は、フィルタ
30に接近配設できるから、静圧室3の高さを小さくブー
ス全体の高さを低くでき設備経済も有利となる。上部
(下部)整流仕切板11(21)は水平移行であり従来の如
く動圧室2に立上げなくてよいから動圧室2の高さを小
さくできる。一方において、許容限度内において動圧室
2の高さを大きくとることが可能となるから、整流効果
を一段と向上できる。Also, the upper (lower) rectifying partition plate 11 (21) is a filter
Since it can be disposed close to 30, the height of the static pressure chamber 3 can be made small, and the height of the entire booth can be made low, so that the facility economy is also advantageous. Since the upper (lower) rectifying partition plate 11 (21) is horizontally moved and does not need to be raised to the dynamic pressure chamber 2 as in the conventional case, the height of the dynamic pressure chamber 2 can be reduced. On the other hand, since the height of the dynamic pressure chamber 2 can be increased within the allowable limit, the rectification effect can be further improved.
また、上部(下部)整流仕切板11(21)を同一寸法の
同一構造とすることができるから、フィルタ30の寸法も
画一化でき、この点からも交換作業能率を高められる。Further, since the upper (lower) rectifying partition plate 11 (21) can be made to have the same size and the same structure, the size of the filter 30 can be made uniform, and the replacement work efficiency can be improved also from this point.
さらに、上部(下部)整流仕切板11(21)は、ブース
長手方向(Y方向)に移動させる構成ゆえ、フィルタ30
をブース幅方向(X方向)に敷設できるので、機械的強
度は補強用横梁材7,7,…で十分でありフィルタ支持用の
縦梁材8,8,…を必要としない。したがって、前出第6図
に示した交点部9を含む縦梁材8の下側の塗料ミストの
舞上り現象を極減でき高品質塗装できる、とともに実質
空気清浄面の挟小化や空気流路抵抗増大化、第7図に示
した縦梁部材8による高さ増大という従来欠点を一掃で
き、この点からもブースを低く構築できる。Further, since the upper (lower) rectifying partition plate 11 (21) is moved in the booth longitudinal direction (Y direction), the filter 30
Can be laid in the booth width direction (X direction), so that the reinforcing cross beam members 7, 7, ... Are sufficient for the mechanical strength, and the vertical beam members 8, 8, .. Therefore, it is possible to minimize the rising phenomenon of the paint mist under the vertical beam member 8 including the intersections 9 shown in FIG. The conventional drawbacks of increased road resistance and increased height due to the vertical beam member 8 shown in FIG. 7 can be eliminated, and the booth can be constructed low also from this point.
[発明の効果] 本発明は、以上の説明から明らかの通り、整流仕切板
がフィルタに接近かつ平行配設された上部案内レールに
それぞれ移動可能に支持された複数の上部整流仕切板と
該上部案内レールの下方に接近配設された下部案内レー
ルにそれぞれ移動可能に支持された複数の下部整流仕切
板とから構成されているので、総高を低くし、フィルタ
交換作業を飛躍的に迅速・容易かつ安全に行え、長期に
亘る円滑運転と塗装高品質を保障することができる。[Advantages of the Invention] As is apparent from the above description, the present invention provides a plurality of upper rectifying partition plates, each of which is movably supported by an upper guide rail in which the rectifying partition plates are close to and parallel to the filter. Since it is composed of a plurality of lower rectifying partition plates, each of which is movably supported by a lower guide rail that is arranged close to the lower part of the guide rail, the total height is made low, and filter replacement work can be done rapidly. It can be done easily and safely, and can guarantee smooth operation for a long time and high quality of coating.
第1図は本発明の一実施例を示す要部の拡大図、第2図
は同じく全体構成図、第3図は同じく整流仕切板の配設
状態を説明するための図、第4図は同じく腰掛作業を説
明するための図、第5図〜第7図は従来給気付塗装ブー
スを示し、第5図は全体構成図、第6図はフィルタの平
面的敷設状態を説明するための図および第7図はフィル
タの立体的敷設状態を説明するための図である。 1……給気室、 2……動圧室、 3……静圧室、 4……塗装室、 5……排気処理室、 10……整流仕切板、 11……上部整流仕切板、 15……上部案内レール、 21……下部整流仕切板、 25……下部案内レール、 30……フィルタ。FIG. 1 is an enlarged view of a main part showing an embodiment of the present invention, FIG. 2 is the same overall configuration diagram, FIG. 3 is a view for explaining the disposition state of the rectifying partition plate, and FIG. Similarly, FIG. 5 to FIG. 7 are views for explaining the sitting work, and FIG. 5 to FIG. 7 show a conventional air-supply coating booth, FIG. 5 is an overall configuration diagram, and FIG. 6 is a diagram for explaining a planar laying state of the filter. And FIG. 7 is a diagram for explaining a three-dimensionally laid state of the filter. 1 ... Air supply chamber, 2 ... Dynamic pressure chamber, 3 ... Static pressure chamber, 4 ... Painting chamber, 5 ... Exhaust treatment chamber, 10 ... Rectifying partition plate, 11 ... Upper rectifying partition plate, 15 …… Upper guide rail, 21 …… Lower flow divider, 25 …… Lower guide rail, 30 …… Filter.
Claims (1)
が整流仕切板を介して上下に連接形成された給気室と、
この給気室の下方にフィルタを介して配設された塗装室
と、この塗装室の下方に配設された排気処理室とからな
る給気付塗装ブースにおいて、 前記整流仕切板が、前記フィルタに接近かつ平行配設さ
れた上部案内レールにそれぞれ移動可能に支持された複
数の上部整流仕切板と該上部案内レールの下方に接近配
設された下部案内レールにそれぞれ移動可能に支持され
た複数の下部整流仕切板とから構成されていることを特
徴とする給気付塗装ブース。1. An air supply chamber in which a dynamic pressure chamber and a static pressure chamber to which conditioned air is fed are vertically connected to each other via a rectifying partition plate,
In a supply booth with an air supply consisting of a coating chamber disposed below the air supply chamber via a filter and an exhaust treatment chamber disposed below the coating chamber, the rectifying partition plate serves as the filter. A plurality of upper rectifying partition plates movably supported by upper guide rails arranged close to each other and a plurality of lower guide rails movably supported by the lower guide rails arranged below the upper guide rails. A paint booth with air supply characterized by being composed of a lower flow rectifying partition plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1162400A JPH0829277B2 (en) | 1989-06-23 | 1989-06-23 | Paint booth with air supply |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1162400A JPH0829277B2 (en) | 1989-06-23 | 1989-06-23 | Paint booth with air supply |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0326359A JPH0326359A (en) | 1991-02-04 |
JPH0829277B2 true JPH0829277B2 (en) | 1996-03-27 |
Family
ID=15753884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1162400A Expired - Lifetime JPH0829277B2 (en) | 1989-06-23 | 1989-06-23 | Paint booth with air supply |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0829277B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITUB20153320A1 (en) * | 2015-09-01 | 2017-03-01 | Geico Spa | Spray booth with filter change system |
-
1989
- 1989-06-23 JP JP1162400A patent/JPH0829277B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0326359A (en) | 1991-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4926746A (en) | Work chamber with shifting ventilation zone | |
KR930009610B1 (en) | Clean room system | |
CA2109571A1 (en) | Paint spray booth with adjustable partitions | |
DE1433509A1 (en) | Hearth walls, especially back walls of industrial ovens, e.g. Siemens-Martin-OEfen | |
US4297940A (en) | Protective workplace and system | |
EP0365707B1 (en) | Cleaning apparatus for façades and similar surfaces | |
JPH0829277B2 (en) | Paint booth with air supply | |
US5291531A (en) | Auxiliary platform for boiling water reactors | |
WO2021063444A1 (en) | Treatment system and treatment method | |
DE3041991C2 (en) | Suction device for especially welding-related exhaust gases and vapors in workshops or the like. | |
DE3242215C2 (en) | ||
JPH03123652A (en) | Coating facility | |
JP2004100193A (en) | Working scaffold device for bridge railing part | |
DE9418619U1 (en) | Work cabin | |
DE102011052543A1 (en) | Method and device for enclosing the well gases in an aluminum electrolysis tank | |
DE3812094A1 (en) | Ceiling structure for clean rooms | |
DE2225603A1 (en) | VENTILATION SYSTEM | |
JP2597404Y2 (en) | All-weather work gondola | |
DE1679534A1 (en) | Process for air conditioning large offices or the like and arrangement for carrying out the process | |
JP2870444B2 (en) | Structure of multipurpose hanging roof arena with variable space | |
CN218668655U (en) | Modular assembly type edge concrete construction protection tool | |
JP2839660B2 (en) | Air conditioning system for large space buildings | |
JPH03262869A (en) | Work scaffolding | |
DE4312768A1 (en) | Machine tool for plate-shaped workpieces | |
JP2806579B2 (en) | Air conditioning system for large space buildings |