JPH0825634B2 - Work loader - Google Patents

Work loader

Info

Publication number
JPH0825634B2
JPH0825634B2 JP62200411A JP20041187A JPH0825634B2 JP H0825634 B2 JPH0825634 B2 JP H0825634B2 JP 62200411 A JP62200411 A JP 62200411A JP 20041187 A JP20041187 A JP 20041187A JP H0825634 B2 JPH0825634 B2 JP H0825634B2
Authority
JP
Japan
Prior art keywords
work
container
loading
positioning
loaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP62200411A
Other languages
Japanese (ja)
Other versions
JPS6443447A (en
Inventor
光雄 須藤
Original Assignee
石川島播磨重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島播磨重工業株式会社 filed Critical 石川島播磨重工業株式会社
Priority to JP62200411A priority Critical patent/JPH0825634B2/en
Publication of JPS6443447A publication Critical patent/JPS6443447A/en
Publication of JPH0825634B2 publication Critical patent/JPH0825634B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)
  • Pile Receivers (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、トランスファープレスで成形されたワーク
をトランスファープレスから取出しコンテナに積込む作
業を人手を掛けずに自動的に行い得るようにしたワーク
積込み装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of use] The present invention makes it possible to automatically carry out the work of taking out a work formed by a transfer press from a transfer press and loading it into a container without manpower. The present invention relates to a loading device.

[従来の技術] 従来、トランスファープレスで成形されたワークは、
例えば、トランスファープレス下流側に設置したチェー
ンコンベア等の搬送装置に移載され、搬送装置によって
所定位置まで搬送され、しかる後、作業員によって搬送
位置からおろされ、コンテナに積込まれていた。
[Prior art] Conventionally, a work formed by a transfer press is
For example, it was transferred to a transfer device such as a chain conveyor installed on the downstream side of the transfer press, transferred to a predetermined position by the transfer device, and then unloaded from the transfer position by an operator and loaded into a container.

[発明が解決しようとする問題点] ところが、上述のように作業員による手作業でワーク
を搬送装置からおろし、コンテナに積込むのは、トラン
スファープレスの生産能力が低く且つ成形されるワーク
の大きさが小さく重量が軽い場合でも、装置可動部近傍
での作業であるため作業に危険性が高く、又複数の作業
員を要するため省人化を行うことができず、更に近年の
ようにトランスファープレスが高能率、高速化し、2.5
〜4sec.に1回の割合で成形されたワークがトランスフ
ァープレスから送出され、しかも大きさも大きいもので
幅1500mm×長さ2000〜2500mm程度、重量も20〜30kg程度
にもなると、作業員による手作業では、ワークを搬送装
置からおろしてコンテナに積込む等の処理を行うことは
困難であり、作業の危険性は増々大きくなる。
[Problems to be Solved by the Invention] However, as described above, it is a problem that the transfer press has a low production capacity and the size of the work to be formed is that the work is manually unloaded by the worker from the transfer device and loaded into the container. However, even if the weight is small and the weight is light, the work is near the moving parts of the device, so there is a high risk of work, and since more than one worker is required, labor saving cannot be performed. The press is highly efficient and high speed, 2.5
The work that is molded once every ~ 4 sec. Is sent out from the transfer press, and the size is large, width 1500 mm x length 2000-2500 mm, and the weight is about 20-30 kg. In the work, it is difficult to perform processing such as unloading the work from the transfer device and loading it in the container, and the risk of the work becomes greater and larger.

本発明は、上述の実情に鑑み、トランスファープレス
で成形したワークを取出しコンテナに積込む作業を作業
員の手作業に頼らず、自動的に行い得るようにすること
を目的としてなしたものである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and an object of the present invention is to make it possible to automatically carry out the work of picking up a work formed by a transfer press into a container without depending on the manual work of a worker. .

[問題点を解決するための手段] 第1の発明はトランスファープレスから送出されたワ
ークを間歇的に送る間歇送り装置と、該間歇送り装置に
より送られて来たワークの位置決めを行うワーク位置決
め装置と、位置決めされたワークを吊下げ搬送しワーク
積込みステーションに待機するコンテナへ積込むワーク
ローダと、空のコンテナを前記ワーク積込みステーショ
ンへ搬入すると共に所定数量のワークが積込まれたコン
テナをワーク積込みステーションから搬出するコンテナ
搬送装置を設けた構成を備え、第2の発明はトランスフ
ァープレスから送出されたワークを間歇的に送る間歇送
り装置と、該間歇送り装置により送られて来たワークを
吊下げ搬送しワーク積込みステーションに待機するコン
テナへ積込むワークローダと、空のコンテナを前記ワー
ク積込みステーションへ搬入すると共に所定数量のワー
クが積込まれたコンテナをワーク積込みステーションか
ら搬出するコンテナ搬送装置と、該コンテナ搬送装置に
空のコンテナを搬入すると共に該コンテナ搬送装置から
ワークの積込まれたコンテナを受取り搬出するコンテナ
搬送モノレールを設けた構成を備え、第3の発明はトラ
ンスファープレスから送出されたワークを間歇的に送る
間歇送り装置と、該間歇送り装置により送られて来たワ
ークの位置決めを行うワーク位置決め装置と、位置決め
されたワークを吊下げ搬送しワーク積込みステーション
に待機するコンテナへ積込むワークローダと、空のコン
テナを前記ワーク積込みステーションへ搬入すると共に
所定数量のワークが積込まれたコンテナをワーク積込み
ステーションから搬出するコンテナ搬送装置と、該コン
テナ搬送装置に空のコンテナを搬入すると共に該コンテ
ナ搬送装置からワークの積込まれたコンテナを受取り搬
送するコンテナ搬送モノレールを設けた構成を備えてい
る。
[Means for Solving Problems] A first invention is an intermittent feeding device for intermittently feeding a workpiece sent from a transfer press, and a workpiece positioning device for positioning the workpiece fed by the intermittent feeding device. And a work loader that hangs and transports the positioned work and loads it into a container waiting at the work loading station, and loads an empty container into the work loading station and loads a container loaded with a predetermined number of works. A second aspect of the present invention is provided with a container transporting device that carries out from a station, and an intermittent feeding device that intermittently feeds a work sent from a transfer press and a work that is sent by the intermittent feeding device is suspended. A work loader for transporting and loading into a container waiting at the work loading station, and an empty container. Container carrying device for carrying the container into the work loading station and carrying out a container loaded with a predetermined number of works from the work loading station, and carrying an empty container into the container carrying device and carrying the work from the container carrying device. A third aspect of the present invention is provided with a container transporting monorail for receiving and unloading loaded containers, and an intermittent feed device for intermittently sending a workpiece sent out from a transfer press, and an intermittent feed device for sending the work. A work positioning device that positions the incoming work, a work loader that suspends and transports the positioned work and loads it into a container waiting at the work loading station, and an empty container that is loaded into the work loading station and that has a predetermined quantity. Place the container loaded with the work on the work loading stage. A container transfer device for unloading from Deployment has a structure in which a container transport monorail for transporting receive containers laden with the workpiece from the container conveying apparatus while carrying the empty containers to the container transport device.

[作用] 第1の発明では、トランスファープレスから送出され
たワークは間歇送り装置によって順次下流側へ送られ、
ワークローダにより吊下げ、搬送され、コンテナへ積込
まれ、所定数量のワークが積込まれたコンテナはコンテ
ナ搬送装置により搬送され、空のコンテナもコンテナ搬
送装置によりワーク積込みステーションへ搬送され、更
にワークローダに吊下げられる前にワークは位置決めが
行われ、第2の発明では、トランスファープレスから送
出されたワークは間歇送り装置によって順次下流側へ送
られ、ワークローダにより吊下げ、搬送され、コンテナ
へ積込まれ、所定数量のワークが積込まれたコンテナは
コンテナ搬送装置により搬送され、空のコンテナもコン
テナ搬送装置によりワーク積込みステーションへ搬送さ
れ、更に所定数量のワークが積込まれたコンテナは、コ
ンテナ搬送装置で所定位置まで搬送された後、コンテナ
搬送モノレールで搬送され、空のコンテナはコンテナ搬
送モノレール、前記コンテナ搬送装置によりワーク積込
みステーションへ送られ、第3の発明では、トランスフ
ァープレスから送出されたワークは間歇送り装置によっ
て順次下流側へ送られ、ワークローダにより吊下げ、搬
送され、コンテナへ積込まれ、所定数量のワークが積込
まれたコンテナはコンテナ搬送装置により搬送され、空
のコンテナもコンテナ搬送装置によりワーク積込みステ
ーションへ搬送され、更にワークローダに吊下げられる
前にワークは位置決めが行われ、所定数量のワークが積
込まれたコンテナはコンテナ搬送装置で所定位置まで搬
送された後コンテナ搬送モノレールにより搬送され、空
のコンテナはコンテナ搬送モノレール、コンテナ搬送装
置によりワーク積込みステーションへ送られる。
[Operation] In the first invention, the work sent from the transfer press is sequentially sent to the downstream side by the intermittent sending device,
A work loader suspends and conveys the cargo, and it is loaded into a container. A container with a predetermined quantity of work is transported by the container transport device, and an empty container is also transported by the container transport device to the work loading station. The work is positioned before being hung by the loader, and in the second aspect, the work sent from the transfer press is sequentially sent to the downstream side by the intermittent feeding device, hung by the work loader, and conveyed to the container. A container loaded with a predetermined number of works is transported by a container transport device, an empty container is also transported by the container transport device to a work loading station, and a container loaded with a predetermined number of works is After being transported to the specified position by the container transport device, the container transport monorail The sent and empty container is sent to the work loading station by the container carrying monorail and the container carrying device. In the third invention, the works sent from the transfer press are sequentially sent to the downstream side by the intermittent sending device, and the work loader is provided. Suspended and transported by a container, loaded into a container, and a container with a predetermined number of workpieces is transported by the container transport device, and empty containers are also transported by the container transport device to the work loading station and further to the work loader. The work is positioned before being hung, the container with a predetermined number of works is transferred to the predetermined position by the container transfer device and then transferred by the container transfer monorail, and the empty container is transferred by the container transfer monorail and container. Work loading station with a transfer device It sent.

[実施例] 以下、本発明の実施例を添付図面を参照しつつ説明す
る。
Embodiments Embodiments of the present invention will be described below with reference to the accompanying drawings.

第1図〜第11図は本発明の一実施例である。 1 to 11 show an embodiment of the present invention.

第1図及び第2図に示す従来公知のトランスファープ
レス1の出側フレーム2に回転自在に枢着した軸3に
は、カム4が固着されると共にギア5が固着され、図示
していない偏心輪軸を回転させて上金型が取付けられた
スライドを昇降させ、上下金型により成形を行わせるプ
レス駆動源からギア群、動力伝達軸、ギア6を介して前
記ギア5に動力が伝達され得るようになっており、軸3
と平行に前記出側フレーム2に回転自在に枢着した軸7
には、カム8及びアーム9が固着され、カム8はローラ
10を介して前記カム4外周に当接し、カム4が回転する
ことにより、カム8及びアーム9はワーク11の送り方向
に対して平行な方向へ揺動運動を行い得るようになって
いる。
A cam 4 and a gear 5 are fixed to a shaft 3 which is rotatably pivotally attached to an outlet frame 2 of a conventionally known transfer press 1 shown in FIGS. Power can be transmitted to the gear 5 through a gear group, a power transmission shaft, and a gear 6 from a press drive source for rotating the wheel shaft to raise and lower a slide to which the upper die is attached and performing molding by the upper and lower dies. And the axis 3
A shaft 7 rotatably and pivotally attached to the outlet frame 2 in parallel with
A cam 8 and an arm 9 are fixed to the cam 8, and the cam 8 is a roller.
By contacting the outer circumference of the cam 4 via 10 and rotating the cam 4, the cam 8 and the arm 9 can swing in a direction parallel to the feed direction of the work 11.

アーム9の上端には、ワーク11の送り方向に対して平
行な方向へ往復移動し得るようにしたトロリー送り装置
13がロッド12を介して連結され、トロリー送り装置13の
下端にはフィードバー14がトロリー送り装置13の移動方
向と同一方向へ移動し得るように連結されている。又フ
ィードバー14には長手方向へ所要の間隔でリフトクラン
プ装置15が取付けられており、リフトクランプ装置15の
トロリー16は、フィードバー14を送り方向に対して直角
方向へ移動し、フィードバー14に取付けたフィンガーに
よってワークを掴み、間歇的に下流方向へワークを送り
得るようになっている。更に又、トロリー16はフィード
バー14を昇降させる機能を有しており、而して、フィー
ドバー14は掴みa、上昇b、送りc、下降d、解放e、
戻りfの各動作を順次繰返して行い得るようになってい
る。
At the upper end of the arm 9, a trolley feeding device capable of reciprocating in a direction parallel to the feeding direction of the workpiece 11.
13 is connected via a rod 12, and a feed bar 14 is connected to the lower end of the trolley feeding device 13 so as to be movable in the same direction as the moving direction of the trolley feeding device 13. Further, a lift clamp device 15 is attached to the feed bar 14 at required intervals in the longitudinal direction, and the trolley 16 of the lift clamp device 15 moves the feed bar 14 in a direction perpendicular to the feed direction so that the feed bar 14 The fingers attached to the gripper can grasp the work piece and intermittently feed the work piece in the downstream direction. Furthermore, the trolley 16 has a function of raising and lowering the feed bar 14, and thus the feed bar 14 holds the grip a, ascends b, feeds c, descends d, releases e,
Each operation of the return f can be sequentially repeated.

トランスファープレス1の下流側には、トランスファ
ープレス1から送出されたワーク11を載置して間歇的に
搬送する間歇送り装置17が配設されている。間歇送り装
置17はベルトコンベア式で、搬送用の無端状のベルト18
が左右2本に分かれている。ベルト搬送面下部には、搬
送時に前後のワーク11が一定間隔に保持されるようマグ
ネットが配設され、下部フレームにはベルト18をフィー
ドバー14の動きのタイミングに合わせて同調駆動するた
めの駆動装置19が配設されている。
On the downstream side of the transfer press 1, an intermittent feeding device 17 for placing the work 11 delivered from the transfer press 1 and intermittently carrying it is disposed. The intermittent feeding device 17 is a belt conveyor type and has an endless belt 18 for conveyance.
Is divided into two on the left and right. A magnet is arranged below the belt conveyance surface so that the front and rear workpieces 11 are held at a constant interval during conveyance, and the lower frame is driven to drive the belt 18 in synchronization with the timing of the movement of the feed bar 14. A device 19 is provided.

間歇送り装置17の中途部には、第5図〜第7図に詳細
に示すようなワーク位置決め装置20が、ワーク搬送方向
へ所要の間隔で2基配設されている。このワーク位置決
め装置20はワーク11を間歇送り装置17の送り方向及び該
送り方向に対して直角方向に位置決めするためのもので
ある。すなわち、間歇送り装置17先端部のフレーム21下
部両側にはアジャスト用の電動機22が配設され、該電動
機22の出力軸に固着したスプロケット23にはチェーン24
が掛け渡され、フレーム21上部には、間歇送り装置17の
送り方向と平行に延びるねじ軸25が回転自在に配設さ
れ、該ねじ軸25の一端に固着したスプロケット26には前
記チェーン24が掛け渡されている。
Two work positioning devices 20 as shown in detail in FIGS. 5 to 7 are provided at a middle portion of the intermittent feeding device 17 in the work transport direction at required intervals. The work positioning device 20 is for positioning the work 11 in the feeding direction of the intermittent feeding device 17 and in the direction perpendicular to the feeding direction. That is, the adjusting electric motors 22 are arranged on both sides of the lower portion of the frame 21 at the tip of the intermittent feeding device 17, and the chain 24 is attached to the sprocket 23 fixed to the output shaft of the electric motor 22.
A screw shaft 25 extending in parallel with the feeding direction of the intermittent feeding device 17 is rotatably arranged on the upper part of the frame 21, and the chain 24 is attached to a sprocket 26 fixed to one end of the screw shaft 25. It has been passed over.

ねじ軸25には前後で逆ねじが切ってあり、間歇送り装
置17の送り方向へ移動し且つ互に近接、離反し得るよう
にした移動フレーム27,28にはナット29,30が固着され、
該ナット29,30は前記ねじ軸25のねじ部に螺着され、移
動フレーム27,28の上部には軸線が間歇送り装置17の送
り方向と平行に延びる流体圧シリンダ31,32が配設され
流体圧シリンダ31,32のピストンロッド先端にはワーク1
1を押してその位置決めを行うための位置決め部材33,34
が連結され、位置決め部材33,34の側部に配設されたブ
ラケット35,36に設けた溝37,38には、位置決め部材33,3
4に枢着した案内ローラ39,40が転動し得るよう嵌入され
ている。
The screw shaft 25 has a reverse screw cut in the front and rear, and nuts 29 and 30 are fixed to the moving frames 27 and 28 that move in the feeding direction of the intermittent feeding device 17 and can approach and separate from each other,
The nuts 29, 30 are screwed onto the threaded portion of the screw shaft 25, and fluid pressure cylinders 31, 32 whose axes extend parallel to the feeding direction of the intermittent feeding device 17 are arranged on the upper portions of the moving frames 27, 28. Workpiece 1 is attached to the tip of the piston rod of fluid pressure cylinders 31, 32.
Positioning members 33 and 34 for pressing 1 to perform positioning
Are connected to each other, and the grooves 37, 38 provided in the brackets 35, 36 arranged on the side portions of the positioning members 33, 34 have the positioning members 33, 3
The guide rollers 39, 40 pivotally mounted on 4 are fitted so that they can roll.

フレーム21の両側部には、アジャスト用の電動機41,4
2が平面的に見て前記電動機22と直交する方向に向けて
配設され、電動機41,42の出力軸に固着したスプロケッ
ト43,44にはチェーン45,46が掛け渡され、フレーム21の
上部には平面的に見て前記ねじ軸25と直交する方向に延
びるねじ軸47,48が回転自在に配設され、ねじ軸47,48の
一端部に固着したスプロケット49,50には前記チェーン4
5,46が掛け渡されている。
On both sides of the frame 21, electric motors 41,4 for adjusting
2 is arranged in a direction orthogonal to the electric motor 22 when viewed two-dimensionally, chains 45, 46 are stretched over the sprockets 43, 44 fixed to the output shafts of the electric motors 41, 42, and the upper portion of the frame 21 Is rotatably arranged with screw shafts 47 and 48 extending in a direction orthogonal to the screw shaft 25 in plan view, and the chain 4 is attached to sprockets 49 and 50 fixed to one end of the screw shafts 47 and 48.
5,46 have been passed over.

フレーム21の上部に前記移動フレーム27,28の移動方
向と直交する方向へ移動し得るよう配設された図示して
いない移動フレームにはナットが固着され、該ナットは
前記ねじ軸47,48に螺合され、図示してない移動フレー
ム上には、前記流体圧シリンダ31,32に対して直交する
方向へ延びる流体圧シリンダ51,52が配設され、該流体
圧シリンダ51,52のピストンロッド先端には、ワーク11
を押してその位置決めを行うための位置決め部材53,54
が連結され、位置決め部材53,54の側部に配設されたブ
ラケット55,56に設けた溝57,58には、位置決め部材53,5
4に枢着した案内ローラ59,60が転動し得るように嵌入さ
れている。
A nut is fixed to a moving frame (not shown) arranged on the upper part of the frame 21 so as to be movable in a direction orthogonal to the moving direction of the moving frames 27 and 28, and the nut is fixed to the screw shafts 47 and 48. Fluid pressure cylinders 51, 52 which are screwed together and extend in a direction orthogonal to the fluid pressure cylinders 31, 32 are arranged on a moving frame (not shown), and piston rods of the fluid pressure cylinders 51, 52 are arranged. Work 11 at the tip
Positioning member 53, 54 for pressing and positioning
And the grooves 57 and 58 provided in the brackets 55 and 56 disposed on the side portions of the positioning members 53 and 54, respectively.
The guide rollers 59, 60 pivotally mounted on 4 are fitted so as to be able to roll.

第1図〜第3図に示すように、床面上には間歇送り装
置17及びワーク位置決め装置20を跨ぐようにしてフレー
ム61が立設され、フレーム61上には、各ワーク位置決め
装置20で位置決めされたワーク11を間歇送り装置17から
受取り、搬送し、後述のコンテナ85に積込むための2組
のワークローダ62が、各ワーク位置決め装置20上方を走
行し得るよう配設されている。
As shown in FIGS. 1 to 3, a frame 61 is erected on the floor so as to straddle the intermittent feeding device 17 and the work positioning device 20, and each work positioning device 20 is placed on the frame 61. Two sets of work loaders 62 for receiving the positioned works 11 from the intermittent feeding device 17, conveying them, and loading them in a container 85 described later are arranged so that they can travel above the respective work positioning devices 20.

ワーク位置決め装置20について説明すると、フレーム
61上には、間歇送り装置17のワーク送り方向に対して直
角方向へ延びるレール63が敷設され、該レール63上には
車輪64を介してローダ本体65が載置されている。ローダ
本体65には、図示してない駆動装置により駆動し得るよ
うにしたピニオン66が取付けられ、該ピニオン66はレー
ル63に沿い平行して敷設したラック67と噛合し、ピニオ
ン66の回転によりローダ本体65はレール63上をワーク送
り方向に対して直角方向へ走行し得るようになってい
る。
Explaining the work positioning device 20, the frame
A rail 63 extending in a direction perpendicular to the work feeding direction of the intermittent feeding device 17 is laid on the 61, and a loader body 65 is placed on the rail 63 via wheels 64. A pinion 66, which can be driven by a drive device (not shown), is attached to the loader body 65, and the pinion 66 meshes with a rack 67 laid in parallel along the rail 63 and the loader is rotated by the rotation of the pinion 66. The main body 65 can travel on the rail 63 in a direction perpendicular to the workpiece feeding direction.

ローダ本体65には、ピニオン及びラックにより、ロー
ダ本体65の走行方向に対して直角方向へ横行し得るよう
にした横行台車68が配設され、横行台車68には、ピニオ
ン及びラックにより昇降し得るようにしたマスト69が配
設されている。又マスト69の下端には水平面に対し旋回
自在なフレーム70が配設され、フレーム70には垂直面に
対し回動自在なフレーム71が取付けられている。フレー
ム71には、アーム72が固着され、アーム72には、ワーク
11を吸着、支持するための複数の真空パッド73が取付け
られている。
The loader main body 65 is provided with a traverse carriage 68 capable of traversing in a direction perpendicular to the traveling direction of the loader main body 65 by a pinion and a rack, and the traverse carriage 68 can be lifted and lowered by a pinion and a rack. The mast 69 thus arranged is provided. At the lower end of the mast 69, a frame 70 which is rotatable with respect to a horizontal plane is provided, and a frame 71 which is rotatable with respect to a vertical plane is attached to the frame 70. An arm 72 is fixed to the frame 71, and a work is attached to the arm 72.
A plurality of vacuum pads 73 for attaching and supporting 11 are attached.

第8図及び第9図に詳細に示すように、天井所要位置
に固着した支持金物74には、コの字形のブラケット75を
介してコンテナ搬送モノレール76が走行し得るようにし
たレール77が第1図に示すような平面配置状態で吊下げ
られ、レール77の中途部には、第2図及び第11図に示す
ように昇降自在なレール78が配設されている。
As shown in detail in FIGS. 8 and 9, the support metal 74 fixed to the required position on the ceiling is provided with a rail 77 for allowing the container transportation monorail 76 to travel via a bracket 75 having a U-shape. It is suspended in a plane arrangement state as shown in FIG. 1, and a rail 78 which can move up and down is arranged in the middle of the rail 77 as shown in FIGS. 2 and 11.

コンテナ搬送モノレール76は駆動装置79により駆動さ
れレール77,78に沿い転動し得るようにした駆動車輪80
及び従動車輪81を備え、フレーム82の下部にはピン83を
介してコンテナ支持枠84を吊下げ得るようになってい
る。コンテナ支持枠84は第10図に示すように枠体を連
結、固着した構造であり、その下部にはコンテナ85下面
と係合する突起86が設けてある。又コンテナ支持枠84の
下面は下降した際に後述のコンテナ搬送装置94と干渉し
ないよう切欠した形状となっている。
The container transport monorail 76 is driven by a drive device 79 so that it can roll along rails 77, 78.
Further, the driven wheels 81 are provided, and the container support frame 84 can be hung from the lower portion of the frame 82 via the pins 83. The container support frame 84 has a structure in which frame bodies are connected and fixed as shown in FIG. 10, and a projection 86 that engages with the lower surface of the container 85 is provided in the lower portion thereof. Further, the lower surface of the container support frame 84 has a notched shape so as not to interfere with a container transfer device 94 described later when the container support frame 84 is lowered.

第11図に示すように、レール78はブラケット87を介し
てフレーム88に固着され、フレーム88は案内車輪89を介
して床面から立設したフレーム90の案内支柱91に支持さ
れている。又フレーム90の上部にはウインチ92が配設さ
れ、ブラケット87を介してレール78を吊下げたロープ93
を巻取り、繰出すことにより、コンテナ搬送モノレール
の6に吊下げたコンテナ支持枠84がコンテナ85を支持し
た状態でレール78と一緒に昇降し得るようになってい
る。
As shown in FIG. 11, the rail 78 is fixed to a frame 88 via a bracket 87, and the frame 88 is supported by guide columns 91 of a frame 90 standing upright from the floor via guide wheels 89. A winch 92 is arranged above the frame 90, and a rope 93 that suspends a rail 78 via a bracket 87 is used.
By winding and unwinding, the container supporting frame 84 hung on the container carrying monorail 6 can move up and down together with the rail 78 while supporting the container 85.

昇降自在なレール78の下方には、コンテナ85搬送用の
チェーンコンベア等のコンテナ搬送装置94が配設され、
コンテナ支持枠84からおろされたコンテナ85をコンテナ
搬送装置94からコンテナ搬送装置95,96,97を経てコンテ
ナ搬送装置97中途部のワーク積込みステーションへ送
り、該ワーク積込みステーションでワークが積込まれた
コンテナ85をコンテナ搬送装置97からコンテナ搬送装置
94へ戻し得るようになっている。コンテナ搬送装置95の
中途部及びコンテナ搬送装置97のワーク積込みステーシ
ョンよりも下流側には、積込むワークの種類によっては
コンテナ85の向きを90度変えるターンテーブル98及びワ
ークの積込まれたコンテナ85の向きをもとに戻すターン
テーブル99が昇降可能且つ旋回可能に設置されている。
又各ワーク搬送装置94,95,96,97の乗り継ぎ部には、昇
降自在な乗り継ぎ用の搬送装置が配設されている。
Below the rail 78 that can be raised and lowered, a container transport device 94 such as a chain conveyor for transporting the container 85 is disposed.
The container 85 unloaded from the container support frame 84 is sent from the container transfer device 94 through the container transfer devices 95, 96 and 97 to the work loading station in the middle of the container transfer device 97, and the work is loaded at the work loading station. Container 85 to container carrier 97 to container carrier
You can get back to 94. A turntable 98 for changing the direction of the container 85 by 90 degrees depending on the type of the work to be loaded and a container 85 loaded with the work, in the middle of the container transfer device 95 and on the downstream side of the work loading station of the container transfer device 97. A turntable 99 that returns the original direction is installed so as to be able to move up and down and turn.
In addition, a transfer device that can move up and down is arranged at the connecting portion of each work transfer device 94, 95, 96, 97.

図中100は、不良品を間歇送り装置17から取出すワー
ク搬送装置である。
In the figure, 100 is a work transfer device for picking up defective products from the intermittent transfer device 17.

次に本発明の作動について説明する。 Next, the operation of the present invention will be described.

トランスファープレス1ではスライド昇降駆動用の電
動機が駆動されて上金型がスライドと共に昇降し、上金
型と下金型とでワーク11の成形が行われ、同時にスライ
ド昇降駆動用の電動機により動力伝達手段を介してギア
6,5が駆動され、カム4が回転する。このためカム8、
アーム9が揺動運動を行い、ロッド12、トロリー送り装
置13を介してフィードバー14が往復運動を行い、これに
よって、リフトクランプ装置15のトロリー16に設けたク
ランプ装置が掴みa→上昇b→送りc→下降d→戻りe
の動作を順次繰返し、この動きによってワーク11は順次
成形されて下流側へ間歇的に送られ、成形が完了したワ
ーク11はトランスファープレス1下流端のリフトクラン
プ装置15によってトランスファープレス1下流側に停止
している間歇送り装置17上流端上に載置される。
In the transfer press 1, the electric motor for driving the slide elevation is driven, and the upper die moves up and down together with the slide, and the work 11 is formed by the upper die and the lower die, and at the same time, the power is transmitted by the electric motor for the slide elevation. Gear through means
6, 5 are driven and the cam 4 rotates. Therefore, the cam 8,
The arm 9 oscillates, and the feed bar 14 reciprocates via the rod 12 and the trolley feeding device 13. As a result, the clamp device provided on the trolley 16 of the lift clamp device 15 is grasped a → raised b → Feed c → Descent d → Return e
The work 11 is sequentially formed by this movement and is intermittently sent to the downstream side, and the completed work 11 is stopped on the downstream side of the transfer press 1 by the lift clamp device 15 at the downstream end of the transfer press 1. The intermittent feeding device 17 is placed on the upstream end.

間歇送り装置17上にワーク11が載置されると間歇送り
装置17が駆動されてワーク11は所定量下流側へ送られ、
ワーク11が所定量送られると間歇送り装置17は停止し、
トランスファープレス1から次のワーク11が間歇送り装
置17上へ載置され、再び間歇送り装置17は駆動されてワ
ーク11が所定量送られる。このようにして間歇送り装置
17上のワーク11は順次間歇的に下流側へ送られるが、間
歇送り装置17のベルト搬送面下部にはマグネットが配置
してあるため、間歇送り時に前後のワーク11のピッチが
狂うことはない。
When the work 11 is placed on the intermittent feeding device 17, the intermittent feeding device 17 is driven and the work 11 is fed to the downstream side by a predetermined amount,
When the work 11 is fed by a predetermined amount, the intermittent feeding device 17 stops,
The next work 11 is placed on the intermittent feeding device 17 from the transfer press 1, and the intermittent feeding device 17 is driven again to feed the work 11 by a predetermined amount. In this way the intermittent feeding device
The work 11 on the 17 is intermittently sent to the downstream side, but since the magnet is arranged below the belt conveying surface of the intermittent feeding device 17, the pitch of the front and rear works 11 does not change during the intermittent feeding. .

ワーク11が間歇送り装置17により2基のワーク位置決
め装置20のうちどちらかまで送られて来ると、該ワーク
位置決め装置20の位置決め部材33,34によってワーク送
り方向の位置決めが行われ、位置決め部材53,54によっ
てワーク送り方向に対して直角方向の位置決めが行われ
る。なお、2基のワーク位置決め位置20では、交互にワ
ーク11の位置決めが行われる。
When the work 11 is sent to one of the two work positioning devices 20 by the intermittent feeding device 17, the positioning members 33 and 34 of the work positioning device 20 perform positioning in the work feeding direction, and the positioning member 53. Positioning in the direction perpendicular to the workpiece feeding direction is performed by the and 54. At the two workpiece positioning positions 20, the workpieces 11 are alternately positioned.

ワーク位置決め装置20の作動を詳細に説明すると、電
動機22が駆動されるとスプロケット23、チェーン24、ス
プロケット26を介してねじ軸25が駆動される。ねじ軸25
には逆ねじが切ってあるためねじ軸25が回転するとナッ
ト29,30を介して移動フレーム27,28が間歇送り装置17の
送り方向へ移動フレーム27,28が互に近接或いは離反す
るよう移動し、位置決め部材33,34間の間隙がワーク11
に合わせて設定される。ここまでの作動はトランスファ
ープレス1で成形されるワーク11の寸法が決った段階で
行っておく。而して、ワーク11が間歇送り装置17の先端
部に来て停止すると、流体圧シリンダ31,32のピストン
ロッドを後退させる方向へ作動させる。そうすると、位
置決め部材33,34は案内ローラ39,40を介してブラケット
35,36の溝37,38に案内され、倒伏している状態から順次
起立しつつワーク11側へ移動し、完全に起立した状態で
ワーク11を挾持し、間歇送り装置17の送り方向の位置決
めが行われる。位置決め部材53,54も位置決め部材33,34
と同様にしてワーク11を挾持し、間歇送り装置17の送り
方向と直角方向の位置決めが行われる。
The operation of the work positioning device 20 will be described in detail. When the electric motor 22 is driven, the screw shaft 25 is driven via the sprocket 23, the chain 24, and the sprocket 26. Screw shaft 25
As the screw shaft 25 rotates, the moving frames 27 and 28 move in the feeding direction of the intermittent feeding device 17 when the screw shaft 25 rotates so that the frames 27 and 28 move toward and away from each other. However, the gap between the positioning members 33 and 34 is
Set to match. The operation up to this point is performed when the dimensions of the work 11 formed by the transfer press 1 are determined. Then, when the work 11 comes to the tip of the intermittent feeding device 17 and stops, the piston rods of the fluid pressure cylinders 31 and 32 are operated in the backward direction. Then, the positioning members 33 and 34 are attached to the brackets via the guide rollers 39 and 40.
Guided by the grooves 37 and 38 of 35 and 36, it moves to the work 11 side while standing up sequentially from the lying state, and holds the work 11 in the completely standing state, and positions the intermittent feeding device 17 in the feeding direction. Is done. The positioning members 53 and 54 are also positioning members 33 and 34.
In the same manner as above, the work 11 is held and positioned in the direction perpendicular to the feeding direction of the intermittent feeding device 17.

一方のワーク位置決め装置20でワーク11の位置決めが
行われている間は、当該系列のワークローダ62は、前記
一方のワーク位置決め装置20上方に待機し、他方のワー
ク位置決め装置20ではワークの位置決めは行われず、当
該系列のワークローダ62は、ワーク搬送装置97のワーク
積込みステーションに停止しているコンテナ85に対して
ワーク11の積込みを行っている。
While the work 11 is being positioned by the one work positioning device 20, the work loader 62 of the relevant series stands by above the one work positioning device 20, and the other work positioning device 20 does not position the work. Instead, the work loader 62 of the relevant series loads the work 11 into the container 85 stopped at the work loading station of the work transfer device 97.

而して、前記一方のワーク位置決め装置20により間歇
送り装置17上のワーク11の位置決めが終了すると、間歇
送り装置17上方に待機しているワークローダ62のマスト
69が下降し、マスト69下端に取付けられている真空パッ
ド73がワーク11上面と接触すると共に真空パッド73内が
真空ポンプにより排気されることにより真空パッド73は
ワーク11表面に吸着させられる。
Thus, when the positioning of the work 11 on the intermittent feeding device 17 is completed by the one work positioning device 20, the mast of the work loader 62 waiting above the intermittent feeding device 17 is completed.
69 is lowered, the vacuum pad 73 attached to the lower end of the mast 69 comes into contact with the upper surface of the work 11, and the inside of the vacuum pad 73 is exhausted by a vacuum pump, so that the vacuum pad 73 is adsorbed to the surface of the work 11.

ワーク11が真空パッド73により吸着されたら、ワーク
位置決め装置20の位置決め部材33,34,53,54が解放さ
れ、マスト69が上昇することによりワーク11は間歇送り
装置17から所定高さまで上昇させられる。
When the work 11 is adsorbed by the vacuum pad 73, the positioning members 33, 34, 53, 54 of the work positioning device 20 are released, and the mast 69 rises, so that the work 11 is raised from the intermittent feeding device 17 to a predetermined height. .

ワーク11がワークローダ62により所定高さまで上昇す
る間に或いは上昇後に、ワークローダ62はワーク11を保
持してレール63に沿いワーク搬送装置97の中途部に設置
されているワーク積込みステーションまで走行する。而
して、ワーク11を縦積みする場合はフレーム71が垂直面
内を回転してワーク11を縦向きにし、マスト69を下降さ
せつつ、横行台車68をレール63に対して直交する方向へ
真空パッド73に吸着されているワーク11がすでに積込み
れているワーク11に近接するよう移動させ、ワーク11が
コンテナ85内に所定の状態に挿入されたら真空パッド73
を解除する。これによってワーク11は、コンテナ85に縦
積みされる(第4図参照)。
While or after the work 11 is lifted to a predetermined height by the work loader 62, the work loader 62 holds the work 11 and travels along the rail 63 to a work loading station installed in the middle of the work transfer device 97. . Thus, when stacking the works 11 vertically, the frame 71 rotates in a vertical plane to orient the works 11 vertically, and while lowering the mast 69, the traverse carriage 68 is vacuumed in a direction orthogonal to the rails 63. The work 11 attracted to the pad 73 is moved close to the work 11 already loaded, and when the work 11 is inserted into the container 85 in a predetermined state, the vacuum pad 73
Cancel. As a result, the works 11 are vertically stacked in the container 85 (see FIG. 4).

ワーク11がコンテナ85に積込まれると、マスト69は上
昇すると共にフレーム71はもとの状態に戻り、ワークロ
ーダ62はレール63上を再び所定のワーク位置決め装置20
上まで走行する。
When the works 11 are loaded in the container 85, the mast 69 rises and the frame 71 returns to the original state, and the work loader 62 moves on the rail 63 again to the predetermined work positioning device 20.
Drive to the top.

これらの作業の間に、他方のワークローダ62がもう一
つのワーク位置決め装置20上へ戻り、位置決めされた次
のワーク11を吸着してワーク搬送装置97の積込みステー
ションまで走行し、上述と同様の手順により次のワーク
11がコンテナ85に積込まれる。従って2基のワーク位置
決め装置20により交互に位置決めされたワーク11は、2
基のワークローダ62により交互に搬送され、コンテナ85
へ順次積込まれる。
During these operations, the other work loader 62 returns to the other work positioning device 20, adsorbs the next positioned work 11 and travels to the loading station of the work transfer device 97, similar to the above. Depending on the procedure, the next work
11 are loaded into container 85. Therefore, the workpieces 11 alternately positioned by the two workpiece positioning devices 20 are 2
Alternately transported by the base work loader 62 to the container 85
Are sequentially loaded into.

2基のワーク位置決め装置20により交互にワーク11の
位置決めを行い、2基のワークローダ62によりワーク11
を今後に搬送し、積込むようにしているため、迅速にワ
ーク11のコンテナ85に対する積込みが行われる。
The workpieces 11 are alternately positioned by the two workpiece positioning devices 20, and the workpieces are loaded by the two workpiece loaders 62.
Are transported and loaded in the future, the work 11 is quickly loaded into the container 85.

ワーク11を水平積みする場合はフレーム71は回転させ
ないが、それ以外は縦積みの場合と略同様の手順で作業
が行われる(第4図参照)。
When the works 11 are stacked horizontally, the frame 71 is not rotated, but otherwise the work is performed in substantially the same procedure as in the case of vertical stacking (see FIG. 4).

次に、コンテナ85の流れについて説明する。 Next, the flow of the container 85 will be described.

コンテナ85は、コンテナ保管場所でコンテナ搬送モノ
レール76のコンテナ支持枠84に保持され、駆動装置79が
駆動されることにより、コンテナ搬送モノレール76によ
りレール77に沿い搬送され、レール78に到達する。
The container 85 is held by the container support frame 84 of the container transport monorail 76 at the container storage location, and is driven by the drive device 79 to be transported along the rail 77 by the container transport monorail 76 and reach the rail 78.

コンテナ搬送モノレール76によりコンテナ85がレール
78所定位置まで搬送されると、ウインチ92が駆動されて
ロープ93が巻戻され、レール78が下降する。このため、
コンテナ搬送モノレール76及びコンテナ支持枠84が下降
し、コンテナ85も下降する。
Container transport monorail 76 allows container 85 to be a rail
When transported to a predetermined position, the winch 92 is driven to rewind the rope 93 and the rail 78 descends. For this reason,
The container transportation monorail 76 and the container support frame 84 descend, and the container 85 also descends.

レール78、コンテナ搬送モノレール76、コンテナ支持
枠84、コンテナ85が一緒に下降してコンテナ85がコンテ
ナ搬送装置94上に載置されると、それ以後はコンテナ85
は下降し得ず、レール78、コンテナ搬送モノレール76、
コンテナ支持枠84が更に下降する。このためコンテナ支
持枠84の突起86がコンテナ85から外れるため、コンテナ
85のコンテナ搬送装置94による搬送が可能な状態とな
る。
When the rail 78, the container transport monorail 76, the container support frame 84, and the container 85 descend together and the container 85 is placed on the container transport device 94, thereafter, the container 85
Cannot descend, rail 78, container transport monorail 76,
The container support frame 84 further descends. For this reason, the projection 86 of the container support frame 84 comes off the container 85,
The container can be transported by the container transport device 94 of 85.

一方、コンテナ搬送装置97上のワーク積込みステーシ
ョンでコンテナ85にワーク11が所定数量積込まれると、
コンテナ85はコンテナ搬送装置97により下流へ送られ
る。そこでコンテナ支持枠84からコンテナ搬送装置94上
へおろされた空のコンテナ85は、ワーク11が所定数量積
込まれて下流へ搬送されるコンテナ85に対応して順次下
流へ送られ、コンテナ搬送装置94,95,96,97を経てコン
テナ搬送装置97上のワーク積込みステーションに到達
し、上述のように、所定数量のワーク11が積込まれる。
On the other hand, when a predetermined number of works 11 are loaded into the container 85 at the work loading station on the container transfer device 97,
The container 85 is sent downstream by the container transfer device 97. Therefore, the empty containers 85 dropped from the container support frame 84 onto the container transfer device 94 are sequentially sent to the downstream side corresponding to the containers 85 in which a predetermined number of works 11 are loaded and transferred to the downstream side. After reaching 94, 95, 96, and 97, the work loading station on the container transfer device 97 is loaded with a predetermined number of works 11 as described above.

ワーク積込みステーションで所定数量のワーク11が積
込まれたコンテナ85はコンテナ搬送装置97からコンテナ
搬送装置94へ戻り、コンテナ85がおろされたコンテナ搬
送モノレール76のコンテナ支持枠84上に位置する。
The container 85 loaded with a predetermined number of works 11 at the work loading station returns from the container transfer device 97 to the container transfer device 94, and is located on the container support frame 84 of the container transfer monorail 76 where the container 85 is unloaded.

ワーク11の積込まれたコンテナ85コンテナ搬送装置94
でコンテナ支持枠84上方に位置したら、ウインチ92を駆
動してロープ93を巻取る。このため、レール78、コンテ
ナ搬送モノレール76、コンテナ支持枠84が上昇し、コン
テナ支持枠84の突起86がコンテナ85下面の穴に嵌合する
と共にコンテナ支持枠84によりコンテナ85が支持され
る。従って、以後は、コンテナ85はコンテナ支持枠84に
支持され、上昇する。
Container 11 loaded with workpieces 11 Container transport device 94
When it is located above the container support frame 84, the winch 92 is driven to wind the rope 93. Therefore, the rail 78, the container transport monorail 76, and the container support frame 84 are raised, the protrusions 86 of the container support frame 84 are fitted into the holes on the lower surface of the container 85, and the container 85 is supported by the container support frame 84. Therefore, thereafter, the container 85 is supported by the container support frame 84 and rises.

上昇によりレール78がレール77と同一高さになると、
駆動装置79によりコンテナ搬送モノレール76が駆動さ
れ、レール78,77に沿い移動するため、ワーク11の積込
まれたコンテナ85はコンテナ搬送モノレール76により次
工程へ搬送される。
When the rail 78 is level with the rail 77 due to the rise,
Since the container transportation monorail 76 is driven by the driving device 79 and moves along the rails 78 and 77, the container 85 loaded with the works 11 is transported to the next process by the container transportation monorail 76.

間歇送り装置17で送られるワーク11のうち、不良品は
ワーク搬送装置100に取出され、作業員によりコンテナ8
5に積込まれ、コンテナ搬送モノレール76により搬送さ
れる。ワーク11の不良品か否かのチェックは、間歇送り
装置17上に検査装置を設けておき行う。
Among the workpieces 11 sent by the intermittent feeding device 17, defective products are taken out to the work transfer device 100, and the worker 8
It is loaded on 5 and transported by container transport monorail 76. An inspection device is provided on the intermittent feeding device 17 to check whether the work 11 is defective.

なお、本発明の実施例では、ワーク位置決め装置及び
ワークローダを2系列設ける場合について説明したが、
何系列設けても実施できること、真空パッドはワークの
大きさによって適宜交換するようにもできること、その
他、本発明の要旨を逸脱しない範囲内で種々変更を加え
得ること、等は勿論である。
In the embodiment of the present invention, the case where the work positioning device and the work loader are provided in two series has been described.
Of course, any number of series can be provided, the vacuum pad can be appropriately replaced depending on the size of the work, and various modifications can be made without departing from the scope of the present invention.

[発明の効果] 本発明のワーク積込み装置によれば、成形されたワー
クは人手を要することなく自動的にコンテナに積込むこ
とが可能となるため、作業員による可動部での作業をな
くすことができて安全性が向上すると共に省人化を図る
ことができる、等種々の優れた効果を奏し得る。
[Effect of the Invention] According to the work loading device of the present invention, it is possible to automatically load a molded work into a container without requiring manpower, so that the worker does not have to work on the movable part. Therefore, it is possible to achieve various excellent effects such as improvement in safety and labor saving.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明のワーク積込み装置の一実施例の平面
図、第2図は第1図のII-II方向矢視図、第3図は第2
図のIII-III方向矢視図、第4図は第3図のIV-IV方向矢
視図、第5図は本発明のワーク積込み装置に使用するワ
ーク位置決め装置の部分の平面図、第6図は第5図のVI
-VI方向矢視図、第7図は第6図のVII-VII方向矢視図、
第8図は本発明のワーク積込み装置に使用するコンテナ
搬送モノレールの正面図、第9図は第8図のIX-IX方向
矢視図、第10図はコンテナの斜視図、第11図は本発明の
ワーク積込み装置に使用するコンテナ搬送モノレールの
レール昇降部の正面図である。 図中1はトランスファープレス、17は間歇送り装置、20
はワーク位置決め装置、62はワークローダ、73は真空パ
ッド、76はコンテナ搬送モノレール、77,78はレール、8
4はコンテナ支持枠、92はウインチ、94,95,96,97はコン
テナ搬送装置を示す。
FIG. 1 is a plan view of an embodiment of the work loading device of the present invention, FIG. 2 is a view taken in the direction of arrows II-II in FIG. 1, and FIG.
III-III direction arrow view of the figure, FIG. 4 is a IV-IV direction arrow view of FIG. 3, FIG. 5 is a plan view of the part of the work positioning device used for the work loading device of the present invention, FIG. The figure shows VI in Figure 5.
-VI direction arrow view, FIG. 7 is a VII-VII direction arrow view of FIG. 6,
FIG. 8 is a front view of a container carrying monorail used in the work loading device of the present invention, FIG. 9 is a view in the direction of IX-IX in FIG. 8, FIG. 10 is a perspective view of the container, and FIG. 11 is a book. It is a front view of the rail raising / lowering part of the container conveyance monorail used for the work loading apparatus of the invention. In the figure, 1 is a transfer press, 17 is an intermittent feeding device, and 20
Is a work positioning device, 62 is a work loader, 73 is a vacuum pad, 76 is a container transport monorail, 77 and 78 are rails, 8
4 is a container support frame, 92 is a winch, and 94, 95, 96, 97 are container transport devices.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】トランスファープレスから送出されたワー
クを間歇的に送る間歇送り装置と、該間歇送り装置によ
り送られて来たワークの位置決めを行うワーク位置決め
装置と、位置決めされたワークを吊下げ搬送しワーク積
込みステーションに待機するコンテナへ積込むワークロ
ーダと、空のコンテナを前記ワーク積込みステーション
へ搬入すると共に所定数量のワークが積込まれたコンテ
ナをワーク積込みステーションから搬出するコンテナ搬
送装置を設けたことを特徴とするワーク積込み装置。
1. An intermittent feeding device for intermittently feeding a work sent from a transfer press, a work positioning device for positioning the work sent by the intermittent feeding device, and a suspended work for the positioned work. A work loader for loading a container waiting at a work loading station, and a container transfer device for loading an empty container to the work loading station and unloading a container loaded with a predetermined number of works from the work loading station are provided. A work loading device characterized in that
【請求項2】トランスファープレスから送出されたワー
クを間歇的に送る間歇送り装置と、該間歇送り装置によ
り送られて来たワークを吊下げ搬送しワーク積込みステ
ーションに待機するコンテナへ積込むワークローダと、
空のコンテナを前記ワーク積込みステーションへ搬入す
ると共に所定数量のワークが積込まれたコンテナをワー
ク積込みステーションから搬出するコンテナ搬送装置
と、該コンテナ搬送装置に空のコンテナを搬入すると共
に該コンテナ搬送装置からワークの積込まれたコンテナ
を受取り搬出するコンテナ搬送モノレールを設けたこと
を特徴とするワーク積込み装置。
2. An intermittent feeding device for intermittently feeding a work sent out from a transfer press, and a work loader for suspending and carrying the work sent by the intermittent feeding device and loading it into a container waiting at a work loading station. When,
A container transfer device for loading an empty container to the work loading station and unloading a container loaded with a predetermined number of works from the work loading station, and an empty container for loading the empty container to the container transfer device A work loading device, which is equipped with a container transport monorail for receiving and unloading a container loaded with work from.
【請求項3】トランスファープレスから送出されたワー
クを間歇的に送る間歇送り装置と、該間歇送り装置によ
り送られて来たワークの位置決めを行うワーク位置決め
装置と、位置決めされたワークを吊下げ搬送しワーク積
込みステーションに待機するコンテナへ積込むワークロ
ーダと、空のコンテナを前記ワーク積込みステーション
へ搬入すると共に所定数量のワークが積込まれたコンテ
ナをワーク積込みステーションから搬出するコンテナ搬
送装置と、該コンテナ搬送装置に空のコンテナを搬入す
ると共に該コンテナ搬送装置からワークの積込まれたコ
ンテナを受取り搬送するコンテナ搬送モノレールを設け
たことを特徴とするワーク積込み装置。
3. An intermittent feeding device for intermittently feeding a work sent from a transfer press, a work positioning device for positioning the work sent by the intermittent feeding device, and a suspended work for the positioned work. A work loader for loading into a container waiting at the work loading station, a container transfer device for loading an empty container into the work loading station and unloading a container loaded with a predetermined number of works from the work loading station, A work loading device comprising a container transport monorail for loading an empty container into the container transport device and receiving and transporting the container loaded with the work from the container transport device.
JP62200411A 1987-08-11 1987-08-11 Work loader Expired - Fee Related JPH0825634B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62200411A JPH0825634B2 (en) 1987-08-11 1987-08-11 Work loader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62200411A JPH0825634B2 (en) 1987-08-11 1987-08-11 Work loader

Publications (2)

Publication Number Publication Date
JPS6443447A JPS6443447A (en) 1989-02-15
JPH0825634B2 true JPH0825634B2 (en) 1996-03-13

Family

ID=16423869

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62200411A Expired - Fee Related JPH0825634B2 (en) 1987-08-11 1987-08-11 Work loader

Country Status (1)

Country Link
JP (1) JPH0825634B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5935313U (en) * 1982-08-28 1984-03-05 積水化成品工業株式会社 packaging container
JPS62124935U (en) * 1986-01-31 1987-08-08

Also Published As

Publication number Publication date
JPS6443447A (en) 1989-02-15

Similar Documents

Publication Publication Date Title
CN109319203B (en) Steel pipe pile up neatly winding packing production line
JP5453555B2 (en) Board material loading / unloading shelf equipment
CN110040415B (en) Integrated laser automatic feeding and discharging mechanism and method thereof
CN110844504B (en) Penicillin bottle tray-filling production line with man-machine cooperation
CN211664208U (en) Automatic dress child equipment
CN213536607U (en) Intelligent unloading and framing system for redried tobacco packages
CN209922141U (en) Integrated laser automatic feeding and discharging mechanism
CN112249737A (en) Intelligent unloading and framing system for redried tobacco packages
CN211034351U (en) Tray lifting transfer machine
CN213864326U (en) Semi-finished product input device convenient for automatic production
JPH0825634B2 (en) Work loader
JPS6283970A (en) Automatic loading device
JPS61226449A (en) Pressed article loading device
JP2509241B2 (en) Work automatic loading device
JP2509242B2 (en) Work automatic loading device
JP2509240B2 (en) Work automatic loading device
CN205312655U (en) Bottle of grabbing of sign indicating number bottle buttress machine moves a bottle mechanism
CN212710373U (en) Semi-automatic equipment for packaging automobile door frame fittings
CN210823119U (en) Automatic glass fiber boxing line
JP2685804B2 (en) Work automatic loading device
JPH06144510A (en) Pallet transporting device of laser beam machining system
CN215325137U (en) Automatic material machine of receiving of general type
CN114599594B (en) Bar storage device and method
CN219990463U (en) Automatic rubber coating equipment
JPS63127920A (en) Automatic loader

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees