JPH08199969A - Cutting method by wire saw in tunnel work - Google Patents

Cutting method by wire saw in tunnel work

Info

Publication number
JPH08199969A
JPH08199969A JP882895A JP882895A JPH08199969A JP H08199969 A JPH08199969 A JP H08199969A JP 882895 A JP882895 A JP 882895A JP 882895 A JP882895 A JP 882895A JP H08199969 A JPH08199969 A JP H08199969A
Authority
JP
Japan
Prior art keywords
wire saw
pair
arms
holes
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP882895A
Other languages
Japanese (ja)
Inventor
Masahiro Kamio
正博 神尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP882895A priority Critical patent/JPH08199969A/en
Publication of JPH08199969A publication Critical patent/JPH08199969A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To increase the working efficiency and facilitate the construction of the bottom floor. CONSTITUTION: A pair of arms 1a, 1b by which a wire saw 17 is stretched by use of driven pulleies 10, 11, idler pulleies 1-9, 12, 13, 15, 16 and a drive pulley 5, are inserted in a pair of holes B1, B2 to circulate the wire saw 17 at a high speed while actuating an tension thereto. The arms 1a, 1b are transferred to the depth of the holes B1, B2 to form a cut face D.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、トンネル工事における
ワイヤソーによる切断方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of cutting with a wire saw in tunnel construction.

【0002】[0002]

【従来の技術】従来のトンネル工事は、通常、岩盤にト
ンネル外形に沿った複数の発破孔を削孔し、これらの発
破孔により発破をかけて地山を破砕し、クラックを利用
し掘削してトンネルを築造していた。
2. Description of the Related Art In conventional tunnel construction, a plurality of blast holes along the outer shape of a tunnel are usually drilled in rock, and the blast holes are blasted to crush the ground and excavate using cracks. Was building a tunnel.

【0003】[0003]

【発明が解決しようとする課題】したがって、施工効率
が低く、また、底床部を平坦に形成するのが面倒であっ
た。
Therefore, the construction efficiency is low, and it is troublesome to form the bottom floor portion flat.

【0004】本発明は施工効率を向上し、底床部の施工
を容易にしたトンネル工事におけるワイヤソーによる切
断方法を提供することを目的としている。
An object of the present invention is to provide a method of cutting with a wire saw in tunnel construction, which improves construction efficiency and facilitates construction of a bottom floor.

【0005】[0005]

【課題を解決するための手段】本発明による方法は、プ
ーリを介してワイヤソーを張った一対のアームを、地山
に穿孔した一対の孔に挿入し、該一対のアーム間のワイ
ヤソーに充分な張力を与えながら高速循環させ、該ワイ
ヤソーにより一対の孔間の岩盤を切断しながら、前記ア
ームを孔の奥に移動させて前記ワイヤソーにより地山に
切削面を形成することを特徴としている。
According to the method of the present invention, a pair of arms having a wire saw stretched through a pulley is inserted into a pair of holes drilled in the ground, and a wire saw between the pair of arms is sufficient. It is characterized in that it is circulated at high speed while applying tension, and while the rock between a pair of holes is cut by the wire saw, the arm is moved to the back of the hole and a cutting surface is formed in the ground by the wire saw.

【0006】上記ワイヤソーには、ダイヤモンド砥粒入
り焼結体リングを無数に装着したワイヤロープを用いる
のが好ましい。
For the wire saw, it is preferable to use a wire rope in which a number of sintered rings containing diamond abrasive grains are mounted.

【0007】[0007]

【作用】本発明においては、複数の孔間を連結する複数
切削面を形成し、これらの切削面により地山と削岩部と
を分離する。したがって、削岩部の岩盤は破砕し易く、
施工効率が向上される。
In the present invention, a plurality of cutting surfaces for connecting a plurality of holes are formed, and the ground surfaces and the rock cutting portion are separated by these cutting surfaces. Therefore, the rock mass of the rock drilling part is easy to crush,
Construction efficiency is improved.

【0008】また、切断断面で底床部が同時に形成さ
れ、省力化が図られる。
In addition, the bottom floor portion is formed at the same time in the cut cross section, which saves labor.

【0009】[0009]

【実施例】以下図面を参照して本発明の実施例を説明す
る。
Embodiments of the present invention will be described below with reference to the drawings.

