JP3019694U - Panels for surface formation of concrete foundations - Google Patents

Panels for surface formation of concrete foundations

Info

Publication number
JP3019694U
JP3019694U JP1995007254U JP725495U JP3019694U JP 3019694 U JP3019694 U JP 3019694U JP 1995007254 U JP1995007254 U JP 1995007254U JP 725495 U JP725495 U JP 725495U JP 3019694 U JP3019694 U JP 3019694U
Authority
JP
Japan
Prior art keywords
concrete
panel
back surface
thickness
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1995007254U
Other languages
Japanese (ja)
Inventor
實 谷林
Original Assignee
實 谷林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 實 谷林 filed Critical 實 谷林
Priority to JP1995007254U priority Critical patent/JP3019694U/en
Application granted granted Critical
Publication of JP3019694U publication Critical patent/JP3019694U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

(57)【要約】 【目的】 仮枠の解体作業、及び生コンクリートの硬化
待ち等を一切必要としないコンクリート基礎の表面形成
用パネルに換気口、或は配管用孔を簡単に形成すること
ができる。 【構成】 コンクリートパネル1の表面3より裏面4側
に向かって略直方形に窪ませて裏面3との間に打ち抜き
肉厚5を残して換気口形成窪み2を窪設する。換気口形
成窪み2の内面7に、裏面4側に向かって円形に窪ませ
て裏面4との間に打ち抜き肉厚8を残して配管形成孔
6,6を窪設する。コンクリートパネル1の両端部にパ
ネル1の厚みの約1/2を残して一端側は表面3から、
他端側は裏面4から横断面L字形に切欠いて切欠き連結
面9,9を形成する。切欠き連結面9の内側の重接面1
0に楕円形に連結ボルト挿通孔11,11を穿設する。
表面3側より裏面4側に貫通した組み付けボルト挿入孔
12,12を穿設する。
(57) [Abstract] [Purpose] It is possible to easily form ventilation holes or piping holes in the panel for forming the surface of the concrete foundation that does not require the dismantling work of the temporary frame and the waiting for hardening of the fresh concrete. it can. [Structure] A ventilation port forming recess 2 is formed by recessing the concrete panel 1 from the front surface 3 toward the back surface 4 in a substantially rectangular parallelepiped shape, leaving a punching thickness 5 between the surface 3 and the back surface 3. On the inner surface 7 of the ventilation port forming recess 2, the pipe forming holes 6 and 6 are recessed in a circular shape toward the back surface 4 side and a punching wall thickness 8 is left between the recess 4 and the back surface 4. About half of the thickness of the panel 1 is left on both ends of the concrete panel 1, and one end side is from the surface 3,
The other end side is cut out from the back surface 4 in an L-shaped cross section to form cutout connecting surfaces 9, 9. Heavy contact surface 1 inside the cutout connecting surface 9
The connecting bolt insertion holes 11 and 11 are drilled in an oval shape.
Assembling bolt insertion holes 12, 12 penetrating from the front surface 3 side to the rear surface 4 side are formed.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、建造物におけるコンクリート基礎の表面形成用パネルに関するもの である。 The present invention relates to a panel for forming a surface of a concrete foundation in a building.

【0002】[0002]

【従来の技術】[Prior art]

従来、木造基礎その他の基礎工事においては全て板枠を組み、後日左右に配列 した仮枠の間隔内にコンクリートを流し込み、コンクリートの硬化を待って3〜 4日後に組んだ仮枠を解体し、解体済の仮枠及び附帯資材は現場で整理して場外 へ撤去処理を行なうために車両其の他の運搬器具によって資材倉庫に搬入し、資 材撤去及び現場での整備が終了後に埋め戻し作業及び埋め戻し基礎の天場をモル タルで均す作業を行なうので通常7〜8日の日程が必要とされている。そのため に前記の仮枠の組み立て、撤去に多大の労力と時間を要し、且つ、その中間にコ ンクリートの硬化を待つために3〜4日徒過する無駄を全て省くために、考案さ れたものとしては、従来の仮枠組みと同様に左右に一対の、且つ対称となるコン クリートプレートを型枠締め付け用セパレーターを介して対向立設せしめるもの とか、(例えば、実開昭55−126354号参照) Conventionally, in the case of wooden foundations and other basic construction, all plate frames are assembled, concrete is poured into the intervals of the temporary frames arranged on the left and right at a later date, the concrete frames are waited for the concrete to harden, and the assembled temporary frames are dismantled after 3 to 4 days. Dismantled temporary frames and incidental materials are transported to the material warehouse by the vehicle and other transportation equipment in order to arrange them at the site and remove them outside the site, and backfilling work after material removal and on-site maintenance are completed. In addition, since the work of flattening the backfill foundation is done with mortar, it usually takes 7 to 8 days. For this reason, it was devised to assemble and remove the temporary frame, which requires a great deal of labor and time, and to eliminate the waste of 3-4 days waiting for the concrete to harden in the middle. For example, as in the case of the conventional temporary framework, a pair of symmetrical concrete plates on the left and right sides are erected so as to face each other via a mold clamping separator (see, for example, Japanese Utility Model Publication No. Sho 55-126354). reference)

【0003】 或は、更に左右に立設させるコンクリートパネル内に金網を埋設し、両端部に はL字形に切欠いた連結部と内面には縦断面略三角形のコンクリート流入溝を刻 設してより利便性を高める共に強化したコンクリート基礎の表面形成用パネルが 知られている。(例えば、実開昭62−143756号公報参照)Alternatively, wire mesh is embedded in concrete panels to be erected on the left and right sides, and L-shaped notched connecting portions are formed at both ends and concrete inflow grooves having a substantially vertical cross section are formed on the inner surface. A panel for forming a surface of a concrete foundation, which enhances convenience and is reinforced, is known. (See, for example, Japanese Utility Model Laid-Open No. 62-143756).

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

従来の技術で述べたものは、多大の労力と時間とを要していた仮枠の組み立て 、撤去作業を無くし、コンクリートの硬化期間をも待たずにコンクリート基礎作 業を進めることができるが、反面、換気口を穿孔したり、或は給排水管や、ガス 管等を通す必要のある配管個所のコンクリート基礎の表面形成用パネルとしては 利用することができない問題点を有していた。 本考案は従来の技術の有するこのような問題点に鑑みてなされたものであり、 その目的とするところは、換気口や給排水管、或はガス管等を通す場合は必要に 応じて簡単に所望孔を工事現場にて穿孔し、利用することのできる便利なコンク リート基礎の表面形成用パネルを提供しようとするものである。 With the conventional technology, the work of assembling and removing the temporary frame, which required a lot of labor and time, can be eliminated, and the concrete foundation work can proceed without waiting for the hardening period of the concrete. On the other hand, it has a problem that it cannot be used as a panel for forming a surface of a concrete foundation at a piping portion where it is necessary to perforate a ventilation port, or through which a water supply / drain pipe or a gas pipe must be passed. The present invention has been made in view of the above problems of the conventional technology, and the purpose thereof is to easily install a ventilation port, a water supply / drainage pipe, or a gas pipe as necessary. The purpose of the present invention is to provide a convenient concrete foundation surface forming panel that can be used by making desired holes at a construction site.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

