JPH0825329A - Form for executing retaining wall and executing method for the same wall - Google Patents

Form for executing retaining wall and executing method for the same wall

Info

Publication number
JPH0825329A
JPH0825329A JP18094494A JP18094494A JPH0825329A JP H0825329 A JPH0825329 A JP H0825329A JP 18094494 A JP18094494 A JP 18094494A JP 18094494 A JP18094494 A JP 18094494A JP H0825329 A JPH0825329 A JP H0825329A
Authority
JP
Japan
Prior art keywords
retaining wall
concrete
bottom plate
panel
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18094494A
Other languages
Japanese (ja)
Other versions
JP2829242B2 (en
Inventor
Katsuya Hiraoka
勝也 平岡
Yozo Yogosawa
洋三 與五沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP6180944A priority Critical patent/JP2829242B2/en
Publication of JPH0825329A publication Critical patent/JPH0825329A/en
Application granted granted Critical
Publication of JP2829242B2 publication Critical patent/JP2829242B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

PURPOSE:To provide a form for easily executing a concrete retaining wall and a method for executing the wall by using the form. CONSTITUTION:The form for executing a retaining wall comprises a vertical board 3 in which a decorative material 1 such as a stone, etc., is placed on a surface and a trusslike, a horse shoe shape, or H shape connector 2 is provided, and a bottom board 4 directed from the lower end of the board 2 toward its rear surface side, wherein a through hole 5 is provided at the part of the board 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明はコンクリート擁壁の施
工を容易に行なえる型枠と、この型枠を用いて擁壁を施
工する方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a formwork capable of easily constructing a concrete retaining wall and a method for constructing a retaining wall using this formwork.

【0002】[0002]

【従来の技術】従来のコンクリート擁壁の施工は、コン
クリート基礎の施工に際して予め縦筋を埋め込んでお
き、このコンクリート基礎の上に突出した縦筋に擁壁を
構成する鉄筋を溶接などの手段で接続し、この鉄筋をパ
ネルで囲み、各パネルをセパレーターボルトで連結固定
した後、パネル内に生コンクリートを投入する方法や、
コンクリートブロックを積み上げていく方法等が行なわ
れている。
2. Description of the Related Art Conventional construction of concrete retaining walls is carried out by embedding a vertical bar in advance when constructing a concrete foundation and then welding the reinforcing bars constituting the retaining wall to the vertical bars protruding above the concrete foundation. After connecting, enclosing this rebar with panels, connecting and fixing each panel with separator bolts, a method of putting ready-mixed concrete into the panel,
Methods such as stacking concrete blocks are being used.

【0003】[0003]

【発明が解決しようとする課題】上記の従来工法は、コ
ンクリート基礎上に設ける鉄筋の形成やパネルの取り付
け等に著しく手数がかかり、工期が長くなる。また、コ
ンクリートブロックを用いる工法は、施工は容易で工期
も短いという利点はあるが大型の擁壁の建設には向かな
いという問題がある。
The above-mentioned conventional method requires a great deal of time and effort to form the reinforcing bars to be provided on the concrete foundation and to attach the panels, thus increasing the construction period. Further, the construction method using a concrete block has an advantage that the construction is easy and the construction period is short, but there is a problem that it is not suitable for the construction of a large retaining wall.

【0004】この発明は、上記のような従来のコンクリ
ート擁壁の施工方法の問題点を解決するために、施工を
容易とする擁壁の施工用型枠と、この型枠を用いた施工
方法を提供するものである。
The present invention, in order to solve the above-mentioned problems of the conventional method of constructing a concrete retaining wall, a retaining wall construction form which facilitates construction, and a construction method using this form. Is provided.

【0005】[0005]

【課題を解決するための手段】上記の課題を解決するた
め、この発明は、表面に石等の化粧材を打込み、裏面に
トラス状,馬蹄形,H型等の係止具を設けた縦盤と、該
縦盤の下端から裏面側に向かう底盤からなり、この底盤
の一部に貫通孔を設けた擁壁の施工用型枠と、この施工
用型枠を基礎コンクリートの上に載せ、該基礎コンクリ
ートに予め連結して立ち上げてある鉄筋を該底盤の貫通
孔に挿入してその上方に鉄筋を構成し、更に該底盤後部
上にパネルを立て、該縦盤とパネルとをセパレータボル
トで固定したのち、縦盤とパネルの間に生コンクリート
を投入してコンクリート擁壁を施工する施工方法を採用
したものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention relates to a vertical board in which a decorative material such as stone is driven on the surface and a truss-shaped, horseshoe-shaped, H-shaped locking tool is provided on the back surface. And a bottom plate extending from the lower end of the vertical plate to the back side, and a construction form for a retaining wall in which a through hole is provided in a part of this bottom plate, and this construction form is placed on basic concrete, Insert the reinforcing bar that has been previously connected to the foundation concrete and started up into the through hole of the bottom plate to form a reinforcing bar above it, and set up a panel on the rear part of the bottom plate, and separate the vertical plate and the panel with separator bolts. After fixing, a concrete retaining wall is constructed by pouring ready-mixed concrete between the vertical plate and the panel.

【0006】また、上記のように施工したコンクリート
擁壁の上に前記同様の施工を施すことを繰り返すことに
より上方にコンクリート擁壁を施工して擁壁を高くして
いく工法、基礎コンクリートに予め連結して立ち上げて
ある鉄筋篭を該底盤に設けた貫通孔に挿入し、更に、底
盤後部上にパネルを立て、該縦盤とパネルとをセパレー
ターボルトで固定したのち縦盤とパネルの間に生コンク
リートを投入して擁壁を施工する工法や、このように施
工したコンクリート擁壁の上に前記同様の施工を施すこ
とを繰り返すことにより上方にコンクリート擁壁を施工
して擁壁を高くしていく工法も提供する。
[0006] Further, by repeating the above-mentioned construction on the concrete retaining wall constructed as described above, a concrete retaining wall is constructed on the upper side to raise the retaining wall in advance. Insert the rebar cages that have been connected and started up into the through holes provided in the bottom plate, and then set up the panel on the rear part of the bottom plate, and fix the vertical plate and the panel with separator bolts, and then between the vertical plate and the panel. A concrete retaining wall can be constructed by placing a concrete retaining wall on the upper side by repeating the construction method in which ready-mixed concrete is poured to construct the retaining wall, and the same construction as above is repeated on the concrete retaining wall constructed in this way. We also provide construction methods.

【0007】[0007]

【実施例】以下、この発明の実施例を添付図面に基づい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0008】図1、図2は擁壁の施工用型枠Aの実施例
を示すもので、表面に石等からなる複数の化粧材1を打
込み、裏面にトラス状の係止具2を、その一部を埋め込
むことにより固定した縦盤3と、該縦盤3の下端から裏
面側に向かう底盤4からなり、この底盤4に貫通孔5を
設けた構造のものをコンクリートにより一体に形成す
る。
1 and 2 show an embodiment of a form A for construction of a retaining wall, in which a plurality of decorative materials 1 made of stone or the like are driven into the front surface and a truss-like locking member 2 is attached to the back surface. A vertical platen 3 fixed by embedding a part of the vertical platen 3 and a bottom plate 4 extending from the lower end of the vertical plate 3 toward the rear surface side, and a structure having a through hole 5 in the bottom plate 4 are integrally formed of concrete. .

【0009】該係止具2は、図1、図2のようなトラス
状の他、図3(I)のように鉄棒を曲げて馬蹄形にした
ものを複数埋め込むもの、図3(II)のように短く切
ったH型鋼を埋め込むもの等の種々の形状のものを用い
ることができる。
The locking tool 2 has a truss shape as shown in FIGS. 1 and 2, a plurality of horseshoe-shaped bent iron bars embedded as shown in FIG. 3 (I), and FIG. 3 (II). It is possible to use various shapes such as one in which H-shaped steel cut into short pieces is embedded.

【0010】また、施工時に、セパレーターボルトを型
枠Aに固定するために、図1,図2のように型枠Aの縦
盤3の後側に雌ねじを有する複数のインサート15を埋
め込んでおく。さらに、底盤4の後端面にもパネルを固
定するボルトを螺合する雌ねじを有する複数のインサー
ト16を埋め込む。
In order to fix the separator bolts to the form A at the time of construction, a plurality of inserts 15 having female threads are embedded in the rear side of the vertical plate 3 of the form A as shown in FIGS. . Further, a plurality of inserts 16 having female threads for screwing bolts for fixing the panel are also embedded in the rear end surface of the bottom plate 4.

【0011】上記の型枠Aにより擁壁を施工する方法を
以下に説明する。即ち、最初に図4(I)のように目的
の地盤6にコンクリート基礎7を施工する。この際、複
数の鉄筋8を埋め込んでおく。次に、該基礎7上に図4
(II)に示すように複数の型枠Aを載せ、各鉄筋8を
貫通孔5に挿入して底盤4上に突出させる。この際基礎
7と底盤4の間にモルタルを介在させるとよい。
A method of constructing a retaining wall with the above-mentioned form A will be described below. That is, first, the concrete foundation 7 is constructed on the target ground 6 as shown in FIG. At this time, a plurality of reinforcing bars 8 are embedded. Next, as shown in FIG.
As shown in (II), a plurality of molds A are placed, and each rebar 8 is inserted into the through hole 5 and projected onto the bottom plate 4. At this time, it is advisable to interpose mortar between the foundation 7 and the bottom plate 4.

【0012】そして、図5のように各底盤4上に突出し
た鉄筋8上に鉄筋9を溶接等の手段で固定し、この鉄筋
8,9に横筋10等を溶接等の手段で固定する。
Then, as shown in FIG. 5, reinforcing bars 9 are fixed on the reinforcing bars 8 projecting on each bottom plate 4 by means such as welding, and transverse bars 10 and the like are fixed to the reinforcing bars 8 and 9 by means such as welding.

【0013】また、各底盤4の後端にパネル11の下端
を当て、このパネル11の下端に設けた複数の孔に挿入
した固定ボルト18をインサート16の雌ねじに捩じ込
んでパネル11を立て、該縦盤3とパネル11とを連結
する複数のセパレーターボルト12をインサート15の
雌ねじに捩じ込んで固定したのち、縦盤3とパネル11
の間に生コンクリート13を投入して擁壁Bとするが、
この際一番端の型枠Aの側面にもパネルを固定して側面
からコンクリートがもれないようにする。
Further, the lower end of the panel 11 is applied to the rear end of each bottom plate 4, and fixing bolts 18 inserted into a plurality of holes provided at the lower end of the panel 11 are screwed into female screws of the insert 16 to stand the panel 11. After fixing a plurality of separator bolts 12 connecting the vertical plate 3 and the panel 11 by screwing them into the female screw of the insert 15, the vertical plate 3 and the panel 11 are fixed.
The ready-mixed concrete 13 is put in between to form the retaining wall B,
At this time, a panel is also fixed to the side surface of the form A at the end so that concrete does not leak from the side surface.

【0014】上記のようにして、コンクリート擁壁Bを
施工したのち、図6のように更に該施工済のコンクリー
ト擁壁Bの上に前記同様の施工を施すことを繰り返すこ
とにより上方にコンクリート擁壁Bを高く建造してい
く。
After the concrete retaining wall B is constructed as described above, the concrete retaining wall B which has already been constructed is repeatedly subjected to the same construction as shown in FIG. Build the wall B high.

【0015】上記のように施工時に縦の鉄筋8,9と横
筋10を組み立てて擁壁Bを順次上方に形成していく方
法の他に、図7のように縦筋21と螺旋筋22により、
予め形成した篭型鉄筋Cを鉄筋8上に連結し、図4乃至
図6と同様の工程で該篭型鉄筋Cを継ぎ足しながらコン
クリート擁壁Bを施工する方法もある。
As described above, in addition to the method of assembling the vertical reinforcing bars 8 and 9 and the horizontal reinforcing bars 10 at the time of construction to form the retaining wall B sequentially upward, the vertical reinforcing bars 21 and the spiral reinforcing bars 22 are used as shown in FIG. ,
There is also a method of connecting the preformed cage-shaped reinforcing bars C on the reinforcing bars 8 and constructing the concrete retaining wall B while adding the cage-shaped reinforcing bars C in the same process as in FIGS. 4 to 6.