【0010】図1及び図2には、本発明を実施する装置
が示されている。図示しないベースの前部(図面では右
側)には、一対の平行なアーム1a、1bが、図示しな
い手段で前後進自在に設けられている。
1 and 2 show an apparatus embodying the present invention. A pair of parallel arms 1a and 1b are provided at a front portion (right side in the drawing) of the base (not shown) so as to be able to move back and forth by means not shown.

【0011】そのベースの後部には、モータベース2が
図示しない手段で前後進自在に設けられている。このベ
ース2には、油圧モータ3が軸線を左右方向に向けて固
設され、その出力軸4には、ドライブプーリ5が固設さ
れている。
A motor base 2 is provided at the rear of the base so as to be able to move forward and backward by means not shown. A hydraulic motor 3 is fixed to the base 2 with its axis oriented in the left-right direction, and a drive pulley 5 is fixed to its output shaft 4.

【0012】他方、アーム1a、1bの前端には、それ
ぞれドリブンプーリ10、11とアイドラプーリ9、1
2とが設けられている。また、前記ベースには、複数の
アイドラプーリ6〜8、13〜16が立体的に設けられ
ている。
On the other hand, at the front ends of the arms 1a and 1b, driven pulleys 10 and 11 and idler pulleys 9 and 1 are provided, respectively.
2 and are provided. Further, a plurality of idler pulleys 6 to 8 and 13 to 16 are three-dimensionally provided on the base.

【0013】そして、これらのプーリ5〜16には、ワ
イヤソー17がプーリの符号の順に巻回され、例えばプ
ーリ5、16の位置を変化させて張力を調整できるよう
になっている。このワイヤソー17には、ダイヤモンド
砥粒入り焼結体リングを無数に装着し、鉄筋コンクリー
トや石材を切断するいわゆるダイヤモンドワイヤソーが
好適に用いられている。
A wire saw 17 is wound around these pulleys 5 to 16 in the order of the pulley signs, and the tension can be adjusted by changing the positions of the pulleys 5 and 16, for example. As the wire saw 17, a so-called diamond wire saw is preferably used, in which countless sintered body rings containing diamond abrasive grains are attached to cut reinforced concrete or stone material.

【0014】施工に際し、掘削する地山Aに対し図示の
例では一対の孔B1、B2を、発破孔やロックボルト孔
を形成するのに用いる図示しない穿孔機で穿孔する。
At the time of construction, a pair of holes B1 and B2 in the illustrated example are bored in the ground A to be excavated by a boring machine (not shown) used for forming a blast hole and a rock bolt hole.

【0015】次いで、アーム1a、1bの前端を孔B
1、B2に挿入し、アーム1a、1b間のワイヤソー1
7aに張力を与え、油圧モータ3を作動してワイヤソー
17を高速循環させる。すると、ワイヤソー17aによ
りアーム1a、1b間の地山Aは、直線状に切断され
る。
Next, the front ends of the arms 1a and 1b are attached to the holes B.
1, wire saw 1 between arms 1a and 1b
A tension is applied to 7a to operate the hydraulic motor 3 to circulate the wire saw 17 at high speed. Then, the ground A between the arms 1a and 1b is linearly cut by the wire saw 17a.

【0016】そこで、モータベース2を矢印の方向に移
動させながら、アーム1a、1bを前進させ、アーム1
a、1b間のワイヤソー17aにより図3に示すよう
に、地山Aに切削面Dを形成する。
Therefore, while moving the motor base 2 in the direction of the arrow, the arms 1a and 1b are moved forward to move the arm 1
As shown in FIG. 3, a cutting surface D is formed on the natural ground A by the wire saw 17a between a and 1b.

【0017】同様の手順で、切削面D1〜D9をトンネ
ル外形に沿って形成する。
By the same procedure, the cut surfaces D1 to D9 are formed along the outer shape of the tunnel.

【0018】このようにして、地山Aと削岩部Eとを切
削面D、D1〜D9で分断したのち、図示しないブレー
カ等の削岩機で削岩部Eを破砕すると、削岩部Eが容易
に崩壊し、トンネルが形成され、同時に切削面Dにより
平坦な底床が形成される。
In this way, if the rock mass A and the rock drilling portion E are divided by the cutting surfaces D and D1 to D9 and then the rock drilling portion E is crushed by a rock drilling machine such as a breaker (not shown), the rock drilling portion E is easily formed. And a tunnel is formed, and at the same time, a flat bottom floor is formed by the cutting surface D.

【0019】図4は、トンネル施工の実施態様を示し、
3個の切削面D、D1、D2で削岩部E1の掘削を容易
にした例である。
FIG. 4 shows an embodiment of tunnel construction,
This is an example in which excavation of the rock drilling portion E1 is facilitated by the three cutting surfaces D, D1, and D2.

【0020】図5も、トンネル施工の別の実施例を示
し、6個の切削面D、D1〜D5で削岩部E1、E2の
掘削を容易にした例である。
FIG. 5 also shows another embodiment of tunnel construction, which is an example in which excavation of rock drilling portions E1 and E2 is facilitated by six cutting surfaces D and D1 to D5.

【0021】図6ないし図8は、トンネル施工の別の実
施態様を示し、図6及び図7において、孔B1〜B7を
用いて切削面D、D1〜D4を形成したのち、アーム1
a、1bを孔B5、B7に挿入してワイヤソー17を切
削面D2、D3の最奥部に挿入する。次いで、ワイヤソ
ー17に張力を与えながらワイヤソー17を高速循環す
ると、ワイヤソー17が位置17A、17Bと移動して
削岩部奥に垂直切削面d1を形成される。
FIGS. 6 to 8 show another embodiment of tunnel construction. In FIGS. 6 and 7, after the cutting surfaces D and D1 to D4 are formed using the holes B1 to B7, the arm 1 is formed.
Insert a and 1b into the holes B5 and B7 and insert the wire saw 17 into the deepest part of the cutting surfaces D2 and D3. Then, when the wire saw 17 is circulated at a high speed while applying tension to the wire saw 17, the wire saw 17 moves to the positions 17A and 17B to form a vertical cutting surface d1 in the depth of the rock drilling portion.

【0022】次いで、図8及び図9に示すように、同様
にしてワイヤソー17を位置17Bから位置17Dに移
動し、垂直切削面d1に連続した垂直切削面d2を形成
する。この実施例では、切削面D、D1〜D4及び垂直
切削面d1、d2により、削岩部を地山から完全に分離
し、トンネル施工をより容易にすることができる。
Next, as shown in FIGS. 8 and 9, the wire saw 17 is similarly moved from the position 17B to the position 17D to form a vertical cutting surface d2 continuous with the vertical cutting surface d1. In this embodiment, the cut surfaces D, D1 to D4 and the vertical cut surfaces d1 and d2 allow the rock drilling portion to be completely separated from the natural ground, thereby facilitating tunnel construction.

【0023】[0023]

【発明の効果】以上説明したように本発明によれば、ト
ンネル施工効率を向上すると共に、底床部の施工を容易
にして省力化を図ることができる。
As described above, according to the present invention, it is possible to improve the tunnel construction efficiency, facilitate the construction of the bottom floor portion, and save labor.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明を実施する装置の一例を示す地山の平面
断面図。
FIG. 1 is a plan cross-sectional view of a natural ground showing an example of an apparatus for carrying out the present invention.

【図2】図1の垂直断面図。FIG. 2 is a vertical sectional view of FIG.

【図3】切削面で底床を形成する態様を説明する斜視
図。
FIG. 3 is a perspective view illustrating an aspect of forming a bottom floor with a cutting surface.

【図4】トンネル施工の一実施態様を説明する斜視図。FIG. 4 is a perspective view illustrating an embodiment of tunnel construction.

【図5】トンネル施工の別の実施態様を説明する斜視
図。
FIG. 5 is a perspective view illustrating another embodiment of tunnel construction.

【図6】トンネルの最奥部に垂直切削面を形成する態様
を説明する正面図。
FIG. 6 is a front view illustrating a mode in which a vertical cutting surface is formed at the innermost portion of the tunnel.

【図7】図6の斜視図。FIG. 7 is a perspective view of FIG.

【図8】図6の次の段階を説明する正面図。FIG. 8 is a front view illustrating the next stage of FIG.

【図9】図8の斜視図。9 is a perspective view of FIG.

【符号の説明】[Explanation of symbols]

A・・・地山 B・・・孔 D・・・切削面 E・・・削岩部 1a、1b・・・アーム 2・・・モータベース 3・・・油圧モータ 4・・・出力軸 5・・・ドライブプーリ 10、11・・・ドリブンプーリ 6〜9、12〜16・・・アイドラプーリ 17・・・ワイヤソー A ... Ground B ... Hole D ... Cutting surface E ... Rock drilling part 1a, 1b ... Arm 2 ... Motor base 3 ... Hydraulic motor 4 ... Output shaft 5 ... ..Drive pulleys 10, 11 ... Driven pulleys 6-9, 12-16 ... Idler pulleys 17 ... Wire saws

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 プーリを介してワイヤソーを張った一対
のアームを、地山に穿孔した一対の孔に挿入し、該一対
のアーム間のワイヤソーに充分な張力を与えながら高速
循環させ、該ワイヤソーにより一対の孔間の岩盤を切断
しながら、前記アームを孔の奥に移動させて前記ワイヤ
ソーにより地山に切削面を形成することを特徴とするト
ンネル工事におけるワイヤソーによる切断方法。
1. A pair of arms having a wire saw stretched through a pulley is inserted into a pair of holes drilled in the ground, and the wiresaw between the pair of arms is circulated at high speed while sufficient tension is applied to the wiresaw. A method for cutting with a wire saw in tunnel construction, characterized in that the arm is moved to the back of the hole and a cutting surface is formed in the natural ground by the wire saw while cutting the rock mass between the pair of holes by.
JP882895A 1995-01-24 1995-01-24 Cutting method by wire saw in tunnel work Pending JPH08199969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP882895A JPH08199969A (en) 1995-01-24 1995-01-24 Cutting method by wire saw in tunnel work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP882895A JPH08199969A (en) 1995-01-24 1995-01-24 Cutting method by wire saw in tunnel work

Publications (1)

Publication Number Publication Date
JPH08199969A true JPH08199969A (en) 1996-08-06

Family

ID=11703660

Family Applications (1)

Application Number Title Priority Date Filing Date
JP882895A Pending JPH08199969A (en) 1995-01-24 1995-01-24 Cutting method by wire saw in tunnel work

Country Status (1)

Country Link
JP (1) JPH08199969A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277889A (en) * 2006-04-05 2007-10-25 Taisei Corp Forepoling device for underground structure, and forepoling method
JP2010174542A (en) * 2009-01-30 2010-08-12 East Japan Railway Co Method for penetrating lining element into natural ground, and ground cutting device
KR101378081B1 (en) * 2012-08-23 2014-03-27 이동현 Cutting apparatus using wire saw
KR20160022177A (en) * 2014-08-19 2016-02-29 한국철도기술연구원 Tunnel excavation method for kerfing outer surface of tunnel for decreasing blasting vibration

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277889A (en) * 2006-04-05 2007-10-25 Taisei Corp Forepoling device for underground structure, and forepoling method
JP4641969B2 (en) * 2006-04-05 2011-03-02 大成建設株式会社 Underground structure receiving device and receiving method
JP2010174542A (en) * 2009-01-30 2010-08-12 East Japan Railway Co Method for penetrating lining element into natural ground, and ground cutting device
KR101378081B1 (en) * 2012-08-23 2014-03-27 이동현 Cutting apparatus using wire saw
KR20160022177A (en) * 2014-08-19 2016-02-29 한국철도기술연구원 Tunnel excavation method for kerfing outer surface of tunnel for decreasing blasting vibration

Similar Documents

Publication Publication Date Title
CH640028A5 (en) PROCEDURE AND EQUIPMENT FOR EXCAVING THE TRENCHES IN THE ROCK.
CN112145192A (en) Soft rock tunnel boring machine and construction method thereof
JPH08199969A (en) Cutting method by wire saw in tunnel work
JPS59138615A (en) Cutter bucket
JPH01223294A (en) Ring cutting machine
RU2209979C2 (en) Tunneling set
AU2007239126A1 (en) Cutting, drilling or grinding apparatus and method
JPH07243298A (en) Tunnel excavation construction method
JPH10205272A (en) Construction method of tunnel and widening method thereof
JP2797956B2 (en) Tunnel excavation method
JP2004225532A (en) Steel sheet pile driving method and auger drilling pile driver
JP2760476B2 (en) Rock tunnel excavation method
JPH07269266A (en) Excavation method and excavator using wire saw
CN201606078U (en) Toothed chain type stone cutting equipment
JP3821479B2 (en) Jackhammer
CN1164859C (en) Driving cutting device
CN2573676Y (en) Driving cutting device
CN109664411B (en) Wire saw for cutting underground construction profiles on rock
JPH0473324A (en) Borer for anchor work
CN214366074U (en) Soft rock tunnel boring machine
JP3364306B2 (en) Extrusion method of extruding tunnel
CN207919625U (en) A kind of miniature rock drilling device of excavator
SU1481410A1 (en) Cutting unit of machine for winning construction stone
CN106166800B (en) Mountain stone groover
JPS62296100A (en) Excavator