上記目的を達成するために、本考案におけるコンクリート基礎の表面形成用パ ネルは、コンクリートで略直方形の板状にコンクリートパネルを形成し、その一 表面より裏面側に向かって直方形に窪ませて裏面側との間に打ち抜き肉厚を残し て形成した換気口形成窪みと、該換気口形成窪みの内面に更に裏面側に向かって 円形に窪ませて裏面側との間に打ち抜き肉厚を残して形成した配管形成孔とを設 け、コンクリートパネルの左右の端部に片方は表面より裏面側に向かって他の一 方は裏面より表面側に向かって逆方向に横断面L字形に切欠いた切欠き連結面を 形成し、該切欠き連結面に楕円形の連結ボルト挿通孔を穿設し、コンクリートパ ネルの長手方向の三等分位置に組み付けボルト挿入孔を穿設し、コンクリートパ ネルの内面に縦断面略三角形のコンクリート流入溝を長手方向に刻設したもので ある。 In order to achieve the above object, the surface forming panel of the concrete foundation according to the present invention is made of concrete to form a concrete panel in a substantially rectangular plate shape, and is dented in a rectangular parallelepiped direction from one surface to the back surface side. The ventilation hole forming recess formed by leaving a punching thickness between the back surface side and the back surface side, and the inner surface of the ventilation opening forming recess is further circularly recessed toward the back surface side to form a punching thickness between the back surface side and the back surface side. The left and right ends of the concrete panel are provided with the remaining holes for pipe formation. One is cut from the front side to the back side, and the other is cut from the back side to the front side in the reverse direction with an L-shaped cross section. A cutout connecting surface is formed, an oval connecting bolt insertion hole is formed in the cutout connecting surface, and an assembling bolt insertion hole is formed at three equal positions in the longitudinal direction of the concrete panel. Vertical on the inside of the flannel Concrete inflow groove surface substantially triangular is obtained by engraved longitudinally.

【0006】[0006]

【作用】[Action]

配管形成孔の打ち抜き肉厚部をタガネ等で打ち破ると配管孔が形成でき、換気 口形成窪みの打ち抜き肉厚部を打ち破ると換気口が形成できる。次いでコンクリ ートパネルを図4に示す如く布基礎A上の左右に所望のコンクリート基礎巾に対 向保持し、(此の場合、左右のコンクリートパネル間に、例えばコンクリートで 形成した間隔調整片Bを挿入することが望ましい。)対向する各組み付けボルト 挿入孔内に組み付けボルトを挿通して締め付け固定し、 A hole can be formed by smashing the punched thick part of the pipe forming hole with a chisel or the like, and a vent can be formed by breaking the punched thick part of the ventilation hole forming recess. Then, as shown in FIG. 4, the concrete panels are held on the left and right sides of the cloth foundation A so as to face the desired concrete foundation width (in this case, a space adjusting piece B made of concrete, for example, is inserted between the left and right concrete panels. It is desirable to insert the assembly bolts into the insertion holes that face each other, and tighten and fix them.

【0007】 次に順次布基礎A上に前記構成に組み付けながら、次々に例えば左隣のコンク リートパネルの裏面側より表面側に向かって切欠いた切欠き連結面と右隣の表面 側より裏面側に向かって切欠いた切欠き連結面とを突合せて重接し、連結ボルト 挿通孔に連結ボルトを挿入して締め付けると隣接するコンクリートパネルの左右 両端部は順次連結し、所望のコンクリート基礎巾で対向した連結パネル面が形成 される布基礎A上にコンクリートパネルを上記の如く連結組み付けた後、左右の パネルの基部外側に適宜パネル固定用モルタルC、Cを塗着し更に強固に固定し た後に前記穿設した配管孔部及び換気口部の内側に適宜詰物Dを詰めてコンクリ ートの流入防止処理を施した後に生コンクリートEを左右のコンクリートパネル 間に流入せしめ、速やかに基礎天場均しを行なうと共に、埋め戻し土砂によりF の部分まで埋め戻し作業も同時に行なえる。Next, while sequentially assembling on the cloth foundation A in the above-mentioned configuration, for example, a notch connecting surface that is cut away from the rear surface side of the left adjacent concrete panel toward the front surface side, and the right side adjacent front surface side to the rear surface side. Butt the connection surface of the notch toward and make a heavy contact, and insert the connection bolt into the insertion hole of the connection bolt and tighten it.The left and right ends of the adjacent concrete panels are connected sequentially and face each other with the desired concrete foundation width. After connecting and assembling concrete panels on the cloth foundation A on which the connecting panel surface is formed, the mortars C and C for fixing the panels are appropriately applied to the outer sides of the bases of the left and right panels, and further firmly fixed. After filling the inside of the drilled piping hole and ventilation hole with filling material D as appropriate to prevent concrete from flowing in, fresh concrete E is placed between the left and right concrete panels. In addition to quickly filling the ground up and down, it is possible to carry out backfill work up to the F part by backfilling sand at the same time.

【0008】[0008]

【実施例】【Example】

実施例について図面を参照して説明する。 図1〜図4において、コンクリート基礎の表面形成用パネルを形成するコンク リートパネル1は、コンクリート材で略直方形の板状に形成する。 換気口形成窪み2はコンクリートパネル1の長手方向の中央位置に表面3より 裏面4側に向かって略直方形に窪ませて裏面3との間に打ち抜き肉厚5を残して 窪設する。この場合、例えば換気口形成窪み2の大きさは縦×横=220mm×4 20mm、打ち抜き肉厚5の厚みは約10mmに形成することが好ましい。 Examples will be described with reference to the drawings. 1 to 4, a concrete panel 1 forming a surface forming panel of a concrete foundation is formed of a concrete material in a substantially rectangular plate shape. The ventilation port forming recess 2 is formed in a central position in the longitudinal direction of the concrete panel 1 so as to be recessed in a substantially rectangular shape from the front surface 3 toward the back surface 4 side and leave a punched wall thickness 5 between the back surface 3 and the recess. In this case, for example, it is preferable that the size of the ventilation hole forming recess 2 is vertical × horizontal = 220 mm × 420 mm, and the thickness of the punching thickness 5 is about 10 mm.

【0009】 配管形成孔6,6は換気口形成窪み2の内面7に、裏面4側に向かって円形に 窪ませて、裏面4との間に打ち抜き肉厚8を残して窪設する。この場合、配管形 成孔6の直径は約100mm、打ち抜き肉厚8の厚みは5mm位が好ましい。 切欠き連結面9,9は、コンクリートパネル1の両端部にコンクリートパネル 1の厚みの約1/2を残して横断面L字形に切欠き内側に残した面で形成する重 接面10を一辺として一端側の切欠き連結面9は表面3側より他端側の切欠き連 結面9は裏面4側より横断面L字形に切欠き形成する。 片方一端側の連結ボルト挿通孔11,11は、重接面10より表面3側に、他 の連結ボルト挿通孔11は重接面10より裏面4に向かって各々楕円形に貫通穿 設する。 組み付けボルト挿入孔12,12は、コンクリートパネル1の長手方向の略三 等分位置に、表面3側より裏面4に向かって貫通穿設する。 コンクリート流入溝13,13は、コンクリートパネル1の内面側に左右横方 向に向かって縦断面略三角形に窪ませ刻設する。The pipe forming holes 6 and 6 are formed in the inner surface 7 of the ventilation hole forming recess 2 so as to be circularly recessed toward the back surface 4 side and leave a punched wall thickness 8 between them and the back surface 4. In this case, it is preferable that the diameter of the pipe forming hole 6 is about 100 mm and the thickness of the punching wall thickness 8 is about 5 mm. The cutout connecting surfaces 9 and 9 have one side of the contact surface 10 formed by the surfaces left inside the cutout in an L-shaped cross section leaving about 1/2 of the thickness of the concrete panel 1 at both ends of the concrete panel 1. As for the notch connecting surface 9 on the one end side, the notch connecting surface 9 on the other end side from the front surface 3 side is cut out from the rear surface 4 side in an L-shaped cross section. The connecting bolt insertion holes 11, 11 on one end side are penetratingly formed in an elliptical shape from the heavy contact surface 10 toward the front surface 3 side, and the other connecting bolt insertion holes 11 are elliptical from the heavy contact surface 10 toward the rear surface 4. The assembling bolt insertion holes 12 and 12 are bored at substantially three equal positions in the longitudinal direction of the concrete panel 1 from the front surface 3 side toward the rear surface 4. The concrete inflow grooves 13 and 13 are engraved on the inner surface side of the concrete panel 1 so as to be recessed laterally in the left and right directions in a substantially triangular cross section.

【0010】[0010]

【考案の効果】[Effect of device]

以上説明したように、本考案を実施すると、配管用の孔が必要な時とか、或は 換気口を必要とする時には現場で必要な部位の打ち抜き肉厚部を打ち抜くのみで 簡単に穿孔することができて配管用の孔、又は換気口をコンクリートパネルに形 成することができ、前記穿孔した孔の固定位置の高さ調整は、組み付け時に楕円 形の連結ボルト挿通孔を上下にずらして取付けることにより可能となり、後はコ ンクリートパネルを布基礎上に横方向に連結させて一定間隔に対向させて組み付 けるのみでその内側に生コンクリートの流し込みと同時に硬化を待つことなくモ ルタルによる基礎天場均し、土砂による布基礎の埋め戻し作業が同時に進行出来 るため、従来硬化待ちも含め7日〜8日を必要としたものが2〜3日の日数に大 巾に短縮でき、更に仮枠を使用しないために、仮枠の解体作業、廃材も含めた場 外撤去処理等の作業が全て無くなり、附帯資材等を整理する資材倉庫までも不用 となり、工期の短縮及び省力化に大きく寄与し、人件費、運搬費、仮設費、その 他在庫場所等の経費全てが削減できる考案である。 As described above, when the present invention is implemented, when a hole for piping is needed or when a ventilation port is needed, it is possible to easily punch a hole by punching out a thick part of a necessary part on site. A hole for piping or a ventilation port can be formed in the concrete panel, and the height of the fixed position of the drilled hole can be adjusted by vertically shifting the elliptical connecting bolt insertion hole during assembly. After that, the concrete panels are simply connected laterally on the cloth foundation and assembled facing each other at regular intervals. Since it is possible to carry out the work of leveling up in the sky and backfilling the cloth foundation with earth and sand at the same time, it is possible to greatly reduce the number of days that required 7 to 8 days, including waiting for curing, to 2-3 days. Since the temporary frame is not used for the work, all the work such as dismantling of the temporary frame and outside removal processing including waste materials is eliminated, and the material warehouse for organizing incidental materials is also unnecessary, shortening the construction period and saving labor. It is a device that contributes greatly and can reduce labor costs, transportation costs, temporary costs, and other costs such as inventory space.

【図面の簡単な説明】[Brief description of drawings]

【図1】コンクリート基礎の表面形成用パネルの斜視図
である。
FIG. 1 is a perspective view of a surface forming panel of a concrete foundation.

【図2】コンクリート基礎の表面形成用パネルの横断面
図である。
FIG. 2 is a cross-sectional view of a surface forming panel of a concrete foundation.

【図3】コンクリート基礎の表面形成用パネルの左側面
図である。
FIG. 3 is a left side view of a panel for forming a surface of a concrete foundation.

【図4】コンクリート基礎の表面形成用パネルの使用態
様を示す図である。
FIG. 4 is a diagram showing a usage mode of a panel for forming a surface of a concrete foundation.

【符号の説明】[Explanation of symbols]

1 コンクリートパネル 2 換気口形成窪み 3 表面 4 裏面 5 打ち抜き肉厚 6 配管形成孔 7 内面 8 打ち抜き肉厚 9 切欠き連結面 10 重接面 11 連結ボルト挿通孔 12 組み付けボルト挿入孔 13 コンクリート流入溝 14 連結ボルト 15 組み付けボルト DESCRIPTION OF SYMBOLS 1 Concrete panel 2 Vent hole forming depression 3 Front surface 4 Back surface 5 Punching wall thickness 6 Piping hole 7 Inner surface 8 Punching wall thickness 9 Notch connecting surface 10 Heavy contact surface 11 Connecting bolt insertion hole 12 Assembling bolt insertion hole 13 Concrete inflow groove 14 Connecting bolt 15 Assembly bolt

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 略直方形の板状に形成したコンクリート
パネル1の長手方向の中央位置に表面3より裏面4側に
向かって略直方形に窪ませて裏面4との間に打ち抜き肉
厚5を残して窪設した換気口形成窪み2と、換気口形成
窪み2の内面7に、裏面4側に向かって円形に窪ませて
裏面4との間に打ち抜き肉厚8を残して円形に形成した
配管形成孔6,6と、コンクリートパネル1の両端部に
パネル1の厚みの約1/2を残して一端側は表面3か
ら、他端側は裏面4から横断面L字形に切欠いて内側に
重接面10を形成した切欠き連結面9,9と、重接面1
0に楕円形に穿設した連結ボルト挿通孔11,11と、
表面3側より裏面4側に貫通した組み付けボルト挿入孔
12,12を穿設してなるコンクリート基礎の表面形成
用パネル。
1. A concrete panel 1 formed in the shape of a substantially rectangular parallelepiped is recessed in a substantially rectangular shape from the front surface 3 toward the rear surface 4 side at a central position in the longitudinal direction and punched with a thickness 5 between the rear surface 4 and the surface. And the ventilation hole forming recess 2 which is recessed to leave the inner surface 7 of the ventilation hole forming recess 2 in a circular shape toward the rear surface 4 side, and a punching thickness 8 is left between the rear surface 4 to form a circular shape. The pipe forming holes 6 and 6 and about 1/2 of the thickness of the panel 1 are left at both ends of the concrete panel 1, and one end side is cut out from the front surface 3 and the other end side is cut out from the back surface 4 in an L-shaped cross section inside. Notch connecting surfaces 9 and 9 in which a heavy contact surface 10 is formed, and a heavy contact surface 1
Connecting bolt insertion holes 11, 11 formed in an oval shape in 0,
A panel for forming a surface of a concrete foundation in which assembly bolt insertion holes 12, 12 penetrating from the front surface 3 side to the rear surface 4 side are provided.
JP1995007254U 1995-06-21 1995-06-21 Panels for surface formation of concrete foundations Expired - Lifetime JP3019694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1995007254U JP3019694U (en) 1995-06-21 1995-06-21 Panels for surface formation of concrete foundations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1995007254U JP3019694U (en) 1995-06-21 1995-06-21 Panels for surface formation of concrete foundations

Publications (1)

Publication Number Publication Date
JP3019694U true JP3019694U (en) 1995-12-19

Family

ID=43155098

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1995007254U Expired - Lifetime JP3019694U (en) 1995-06-21 1995-06-21 Panels for surface formation of concrete foundations

Country Status (1)

Country Link
JP (1) JP3019694U (en)

Similar Documents

Publication Publication Date Title
JP2001295298A (en) Foundation for columnar structure and its work execution method
KR100557335B1 (en) A Dismonuting Structure Form And Manufacturing Method Thereof
CN1329589C (en) Underground beam construction frame and underground beam construction method using the same
JP3019694U (en) Panels for surface formation of concrete foundations
JPH09125417A (en) Basement wall body and asymmetrically closed section steel pile
JP3239151B2 (en) Concrete wall construction method
JPH077384Y2 (en) Panels for surface formation of concrete foundations
JP2007077616A (en) Nonform foundation structure of building
CN214364024U (en) Prefabricated assembled floor and prefabricated assembled building
KR102682632B1 (en) Permanant form panel for buliding foundation work
JP2733722B2 (en) Construction method of deep foundation pile type retaining wall
JP2008255583A (en) Form connecting implement, method for forming form for wall surface, method for forming wall surface, and construction method for building
JP2002146954A (en) Built-up form apparatus for use in forming skeleton
JPS60203737A (en) Method of settling prefabricated caisson
JP2552860B2 (en) Basement method
JP2583058B2 (en) Basement method
JPH0348272Y2 (en)
AU647783B2 (en) Improved building techniques
JPH08209926A (en) Form and execution method of concrete wall
JP2829242B2 (en) Construction method of retaining wall
JP2001003374A (en) Execution method of underground concrete wall using embedded form
JP3035009U (en) Haunch metal fittings
JP2540022Y2 (en) Buried underground beam formwork
JP3027589U (en) Wooden building connection foundation block
JP3000260U (en) Structural wall using earth retaining connection wall constructed at a position within 480 mm from the boundary