JPH08246476A - Method of constructing underground structure - Google Patents

Method of constructing underground structure

Info

Publication number
JPH08246476A
JPH08246476A JP7085884A JP8588495A JPH08246476A JP H08246476 A JPH08246476 A JP H08246476A JP 7085884 A JP7085884 A JP 7085884A JP 8588495 A JP8588495 A JP 8588495A JP H08246476 A JPH08246476 A JP H08246476A
Authority
JP
Japan
Prior art keywords
underground structure
members
same time
forming
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7085884A
Other languages
Japanese (ja)
Other versions
JP3165880B2 (en
Inventor
Hiroo Toho
洋雄 東方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THREE U KK
Original Assignee
THREE U KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THREE U KK filed Critical THREE U KK
Priority to JP08588495A priority Critical patent/JP3165880B2/en
Publication of JPH08246476A publication Critical patent/JPH08246476A/en
Application granted granted Critical
Publication of JP3165880B2 publication Critical patent/JP3165880B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE: To omit earth retaining work taking much time by using a wall substrate of an underground structure as an earth retaining material, at the same time, preventing very rationally the waste of the material economically, and making it possible to speedily arrange horizontal bar members and vertical bar members. CONSTITUTION: An underground structure formation hole is bored in the ground 1, column members 2, 2,... are erected around a side wall section of the underground structure formation hole and, at the same time, floorings 3 are laid on the bottom of the underground structure formation hole to form floor substrates 4. Horizontal bar members 6, 6,... are constructed on bar holding sections arranged in the longitudinal direction of the column members 2, 2,... and, at the same time, they are intersected with the horizontal bar members 6, 6,... to arrange vertical bar members 7, 7,... Form panels 8 and 8 are arranged to both sides of a bar arrangement section at an interval and, at the same time, a wall substrate 10 used for earth retaining is formed by placing concrete 9 between the form panels 8 and 8.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地下室、その他の地下
構築物の構築方法に係る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a basement or other underground structure.

【0002】[0002]

【従来の技術】従来、地下室、その他の地下構築物を構
築する場合には、地面に地下構築物形成用穴を堀設し、
該地下構築物形成用穴の内周面部の土砂崩れを防止する
ために、該内周面部に間隔を隔てて2枚の型枠パネルを
並設し、該型枠パネル間に鉄筋よりなる横筋材および縦
筋材を配筋すると共にコンクリートを打設して山留め工
事を施した後、該地下構築物形成用穴の側壁部近傍に地
下構築物の柱材を立設すると共に地下構築物形成用穴の
底部に床材料を敷設して床下地を形成し、前記柱材間に
横筋材および縦筋材を配筋し、該配筋部の両側に間隔を
隔てて型枠パネルを並設すると共に該型枠パネル間にコ
ンクリートを打設して壁下地を形成し、以下、常法に従
って、前記壁下地の上端開口部に屋根を張設し、床下地
上に床仕上げ材を張設すると共に壁下地上に壁仕上げ材
を張設して地下構築物を構築している。
2. Description of the Related Art Conventionally, when building a basement or other underground structure, an underground structure forming hole is dug in the ground,
In order to prevent landslides on the inner peripheral surface of the underground structure forming hole, two formwork panels are arranged side by side on the inner peripheral surface with a space therebetween, and a horizontal reinforcing bar made of a reinforcing bar between the formwork panels and After arranging the vertical bars and placing concrete and carrying out mountain retaining work, the pillar material of the underground structure is erected near the side wall of the underground structure forming hole and at the bottom of the underground structure forming hole. A floor material is laid to form a floor base, horizontal bar members and vertical bar members are laid between the pillar members, and form panel panels are arranged side by side on both sides of the reinforced part and the form frame is formed. Concrete is cast between the panels to form a wall foundation, and then, in accordance with the conventional method, a roof is stretched at the upper end opening of the wall foundation, a floor finishing material is stretched on the floor foundation, and the wall foundation is also stretched. Wall finishing materials are stretched to construct an underground structure.