【0016】この方法は篭型鉄筋Cをあらかじめ工場生
産しておくことにより現場での鉄筋の組み立ての手数が
省略されるので施工期間の短縮となる。
According to this method, since the cage-shaped reinforcing bar C is produced in the factory in advance, the labor of assembling the reinforcing bar on the site can be omitted, so that the construction period can be shortened.

【0017】上記の各実施例はパネルが必要であり、施
工後にパネルを取り除く作業が必要であるが、以下の工
法はパネルが不要である。
Each of the above-mentioned embodiments requires a panel, and it is necessary to remove the panel after construction, but the following construction method does not require a panel.

【0018】即ち、図8のように幅の広い基礎7上に一
対の型枠Aを背中合せに載せ、各型枠Aの対向する底盤
4の各インサート16にそれぞれボルト25を固定し、
この各ボルト25の相対向する部分に設けた逆ねじにタ
ーンバックル26を捩じ込んで、両型枠Aの間隔を調整
し、この一対の型枠Aの間に前記各実施例と同様に、鉄
筋を適宜構成し、コンクリートを打設する工法では型枠
Aの2倍以上の広幅の擁壁の構築が行え、しかもパネル
が不要である。
That is, as shown in FIG. 8, a pair of molds A are placed back to back on a wide base 7, and bolts 25 are fixed to the respective inserts 16 of the bottom plate 4 facing each other,
The turnbuckle 26 is screwed into the reverse screws provided in the portions of the bolts 25 facing each other to adjust the interval between the two molds A, and between the pair of molds A as in the above-described embodiments. In the construction method in which the reinforcing bars are appropriately constructed and concrete is placed, a retaining wall having a width twice or more that of the form A can be constructed, and no panel is required.

【0019】図9の場合は表面に石等からなる複数の化
粧材1を打込み、裏面にトラス状の係止具2を、その一
部を埋め込むことにより固定した平面盤30をコンクリ
ートにより形成し、この平面盤30の上端付近に雌ねじ
を有する複数のインサート31を埋め込み、下端には複
数の挿入孔32を設ける。
In the case of FIG. 9, a plurality of decorative materials 1 made of stone or the like are driven into the front surface, and a truss-like locking tool 2 is embedded into the rear surface to partially fix the flat board 30 formed of concrete. A plurality of inserts 31 having internal threads are embedded near the upper end of the plane board 30, and a plurality of insertion holes 32 are provided at the lower end.

【0020】上記のような平面盤30の挿入孔32に挿
入した固定ボルト33を各型枠Aの各インサート16に
螺合して型枠Aと平面盤30とを固定してチャンネル状
とし、対向するインサート15,31にそれぞれボルト
25を螺合し、この各ボルト25の相対向する部分に設
けた逆ねじにターンバックル26を捩じ込んで、型枠A
と平面盤30の間隔を調整し、型枠Aと平面盤30の間
に鉄筋を構成するか、篭型鉄筋Cを連結したのち、コン
クリートを流し込んでコンクリート擁壁をつくる工法を
繰り返す。この工法もパネルが全く不要である。
The fixing bolts 33 inserted into the insertion holes 32 of the flat plate 30 as described above are screwed into the inserts 16 of the molds A to fix the molds A and the flat plate 30 into a channel shape. The bolts 25 are screwed into the opposing inserts 15 and 31, respectively, and the turnbuckles 26 are screwed into the reverse screws provided in the opposing portions of the bolts 25 to form the form A.
The space between the plane plate 30 and the plane plate 30 is adjusted, and a reinforcing bar is formed between the form A and the plane plate 30 or a cage-shaped reinforcing bar C is connected, and then concrete is poured into the concrete retaining wall to repeat. This method also requires no panel.

【0021】[0021]

【発明の効果】この発明は、上記のように予めL型に形
成してある型枠を用いることにより、パネルの使用数が
著しく少なくなり、現場での施工が極めて容易となり施
工期間の短縮につながる。
As described above, according to the present invention, the number of panels used is remarkably reduced by using the form which is preliminarily formed in the L shape as described above, and the construction at the site is extremely easy and the construction period can be shortened. Connect

【0022】又縦盤の表面に化粧材が埋め込んであるか
ら極めて体裁が良く、更に縦盤と底盤が一体になってい
るから分厚くて極めて安定した擁壁が製造できるなどの
効果を有する。
Moreover, since the decorative material is embedded in the surface of the vertical plate, the appearance is very good, and since the vertical plate and the bottom plate are integrated, a thick and extremely stable retaining wall can be manufactured.

【図面の簡単な説明】[Brief description of drawings]

【図1】この本発明の一実施例の側面図。FIG. 1 is a side view of an embodiment of the present invention.

【図2】同上の平面図。FIG. 2 is a plan view of the same.

【図3】係止具の各例を示す一部拡大側面図。FIG. 3 is a partially enlarged side view showing each example of a locking tool.

【図4】施工順序を示す斜視図。FIG. 4 is a perspective view showing a construction order.

【図5】施工された擁壁の縦断側面図。FIG. 5 is a vertical sectional side view of the constructed retaining wall.

【図6】上方に延ばした擁壁の縦断側面図。FIG. 6 is a vertical sectional side view of a retaining wall extended upward.

【図7】篭型鉄筋を用いた実施例の縦断側面図。FIG. 7 is a vertical cross-sectional side view of an example using cage-shaped rebar.

【図8】型枠を対向させた実施例の縦断側面図。FIG. 8 is a vertical sectional side view of an embodiment in which molds are opposed to each other.

【図9】型枠と平面盤を用いた実施例の縦断側面図。FIG. 9 is a vertical cross-sectional side view of an embodiment using a mold and a flat board.

【符号の説明】[Explanation of symbols]

1 化粧材 2 係止具 3 縦盤 4 底盤 5 貫通孔 6 地盤 7 基礎 8 鉄筋 9 鉄筋 10 螺旋筋 11 パネル 12 セパレータボルト 13 生コンクリート A 擁壁施工型枠 1 Decorative Material 2 Locking Tool 3 Vertical Plate 4 Bottom Plate 5 Through Hole 6 Ground 7 Foundation 8 Reinforcing Bar 9 Reinforcing Bar 10 Spiral Bar 11 Panel 12 Separator Bolt 13 Fresh Concrete A Retaining Wall Construction Form

