Info

Publication number
JPH08189230A
JPH08189230A JP19095A JP19095A JPH08189230A JP H08189230 A JPH08189230 A JP H08189230A JP 19095 A JP19095 A JP 19095A JP 19095 A JP19095 A JP 19095A JP H08189230 A JPH08189230 A JP H08189230A
Authority
JP
Japan
Prior art keywords
pile
lower frame
concrete block
mortar
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP19095A
Other languages
Japanese (ja)
Inventor
Kei Tanimoto
圭 谷本
Norimasa Bando
典正 板東
Tokuji Kimura
督司 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP19095A priority Critical patent/JPH08189230A/en
Publication of JPH08189230A publication Critical patent/JPH08189230A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Fencing (AREA)

Abstract

PURPOSE: To provide the foundation with a short period of construction by placing a concrete block on a levelled lower frame, and uniting the concrete block and a pile into one body by a cement hardening body. CONSTITUTION: Plural bolts are driven along the longitudinal foundation to be formed in such a manner that the bolt fitting parts 11 of the pile upper end part are positioned above the bottom of a groove 15, and in some case, the fastening positions of nuts 14 are adjusted to adjust the lateral projecting length of the horizontal rod parts of the bolts 11 over the pile 1 so that the longitudinal rod parts 10 of the bolts 11 are positioned on a straight line part. Subsequently, a formwork is erected in the groove 15 in such a manner as to surround the projected part of the upper end part of the pile 1 above the bottom of the groove 15, mortar is filled in such a manner that the longitudinal rod part 10 is projected above, and in such a condition, a lower frame 3 is installed on the upper part. Subsequently, the fastening positions of the nuts 19 are adjusted to adjust the level of the lower frame 3, a concrete block 5 is placed on the lower frame, and mortar is poured from an upper opening of a vertically pierced hole part 6 to be filled in a clearance among the previously filled mortar, the lower frame 3 and the concrete block 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、フェンスなどの基礎の
構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation structure such as a fence.

【0002】[0002]

【従来の技術】従来、フェンスなどの基礎は、地面を掘
って溝を形成し、この溝の底に栗石を敷き、その上に捨
てコンクリートを打ち、捨てコンクリートを養生し、捨
てコンクリートが硬化した後、捨てコンクリートの上に
基礎コンクリートを打設し、基礎コンクリートの上にモ
ルタルを盛り、この上にコンクリートブロックを載設
し、この際に、水糸を引いて一つ一つのコンクリートブ
ロックのレベル出しをしながら施工する必要があった。
この一つ一つのコンクリートブロックのレベル出しに当
たっては、基礎コンクリートとコンクリートブロックと
の間に介在するモルタルの量を調整することで、高さ調
整をしていた。
2. Description of the Related Art Conventionally, foundations such as fences have been formed by digging the ground to form a groove, laying stones on the bottom of the groove, striking concrete on it, curing the concrete, and hardening the concrete. After that, the basic concrete is placed on the discarded concrete, the mortar is piled on the basic concrete, and the concrete block is placed on this. At this time, pulling the water thread, the level of each individual concrete block. It was necessary to construct it while taking it out.
In leveling each of these concrete blocks, the height was adjusted by adjusting the amount of mortar interposed between the basic concrete and the concrete block.

【0003】[0003]

【発明が解決しようとする課題】上記のような従来例に
あっては、捨てコンクリートの養生硬化、基礎コンクリ
ートの養生硬化が必要で、基礎コンクリートが硬化する
までコンクリートブロックの施工ができず、施工に長期
間を要するという問題があり、また、コンクリートブロ
ックのレベル出しに当たって、基礎コンクリートとコン
クリートブロックとの間に介在するモルタルの量を調整
しながら一つ一つのコンクリートブロックのレベル出し
をするので、レベル出し作業が面倒であり、また、レベ
ル出し後、モルタルが硬化するまでの間にコンクリート
ブロックに外力が加わると、コンクリートブロックが沈
んだりしてレベルが正確に出ない場合があるという問題
があった。
In the above-mentioned conventional examples, it is necessary to cure the waste concrete and the basic concrete, and the concrete block cannot be constructed until the basic concrete is hardened. There is a problem that it takes a long time to level, and when leveling concrete blocks, leveling each individual concrete block while adjusting the amount of mortar interposed between the basic concrete and the concrete block, Leveling work is troublesome, and if an external force is applied to the concrete block after leveling and before the mortar hardens, the concrete block may sink and the level may not be accurate. It was

【0004】本発明は上記の従来例の問題点に鑑みて発
明したものであって、その目的とするところは、捨てコ
ンクリート、基礎コンクリートを必要とせず、施工期間
が短く、正確にレベルが出せる基礎の構造を提供するに
ある。
The present invention was invented in view of the above-mentioned problems of the prior art, and its purpose is to eliminate waste concrete and foundation concrete, to shorten the construction period and to accurately level. In providing the foundation structure.

【0005】[0005]

【課題を解決するための手段】上記従来例の問題点を解
決して本発明の目的を達成するため、本発明の基礎の構
造は、地中に打ち込まれた杭1と、該杭1に高さ調整機
能を有する連結手段2により連結された下枠3と、下枠
3に載置されて杭1とセメント系硬化体4により一体化
されたコンクリートブロック5とで構成されたものであ
る。
In order to solve the problems of the above-mentioned conventional example and to achieve the object of the present invention, the structure of the foundation of the present invention is a pile 1 driven into the ground and the pile 1. It is composed of a lower frame 3 connected by a connecting means 2 having a height adjusting function, and a concrete block 5 placed on the lower frame 3 and integrated with a pile 1 and a cement-based hardening body 4. .

【0006】また、コンクリートブロック5に設けられ
た孔部6から杭1に設けた上方が開口した孔7にわたっ
て充填されたセメント系硬化体4と、コンクリートブロ
ック5に設けられた孔部6から杭1に設けた孔7にわた
るようにセメント系硬化体4内に埋設された鉄筋8とを
備えることも好ましい。また、横棒部9と縦棒部10と
からなるL状をしたボルト11により連結手段2を構成
し、該L状をしたボルト11の横棒部9を杭1の上端部
に挿通して縦棒部10の杭1からの横方向の突出長さを
調整自在に取付け、下枠3に設けた挿通孔12に縦棒部
10を挿通して縦棒部10に下枠3を高さ調整自在に取
付けることも好ましい。
[0006] Further, the cement type hardened body 4 filled from the hole 6 provided in the concrete block 5 to the hole 7 opened upward in the pile 1 and the hole 6 provided in the concrete block 5 to the pile. It is also preferable to provide a reinforcing bar 8 embedded in the cement-based hardened body 4 so as to extend over the hole 7 formed in the first hardened body 1. Further, the connecting means 2 is configured by the L-shaped bolt 11 including the horizontal rod portion 9 and the vertical rod portion 10, and the horizontal rod portion 9 of the L-shaped bolt 11 is inserted into the upper end portion of the pile 1. The length of the vertical bar portion 10 protruding from the pile 1 in the lateral direction is adjustably attached, and the vertical bar portion 10 is inserted into the through hole 12 provided in the lower frame 3 so that the vertical frame portion 10 has a lower frame 3 height. Adjustable mounting is also preferable.

【0007】[0007]

【作用】上記のような構成の本発明によれば、地中に杭
1を打ち込み、下枠3を杭1に連結手段2により高さを
調整しながら連結することで、下枠3のレベルを出し、
このレベル出しをした下枠3の上にコンクリートブロッ
ク5を載せ、セメント系硬化体4によりコンクリートブ
ロック5と杭1とを一体化することで基礎を構成できる
ものである。このようにレベル出しをした下枠3の上に
コンクリートブロック5を載置することで、コンクリー
トブロック5の載置作業時にレベル出しをする必要がな
く、またセメント系硬化体4が硬化する前でもコンクリ
ートブロック5が沈んだりすることがないようになって
いる。そして、杭1とコンクリートブロック5とをセメ
ント系硬化体4で一体化することで、確実に安定してコ
ンクリートブロック5からの荷重を支持でき、この結
果、従来のように栗石を敷き、捨てコンクリートを打
ち、基礎コンクリートを打つという構造にする必要がな
くなったものである。
According to the present invention having the above-described structure, the pile 1 is driven into the ground, and the lower frame 3 is connected to the pile 1 while adjusting the height thereof by the connecting means 2. Put out
The concrete block 5 is placed on the leveled lower frame 3, and the concrete block 5 and the pile 1 are integrated by the cement-based hardened body 4 to form a foundation. By placing the concrete block 5 on the leveled lower frame 3 in this manner, it is not necessary to level the concrete block 5 during the placing work, and even before the cement-based hardened body 4 is hardened. The concrete block 5 does not sink. Then, by integrating the pile 1 and the concrete block 5 with the cement-based hardened body 4, it is possible to reliably and stably support the load from the concrete block 5, and as a result, lay stones as in the past and discard concrete. It is no longer necessary to make a structure of hitting concrete and hitting concrete.

