Gravity-type retaining wall and manufacture thereof

Info

Publication number
JPH05187030A
JPH05187030A JP453292A JP453292A JPH05187030A JP H05187030 A JPH05187030 A JP H05187030A JP 453292 A JP453292 A JP 453292A JP 453292 A JP453292 A JP 453292A JP H05187030 A JPH05187030 A JP H05187030A
Authority
JP
Japan
Prior art keywords
wall
rear wall
pillow
concrete
posture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP453292A
Other languages
Japanese (ja)
Other versions
JPH0786237B2 (en
Inventor
Jinkou Kinugasa
仁浩 衣笠
Masami Hirose
政美 広瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K I GIKEN KK
Original Assignee
K I GIKEN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K I GIKEN KK filed Critical K I GIKEN KK
Priority to JP4004532A priority Critical patent/JPH0786237B2/en
Publication of JPH05187030A publication Critical patent/JPH05187030A/en
Publication of JPH0786237B2 publication Critical patent/JPH0786237B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

PURPOSE:To improve workability, and to enhance the whole rigidity by engaging each lower edge with projections on a sleeper material and placing concrete between a front wall and a rear wall held and juxtaposed by a strut member and a tension member. CONSTITUTION:Sleeper materials 1 having positioning projections 2-5 at the front ends and rear ends of top faces are arranged in parallel on the same surface in a flat surface, on which stone 6 is paced and tamped. A rear wall 10 composed of a concrete board, in which reinforcements are incorporated, is hung down, the lower edge of the rear wall is engaged with the front surfaces of the rear-end projections 4, 5 of the sleeper materials 1, and strut members 14 are disposed among the rear wall 10 and the sleeper materials 1 and the rear wall 10 is held at a forward inclined attitude. A front wall 9, in which reinforcements are incorporated, is hung down, the lower edge of the front wall is engaged with the rear surfaces of the front-end projections 2, 3 of the sleeper materials 1, and tension members 21 are arranged between the front wall 9 and the sleeper members 1 and the front wall 9 is held at an approximately vertical attitude. Another front wall and rear wall are installed to other sleeper materials, and concrete is placed in spaces 34 between each front and rear wall 9, 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は重力式擁壁及びその製造
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gravity type retaining wall and its manufacturing method.

【0002】[0002]

【従来の技術】一般に山の斜面に山を巡る道を作る場合
等には、道の山側に山からの土圧をうける重力式擁壁を
設けているが、従来は重力式擁壁の配置される場所に、
まず床敷付けを行い、フーチング打設を行い(表面をコ
ンクリートで平坦に仕上げ)、その上に位置決めの為の
墨出しを行い、足場支保工を組み立て、サポート等を使
用してベニヤ板で型枠を組み立て、通り(寸法精度)確
認を行い、内部に鉄筋、アングル材等で補強を施し、コ
ンクリートを打設し、養生の後、型枠ばらし、支保工ば
らし、後じまい……の手順を必要としていた。しかし従
来の工法では、足場支保工組立、型枠組立、型枠ばら
し、支保工ばらし等に専門職の熟練と多くの手間を要
し、工期が長くなるばかりでなく、コスト高になる。し
かも擁壁の表面に模様を付けることはできず、また擁壁
表面付近の強度を上げて全体の剛性を高める為には鉄筋
の組込みに特別の手間が掛かり、作りにくくなる。
2. Description of the Related Art Generally, when making a road around a mountain on a slope of a mountain, a gravity retaining wall that receives earth pressure from the mountain is provided on the mountain side of the road. Where
First, floor laying, footing placement (finishing the surface flat with concrete), marking for positioning on it, assembling scaffolding support, and using a support etc. to form the formwork with a plywood board Assembling, confirming the street (dimensional accuracy), reinforcing the inside with reinforcing bars, angle materials, etc., placing concrete, curing, dismantling the formwork, dismantling the support work, and the post-wiring procedure. I was trying. However, in the conventional method, scaffolding support assembly, formwork assembly, formwork dismantling, supportwork disassembly, etc. require the skill and a lot of labor of a professional profession, which not only prolongs the construction period but also increases the cost. Moreover, it is not possible to form a pattern on the surface of the retaining wall, and in order to increase the strength near the surface of the retaining wall and increase the rigidity of the whole, it takes special labor to assemble the reinforcing bar, which makes it difficult to make.

【0003】[0003]

【発明の目的】第1の発明は、表面に模様を付けること
が容易で、しかも表面付近の強度を高めて全体の剛性を
大幅に増大することができるようにすることを目的とし
ている。第2の発明は第1の発明による重力式擁壁を熟
練を要することなく短期間に低コストで製造できるよう
にすることを目的としている。
SUMMARY OF THE INVENTION The first object of the present invention is to make it easy to form a pattern on the surface and to increase the strength in the vicinity of the surface to significantly increase the overall rigidity. A second aspect of the present invention aims to enable the gravity type retaining wall according to the first aspect to be manufactured at low cost in a short period of time without requiring skill.

【0004】[0004]

【発明の構成】第1の発明は上面の前端と後端に位置決
め突起を有し間隔を隔てて平行に一平面上に配置される
鉄筋内蔵のコンクリート枕材と、少なくとも2個の枕材
の後端突起の前面に下縁が係合し上方へ行くにつれて前
方へ傾斜した鉄筋内蔵のコンクリート板からなる後壁
と、後壁を傾斜姿勢に支えるように枕材と後壁の間に取
り付けた突張材と、枕材の前端突起の後面に下縁が係合
し垂直又は上方へ行くにつれてわずかに後方へ傾斜した
鉄筋内蔵のコンクリート板からなる前壁と、後壁に対し
前壁の姿勢を保つように前壁と後壁の間に取り付けた引
張材と、前後壁間に打設されたコンクリートからなる重
力式擁壁である。第2の発明は上面の前端と後端に位置
決め突起を有する枕材を石を敷き固めた平坦面に同一面
上で平行に配置し、鉄筋内蔵のコンクリート板からなる
後壁を吊り下げて下縁が少なくとも2個の枕材の後端突
起の前面に係合し上方へ行くにつれて前方へ傾斜した姿
勢に保持した状態で枕材と後壁の間に突張材を取り付け
て後壁を傾斜姿勢に保ち、次に鉄筋内蔵のコンクリート
板からなる前壁を吊り下げて下縁が枕材の前端突起の後
面に係合し垂直又は上方へ行くにつれてわずかに後方へ
傾斜した姿勢に保持した状態で後壁と前壁の間に引張材
を取り付けて前壁の姿勢を保ち、上記の枕材とは別の枕
材に上記の前壁と後壁とは別の前壁と後壁を横に並べて
それぞれ同一面内に保ちかつ別の突張材と引張材を取り
付け、前後壁間にコンクリートを打設する重力式擁壁の
製造方法である。
According to a first aspect of the present invention, there are provided a concrete pillow member having built-in reinforcing bars, which has positioning protrusions at front and rear ends of an upper surface and is arranged in parallel on one plane at a distance, and at least two pillow members. Attached between the pillow and the rear wall so as to support the rear wall in a tilted position and the rear wall made of concrete plate with built-in reinforcing bars that is inclined forward as the lower edge engages with the front surface of the rear end protrusion. Position of the front wall with respect to the rear wall and the front wall composed of the reinforcement and the front plate of the pillow, the lower edge of which engages with the rear surface of the front end of the pillow, and the concrete plate with built-in reinforcing bars that is inclined rearward as it goes vertically or upward It is a gravity-type retaining wall made of concrete that is placed between the front and rear walls and a tension material that is attached between the front and rear walls so as to keep the above. A second aspect of the invention is to arrange pillows having positioning protrusions at the front and rear ends of the upper surface in parallel on the same flat surface where stones are laid, and to hang down the rear wall made of concrete plate with built-in reinforcing bars. Incline the rear wall by attaching a tension member between the pillow and the rear wall with the edges engaging the front surfaces of the rear end projections of at least two pillows and holding the posture inclined forward as it goes upward. Hold the posture, then suspend the front wall made of concrete plate with built-in reinforcing bars, and hold the posture in which the lower edge engages with the rear surface of the front end protrusion of the pillow and tilts slightly backward as it goes vertically or upward. Install a tension member between the rear wall and the front wall to maintain the posture of the front wall, and place the front wall and the rear wall different from the above front and rear walls on the pillow other than the above pillow. Keep them in the same plane and attach different tensioning and tensioning materials to each other and pour concrete between the front and rear walls. It is a manufacturing method of gravity retaining wall to be.

【0005】[0005]

【実施例】図1の1は鉄筋内蔵のコンクリート枕材で上
面の前端部(図1の左側)に2個の突起2、3を、また
後端部に2個の突起4、5を備え、石6を敷き詰めて平
坦に転圧して得られた平坦面(重力式擁壁7が設置され
る面)の上に間隔を隔てて平行にのせてある。9、10
は鉄筋が内蔵されたプレキャストコンクリート板からな
る前壁と後壁で、それぞれ少なくとも2個のコンクリー
ト枕材1の上に乗り、前壁9の前面下縁部は前端突起2
の後面に係合し、後壁10の後面は後端突起5の前面に
係合している。コンクリート枕材1の突起3、4間には
3個のインサートナット11(図2)が埋め込まれて内
部の鉄筋15に溶接により固定されており、このインサ
ートナット11に鉄の棒12の下端のねじ部13が螺合
し、棒12に突張材14(アングル材又は鉄筋)の下端
部が溶接により固定されている。突張材14の上端部は
後壁10から前方へ突出したアングル材やU字形鉄筋か
らなるアンカー16に溶接により固定され、アンカー1
6(図3)は後壁10内の鉄筋17、18に溶着され、
前端部に吊上用フックの嵌まる孔19を有する。1個の
枕材1からは2本の長さの異なる突張材14が上方へ延
びて後壁10を図示の傾斜姿勢に保持している。前壁9
の後面から後方へ突出したアンカー20と対応する高さ
の後壁10のアンカー16とにアングル材又は鉄筋から
なる引張材21の前後端部が溶着され、1個の枕材1の
上方では少なくとも2本の引張材21が略水平に延びて
後壁10に対する前壁9の姿勢(図示の例では垂直姿
勢)を保持している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS 1 of FIG. 1 is a concrete pillow material with a built-in reinforcing bar and is provided with two protrusions 2 and 3 at the front end portion (left side of FIG. 1) of the upper surface and two protrusions 4 and 5 at the rear end portion. , Are placed parallel to each other on a flat surface (the surface on which the gravity type retaining wall 7 is installed) obtained by laying stones 6 and rolling it flatly. 9, 10
Is a front wall and a rear wall made of precast concrete plates with built-in reinforcing bars, each of which rides on at least two concrete pillows 1, and the lower front edge of the front wall 9 is a front end projection 2
The rear surface of the rear wall 10 is engaged with the front surface of the rear end projection 5. Three insert nuts 11 (Fig. 2) are embedded between the protrusions 3 and 4 of the concrete pillow material 1 and fixed to the internal reinforcing bar 15 by welding. The screw portion 13 is screwed, and the lower end portion of the tension member 14 (angle member or rebar) is fixed to the rod 12 by welding. The upper end of the strut 14 is fixed by welding to an anchor 16 that is made of an angle member or a U-shaped rebar that protrudes forward from the rear wall 10.
6 (FIG. 3) is welded to the rebars 17, 18 in the rear wall 10,
The front end has a hole 19 into which the lifting hook fits. Two tension members 14 having different lengths extend upward from one pillow member 1 to hold the rear wall 10 in the illustrated inclined posture. Front wall 9
The front and rear ends of the tension member 21 made of an angle member or a reinforcing bar are welded to the anchor 20 protruding rearward from the rear surface and the anchor 16 of the rear wall 10 having a corresponding height, and at least above one pillow member 1. The two tension members 21 extend substantially horizontally and hold the posture (vertical posture in the illustrated example) of the front wall 9 with respect to the rear wall 10.

【0006】後壁10の上端面の前半分の部分は後壁1
0の厚さの半分の厚さの前上フランジ23となってお
り、そこに2段目の後壁10aの下面の後下フランジ2
4aが噛み合い、これにより後壁10aの下端部が後壁
10の上端部に安定に支持される。後壁10aの上端部
の前上フランジ23aには3段目の低い後壁10bの後
下フランジ24bが噛み合う。14aはアンカー16a
と棒12、アンカー20をつなぐ突張材、24aはアン
カー16aと2段目の前壁9aのアンカーをつなぐ引張
材、21bはアンカー16bと前壁9aのアンカーをつ
なぐ引張材である。前壁9は上端に後上フランジ25を
備え、これに2段目の前壁9aの下端の前下フランジ2
6aが噛み合っている。後壁10、10a、10bは左
側の端面に後横フランジ27、27a、27bを備え、
反対の右側端面に上記の後横フランジ27、27a、2
7bに対応する前横フランジを備え、後壁を道に沿い横
(左右方向)に長く嵌合状態で並べることができるよう
になっている。前壁9、9aは左側の端面に後横フラン
ジ28、28aを備え、反対の右側端面に上記の後横フ
ランジ28、28aに対応する前横フランジを備え、前
壁を道に沿い横(左右方向)に長く嵌合状態で並べるこ
とができるようになっている。図示の前壁9、後壁10
の下端面は平坦に形成されているが、2段目の前壁9
a、後壁10aを兼用することもできる。
The front half of the upper end surface of the rear wall 10 is the rear wall 1.
The front upper flange 23 has a thickness half the thickness of 0, and the rear lower flange 2 on the lower surface of the second-stage rear wall 10a is formed there.
4a meshes with each other, whereby the lower end of the rear wall 10a is stably supported by the upper end of the rear wall 10. A rear lower flange 24b of the third lower rear wall 10b meshes with the front upper flange 23a at the upper end of the rear wall 10a. 14a is an anchor 16a
A tension member that connects the anchor 16a and the anchor of the second front wall 9a, and a reference numeral 21b is a tension member that connects the anchor 16b and the anchor of the front wall 9a. The front wall 9 is provided with a rear upper flange 25 at the upper end, and a front lower flange 2 at the lower end of the front wall 9a of the second stage is provided therewith.
6a is engaged. The rear walls 10, 10a, 10b have rear lateral flanges 27, 27a, 27b on the left end face,
On the opposite right end face, the above-mentioned rear lateral flanges 27, 27a, 2
A front lateral flange corresponding to 7b is provided so that the rear wall can be arranged sideways along the road (left-right direction) in a long fitted state. The front walls 9, 9a are provided with rear lateral flanges 28, 28a on the left end surface and front lateral flanges corresponding to the rear lateral flanges 28, 28a on the opposite right end surface, and the front wall is laterally (left and right) along the road. Direction) and can be arranged in a fitted state for a long time. The illustrated front wall 9 and rear wall 10
Although the lower end surface of the front wall is flat, the front wall 9 of the second stage is
It is also possible to use both a and the rear wall 10a.

【0007】前壁9、9aの前面には、プレキャスト時
の型により、模様30が規則的に設けてある。また足場
31を取り付ける為のインサートナット32がアンカー
16、20と同様に設けてある。34は前後壁間の空間
で、この中にコンクリートが打設される。35はアング
ル材又は鉄筋で内部空間34の下半部の形状を定める治
具(形ゲージ)で、埋め殺されるか後壁10を所定の姿
勢にセットした後に取外して何回も使用することができ
る。36は水抜き用のプラスチックパイプで、前後壁の
孔37に端部が嵌合している。38は道の表面、39は
擁壁7を作る為に削られた山肌、40は擁壁7ができた
後に埋め戻された部分の山肌である。
Patterns 30 are regularly provided on the front surfaces of the front walls 9 and 9a according to the mold used for precasting. An insert nut 32 for attaching the scaffold 31 is provided similarly to the anchors 16 and 20. 34 is a space between the front and rear walls, in which concrete is poured. Reference numeral 35 is a jig (shape gauge) that determines the shape of the lower half of the internal space 34 by an angle member or a reinforcing bar, and can be used many times after being buried or after the rear wall 10 is set in a predetermined posture. it can. Reference numeral 36 is a plastic pipe for draining water, the ends of which are fitted into holes 37 in the front and rear walls. 38 is the surface of the road, 39 is the mountain surface that has been carved to make the retaining wall 7, and 40 is the mountain surface that is backfilled after the retaining wall 7 is formed.

【0008】擁壁7を作るには、まず山肌39を削り、
擁壁7の設置場所に多数の石6を敷いて平坦に転圧する
床敷付を行い、道に沿いコンクリート枕材1をそれぞれ
平行に等間隔に布設する。枕材1の間隔は前壁9、後壁
10の下に少なくとも2個、好ましくは3〜4個来るよ
うに定める。次に後壁10をレッカー等で吊り下げ、後
壁10の後面下縁部を枕材1の後端突起5に当てた状態
で治具35に当たるまで傾け、各枕材1の部分で突張材
14を溶着し、後壁10をレッカーから解放する。引き
続き前壁9をレッカー等で吊り下げ、前壁9の前面下縁
部を枕材1の前端突起2に当てた状態で治具35に当て
て例えば垂直に保ち、引張材21を溶着し、水抜きパイ
プ36を取り付け、前壁9をレッカーから解放する。同
様の手順で道に沿い多数の前壁9、後壁10を組み立て
る。次に2段目の後壁10aを吊り下げ、後壁10の前
上フランジ23に後壁10aの後下フランジ24aを嵌
め、後壁10、10aの後面を棒ゲージ(図示せず)に
より同一平面に保ち、突張材14aを溶着して、後壁1
0aをレッカーから解放する。引き続き2段目の前壁9
aを吊り下げ、前壁9の後上フランジ25に前壁9aの
前下フランジ26aを嵌め、前壁9、9aの前面を棒ゲ
ージ(図示せず)により同一平面(垂直面)に保ち、引
張材21aを溶着して、前壁9aをレッカーから解放す
る。同様の手順で道に沿い多数の2段目の前壁9a、後
壁10a組み立てる。3段目の後壁10bを取り付ける
前に所定長さの前壁9、9aと後壁10、10aの列の
両端部をベニヤ板等で塞ぎ、足場31、31aを取り付
け、内部の空間34にコンクリートを打設する。そのコ
ンクリートの養生中に3段目の後壁10bを吊り下げて
前上フランジ23aに後下フランジ24bを嵌め、引張
材21bを溶着し、先のコンクリートの養生が終了した
段階で2回目のコンクリート打設を空間34の上面まで
行う。養生の後又は並行して後じまいを行う。
To make the retaining wall 7, first scrape the mountain surface 39,
A large number of stones 6 are laid at the place where the retaining wall 7 is installed, and floor laying is performed so that the stones are rolled flat, and concrete pillow materials 1 are laid parallel to each other at equal intervals along the road. The distance between the pillows 1 is set to be at least two, preferably three to four below the front wall 9 and the rear wall 10. Next, the rear wall 10 is hung by a wrecker or the like, and the lower edge of the rear surface of the rear wall 10 is tilted until it hits the jig 35 with the rear end projection 5 of the pillow 1 being squeezed. The material 14 is welded and the rear wall 10 is released from the wrecker. Then, the front wall 9 is hung by a wrecker or the like, and the front lower edge portion of the front wall 9 is applied to the jig 35 in a state of being applied to the front end protrusion 2 of the pillow material 1 and kept vertically, for example, and the tension member 21 is welded, The drainage pipe 36 is attached and the front wall 9 is released from the wrecker. A large number of front walls 9 and rear walls 10 are assembled along the road by the same procedure. Next, the rear wall 10a of the second stage is suspended, the rear lower flange 24a of the rear wall 10a is fitted to the front upper flange 23 of the rear wall 10, and the rear surfaces of the rear walls 10 and 10a are made the same with a bar gauge (not shown). Keep the surface flat and weld the bracing material 14a to the rear wall 1
Release 0a from wrecker. Second front wall 9
a is suspended, the front lower flange 26a of the front wall 9a is fitted to the rear upper flange 25 of the front wall 9, and the front surfaces of the front walls 9 and 9a are kept in the same plane (vertical surface) by a bar gauge (not shown), The tension member 21a is welded to release the front wall 9a from the wrecker. A large number of second-stage front walls 9a and rear walls 10a are assembled along the road in the same procedure. Before attaching the rear wall 10b of the third stage, both ends of the row of the front walls 9 and 9a and the rear walls 10 and 10a having a predetermined length are covered with a plywood board or the like, scaffolds 31 and 31a are attached, and the interior space 34 is made of concrete. To place. During the curing of the concrete, the rear wall 10b of the third stage is hung, the rear lower flange 24b is fitted to the front upper flange 23a, the tensile member 21b is welded, and the second concrete is finished at the stage when the previous concrete curing is completed. The casting is performed up to the upper surface of the space 34. After curing or in parallel, perform post-extension.

【0009】[0009]

【発明の効果】第1の発明によると、模様30を有する
前壁9、9aを使用できるため、道からの景観が良くな
る。予め表面に樹脂加工を施す事も容易である。又前壁
9、9a、後壁10、10a、10bには鉄筋17、1
8(図3)が予め工場で内蔵されているので、擁壁7の
前後表面近傍の引張り強度が増大し、擁壁7の全体とし
ての剛性が向上する。更に突起2、5を有する枕材1を
採用したので、前後壁下端の寸法が正確に定まり、全体
の寸法精度が向上するし、作りやすくなる。空間34内
のコンクリートは隣接した枕材1、1の間にある石6の
間の隙間にも入り込み、石6と枕材1に強固に結合する
ため、土圧に対する強度が格段に増大する。 第2の発
明によると、現場における作業性が向上し、工期が短縮
する。即ち熟練(専門職)を要する支保工組立、型枠組
立、型枠ばらし、支保工ばらし等の作業がなくなる為、
型枠大工等の専門職が不要となり、突張材14、引張材
21等の取付けも簡単になり、工期が短縮する。しかも
高い寸法精度の丈夫な擁壁7が得られる。
According to the first aspect of the present invention, since the front walls 9 and 9a having the pattern 30 can be used, the view from the road is improved. It is easy to apply resin processing to the surface in advance. The front walls 9, 9a and the rear walls 10, 10a, 10b have reinforcing bars 17, 1,
8 (FIG. 3) is built in the factory in advance, the tensile strength in the vicinity of the front and rear surfaces of the retaining wall 7 is increased, and the rigidity of the retaining wall 7 as a whole is improved. Further, since the pillow material 1 having the projections 2 and 5 is adopted, the dimensions of the lower ends of the front and rear walls are accurately determined, the overall dimensional accuracy is improved, and it is easy to make. The concrete in the space 34 also enters the gap between the stones 6 between the adjacent pillows 1 and 1 and is firmly bonded to the stones 6 and the pillow 1, so that the strength against earth pressure is significantly increased. According to the second invention, workability at the site is improved and the construction period is shortened. That is, since the work of supporting work assembly, formwork assembly, mold release, support work removal, etc. that requires skill (professional) is eliminated,
It eliminates the need for a profession such as a form carpenter, and makes it easy to attach the tension members 14, the tension members 21, etc., and shortens the construction period. Moreover, a strong retaining wall 7 with high dimensional accuracy can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】 コンクリート打設前の擁壁の斜視図である。FIG. 1 is a perspective view of a retaining wall before placing concrete.

【図2】 図1のII−II断面図である。FIG. 2 is a sectional view taken along line II-II of FIG.

【図3】 図1のIII−III断面図である。3 is a sectional view taken along line III-III in FIG.

【符号の説明】[Explanation of symbols]

1 コンクリート枕材 2 突起 5 突起 9 前壁 10 後壁 14 突張材 21 引張材 34 コンクリートが打設される空間 1 Concrete pillow 2 Protrusion 5 Protrusion 9 Front wall 10 Rear wall 14 Extension material 21 Tensile material 34 Space where concrete is placed

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 上面の前端と後端に位置決め突起を有し
間隔を隔てて平行に一平面上に配置される鉄筋内蔵のコ
ンクリート枕材と、少なくとも2個の枕材の後端突起の
前面に下縁が係合し上方へ行くにつれて前方へ傾斜した
鉄筋内蔵のコンクリート板からなる後壁と、後壁を傾斜
姿勢に支えるように枕材と後壁の間に取り付けた突張材
と、枕材の前端突起の後面に下縁が係合し垂直又は上方
へ行くにつれてわずかに後方へ傾斜した鉄筋内蔵のコン
クリート板からなる前壁と、後壁に対し前壁の姿勢を保
つように前壁と後壁の間に取り付けた引張材と、前後壁
間に打設されたコンクリートからなる重力式擁壁。
1. A concrete pillow material with built-in reinforcing bars, which has positioning protrusions at the front and rear ends of the upper surface and is arranged in parallel on a plane at a distance, and the front surface of the rear end protrusions of at least two pillow members. A rear wall made of a concrete plate with a built-in reinforcing bar that is inclined forward as the lower edge engages and goes upward, and a tension member attached between the pillow and the rear wall so as to support the rear wall in an inclined posture, The front wall is made of concrete plate with built-in reinforcing bars, the lower edge of which engages with the rear surface of the front end projection of the pillow material, and is inclined rearward slightly as it goes vertically or upward, A gravity-type retaining wall made of concrete that is placed between the front and rear walls and a tension material that is attached between the wall and the rear wall.
【請求項2】 上面の前端と後端に位置決め突起を有す
る枕材を石を敷き固めた平坦面に同一面上で平行に配置
し、鉄筋内蔵のコンクリート板からなる後壁を吊り下げ
て下縁が少なくとも2個の枕材の後端突起の前面に係合
し上方へ行くにつれて前方へ傾斜した姿勢に保持した状
態で枕材と後壁の間に突張材を取り付けて後壁を傾斜姿
勢に保ち、次に鉄筋内蔵のコンクリート板からなる前壁
を吊り下げて下縁が枕材の前端突起の後面に係合し垂直
又は上方へ行くにつれてわずかに後方へ傾斜した姿勢に
保持した状態で後壁と前壁の間に引張材を取り付けて前
壁の姿勢を保ち、上記の枕材とは別の枕材に上記の前壁
と後壁とは別の前壁と後壁を横に並べてそれぞれ同一面
内に保ちかつ別の突張材と引張材を取り付け、前後壁間
にコンクリートを打設する重力式擁壁の製造方法。
2. Pillows having positioning projections at the front and rear ends of the upper surface are arranged in parallel on the same flat surface where stones are laid and the rear wall made of concrete plate with built-in reinforcing bars is hung down. Incline the rear wall by attaching a tension member between the pillow and the rear wall with the edges engaging the front surfaces of the rear end projections of at least two pillows and holding the posture inclined forward as it goes upward. Hold the posture, then suspend the front wall made of concrete plate with built-in reinforcing bars, and hold the posture in which the lower edge engages with the rear surface of the front end protrusion of the pillow and tilts slightly backward as it goes vertically or upward. Install a tension member between the rear wall and the front wall to maintain the posture of the front wall, and place the front wall and the rear wall different from the above front and rear walls on the pillow other than the above pillow. Keep them in the same plane and attach different tensioning and tensioning materials to each other and pour concrete between the front and rear walls. Method of manufacturing gravity type retaining wall to be installed.
JP4004532A 1992-01-14 1992-01-14 Gravity type retaining wall and manufacturing method thereof Expired - Fee Related JPH0786237B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4004532A JPH0786237B2 (en) 1992-01-14 1992-01-14 Gravity type retaining wall and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4004532A JPH0786237B2 (en) 1992-01-14 1992-01-14 Gravity type retaining wall and manufacturing method thereof

Publications (2)

Publication Number Publication Date
JPH05187030A true JPH05187030A (en) 1993-07-27
JPH0786237B2 JPH0786237B2 (en) 1995-09-20

Family

ID=11586659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4004532A Expired - Fee Related JPH0786237B2 (en) 1992-01-14 1992-01-14 Gravity type retaining wall and manufacturing method thereof

Country Status (1)

Country Link
JP (1) JPH0786237B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0825330A (en) * 1994-07-08 1996-01-30 Katsuya Hiraoka Form for executing retaining wall and executing method for the same wall
JPH0825329A (en) * 1994-07-08 1996-01-30 Katsuya Hiraoka Form for executing retaining wall and executing method for the same wall
JPH08296241A (en) * 1995-04-26 1996-11-12 Marutaka Concrete Kogyo Kk Construction method for establishment of wall surface worked retaining wall, and panel block

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5976630A (en) * 1982-10-25 1984-05-01 Honda Motor Co Ltd Transfer device having rotating mechanism of work having circular section
JPS6037336A (en) * 1983-08-11 1985-02-26 Chiyoda Tech & Ind Co Ltd Construction of concrete wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5976630A (en) * 1982-10-25 1984-05-01 Honda Motor Co Ltd Transfer device having rotating mechanism of work having circular section
JPS6037336A (en) * 1983-08-11 1985-02-26 Chiyoda Tech & Ind Co Ltd Construction of concrete wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0825330A (en) * 1994-07-08 1996-01-30 Katsuya Hiraoka Form for executing retaining wall and executing method for the same wall
JPH0825329A (en) * 1994-07-08 1996-01-30 Katsuya Hiraoka Form for executing retaining wall and executing method for the same wall
JPH08296241A (en) * 1995-04-26 1996-11-12 Marutaka Concrete Kogyo Kk Construction method for establishment of wall surface worked retaining wall, and panel block

Also Published As

Publication number Publication date
JPH0786237B2 (en) 1995-09-20

Similar Documents

Publication Publication Date Title
JP3841493B2 (en) Construction method of viaduct using PCa concrete member
JPH05187030A (en) Gravity-type retaining wall and manufacture thereof
JP3945668B2 (en) Construction method of concrete pier
JP2000234410A (en) Driven form and slab construction method making use thereof
JPH06136771A (en) Wall retaining panel installation method
JPH0380946B2 (en)
JPH084196A (en) Panel for building
JP2001342639A (en) Buried form
JP2000336658A (en) Base-continuous footing integral placing form holder
JPH0421874Y2 (en)
JP2000257078A (en) Construction method of mat foundation to use pc foundation beam member and pc support frame for pc foundation beam member
JPS6351212B2 (en)
US3801060A (en) Collapsible crypt forming system
JPH09268579A (en) Construction method of retaining wall
JPH0722413Y2 (en) PC half slab version
JP3729890B2 (en) Single-sided precast concrete underground beam and its components
JPH03260222A (en) Construction of slope frame and block structure
JP2759229B2 (en) Construction method of RC construction stairs
JPH08105059A (en) Concrete strip footing and forming method thereof
KR100733715B1 (en) Forming apparatus for half precast concreat slab
JPS631718Y2 (en)
JPH031531Y2 (en)
JPS6137697Y2 (en)
JPH0874381A (en) Reinforcement unit and construction method of reinforced concrete-made building using the same
KR20020033125A (en) supporting structure for slab form of steel frame concrete structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees