JPH0811920B2 - Formwork for tunnel lining - Google Patents

Formwork for tunnel lining

Info

Publication number
JPH0811920B2
JPH0811920B2 JP4278198A JP27819892A JPH0811920B2 JP H0811920 B2 JPH0811920 B2 JP H0811920B2 JP 4278198 A JP4278198 A JP 4278198A JP 27819892 A JP27819892 A JP 27819892A JP H0811920 B2 JPH0811920 B2 JP H0811920B2
Authority
JP
Japan
Prior art keywords
formwork
lining
tunnel
wall
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4278198A
Other languages
Japanese (ja)
Other versions
JPH06108794A (en
Inventor
実 末広
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toray Engineering Co Ltd
Original Assignee
Toyo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Construction Co Ltd filed Critical Toyo Construction Co Ltd
Priority to JP4278198A priority Critical patent/JPH0811920B2/en
Publication of JPH06108794A publication Critical patent/JPH06108794A/en
Publication of JPH0811920B2 publication Critical patent/JPH0811920B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、トンネルの覆工に用い
る型枠に係り、特に二次覆工に用いて好適な型枠に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a formwork used for tunnel lining, and more particularly to a formwork suitable for secondary lining.

【0002】[0002]

【従来の技術】 トンネル工事においては、通常、シー
ルド工法等により掘削したトンネル壁面に鋼製セグメン
ト等により一次覆工を行った後、その上にさらにコンク
リートを打設して二次覆工(仕上覆工)を行うようにし
ている。ところで、二次覆工によるコンクリート壁は、
そのまゝトンネル内壁として外部に露出し、したがって
型枠を用いてこれをきれいに仕上げる必要がある。そし
て従来、この二次覆工用の型枠としては、複数分割の鋼
製型板をジャッキによりスライドさせて組立てる、いわ
ゆる脱着式スライド型枠が多く用いられていた。
2. Description of the Related Art In tunnel construction, usually, a tunnel wall excavated by a shield construction method or the like is subjected to a primary lining by a steel segment or the like, and then concrete is further placed on the lining. The next lining (finish lining) is performed. By the way, the concrete wall by the secondary lining is
As such, it is exposed to the outside as the inner wall of the tunnel, so it is necessary to finish it neatly using a formwork. Conventionally, a so-called removable slide form frame has been widely used as the form liner for the secondary lining, in which a plurality of divided steel form plates are slid by a jack to be assembled.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記従
来のスライド式型枠によれば、型板の重量が大きいた
め、その組立ておよび覆工区域への移動に多大の労力と
時間とを要し、据付作業性が極めて悪いという問題があ
った。また、トンネルの口径または形状は全長を通して
一様であるとは限らないため、口径または断面形状の変
化に応じて専用の型板を用意しなければならず、その製
作が面倒で、コスト負担の増大が避けられないという問
題もあった。
However, according to the above-mentioned conventional slide type mold, since the weight of the mold plate is large, it takes a lot of labor and time to assemble it and move it to the lining area. There was a problem that the installation workability was extremely poor. In addition, since the diameter or shape of the tunnel is not always uniform over the entire length, it is necessary to prepare a dedicated template according to changes in the diameter or cross-sectional shape, which is cumbersome to manufacture and costs less. There was also a problem that the increase was inevitable.

【0004】本発明は、上記従来の問題点に鑑みてなさ
れたもので、その目的とするところは、据付作業性が良
好で、口径または形状の変化にも容易に対応できるトン
ネル覆工用型枠を提供することにある。
The present invention has been made in view of the above-mentioned conventional problems, and an object thereof is to provide a tunnel lining mold which has good workability in installation and can easily cope with a change in diameter or shape. To provide a frame.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、発泡スチロール製の複数のブロックを積
み重ねて形成した型枠本体と、該型枠本体の外周を被覆
するシートとから成るように構成したことを特徴とす
る。
In order to achieve the above object, the present invention comprises a formwork main body formed by stacking a plurality of blocks made of expanded polystyrene, and a sheet covering the outer periphery of the formwork main body. It is characterized in that it is configured in.

【0006】[0006]

【作用】上記のように構成したトンネル覆工用型枠にお
いては、発泡スチロール製のブロックを型枠本体の基材
としているので、その重量は極めて軽量となり、この型
枠本体をシートにて被覆するだけの構造と相まって、組
立て、移動が容易となる。しかも、ブロックは発泡成形
により簡単に製作できるので、トンネルの口径および断
面形状の変化に容易に対応できるようになる。
In the formwork for tunnel lining constructed as described above, since the block made of styrofoam is used as the base material of the formwork body, the weight thereof is extremely light and the formwork body is covered with the sheet. Combined with the simple structure, it is easy to assemble and move. Moreover, since the block can be easily manufactured by foam molding, it is possible to easily cope with changes in the diameter and cross-sectional shape of the tunnel.

【0007】[0007]

【実施例】以下、本発明の実施例を添付図面にもとづい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0008】図1および図2において、1は本発明にか
ゝる型枠1であり、発泡スチロール製の複数のブロック
2を積み重ねて形成した円柱状の型枠本体3と、この型
枠本体3の外周を被覆する布製のシート4と、型枠本体
3の中心部に貫設された硬質塩化ビニル樹脂製の導管5
とから概略構成されている。型枠本体3は、こゝでは6
個のブロック2から成り、各ブロック2は、下側に位置
する2つ(と)が型枠本体3のほヾ半分の容積を占
める大型に、上側の左右に位置する2つ(と)が中
型に、上側中央に位置する2つ(と)が小型にそれ
ぞれ形成されている。なお、型枠本体3は、一例として
5M程度の長さを有している。また導管5は作業通路と
して利用されるもので、一例として直径 600〜800 mmの
大きさのものが用いられる。
1 and 2, reference numeral 1 denotes a mold 1 according to the present invention, which is a cylindrical mold body 3 formed by stacking a plurality of blocks 2 made of styrofoam, and this mold body 3 Sheet 4 for covering the outer periphery of the pipe, and conduit 5 made of hard vinyl chloride resin penetrating the center of the form body 3
It is composed of and. Formwork body 3 is 6 here
Each block 2 consists of two blocks (2) located on the lower side (and) that occupy almost half the volume of the mold body 3, and two (and) located on the left and right sides of the upper part. Two (and) located at the center of the upper side are formed in a small size in the middle size. The form body 3 has, for example, a length of about 5M. The conduit 5 is used as a working passage, and as an example, a conduit having a diameter of 600 to 800 mm is used.

【0009】本型枠1は、二次覆工に用いられるもの
で、トンネル10の内面には一次覆工によるセグメント
(一次覆工壁)11が既に組立てられている。以下、前
記一次覆工壁11の一部に本型枠1を用いて二次覆工壁
12が既に打設されていると仮定し、この既設の二次覆
工壁12に連接して新たな二次覆工壁を打設する場合の
施工順序を説明する。
This formwork 1 is used for a secondary lining, and a segment (primary lining wall) 11 by the primary lining is already assembled on the inner surface of the tunnel 10. Hereinafter, it is assumed that the secondary lining wall 12 has already been cast using the main frame 1 on a part of the primary lining wall 11, and the secondary lining wall 12 is connected to the existing secondary lining wall 12 and newly added. The construction sequence for placing a secondary lining wall will be described.

【0010】 二次覆工に際しては、先ず一次覆工壁1
に係止具を用いて既設の二次覆工壁12と同一高さの
スペーサ(例えばコンクリート製)13を円周方向およ
び軸方向に複数取付ける。次に、このスペーサ13の内
側に両端を縫い合わせて無端ベルト状としてシート4を
配置し、このシート4を拡張しながらブロック2をその
番号〜にしたがって積み重ねて型枠本体3を組立て
る。より詳しくは、最初に2つの大型ブロックとを
シート4を介してスペーサ13に着座させる。この時、
これら2つのブロックとは型枠本体3のほヾ半分の
容積を占めるので、単にスペーサ13に着座させただけ
でその位置は固定される。続いて、この2つのブロック
との上に導管5を載置し、さらに上側の2つの中型
ブロックとを載置する。そして、最終的に小型のブ
ロックとを上側の隙に順に差し込むが、この差し込
みにより中型ブロックとは所定位置に寄せられ、シ
ート4は緊張状態に膨らみ、型枠本体3は完成する。
At the time of secondary lining, first, the primary lining wall 1
A plurality of spacers (for example, made of concrete) 13 having the same height as the existing secondary lining wall 12 are attached in the circumferential direction and the axial direction by using a locking tool . Next, both ends are sewn to each other inside the spacer 13 to form the endless belt, and the sheet 4 is arranged. While expanding the sheet 4, the blocks 2 are stacked according to their numbers to assemble the frame body 3. More specifically, first, the two large blocks are seated on the spacer 13 via the seat 4. This time,
Since these two blocks occupy almost half the volume of the mold body 3, their positions are fixed simply by seating them on the spacer 13. Then, the conduit 5 is placed on the two blocks, and the upper two medium-sized blocks are further placed. Then, finally, small blocks are sequentially inserted into the upper gap, and by this insertion, the medium blocks are brought to a predetermined position, the sheet 4 swells in a tensioned state, and the mold body 3 is completed.

【0011】その後、本型枠1の、既設二次覆工壁12
と反対側の端面に環状の妻型枠14を配置し、例えばセ
パレータによりその位置を固定する。この妻型枠14の
配置により型枠1と一次覆工壁11との間には、既設の
2次覆工壁12および妻型枠14により区画されたコン
クリート打設空間15が形成される。妻型枠14には予
めコンクリート供給管16が接続されており、このコン
クリート供給管16を通じて前記コンクリート打設空間
15にコンクリートを供給する。そして、コンクリート
打設空間15にコンクリートを充填した後、その固化を
待って本型枠1を解体する。型枠1の解体は、最初に一
方の端面側から小型ブロックまたはを押して、これ
をシート4内から抜き取るようにすれば良く、これによ
り型枠本体3の全体が緩み、その後、上記組立てと逆の
順序で各ブロック2を抜き取れば、その解体を容易に行
うことができる。
After that, the existing secondary lining wall 12 of the formwork 1 is formed.
An annular gable form 14 is arranged on the end face on the opposite side to and its position is fixed by, for example, a separator. Due to the disposition of the gable formwork 14, a concrete placing space 15 defined by the existing secondary lining wall 12 and the gable formwork 14 is formed between the formwork 1 and the primary lining wall 11. A concrete supply pipe 16 is previously connected to the gable form 14, and concrete is supplied to the concrete placing space 15 through the concrete supply pipe 16. Then, after filling the concrete placing space 15 with concrete, the main formwork 1 is dismantled after waiting for its solidification. The dismantling of the formwork 1 may be carried out by first pressing the small block or from one end face side and pulling it out from within the seat 4, whereby the entire formwork body 3 is loosened, and then the reverse of the above-mentioned assembly. If each block 2 is extracted in the order of, the disassembly can be easily performed.

【0012】なお、上記実施例において、小型ブロック
を最後に差し込んで型枠本体3を完成させるようにし
たが、導管5を最後に差し込むようにしても良い。さら
にシート4として模様入りのものを用いれば、覆工壁面
にその模様が転写されるので、コンクリート打設の意匠
性がより向上する。
In the above embodiment, the small block is inserted last to complete the mold body 3, but the conduit 5 may be inserted last. Furthermore, if a sheet with a pattern is used as the sheet 4, the pattern is transferred to the wall surface of the lining, so that the designability of concrete pouring is further improved.

【0013】[0013]

【発明の効果】以上、詳細に説明したように、本発明に
かゝるトンネル覆工用型枠によれば、極めて軽量である
ばかりか組立構造も簡単となり、組立て、移動が容易と
なって据付作業性が著しく向上し、工期短縮に大きく寄
与するものとなる。しかも、型枠本体を構成するブロッ
クは発泡成形により簡単に製作できるので、トンネルの
口径および断面形状の変化に容易に対応でき、施工コス
トの低減に大きく寄与するものとなる。
As described above in detail, according to the tunnel lining form according to the present invention, not only is it extremely lightweight, but the assembling structure is simple and the assembling and moving are easy. Installation workability is significantly improved, which greatly contributes to shortening the construction period. In addition, since the block constituting the mold body can be easily manufactured by foam molding, it is possible to easily cope with changes in the diameter and cross-sectional shape of the tunnel, which greatly contributes to the reduction of construction cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明にかゝるトンネル覆工用型枠の構造およ
び使用態様を示す横断面図である。
FIG. 1 is a cross-sectional view showing the structure and usage of a tunnel lining form frame according to the present invention.

【図2】本発明にかゝるトンネル覆工用型枠の構造およ
び使用態様を示す横断面図である。
FIG. 2 is a cross-sectional view showing the structure and usage of the tunnel lining form according to the present invention.

【符号の説明】[Explanation of symbols]

1 型枠 2 ブロック 3 型枠本体 4 シート 5 導管 10 トンネル 11 一次覆工壁 12 二次覆工壁 13 スペーサ 16 妻型枠 1 Formwork 2 Block 3 Formwork body 4 Sheet 5 Conduit 10 Tunnel 11 Primary lining wall 12 Secondary lining wall 13 Spacer 16 Gable formwork

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 発泡スチロール製の複数のブロックを積
み重ねて形成した型枠本体と、該型枠本体の外周を被覆
するシートとから成ることを特徴とするトンネル覆工用
型枠。
1. A formwork for tunnel lining, comprising a formwork main body formed by stacking a plurality of blocks made of expanded polystyrene and a sheet covering the outer periphery of the formwork main body.
JP4278198A 1992-09-22 1992-09-22 Formwork for tunnel lining Expired - Lifetime JPH0811920B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4278198A JPH0811920B2 (en) 1992-09-22 1992-09-22 Formwork for tunnel lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4278198A JPH0811920B2 (en) 1992-09-22 1992-09-22 Formwork for tunnel lining

Publications (2)

Publication Number Publication Date
JPH06108794A JPH06108794A (en) 1994-04-19
JPH0811920B2 true JPH0811920B2 (en) 1996-02-07

Family

ID=17593967

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4278198A Expired - Lifetime JPH0811920B2 (en) 1992-09-22 1992-09-22 Formwork for tunnel lining

Country Status (1)

Country Link
JP (1) JPH0811920B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144771A (en) * 2006-12-06 2008-06-26 Kaneka Corp Form for filling filler material in conduit pipe protecting tunnel and construction method of filler material using the same

Also Published As

Publication number Publication date
JPH06108794A (en) 1994-04-19

Similar Documents

Publication Publication Date Title
CN102383590A (en) Combined system of split building template
CN113334568A (en) Segment whole-ring structure and segment whole-ring prefabricating method
JP2006214212A (en) Floor slab construction method and form panel
JPH0811920B2 (en) Formwork for tunnel lining
JP2889957B2 (en) Concrete segment manufacturing method
JP3615031B2 (en) Method and apparatus for manufacturing synthetic tunnel liner
JPS639508A (en) Manufacture of steel-pipe concrete composite pile with diameter expanding section
JPS6131261B2 (en)
JP7452721B2 (en) How to build a structure
JP3406280B2 (en) Manufacturing method of synthetic segment
JPS5942783B2 (en) How to construct a dome with double walls inside and outside
US5108671A (en) Concrete formwork and method for forming a draft tube
CN209903516U (en) Die for manufacturing prefabricated boundary beam with supporting surface
CN209903515U (en) Die for manufacturing precast beam with bearing surface
JPH0414216B2 (en)
GB876521A (en) Filter tanks, silos and like structures and method of constructing the same
WO2000047381A1 (en) Formers and methods of casting bodies, particularly concrete bodies, using the formers
JPH0988103A (en) Method of constructing underground structure
JP2001219417A (en) Form system for u-shaped pc member, method for manufacturing u-shaped pc member and u-shaped pc member
JPH0144684Y2 (en)
JPH0144685Y2 (en)
JP2000320012A (en) Construction method of concrete building utilizing soil as form
JPH06212829A (en) Method of constructing roof for tank
WO2013063623A1 (en) Method of constructing a curved structure and apparatus for performing such method
JPH08277628A (en) Form forming method for hollow concrete structure