【0008】また、コンクリートブロック5に設けられ
た孔部6から杭1に設けた上方が開口した孔7にわたっ
て充填されたセメント系硬化体4と、コンクリートブロ
ック5に設けられた孔部6から杭1に設けた孔7にわた
るようにセメント系硬化体4内に埋設された鉄筋8とを
備えることで、コンクリートブロック5が杭1に確実且
つ強固に一体化されるものである。
[0008] Further, the cement type hardened body 4 filled from the hole 6 provided in the concrete block 5 to the hole 7 opened upward in the pile 1 and the hole 6 provided in the concrete block 5 from the pile 6 The concrete block 5 is reliably and firmly integrated with the pile 1 by providing the reinforcing bar 8 embedded in the cement-based hardened body 4 so as to extend over the hole 7 provided in the pile 1.

【0009】また、横棒部9と縦棒部10とからなるL
状をしたボルト11により連結手段2を構成し、該L状
をしたボルト11の横棒部9を杭1の上端部に挿通して
縦棒部10の杭1からの横方向の突出長さを調整自在に
取付け、下枠3に設けた挿通孔12に縦棒部10を挿通
して縦棒部10に下枠3を高さ調整自在とすることで、
連結手段2の構成が簡略化し、また、杭1の打ち込みの
程度が異なっていても下枠3のレベル出しが容易に行
え、また、杭1の打ち込み位置が巾方向にずれていても
下枠3の巾方向の連結位置を調整できることになる。
Further, L consisting of a horizontal bar portion 9 and a vertical bar portion 10
The connecting means 2 is constituted by the bolts 11 in the shape of L, and the horizontal bar portion 9 of the L-shaped bolts 11 is inserted into the upper end portion of the pile 1 so that the length of the vertical bar portion 10 projecting in the lateral direction from the pile 1 is increased. By adjusting the height of the lower frame 3 so that the lower frame 3 can be freely adjusted by inserting the vertical bar portion 10 into the insertion hole 12 provided in the lower frame 3,
The structure of the connecting means 2 is simplified, and the leveling of the lower frame 3 can be easily performed even if the piles 1 are driven in different degrees, and even if the driving position of the piles 1 is displaced in the width direction, the lower frame is used. The connection position in the width direction of 3 can be adjusted.

【0010】[0010]

【実施例】本発明を以下添付図面に示す実施例に基づい
て詳述する。杭1は金属製であり、金属パイプなどの下
端部に先端が尖った底蓋等を設けて構成してあり、内部
に孔7が設けてあって、該孔7は上方に開口している。
杭1の上端部には上下に2段に横孔13が設けてある。
この横孔13には横棒部9と縦棒部10とからなるL状
をしたボルト11の横棒部9が挿通してあり、横棒部9
に螺合したナット14により固定してある。ここで、図
3に示すように、杭1の上端部に上下2段に取付けたL
状をしたボルト11は上のボルト11の縦棒部10と下
のボルト11の縦棒部10とが杭1を挟んで両側に位置
し且つ縦棒部11が上方を向くように取付けるものであ
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the embodiments shown in the accompanying drawings. The pile 1 is made of metal, and is configured by providing a bottom lid or the like with a sharp tip at a lower end portion of a metal pipe or the like, and a hole 7 is provided inside, and the hole 7 is opened upward. .
At the upper end of the pile 1, horizontal holes 13 are provided in two steps, one above the other.
A horizontal rod portion 9 of an L-shaped bolt 11 including a horizontal rod portion 9 and a vertical rod portion 10 is inserted through the horizontal hole 13, and the horizontal rod portion 9
It is fixed by a nut 14 that is screwed into. Here, as shown in FIG. 3, L attached to the upper end of the pile 1 in two steps
The bolts 11 having a shape are mounted so that the vertical bar portion 10 of the upper bolt 11 and the vertical bar portion 10 of the lower bolt 11 are located on both sides of the pile 1 and the vertical bar portion 11 faces upward. is there.

【0011】杭1は地盤28を掘削した溝15の底から
地中に打ち込むものであり、この場合、図1に示すよう
に杭1の上端部のボルト11の取付け部分が溝15の底
よりも上方に位置するように杭1を打ち込むものであ
る。溝15の掘削に当たっては形成すべき基礎の長手方
向に渡って浅い溝を形成し、この浅い溝の一部を部分的
に少し深く形成し、杭1は部分的に深く形成した溝15
の底に打ち込みものである。なお、溝15の形成に当た
り、浅い溝を形成することなく、杭1打ちを行う部分の
みに溝15を形成するようにしてもよい。いずれにし
ろ、基礎コンクリートを打設するために形成すべき基礎
の全長にわたって深い溝を掘る従来例に比べると掘削量
が少なくて済むものである。ここで、杭1は形成すべき
基礎の長手方向のセンター線に相当する位置に沿って複
数本打ち込むのであるが、杭1の打ち込み位置が上記セ
ンター線に直角な方向にずれている場合、ナット14の
締め付け位置を調整して杭1からのボルト11の横棒部
9の横方向への突出長さを調整し、複数本の杭1に取付
けたボルト11の縦棒部10が一直線上に位置するよう
にする。なお、上記説明では杭1にボルト11を取付け
た状態で杭1を打ち込んだ例を示しているが、杭1を打
ち込んだ後に杭1にボルト11を取付けるようにしても
よい。
The pile 1 is driven into the ground from the bottom of the groove 15 excavated in the ground 28. In this case, the mounting portion of the bolt 11 at the upper end of the pile 1 is located below the bottom of the groove 15 as shown in FIG. Also, the pile 1 is driven so that it is located above. When excavating the trench 15, a shallow trench is formed over the longitudinal direction of the foundation to be formed, and a part of the shallow trench is partially formed slightly deep, and the pile 1 is partially formed deeply.
It is something that is driven into the bottom of. In forming the groove 15, the groove 15 may be formed only in a portion where the pile 1 is driven without forming a shallow groove. In any case, the amount of excavation is smaller than that of the conventional example in which a deep groove is dug over the entire length of the foundation to be formed for pouring concrete. Here, a plurality of piles 1 are driven along the position corresponding to the center line in the longitudinal direction of the foundation to be formed. When the driving position of the piles 1 is displaced in the direction perpendicular to the center line, the nut is Adjusting the tightening position of 14 adjusts the lateral projection length of the horizontal bar portion 9 of the bolt 11 from the pile 1, and the vertical bar portion 10 of the bolt 11 attached to the plurality of piles 1 is aligned. To be located. Although the above description shows an example in which the pile 1 is driven with the bolt 11 attached to the pile 1, the bolt 11 may be attached to the pile 1 after the pile 1 is driven.

【0012】杭1の上端部の溝15の底よりも上方に突
出した部分を囲むように溝15内に型枠16を建て込
み、この状態で型枠16内にモルタル4a(コンクリー
トでもよい)を充填する。この際、ボルト11の縦棒部
10の上部がモルタル4aの上面よりも上方に突出する
ようにする。この状態で、ボルト11の縦棒部10の上
部に下枠3を取付けるものである。
A mold 16 is built in the groove 15 so as to surround a portion of the upper end of the pile 1 which protrudes above the bottom of the groove 15. In this state, the mortar 4a (concrete may be used). To fill. At this time, the upper portion of the vertical rod portion 10 of the bolt 11 is made to project above the upper surface of the mortar 4a. In this state, the lower frame 3 is attached to the upper portion of the vertical rod portion 10 of the bolt 11.

【0013】下枠3は断面L状をした金属材により構成
してあり、図2に示すように、下枠3の下横片17の長
手方向の複数箇所に長孔状をした挿通孔12が形成して
ある。挿通孔12にはボルト11の縦棒部10の上端部
が挿通され、縦棒部10に螺合したナット19により下
枠3の下横片17を上下より挟着して固定するようにな
っている。この場合、ナット19の締め付け位置を調整
することで、下枠3のレベルを調整するものである。し
たがって、L状をしたボルト11が杭1に下枠3を高さ
調整自在に取付けるための連結手段2を構成している。
断面L状をした下枠3は縦片20が互いに対向するよう
に2列取付けられるものであり、この2列の下枠3の対
向する縦片20間にコンクリートブロック5が嵌め込ん
で位置決めされると共に下枠3の下横片17上に載置さ
れる。ここで、下枠3はすでに述べたようにレベル出し
が完了しており、このため下枠3にコンクリートブロッ
ク5を載置するのみでコンクリートブロック5のレベル
は目的とするレベルに設定される。したがって、従来の
ようにコンクリートブロックを一つ一つレベル出しをし
ながらセットしていく必要がない。コンクリートブロッ
ク5の下面部の両側には切欠部21が設けてあって、下
枠3の下横片17から上方に突出したボルト11の上端
部が切欠部21に差し込まれて収納される。
The lower frame 3 is made of a metal material having an L-shaped cross section. As shown in FIG. 2, the lower horizontal piece 17 of the lower frame 3 has elongated holes 12 at a plurality of longitudinal positions. Is formed. The upper end portion of the vertical bar portion 10 of the bolt 11 is inserted into the insertion hole 12, and the lower horizontal piece 17 of the lower frame 3 is clamped from above and below by the nut 19 screwed to the vertical bar portion 10 to be fixed. ing. In this case, the level of the lower frame 3 is adjusted by adjusting the tightening position of the nut 19. Therefore, the L-shaped bolt 11 constitutes the connecting means 2 for mounting the lower frame 3 on the pile 1 in a height-adjustable manner.
The lower frame 3 having an L-shaped cross section is attached in two rows so that the vertical pieces 20 face each other, and the concrete block 5 is fitted between the vertical pieces 20 of the two rows of the lower frame 3 and positioned. And is placed on the lower horizontal piece 17 of the lower frame 3. Here, the leveling of the lower frame 3 has been completed as described above, and therefore, the level of the concrete block 5 is set to the target level only by placing the concrete block 5 on the lower frame 3. Therefore, unlike the conventional method, it is not necessary to set the concrete blocks while leveling them one by one. Notches 21 are provided on both sides of the lower surface of the concrete block 5, and the upper ends of the bolts 11 projecting upward from the lower horizontal pieces 17 of the lower frame 3 are inserted into the notches 21 and stored therein.

【0014】このようにしてコンクリートブロック5を
下枠3の上にセットすると、コンクリートブロック5に
設けてある上下に貫通した孔部6の上開口からモルタル
4b(コンクリートでもよい)を流し込んで、モルタル
4bを孔部6及び先に充填したモルタル4aと下枠3及
びコンクリートブロック5との間の隙間に充填する。コ
ンクリートブロック5の孔部6内にはフェンス25の支
柱26の下部が差し込まれるが、上記モルタル4bの充
填前にコンクリートブロック5の孔部6内にあらかじめ
フェンス25の支柱26の下部を差し込んでおいてもよ
く、また、モルタル4bを孔部6内に充填した後にモル
タル4bが硬化する前に支柱26を孔部6内に充填した
モルタル4bに差し込んで埋め込むようにしてもよい。
When the concrete block 5 is set on the lower frame 3 in this manner, the mortar 4b (concrete may be used) is poured from the upper opening of the hole 6 provided in the concrete block 5 and penetrating vertically. 4b is filled in the space between the hole 6 and the mortar 4a previously filled with the lower frame 3 and the concrete block 5. The lower part of the pillar 26 of the fence 25 is inserted into the hole 6 of the concrete block 5, but the lower part of the pillar 26 of the fence 25 is previously inserted into the hole 6 of the concrete block 5 before filling the mortar 4b. Alternatively, after the mortar 4b is filled in the hole portion 6 and before the mortar 4b is cured, the support column 26 may be inserted and embedded in the mortar 4b filled in the hole portion 6.

【0015】また、下枠3の取付け及びコンクリートブ
ロック5の下枠3への載設は型枠16内に充填したモル
タル4aが硬化する前に行うものであり、この場合、下
枠3は杭1に支持されるために下枠3のレベル決めをし
た後はモルタル4aが未硬化状態であってもコンクリー
トブロック5のレベルの変動がないものである。図中8
は鉄筋であって、コンクリートブロック5に設けられた
孔部6から杭1に設けた上方が開口した孔7とにわたっ
て挿入されるものであり、この鉄筋8はコンクリートブ
ロック5をセットする前に杭1の孔7に下部を差込んで
おき、コンクリートブロック5をセットする際に鉄筋8
の上部をコンクリートブロック5の孔部6に差込み、そ
の後に孔部6にモルタル4bを充填することで、孔7内
に充填したモルタル4a及び孔部6内に充填したモルタ
ル4b内に鉄筋8を埋設するようにしたり、あるいは、
モルタル4bを孔部6に充填した後に、孔部6の上方か
ら鉄筋8を孔部6から孔7に到るように埋設してもよ
い。
The mounting of the lower frame 3 and the mounting of the concrete block 5 on the lower frame 3 are carried out before the mortar 4a filled in the mold 16 is cured. In this case, the lower frame 3 is piled. After the level of the lower frame 3 is determined to be supported by 1, the level of the concrete block 5 does not change even if the mortar 4a is in an uncured state. 8 in the figure
Is a rebar and is inserted from a hole 6 provided in the concrete block 5 to a hole 7 provided in the pile 1 and having an upper opening. The rebar 8 is provided before the concrete block 5 is set. Insert the lower part into the hole 7 of No. 1 and rebar 8 when setting the concrete block 5.
The upper part of the mortar 4b is inserted into the hole 6 of the concrete block 5, and then the hole 6 is filled with the mortar 4b, whereby the rebar 8 is inserted into the mortar 4a filled in the hole 7 and the mortar 4b filled in the hole 6. To be buried, or
After filling the holes 6 with the mortar 4b, the reinforcing bars 8 may be embedded from above the holes 6 to reach the holes 7 from the holes 6.

【0016】なお、孔7内にはモルタル4aが流入して
充填される場合と、モルタル4aを流す場合には流入せ
ず、モルタル4bを流す場合に充填される場合とがある
が、いずれの場合でもよい。このようにして、基礎を構
成するのであるが、モルタル4a、10bが硬化するこ
とで、モルタル4a、10bが一体に硬化してセメント
系硬化体4が構成され、このセメント系硬化体4により
コンクリートブロック5と杭1と下枠3とが強固に一体
化されることになる。
There is a case where the mortar 4a is filled into the hole 7 and a case where the mortar 4a is not filled and a case where the mortar 4b is filled is filled. In some cases. In this way, the foundation is constituted. By hardening the mortars 4a, 10b, the mortars 4a, 10b are integrally hardened to form the cement-based hardened body 4, and the cement-based hardened body 4 is used for concrete. The block 5, the pile 1, and the lower frame 3 are firmly integrated.

【0017】なお、溝15の側壁面と基礎の下端部との
間の隙間には土を埋め戻しするものである。この埋め戻
しは、モルタル4a、10bの硬化前であっても行うこ
とができる。したがって、本発明によれば、杭1打ち、
モルタル4aの充填、下枠3の取付け、コンクリートブ
ロック5の載置、モルタル4bの載置、鉄筋8の挿入、
土の埋め戻しがモルタル4a、10bの硬化に関係なく
短時間で行えることになる。
The gap between the side wall surface of the groove 15 and the lower end of the foundation is filled with soil. This backfilling can be performed even before the mortar 4a, 10b is cured. Therefore, according to the invention, one stake of the pile,
Filling mortar 4a, mounting lower frame 3, placing concrete block 5, placing mortar 4b, inserting rebar 8,
The soil can be backfilled in a short time regardless of the hardening of the mortars 4a and 10b.

【0018】なお、フェンス25の支柱26にはフェン
ス本体29が取付けられるものである。
A fence body 29 is attached to the pillar 26 of the fence 25.

【0019】[0019]

【発明の効果】本発明の請求項1記載の発明にあって
は、上述のように、地中に打ち込まれた杭と、該杭に高
さ調整機能を有する連結手段により連結された下枠と、
下枠に載置されて杭とセメント系硬化体により一体化さ
れたコンクリートブロックとで構成してあるので、従来
のように捨てコンクリート、基礎コンクリートを形成す
る必要がなく、これらの養生期間が必要でないので、施
工期間が短い基礎を提供できるものであり、また、コン
クリートブロックは杭に高さ調整自在に取付けられてレ
ベル出しがされた下枠に載設するので、コンクリートブ
ロックのセット時にコンクリートブロックを一つ一つレ
ベル出しをする手間が省ける基礎を提供できるものであ
り、また、従来のように基礎の全長に渡って基礎コンク
リートを形成するものに比べて、主に杭を打設する部分
を掘削し他の部分は浅く掘削するのみでよいので地盤の
掘削量も少なくできるものである。
According to the invention of claim 1 of the present invention, as described above, the pile driven into the ground and the lower frame connected to the pile by the connecting means having the height adjusting function. When,
Since it is composed of a pile and a concrete block that is integrated with a cement-based hardened body placed on the lower frame, it is not necessary to form waste concrete and basic concrete as in the past, and a curing period for these is required. Therefore, it is possible to provide a foundation with a short construction period.Because the concrete block is mounted on a pile whose height can be adjusted freely and placed on a leveled lower frame, the concrete block can be set when setting the concrete block. It is possible to provide a foundation that saves the labor of leveling out one by one, and also, compared to the conventional one in which the foundation concrete is formed over the entire length of the foundation, the part where the piles are mainly placed Since it is only necessary to excavate the ground and shallowly excavate the other part, the amount of ground excavation can be reduced.

【0020】また、請求項2記載の発明にあっては、上
記した請求項1記載の効果に加えて、コンクリートブロ
ックに設けられた孔部から杭に設けた上方が開口した孔
にわたって充填されたセメント系硬化体と、コンクリー
トブロックに設けられた孔部から杭に設けた孔にわたる
ようにセメント系硬化体内に埋設された鉄筋とを備えて
あるので、コンクリートブロックが杭に確実且つ強固に
一体化され、強度の強い基礎を形成できるものである。
Further, in addition to the effect of the above-mentioned claim 1, in the invention of claim 2, in addition to the effect described in claim 1, filling is carried out from the hole provided in the concrete block to the hole opened upward in the pile. Since the cement-based hardened body and the reinforcing bars embedded in the cement-based hardened body so as to extend from the holes provided in the concrete block to the holes provided in the pile are provided, the concrete block is securely and firmly integrated into the pile. It is possible to form a strong foundation.

【0021】また、請求項3記載の発明にあっては、上
記した請求項1又は請求項2記載の効果に加えて、横棒
部と縦棒部とからなるL状をしたボルトにより連結手段
を構成し、該L状をしたボルトの横棒部を杭の上端部に
挿通して縦棒部の杭からの横方向の突出長さを調整自在
に取付け、下枠に設けた挿通孔に縦棒部を挿通して縦棒
部に下枠を高さ調整自在に取付けてあるので、簡単な構
成の連結手段により杭の対して下枠を高さ調整自在に連
結してレベル出しできるものであり、また、杭の打ち込
み位置が巾方向にずれていても下枠の巾方向の連結位置
を調整できて正確に下枠を杭に連結できるものである。
Further, in the invention according to claim 3, in addition to the effect according to claim 1 or claim 2, the connecting means is provided by an L-shaped bolt having a horizontal rod portion and a vertical rod portion. The horizontal rod portion of the L-shaped bolt is inserted into the upper end portion of the pile to adjust the lateral projection length of the vertical rod portion from the pile, and is attached to the through hole provided in the lower frame. The lower frame is attached to the vertical bar so that the height can be adjusted freely, so the lower frame can be connected to the pile with the height adjustable so that the level can be adjusted. Further, even if the driving position of the pile is shifted in the width direction, the connecting position of the lower frame in the width direction can be adjusted and the lower frame can be accurately connected to the pile.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の断面図である。1 is a cross-sectional view of the present invention.

【図2】同上の分解斜視図である。FIG. 2 is an exploded perspective view of the same.

【図3】同上に使用する杭の上部にボルトを取付けた状
態の斜視図である。
FIG. 3 is a perspective view showing a state in which a bolt is attached to an upper portion of a pile used in the above.

【図4】同上のコンクリートブロックのセット状態を示
す斜視図である。
FIG. 4 is a perspective view showing a set state of the above concrete block.

【符号の説明】[Explanation of symbols]

1 杭 2 連結手段 3 下枠 4 セメント系硬化体 5 コンクリートブロック 6 孔部 7 孔 8 鉄筋 9 横棒部 10 縦棒部 11 ボルト 12 挿通孔 DESCRIPTION OF SYMBOLS 1 Pile 2 Connecting means 3 Lower frame 4 Cement-based hardened body 5 Concrete block 6 Hole 7 Hole 8 Reinforcing bar 9 Horizontal bar 10 Vertical bar 11 Bolt 12 Insertion hole

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地中に打ち込まれた杭と、該杭に高さ調
整機能を有する連結手段により連結された下枠と、下枠
に載置されて杭とセメント系硬化体により一体化された
コンクリートブロックとで構成される基礎の構造。
1. A pile driven into the ground, a lower frame connected to the pile by a connecting means having a height adjusting function, a pile mounted on the lower frame, and integrated with the pile by a cement-based hardening material. Basic structure consisting of concrete blocks.
【請求項2】 コンクリートブロックに設けられた孔部
から杭に設けた上方が開口した孔にわたって充填された
セメント系硬化体と、コンクリートブロックに設けられ
た孔部から杭に設けた孔にわたるようにセメント系硬化
体内に埋設された鉄筋とを備えて成ることを特徴とする
請求項1記載の基礎の構造。
2. A cement type hardened body filled from a hole provided in a concrete block to a hole provided at an upper portion of a pile, and a cement-based hardened body extending from the hole provided in the concrete block to a hole provided in the pile. 2. The foundation structure according to claim 1, further comprising a reinforcing bar embedded in a cement-based hardened body.
【請求項3】 横棒部と縦棒部とからなるL状をしたボ
ルトにより連結手段を構成し、該L状をしたボルトの横
棒部を杭の上端部に挿通して縦棒部の杭からの横方向の
突出長さを調整自在に取付け、下枠に設けた挿通孔に縦
棒部を挿通して縦棒部に下枠を高さ調整自在に取付けて
成ることを特徴とする請求項1又は請求項2記載の基礎
の構造。
3. An L-shaped bolt composed of a horizontal rod portion and a vertical rod portion constitutes a connecting means, and the horizontal rod portion of the L-shaped bolt is inserted into an upper end portion of a pile to form a vertical rod portion. It is characterized in that the protruding length in the lateral direction from the pile is adjustable, and the vertical frame is inserted into the insertion hole provided in the lower frame, and the lower frame is mounted on the vertical bar so that the height is adjustable. The base structure according to claim 1 or 2.
JP19095A 1995-01-05 1995-01-05 Structure of foundation Withdrawn JPH08189230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19095A JPH08189230A (en) 1995-01-05 1995-01-05 Structure of foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19095A JPH08189230A (en) 1995-01-05 1995-01-05 Structure of foundation

Publications (1)

Publication Number Publication Date
JPH08189230A true JPH08189230A (en) 1996-07-23

Family

ID=11467084

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19095A Withdrawn JPH08189230A (en) 1995-01-05 1995-01-05 Structure of foundation

Country Status (1)

Country Link
JP (1) JPH08189230A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1025648C2 (en) * 2004-03-05 2005-09-08 Beton Son Bv Application of initially adjustable connecting construction between foundation component and further component supported by it
KR101636216B1 (en) * 2015-08-06 2016-07-04 주식회사 웰콘 Foundation structure for pillar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1025648C2 (en) * 2004-03-05 2005-09-08 Beton Son Bv Application of initially adjustable connecting construction between foundation component and further component supported by it
KR101636216B1 (en) * 2015-08-06 2016-07-04 주식회사 웰콘 Foundation structure for pillar

Similar Documents

Publication Publication Date Title
US6503025B1 (en) Precast concrete beam element and methods of making and installing same
KR20080077721A (en) The method of constructing bloclk for wall
JP2008308945A (en) Concrete foundation combined with tension pile, and construction method thereof
JP2008002114A (en) Independent foundation and method of constructing the same
JPH08189230A (en) Structure of foundation
JPH0892981A (en) Earth retaining wall
JP2787806B2 (en) Earth retaining wall
JP2641182B2 (en) Slope stabilization method and slope expansion method
CN107514140B (en) Basement floor support and method for constructing outer wall and floor by using same
JP3778392B2 (en) Basic block
JP2000257088A (en) Earth retaining wall and its construction method
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR100401330B1 (en) A method of construction for earth-protection walls of building
JPH0657768A (en) Retaining wall structure and working method thereof
KR102613254B1 (en) Self-standing fixing type pile and construction method of earth retaining facilities including it
JPH0892970A (en) Foundation structure
JP2517822B2 (en) Precast concrete basics
JP3028011B2 (en) Concrete wall fixing structure and construction method
JPH0885959A (en) Execution of work for foundation of building
JPH03260223A (en) Positioning plate for base construction of housing
US20030084630A1 (en) Perimeter walls
JP2992160B2 (en) Precast foundation structure
JPH0673923A (en) Concrete fence and construction method thereof
JPH02248527A (en) Constructing foundation structure
JP2006138079A (en) Foundation reinforcing equipment and construction method for foundation

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020305