CN108301544A - Sandwich combined system and its construction method - Google Patents
Sandwich combined system and its construction method Download PDFInfo
- Publication number
- CN108301544A CN108301544A CN201810252788.3A CN201810252788A CN108301544A CN 108301544 A CN108301544 A CN 108301544A CN 201810252788 A CN201810252788 A CN 201810252788A CN 108301544 A CN108301544 A CN 108301544A
- Authority
- CN
- China
- Prior art keywords
- steel
- girder steel
- construction
- combined system
- support element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 63
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 142
- 239000010959 steel Substances 0.000 claims abstract description 142
- 238000004873 anchoring Methods 0.000 claims description 12
- 239000004568 cement Substances 0.000 claims description 6
- 238000004080 punching Methods 0.000 claims description 5
- 238000007586 pull-out test Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 6
- 239000011150 reinforced concrete Substances 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 10
- 239000004567 concrete Substances 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 239000011229 interlayer Substances 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000005520 cutting process Methods 0.000 description 3
- 239000004566 building material Substances 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000007373 indentation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4157—Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention relates to building fields, in particular to a kind of sandwich combined system and its construction method.The system includes:Steel construction and floor construction.Wherein, steel construction includes multiple girder steel components.Girder steel component is mounted on wall at preset elevation line;And multiple girder steel components form the frame for installing floor construction.Floor construction is mounted in the frame that steel construction is formed.It combines to form sandwich combined system with floor construction by using steel construction, the sandwich that middle monolithic reinforced concrete structure is formed compared with the existing technology, the sandwich combined system can effectively shorten construction period.The sandwich that middle full steel structure is formed compared with the existing technology, the sandwich combined system cost is relatively low, and quality is easier to control.
Description
Technical field
The present invention relates to building fields, in particular to a kind of sandwich combined system and its construction method.
Background technology
It constructs for sandwich, usual way is using cast-in-situ steel reinforced concrete or full steel structure.According to cast-in-place
Armored concrete extends the construction period because of the setting of structural elements while reducing head room influence using function.
According to full steel structure, then need setting ground screed-coat that can meet floor paving quality requirement, and steel construction cost is higher,
Welding and interlayer terrace pouring quality are difficult to control.
Invention content
The purpose of the present invention is to provide a kind of sandwich combined systems, and the system quality is good, short construction period.
The purpose of the present invention is to provide a kind of construction method of sandwich combined system, construction method operation letters
Single, feasibility is strong, can effectively shorten construction period.
To achieve the goals above, the technical solution adopted by the present invention is as follows:
A kind of sandwich combined system, including:Steel construction and floor construction;Steel construction includes multiple girder steel components;Steel
Beam assembly is mounted on wall at preset elevation line;And multiple girder steel components form the frame for installing floor construction;Building
Harden structure is mounted in the frame that steel construction is formed.
In preferred embodiments of the present invention, each girder steel component includes anchoring piece, support element and girder steel sheet
Body;Support element is fixedly connected on wall by anchoring piece;Girder steel ontology is fixedly connected on support element.
In preferred embodiments of the present invention, anchoring piece is bolt;Support element is angle steel or steel plate;Girder steel ontology is H
Shaped steel or channel steel.
In preferred embodiments of the present invention, support element is bolted to connection in wall;Girder steel ontology is welded on branch
In support member.
In preferred embodiments of the present invention, floor construction includes multiple ALC floors and multiple fixing pieces;Multiple ALC
Floor is mounted in frame.
In preferred embodiments of the present invention, the both sides of each girder steel ontology are respectively provided with groove, each ALC floor
It is fixedly mounted in groove.
In preferred embodiments of the present invention, notch is provided on girder steel ontology, ALC floors enter groove by notch
It is interior.
In preferred embodiments of the present invention, the filling of multiple fixing pieces is in groove, to ensure ALC floors and steel construction
Top surface is horizontal.
In preferred embodiments of the present invention, fixed structure includes cement pressure plate item and joint filling portion.
A kind of construction method of sandwich combined system, including:Support element is put according to control line, in support element
Preformed hole at punching is marked;After support element is bolted on wall, pull-out test is carried out, to ensure to hold
Carry power;Multiple girder steel ontologies are welded on support element, frame is formed;Floor is fixedly mounted in frame;Adjust floor and
The absolute altitude of girder steel ontology, so that the top surface of floor and the top surface of girder steel ontology are maintained in same level.
The beneficial effects of the invention are as follows:
A kind of sandwich combined system provided by the invention, including:Steel construction and floor construction.Wherein, steel construction packet
Include multiple girder steel components.Girder steel component is mounted on wall at preset elevation line;And multiple girder steel components are formed for installing
The frame of floor construction.Floor construction is mounted in the frame that steel construction is formed.It is combined with floor construction by using steel construction
Sandwich combined system is formed, the sandwich that middle monolithic reinforced concrete structure is formed compared with the existing technology, the interlayer
Structural combination system can effectively shorten construction period.The sandwich that middle full steel structure is formed compared with the existing technology,
The sandwich combined system cost is relatively low, and quality is easier to control.
A kind of construction method of sandwich combined system provided by the invention, including:By support element according to control string pendulum
It puts, punching is marked at the preformed hole of support element.After support element is bolted on wall, drawing examination is carried out
It tests, to ensure bearing capacity.Multiple girder steel ontologies are welded on support element, frame is formed.Floor is fixedly mounted on frame
It is interior;The absolute altitude for adjusting floor and girder steel ontology, so that the top surface of floor and the top surface of girder steel ontology are maintained at same level
It is interior.The construction method of this sandwich combined system, easy to operate, feasibility is strong, can effectively shorten construction period.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment
Attached drawing is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as
It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with
Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 is that the steel plate for the sandwich combined system that first embodiment of the invention provides is connect greatly with concrete structure
Sample schematic diagram;
Fig. 2 is rear plus H profile steel beam and the concrete structure for the sandwich combined system that first embodiment of the invention provides
Connect full-page proof schematic diagram;
Fig. 3 is the rear plus channel steel girder steel and concrete knot for the sandwich combined system that first embodiment of the invention provides
Structure connects full-page proof schematic diagram;
Fig. 4 is the rear plus angle steel girder steel and concrete knot for the sandwich combined system that first embodiment of the invention provides
Structure connects full-page proof schematic diagram;
Fig. 5 is that the rear plus H profile steel beam for the sandwich combined system that first embodiment of the invention provides and H profile steel beam connect
Connect full-page proof schematic diagram;
Fig. 6 is that the ALC floors for the sandwich combined system that first embodiment of the invention provides install node schematic diagram;
Fig. 7 is that the ALC floors for the sandwich combined system that first embodiment of the invention provides install perspective view.
Icon:111- angle steel;112- steel plates;113- expansion bolts;114- chemical bolts;120- girder steel ontologies;121-H
Shaped steel;122- channel steels;130-ALC floors;131- cement pressure plates.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention to providing in the accompanying drawings is not intended to limit requirement guarantor below
The scope of the present invention of shield, but it is merely representative of the selected embodiment of the present invention.Based on the embodiments of the present invention, this field
The every other embodiment that those of ordinary skill is obtained without creative efforts, belongs to guarantor of the present invention
The range of shield.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain item exists
It is defined, then it further need not be defined and explained in subsequent attached drawing in one attached drawing.
In the description of the embodiment of the present invention, it should be noted that the orientation or position of the instructions such as term "upper", "inner"
Relationship be based on the orientation or positional relationship shown in the drawings or the invention product using when the orientation or position usually put
Relationship is set, is merely for convenience of description of the present invention and simplification of the description, device is not indicated or implied the indicated or element is necessary
With specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be directly connected, can also can be indirectly connected through an intermediary the connection inside two elements.
For the ordinary skill in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
First embodiment
The present embodiment provides a kind of sandwich combined systems comprising:Steel construction and floor construction.
Further, steel construction includes multiple girder steel components.
Further, girder steel component is mounted on wall at preset elevation line;And multiple girder steel components are formed for pacifying
Fill the frame of floor construction.
Specifically, each girder steel component includes anchoring piece, support element and girder steel ontology 120;Support element passes through anchor
Firmware is fixedly connected on wall;Girder steel ontology 120 is fixedly connected on support element.
Further, anchoring piece is bolt;Support element is angle steel 111 or steel plate 112;Support element is bolted
It is connected to wall.
By, using anchoring piece securing supports, being connected firmly on wall, good reliability.By the way that support element is arranged, it is
Subsequent installation girder steel ontology 120, provides installation site, and advantageous guarantee is provided for the secured installation of girder steel.
In the present embodiment, above-mentioned bolt can select expansion bolt 113.
Specifically, first steel plate 112 or angle steel 111 are put according to the control line of pop-up, with marking pen in steel plate
112 or angle steel 111 preformed hole at be marked, then using electric drill punch.After the completion of punching is cleared up, installation bolt.
Further, when above-mentioned support element can select angle steel 111, expansion bolt 113 is selected to fix.Above-mentioned branch
When support member selects steel plate 112, chemical bolt 114 is selected to be fixed, corner welding line hf > 8mm.
Specifically, in the present embodiment, above-mentioned expansion bolt 113 selects the expansion bolt of M10*95 models.Above-mentioned
Chemical bolt 114 selects M14 chemical bolts.
Further, when selecting expansion bolt 113 to fix angle steel 111, between each above-mentioned expansion bolt 113
Spacing selection be set as 55-65mm.
Further, in the present embodiment, the spacing selection between each above-mentioned expansion bolt 113 is set as
60mm。
Further, after installation is complete for above-mentioned anchoring piece, it is also necessary to pull-out test is carried out as required, to ensure spiral shell
Bolt bearing capacity.
Further, above-mentioned support plate is placed on above installed anchoring piece.
Specifically, when above-mentioned support plate is selected as steel plate 112, the size model number of steel plate 112 selects 200*200*
14mm。
Further, when above-mentioned support plate is selected as angle steel 111, the size model number of angle steel 111 selects L90*90*
8。
Further, after above-mentioned support plate being placed on anchoring piece, it is also necessary to according to the elevation line popped up on wall into
After row correction, then reinforced.
It should be noted that when above-mentioned support plate is selected as angle steel 111, after should being corrected using horizon rule again
It is fixed.
Further, girder steel ontology 120 is H profile steel 121 or channel steel 122.Girder steel ontology 120 is welded on support element.
It is not only easy for construction by the way that girder steel ontology 120 to be welded on support element, and good integrity, entire interlayer knot
The stability of structure combined system is high.
Specifically, by girder steel ontology 120 according to the installation of wall upper control line it is in place after, the end of girder steel ontology 120 into
The measurement of two vertical direction of row influences the flatness of follow-up ALC floors 130 to prevent girder steel ontology 120 from installing out-of-flatness;
It is welded again after determining 120 position exact level of girder steel ontology.
Further, in the present embodiment, it is measured using 1m horizon rules.
In other alternative-embodiments, the above-mentioned measurement whether horizontal to 120 installation site of girder steel ontology can also be selected
Select other tools applicatory of this field.
By installing above-mentioned girder steel component so that multiple girder steel components form the frame for installing floor construction, and
Multiple girder steel components are located at preset elevation line, help to ensure that the entirety for the frame structure that entire girder steel component is formed is flat
Whole property improves advantageous guarantee for subsequent installation ALC floors 130.
Further, when being connected between girder steel ontology 120, by two ends cuttings at angle, it is two-sided full to carry out angle
Weldering.Please refer to Fig. 7, when selecting H profile steel 121, connected two H profile steels 121 use the two-sided full welds of angle, weld horizontal away from
It is equal to 2000mm from d.
Further, floor construction is mounted in the frame that steel construction is formed.Floor construction includes multiple ALC floors 130
And multiple fixing pieces.Multiple ALC floors 130 are mounted in frame.
ALC floors 130 are autoclaved lightweight concrete board, are one kind of high-performance steam-pressing aero-concrete.ALC plates
It is with flyash or silica sand, cement, lime etc. for main material, is molded by more aerocretes made of autoclave curing
Plank (includes treated reinforcing bar enhancing).ALC plates can not only do materials for wall, but also can do roof boarding, be a kind of superior performance
Building material.
In the present embodiment, above-mentioned ALC floors 130 select width for 600mm planks.
In the present embodiment, by selecting ALC floors 130, the matter of entire sandwich combined system can not only be met
Amount requires, and environment protecting and power-saving, can reduce the cost of entire sandwich combined system.
Further, the both sides of each girder steel ontology 120 are respectively provided with groove, each ALC floor 130 is fixedly mounted on
In groove.Notch is provided on girder steel ontology 120, ALC floors 130 are entered by notch in groove.The filling of multiple fixing pieces in
In groove, to ensure that ALC floors 130 are horizontal with top of steel.Wherein, fixed structure includes cement pressure plate 131 and fills out
Seam portion.Further, when ALC floors 130 are installed, ALC floors 130 need to cut 121 wall thickness of H profile steel.According to practical standard width of a room in an old-style house ruler
Very little interception corresponding length H profile steel 121.A part is cut off on the unilateral edge of a wing of 121 one end of H profile steel.It is after H profile steel 121 is in place and pre-
Steel plate 112 is buried to weld.It is caught in from 121 indentation, there of H profile steel in ALC floors 130.Continue next ALC floors 130 from H profile steel
121 indentation, theres are caught in, and each ALC floor 130 is drawn close naturally, are left no gaps.Reasonable Arrangement plank, cuts when insufficient
Except other planks, until being paved with.It is firm that 121 edge of a wing of H profile steel of excision is welded again, using special caulking agent joint filling.
Specifically, 121 side top flange of same span H profile steel is cut off into 700mm, notch is formed, so as to width 600mm
Plank is sequentially placed into from this notch in H profile steel 121.Since plank both ends are anchored at the groove position of H profile steel 121, plank peace
The tongue and groove (end needs three-sided cut) along two 7 × 60mm of lateral incision of plank using cutting machine is needed before dress, to ensure its surface and steel knot
Structure is concordant.After on board suspending to the steel construction that installation is complete, plank is sequentially placed into H profile steel at the position for cutting off the edge of a wing
In 121 notch, and ensure to put it is straight, it is seamless.The surrounding that every block of plank is filled in using timber wedge is used in plank top surface
Guiding ruler measures, and adjusts the wooden contract height, it is ensured that plank and (flatness≤3mm) after top of steel level, then use and cut
Cement pressure plate 131 clogged, finally use special jointing agent joint filling, reach and remove timber wedge after intensity, carry out last
Repairing and 121 edge of a wing of H shaped steel cut off early period welded again.
Compared to monolithic reinforced concrete structure, which can effectively shorten the construction period, reduce item
Mesh cost.Compared to traditional full steel structure, which can significantly reduce and construction technology quality is easily controllable.
While reaching interlayer ground and exempt from levelling, ALC plates itself are a kind of to have many advantages, such as lightweight, high-strength, green, energy saving new
Type construction material.Therefore, which passes through using so that green for New Building Materials while meeting quality objective
Colour circle is protected ideas of energy-saving and is carried out and implemented, and can significantly shorten construction period reduction project cost, has good warp
Ji property, generalization and social benefit.
Second embodiment
The present embodiment provides a kind of construction methods of sandwich combined system, including:By support element according to control string pendulum
It puts, punching is marked at the preformed hole of support element;After support element is bolted on wall, drawing examination is carried out
It tests, to ensure bearing capacity;Multiple girder steel ontologies are welded on support element, frame is formed;Floor is fixedly mounted on frame
It is interior;The absolute altitude for adjusting floor and girder steel ontology, so that the top surface of floor and the top surface of girder steel ontology are maintained at same level
It is interior.
The construction method of this sandwich combined system, easy to operate, feasibility is strong, can effectively shorten construction
Period.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by
Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of sandwich combined system, which is characterized in that including:
Steel construction and floor construction;
The steel construction includes multiple girder steel components;The girder steel component is mounted on wall at preset elevation line;And it is multiple
The girder steel component forms the frame for installing the floor construction;
The floor construction is mounted in the frame that the steel construction is formed.
2. sandwich combined system as described in claim 1, which is characterized in that
Each described girder steel component includes anchoring piece, support element and girder steel ontology;
The support element is fixedly connected on the wall by the anchoring piece;
The girder steel ontology is fixedly connected on the support element.
3. sandwich combined system as claimed in claim 2, which is characterized in that
The anchoring piece is bolt;
The support element is angle steel or steel plate;
The girder steel ontology is H profile steel or channel steel.
4. sandwich combined system as claimed in claim 3, which is characterized in that
The support element is fixedly connected on the wall by the bolt;
The girder steel ontology is welded on the support element.
5. sandwich combined system as described in claim 1, which is characterized in that
The floor construction includes multiple ALC floors and multiple fixing pieces;
Multiple ALC floors are mounted in the frame.
6. sandwich combined system as claimed in claim 5, which is characterized in that
The both sides of each girder steel ontology are respectively provided with groove, each described ALC floor is fixedly mounted in the groove.
7. sandwich combined system as claimed in claim 6, which is characterized in that
Notch is provided on the girder steel ontology, the ALC floors are entered by the notch in the groove.
8. sandwich combined system as claimed in claim 7, which is characterized in that
Multiple fixing pieces fillings are in the groove, to ensure that the ALC floors are horizontal with the top of steel.
9. sandwich combined system as claimed in claim 8, which is characterized in that
The fixed structure includes cement pressure plate item and joint filling portion.
10. a kind of construction method of sandwich combined system, which is characterized in that including
Support element is put according to control line, punching is marked at the preformed hole of the support element;
After the support element is bolted on wall, pull-out test is carried out, to ensure bearing capacity;
Multiple girder steel ontologies are welded on the support element, frame is formed;
Floor is fixedly mounted in the frame;
The absolute altitude of the floor and the girder steel ontology is adjusted, so that the top surface of the floor and the top surface of the girder steel ontology are protected
It holds in same level.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810252788.3A CN108301544A (en) | 2018-03-26 | 2018-03-26 | Sandwich combined system and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810252788.3A CN108301544A (en) | 2018-03-26 | 2018-03-26 | Sandwich combined system and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108301544A true CN108301544A (en) | 2018-07-20 |
Family
ID=62846789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810252788.3A Pending CN108301544A (en) | 2018-03-26 | 2018-03-26 | Sandwich combined system and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108301544A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898699A (en) * | 2019-03-22 | 2019-06-18 | 中南大学 | A kind of fabricated ripple type steel plate shear wall structure and its construction method |
CN111608310A (en) * | 2020-06-19 | 2020-09-01 | 中国建筑第四工程局有限公司 | ALC light floor slab and construction method |
CN114571080A (en) * | 2022-04-14 | 2022-06-03 | 常州世竟液态金属有限公司 | Oblique angle double-sided laser welding method for bulk amorphous alloy and plate |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08189042A (en) * | 1994-12-31 | 1996-07-23 | Daiwa House Ind Co Ltd | Structure of h-section continuous footing beam for tying in building member |
CN103410218A (en) * | 2013-07-26 | 2013-11-27 | 北京工业大学 | Fabricated multistory and high-rise prestressed steel frame-sway brace system provided with special-shaped columns |
KR101520002B1 (en) * | 2015-01-05 | 2015-05-14 | (주)세종알앤디 | Precast Concrete Member With Assembly Plate And Fixing Channel |
CN204983159U (en) * | 2015-08-28 | 2016-01-20 | 洛阳美辰钢构工程有限公司 | Connected node of girder steel and shear force wall |
CN105525702A (en) * | 2015-11-18 | 2016-04-27 | 北京工业大学 | Assembly type outer wall system of steel structure |
CN206157897U (en) * | 2016-10-27 | 2017-05-10 | 浙江鑫润工程管理有限公司 | Assembled steel construction of high -rise structure system |
CN106836475A (en) * | 2017-01-17 | 2017-06-13 | 北京工业大学 | Modular many high level assembling type steel structure systems |
CN107130684A (en) * | 2017-05-26 | 2017-09-05 | 北京北玻硅巢技术有限公司 | A kind of fabricated structure and its construction method |
CN208137227U (en) * | 2018-03-26 | 2018-11-23 | 中建五局华东建设有限公司 | Sandwich combined system and office building |
-
2018
- 2018-03-26 CN CN201810252788.3A patent/CN108301544A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08189042A (en) * | 1994-12-31 | 1996-07-23 | Daiwa House Ind Co Ltd | Structure of h-section continuous footing beam for tying in building member |
CN103410218A (en) * | 2013-07-26 | 2013-11-27 | 北京工业大学 | Fabricated multistory and high-rise prestressed steel frame-sway brace system provided with special-shaped columns |
KR101520002B1 (en) * | 2015-01-05 | 2015-05-14 | (주)세종알앤디 | Precast Concrete Member With Assembly Plate And Fixing Channel |
CN204983159U (en) * | 2015-08-28 | 2016-01-20 | 洛阳美辰钢构工程有限公司 | Connected node of girder steel and shear force wall |
CN105525702A (en) * | 2015-11-18 | 2016-04-27 | 北京工业大学 | Assembly type outer wall system of steel structure |
CN206157897U (en) * | 2016-10-27 | 2017-05-10 | 浙江鑫润工程管理有限公司 | Assembled steel construction of high -rise structure system |
CN106836475A (en) * | 2017-01-17 | 2017-06-13 | 北京工业大学 | Modular many high level assembling type steel structure systems |
CN107130684A (en) * | 2017-05-26 | 2017-09-05 | 北京北玻硅巢技术有限公司 | A kind of fabricated structure and its construction method |
CN208137227U (en) * | 2018-03-26 | 2018-11-23 | 中建五局华东建设有限公司 | Sandwich combined system and office building |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898699A (en) * | 2019-03-22 | 2019-06-18 | 中南大学 | A kind of fabricated ripple type steel plate shear wall structure and its construction method |
CN109898699B (en) * | 2019-03-22 | 2024-01-30 | 中南大学 | Assembled corrugated steel plate shear wall structure and construction method thereof |
CN111608310A (en) * | 2020-06-19 | 2020-09-01 | 中国建筑第四工程局有限公司 | ALC light floor slab and construction method |
CN114571080A (en) * | 2022-04-14 | 2022-06-03 | 常州世竟液态金属有限公司 | Oblique angle double-sided laser welding method for bulk amorphous alloy and plate |
CN114571080B (en) * | 2022-04-14 | 2024-03-22 | 常州世竟液态金属有限公司 | Oblique angle double-sided laser welding method for bulk amorphous alloy and plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107476476B (en) | One kind is greatly across steel bar truss floor support plate and reinforced beam combination constructing method thereof | |
CA2539466C (en) | Concrete post anchor | |
US5063718A (en) | Curtain wall for a building | |
CA3046507C (en) | Improvements to modular dwellings | |
CN108301544A (en) | Sandwich combined system and its construction method | |
CN104532997A (en) | Assembly type floor system and construction method thereof | |
US20170130474A1 (en) | Enclosure for modular construction systems | |
CN105887660B (en) | A kind of perforated plate connector with boot-shaped slot, girder steel and method | |
CN109723142A (en) | A kind of building structure | |
CN205296489U (en) | Superelevation light gauge steel fire compartment wall construction structures | |
CN208137227U (en) | Sandwich combined system and office building | |
US10676928B2 (en) | Prefabricated building panel | |
CN108824651B (en) | Assembly type steel structure building main body connecting structure and mounting method thereof | |
CN108487462B (en) | Anchoring method for steel bars in concrete frame node | |
CN203441062U (en) | Field installation supporting frame for door frame of civil air defense door | |
CN110565667A (en) | Steel sheet pile cofferdam with slip casting platform | |
CN212802449U (en) | Non-pre-buried cantilever steel beam | |
CN211257025U (en) | Steel sheet pile cofferdam with slip casting platform | |
EP1712706A2 (en) | Balcony extension | |
RU2550173C2 (en) | Method to reinforce precast panels of surface from cellular concrete | |
CN207567998U (en) | A kind of composite structure of steel plate shear force wall and steel column | |
CN207878644U (en) | A kind of double steel plate tongue and groove connecting node | |
CN101881051B (en) | Beam-beam connecting node structure | |
CN110259118A (en) | Stair ramp type Stadium formwork reinforcement system and its construction method | |
CN220620591U (en) | Keel hoop connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |