- JPH0144685Y2 JPH0144685Y2 JP1983051851U JP5185183U JPH0144685Y2 JP H0144685 Y2 JPH0144685 Y2 JP H0144685Y2 JP 1983051851 U JP1983051851 U JP 1983051851U JP 5185183 U JP5185183 U JP 5185183U JP H0144685 Y2 JPH0144685 Y2 JP H0144685Y2
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- floor
- support
- erected
- right ends
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 claims description 27
- 239000002184 metal Substances 0.000 claims description 5
- 239000004567 concrete Substances 0.000 description 4
- 239000011120 plywood Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【考案の詳細な説明】
この考案は梁、床を一緒に施工しうる梁、床型
枠装置に関するものである。[Detailed description of the invention] This invention relates to a beam and floor formwork device that can construct beams and floors together.
従来の鉄筋コンクリート構造物の梁、床を施工
する型枠は梁部分と床部分とを別体に組立てるの
が普通である。そして梁部分の型枠はその組立解
体が煩雑であり、転用が困難である。また床部分
の型枠は多数の単管サポートで支承するので、建
込階の作業性を阻害し、また解体時に危険性が伴
う等の問題がある。そこで支保梁上に梁型枠と床
型枠とを一体に連続構成した大型型枠が開発され
ている。 In conventional formwork for constructing beams and floors of reinforced concrete structures, the beam portion and floor portion are usually assembled separately. The formwork for the beam portion is complicated to assemble and dismantle, making it difficult to repurpose it. Furthermore, since the formwork for the floor portion is supported by a large number of single pipe supports, there are problems such as hindering the workability of the erected floor and creating dangers during dismantling. Therefore, a large formwork has been developed in which a beam formwork and a floor formwork are integrated and continuous on a support beam.
この考案も梁、床を同時に施工しうる大型型枠
に関するもので、より組立、解体が容易で能率的
に施工しうる装置を提供すべくしたものである。 This invention also relates to a large formwork that can construct beams and floors at the same time, and is intended to provide equipment that is easier to assemble and dismantle and can be constructed more efficiently.
以下、この考案を第1図、第2図に示した実施
例により説明する。 This invention will be explained below with reference to the embodiments shown in FIGS. 1 and 2.
床上に所定の間隔をおいて複数の昇降しうる支
保工1を並列して樹立する。そしてこの支保工1
の上部には受梁2があり、その受梁2上中央にU
形断面の金属製梁型枠3を必要により根太6を介
して設置する。また支保工1上の受梁2の両側に
束5を立設し束上に支持大引6を設置する。なお
梁型枠3のリブ7と束5間には組立あるいは払用
に使用するターンバツクル8を配置する。 A plurality of supports 1 that can be raised and lowered are established in parallel on the floor at predetermined intervals. And this shoring 1
There is a support beam 2 at the top of the support beam 2, and in the center of the support beam 2 there is a U
A metal beam formwork 3 with a shaped cross section is installed via joists 6 if necessary. Further, bundles 5 are erected on both sides of the support beams 2 on the support 1, and support pullers 6 are installed on the bundles. Note that a turnbuckle 8 used for assembly or removal is arranged between the rib 7 of the beam formwork 3 and the bundle 5.
次いで、互いに隣り合う支保工1上の金属製梁
型枠3の相対向する側壁と側壁に、合板等よりな
る床型枠9の左右それぞれの端部を架設し、かつ
互いに隣り合う支保工1上の相対向する束5上の
支持大引6と支持大引6とに仮設梁10の左右端
部を架設すると共に仮設梁10により床型枠9の
下面を支承し、梁型枠3、床型枠9上にコンクリ
ートAを打設し、コンクリート硬化後、支保工1
および仮設梁10を撤去後、梁型枠3、床型枠9
を脱型するようにしたものである。 Next, the left and right ends of the floor formwork 9 made of plywood or the like are erected on the opposing side walls of the metal beam formwork 3 on the mutually adjacent shoring works 1, and the respective right and left ends of the floor formwork 9 made of plywood etc. The left and right ends of the temporary beam 10 are erected between the support 6 and the support 6 on the upper opposing bundles 5, and the lower surface of the floor form 9 is supported by the temporary beam 10, and the beam form 3, Concrete A is placed on the floor formwork 9, and after the concrete hardens, shoring 1 is placed.
After removing the temporary beam 10, the beam formwork 3 and the floor formwork 9
It is designed to remove the mold.
なお、床型枠上には必要に応じコンクリートの
打設に先んじ上端筋、トラス筋等を配筋すること
は言うまでもない。 It goes without saying that top reinforcement, truss reinforcement, etc. are placed on the floor formwork, if necessary, prior to concrete placement.
この考案は以上の構成からなり、梁型枠を支保
工に支持させ、梁型枠とその側方に設けた支持大
引上に床型枠を架設し、しかも支持大引6,6間
に仮設梁を架設して床型枠を支承してあるので、
床型枠下面にはサポートを全く使用することなく
梁と床を同時に施工することができ、工期の短縮
と省力化が達成できる。また、梁型枠を金属製化
することで、コンクリート打上り精度を向上させ
うるとともに、繰返し転用することができる。 This idea consists of the above-mentioned structure, the beam formwork is supported by the shoring, the floor formwork is erected on the beam formwork and the support large pullouts provided on the sides, and between Temporary beams were erected to support the floor formwork, so
Beams and floors can be constructed at the same time without using any supports at the bottom of the floor formwork, shortening the construction period and saving labor. Furthermore, by making the beam formwork metal, it is possible to improve the accuracy of concrete pouring and to make it possible to reuse it repeatedly.
第1図は第1実施例の概要を示した断面図、第
2図はその要部の断面図である。
1……支保工、2……受梁、3……梁型枠、4
……根太、5……束、6……支持大引、7……リ
ブ、8……ターンバツクル、9……床型枠、10
……仮設梁。
FIG. 1 is a sectional view showing an outline of the first embodiment, and FIG. 2 is a sectional view of the main part thereof. 1...Shoring, 2...Beam support, 3...Beam formwork, 4
... Joist, 5 ... Bundle, 6 ... Supporting drawer, 7 ... Rib, 8 ... Turnbuckle, 9 ... Floor formwork, 10
...Temporary beam.
Claims (1)
上に並列して樹立し、それぞれの支保工の上部に
ある受梁には中央にU形断面の金属製梁型枠を設
置し、受梁の両側に上端に支持大引を設置した束
を立設すると共に、互いに隣り合う支保工上の金
属製梁型枠の相対向する側壁と側壁に床型枠の左
右の端部をそれぞれ架設し、かつ互いに隣り合う
支保工上の相対向する束上の支持大引と支持大引
に仮設梁の左右の端部をそれぞれ架設し、この仮
設梁により床型枠の下面を支承させたことを特徴
とする梁、床型枠装置。 A plurality of supports that can be raised and lowered are erected in parallel on the floor at predetermined intervals, and a metal beam formwork with a U-shaped cross section is installed in the center of the support beam on top of each support support. At the same time, the left and right ends of the floor form are erected on the opposing side walls of the metal beam form on the adjacent shoring. , and that the left and right ends of the temporary beams were erected on the supporting poles and supporting poles on opposing bundles on adjacent shoring structures, respectively, and the lower surface of the floor form was supported by these temporary beams. Characteristic beam and floor formwork equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5185183U JPS59163040U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5185183U JPS59163040U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS59163040U JPS59163040U (en) | 1984-10-31 |
JPH0144685Y2 true JPH0144685Y2 (en) | 1989-12-25 |
Family
ID=30182241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5185183U Granted JPS59163040U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS59163040U (en) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5624761Y2 (en) * | 1976-02-04 | 1981-06-11 |
-
1983
- 1983-04-07 JP JP5185183U patent/JPS59163040U/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS59163040U (en) | 1984-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3818083A (en) | Building method | |
US2379636A (en) | Method of making reinforced concrete buildings | |
JP3342891B2 (en) | Construction method of horizontal beam erected on columnar structure | |
JPH0144685Y2 (en) | ||
JP3701078B2 (en) | Road slab construction method | |
JPH0144684Y2 (en) | ||
JPH0144686Y2 (en) | ||
JPH0312184B2 (en) | ||
JPH046450Y2 (en) | ||
JPH0332678Y2 (en) | ||
KR20180027159A (en) | Steel adhension type wall system being detachable and the construction method of form | |
JPH03271465A (en) | Method of construction for placing slab with manhole | |
JPH06306931A (en) | Construction of steel frame reinforced concrete structure | |
JPS61196035A (en) | Construction of concrete building | |
JPS6232303B2 (en) | ||
JPH06136821A (en) | Construction method for steel frame reinforced concrete structure | |
JPH0621469B2 (en) | Multi-story building frame construction method | |
JPS6349773B2 (en) | ||
JPS6145028B2 (en) | ||
JPH0334530B2 (en) | ||
JPH0531632B2 (en) | ||
JPH01223248A (en) | Folded plate unit slab construction | |
JPS6041181B2 (en) | Construction method of composite slab | |
JPS58204243A (en) | Construction of reinforced concrete building | |
JPH0542547B2 (en) |