JPH0819716B2 JP13172590A JP13172590A JPH0819716B2 JP H0819716 B2 JPH0819716 B2 JP H0819716B2 JP 13172590 A JP13172590 A JP 13172590A JP 13172590 A JP13172590 A JP 13172590A JP H0819716 B2 JPH0819716 B2 JP H0819716B2
Authority
JP
Japan
Prior art keywords
reinforced concrete
column
beams
bars
precast reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP13172590A
Other languages
Japanese (ja)
Other versions
JPH0427037A (en
Inventor
征男 井崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP13172590A priority Critical patent/JPH0819716B2/en
Publication of JPH0427037A publication Critical patent/JPH0427037A/en
Publication of JPH0819716B2 publication Critical patent/JPH0819716B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明はプレキャスト鉄筋コンクリート柱梁の接合方
法に関する。
The present invention relates to a method for joining precast reinforced concrete column beams.

[従来の技術] 従来、プレキャスト鉄筋コンクリート柱梁の接合方法
としては、特開昭55−61632号、同57−21641号、同61−
151346号、特公昭53−22769号、同58−30459号、同60−
44459号、同62−32299号及び同63−20973号等に記載の
ものが知られている。
[Prior Art] Conventionally, as a method for joining precast reinforced concrete columns and beams, JP-A-55-61632, 57-21641, and 61-
151346, Japanese Patent Publication No. 53-22769, 58-30459, 60-
Those described in Nos. 44459, 62-32299, 63-20973, etc. are known.

[発明が解決しようとする課題] 上記従来の接合方法は何れも、プレキャスト鉄筋コン
クリート柱(以下、単に柱ということもある)の柱頭部
に架乗するプレキャスト鉄筋コンクリート梁(以下、単
に梁ということもある)の下端梁主筋露出端部を上方に
彎曲させ、該彎曲部を補強帯筋で囲繞したり、或いは相
対向する彎曲部を一組毎にループ筋や拘束金物等で拘束
嵌合し、さらに彎曲部全体を補強帯筋や円筒鋼管で囲繞
したりしていた。
[Problems to be Solved by the Invention] In any of the above-described conventional joining methods, a precast reinforced concrete beam (hereinafter, also simply referred to as a beam) may be mounted on a column head of a precast reinforced concrete column (hereinafter sometimes simply referred to as a column). ) The lower end beam main bar exposed end is bent upward, and the bent part is surrounded by a reinforcing band, or the opposing bent parts are restrained and fitted with loop streaks or restraint hardware for each pair, and The entire curved portion was surrounded by reinforcing stirrups and cylindrical steel pipes.

しかし前記従来の方法によると、柱頭部内において下
方梁主筋の定着が上向きに行われており、多数の鉄筋が
狭い範囲内で林立・錯綜する構成となるので、配筋作業
が容易ではなく施工効率が低いだけでなく、該柱頭部に
打設するコンクリートの充填性も低いので梁接合部強度
が低下するという欠点を有している。
However, according to the above-mentioned conventional method, the main reinforcement of the lower beam is set upward in the stigma, and a large number of rebars are forested / complexed within a narrow range. Not only is low, but also the filling property of the concrete placed on the column head is low, so that there is a drawback that the beam joint strength is reduced.

[発明の目的] そこで本発明の目的は、梁接合部である柱頭部の配筋
構造が簡単で、しかも高い梁主筋の定着性能を得ること
ができるプレキャスト鉄筋コンクリート柱梁の接合方法
を提供することにある。
[Object of the Invention] Therefore, an object of the present invention is to provide a method for joining precast reinforced concrete column beams, which has a simple reinforcement structure of the column heads, which are beam joints, and which can obtain high anchorage performance of the main beam reinforcement. It is in.

[課題を解決するための手段] 本発明者は、上記目的を達成するため鋭意検討を重ね
た結果、本発明に至ったものである。
[Means for Solving the Problems] The inventors of the present invention have reached the present invention as a result of extensive studies to achieve the above object.

即ち、本発明に係るプレキャスト鉄筋コンクリート柱
梁の接合方法は、鉄筋コンクリート柱の柱頭部に、少な
くとも2本のプレキャスト鉄筋コンクリート梁を相対向
するように架乗し、架乗後、該柱頭部にコンクリートを
打設するプレキャスト鉄筋コンクリート柱梁の接合方法
において、前記プレキャスト鉄筋コンクリート梁の梁主
筋露出端部にアンカープレートを各々予め固着してお
き、前記柱頭部に相対向するように架乗する際に、前記
アンカープレートを柱頭部の鉄筋コンクリート柱主筋の
内側に配設したロ形帯状の被係合プレートの対応する各
辺に引掛係合させることを特徴とする。
That is, the method for joining precast reinforced concrete column beams according to the present invention is such that at least two precast reinforced concrete beams are mounted on the column heads of the reinforced concrete columns so as to face each other, and after the mounting, concrete is applied to the column heads. In the method of joining precast reinforced concrete column beams to be installed, anchor plates are preliminarily fixed to the exposed ends of the beam main bars of the precast reinforced concrete beams, respectively, and the anchor plates are mounted on the pillar heads so as to face each other. Is engaged with each corresponding side of a square-shaped strip-shaped engaged plate arranged inside the reinforced concrete column main bar of the column head.

また本発明に係るプレキャスト鉄筋コンクリート柱梁
の接合方法の好ましい実施態様は、前記ロ形帯状の被
係合プレートを梁主筋よりも高強度の材質によって形成
すること、前記ロ形帯状の被係合プレートの内側を角
棒及び/又は丸棒の鉄筋を格子状に配設して補強したこ
と、前記角棒及び/又は丸棒の鉄筋を、梁主筋よりも
高強度の材質によって形成すること、である。
A preferred embodiment of the method for joining precast reinforced concrete column beams according to the present invention is to form the plate-shaped strip-shaped engaged plate with a material having a strength higher than that of the beam main bar. The reinforcing bars of the rectangular bars and / or round bars arranged in a grid pattern on the inner side of the bar, and the reinforcing bars of the rectangular bars and / or round bars are formed of a material having higher strength than the beam main bar. is there.

[作 用] 本発明によれば、梁を、柱頭部に相対向するように架
乗する際、該梁の梁主筋露出端部に糊着したアンカープ
レートを、柱頭部の鉄筋コンクリート柱主筋の内側に配
設したロ形帯状の被係合プレートの対応する各辺に互い
に引掛係合させることにより、通し筋等を配筋すること
なく相対向する梁の梁主筋が結合される。
[Operation] According to the present invention, when the beam is mounted on the column head so as to face each other, an anchor plate glued to the exposed end of the beam main bar of the beam is attached to the inside of the reinforced concrete column main bar of the column head. The beam main bars of the beams facing each other are coupled to each other by hooking and engaging with the corresponding sides of the square-shaped plate to be engaged, which are arranged in the above.

本発明の接合方法による柱頭部における配筋構造は極
めて簡単な構造であり、且つ梁主筋露出端部へのアンカ
ープレートの固着やロ形帯状の被係合プレートの製造は
現場への搬入前に予め準備可能であるため、容易且つ迅
速な現場での配筋作業が可能となり、しかもコンクリー
トの充填性が良好であるので、施工期間を短縮できる。
The bar arrangement structure in the stigma by the joining method of the present invention is a very simple structure, and the anchor plate is fixed to the exposed end of the beam main bar and the manufacture of the square-shaped engaged plate is carried out before carrying it to the site. Since preparation is possible in advance, it is possible to easily and swiftly perform on-site rebar work, and since the concrete can be filled well, the construction period can be shortened.

また、被係合プレートの内側を鉄筋を格子状に配設し
て補強すれば、柱梁接合部強度をより高めることができ
る。
Further, by arranging reinforcing bars inside the engaged plate to reinforce it, the strength of the beam-column joint can be further increased.

さらに、被係合プレート(補強鉄筋を配設した場合に
は該補強鉄筋を含む)を、梁主筋よりも高強度の材質に
よって形成すれば、柱梁接合部内で梁主筋の降伏が生じ
ないので梁主筋の柱梁接合部からの伸び出しを防止で
き、架構の復元力特性を改善することができる。
Further, if the engaged plate (including the reinforcing bar when the reinforcing bar is provided) is made of a material having higher strength than the beam main bar, the beam main bar will not yield in the beam-column joint. It is possible to prevent the main beam reinforcement from extending from the beam-column joint, and improve the restoring force characteristics of the frame.

[実施例] 以下、本発明の実施例を添付図面に基き説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the accompanying drawings.

第1図及び第2図は本発明の方法によって施工された
プレキャスト鉄筋コンクリート柱梁の接合部を示す図で
あり、第1図は横断面図、第2図は縦断面図である。ま
た、第3図は鉄筋コンクリート梁の梁主筋露出端部とロ
形帯状の被係合プレートとの係合状態を説明する概略斜
視図である。
1 and 2 are views showing a joint portion of a precast reinforced concrete column beam constructed by the method of the present invention, FIG. 1 is a transverse sectional view, and FIG. 2 is a longitudinal sectional view. Further, FIG. 3 is a schematic perspective view for explaining an engagement state between the exposed end portion of the beam main bar of the reinforced concrete beam and the plate-shaped engaged plate having a square shape.

第1図及び第2図において、1はプレキャスト鉄筋コ
ンクリート柱若しくは現場打ち鉄筋コンクリート柱であ
り、該柱1頭部にプレキャスト鉄筋コンクリート梁2,3
を架乗して接合するものであり、梁2,3架乗後、柱1頭
部にコンクリート4を打設する。図中、5は柱主筋、6
は該柱主筋5の柱補強帯筋である。
In FIGS. 1 and 2, 1 is a precast reinforced concrete column or cast-in-place reinforced concrete column, and the precast reinforced concrete beam 2, 3 is attached to the head of the column.
Is mounted and joined. After mounting the beams 2 and 3, concrete 4 is placed on the head of the pillar. In the figure, 5 is the main pillar, 6
Is a column reinforcing strip of the column main reinforcement 5.

梁2の上方梁主筋7及び下方梁主筋8、並びに梁3の
上方梁主筋9及び下方梁主筋10の、各々の露出端部には
予め、例えば、工場等でアンカープレート11が固着され
ている(第3図参照)。
An anchor plate 11 is fixed in advance to each exposed end of the upper beam main bar 7 and the lower beam main bar 8 of the beam 2 and the upper beam main bar 9 and the lower beam main bar 10 of the beam 3, for example, in a factory. (See Figure 3).

梁主筋7〜10の露出端部へのアンカープレート11の固
着は、十分な強度が得られればどのような手段によって
もよく、例えば、 溶接によって固着する、 アンカープレート11に雌螺子を有する透孔を形成し、
露出端部に雄螺子を形成し、前記透孔に露出端部を螺合
して固着する、 アンカープレート11に透孔を形成し、該透孔に露出端
部を挿通した後、該端部にナットを螺合して固着する、 アンカープレート11に透孔を形成し、該透孔に露出端
部を挿通した後、該端部を折曲げて固着する、 等の手段が挙げられる。
The anchor plate 11 may be fixed to the exposed ends of the beam main bars 7 to 10 by any means as long as sufficient strength can be obtained. For example, the anchor plate 11 is fixed by welding. To form
A male screw is formed on the exposed end, and the exposed end is screwed and fixed to the through hole. A through hole is formed on the anchor plate 11, and the exposed end is inserted into the through hole, and then the end is inserted. Means such as screwing and fixing a nut on the anchor plate, forming a through hole in the anchor plate 11, inserting the exposed end portion into the through hole, and then bending and fixing the end portion can be used.

尚、図中、凹部12はアンカープレート11を後述する被
係合プレート13に係合した際に、被係合プレート13が内
側に格子鉄筋15を配設して補強したものである場合、補
強鉄筋15が入りこむためのものである。尚また、被係合
プレート13が補強鉄筋15によって補強されていない場合
には凹部12は不要であることは言うまでもない。
In the figure, the recessed portion 12 is reinforced when the anchor plate 11 is engaged with the engaged plate 13 described later and the engaged plate 13 is reinforced by arranging the lattice reinforcing bars 15 inside. It is for the rebar 15 to enter. Needless to say, the recess 12 is not necessary when the engaged plate 13 is not reinforced by the reinforcing bar 15.

柱1頭部の柱主筋5の内側には、梁2,3を柱1頭部に
架乗した際に梁主筋7〜10の露出端部に固着した前記ア
ンカープレート11を引掛係合して接合するためのロ形帯
状の被係合プレート13が配設されている。該被係合プレ
ート13の各辺には、アンカープレート11を引掛係合した
際に、梁主筋7〜10が入りこむ凹部14が形成されてい
る。また該被係合プレート13の内側には、補強鉄筋15を
格子状に配設することにより補強が施されている。該補
強鉄筋15は、図示の丸棒に限らず、角棒でもよいし、両
者の混合であってもよい。格子の間隔は、コンクリート
打設時の充填性を損なわない程度の間隔、例えば、梁主
筋7〜10と同程度の間隔が好ましい。被係合プレート13
への補強帯筋15の固着としては、梁主筋7〜10の露出端
部へのアンカープレート11の固着と同様の方法による
他、一体成型によってもよい。尚、被係合プレート13
(補強鉄筋15を配設した場合には該補強鉄筋15を含む)
の強度は、柱梁接合部からの伸び出しの防止及び架構の
復元力特性の向上のために、梁主筋7〜10よりも高強度
とする。
The anchor plate 11 fixed to the exposed ends of the beam main bars 7 to 10 is hooked and engaged with the inside of the column main bar 5 of the head of the column when the beams 2 and 3 are mounted on the head of the column. A square band-shaped engaged plate 13 for joining is provided. Each side of the engaged plate 13 is formed with a recess 14 into which the beam main bars 7 to 10 enter when the anchor plate 11 is hooked and engaged. The inside of the engaged plate 13 is reinforced by arranging reinforcing reinforcing bars 15 in a grid pattern. The reinforcing bar 15 is not limited to the illustrated round bar, but may be a square bar or a mixture of both. The spacing between the lattices is preferably a spacing that does not impair the filling property when pouring concrete, for example, a spacing similar to that of the beam main bars 7-10. Engaged plate 13
The reinforcing strips 15 may be fixedly attached to the reinforcing plate 15 by the same method as the fixing of the anchor plate 11 to the exposed ends of the beam main bars 7 to 10, or by integral molding. The engaged plate 13
(Including the reinforcing bar 15 when the reinforcing bar 15 is provided)
In order to prevent the extension from the beam-column joint and to improve the restoring force characteristics of the frame, the strength of is higher than that of the beam main bars 7 to 10.

以上のような構成を有する被係合プレート13に前記ア
ンカープレート11を引掛係合することにより、柱1頭部
に梁2,3を接合し、通し筋等を配筋することなく相対向
する梁の梁主筋7〜10が結合される。
By hooking and engaging the anchor plate 11 with the engaged plate 13 having the above-described structure, the beams 2 and 3 are joined to the head of the column 1 and face each other without arranging the through bars or the like. The beam main bars 7 to 10 of the beam are connected.

本発明の接合方法による柱1頭部における配筋構造
は、従来のものに比して極めて簡単な構造であり、且つ
梁主筋7〜10の露出端部へのアンカープレート11の固着
やロ形帯状の被係合プレート13の製造は現場への搬入前
に予め準備可能であるため、容易且つ迅速な現場での背
筋作業が可能となり、しかもコンクリートの充填性が良
好であるので、施工期間を短縮化できる。
The bar arrangement structure at the head of the column by the joining method of the present invention is extremely simpler than the conventional structure, and the anchor plate 11 is fixed to the exposed end portions of the beam main bars 7 to 10 or the square shape. Since the strip-shaped engaged plate 13 can be prepared in advance before it is brought into the site, it is possible to perform the spine work easily and quickly at the site, and since the filling property of concrete is good, the construction period can be shortened. Can be shortened.

以上、本発明の一実施例について第1図〜第3図に基
き説明したが、本実施例では、4本の梁を十字状に柱1
頭部に架乗(柱1に接合)する場合について説明した
が、本発明はこれに限定されず、架乗する梁の本数及び
架乗位置が本実施例とは異る場合においても適用し得る
ものである。
Although one embodiment of the present invention has been described above with reference to FIGS. 1 to 3, in the present embodiment, four beams are formed into a cross-shaped pillar 1.
The case of mounting on the head (joining to the pillar 1) has been described, but the present invention is not limited to this, and the present invention can be applied to the case where the number of beams to be mounted and the mounting position are different from those of the present embodiment. I will get it.

[発明の効果] 本発明の接合方法による柱頭部における配筋構造は極
めて簡単な構造で高い梁主筋の定着性能を得ることがで
き、且つ梁主筋露出端部へのアンカープレートの固着や
ロ形帯状の被係合プレートの製造は現場への搬入前に予
め準備可能であるため、容易且つ迅速な現場での配筋作
業が可能となり、しかもコンクリートの充填性が良好で
あるので、施工期間を短縮できる。
[Advantages of the Invention] The bar arrangement structure in the stigma by the joining method of the present invention is an extremely simple structure and can obtain a high anchorage performance of the beam main bar, and the anchor plate is fixed to the exposed end of the beam main bar or the square shape. Since the belt-shaped engaged plate can be manufactured in advance before it is brought into the site, it is possible to easily and quickly perform the bar arrangement work on the site, and because the concrete filling property is good, the construction period can be shortened. Can be shortened.

また、被係合プレートの内側を鉄筋を格子状に配設し
て補強すれば、柱梁接合部強度をより高めることができ
る。
Further, by arranging reinforcing bars inside the engaged plate to reinforce it, the strength of the beam-column joint can be further increased.

さらに、被係合プレート(補強鉄筋を配設した場合に
は該補強鉄筋を含む)を、梁主筋よりも高強度の材質に
よって形成すれば、柱梁接合部内で梁主筋の降伏が生じ
ないので梁主筋の柱梁接合部からの伸び出しを防止で
き、架構の復元力特性を改善することができる。
Further, if the engaged plate (including the reinforcing bar when the reinforcing bar is provided) is made of a material having higher strength than the beam main bar, the beam main bar will not yield in the beam-column joint. It is possible to prevent the main beam reinforcement from extending from the beam-column joint, and improve the restoring force characteristics of the frame.

【図面の簡単な説明】[Brief description of drawings]

第1図及び第2図は本発明の方法によって施工されたプ
レキャスト鉄筋コンクリート柱梁の接合部を示す図であ
り、第1図は横断面図、第2図は縦断面図である。ま
た、第3図は鉄筋コンクリート梁の梁主筋露出端部の係
合状態を説明する概略斜視図である。 1:柱 2,3:梁 4:コンクリート 5:柱主筋 6:柱補強帯筋 7,9:上方梁主筋 8,10:下方梁主筋 11:アンカープレート 12:凹部 13:ロ形帯状の被係合プレート 14:凹部 15:補強鉄筋
1 and 2 are views showing a joint portion of a precast reinforced concrete column beam constructed by the method of the present invention, FIG. 1 is a transverse sectional view, and FIG. 2 is a longitudinal sectional view. Further, FIG. 3 is a schematic perspective view for explaining an engaged state of the exposed end portion of the beam main bar of the reinforced concrete beam. 1: Pillars 2, 3: Beams 4: Concrete 5: Column reinforcements 6, Column reinforcement bars 7, 9: Upper beam reinforcements 8, 10: Lower beam reinforcements 11: Anchor plate 12: Recesses 13: B-shaped strip Composite plate 14: Recess 15: Reinforcing bar

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】鉄筋コンクリート柱の柱頭部に、少なくと
も2本のプレキャスト鉄筋コンクリート梁を相対向する
ように架乗し、架乗後、該柱頭部にコンクリートを打設
するプレキャスト鉄筋コンクリート柱梁の接合方法にお
いて、前記プレキャスト鉄筋コンクリート梁の梁主筋露
出端部にアンカープレートを各々予め固着しておき、前
記柱頭部に相対向するように架乗する際に、前記アンカ
ープレートを柱頭部の鉄筋コンクリート柱主筋の内側に
配設したロ形帯状の被係合プレートの対応する各辺に引
掛係合させることを特徴とするプレキャスト鉄筋コンク
リート柱梁の接合方法。
1. A method for joining precast reinforced concrete column beams, wherein at least two precast reinforced concrete beams are mounted on the column heads of the reinforced concrete columns so as to face each other, and after the mounting, concrete is placed on the column heads. , Anchor plates are pre-fixed to the exposed ends of the beam main bars of the precast reinforced concrete beams respectively, and when the anchor plates are mounted so as to face the column heads, the anchor plates are placed inside the reinforced concrete column bars of the column heads. A method for joining precast reinforced concrete column beams, which comprises hooking and engaging each of the corresponding sides of the arranged square-shaped strip-shaped engaged plates.
【請求項2】前記ロ形帯状の被係合プレートを梁主筋よ
りも高強度の材質によって形成することを特徴とする請
求項1記載のプレキャスト鉄筋コンクリート柱梁の接合
方法。
2. The method for joining precast reinforced concrete column beams according to claim 1, wherein the engaged plate in the shape of a strip is made of a material having a strength higher than that of the main beam.
【請求項3】前記ロ形帯状の被係合プレートの内側を角
棒及び/又は丸棒の鉄筋を格子状に配設して補強したこ
とを特徴とする請求項1又は2記載のプレキャスト鉄筋
コンクリート柱梁の接合方法。
3. The precast reinforced concrete according to claim 1, wherein the inner side of the plate-shaped band-shaped engaged plate is reinforced by arranging the reinforcing bars of square bars and / or round bars in a grid pattern. How to join columns and beams.
【請求項4】前記角棒及び/又は丸棒の鉄筋を、梁主筋
よりも高強度の材質によって形成することを特徴とする
請求項3記載のプレキャスト鉄筋コンクリート柱梁の接
合方法。
4. The method for joining precast reinforced concrete column beams according to claim 3, wherein the reinforcing bars of the square bars and / or round bars are formed of a material having a strength higher than that of the beam main bars.
JP13172590A 1990-05-21 1990-05-21 How to join precast reinforced concrete columns and beams Expired - Lifetime JPH0819716B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13172590A JPH0819716B2 (en) 1990-05-21 1990-05-21 How to join precast reinforced concrete columns and beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13172590A JPH0819716B2 (en) 1990-05-21 1990-05-21 How to join precast reinforced concrete columns and beams

Publications (2)

Publication Number Publication Date
JPH0427037A JPH0427037A (en) 1992-01-30
JPH0819716B2 true JPH0819716B2 (en) 1996-02-28

Family

ID=15064740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13172590A Expired - Lifetime JPH0819716B2 (en) 1990-05-21 1990-05-21 How to join precast reinforced concrete columns and beams

Country Status (1)

Country Link
JP (1) JPH0819716B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020034133A (en) * 2002-04-11 2002-05-08 원대연 C-magic system for connecting precast prestressed concrete members
KR101020865B1 (en) * 2008-06-03 2011-03-09 동국대학교 산학협력단 Dry Beam-Column Connection of Precast Concrete Members within the Extended Limitation of Construction Tolerances
JP5755969B2 (en) * 2011-08-15 2015-07-29 Jfeスチール株式会社 Joint structure of load support and support
JP5715528B2 (en) * 2011-08-15 2015-05-07 Jfeスチール株式会社 Joint structure of load support and support
ES2623461T3 (en) * 2014-07-07 2017-07-11 Fundación Tecnalia Research & Innovation Connection device with dry joint between beams and prefabricated reinforced concrete pillars

Also Published As

Publication number Publication date
JPH0427037A (en) 1992-01-30

Similar Documents

Publication Publication Date Title
JP2000170285A (en) Connecting method for steel sheet concrete structural wall and junction structure
JP4264916B2 (en) End RC steel beam
JP2001342679A (en) CONNECTING METHOD FOR PCa BEAM MEMBER AT COLUMN/BEAM JUNCTION AND PCa BEAM MEMBER FOR IT
JPH0819716B2 (en) How to join precast reinforced concrete columns and beams
JP3772247B2 (en) Seismic reinforcement method for bending of existing large beams
JPH0711156B2 (en) Method for joining reinforced concrete columns and steel beams
JP4068398B2 (en) Underground structure
JPH0868113A (en) Connecting structure for steel beam and reinforced concrete beam
CN218493132U (en) Assembled concrete column indulges muscle positioner
JPH1150468A (en) Pc concrete strip footing and installation method thereof
JP2622727B2 (en) RC precast earthquake-resistant wall
JP7313770B2 (en) Beam reinforcement structure, structure for beam reinforcement, steel frame structure, and beam reinforcement method
JPS6029524Y2 (en) Three-dimensional truss joint hardware
JPH0833024B2 (en) How to join precast reinforced concrete columns and beams
JPH01187237A (en) Method for beam-column joining in precast reinforced concrete structure
JP2709893B2 (en) Three-dimensional structure using frame structure of arbitrary strength
JPH0449253Y2 (en)
JP2022061695A (en) Joint structure between reinforced concrete column and steel beam
JPH02236328A (en) Construction method for super-highrice building
JP3749935B2 (en) Column and beam construction method and enclosure
JP2000204674A (en) Column-beam joining part of column of steel pipe structure or filled steel pipe concrete structure and beam of src structure
JPH0449254Y2 (en)
JPH0443131B2 (en)
JPS6251335B2 (en)
JPH05311673A (en) Foundation construction method for building