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 表面に石等の化粧材を打込み、裏面にト
ラス状,馬蹄形,H型等の係止具を設けた縦盤と、該縦
盤の下端から裏面側に向かう底盤からなり、この底盤の
一部に貫通孔を設けたことを特徴とする擁壁の施工用型
枠。
1. A vertical board having a surface made of a decorative material such as stones and a back surface provided with a truss-shaped, horseshoe-shaped, H-shaped locking tool, etc., and a bottom board from the lower end of the vertical board to the back surface side. A formwork for construction of a retaining wall characterized in that a through hole is provided in a part of this bottom plate.
【請求項2】 表面に石等の化粧材を打込み、裏面にト
ラス状,馬蹄形,H型等の係止具を設けた縦盤と、該縦
盤の下端から裏面側に向かう底盤からなり、この底盤の
一部に貫通孔を設けた擁壁の施工用型枠を基礎コンクリ
ートの上に載せ、該基礎コンクリートに予め連結して立
ち上げてある鉄筋を該底盤の貫通孔に挿入してその上方
に鉄筋を構成し、更に該底盤後部上にパネルを立て、該
縦盤とパネルとをセパレータボルトで固定したのち、縦
盤とパネルの間に生コンクリートを投入してコンクリー
ト擁壁を施工することを特徴とする擁壁の施工方法。
2. A vertical plate having a surface made of a decorative material such as stones and a rear face provided with truss-shaped, horseshoe-shaped, H-shaped locking members, etc., and a bottom plate extending from the lower end of the vertical plate to the rear face side. The construction form for the retaining wall having a through hole in a part of the bottom plate is placed on the basic concrete, and the reinforcing bars that have been previously connected to the basic concrete and have been raised are inserted into the through hole of the bottom plate. After constructing a reinforcing bar above, further standing a panel on the rear part of the bottom plate, fixing the vertical plate and the panel with separator bolts, and then pouring ready-mixed concrete between the vertical plate and the panel to construct a concrete retaining wall. Retaining wall construction method characterized by the above.
【請求項3】 表面に石等の化粧材を打込み、裏面にト
ラス状,馬蹄形,H型等の係止具を設けた縦盤と、該縦
盤の下端から裏面側に向かう底盤からなり、この底盤の
一部に貫通孔を設けた擁壁の施工用型枠を基礎コンクリ
ートの上に載せ、該基礎コンクリートに予め連結して立
ち上げてある鉄筋を該底盤の貫通孔に挿入してその上方
に鉄筋を構成し、更に、底盤後部上にパネルを立て、該
縦盤とパネルとをセパレータボルトで固定したのち、縦
盤とパネルの間に生コンクリートを投入してコンクリー
ト擁壁を施工し、更に該施工済のコンクリート擁壁の上
に前記同様の施工を施すことを繰り返すことにより上方
にコンクリート擁壁を施工していくことを特徴とする擁
壁の施工方法。
3. A vertical board having a surface made of a decorative material such as stones and a back surface provided with a truss-shaped, horseshoe-shaped, H-shaped locking tool, etc., and a bottom board extending from the lower end of the vertical board to the back surface side. The construction form for the retaining wall having a through hole in a part of the bottom plate is placed on the basic concrete, and the reinforcing bars that have been previously connected to the basic concrete and have been raised are inserted into the through hole of the bottom plate. After constructing a reinforcing bar above, further standing a panel on the rear part of the bottom plate, fixing the vertical plate and the panel with separator bolts, and then pouring ready-mixed concrete between the vertical plate and the panel to construct a concrete retaining wall. A retaining wall construction method characterized in that a concrete retaining wall is constructed above by repeating the same construction as above on the already constructed concrete retaining wall.
【請求項4】 表面に石等の化粧材を打込み、裏面にト
ラス状,馬蹄形,H型等の係止具を設けた縦盤と、該縦
盤の下端から裏面側に向かう底盤からなり、この底盤の
一部に貫通孔を設けた擁壁の施工用型枠を基礎コンクリ
ート上に載せ、該基礎コンクリートに予め連結して立ち
上げてある鉄筋篭を該底盤に設けた貫通孔に挿入し、更
に、底盤後部上にパネルを立て、該縦盤とパネルとをセ
パレーターボルトで固定したのち縦盤とパネルの間に生
コンクリートを投入してコンクリート擁壁を施工するこ
とを特徴とする擁壁の施工方法。
4. A vertical plate having a surface made of a decorative material such as stones and a rear face provided with truss-shaped, horseshoe-shaped, H-shaped locking members, etc., and a bottom plate extending from the lower end of the vertical plate to the rear surface side. A construction frame for a retaining wall having a through hole in a part of this bottom plate is placed on the foundation concrete, and a reinforcing bar cage that has been pre-connected to the foundation concrete and started up is inserted into the through hole provided in the bottom plate. Further, a retaining wall characterized in that a panel is erected on the rear part of the bottom plate, the vertical plate and the panel are fixed with separator bolts, and then concrete is put between the vertical plate and the panel to construct a concrete retaining wall. Construction method.
【請求項5】 表面に石等の化粧材を打込み、裏面にト
ラス状,馬蹄形,H型等の係止具を設けた縦盤と、該縦
盤の下端から裏面側に向かう底盤からなり、この底盤の
一部に貫通孔を設けた擁壁の施工用型枠を基礎コンクリ
ート上に載せ、該基礎コンクリートに予め連結して立ち
上げてある鉄筋篭を該底盤に設けた貫通孔に挿入し、更
に底盤後部上にパネルを立て、該縦盤とパネルとをセパ
レーターボルトで固定したのち縦盤とパネルの間に生コ
ンクリートを投入してコンクリート擁壁を施工し、更に
該施工済のコンクリート擁壁の上に前記同様の施工を施
すことを繰り返すことにより上方にコンクリート擁壁を
施工していくことを特徴とする擁壁の施工方法。
5. A vertical board having a surface made of a decorative material such as stones and a back surface provided with a truss-shaped, horseshoe-shaped, H-shaped locking tool, etc., and a bottom board from the lower end of the vertical board to the back surface side. A construction frame for a retaining wall having a through hole in a part of this bottom plate is placed on the foundation concrete, and a reinforcing bar cage that has been pre-connected to the foundation concrete and started up is inserted into the through hole provided in the bottom plate. Further, a panel is erected on the rear part of the bottom plate, the vertical plate and the panel are fixed with separator bolts, and then concrete is put between the vertical plate and the panel to construct a concrete retaining wall. A method for constructing a retaining wall, characterized in that a concrete retaining wall is constructed upward by repeating the same construction as above on the wall.
JP6180944A 1994-07-08 1994-07-08 Construction method of retaining wall Expired - Fee Related JP2829242B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6180944A JP2829242B2 (en) 1994-07-08 1994-07-08 Construction method of retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6180944A JP2829242B2 (en) 1994-07-08 1994-07-08 Construction method of retaining wall

Publications (2)

Publication Number Publication Date
JPH0825329A true JPH0825329A (en) 1996-01-30
JP2829242B2 JP2829242B2 (en) 1998-11-25

Family

ID=16092013

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6180944A Expired - Fee Related JP2829242B2 (en) 1994-07-08 1994-07-08 Construction method of retaining wall

Country Status (1)

Country Link
JP (1) JP2829242B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0426241U (en) * 1990-06-25 1992-03-02
JPH05187030A (en) * 1992-01-14 1993-07-27 K I Giken:Kk Gravity-type retaining wall and manufacture thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0426241U (en) * 1990-06-25 1992-03-02
JPH05187030A (en) * 1992-01-14 1993-07-27 K I Giken:Kk Gravity-type retaining wall and manufacture thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod

Also Published As

Publication number Publication date
JP2829242B2 (en) 1998-11-25

Similar Documents

Publication Publication Date Title
CA2038524C (en) Form and method of constructing a wall from pourable concrete material
JPH0825329A (en) Form for executing retaining wall and executing method for the same wall
JP2002047661A (en) Building foundation, foundation material, and its execution method
JPH0932014A (en) Method of execution for retaining wall
JP2829243B2 (en) Construction method of retaining wall
JPH059999A (en) Concrete block and its construction method
JPH0414507Y2 (en)
JPH0673786A (en) Junction of precast concrete column
JP2001342639A (en) Buried form
JPH11343628A (en) Footing/retaining wall construction material and construction method therefor
AU647783B2 (en) Improved building techniques
JPS61162635A (en) Column leg securing structure and member thereof and forming method thereof
JPH077384Y2 (en) Panels for surface formation of concrete foundations
JPH0754348Y2 (en) Combination basic block and combination basic
JPS6024759Y2 (en) Concrete block for retaining wall
JPH0525871A (en) Construction of stone wall without frame works of building
JPH026901B2 (en)
JP2002242206A (en) Continuous footing construction method
JP2709551B2 (en) Prefabricated foundation member and its construction method
JP3019694U (en) Panels for surface formation of concrete foundations
JPH0137542B2 (en)
JPS5824992Y2 (en) L-shaped block for construction
JPH0513785Y2 (en)
JPS6011171Y2 (en) Hōto formwork
JP2000087481A (en) Building frame and method for forming the same

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees