JPH06306931A - Construction of steel frame reinforced concrete structure - Google Patents

Construction of steel frame reinforced concrete structure

Info

Publication number
JPH06306931A
JPH06306931A JP9301293A JP9301293A JPH06306931A JP H06306931 A JPH06306931 A JP H06306931A JP 9301293 A JP9301293 A JP 9301293A JP 9301293 A JP9301293 A JP 9301293A JP H06306931 A JPH06306931 A JP H06306931A
Authority
JP
Japan
Prior art keywords
column
concrete
formwork
steel frame
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9301293A
Other languages
Japanese (ja)
Other versions
JP2959325B2 (en
Inventor
Osami Kameda
修身 亀田
Tsuneo Yonehara
常夫 米原
Shingo Taira
進悟 平
Joji Yamamoto
譲治 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP5093012A priority Critical patent/JP2959325B2/en
Publication of JPH06306931A publication Critical patent/JPH06306931A/en
Application granted granted Critical
Publication of JP2959325B2 publication Critical patent/JP2959325B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To reduce labors and construction, period in the construction of a steel framed reinforced concrete structure. CONSTITUTION:After steel structural columns 1 for at least one floor are erected, column-forms 3 made of precast concrete having a hollow section and main reinforcements 31 and hoops 32 buried in the concrete in advance, are arranged around the steel structural columns. And steel structural beams 2 are suspended between the adjacent column-forms 3, 3. And floor-forms 4 are laid down on the steel structural beams 2. Then concrete is placed on the floor forms 4 and the column-forms 3. This procedure is repeated to construct a steel framed reinforced concrete structure. The labors of arrangement of column- reinforcements, assembling of column-forms and removing thereof can be reduced by use of precast concrete column-forms as the column-forms 3 and further, the construction period can be also reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は鉄骨鉄筋コンクリート
造躯体の構築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a steel-framed reinforced concrete structure.

【0002】[0002]

【発明が解決しようとする課題】鉄骨鉄筋コンクリート
造躯体の構築はスラブ上に柱鉄骨を立設した後、柱鉄骨
回りに配筋すると同時に、柱型枠を組み立て、柱鉄骨間
に鉄骨梁を架構し、柱型枠上に床型枠を敷設した後に、
床型枠上と柱型枠内にコンクリートを打設する、という
要領で行われるが、転用される柱型枠を使用することか
ら、型枠工事にある程度の時間が割かれ、また脱型まで
にはコンクリートの硬化を待たなければないため転用型
枠の使用は工期を短縮する上での障害になっている。
[Problems to be Solved by the Invention] The construction of a steel-framed reinforced concrete structure is carried out by erection of a pillar steel frame on a slab, then arranging around the pillar steel frame, simultaneously assembling a pillar formwork, and constructing a steel beam between the pillar steel frames. After laying the floor formwork on the pillar formwork,
Concrete is placed on the floor formwork and in the column formwork, but since the column formwork that is diverted is used, some time is spent on the formwork and until demolding. Since it is necessary to wait for concrete to harden, the use of divert formwork is an obstacle to shortening the construction period.

【0003】この発明は鉄骨鉄筋コンクリート造躯体の
工期の短縮化を図る目的からなされたもので、型枠工事
を省力化する構築方法を提案しようとするものである。
The present invention was made for the purpose of shortening the construction period of a steel-framed reinforced concrete structure, and proposes a construction method that saves labor for formwork.

【0004】[0004]

【課題を解決するための手段】本発明では柱型枠に予め
主筋とフープが埋設されて中空断面形状に製作されたプ
レキャストコンクリート製の柱型枠を使用することによ
り柱筋の配筋と柱型枠の組み立て及び脱型の手間を省
き、工期の短縮化を図る。
SUMMARY OF THE INVENTION In the present invention, by using a precast concrete pillar formwork having a hollow cross-sectional shape in which a main bar and a hoop are embedded in advance in the pillar formwork, the bar reinforcement and the pillars are arranged. The work of assembling and demolding the formwork is omitted, and the construction period is shortened.

【0005】躯体の構築は少なくとも1層分の柱鉄骨を
立設した後、柱鉄骨回りに上記の柱型枠を設置し、隣接
する柱型枠間に鉄骨梁を架設するとともに、鉄骨梁上に
床型枠を敷設し、この床型枠上と柱型枠内にコンクリー
トを打設する、という手順を繰り返すことにより行われ
る。
To construct the frame, at least one layer of column steel frame is erected, the above-mentioned column form is installed around the column steel frame, and the steel frame beams are installed between the adjacent column forms, and on the steel frame beams. It is carried out by repeating the procedure of laying a floor formwork on the floor form and placing concrete on the floor formwork and in the pillar formwork.

【0006】柱型枠がプレキャストコンクリート製で、
内部に主筋とフープが埋設されることにより柱鉄骨回り
への配筋と脱型が省略され、また柱型枠内へのコンクリ
ート打設後にその硬化を待つ必要がなく、上層階工事へ
の移行が円滑に行われ、施工の進捗が図られる。
The pillar formwork is made of precast concrete,
By embedding the main bars and hoops inside, the reinforcement and demolding around the pillar steel frame are omitted, and there is no need to wait for the hardening after placing concrete in the pillar formwork, and the transition to the upper floor construction Will be carried out smoothly, and the progress of construction will be promoted.

【0007】[0007]

【実施例】以下本発明を一実施例を示す図面に基づいて
説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings showing an embodiment.

【0008】この発明は図1に示すように柱鉄骨1を立
設した後、柱鉄骨1回りにプレキャストコンクリート製
の柱型枠3を設置し、隣接する柱鉄骨1,1間に鉄骨梁
2を架設するとととに、鉄骨梁2上に床型枠4を敷設
し、この床型枠4上と柱型枠3内にコンクリート5を打
設する、という手順を繰り返して鉄骨鉄筋コンクリート
造躯体を構築する方法である。
According to the present invention, as shown in FIG. 1, a pillar steel frame 1 is erected, a precast concrete pillar frame 3 is installed around the pillar steel frame 1, and a steel beam 2 is provided between adjacent pillar steel frames 1 and 1. The floor formwork 4 is laid on the steel beam 2 and the concrete 5 is placed on the floor formwork 4 and in the pillar formwork 3 by repeating the procedure of erection of the steel frame reinforced concrete structure. How to build.

【0009】柱型枠3は図10〜図12に示すように予め主
筋31とフープ32がコンクリート33中に埋設されて中空断
面形状に形成される。中空部34は柱鉄骨1が挿入可能な
面積を持ち、主筋31はコンクリート33の上下端から、上
下階の柱型枠3の主筋31との継手に十分な長さだけ突出
する。図11は中空部34が円形状の場合、図12は円形と方
形が組み合わせられた形状の場合であるが、中空部34は
柱鉄骨1の断面形状によって決まる。
As shown in FIGS. 10 to 12, the pillar form 3 has a hollow cross-sectional shape in which a main bar 31 and a hoop 32 are previously embedded in concrete 33. The hollow portion 34 has an area into which the pillar steel frame 1 can be inserted, and the main bars 31 project from the upper and lower ends of the concrete 33 by a length sufficient for the joint with the main bars 31 of the pillar formwork 3 on the upper and lower floors. 11 shows the case where the hollow portion 34 has a circular shape, and FIG. 12 shows the case where the circular shape and the rectangular shape are combined, the hollow portion 34 is determined by the cross-sectional shape of the pillar steel frame 1.

【0010】図13〜図16はコンクリート33中に更に、中
空部34内に打設されるコンクリート5との一体性を確保
するためにジベル筋35を配筋した場合の製作例を示した
ものである。ジベル筋35は一部が中空部34内へ突出し、
一部がコンクリート33中に定着されて配筋され、後打ち
のコンクリート5との境界面で両者間のせん断力を伝達
し、柱型枠3とコンクリート3との一体性を確保する。
FIGS. 13 to 16 show an example of production in which concrete 33 is further arranged with giverel bars 35 in order to secure the integrity with the concrete 5 placed in the hollow portion 34. Is. Part of the gibber muscle 35 projects into the hollow portion 34,
A part is fixed and reinforced in the concrete 33, and the shear force between the two is transmitted at the boundary surface with the concrete 5 that is post-cast, and the integrity of the column form 3 and the concrete 3 is secured.

【0011】図13,図14に示す製作例はジベル筋35を波
形に形成し、断面上、適所に中空部34との境界に沿って
配筋し、振れ止め筋36によってコンクリート33中に定着
させた場合、図15,図16はジベル筋35を柱型枠3の軸方
向に適当な間隔をおき、フープ状に中空部34回りを周回
させて配筋し、両側をコンクリート33中に定着させ、中
間部を中空部34内に突出させた場合である。後者の場
合、ジベル筋35はコンクリート33とコンクリート5の一
体化を図る他、コンクリート33内に周回して配筋される
ことによりフープ32と共にコンクリート5を拘束し、コ
ンクリート5のせん断耐力を高め、また柱のせん断力を
コンクリート5と柱型枠3に分担させる働きをする。
In the manufacturing examples shown in FIGS. 13 and 14, the gibber streak 35 is formed in a corrugated form, and it is arranged along the boundary with the hollow part 34 at an appropriate position on the cross section, and is fixed in the concrete 33 by the steady rest 36. 15 and 16 show that the gibber reinforcement 35 is arranged at an appropriate interval in the axial direction of the column form 3 and is laid around the hollow portion 34 in a hoop shape so that both sides are anchored in the concrete 33. This is the case where the intermediate portion is projected into the hollow portion 34. In the latter case, the gibber reinforcement 35 not only integrates the concrete 33 and the concrete 5, but also circulates in the concrete 33 to constrain the concrete 5 together with the hoop 32 to increase the shear resistance of the concrete 5, Further, the shearing force of the column is shared by the concrete 5 and the column form 3.

【0012】図2〜図7により施工手順を説明する。The construction procedure will be described with reference to FIGS.

【0013】まず図2,図3に示すようにスラブ上,ま
たは図1に示すように下階側の柱鉄骨1に接続して少な
くとも1層分の柱鉄骨1を立設し、柱鉄骨1回りに柱型
枠3を設置する。図2〜図7に示す実施例では1階の柱
鉄骨1回りの型枠に、せき板からなる柱型枠6を使用
し、柱型枠3を2階の柱鉄骨1回りから使用しているこ
とから、柱型枠3の設置前にスラブ上に2層分の長さを
持つ柱鉄骨1を立設し、柱鉄骨1,1間への鉄骨梁2の
架設と、鉄骨梁2上への床型枠4の敷設を行っている。
床型枠4には脱型を要しないプレキャストコンクリート
製床版,またはそれに類似する床版が使用される。
First, at least one layer of column steel frame 1 is erected by connecting to the column steel frame 1 on the slab as shown in FIGS. 2 and 3 or on the lower floor as shown in FIG. The pillar formwork 3 is installed around. In the embodiment shown in FIG. 2 to FIG. 7, a pillar formwork 6 made of a weir board is used as a formwork around the pillar steel frame 1 on the first floor, and a pillar formwork 3 is used from around the pillar steel frame 1 on the second floor. Therefore, the pillar steel frame 1 having a length of two layers is erected on the slab before the pillar formwork 3 is installed, and the steel frame beam 2 is erected between the pillar steel frames 1 and 1 and the steel frame beam 2 is provided. The floor formwork 4 is laid on the floor.
For the floor form 4, a precast concrete floor slab that does not require demolding or a floor slab similar to it is used.

【0014】柱型枠3は上方から落とし込まれることに
より設置され、下階側の鉄骨梁2,または床型枠4に支
持されるが、例えば図8の、鉄骨梁2との接合部の詳細
図である図9に示すように鉄骨梁2上の受け部材7に支
持され、その主筋31は下階の柱型枠3の主筋31と圧接や
重ね継手等により接続される。
The column form 3 is installed by being dropped from above, and is supported by the steel frame beam 2 on the lower floor side or the floor form 4, for example, in the joint portion with the steel frame beam 2 in FIG. As shown in FIG. 9 which is a detailed view, it is supported by the receiving member 7 on the steel beam 2, and its main reinforcement 31 is connected to the main reinforcement 31 of the column form 3 on the lower floor by pressure welding, a lap joint or the like.

【0015】柱型枠3の設置後、図4,図5に示すよう
に鉄骨梁2を柱鉄骨1,1に支持させて架設すると同時
に、鉄骨梁2上に床型枠4を敷設する。その後、図7に
示すようにこの床型枠4上と柱型枠3内にコンクリート
5が打設されるが、図示する実施例の場合には、図6に
示すように柱型枠3内へのコンクリート5の打設に先行
して下層階の柱型枠6内とその上の床型枠4上にコンク
リート5が打設される。
After the column form 3 is installed, as shown in FIGS. 4 and 5, the steel frame beam 2 is erected while being supported by the column steel frames 1 and 1, and at the same time, the floor form 4 is laid on the steel frame beam 2. Thereafter, as shown in FIG. 7, concrete 5 is placed on the floor formwork 4 and in the pillar formwork 3. In the illustrated embodiment, the concrete form 5 is placed in the pillar formwork 3 as shown in FIG. Prior to the placing of the concrete 5 in the concrete, the concrete 5 is placed in the pillar formwork 6 on the lower floor and on the floor formwork 4 thereabove.

【0016】以後、柱鉄骨1の立設から柱型枠3の設
置、鉄骨梁2の架設と床型枠4の敷設、柱型枠3内と床
型枠4上へのコンクリート5の打設までの手順を繰り返
して躯体が構築される。
Thereafter, from the standing of the pillar steel frame 1 to the installation of the pillar formwork 3, the installation of the steel beam 2 and the laying of the floor formwork 4, and the placing of concrete 5 in the pillar formwork 3 and on the floor formwork 4. The procedure is repeated until the skeleton is constructed.

【0017】[0017]

【発明の効果】この発明は以上の通りであり、柱型枠に
予め主筋とフープが埋設されて中空断面形状に製作され
たプレキャストコンクリート製の柱型枠を使用したもの
であるため柱筋の配筋と柱型枠の組み立て及び脱型の手
間が省略されると同時に、コンクリートの硬化を待つ必
要がなく、施工の省力化と進捗が図られ、工期の短縮化
を図ることができる。
The present invention is as described above. Since a column mold made of precast concrete is used which has a hollow cross-section and main ribs and hoops are previously embedded in the column frame, The work of assembling and demolding the bar arrangement and the pillar formwork is omitted, and at the same time, there is no need to wait for the concrete to harden, labor saving and progress of construction can be achieved, and the construction period can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】柱型枠を設置した状態の柱・梁架構を示した斜
視図である。
FIG. 1 is a perspective view showing a column / beam frame with a column form installed.

【図2】柱鉄骨立設時の様子を示した立面図である。FIG. 2 is an elevational view showing a state when a pillar steel frame is erected.

【図3】柱型枠設置時の様子を示した立面図である。FIG. 3 is an elevational view showing a state when a pillar formwork is installed.

【図4】柱型枠上への鉄骨梁架設時の様子を示した立面
図である。
FIG. 4 is an elevational view showing a state in which a steel frame beam is erected on a pillar formwork.

【図5】1階の柱鉄骨回りへの柱型枠組み立ての様子を
示した立面図である。
FIG. 5 is an elevational view showing how the column formwork is assembled around the column steel frame on the first floor.

【図6】1階の柱型枠内と床型枠上へのコンクリート打
設時の様子を示した立面図である。
[Fig. 6] Fig. 6 is an elevational view showing the state of concrete pouring in the pillar formwork on the first floor and on the floor formwork.

【図7】2階の柱型枠内と床型枠上へのコンクリート打
設時の様子を示した立面図である。
FIG. 7 is an elevational view showing how concrete is placed inside the pillar formwork on the second floor and on the floor formwork.

【図8】柱型枠と鉄骨梁との取合いを示した立面図であ
る。
FIG. 8 is an elevational view showing the connection between the pillar formwork and the steel beam.

【図9】図8の一部拡大図である。9 is a partially enlarged view of FIG.

【図10】柱型枠の製作例を示した立面図である。FIG. 10 is an elevational view showing an example of manufacturing a pillar formwork.

【図11】図10の断面図である。11 is a cross-sectional view of FIG.

【図12】柱型枠の他の製作例を示した断面図である。FIG. 12 is a cross-sectional view showing another example of manufacturing a pillar formwork.

【図13】ジベル筋を配筋した場合の柱型枠の製作例を
示した立面図である。
FIG. 13 is an elevational view showing an example of manufacturing a column form in which the gibber reinforcement is arranged.

【図14】図13の断面図である。14 is a cross-sectional view of FIG.

【図15】ジベル筋を配筋した場合の柱型枠の他の製作
例を示した立面図である。
FIG. 15 is an elevational view showing another example of manufacturing the columnar frame in the case where the gibber reinforcement is arranged.

【図16】図15の断面図である。16 is a cross-sectional view of FIG.

【符号の説明】[Explanation of symbols]

1……柱鉄骨、2……鉄骨梁、3……柱型枠、31……主
筋、32……フープ、33……コンクリート、34……中空
部、35……ジベル筋、36……振れ止め筋、4……床型
枠、5……コンクリート、6……柱型枠、7……受け部
材。
1 …… Column steel frame, 2 …… Steel beam, 3 …… Column formwork, 31 …… Main bar, 32 …… Hoop, 33 …… Concrete, 34 …… Hollow part, 35 …… Givere bar, 36 …… Runout Staples, 4 ... Floor formwork, 5 ... Concrete, 6 ... Pillar formwork, 7 ... Receiving member.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山本 譲治 大阪府大阪市西区阿波座1丁目3番15号 鹿島建設株式会社大阪支店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Joji Yamamoto 1-3-15 Awaza, Nishi-ku, Osaka City, Osaka Prefecture Kashima Construction Co., Ltd. Osaka Branch

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも1層分の柱鉄骨を立設した
後、柱鉄骨回りに、予め主筋とフープがコンクリート中
に埋設されて中空断面形状に製作されたプレキャストコ
ンクリート製の柱型枠を設置し、隣接する柱型枠間に鉄
骨梁を架設するとともに、鉄骨梁上に床型枠を敷設し、
この床型枠上と柱型枠内にコンクリートを打設する、と
いう手順を繰り返して躯体を構築する鉄骨鉄筋コンクリ
ート造躯体の構築方法。
1. After erection of at least one layer of column steel frame, a column form made of precast concrete in which main bars and hoops are previously embedded in concrete and made into a hollow cross-sectional shape is installed around the column steel frame. Then, while constructing a steel frame beam between adjacent column formwork, laying a floor formwork on the steel frame beam,
A method for constructing a steel-framed reinforced concrete structure by repeating the procedure of placing concrete on the floor formwork and in the column formwork to construct the structure.
JP5093012A 1993-04-20 1993-04-20 Construction method of steel frame reinforced concrete structure Expired - Fee Related JP2959325B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5093012A JP2959325B2 (en) 1993-04-20 1993-04-20 Construction method of steel frame reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5093012A JP2959325B2 (en) 1993-04-20 1993-04-20 Construction method of steel frame reinforced concrete structure

Publications (2)

Publication Number Publication Date
JPH06306931A true JPH06306931A (en) 1994-11-01
JP2959325B2 JP2959325B2 (en) 1999-10-06

Family

ID=14070526

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5093012A Expired - Fee Related JP2959325B2 (en) 1993-04-20 1993-04-20 Construction method of steel frame reinforced concrete structure

Country Status (1)

Country Link
JP (1) JP2959325B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013180280A (en) * 2012-03-05 2013-09-12 Takuma Co Ltd Multimodule type moving-bed continuous sand filtration device and construction method of the same
CN103993658A (en) * 2013-02-16 2014-08-20 谷玉花 Steel structure and prefabricated concrete fabricated residential building system
CN104563506A (en) * 2014-12-09 2015-04-29 济南轨道交通集团有限公司 Constructing method of prefabricated lifting column and lifting beam combined frame structure
CN117386013A (en) * 2023-12-12 2024-01-12 北京工业大学 Assembled outsourcing concrete shaped steel dysmorphism post-T shape concatenation combination honeycomb beam structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03115630A (en) * 1989-09-27 1991-05-16 Kajima Corp Method for building construction material
JPH04149365A (en) * 1990-10-12 1992-05-22 Takenaka Komuten Co Ltd Construction method of beam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03115630A (en) * 1989-09-27 1991-05-16 Kajima Corp Method for building construction material
JPH04149365A (en) * 1990-10-12 1992-05-22 Takenaka Komuten Co Ltd Construction method of beam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013180280A (en) * 2012-03-05 2013-09-12 Takuma Co Ltd Multimodule type moving-bed continuous sand filtration device and construction method of the same
CN103993658A (en) * 2013-02-16 2014-08-20 谷玉花 Steel structure and prefabricated concrete fabricated residential building system
CN104563506A (en) * 2014-12-09 2015-04-29 济南轨道交通集团有限公司 Constructing method of prefabricated lifting column and lifting beam combined frame structure
CN117386013A (en) * 2023-12-12 2024-01-12 北京工业大学 Assembled outsourcing concrete shaped steel dysmorphism post-T shape concatenation combination honeycomb beam structure
CN117386013B (en) * 2023-12-12 2024-03-26 北京工业大学 Assembled outsourcing concrete shaped steel dysmorphism post-T shape concatenation combination honeycomb beam structure

Also Published As

Publication number Publication date
JP2959325B2 (en) 1999-10-06

Similar Documents

Publication Publication Date Title
JPH0518003A (en) Joining method of steel pipe concrete column and half-precast reinforced concrete column
JP3069753B2 (en) Construction method of framed reinforced concrete structure
JP3752999B2 (en) Upper and lower integrated bridge and its construction method
JP2927402B2 (en) Column-beam joint structure of concrete building
JPH06306931A (en) Construction of steel frame reinforced concrete structure
JPH02300439A (en) Prefabricating method
JPH03132532A (en) Construction method of precast reinforced concrete column and beam
KR100612938B1 (en) A construction system of the wall/dome and the the method thereof it
JP2000160687A (en) Construction method for composite structure and precast concrete column
JP2643641B2 (en) Building method using PC members
JPH0366878A (en) Construction method for precast column and beam and precast anti-seismic wall
JPH0447737B2 (en)
JP2651506B2 (en) How to apply underground beams
JP2554499Y2 (en) Precast concrete column members
JPH06316964A (en) Method for constructing joint of precast reinforced concrete column and beam
JPH0123614B2 (en)
JPH0598653A (en) Steel pipe concrete pillar in underground inverter construction method
JPS6232303B2 (en)
JP2749474B2 (en) Reverse construction method for underground structures
JP3312945B2 (en) Construction method of concrete structure
JPH0366852A (en) Construction method for complex structure of precast reinforced concrete column and steel beam
JPH032435A (en) Construction method for jointing column and steel frame reinforced-concrete beam to each other
JPH0533388A (en) Joining section of precast reinforced concrete construction
JPH03187436A (en) Supporting member for construction pillar of reinforced concrete building
JP2004190228A (en) Earthquake-resisting wall, and construction method of earthquake-resisting wall structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990629

LAPS Cancellation because of no payment of annual fees