【0003】[0003]

【発明が解決しようとする課題】上記従来の技術におい
ては、地下構築物形成用穴の内周面部に横筋材および縦
筋材を配筋すると共にコンクリートを打設して山留め工
事を施すのに手間がかかり、又、山留め工事に使用した
横筋材および縦筋材並びにコンクリートは地下構築物の
構成材料とは、無関係に別途必要なため経済的にも不経
済であると云う問題があり、更に加うるに、地下構築物
の柱材間に横筋材および縦筋材を迅速、確実に配筋する
のに手間がかかると云う問題があつた。
SUMMARY OF THE INVENTION In the above conventional technique, it is troublesome to arrange horizontal reinforcing bars and vertical reinforcing bars on the inner peripheral surface of the hole for forming an underground structure, and to piling concrete to carry out mountain retaining work. There is also a problem that it is economically uneconomical because the horizontal reinforcing bar and vertical reinforcing bar used for mountain retaining work and concrete are separately required regardless of the constituent material of the underground structure, which may be further added. In addition, there is a problem that it takes time to arrange the horizontal and vertical reinforcements between the pillars of the underground structure quickly and reliably.

【0004】本発明は、上記従来の問題点を解消するた
めに為されたものであり、地下構築物の壁下地を山留め
材として兼用することによつて手間のかかる山留め工事
を省略すると共に経済的にも材料が無駄にならず、きわ
めて合理的であり、更に加うるに、横筋材および縦筋材
を迅速、確実に配筋することができる地下構築物の構築
方法を提供することを課題とするものである。
The present invention has been made in order to solve the above-mentioned conventional problems. By using the wall foundation of the underground structure as a mountain retaining material as well, a troublesome mountain retaining work can be omitted and it is economical. In addition, it is an object of the present invention to provide a method for constructing an underground structure, which is extremely rational in that the material is not wasted and, in addition, horizontal and vertical reinforcements can be arranged quickly and reliably. It is a thing.

【0005】[0005]

【課題を解決するための手段】本発明は、上記課題を解
決するために、地面に地下構築物形成用穴を形成し、該
地下構築物形成用穴の側壁部近傍に柱材を立設すると共
に地下構築物形成用穴の底部に床材料を敷設して床下地
を形成し、前記柱材の長手方向に並設せる筋材受部に横
筋材を架設すると共に該横筋材と交叉して縦筋材を配筋
し、該配筋部の両側に間隔を隔てて型枠パネルを並設す
ると共に該型枠パネル間にコンクリートを打設すること
により山留め兼用の壁下地を形成することを特徴とする
ものである。
In order to solve the above-mentioned problems, the present invention forms a hole for forming an underground structure in the ground, and erects a pillar member in the vicinity of the side wall of the hole for forming an underground structure. A floor material is laid at the bottom of the hole for forming an underground structure to form a floor base, and a horizontal reinforcing member is erected on a reinforcing member receiving portion arranged in parallel in the longitudinal direction of the pillar material, and a vertical reinforcing member is crossed with the horizontal reinforcing member. Characterized in that the material is reinforced, formwork panels are arranged side by side on both sides of the reinforced part, and concrete is placed between the formwork panels to form a wall foundation that also serves as mountain retaining. To do.

【0006】[0006]

【実施例】図1〜図4は、本発明の地下構築物の一実施
例を示し、地面1に地下構築物形成用穴(図示せず)を
形成し、該地下構築物形成用穴の側壁部近傍に、H型
鋼、コ字型鋼、L型鋼、I型鋼等の型鋼よりなる柱材
2、2、…を立設すると共に地下構築物形成用穴の底部
に床材料3を敷設して床下地4を形成し、前記柱材2、
2、…の長手方向に一定間隔を隔てて穿設して並設せる
孔よりなる筋材受部5、5、…に、鉄筋よりなる横筋材
6、6、…を貫挿して架設すると共に、該横筋材6、
6、…と交叉して鉄筋よりなる縦筋材7、7、…を配筋
して結束し、該配筋部の両側に間隔を隔てて、発泡ポリ
スチロール、発泡ポリウレタン等の断熱材を裏打ちした
合板、合成樹脂板、鋼板、メッシュシート等よりなる型
枠パネル8、8を並設すると共に、該型枠パネル8、8
間にコンクリート9を打設することにより山留め兼用の
壁下地10を形成することを特徴とする地下構築物の構
築方法に関するものである。
1 to 4 show an embodiment of an underground structure of the present invention, in which a hole (not shown) for forming an underground structure is formed in the ground 1, and the vicinity of the side wall portion of the hole for forming an underground structure. , Column materials 2, 2, ... made of H-shaped steel, U-shaped steel, L-shaped steel, I-shaped steel and the like are erected, and a floor material 3 is laid at the bottom of the underground structure forming hole to form a floor base 4. Formed, the pillar 2,
The horizontal reinforcing bars 6, 6 made of rebar are pierced and installed in the reinforcing bar receiving parts 5, 5, made of holes that are formed in parallel in the longitudinal direction of the holes. , The transverse reinforcement 6,
6 are cross-linked with longitudinal reinforcing members 7, 7, ..., which are made of rebar and are tied together, and are lined with heat insulating materials such as expanded polystyrene and expanded polyurethane at intervals on both sides of the arranged reinforcing parts. Forming panels 8, 8 made of plywood, synthetic resin plate, steel plate, mesh sheet, etc. are arranged side by side, and the forming panel 8, 8 is formed.
The present invention relates to a method for constructing an underground structure, characterized in that a wall foundation 10 also serving as a mountain retaining is formed by placing concrete 9 in between.

【0007】尚、地下構築物形成用穴の底部に床材料3
を敷設して床下地4を形成する場合には、例えば、図1
に示すように、壁下地10を形成する場合と同様に、地
下構築物形成用穴の底部に横筋材6、6、…および縦筋
材7、7、…を配筋して結束し、コンクリートよりなる
床材料3を打設して敷設することによつて床下地4を形
成したり、地下構築物形成用穴の底部に鋼製パネル(H
型鋼、コ字型鋼、L型鋼、I型鋼等の型鋼よりなるパネ
ル枠の片面又は両面に鋼板を張設し、溶接一体化してな
るパネル)よりなる床材料を敷設することによつて床下
地を形成したりすれば良い。
Floor material 3 is provided at the bottom of the underground structure forming hole.
In the case of laying the floor base 4 to form the floor base 4, for example, as shown in FIG.
As shown in FIG. 5, similarly to the case of forming the wall foundation 10, the horizontal reinforcing members 6, 6, ... And the vertical reinforcing members 7, 7 ,. A floor material 4 is formed by laying and laying a floor material 3 that is made of steel, and a steel panel (H
By laying a floor material composed of a panel made by arranging steel plates on one or both sides of a panel frame made of model steel such as type steel, U-shaped steel, L-shaped steel, I-shaped steel, etc. It may be formed.

【0008】図1および図2において、11は地下構築
物のコーナー部の型枠パネル8、8を支持するL型鋼、
L型金属材等よりなるコーナーアングルであり、12は
該コーナーアングル11を載置する型鋼片、金属ボック
ス片等よりなるコーナーアングル受けであり、該コーナ
ーアングル11の下端部をコーナーアングル受け12上
に載置、溶接して使用する。
In FIG. 1 and FIG. 2, 11 is an L-shaped steel for supporting the form panels 8 at the corners of the underground structure,
A corner angle made of an L-shaped metal material or the like, 12 is a corner angle receiver made of a steel mold piece on which the corner angle 11 is placed, a metal box piece, etc., and the lower end of the corner angle 11 is placed on the corner angle receiver 12. Place on, weld and use.

【0009】図1において、13は割栗石、14は地下
構築物の上部に載置、固着せる地上建屋の大引、根太等
の床組材、15は該床組材14に立設せる地上建屋の柱
材である。
In FIG. 1, 13 is a rubble stone, 14 is a floor assembly such as Daihiki and joist of an above-ground building that is placed and fixed on the upper part of an underground structure, and 15 is an above-ground building that is erected on the floor assembly 14. It is a pillar material.

【0010】図1、図3および図4において、16は横
筋材6、6、縦筋材7、7等を連結するために使用せる
鉄筋片、鉄棒片等よりなる継手筋材片であり、横筋材
6、6、縦筋材7、7等の端部を突き合わせ、該突き合
わせ部に継手筋材片16を添接し、針金にて結束した
り、溶接したりして横筋材6、6、縦筋材7、7等を連
結一体化する際に使用する。
In FIGS. 1, 3 and 4, reference numeral 16 is a joint reinforcing bar piece composed of a reinforcing bar piece, an iron bar piece, etc. used for connecting the horizontal reinforcing bars 6, 6, the vertical reinforcing bars 7, 7, etc., The end portions of the horizontal reinforcing members 6, 6, the vertical reinforcing members 7, 7 and the like are butted against each other, and the jointed braided material piece 16 is attached to the butted portion, and the laterally braided materials 6, 6 are bound by wire or welded It is used when connecting and integrating the vertical reinforcing members 7, 7.

【0011】図1において、17は地下構築物の天井部
(屋根部)に形成せる天井下地(屋根下地)であり、例
えば、壁下地10を形成する場合と同様に、地下構築物
の天井部(屋根部)に横筋材6、6、…および縦筋材
7、7、…を配筋して結束し、コンクリート9を打設し
て天井下地(屋根下地)を形成したり、地下構築物の天
井部(屋根部)に前述と同様の鋼製パネルを載置してボ
ルト・ナットにて締着したり、溶接したりして固着一体
化して天井下地(屋根下地)を形成したりすれば良い。
In FIG. 1, reference numeral 17 denotes a ceiling base (roof base) that can be formed on the ceiling (roof) of the underground structure. For example, as in the case of forming the wall base 10, the ceiling (roof) of the underground structure. , And vertical stiffeners 7, 7, ... are arranged and bundled, and concrete 9 is placed to form a ceiling base (roof base), or a ceiling part of an underground structure. A steel panel similar to the one described above may be placed on the (roof portion) and tightened with bolts and nuts, or welded and fixedly integrated to form a ceiling base (roof base).

【0012】図5は、本発明において、柱材2の長手方
向に並設せる筋材受部5、5、…の異なった実施例を示
し、柱材2の長手方向に一定間隔を隔てて鋼材片よりな
る筋材受片を溶接一体化して筋材受部5、5、…を突設
したものである。
FIG. 5 shows a different embodiment of the reinforcing member receiving portions 5, 5, ... Arranged side by side in the longitudinal direction of the column member 2 in the present invention, with a constant interval in the longitudinal direction of the column member 2. A reinforcing material receiving part made of steel is integrally welded to form protruding reinforcing material receiving parts 5, 5 ,.

【0013】図6は、本発明において使用せる柱材2の
異なった実施例を示し、断面が角形、円形等の鋼管より
なる柱材2を示したものである。
FIG. 6 shows a different embodiment of the pillar 2 used in the present invention, showing the pillar 2 made of a steel pipe having a square or circular cross section.

【0014】図7〜図9は、本発明の地下構築物の異な
った実施例を示し、柱材2の長手方向に二列にわたつて
筋材受部5、5、…を並設し、該筋材受部5、5、…を
介して横筋材6、6、…および縦筋材7、7、…を二層
に配筋し、コンクリート9を打設して地下構築物を構築
したものであるが、横筋材6、6、…および縦筋材7、
7、…を何層にわたつて配筋するかは所望する強度に応
じて任意に決定すれば良い。
FIGS. 7 to 9 show different embodiments of the underground structure of the present invention, in which the reinforcing material receiving portions 5, 5, ... Are arranged in parallel in two rows in the longitudinal direction of the pillar material 2. The horizontal reinforcements 6, 6, ... and the vertical reinforcements 7, 7, ... are arranged in two layers via the reinforcement receiving portions 5, 5, ..., and concrete 9 is cast to construct an underground structure. There are horizontal bars 6, 6, ... and vertical bars 7,
The number of layers to be arranged for 7, ... May be arbitrarily determined according to the desired strength.

【0015】尚、地面に地下構築物用穴を形成して地下
構築物を構築する場合には、図1に示すように、地下構
築物の上部を地面1より突出させて地下構築物を構築し
たり、図7に示すように、地下構築物全体を地中に埋没
させて地下構築物を構築したりすれば良い。
In the case of constructing an underground structure by forming a hole for the underground structure on the ground, as shown in FIG. 1, the upper part of the underground structure is projected from the ground 1 to construct the underground structure. As shown in 7, an underground structure may be constructed by burying the entire underground structure in the ground.

【0016】又、図1に示すように、上部を地面1より
突出させて地下構築物を構築した場合には、該地下構築
物の突出部を地上建屋の基礎として使用し、床組材14
を載置、固着すれば良く、図7に示すように、全体を地
中に埋没させて地下構築物を構築した場合には、地下構
築物の柱材2の頭部のみを地面1より突出させて地上建
屋の基礎として使用し、地上建屋の柱材15を立設すれ
ば良い。
Further, as shown in FIG. 1, when an upper part is projected from the ground 1 to construct an underground structure, the projecting part of the underground structure is used as a foundation of the above-ground building and the floor assembly 14
It suffices to place and fix the above. As shown in FIG. 7, when an underground structure is constructed by burying the whole structure in the ground, only the heads of the pillar members 2 of the underground structure are projected from the ground 1. It may be used as a foundation of the above-ground building and the pillar material 15 of the above-ground building may be erected.

【0017】又、上記本発明において、地下構築物を完
成させる場合には、常法に従って、内部に床仕上げ材、
壁仕上げ材、天井仕上げ材等の仕上げ材料を張設して化
粧仕上げして完成させれば良い。
Further, in the above-mentioned present invention, in the case of completing an underground structure, a floor finishing material,
Finishing materials, such as wall finishing materials and ceiling finishing materials, may be stretched to make up and finish.

【0018】[0018]

【発明の効果】以上説明したように、本発明は、地面に
地下構築物形成用穴を形成し、該地下構築物形成用穴の
側壁部近傍に柱材を立設すると共に地下構築物形成用穴
の底部に床材料を敷設して床下地を形成し、前記柱材の
長手方向に並設せる筋材受部に横筋材を架設すると共に
該横筋材と交叉して縦筋材を配筋し、該配筋部の両側に
間隔を隔てて型枠パネルを並設すると共に該型枠パネル
間にコンクリートを打設することにより山留め兼用の壁
下地を形成しているので、壁下地を山留め材として兼用
することができ、従って、壁下地を形成すると同時に山
留め工事も完了したことになり、従来のように手間のか
かる山留め工事を省略することができると共に、地下構
築物の構成材料とは無関係に別途山留め工事用の筋材お
よびコンクリートを使用する必要がなく、経済的にも材
料が無駄にならず、きわめて合理的であり、更に加うる
に、柱材の長手方向に並設せる筋材受部を介して横筋材
を簡単、正確に架設することができるため、柱材間に横
筋材および縦筋材を迅速、確実に配筋することができ
る。
As described above, according to the present invention, an underground structure forming hole is formed in the ground, and a pillar material is erected in the vicinity of the side wall portion of the underground structure forming hole and the underground structure forming hole is formed. A floor material is laid on the bottom to form a floor base, and a horizontal reinforcing member is laid on the reinforcing member receiving portion that can be arranged in parallel in the longitudinal direction of the pillar material, and a vertical reinforcing member is arranged by intersecting with the horizontal reinforcing member, Forming panels on both sides of the bar arrangement at intervals and placing concrete between the forming panels to form a wall foundation that also serves as a mountain retaining material. Since it can also be used for both purposes, the earth retaining work has been completed at the same time as the formation of the wall foundation, and the labor-consuming earth retaining work as in the past can be omitted. Bars and concrete for mountain retaining work It is not necessary to use, economically, the material is not wasted, it is extremely rational, and, in addition, the horizontal reinforcement is easy and accurate through the reinforcement receiving part that can be arranged side by side in the longitudinal direction of the column. Since it can be erected on, the horizontal reinforcement and the vertical reinforcement can be arranged between the pillars quickly and reliably.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地下構築物の一実施例を示す要部縦断
面図である。
FIG. 1 is a longitudinal sectional view of an essential part showing an embodiment of an underground structure of the present invention.

【図2】本発明の同上実施例を示す要部横断面図であ
る。
FIG. 2 is a horizontal cross-sectional view of a main part showing the embodiment of the present invention.

【図3】本発明における横筋材の連結状態の一実施例を
示す要部拡大横断面図である。
FIG. 3 is an enlarged cross-sectional view of an essential part showing an example of a connected state of the horizontal reinforcing members in the present invention.

【図4】本発明における柱材の使用状態を示す要部拡大
斜視図である。
FIG. 4 is an enlarged perspective view of an essential part showing a usage state of a pillar material according to the present invention.

【図5】本発明における異なった柱材の使用状態を示す
要部拡大斜視図である。
FIG. 5 is an enlarged perspective view of an essential part showing a usage state of different column members in the present invention.

【図6】本発明における更に異なった柱材の使用状態を
示す要部拡大斜視図である。
FIG. 6 is an enlarged perspective view of an essential part showing a usage state of still another column member according to the present invention.

【図7】本発明の地下構築物の異なった実施例を示す要
部縦断面図である。
FIG. 7 is a longitudinal sectional view of a main part showing a different embodiment of the underground structure of the present invention.

【図8】本発明の同上実施例を示す要部拡大横断面図で
ある。
FIG. 8 is an enlarged transverse cross-sectional view of essential parts showing the embodiment of the present invention.

【図9】本発明の同上実施例を示す要部拡大縦断面図で
ある。
FIG. 9 is an enlarged vertical sectional view of an essential part showing the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 地面 2 柱材 3 床材料 4 床下地 5 筋材受部 6 横筋材 7 縦筋材 8 型枠パネル 9 コンクリート 10 壁下地 1 Ground 2 Column material 3 Floor material 4 Floor base 5 Reinforcement receiving part 6 Horizontal reinforcement 7 Vertical reinforcement 8 Formwork panel 9 Concrete 10 Wall foundation

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地面に地下構築物形成用穴を形成し、該
地下構築物形成用穴の側壁部近傍に柱材を立設すると共
に地下構築物形成用穴の底部に床材料を敷設して床下地
を形成し、前記柱材の長手方向に並設せる筋材受部に横
筋材を架設すると共に該横筋材と交叉して縦筋材を配筋
し、該配筋部の両側に間隔を隔てて型枠パネルを並設す
ると共に該型枠パネル間にコンクリートを打設すること
により山留め兼用の壁下地を形成することを特徴とする
地下構築物の構築方法。
1. An underfloor base material in which a hole for forming an underground structure is formed in the ground, a pillar material is erected near a side wall portion of the hole for forming an underground structure, and a floor material is laid at the bottom of the hole for forming an underground structure. To form a horizontal bar in the longitudinal direction of the pillar material, and lay a horizontal bar in the bar receiving part and intersect the horizontal bar to arrange a vertical bar, with a space on both sides of the bar. A method of constructing an underground structure, characterized in that a wall base also serving as a mountain retaining is formed by arranging formwork panels in parallel and placing concrete between the formwork panels.
JP08588495A 1995-03-07 1995-03-07 How to build underground structures Expired - Fee Related JP3165880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08588495A JP3165880B2 (en) 1995-03-07 1995-03-07 How to build underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08588495A JP3165880B2 (en) 1995-03-07 1995-03-07 How to build underground structures

Publications (2)

Publication Number Publication Date
JPH08246476A true JPH08246476A (en) 1996-09-24
JP3165880B2 JP3165880B2 (en) 2001-05-14

Family

ID=13871341

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08588495A Expired - Fee Related JP3165880B2 (en) 1995-03-07 1995-03-07 How to build underground structures

Country Status (1)

Country Link
JP (1) JP3165880B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016035177A (en) * 2014-08-04 2016-03-17 エコ ジャパン株式会社 Wall structure and construction method for wall structure
JP2016089449A (en) * 2014-11-04 2016-05-23 鹿島建設株式会社 Shear force transmission structure and construction method of the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016035177A (en) * 2014-08-04 2016-03-17 エコ ジャパン株式会社 Wall structure and construction method for wall structure
JP2016089449A (en) * 2014-11-04 2016-05-23 鹿島建設株式会社 Shear force transmission structure and construction method of the same

Also Published As

Publication number Publication date
JP3165880B2 (en) 2001-05-14

Similar Documents

Publication Publication Date Title
KR20110122310A (en) Construction method for basement structure without temporary structure
US4015379A (en) In-ground swimming pool and apparatus and method for constructing same
JP2011006849A (en) Method for constructing foundation
JPH09268583A (en) Structural steel embedded half precast concrete member and construction method of underground structure using the same member
JPH08189042A (en) Structure of h-section continuous footing beam for tying in building member
KR100462236B1 (en) panel for external underground wall of building, structure and construction method using the same
JPH08246476A (en) Method of constructing underground structure
JP2979117B2 (en) Building foundation method
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JPH0684690B2 (en) Building basement extension method
KR101736009B1 (en) Top-Down Construction Method For Underground Structure
JP2577973B2 (en) How to build a building with a basement
JP2003020658A (en) Structural body
CA3162116C (en) Method for assembling a building using concrete columns
JP2894217B2 (en) Building structural frame
JPS6030819B2 (en) building substructure
KR102112508B1 (en) Retaining wall construction method using soil cement and rigid geogrid
JPH07279186A (en) Prefabricated retaining wall
JP2572680B2 (en) Underground structure by reverse strike method
JP3677834B2 (en) Structure of connecting part of reinforced concrete basement building unit
JPH0571128A (en) Forming method for grille frame
JPH05179662A (en) Construction for building with basement
JP2784449B2 (en) Steel reinforced concrete foundation
JP2003176696A (en) Prefabricated tunnel and construction method therefor
JP3002794B2 (en) How to build a building with a basement

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090309

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090309

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100309

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees