KR100612938B1 - A construction system of the wall/dome and the the method thereof it - Google Patents
A construction system of the wall/dome and the the method thereof it Download PDFInfo
- Publication number
- KR100612938B1 KR100612938B1 KR1020040038352A KR20040038352A KR100612938B1 KR 100612938 B1 KR100612938 B1 KR 100612938B1 KR 1020040038352 A KR1020040038352 A KR 1020040038352A KR 20040038352 A KR20040038352 A KR 20040038352A KR 100612938 B1 KR100612938 B1 KR 100612938B1
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- plate
- support
- slab
- reinforcing bar
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/168—Spacers connecting parts for reinforcements and spacing the reinforcements from the form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
- E04G9/05—Forming boards or similar elements the form surface being of plastics
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2103/00—Material constitution of slabs, sheets or the like
- E04B2103/02—Material constitution of slabs, sheets or the like of ceramics, concrete or other stone-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
- E04G2009/028—Forming boards or similar elements with reinforcing ribs on the underside
Abstract
본 발명은 벽시공위치에 수직으로 고정되는 다수의 철근조립체(40,40a)와, 상기 철근조립체의 외측에 마주하여 고정되어 상기 철근조립체에 콘크리트가 타설된 후 콘크리트가 유출되지 않도록 하는 플레이트(20,20a)와, 상기 플레이트의 외측에 각각 고정되어 상기 플레이트가 외측으로 밀리지 않도록 하는 지지체(10,10a)와, 상기 각각의 지지체 및 플레이트를 관통한 상태에서 상기 마주하는 플레이트와 플레이트간의 간격을 고정시켜주는 간격유지수단(35)을 포함하되, 적어도 2개이상이 마주하여 수직으로 고정되는 벽체와; 상기 각각의 마주하는 벽체 상단부를 가로질러서 고정되는 슬라브용철근(50) 을 포함하여 이루어져 상기 슬라브용 철근과 상기 철근조립체에 콘크리트를 동시에 타설한 후 양생시키는 것을 특징으로 하는 벽과 슬라브 시공시스템을 요지로 한다.The present invention is a plurality of reinforcing bar assembly (40, 40a) is fixed to the wall construction position perpendicular to the outside of the reinforcing bar assembly is fixed so as to prevent the outflow of concrete after the concrete is poured into the reinforcing bar assembly (20) 20a and the supports 10 and 10a respectively fixed to the outside of the plate to prevent the plate from being pushed outward, and fixing the gap between the plate and the plate facing each other in the state of penetrating the support and the plate. A wall including a spacing means 35 to allow the at least two to face each other; The slab construction system comprises a slab reinforcing bar (50) fixed across the upper end of each facing wall, the concrete for the slab reinforcement and the reinforcing bar assembly at the same time characterized in that the curing and curing Shall be.
벽체, 슬라브Wall, slab
Description
도 1은 종래의 발명에 의한 벽과 슬라브의 시공시스템을 나타내는 도면.1 is a view showing a construction system of a wall and a slab according to the conventional invention.
도 2은 본 발명에 의한 벽과 슬라브 시공시스템을 나타내는 도면.2 is a view showing a wall and slab construction system according to the present invention.
도 3는 본 발명에 의한 벽과 슬라브 시공시스템에 의하여 완성된 벽과 슬라브를 나타내는 도면.Figure 3 is a view showing the walls and slabs completed by the wall and slab construction system according to the present invention.
도 4는 본 발명의 분리사시도.Figure 4 is an exploded perspective view of the present invention.
도 5(a)는 간격유지수단의 일측에 고정된 와셔와 미리 장착한 너트를 보여주는 도면. Figure 5 (a) is a view showing a washer and a nut previously mounted fixed to one side of the gap maintaining means.
도 5(b)는 간격유지수단의 또 다른 실시예를나타내는 도면.Fig. 5 (b) shows another embodiment of the space keeping means.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10,10a: 지지체 20,20a: 플레이트10,10a:
30, 35: 간격유지수단 40,40a: 철근조립체30, 35: spacing means 40, 40a: reinforcing bar assembly
50: 슬라브용철근 A,A': 벽체50: slab steel A, A ': wall
본 발명은 벽과 슬라브 시공시스템 및 이를 이용한 시공방법에 관한것으로서, 특히, 콘크리트 구조물 시공시에 시공현장에서 이루어지는 철근배근 작업, 거푸집 설치/제거 작업, 거푸집을 지지하기 위한 지지대설치/제거작업을 하지 않고 시공현장에서 가까운 근거리의 공장에서 본발명에 의한 시공시스템을 일체로 미리 조립하여 시공현장에서는 시공시스템을 크래인을 이용하여 작업위치에 고정한후 콘크리트를 타설하므로서 공기(工期)를 획기적으로 단축할 수 있는 벽과 슬라브 시공시스템 및 이를 이용한 시공방법에 관한 것이다.The present invention relates to a wall and slab construction system and a construction method using the same, and in particular, reinforcement work, form installation / removal work, formwork installation / removal work for supporting the formwork at the construction site during the construction of concrete structures Instead, the assembly system of the present invention is pre-assembled in a factory near to the construction site, and the construction site can be drastically shortened by placing concrete after fixing the construction system to the working position using crane. Wall and slab construction system and a construction method using the same.
일반적으로 콘크리트 구조물중 아파트와 같이 내력벽으로 지어지는 건축구조물은 현장 타설에 의하여 지어짐으로서 그 구성을 견고하게 할 수 있다. 이러한 현장타설과정을 보면, 조립 설치되는 벽체용 거푸집 내에 배근되는 철근과 슬라브용 거푸집 내에 배근되는 철근을 일일이 작업자들이 결속선(예를 들어 철사)로 연결시키고, 벽체용 및 슬라브용 거푸집 내에 현장 콘크리트를 타설하여서 벽과 슬라브를 일체성 있도록 시공하게 된다.In general, the building structure, which is built by the bearing wall, such as the apartment of the concrete structure is built by the site casting can be strengthened its construction. In the field casting process, workers connect the reinforcing bars in the formwork for wall assembly and the reinforcing bars in the slab formwork with worker binding lines (for example, wires), and the site concrete in the wall and slab formwork. By pouring the wall and the slab will be installed to unite.
그러나, 이러한 시공방법은 철근배근 작업, 즉, 철근을 일일이 작업자들이 결속선으로 묵는 작업, 거푸집 설치작업 및 제거작업, 슬라브를 지지하는 다수의 서포트를 설치하고 제거하는 등의 모든작업을 현장에서 수행하게 됨으로써, 첫째, 벽체와 함께 슬라브의 성형을 위한 거푸집 및 서포트 등을 설치하는 데에 많은 인 력과 작업시간을 필요로하게 되었으며, 둘째, 타설된 미경화 콘크리트가 충분한 강도를 가질때 까지 거푸집을 존치시키게 되는 만큼의 작업 진행상의 공백 및 슬라브콘크리트의 양생기간 만큼의 상층작업진행의 공백등으로 인하여 공사기간이 길어질 수 밖에 없었으며, 셋째, 슬라브, 서포트 및 벽체 거푸집 해체에 따른 번거로움과 안전사고의 염려가 상존하는 등의 단점이 있었다.However, this construction method performs all the work on the site, such as reinforcement work, that is, the workers staying the reinforcing bars as binding lines, installing and removing formwork, and installing and removing a plurality of supports supporting the slabs. As a result, first, it requires a lot of manpower and working time to install the formwork and support for forming the slab together with the wall, and secondly, the formwork is maintained until the unhardened concrete has sufficient strength. Due to the gap in the progress of work and the gap in the progress of upper floor work as long as the curing period of the slab concrete, the construction period had to be long. Third, the hassle and safety accidents caused by the dismantling of slabs, supports and wall formwork. There were disadvantages such as concern.
한편, 이러한 단점을 극복하기 위하여 본 발명자는 2004년 4월 27일자로 특허출원한 2004-29028호를 통하여 도 1과 같은 발명을 하였다. 도 1에 나타난 본 발명자에 의한 콘크리트 구조물 시스템의 구성을 보면, 철근이 격자형으로 배근되는 격자형철근(20)과, 상기 격자형 철근을 내부에 고정시실수 있으며 건물벽을 시공하고자 하는 다수의 위치에 각각 마주하여 한쌍을 이룬 상태로 고정되는 철망조립체(10)와, 상기 각각의 쌍을 이루는 철망조립체(10)상단을 가교하여 고정되는 스틸판(30)과, 상기 스틸탄(30)의 상단에 고정되는 슬라브용철근(40)과, 상기 철망조립체(10)를 지지할 수 있는 서포트를 포함하여 이루어지되, 상기 각각의 구성품을 적어도 2개이상 서로 조합하는 것을 특징으로 하는 콘크리트 구조물 시공시스템으로 이루어져 있었다. 이와 같은 본 발명자에 의한 종래의 발명은 다음과 같은 문제점이 있었다.On the other hand, in order to overcome these disadvantages, the inventor has made the invention as shown in Fig. 1 through the 2004-29028 patent application of April 27, 2004. Looking at the configuration of the concrete structure system according to the present inventors shown in Figure 1, the reinforcing bar is reinforced with a grid-shaped reinforcement (20), the grid-shaped reinforcement can be fixed inside and a number of building walls The
그러나, 종래의 발명은 철망조립체가 시멘트와 함께 벽체에 고정되기 때문에 시멘트벽의 시공상태를 육안으로 확인할 수가 없었다. 다시말해서, 기포발생, 크랙등을 육안으로 확인할 수가 없는 문제점이 있었다. 또한, 종래의 발명은 철망조립체가 시멘트의 하중을 견디지 못할 경우에는 벽체의 중간이 다소 볼록해질수 있는 문제점이 있었다. 또한, 종래의 발명은 각각의 구성품을 현장에서 조립해야하기 때문에 공기를 획기적으로 단축하는 데에는 한계가 있었다.However, the conventional invention has not been able to visually confirm the construction state of the cement wall because the wire mesh assembly is fixed to the wall with cement. In other words, there was a problem that can not be confirmed with the appearance of bubbles, cracks and the like. In addition, the conventional invention has a problem that the middle of the wall can be somewhat convex when the wire mesh assembly does not withstand the load of the cement. In addition, the conventional invention has a limitation in significantly shortening the air because each component must be assembled in the field.
본 발명의 목적은 상술한 문제점을 해결하기 위한 것으로서, 콘크리트 구조물 시공시에 시공현장에서 이루어지는 철근배근 작업, 거푸집 설치/제거 작업, 거푸집을 지지하기 위한 지지대설치/제거작업을 하지 않고 시공현장에서 가까운 근거리의 공장에서 본발명에 의한 시공시스템을 일체로 미리 조립하여 시공현장에서는 시공시스템을 크래인을 이용하여 작업위치에 고정한 후 콘크리트를 타설하므로서 공기(工期)를 획기적으로 단축할 수 있는 벽과 슬라브 시공시스템 및 이를 이용한 시공방법를 제공하는 데 그 목적이 있다.An object of the present invention is to solve the above-mentioned problems, the reinforcement work made in the construction site at the time of construction of concrete structures, the formwork installation / removal work, close to the construction site without the support installation / removal work for supporting the formwork Pre-assemble the construction system according to the present invention in a short distance factory, and at the construction site, fix the construction system to the working position by using crane and then install concrete and wall and slab to drastically shorten the air by placing concrete. The purpose is to provide a system and a construction method using the same.
상술한 목적은 벽시공위치에 수직으로 고정되는 다수의 철근조립체(40,40a)와, 상기 철근조립체의 외측에 마주하여 고정되어 상기 철근조립체에 콘크리트가 타설된 후 콘크리트가 유출되지 않도록 하는 플레이트(20,20a)와, 상기 플레이트의 외측에 각각 고정되어 상기 플레이트가 외측으로 밀리지 않도록 하는 지지체(10,10a)와, 상기 각각의 지지체 및 플레이트를 관통한 상태에서 상기 마주하는 플레이트와 플레이트간의 간격을 고정시켜주는 간격유지수단(35)을 포함하되, 적어도 2개이상이 마주하여 수직으로 고정되는 벽체와; 상기 각각의 마주하는 벽체 상단부를 가로질러서 고정되는 슬라브용철근(50) 을 포함하여 이루어져 상기 슬라브용 철근과 상기 철근조립체에 콘크리트를 동시에 타설한 후 양생시키는 것을 특 징으로 하는 벽과 슬라브 시공시스템에 의하여 달성된다.The above object is a plurality of reinforcing bar assemblies (40, 40a) fixed perpendicular to the wall construction position, and fixed to face the outer side of the reinforcing bar assembly to prevent the concrete outflow after the concrete is poured into the reinforcing bar assembly ( 20 and 20a,
이하, 첨부된 도면을 참조하여 본 발명의 구성에 대하여 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration of the present invention.
도 2은 본 발명에 의한 벽과 슬라브 시공시스템을 나타내는 도면이고, 도 3는 본 발명에 의한 벽과 슬라브 시공시스템에 의하여 완성된 벽과 슬라브를 나타내는 도면이고, 도 4는 본 발명의 분리사시도이고, 도 5(a)는 간격유지수단의 일측에 고정된 와셔와 미리 장착한 너트를 보여주는 도면이고, 도 5(b)는 간격유지수단의 또 다른 실시예를나타내는 도면으로서, 본 발명에 의한 벽과 슬라브 시공시스템은, 벽시공위치에 수직으로 고정되는 다수의 철근조립체(40,40a)와, 상기 철근조립체의 외측에 마주하여 고정되어 상기 철근조립체에 콘크리트가 타설된 후 콘크리트가 유출되지 않도록 하는 플레이트(20,20a)와, 상기 플레이트의 외측에 각각 고정되어 상기 플레이트가 외측으로 밀리지 않도록 하는 지지체(10,10a)와, 상기 각각의 지지체 및 플레이트를 관통한 상태에서 상기 마주하는 플레이트와 플레이트간의 간격을 고정시켜주는 간격유지수단(35)을 포함하되, 적어도 2개이상이 마주하여 수직으로 고정되는 벽체와; 상기 각각의 마주하는 벽체 상단부를 가로질러서 고정되는 슬라브용철근(50) 을 포함하여 이루어져 상기 슬라브용 철근과 상기 철근조립체에 콘크리트를 동시에 타설한 후 양생시키는 것을 특징으로 한다. 이하, 본 발명의 가각의 부재에 대하여 상세히 설명하기로 한다.Figure 2 is a view showing a wall and slab construction system according to the present invention, Figure 3 is a view showing a wall and slab completed by the wall and slab construction system according to the present invention, Figure 4 is an exploded perspective view of the present invention Figure 5 (a) is a view showing a washer and a pre-mounted nut fixed to one side of the gap holding means, Figure 5 (b) is a view showing another embodiment of the gap holding means, the wall according to the present invention And the slab construction system, a plurality of reinforcing bar assembly (40, 40a) fixed perpendicular to the wall construction position, and fixed to face the outer side of the reinforcing bar assembly so that the concrete does not spill after the concrete is poured into the reinforcing
철근조립체(40)는 벽시공위치에 수직으로 고정되는데, 가로방향의 철근과 수직방향의 철근이 용접 또는 철사등에 의하여 서로 고정된다. 이러한 철근조립체(40)는 별도의 공장에서 미리 제작된다. Reinforcing
플레이트(20)는 종래의 거푸집에 이용되는 합판을 대신하는 것으로서, 플레이트(20)의 재질은 투명한 재질로 이루어져 있다. 투명한 재질로는 시중에서 흔히 볼수 있는 아크릴판과 같은 것을 사용할수 있으나, 굳이 아크릴판에 한정하지는 않으며 투명한 재질이면서도 강도를 가지는 것은 무방하다고 할 수 있다. 플레이트(20)상에는 다수의 개구(21)가 일정한 간격으로 천공되어 있다. 한편, 플레이트(20)는 상기 철근조립체(40)의 외측에 벽두께 만큼 이격된 상태로 마주하여 고정된다. 또한, 플레이트(20)는 콘크리트가 타설된 후 콘크리트가 외부로 유출되지 않도록 하는 역활을 한다.
지지체(10)는 중공의 사각 프레임으로 이루어져 있는데, 가로방향의 프레임과 세로방향의 프레임이 서로 가교되어 있으며, 각각의 가로방향 및 세로방향의 프레임이 가교되는 위치에는 개구(11)가 형성되어 후술하는 간격유지수단(30)이 삽입될수 있도록 구성된다. 한편, 지지체(10)는 전체적으로 격자형으로 이루어져 있으나, 격자형에 한정하지는 않으며, 필요에 따라 격자형, 마름모형, 삼각형등 다양하게 구성할 수 있다. 또한, 지지체(10)는 중공으로 프레임으로 도시되어 있으나, 중공의 프레임에 한정하지 않으며, 중공의 프레임이 아닌 통상의 스틸 또는 알루미늄, 플라스틱 등의 재질로 이루어진 막대형상이면 모두 사용할 수 있다. The
간격유지 수단(30)은 상기 각각의 지지체 및 플레이트를 관통한 상태에서 상기 마주하는 플레이트와 플레이트간의 간격을 고정시켜주는데, 도시되어 있지는 않으나, 그 외측에는 숫나사가 형성되어 있어서 너트(33,31)를 조립할수 있도록 구성 된다. 숫나사는 전체에 형성할 수도 있으며, 단부(34)부분에만 형성할수도 있다. 한편, 간격유지 수단은 상술한 마주하는 지지체 및 플레이트상에 형성된 개구(11,21)을 관통하여 장착된 후, 상기 플레이트(20)의 양측에 너트(31: 외측에 위치하는 너트, 33: 내측에 위치하는 너트)를 체결한다. 체결된 너트에 의하여 플레이트를 수평방향으로 움질일수 없도록 고정한다. 내측 및 외측의 너트(31,33)에는 각각 와셔(32,32a)가 장착되어 너트의 풀림을 방지할 수 있다. 한편, 조립의 편리를 위하여 도 4와 같이 너트를 먼저 일측에서 체결하여 넣은 후, 한개의 와셔만을 간격유지수단의 일측에 용접에 의하여 고정시킬 수도 있다. The gap maintaining means 30 fixes the gap between the plate and the plate facing each other in the state of penetrating the respective supports and plates, although not shown, male threads are formed on the outside thereof so that the
또한, 간격유지수단을 도 4(b)와 같이 구성할 수도 있는데, 숫나사부(36)를 단부에만 형성하고, 양측단부에 벽두께 만큼 이격된 상태에서 돌출부(35a)를 구성할수도 있다. 이와 같이 도 4(b)와 같은 간격유지수단을 사용할수도 있으며, 전체적으로 숫나사가 형성된 간격유지수단(30)을 사용할수도 있다. 도 4(b)와같은 간격유지수단을 이용할 경우에는 2개의 너트만 있으면 된다. 즉, 양측단의 숫나사부(36)부분에 너트가 장착된다.In addition, the interval holding means may be configured as shown in FIG. 4 (b), but the
또한, 플레이트(20)의 내측에는 비닐지(22)를 내삽하여 시공후에 플레이트를 시멘트벽에서 분리하기 편리하도록 할수 있다. 또한, 굳이 비닐지를 내삽하지 않고, 플레이트의 내측벽면에 윤활제츨 칠하여 시멘트벽에서 잘 분리되도록 할수도 있다. 비닐지(22)에도 개구(22a)이 형성되어 있다. In addition, the inside of the
한편, 벽체(A)의 측면역시 내측으로부터 비닐지(22a), 플레이트(20a), 지지체(10a)가 순차로 마주하여 고정된다. 한편, 마주하는 각각의 비닐지(22a), 플레이 트(20a), 지지체(10a)는 벽체의 길이방향으로 상기 각각의 비닐지, 플레이트, 지지체를 관통하는 다수의 간격유지수단(30)에 의하여 그 간격이 유지된 채로 고정된다.On the other hand, the
상기 벽체(A)와 마주하는 벽체(A')의 상단부에 슬라브용철근(50)을 가로질러서 고정한 다음, 상기 슬라브용 철근과 상기 철근조립체에 콘크리트(여기서 콘크리트는 시멘트, 모래, 자갈등을 혼합한 혼합물로서 양생되기 전의 상태를 말한다)를 동시에 타설한 후 콘크리트를 양생시킨다. 한편, 슬라브용철근(50)은 시중에 유통되는 공지의 제품으로서, 슬라브용철근(50)의 하단부에는 스틸판(51)을 가진다. 스틸판(51)의 상부에 철근을 미리 역어서 철근과 스틸판을 일체로 용접한 제품이며, 시중에 유통되는 공지의 제품이므로 상세한 설명은 생략한다. 한편, 벽체의 일측은 단턱(C)이 형성되어 있다. 이는 후술하는 시멘트 타설과정에서 슬라브용철근을 안착시키기 위한 것이다.The slab is fixed across the reinforcing
이하, 상술한 벽과 슬라브 시공시스템에 의한 시공방법에 대하여 상세히 설명하기로 한다.Hereinafter, the construction method by the above-described wall and slab construction system will be described in detail.
제 1단계First stage
우선, 본 발명에 의한 벽과 슬라브 시공시스템은 건설현장의 가까운 별도의 공장에서 미리조립되어지는데, 슬라브를 시공하기 위한 철근조립체(50)는 시중에 유통되는 공지의 제품을 미리 확보한다. 이후, 철근조립체(40)를 제조하게 되는데, 철근조립체는 가로방향의 철근과 세로방향의 철근을 용접에 의하여 결합하거나 철사등에 의하여 역어서 가공할수도 있다. 이후, 플레이트 및 비닐지를 벽체의 넓이에 맞추어 절단한 후 일정간격으로 개구(21,22a)를 형성한다. First, the wall and the slab construction system according to the present invention is pre-assembled in a separate factory near the construction site, the reinforcing
또한, 지지체(10)를 만들기 위하여 가로방향의 프레임과 세로방향의 프레임을 서로 연결하여 격자형으로 구성한후, 개구(11)를 형성시킨다. 또한, 간격유지수단(30)을 장착하기에 적당한 길이로 다수 절단하고, 너트(31,33) 및 와셔(32)를 준비한다. 한편, 벽체의 측면에 고정되는 지지체(10a), 플레이트(20a), 비닐지(22a) 역시 측면의 넓이에 맞추어 제작한다. 한편, 간격유지수단(30)의 일측에는 와셔(32a)가 미리 용접에 의하여 고정된다. 이와 같은 과정에 의하여 본 발명에 필요한 구성품에 대한 제공이 완료된다. 한편, 간격유지수단은 도 4(b)와 같은 간격유지수단(35)을 제공할 수도 있다.In addition, in order to make the
제2단계2nd step
이후, 각각의 구성부재에 대한 조립은 도 3의 "B측" 을 먼저조립한 이후, B' 측을 조립한다. 우선, 플레이트(20), 지지체(10), 비닐지(22)에 형성된 개구(11,21,22a)에 도 4와 같이 미리 조립된 간격유지수단을 삽입한다. 이때, 와셔 32를 간격유지수단에 미리 삽입하여 둔다. 다음으로, 지지체(10)의 외측으로 돌출된 간격유지수단(30)의 단부에 너트(31)를 조립한다. Subsequently, the assembly for each component member first assembles the "B side" of FIG. 3, and then assembles the B 'side. First, the space keeping means pre-assembled as shown in FIG. 4 is inserted into the
이후, 지지체(10)와 반대편 측벽면 쪽의 간격유지수단에 미리 장착된 도5(a)의 너트 33을 돌려서 와셔(32)를 압착시키므로서 플레이트, 비닐지, 지지체가 일체로 조립된다. 이후, 측면에 있는 플레이트(20a), 비닐지(22a), 지지체(10a)역시 동일한 방법으로 조립한다. 철근조립체(40)는 소정의 갯수만큼 간격유지수단(30)사이 에 집어넣은 간격유지수단(30)과 용접에 의하여 고정되거나 철사에 의하여 고정된다. 상술한 과정에 의하여 B 측의 조립이 완료되면, B' 측의 조립을 한다.Subsequently, the plate, the plastic sheet, and the support are assembled integrally by pressing the
B' 측의 비닐지, 플레이트, 지지체에 형성된 개구를 순차로 상기 간격유지수단의 단부(34)에 삽입한다. 이후, 너트(31)를 단부(34)에 체결하므로서 모든 벽체의 조립이 완성된다. The openings formed on the B 'side of the plastic sheet, the plate and the support are sequentially inserted into the
한편, 도 5(b)에 의한 간격유지수단을 이용하여 벽체를 조립할 경우에는 B, B' 측으로 나누어 조립할 필요없이 돌출부(35a)의 양측에 비닐지(22), 플레이트(20), 지제체(10)를 삽입한후 외측에서 너트(31)를 제결하므로서 간편하게 조립할수 있다. 한편, 간격유지수단 35에 의하여 조립할 경우에는 간격유지수단(35)의 양측 돌출부(35a)의 외측에 각각의 비닐지(22), 플레이트(20), 지지체(10)에 형성된 개구(22a,21,11)를 순차로 사입한 후, 너트를 체결하므로서 쉽게 조립할수 있다.On the other hand, when assembling the wall using the gap holding means according to Figure 5 (b), the
제3단계3rd step
조립이 완성된 벽체와 슬라브용철근은 트럭등을 이용하여 건설현장으로 이송된다. 이송된 벽체와 슬라브용 철근은 다시 크레인등을 이용하여 원하는 벽의 시공위치로 이송된다. The assembled walls and slabs are transported to the construction site by trucks. The transferred wall and slab reinforcing bars are again transferred to the construction site of the desired wall using a crane or the like.
제4단계4th step
벽시공위치로 이송된 벽체는 원하는 벽의 시공위치에 수직으로 세워서 고정한다. 이후, 도 2와 같이 벽체(A)를 세운다음 벽체(A)와 마주하는 벽체(A')를 소정간격 이격된 상태로 고정한다. 이후, 턱이 형성된 (C)부분에 슬라브용철근(50)을 올려놓는다. The wall transferred to the wall construction position is fixed vertically at the construction position of the desired wall. Thereafter, the wall A is erected as shown in FIG. 2, and then the wall A 'facing the wall A is fixed at a predetermined interval. Then, put the slab reinforcing bar (50) on the (C) formed jaw.
제5단계5th step
상술한 제4단계 이후에 상기 슬라브용철근과 상기 벽체(A,A')의 내부에 콘크리트를 타설하게 된다. 콘크리트를 타설한 이후에는 양생하는 과정을 거치게 된다. 콘크리트가 양생된 이후에는 너트(31)를 풀어서, 지지체(10,10a)와 플레이트(20,20a)를 간격유지수단(30,35)에서 분리한다. 이때, 비닐지(22)에 의하여 플레이트가 원활하게 벽으로부터 분리된다. 한편, 분리된 플레이트(20,20a) 및 지지체(10,10a)는 다시 수거되어 공장으로 이송된후 재활용된다. 플레이트 및 지지체를 분리하므로서 본 발명에 의한 슬라브 및 벽은 시공이 완성된다.After the fourth step described above, concrete is poured into the slab reinforcing bars and the walls A and A '. After the concrete is poured, it is cured. After the concrete is cured, the nuts 31 are loosened to separate the
본 발명에 의하여 시멘트벽 내의 시공상태를 육안으로 확인할 수가 있다. 다시말해서, 기포발생, 크랙등을 육안으로 확인할 수가 있다. 또한, 시공시스템이 시멘트의 하중을 견디지 못할 경우에는 벽체의 중간이 다소 볼록해지는 것을 방지할수 있는 효과가 있다. 또한, 시공시스템을 근거리 공장에서 완전히 조립한 완성품을 이송하여 현장에서는 단지 수직으로 세워서 고정하기만 하면 되므로 공기를 획기적으로 단축할 수 있는 우수한 효과가 있다.
According to the present invention, the construction state in the cement wall can be visually confirmed. In other words, bubble generation, cracks, and the like can be visually confirmed. In addition, when the construction system does not withstand the load of cement, there is an effect that can prevent the middle of the wall somewhat convex. In addition, the construction system is transferred to the finished product assembled at a short-range factory, so in the field only need to stand vertically fixed there is an excellent effect that can significantly reduce the air.
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040038352A KR100612938B1 (en) | 2004-05-28 | 2004-05-28 | A construction system of the wall/dome and the the method thereof it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040038352A KR100612938B1 (en) | 2004-05-28 | 2004-05-28 | A construction system of the wall/dome and the the method thereof it |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050112913A KR20050112913A (en) | 2005-12-01 |
KR100612938B1 true KR100612938B1 (en) | 2006-08-16 |
Family
ID=37287718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040038352A KR100612938B1 (en) | 2004-05-28 | 2004-05-28 | A construction system of the wall/dome and the the method thereof it |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100612938B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101480360B1 (en) | 2013-08-09 | 2015-01-09 | 윤동현 | Construction method for underground structure |
CN106401178A (en) * | 2016-08-31 | 2017-02-15 | 中国十七冶集团有限公司 | Cracking prevention measure mold for joint of concrete wall and brick wall and installation method |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180027159A (en) * | 2016-09-06 | 2018-03-14 | 삼성물산 주식회사 | Steel adhension type wall system being detachable and the construction method of form |
KR101939090B1 (en) * | 2016-12-26 | 2019-01-16 | 김 다니엘 | Seismic design reinforcement system for buildings and seismic reinforcement method of buildings using the same |
KR102339591B1 (en) * | 2020-01-09 | 2021-12-17 | 선구시엠(주) | The mold of a corporate body assembling PE unwoven waterproof sheet and temporary supporter and method installing it thereof |
-
2004
- 2004-05-28 KR KR1020040038352A patent/KR100612938B1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101480360B1 (en) | 2013-08-09 | 2015-01-09 | 윤동현 | Construction method for underground structure |
CN106401178A (en) * | 2016-08-31 | 2017-02-15 | 中国十七冶集团有限公司 | Cracking prevention measure mold for joint of concrete wall and brick wall and installation method |
Also Published As
Publication number | Publication date |
---|---|
KR20050112913A (en) | 2005-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100343960B1 (en) | Steel concrete structure | |
JP5386379B2 (en) | Precast slab joints in bridges | |
KR200414349Y1 (en) | Connection structure of precast concrete structure | |
KR100612938B1 (en) | A construction system of the wall/dome and the the method thereof it | |
KR102269141B1 (en) | Deck plate wall installation method using underground pavement | |
KR101954387B1 (en) | Grid precast concrete structure and constructing method thereof | |
JP2520354B2 (en) | Construction method of precast concrete beams and columns, and earthquake-resistant walls using them | |
JP4657993B2 (en) | Beam-column joint structure and construction method thereof | |
KR100433150B1 (en) | A working desk assembling framework of gang form for building | |
KR101078292B1 (en) | Concrete slab mold assembly and method for constructing slab | |
KR100557334B1 (en) | A Dismonuting Stair Form | |
JP2959325B2 (en) | Construction method of steel frame reinforced concrete structure | |
KR0145358B1 (en) | Method of building slabs | |
KR101576224B1 (en) | Prefabricated precast concrete girder for building construction | |
KR102109900B1 (en) | Reinforced Concrete Method and Reinforced Concrete Structure | |
JPH0754361A (en) | Construction method of wall for slope face, building, or the like, and built-up reinforcement used therefor | |
KR200166886Y1 (en) | Steel concrete structure | |
JP4061611B2 (en) | PCa stairs mounting structure, PCa stairs mounting method, PCa stairs | |
JP2005290711A (en) | Wall form structure of reinforced concrete building | |
JPH06272378A (en) | Supporting structure for precast concrete form | |
JP2008150820A (en) | Wall concrete, and manufacturing method and construction method therefor | |
KR100402659B1 (en) | Grid precast concrete beam | |
KR20230147322A (en) | the construction system for the surface finishing material simultaneous construction | |
KR200362854Y1 (en) | Clamp for supporting a sheeting using in build structure | |
JP2001026975A (en) | Construction method for lining plate for side ditch on farm road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110808 Year of fee payment: 6 |
|
LAPS | Lapse due to unpaid annual fee |