JPH08189042A - Structure of h-section continuous footing beam for tying in building member - Google Patents

Structure of h-section continuous footing beam for tying in building member

Info

Publication number
JPH08189042A
JPH08189042A JP33947894A JP33947894A JPH08189042A JP H08189042 A JPH08189042 A JP H08189042A JP 33947894 A JP33947894 A JP 33947894A JP 33947894 A JP33947894 A JP 33947894A JP H08189042 A JPH08189042 A JP H08189042A
Authority
JP
Japan
Prior art keywords
shaped steel
upper flange
section
steel beam
continuous foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33947894A
Other languages
Japanese (ja)
Other versions
JP3682588B2 (en
Inventor
Masanori Narasawa
正規 奈良澤
Osamu Sunaga
修 須永
Takehiko Shimada
武彦 島田
Fusakatsu Ikeno
総克 池野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP33947894A priority Critical patent/JP3682588B2/en
Publication of JPH08189042A publication Critical patent/JPH08189042A/en
Application granted granted Critical
Publication of JP3682588B2 publication Critical patent/JP3682588B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE: To conveniently attach building members such as floor beams, stair frames, ALC wallboards and wall panels to an H-section beam wrapped in concrete. CONSTITUTION: The flanges 70, 71 of an H-section beam 76 are horizontally welded to the base 37 of a column 58 to construct an H-section continuous footing beam 36. Bolt holes 77a, 77b, 77c... are bored in the upper flange 70 of the H-section beam 76 at intervals of 90cm or less and in the longitudinal direction of the H-section beam 76, and fittings for mounting building materials such as floor beams, stair frames, ALC wallboards and wall panels are joined to the top surface of the upper flange 70 of the H-section beam 76 by bolts mounted in the bolt holes 77. The building members such as floor beams, stair frames, ALC wallboards and wall panels are mounted on the H-section continuous footing beam 36 while being leveled and having their projected lengths and horizontal positions adjusted.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築物の基礎に関するも
のである。
FIELD OF THE INVENTION The present invention relates to the foundation of buildings.

【0002】[0002]

【従来の技術】コンクリート基礎梁を打設する場合、地
中を深く堀り下げて捨てコンクリートを打設し、その上
にアンカーフレームと地中梁の配筋を行い、それらの鉄
筋の周りを型枠で囲んでコンクリートを打ち込み、コン
クリートの硬化後に型枠を取り外し、その取り出した土
を埋め戻す一連の作業が行われる。
2. Description of the Related Art When placing a concrete foundation beam, the ground is dug deeply into the ground, the concrete is thrown away, and the anchor frame and the underground beam are laid on it. A series of work is performed in which concrete is enclosed in a formwork, concrete is hardened, the formwork is removed after the concrete hardens, and the soil taken out is backfilled.

【0003】かかる従来工法では、コンクリート基礎梁
を打設するために堀り下げた建築物には、周囲を囲む深
い溝が出来るので、コンクリート基礎梁が出来て土を埋
め戻すまでに建築資材を建築現場に持ち込むことは困難
である。そして、堀り出した土の搬出と埋め戻す土の搬
入や型枠の搬入・搬出、配筋や型枠の組み立て・解体に
多大な労力を要する。而も、その打ち込んだコンクリー
トの養生に長時間を要するので建築工事を短期化するこ
とは出来ない。
In such a conventional construction method, since a deep groove surrounding the periphery is formed in a building dug down for placing a concrete foundation beam, a building material is provided until the concrete foundation beam is formed and the soil is backfilled. It is difficult to bring it to the construction site. Then, a great deal of labor is required to carry out the unearthed soil, carry in the soil to be backfilled, carry in and carry out the formwork, and arrange and disassemble the bar and formwork. Moreover, since it takes a long time to cure the injected concrete, the construction work cannot be shortened.

【0004】建築工事の短期化のためにはコンクリート
基礎梁に代えてH形鋼梁を使用することが考えられる。
しかし、H形鋼梁は地中から湧き出る湿気によって腐蝕
し易く耐用性の面で問題がある。そこで、H形鋼梁をコ
ンクリートで包み込み全面被覆することが試みられた。
In order to shorten the construction work, it is possible to use an H-shaped steel beam instead of the concrete foundation beam.
However, the H-shaped steel beam is apt to be corroded by the moisture emanating from the ground and has a problem in terms of durability. Therefore, it has been attempted to wrap the H-shaped steel beam in concrete to cover the entire surface.

【0005】[0005]

【発明が解決しようとする課題】H形鋼梁をコンクリー
トで包み込むには、先ずメッシュ筋や細手の鉄筋でH形
鋼梁の周りを囲み、その周りを形枠で囲んでコンクリー
トを打設することになる。しかし、コンクリートを打設
すると、床梁や階段フレーム、ALC壁板、壁パネルな
どの建築部材のH形鋼連続基礎梁への取り付けが困難に
なる。
In order to wrap the H-shaped steel beam with concrete, first surround the H-shaped steel beam with mesh rebars or fine rebars, and surround it with a frame to place concrete. Will be done. However, when concrete is placed, it becomes difficult to attach building members such as floor beams, stair frames, ALC wall boards, and wall panels to the H-section steel continuous foundation beams.

【0006】[0006]

【発明の目的】そこで本発明は、コンクリートに包み込
まれたH形鋼梁に床梁や階段フレーム、ALC壁板、壁
パネルなどの建築部材を、レベルや出入り、左右の位置
を所定の位置に揃えて簡便に取り付けられるようにする
ことを目的とする。
SUMMARY OF THE INVENTION Therefore, according to the present invention, a building member such as a floor beam, a stair frame, an ALC wall plate, a wall panel, etc. is placed on an H-shaped steel beam encased in concrete, and the left and right positions are set to predetermined positions. The purpose is to align and easily attach.

【0007】[0007]

【課題を解決するための手段】本発明の第1の特徴は、
支柱(58)の柱脚(37)にH形鋼梁(76)のフラ
ンジ(70)・(71)を水平に溶接して構成され、そ
のH形鋼梁(76)の上側フランジ(70)に90cm
以下の間隔をもってH形鋼梁(76)の長さ方向にボル
ト差込孔(77a)・(77b)・(77c)………が
穿設されているH形鋼連続基礎梁(36)にある。
The first feature of the present invention is to:
The flanges (70) and (71) of the H-shaped steel beam (76) are horizontally welded to the column base (37) of the column (58), and the upper flange (70) of the H-shaped steel beam (76) is formed. 90 cm
On the H-section steel continuous foundation beam (36) in which bolt insertion holes (77a), (77b), (77c) ... Are bored in the length direction of the H-section steel beam (76) at the following intervals. is there.

【0008】本発明の第2の特徴は、支柱(58)の柱
脚(37)にH形鋼梁(76)のフランジ(70)・
(71)を水平に溶接してH形鋼連続基礎梁(36)が
構成され、そのH形鋼梁(76)の上側フランジ(7
0)に90cm以下の間隔をもってH形鋼梁(76)の
長さ方向にボルト差込孔(77a)・(77b)・(7
7c)………が穿設されており、上側フランジ(70)
のボルト差込孔(77)に装着したボルト(78)によ
って床梁(81)や階段フレーム(82)、ALC壁板
(83)、壁パネルなどの建築資材を取り付ける建築金
物(91)・(92)・(93)………がH形鋼梁(7
6)の上側フランジ(70)の上面に接合されており、
その上側フランジ(70)に突設された建築金物(9
1)・(92)・(93)………を介して床梁(81)
や階段フレーム(82)、ALC壁板(83)、壁パネ
ルなどの建築部材がレベルおよび出入りと左右の位置を
揃えてH形鋼連続基礎梁(36)に取り付けられている
建築部材の取合構造にある。
The second feature of the present invention is that the column base (37) of the column (58) is provided with the flange (70) of the H-shaped steel beam (76).
(71) is welded horizontally to form an H-section steel continuous foundation beam (36), and the upper flange (7) of the H-section steel beam (76) is formed.
0) with a space of 90 cm or less in the length direction of the H-shaped steel beam (76) in the bolt insertion holes (77a), (77b), (7).
7c) ... is drilled, and the upper flange (70)
Building metal fittings (91) (() for attaching building materials such as floor beams (81), stair frames (82), ALC wall boards (83), wall panels, etc. by means of bolts (78) attached to bolt insertion holes (77) of 92) and (93) ......... are H-shaped steel beams (7
6) is joined to the upper surface of the upper flange (70),
Building hardware (9) protruding from the upper flange (70)
Floor beam (81) through 1), (92), (93) ...
Construction of structural members such as stair frames (82), ALC wall plates (83), and wall panels that are attached to the H-section steel continuous foundation beam (36) at the same level and right / left position. In structure.

【0009】[0009]

【第1実施例】以下、図示する実施例により本発明を説
明する。図1は本発明の第1実施例を図示し、支柱58
の柱脚37にH形鋼梁76のフランジ70・71を水平
に取り付けてH形鋼連続基礎梁36が構成され、そのH
形鋼梁76の上側フランジ70に20cmの間隔をもっ
てH形鋼梁76の長さ方向にボルト差込孔77a・77
b・77c………が穿設されている。アンカーボルト8
4は、上側フランジ70の所定の位置のボルト差込孔7
7に係止されている。図中、85は主筋であり、86は
スターラップ筋であり、これらにはコンクリート基礎梁
に使用される鉄筋よりも細手のものを使用してもよい。
First Embodiment The present invention will be described below with reference to the embodiments shown in the drawings. FIG. 1 illustrates a first embodiment of the present invention, in which a column 58
The flanges 70 and 71 of the H-shaped steel beam 76 are horizontally attached to the column base 37 of the H-shaped steel beam to form the H-shaped steel continuous foundation beam 36.
Bolt insertion holes 77a, 77 are provided in the upper side flange 70 of the shaped steel beam 76 at intervals of 20 cm in the longitudinal direction of the H shaped steel beam 76.
b. 77c ... is drilled. Anchor bolt 8
4 is a bolt insertion hole 7 at a predetermined position of the upper flange 70.
It is locked at 7. In the figure, 85 is a main bar and 86 is a stirrup bar, which may be finer than the reinforcing bar used for the concrete foundation beam.

【0010】この実施例では、支柱58の柱脚37に溶
接して突設したブラケット梁にH形鋼梁76をスプライ
スプレートと高力ボルトによって接合しているが、支柱
58の下端にジョイントボックスを取り付けて柱脚37
とし、一方、H形鋼梁76の仕口にはエンドプレートを
溶接しておき、そのジョイントボックスにエンドプレー
トを高力ボルトによって接合してH形鋼連続基礎梁36
を構成することも出来る。
In this embodiment, the H-shaped steel beam 76 is joined to the bracket beam, which is welded to the column base 37 of the support column 58 so as to project, by the splice plate and the high-strength bolt. Attach the column base 37
On the other hand, an end plate is welded to the joint of the H-section steel beam 76, and the end plate is joined to the joint box by a high-strength bolt to form the H-section steel continuous foundation beam 36.
Can also be configured.

【0011】[0011]

【第2実施例】図2は本発明の第2実施例を図示し、上
側フランジ70のボルト差込孔77に装着したボルト7
8によって床梁取付金物91がH形鋼梁76の上側フラ
ンジ70の上面に接合されており、その上側フランジ7
0に突設された床梁取付金物91を介して床梁81がH
形鋼連続基礎梁36に天端を揃えて取り付けられてい
る。図中、87はコンクリートである。
[Second Embodiment] FIG. 2 shows a second embodiment of the present invention, in which a bolt 7 mounted in a bolt insertion hole 77 of an upper flange 70 is mounted.
The floor beam mounting hardware 91 is joined to the upper surface of the upper flange 70 of the H-shaped steel beam 76 by means of 8.
The floor beam 81 is connected to the H
The top end of the shaped steel continuous foundation beam 36 is aligned and attached. In the figure, 87 is concrete.

【0012】[0012]

【第3実施例】図3は本発明の第3実施例を図示し、上
側フランジ70のボルト差込孔77に装着したボルト7
8によって階段取付金物92がH形鋼梁76の上側フラ
ンジ70の上面に接合されており、その上側フランジ7
0に突設された階段取付金物92を介して階段フレーム
82がH形鋼連続基礎梁36に天端を揃えて取り付けら
れている。
[Third Embodiment] FIG. 3 illustrates a third embodiment of the present invention, in which a bolt 7 mounted in a bolt insertion hole 77 of an upper flange 70 is mounted.
The staircase mounting hardware 92 is joined to the upper surface of the upper flange 70 of the H-shaped steel beam 76 by means of 8.
The staircase frame 82 is attached to the H-shaped steel continuous foundation beam 36 with the top end aligned via the staircase mounting hardware 92 that is provided so as to project at zero.

【0013】[0013]

【第4実施例】図4は本発明の第4実施例を図示し、上
側フランジ70のボルト差込孔77に装着したボルト7
8によってパネル取付金物93がH形鋼梁76の上側フ
ランジ70の上面に接合されており、そのパネル取付金
物93に突設したボルト94によってFレール95がH
形鋼連続基礎梁36に取り付けられている。ALC壁板
83は、下端をFレール95に載せ、係止舌片96をF
レール95のレール97に引っ掛けて係止されている。
H形鋼連続基礎梁36に床下換気口38を取り付ける場
合には、図5に図示するように、Fレール95にブラケ
ット39を螺子止めし、そのブラケット39に床下換気
口38を螺子止めする。
[Fourth Embodiment] FIG. 4 shows a fourth embodiment of the present invention, in which the bolt 7 mounted in the bolt insertion hole 77 of the upper flange 70 is mounted.
The panel mounting hardware 93 is joined to the upper surface of the upper flange 70 of the H-shaped steel beam 76 by means of 8, and the F-rail 95 is H-shaped by the bolt 94 protruding from the panel mounting hardware 93.
It is attached to the section steel continuous foundation beam 36. The lower end of the ALC wall plate 83 is placed on the F rail 95, and the locking tongue piece 96 is attached to the F rail 95.
It is hooked on the rail 97 of the rail 95 and locked.
When attaching the underfloor ventilation port 38 to the H-section steel continuous foundation beam 36, as shown in FIG. 5, the bracket 39 is screwed to the F rail 95, and the underfloor ventilation port 38 is screwed to the bracket 39.

【0014】[0014]

【第5実施例】図6と図7は本発明の第5実施例を図示
し、この実施例ではH形鋼梁76は鉄筋やコンクリート
に包み込まれることなく、そのままH形鋼連続基礎梁3
6を構成している。83はALC壁板である。ALC壁
板83は、その裏面に螺子止めした係止舌片96を、H
形鋼梁76の上側フランジ70のボルト差込孔77に装
着したボルト78によって係止したFレール95のレー
ル97に引っ掛けてH形鋼連続基礎梁36に取り付けら
れている。H形鋼連続基礎梁36の前面は、H形鋼梁7
6の上側フランジ70に螺子止めしたフアスナー40と
下側フランジ71に螺子止めしたフアスナー41に化粧
ブロック99を螺子止めして仕上げられている(図
6)。図7は、H形鋼連続基礎梁36の前面の他の仕上
法を図示し、H形鋼連続基礎梁36の前面は、犬走りコ
ンクリート98に固定した化粧ブロック99によって仕
上げられている。
[Fifth Embodiment] FIGS. 6 and 7 show a fifth embodiment of the present invention. In this embodiment, the H-section steel beam 76 is not wrapped in reinforcing bars or concrete, but is directly in the H-section steel continuous foundation beam 3.
6. 83 is an ALC wall plate. The ALC wall plate 83 has a locking tongue piece 96 screwed to the back surface thereof,
It is attached to the H-shaped steel continuous foundation beam 36 by being hooked on the rail 97 of the F rail 95 locked by the bolt 78 mounted in the bolt insertion hole 77 of the upper flange 70 of the shaped steel beam 76. The front of the H-shaped steel continuous foundation beam 36 is the H-shaped steel beam 7
6 is finished by screwing the decorative block 99 to the fastener 40 screwed to the upper flange 70 and the fastener 41 screwed to the lower flange 71 (FIG. 6). FIG. 7 illustrates another finishing method for the front surface of the H-section steel continuous foundation beam 36, and the front surface of the H-section steel continuous foundation beam 36 is finished by a decorative block 99 fixed to dog running concrete 98.

【0015】[0015]

【発明の効果】上記の通り本発明では、支柱58の柱脚
37にH形鋼梁76のフランジ70・71を水平に溶接
してH形鋼連続基礎梁36が構成される。そのH形鋼梁
76の上側フランジ70に90cm以下の間隔をもって
H形鋼梁76の長さ方向にボルト差込孔77a・77b
・77c………が穿設されている。このため、建物のデ
ィティールに合わせて床梁取付金物91、階段取付金物
92、パネル取付金物93などの建築金物を、所要の箇
所のボルト差込孔77に差し込んだボルト78によって
H形鋼梁76に取り付け、それらの建築金物91・92
・93………を介して床梁81や階段フレーム82、A
LC壁板83、壁パネルなどの建築部材をH形鋼連続基
礎梁36に取り付けることが出来る。そうすることによ
って、それらの建築部材を簡便に所定のレベルおよび出
入りと左右の位置に揃えることが出来るようになる。
As described above, in the present invention, the H-shaped steel continuous foundation beam 36 is constructed by horizontally welding the flanges 70 and 71 of the H-shaped steel beam 76 to the column base 37 of the column 58. Bolt insertion holes 77a and 77b are provided in the upper flange 70 of the H-shaped steel beam 76 in the longitudinal direction of the H-shaped steel beam 76 at intervals of 90 cm or less.
・ 77c ......... is drilled. Therefore, building hardware such as floor beam mounting hardware 91, stair mounting hardware 92, panel mounting hardware 93, etc. are inserted into the bolt insertion holes 77 at the required locations according to the details of the building by bolts 78 and the H-shaped steel beam 76 is inserted. Attached to those building hardware 91/92
· Floors 81 and stair frames 82, A through 93 ...
Building members such as LC wall plates 83 and wall panels can be attached to the H-section steel continuous foundation beam 36. By doing so, it becomes possible to easily align those building members in a predetermined level and in / out and left / right positions.

【0016】尚、この明細書の特許請求の範囲の欄の記
載事項には、図面に表示した番号に対応する番号を付記
しているが、その付記した番号は、この明細書の内容を
理解し易くするためのものであり、その付記した番号に
よって、その付記された特許請求の範囲の欄の記載事項
が、図面の記載事項に限定されることを意味するもので
はない。
It should be noted that, although the items corresponding to the claims in this specification are provided with the numbers corresponding to the numbers shown in the drawings, the added numbers mean the contents of this specification. This is for the purpose of facilitating the description, and the added number does not mean that the items described in the appended claims are limited to the items described in the drawings.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例に係るH形鋼連続基礎梁の
斜視図である。
FIG. 1 is a perspective view of an H-section steel continuous foundation beam according to a first embodiment of the present invention.

【図2】本発明の第2実施例に係るH形鋼連続基礎梁と
床梁との取付箇所における断面図である。
FIG. 2 is a sectional view of an H-shaped steel continuous foundation beam and a floor beam at a mounting portion according to a second embodiment of the present invention.

【図3】本発明の第3実施例に係るH形鋼連続基礎梁と
階段フレームとの取付箇所における断面図である。
FIG. 3 is a cross-sectional view of an H-shaped steel continuous foundation beam and a stair frame at a mounting portion according to a third embodiment of the present invention.

【図4】本発明の第4実施例に係るH形鋼連続基礎梁と
ALC壁板との取付箇所における断面図である。
FIG. 4 is a cross-sectional view of an H-shaped steel continuous foundation beam and an ALC wall plate at a mounting portion according to a fourth embodiment of the present invention.

【図5】本発明の第4実施例に係るH形鋼連続基礎梁の
床下換気口の取付箇所における斜視図である。
FIG. 5 is a perspective view of an H-shaped steel continuous foundation beam according to a fourth embodiment of the present invention at a location where an underfloor ventilation port is attached.

【図6】本発明の第5実施例に係るH形鋼連続基礎梁と
ALC壁板との取付箇所における断面図である。
FIG. 6 is a sectional view of an H-shaped steel continuous foundation beam and an ALC wall plate at a mounting portion according to a fifth embodiment of the present invention.

【図7】本発明の第5実施例に係るH形鋼連続基礎梁と
ALC壁板との取付箇所における断面図である。
FIG. 7 is a cross-sectional view of an H-shaped steel continuous foundation beam and an ALC wall plate at a mounting portion according to a fifth embodiment of the present invention.

【符号の説明】[Explanation of symbols]

36 H形鋼連続基礎梁 37 柱脚 38 床下換気口 39 ブラケット 40 フアスナー 41 フアスナー 58 支柱 70 上側フランジ 71 下側フランジ 76 H形鋼梁 77 ボルト差込孔 78 ボルト 81 床梁 82 階段フレーム 83 ALC壁板 84 アンカーボルト 85 主筋 86 スターラップ筋 87 コンクリート 89 床パネル 91 床梁取付金物 92 階段取付金物 93 パネル取付金物 94 ボルト 95 Fレール 96 係止舌片 97 レール 98 コンクリート 99 化粧ブロック 36 H-shaped steel continuous foundation beam 37 Column base 38 Underfloor ventilation port 39 Bracket 40 Huasner 41 Huasner 58 Strut 70 Upper flange 71 Lower flange 76 H-shaped steel beam 77 Bolt insertion hole 78 Bolt 81 Floor beam 82 Stair frame 83 ALC wall Plate 84 Anchor bolt 85 Main bar 86 Stirrup bar 87 Concrete 89 Floor panel 91 Floor beam mounting hardware 92 Stair mounting hardware 93 Panel mounting hardware 94 Bolt 95 F rail 96 Locking tongue 97 Rail 98 Concrete 99 Cosmetic block

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04C 3/04 (72)発明者 池野 総克 大阪府大阪市西区阿波座1丁目5番16号 大和ハウス工業株式会社内─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification number Reference number within the agency FI Technical indication location E04C 3/04 (72) Inventor Soukatsu Ikeno 1-5-16 Awaza, Nishi-ku, Osaka-shi, Osaka Yamato House Industry Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 支柱(58)の柱脚(37)にH形鋼梁
(76)のフランジ(70)・(71)を水平に溶接し
て構成され、そのH形鋼梁(76)の上側フランジ(7
0)に90cm以下の間隔をもってH形鋼梁(76)の
長さ方向にボルト差込孔(77a)・(77b)・(7
7c)………が穿設されていることを特徴とするH形鋼
連続基礎梁。
1. The flange (70) / (71) of an H-shaped steel beam (76) is horizontally welded to the column base (37) of the column (58), and the flange (70) / (71) of the H-shaped steel beam (76) is welded. Upper flange (7
0) with a space of 90 cm or less in the length direction of the H-shaped steel beam (76) in the bolt insertion holes (77a), (77b), (7).
7c) ... An H-section steel continuous foundation beam characterized by being perforated.
【請求項2】 支柱(58)の柱脚(37)にH形鋼梁
(76)のフランジ(70)・(71)を水平に溶接し
てH形鋼連続基礎梁(36)が構成され、そのH形鋼梁
(76)の上側フランジ(70)に90cm以下の間隔
をもってH形鋼梁(76)の長さ方向にボルト差込孔
(77a)・(77b)・(77c)………が穿設され
ており、上側フランジ(70)のボルト差込孔(77)
に装着したボルト(78)によって床梁(81)や階段
フレーム(82)、ALC壁板(83)、壁パネルなど
の建築資材を取り付ける建築金物(91)・(92)・
(93)………がH形鋼梁(76)の上側フランジ(7
0)の上面に接合されており、その上側フランジ(7
0)に突設された建築金物(91)・(92)・(9
3)………を介して床梁(81)や階段フレーム(8
2)、ALC壁板(83)、壁パネルなどの建築部材が
レベルおよび出入りと左右の位置を揃えてH形鋼連続基
礎梁(36)に取り付けられていることを特徴とする建
築部材取合構造。
2. The H-section steel continuous foundation beam (36) is constructed by horizontally welding the flanges (70) and (71) of the H-section steel beam (76) to the column base (37) of the column (58). , With bolt intervals (77a), (77b), (77c) in the length direction of the H-shaped steel beam (76) on the upper flange (70) of the H-shaped steel beam (76) at intervals of 90 cm or less. Are drilled, and the bolt insertion hole (77) of the upper flange (70) is formed.
Building hardware (91), (92), which attaches building materials such as floor beams (81), stair frames (82), ALC wall boards (83), and wall panels with bolts (78) attached to
(93) ... is the upper flange (7) of the H-shaped steel beam (76).
0) and the upper flange (7
Building hardware (91) ・ (92) ・ (9)
3) ……… through floor beams (81) and stair frames (8
2), building members such as ALC wall plate (83), wall panel, etc. are attached to the H-section steel continuous foundation beam (36) at the same level and left / right position, and attached to the H-shaped steel continuous foundation beam (36). Construction.
JP33947894A 1994-12-31 1994-12-31 Building member connection structure of H-shaped steel continuous foundation beam Expired - Fee Related JP3682588B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33947894A JP3682588B2 (en) 1994-12-31 1994-12-31 Building member connection structure of H-shaped steel continuous foundation beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33947894A JP3682588B2 (en) 1994-12-31 1994-12-31 Building member connection structure of H-shaped steel continuous foundation beam

Publications (2)

Publication Number Publication Date
JPH08189042A true JPH08189042A (en) 1996-07-23
JP3682588B2 JP3682588B2 (en) 2005-08-10

Family

ID=18327854

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33947894A Expired - Fee Related JP3682588B2 (en) 1994-12-31 1994-12-31 Building member connection structure of H-shaped steel continuous foundation beam

Country Status (1)

Country Link
JP (1) JP3682588B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321845A (en) * 2002-05-01 2003-11-14 Panahome Corp Reinforcement-steel frame core unit for foundation, and connection structure for the unit
CN104358332A (en) * 2014-11-25 2015-02-18 智房科技股份有限公司 Steel structure wall surface system
JP2016003532A (en) * 2014-06-19 2016-01-12 ジオスター株式会社 Footing of wall-like structure
KR20160087300A (en) * 2015-01-13 2016-07-21 경희대학교 산학협력단 Bottom foundation base of small scale prefabricated storage and construction method of the same
CN106639056A (en) * 2016-12-13 2017-05-10 江苏中南建筑产业集团有限责任公司 Steel structure building outer wall board anti-cracking device and construction method
JP2017096011A (en) * 2015-11-26 2017-06-01 株式会社内藤ハウス Frame cover panel installing structure
JP2017179935A (en) * 2016-03-31 2017-10-05 大和ハウス工業株式会社 Member support structure of building
CN108301544A (en) * 2018-03-26 2018-07-20 中建五局华东建设有限公司 Sandwich combined system and its construction method
CN112127545A (en) * 2020-09-28 2020-12-25 宁波建工建乐工程有限公司 Assembled suspension frame type steel beam device
CN117027251A (en) * 2023-09-21 2023-11-10 北京市第三建筑工程有限公司 Cross deformation joint position curtain wall connecting point structure and construction method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321845A (en) * 2002-05-01 2003-11-14 Panahome Corp Reinforcement-steel frame core unit for foundation, and connection structure for the unit
JP2016003532A (en) * 2014-06-19 2016-01-12 ジオスター株式会社 Footing of wall-like structure
CN104358332A (en) * 2014-11-25 2015-02-18 智房科技股份有限公司 Steel structure wall surface system
KR20160087300A (en) * 2015-01-13 2016-07-21 경희대학교 산학협력단 Bottom foundation base of small scale prefabricated storage and construction method of the same
JP2017096011A (en) * 2015-11-26 2017-06-01 株式会社内藤ハウス Frame cover panel installing structure
JP2017179935A (en) * 2016-03-31 2017-10-05 大和ハウス工業株式会社 Member support structure of building
CN106639056A (en) * 2016-12-13 2017-05-10 江苏中南建筑产业集团有限责任公司 Steel structure building outer wall board anti-cracking device and construction method
CN108301544A (en) * 2018-03-26 2018-07-20 中建五局华东建设有限公司 Sandwich combined system and its construction method
CN112127545A (en) * 2020-09-28 2020-12-25 宁波建工建乐工程有限公司 Assembled suspension frame type steel beam device
CN117027251A (en) * 2023-09-21 2023-11-10 北京市第三建筑工程有限公司 Cross deformation joint position curtain wall connecting point structure and construction method thereof
CN117027251B (en) * 2023-09-21 2024-04-09 北京市第三建筑工程有限公司 Cross deformation joint position curtain wall connecting point structure and construction method thereof

Also Published As

Publication number Publication date
JP3682588B2 (en) 2005-08-10

Similar Documents

Publication Publication Date Title
US7523591B2 (en) Concrete panel construction system
US4987719A (en) Reinforced concrete building construction and method of forming same
US20060096202A1 (en) Pre-cast panel unibody building system
US7219474B2 (en) Load bearing building panel
JPH08189042A (en) Structure of h-section continuous footing beam for tying in building member
RU2082853C1 (en) Method of construction of foundation
US4457118A (en) Integral foundation and floor frame system and method of building construction
KR102398605B1 (en) Construction method of seismic retrofit system using pc panel
JP3611876B2 (en) Column base and foundation beam structure
JP3235716B2 (en) Seismic retrofitting method for existing buildings
US2139907A (en) Building construction
JP3020021B2 (en) Building seismic retrofitting method
JP2577973B2 (en) How to build a building with a basement
KR100590178B1 (en) Fixing apparatus of cast using a dirt wall
JP3515744B2 (en) Repair method for wooden buildings
JP4362610B2 (en) Building floor structure
JPS60258351A (en) Construction of concrete block wall
JPH07103620B2 (en) Construction method for steel structure
JPH03129034A (en) Construction of floor and connecting device between striking-in mold frame for floor slab and self erection type truss-shaped steel reinforcement
JP3451274B2 (en) Soil unit and integrated prefabricated house unit
JP2001064980A (en) Foundation of building and its construction
JPH08246476A (en) Method of constructing underground structure
JPH0635074Y2 (en) Frame structure of multi-storey car park
KR200348605Y1 (en) Fixing apparatus of cast using a dirt wall
AU2002234421B2 (en) A load bearing building panel

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040914

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041012

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041124

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050412

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050510

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110603

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110603

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120603

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120603

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140603

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees