JP2001026975A - Construction method for lining plate for side ditch on farm road - Google Patents

Construction method for lining plate for side ditch on farm road

Info

Publication number
JP2001026975A
JP2001026975A JP11201347A JP20134799A JP2001026975A JP 2001026975 A JP2001026975 A JP 2001026975A JP 11201347 A JP11201347 A JP 11201347A JP 20134799 A JP20134799 A JP 20134799A JP 2001026975 A JP2001026975 A JP 2001026975A
Authority
JP
Japan
Prior art keywords
concrete
reinforcing bar
dimensional
lining plate
abutment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11201347A
Other languages
Japanese (ja)
Other versions
JP3874576B2 (en
Inventor
Katsuto Kichimurei
勝人 吉牟禮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KONDO KOZAI KK
Original Assignee
KONDO KOZAI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KONDO KOZAI KK filed Critical KONDO KOZAI KK
Priority to JP20134799A priority Critical patent/JP3874576B2/en
Publication of JP2001026975A publication Critical patent/JP2001026975A/en
Application granted granted Critical
Publication of JP3874576B2 publication Critical patent/JP3874576B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Sewage (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for lining plate for side ditch capable of eliminating almost al of reinforcing bar arrangement work, form assembly work, and disassembly and removal works at site and rationalizing the construction works. SOLUTION: This construction method for a lining plate for side ditch on a farm road consists of a process in which a three-dimensional truss 2 with a concrete permanent form in which a concrete board 22 is integrally formed in a lower part of a three-dimensional welded reinforcing bar 21 is spread and provided by inserting a U-shaped bare 3 into the inside of the three-dimensional welded reinforcing bar 21 so as to pull it out in advance and putting both ends of the three-dimensional truss 2 with concrete permanent form on a bridge base 11 of a side ditch 1, a process in which the U-shaped bar 3 is pulled out of the three-dimensional truss 2 with concrete permanent form after spreading and providing the truss 2, a connection process in which a projection 4 is driven and erected in the bridge base 11 on an inner side of a bent part of the U-shaped bar 3, a nd a process in which concrete is placed on the three-dimensional welded reinforcing bar 21 and each three-dimensional truss 2 with concrete permanent form is connected to form the lining plate.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は農道に於ける側溝用
覆工板の施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a lining plate for a gutter on an agricultural road.

【0002】[0002]

【従来の技術】図4は従来の農道に於ける側溝用覆工板
の施工方法の要部を示す図である。この施工方法は、先
ず側溝(1)の橋台(11)と面一になるように、型枠を設
置する。この時、前記型枠は側溝(1)の内側面に接触さ
せて位置設定すると共に前記型枠が作業中やコンクリー
ト打設した後、重量で落下したり反ったりしないよう
に、前記型枠と側溝(1)の底面の間に支持具を設置させ
て保持していた。前記型枠が設置された後、鉄筋を加工
して適宜な形状に組立てると共にその鉄筋が橋台(11)
面から所定高さ浮くように多数のスペーサーなどを使用
して鉄筋配筋作業を終了させる。そして側溝(1)の橋台
(11)より上に覆工板が形成出来るようにコンクリート
打設して側溝(1)の上面が面一になるまでコンクリート
を供給する。コンクリートの固化後は、先ず始めに、作
業者が側溝(1)の中に入って支持具を外し、更に型枠を
分解して側溝(1)内部に順次置いて行く。その後、型枠
や支持具を側溝(1)から外部へ搬出させていた。
2. Description of the Related Art FIG. 4 is a view showing a main part of a conventional method of constructing a gutter lining plate on an agricultural road. In this construction method, first, a formwork is installed so as to be flush with the abutment (11) of the gutter (1). At this time, the form is brought into contact with the inner side surface of the side groove (1) to set the position and the form is not dropped or warped by weight during the work or after the concrete is cast. A support was installed and held between the bottom surfaces of the side grooves (1). After the formwork is installed, the rebar is processed and assembled into an appropriate shape, and the rebar is attached to the abutment (11).
The rebar arrangement work is completed using a number of spacers or the like so as to float at a predetermined height from the surface. Then, concrete is cast so that a lining plate can be formed above the abutment (11) of the gutter (1), and concrete is supplied until the upper surface of the gutter (1) is flush. After the concrete is solidified, first, an operator enters the gutter (1), removes the support, disassemble the formwork, and sequentially places the mold inside the gutter (1). After that, the mold and the support were carried out from the side groove (1) to the outside.

【0003】[0003]

【発明が解決しようとする課題】しかしながら前記側溝
用覆工板の施工方法は現場に於いて、型枠の組立作業や
鉄筋配筋作業が行われるため、手間が掛ると共に多くの
作業員が必要であった。また型枠の解体後、作業者が狭
い側溝(1)の中に入って作業するため、非常に作業性が
悪く、狭い側溝(1)の中に入って型枠を搬出する際は、
運搬機械などが入らないのでそれらは使用出来ず、人力
に頼るしかなかった。特に型枠は大きく嵩ばるため、覆
工板が施工されて形成した一定長さの出入口まで人力で
運び出さなければならず、大変な重労働であった。この
ため覆工板が長くなると、一気に形成させずに、所定長
さに区切って施工しなければならない等の問題点があっ
た。
However, the method of installing the lining plate for gutters requires a lot of labor and requires a large number of workers, since the assembling work of the formwork and the reinforcing bar reinforcing work are performed on site. Met. Also, after dismantling the formwork, the worker enters the narrow gutter (1) and works, so the workability is very poor. When the mold is carried out in the narrow gutter (1),
They couldn't be used because they couldn't enter the transport equipment, so they had to rely on human power. In particular, since the formwork is large and bulky, it has to be carried out manually to a fixed-length entrance formed with a lining plate, which is a very heavy labor. For this reason, when the length of the lining plate is long, there is a problem in that the lining plate must be divided into a predetermined length and formed without being formed at once.

【0004】本発明は型枠作業が省略でき、特に大変で
ある型枠撤去が不要となって現場作業が容易で且つ施工
の合理化が図れる農道に於ける側溝用覆工板の施工方法
を提供することを目的とする。
[0004] The present invention provides a method of installing a lining plate for a gutter on an agricultural road, which can omit a formwork operation, eliminates the need for particularly difficult formwork removal, facilitates on-site work, and streamlines the work. The purpose is to do.

【0005】[0005]

【課題を解決するための手段】上記問題点を解決するた
めに本発明は成されたものであり、つまり、イ)立体溶
接鉄筋の下部にコンクリート版を一体に形成させたコン
クリート捨て型枠付き立体トラスを用意すると共に立体
溶接鉄筋の内部に、接続用のU字筋の開口側から引出し
可能に成し、そのコンクリート捨て型枠付き立体トラス
の両端を、側溝の橋台に載置して敷設する工程と、ロ)
敷設後、コンクリート捨て型枠付き立体トラスに差し込
まれていた各U字筋を引出し、その折曲部を橋台の壁面
に当接させるU字筋の引出し工程と、ハ)引出された各
U字筋の折曲部の内側で且つ橋台に、コンクリートアン
カーやスタッドボルトなどの突起物を打込んで立設させ
る接続工程と、ニ)立体溶接鉄筋にコンクリート打設
し、敷設された各コンクリート捨て型枠付き立体トラス
が一体化されて覆工板を形成する工程とから構成する。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems. Namely, a) a concrete dumping form in which a concrete slab is integrally formed below a three-dimensional welded reinforcing bar; A three-dimensional truss is prepared, and it can be pulled out from the opening side of the U-shaped reinforcing bar inside the three-dimensional welded reinforcing bar, and both ends of the three-dimensional truss with the concrete dumping formwork are placed and laid on the abutment in the gutter Process and b)
After laying, each U-shaped streak inserted into the three-dimensional truss with the concrete dumping formwork is pulled out, and the U-shaped streak drawing process of bringing the bent portion into contact with the abutment wall surface; A connection process in which a projection such as a concrete anchor or stud bolt is driven into the abutment inside the bent portion of the streak, and d) concrete is cast into the three-dimensional welded rebar, and each concrete dumping mold is laid. Forming the lining plate by integrating the framed space truss.

【0006】又、橋台の幅が狭い側溝に覆工板が施工さ
れる場合には、イ)側溝の両側の橋台に突起物を所定ピ
ッチで打込んで立設させる工程と、ロ)立体溶接鉄筋の
下部にコンクリート版が一体に形成されたコンクリート
捨て型枠付き立体トラスを用意し、そのコンクリート捨
て型枠付き立体トラスの両端を、橋台に載置して敷設す
る工程と、ハ)突起物の外側に接続用の長尺な鉄筋を配
置すると共に長尺な鉄筋と立体溶接鉄筋の間が、複数の
短い鉄筋を用いて鉄線や溶接などで固定しながら、その
短い鉄筋が突起物に接触しないように確認する接続工程
と、ニ)立体溶接鉄筋にコンクリート打設し、敷設され
た各コンクリート捨て型枠付き立体トラスが一体化され
て覆工板を形成する工程とから構成する。
In the case where a lining plate is installed in a narrow gutter having a narrow abutment, a) a step of driving projections into the abutment on both sides of the gutter at a predetermined pitch and erecting the abutment; (3) a step of preparing a three-dimensional truss with a concrete dumping formwork in which a concrete plate is integrally formed below the reinforcing bars, and placing and laying both ends of the three-dimensional truss with the concrete dumping formwork on an abutment; A long reinforcing bar for connection is placed on the outside of the steel bar, and between the long reinforcing bar and the three-dimensional welded reinforcing bar is fixed with multiple short reinforcing bars by iron wire or welding, and the short reinforcing bar contacts the protrusion And d) a step of casting concrete on the three-dimensional welded reinforcing bar and forming a lining plate by integrating the laid three-dimensional truss with the concrete dumping formwork.

【0007】[0007]

【発明の実施の形態】図1、図2は本発明の実施形態を
示す図であり、先ず始めに図中の番号について説明す
る。(1)は上方が開口され且つ上縁に段差を有した農道
用のコンクリート製の側溝である。尚、橋台(11)は側
溝(1)の上縁に設けた段差の下段部を指す。(2)は立
体溶接鉄筋(21)の下部にコンクリート打設して所定厚
さのコンクリート版(22)を一体に形成させたコンクリー
ト捨て型枠付き立体トラスであり、これは工場で仕上げ
たものを現場に持ち込む。尚、この時、コンクリート構
造物で必要な鉄筋からの厚さ分、つまり、底面から下方
の鉄筋までの距離を3cm以上確保しておく。又、前記コ
ンクリート捨て型枠付き立体トラス(2)は本発明者が
提案した特願平11−169099号の構造のものを利
用すれば良い。(3)はコンクリート鉄筋をU字状に折
曲した接続用のU字筋であり、該U字筋(3)は予め工
場に於いて、立体溶接鉄筋(21)の長手方向の各鉄筋間
に沿って引出し可能に差し込んでおく。この時、U字筋
(3)の折曲部(31)が外側に来るようにセットすると
共にU字筋(3)の開口側を若干縮めて弾性を持たせた
状態でセットしておくと良い。(4)はコンクリートア
ンカーやスタッドボルトなどの突起物であり、該突起物
(4)はU字筋(3)の折曲部(31)の内側で且つ橋台
(11)に打込んで立設させて使用する。
1 and 2 are views showing an embodiment of the present invention. First, the numbers in the figures will be described. (1) is a concrete gutter for agricultural roads having an upper opening and a step at the upper edge. In addition, the abutment (11) indicates the lower part of the step provided on the upper edge of the side groove (1). (2) is a three-dimensional truss with a concrete dumping formwork in which concrete is cast into the lower part of a three-dimensional welded reinforcing bar (21) and a concrete slab (22) of a predetermined thickness is integrally formed, which is finished at a factory. Bring to the site. At this time, the thickness from the reinforcing bar required for the concrete structure, that is, the distance from the bottom surface to the lower reinforcing bar, should be at least 3 cm. The three-dimensional truss (2) with the concrete dumping formwork may use the structure of Japanese Patent Application No. 11-169099 proposed by the present inventor. (3) is a connecting U-shaped reinforcing steel bent in a U-shape, and the U-shaped reinforcing bar (3) is connected between the reinforcing bars in the longitudinal direction of the three-dimensional welded reinforcing bar (21) in advance in a factory. It is inserted so that it can be pulled out along. At this time, it is preferable to set the bent portion (31) of the U-shaped streak (3) to the outside and to set the U-shaped streak (3) with elasticity by slightly reducing the opening side thereof. good. (4) is a projection such as a concrete anchor or a stud bolt, and the projection (4) is set inside the bent portion (31) of the U-shaped streak (3) and into the abutment (11). Let me use it.

【0008】次に本実施形態の農道に於ける側溝用覆工
板の施工方法について説明する。予め工場でU字筋
(3)を立体溶接鉄筋(21)の長手方向の各鉄筋間へ引
出し可能に差し込んでおく。先ず始めに、イ)U字筋
(3)を差し込んだコンクリート捨て型枠付き立体トラ
ス(2)の両端を、側溝(1)の橋台(11)に載置して敷
設する。次に全ての敷設作業が完了後、コンクリート捨
て型枠付き立体トラス(2)に差し込まれていたU字筋
(3)を引出し、その折曲部(31)を橋台(11)の壁面
に当接させるロ)U字筋(3)の引出し工程を行う。そ
して、U字筋(3)の折曲部(31)の内側で且つ橋台(1
1)に、コンクリートアンカーやスタッドボルトなどの
突起物(4)を打込んで立設させる ハ)接続工程が行わ
れる。この時、図2のように突起物(4)はU字筋
(3)と固定されていない状態である。次に立体溶接鉄
筋(21)にコンクリート打設することにより、敷設され
た各コンクリート捨て型枠付き立体トラス(2)が一体
化されてニ)覆工板を形成する工程が終了するのであ
る。前記突起物(4)はU字筋(3)及び立体溶接鉄筋
(21)と離れているが、コンクリートを介在して、コン
クリート捨て型枠付き立体トラス(2)は、側溝(1)の
橋台(11)に固定した突起物(4)と立体溶接鉄筋(2
1)が一体化され、側溝(1)の上部に覆工板が強固に形
成される。従って、強固に形成された覆工板は農道とし
ての役割が果たせるものとなるのである。
Next, a method for constructing the gutter lining plate on the agricultural road according to the present embodiment will be described. A U-shaped reinforcing bar (3) is inserted in advance at a factory between the respective reinforcing bars in the longitudinal direction of the three-dimensional welded reinforcing bar (21) so as to be able to be pulled out. First, a) The both ends of the three-dimensional truss (2) with concrete dumping formwork into which the U-shaped reinforcement (3) is inserted are placed and laid on the abutment (11) of the gutter (1). Next, after all the laying work is completed, the U-shaped streak (3) inserted into the three-dimensional truss (2) with concrete dumping formwork is pulled out, and the bent part (31) is applied to the wall of the abutment (11). B) A step of pulling out the U-shaped streak (3) is performed. Then, the inside of the bent portion (31) of the U-shaped streak (3) and the abutment (1
In 1), a projecting object (4) such as a concrete anchor or stud bolt is driven in to stand up. At this time, the projection (4) is not fixed to the U-shaped streak (3) as shown in FIG. Next, concrete is cast on the three-dimensional welded reinforcing bar (21), whereby the laid three-dimensional trusses (2) with the concrete dumping formwork are integrated, and d) the step of forming a lining plate is completed. The protrusion (4) is separated from the U-shaped reinforcing bar (3) and the three-dimensional welded reinforcing bar (21), but with concrete interposed therebetween, the three-dimensional truss with a concrete dumping formwork (2) is connected to the abutment of the gutter (1). The protrusion (4) fixed to (11) and the three-dimensional welded reinforcing bar (2
1) is integrated, and the lining plate is firmly formed on the upper part of the side groove (1). Therefore, the firmly formed lining plate can serve as a farm road.

【0009】図3は本発明の別実施形態を示す図であ
り、これは狭い橋台(11)を有した従来よく使用された
側溝(1)に対応可能な覆工板の施工方法である。先ず始
めに図中の番号について説明する。(1)は上方が開口さ
れ且つ上縁に橋台(11)を有した農道用のコンクリート
製の側溝であり、この側溝(1)は橋台(11)の幅が狭い
が、前記実施形態と同一のものを用いても良い。尚、前
記実施形態に於いて、橋台(11)の幅が狭い側溝(1)を
用いると、U字筋(3)の折曲部(31)と突起物(4)が
接触或いは該突起物(4)が折曲部(31)の内側に入らな
い場合が発生する。(2)は前記実施形態と同一のコン
クリート捨て型枠付き立体トラス(2)を用いる。(3)
のU字筋は用いない。(4)はスタッドボルトなどの突
起物である。(5)は突起物(4)の外側に配置した接
続用の長尺な鉄筋であり、該長尺な鉄筋(5)は束だてに
よって浮いた状態で配置されている。(6)は長尺な鉄
筋(5)と立体溶接鉄筋(21)に一端ずつを鉄線や溶接な
どで固定させて連結した短い鉄筋であり、これは所定間
隔に固定すると共に突起物(4)に接触しないように確
認して配置する。
FIG. 3 is a view showing another embodiment of the present invention, which is a method of constructing a lining plate having a narrow abutment (11) and capable of coping with a conventionally used gutter (1). First, the numbers in the figure will be described. (1) is a concrete gutter for an agricultural road having an open top and an abutment (11) at the upper edge. The gutter (1) has a narrow width of the abutment (11), but is the same as the above embodiment. May be used. In the above embodiment, when the abutment (11) has a narrow side groove (1), the bent portion (31) of the U-shaped streak (3) comes into contact with the projection (4) or the projection (4). (4) may not enter the inside of the bent portion (31). (2) uses the same three-dimensional truss (2) with a concrete dumping formwork as in the above embodiment. (3)
U-shaped streaks are not used. (4) is a projection such as a stud bolt. (5) is a long bar for connection arranged outside the projection (4), and the long bar (5) is arranged in a floating state by bundling. (6) is a short reinforcing bar having one end fixed to a long reinforcing bar (5) and a three-dimensional welded reinforcing bar (21) by an iron wire or welding, and fixed at a predetermined interval and a projection (4). Make sure that it does not touch the device.

【0010】次に別実施形態の農道に於ける側溝用覆工
板の施工方法について説明する。先ず始めにイ)側溝
(1)両側の幅の狭い橋台(11)にスタッドボルトなどの
突起物(4)を所定ピッチで打込んで突起物(4)が立
設される工程を行う。尚、この工程は後述する設置工程
の後に行っても良く、或いは長尺な鉄筋(5)を鉄線や溶
接などで連結した後に行っても良い。ロ)立体溶接鉄筋
(21)の下部にコンクリート打設してコンクリート版(2
2)が一体に形成されたコンクリート捨て型枠付き立体ト
ラス(2)を用意し、そのコンクリート捨て型枠付き立
体トラス(2)の両端を、前記橋台(11)に載置して敷
設する工程を行う。次にハ)前記突起物(4)の外側に
接続用の長尺な鉄筋(5)を配置すると共に該長尺な鉄筋
(5)と前記立体溶接鉄筋(21)の間が、複数の短い鉄筋
(6)を用いて鉄線や溶接などで固定しながら、前記突起
物(4)に接触しないように確認する接続工程が終了す
る。そしてニ)前記立体溶接鉄筋(21)にコンクリート
打設し、敷設された各コンクリート捨て型枠付き立体ト
ラス(2)が一体化されて覆工板を形成する工程を行
う。このため、コンクリートの固化後は、従来の如き支
持具を外したり、型枠を分解して側溝(1)から型枠や支
持具を搬出させたりする作業は不要となるのである。
Next, a method of constructing a lining plate for a gutter on an agricultural road according to another embodiment will be described. First, a) gutter
(1) A process is performed in which projections (4) such as stud bolts are driven into a narrow abutment (11) on both sides at a predetermined pitch so that the projections (4) are erected. This step may be performed after the installation step described later, or may be performed after connecting the long reinforcing bar (5) by iron wire or welding. B) Concrete is cast at the lower part of the three-dimensional welded reinforcing bar (21) and the concrete plate (2
A step of preparing a three-dimensional truss (2) with a concrete dumping formwork integrally formed with 2) and placing and laying both ends of the three-dimensional truss (2) with a concrete dumping formwork on the abutment (11). I do. Next, (c) a long reinforcing bar (5) for connection is arranged outside the protrusion (4), and the long reinforcing bar (5) is arranged.
A plurality of short reinforcing bars are provided between (5) and the three-dimensional welding reinforcing bar (21).
The connection step of confirming not to come into contact with the protrusion (4) while fixing with iron wire or welding using (6) is completed. And d) a step of casting concrete onto the three-dimensional welded reinforcing bar (21) and integrating the laid three-dimensional trusses (2) with the concrete dumping formwork to form a lining plate. For this reason, after the concrete is solidified, it is not necessary to remove the support and to disassemble the mold and carry out the form and the support from the side groove (1) as in the conventional art.

【0011】[0011]

【発明の効果】本発明はこのように構成させたことによ
り、下記に記載する効果を有する。
The present invention having the above-described structure has the following effects.

【0012】請求項1のようにイ)立体溶接鉄筋(21)
の下部にコンクリート版(22)を一体に形成させたコンク
リート捨て型枠付き立体トラス(2)を用意すると共に
前記立体溶接鉄筋(21)の内部にU字筋(3)を引出し
可能に予め差し込み、そのコンクリート捨て型枠付き立
体トラス(2)の両端を、側溝(1)の橋台(11)に載置
して敷設する工程と、ロ)敷設後、コンクリート捨て型
枠付き立体トラス(2)に差し込まれていたU字筋
(3)を引出し、その折曲部(31)を橋台(11)の壁面
に当接させるU字筋(3)の引出し工程と、ハ)引出さ
れたU字筋(3)に突起物(4)を接触させないように
立設する接続工程と、ニ)立体溶接鉄筋(21)にコンク
リート打設して各コンクリート捨て型枠付き立体トラス
(2)が一体化されて覆工板を形成する工程とから成る
施工方法とすることにより、現場に於いて、型枠の組立
作業や鉄筋配筋作業が不要となるため、手間が省けると
共に少ない作業員で作業が行え、施工の合理化が図れ、
工期の短縮やコストダウンが可能となる。また型枠の解
体撤去が不要となるため、従来の如き作業者が狭い側溝
(1)の中に入って作業する必要がなく且つその狭い側溝
(1)の中で大きく嵩ばる型枠を所定長さの出口まで人力
で運び出さなくても良くなったので、力仕事に不向きな
臨時の女性作業員でも作業が行えるものとなった。また
覆工板が長くなる場合であっても、従来の如く所定長さ
に区切って施工しなくても良くなるので、一度で施工を
完了させることができ、作業効率が飛躍的に向上する。
According to the first aspect of the present invention, a) a three-dimensional welded reinforcing bar is provided.
A three-dimensional truss (2) with a concrete disposal form in which a concrete slab (22) is integrally formed at the lower part of the slab is prepared, and a U-shaped reinforcing bar (3) is previously inserted into the three-dimensional welded reinforcing bar (21) so as to be able to be drawn out. Placing the two ends of the three-dimensional truss with concrete dumping formwork (2) on the abutment (11) of the gutter (1) and laying it down; b) After laying, the three-dimensional truss with concrete dumping formwork (2) A U-shaped bar (3) drawn out of the U-shaped bar (3) for bringing the bent portion (31) into contact with the wall surface of the abutment (11); A connecting step of erecting the projections (4) so as not to contact the bars (3), and d) a concrete truss (2) with concrete dumping formwork by casting concrete on the three-dimensional welded reinforcing bar (21). And the step of forming a lining plate, On-site, there is no need for formwork assembling work and rebar arrangement work, so labor can be saved and work can be done with a small number of workers, streamlining construction,
The construction period can be shortened and costs can be reduced. In addition, since it is not necessary to dismantle and remove the formwork, it is necessary for workers to
(1) There is no need to work inside and its narrow gutter
In (1), a large bulky formwork does not have to be manually carried out to an exit of a predetermined length, so that a temporary female worker unsuitable for heavy work can work. Further, even when the lining plate becomes long, it is not necessary to perform the work by dividing the work into a predetermined length as in the related art, so that the work can be completed at once and the work efficiency is dramatically improved.

【0013】請求項2のようにU字筋(3)を立体溶接
鉄筋(21)の長手方向の各鉄筋間に沿って引出し可能に
差し込むことにより、コンクリート捨て型枠付き立体ト
ラス(2)同士の結合や側溝(1)との結合が、U字筋
(3)の折曲部(31)内側に突起物(4)を打込んでコ
ンクリート打設させるだけの簡単な作業となる。又、現
場に於いては殆ど手直しや修理が不要となり、従来の工
法と比較して短工期で且つ省労力できると共にコスト削
減も可能である。
According to a second aspect of the present invention, the U-shaped reinforcing bar (3) is inserted between the reinforcing bars in the longitudinal direction of the three-dimensional welded reinforcing bar (21) so as to be able to be drawn out, so that the three-dimensional truss (2) with the concrete dumping formwork is connected. And the connection with the side groove (1) is a simple operation of driving the projection (4) into the inside of the bent portion (31) of the U-shaped streak (3) and placing concrete. Further, almost no rework or repair is required at the site, the construction period can be shortened, labor can be saved, and the cost can be reduced as compared with the conventional construction method.

【0014】請求項3に示すようにイ)側溝(1)の両側
の橋台(11)に突起物(4)を所定ピッチで打込んで立
設させる工程と、ロ)立体溶接鉄筋(21)の下部にコン
クリート版(22)が一体に形成されたコンクリート捨て型
枠付き立体トラス(2)の両端を、橋台(11)に載置し
て敷設する工程と、ハ)突起物(4)の外側に接続用の
長尺な鉄筋(5)を配置すると共にその長尺な鉄筋(5)と
立体溶接鉄筋(21)と固定する接続工程と、ニ)立体溶
接鉄筋(21)にコンクリート打設し、敷設された各コン
クリート捨て型枠付き立体トラス(2)が一体化されて
覆工板を形成する工程とから成る施工方法とすることに
より、請求項1と略同一の効果を得ることが出来る。特
に、幅の狭い橋台(11)を有した側溝(1)に覆工板を
施工する場合、突起物(4)に触らずに施工が可能であ
る。またコンクリート捨て型枠付き立体トラス(2)の
立体溶接鉄筋(21)にU字筋(3)を差し込むことがな
くなるため、運搬時の重量がより減少できるものとな
る。
According to the third aspect of the present invention, a) a step of driving projections (4) into the abutments (11) on both sides of the side groove (1) at a predetermined pitch to erect them, and (b) a three-dimensional welded reinforcing bar (21). A step of placing and laying both ends of a three-dimensional truss (2) with a concrete dumping formwork in which a concrete slab (22) is integrally formed at the lower part of the abutment (11); Connecting a long reinforcing bar (5) for connection on the outside and fixing it to the long reinforcing bar (5) and the three-dimensional welded reinforcing bar (21); And the step of forming the lining plate by integrating the laid trusses (2) with the concrete dumping formwork to be laid, whereby substantially the same effect as in claim 1 can be obtained. I can do it. In particular, when the lining plate is installed in the gutter (1) having the narrow abutment (11), the installation can be performed without touching the protrusion (4). Further, since the U-shaped reinforcing bar (3) is not inserted into the three-dimensional welded reinforcing bar (21) of the three-dimensional truss (2) with the concrete dumping formwork, the weight during transportation can be further reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態の要部を示す断面図である。FIG. 1 is a sectional view showing a main part of an embodiment of the present invention.

【図2】本発明の実施形態の要部を示す平面図である。FIG. 2 is a plan view showing a main part of the embodiment of the present invention.

【図3】本発明の別実施形態の要部を示す平面図であ
る。
FIG. 3 is a plan view showing a main part of another embodiment of the present invention.

【図4】従来の実施形態の要部を示す断面図である。FIG. 4 is a cross-sectional view showing a main part of a conventional embodiment.

【符号の説明】[Explanation of symbols]

1 側溝 11 橋台 2 コンクリート捨て型枠付き立体トラス 21 立体溶接鉄筋 22 コンクリート版 4 突起物 5 長尺な鉄筋 6 短い鉄筋 DESCRIPTION OF SYMBOLS 1 Gutter 11 Abutment 2 Three-dimensional truss with concrete dumping formwork 21 Three-dimensional welded reinforcing bar 22 Concrete plate 4 Projection 5 Long reinforcing bar 6 Short reinforcing bar

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 以下の工程から成ることを特徴とする農
道に於ける側溝用覆工板の施工方法。イ )立体溶接鉄筋(21)の下部にコンクリート打設して
コンクリート版(22)が一体に形成されせたコンクリート
捨て型枠付き立体トラス(2)を用意し、且つ前記立体
溶接鉄筋(21)の内部に、接続用のU字筋(3)の開口
側から差し込むと共に引出し可能に成し、そのコンクリ
ート捨て型枠付き立体トラス(2)の両端を、側溝(1)
の橋台(11)に載置して敷設する工程。ロ )敷設後、コンクリート捨て型枠付き立体トラス
(2)に差し込まれていた接続用のU字筋(3)を引出
し、その折曲部(31)を前記橋台(11)の壁面に当接さ
せるU字筋(3)の引出し工程。ハ )引出されたU字筋(3)の折曲部(31)の内側で且つ
橋台(11)に、コンクリートアンカーやスタッドボルト
などの突起物(4)を打込んで立設させる接続工程。ニ )前記立体溶接鉄筋(21)にコンクリート打設し、敷
設された各コンクリート捨て型枠付き立体トラス(2)
が一体化されて覆工板を形成する工程。
1. A method for constructing a gutter lining board on an agricultural road, comprising the following steps. B) A three-dimensional truss (2) with a concrete dumping formwork in which concrete is cast into the lower part of the three-dimensional welded reinforcing bar (21) and a concrete plate (22) is integrally formed, and the three-dimensional welded reinforcing bar (21) is provided. Can be inserted from the opening side of the connecting U-shaped reinforcement (3) and can be pulled out.
The process of placing and laying on the abutment (11). B) After laying, pull out the connecting U-shaped streak (3) inserted in the three-dimensional truss with concrete dumping formwork (2), and abut the bent part (31) on the wall of the abutment (11). A step of pulling out a U-shaped streak (3). C) A connecting step in which a projection (4) such as a concrete anchor or a stud bolt is driven into the bent portion (31) of the drawn-out U-shaped bar (3) and into the abutment (11) to be erected. D) Three-dimensional truss (2) with concrete cast-out formwork laid by placing concrete on the three-dimensional welded reinforcing bar (21)
A step of forming a lining plate by being integrated.
【請求項2】 前記U字筋(3)が、立体溶接鉄筋(2
1)の長手方向の各鉄筋間に沿って引出し可能に差し込
まれた請求項1記載の農道に於ける側溝用覆工板の施工
方法。
2. The three-dimensional welded reinforcing bar (2)
2. The method of claim 1, wherein the lining plate for a gutter on an agricultural road is inserted so as to be able to be drawn out between the reinforcing bars in the longitudinal direction.
【請求項3】 以下の工程から成ることを特徴とする農
道に於ける側溝用覆工板の施工方法。イ )側溝(1)の両側の橋台(11)にスタッドボルトなど
の突起物(4)を所定ピッチで打込んで立設させる工
程。ロ )立体溶接鉄筋(21)の下部にコンクリート打設して
コンクリート版(22)が一体に形成されたコンクリート捨
て型枠付き立体トラス(2)を用意し、そのコンクリー
ト捨て型枠付き立体トラス(2)の両端を、前記橋台
(11)に載置して敷設する工程。ハ )前記突起物(4)の外側に接続用の長尺な鉄筋(5)
を配置すると共に該長尺な鉄筋(5)と前記立体溶接鉄筋
(21)の間が、短い鉄筋(6)を用いて鉄線や溶接など
で固定しながら、その短い鉄筋(6)が前記突起物
(4)に接触しないことを確認する接続工程。ニ )前記立体溶接鉄筋(21)にコンクリート打設し、敷
設された各コンクリート捨て型枠付き立体トラス(2)
が一体化されて覆工板を形成する工程。
3. A method for constructing a lining plate for a gutter on an agricultural road, comprising the following steps. B) A step of driving projections (4) such as stud bolts at a predetermined pitch into the abutments (11) on both sides of the side groove (1) to be erected. B) A three-dimensional truss with a concrete dumping formwork (2), in which concrete is cast under the three-dimensional welding reinforcing bar (21) and a concrete plate (22) is integrally formed, is prepared. A step of placing and laying both ends of 2) on the abutment (11). C) A long reinforcing bar (5) for connection outside the projection (4).
While the long reinforcing bar (5) and the three-dimensional welded reinforcing bar (21) are fixed by using a short reinforcing bar (6) by iron wire or welding, the short reinforcing bar (6) A connection step for confirming that the object (4) does not come into contact with the object (4). D) Three-dimensional truss (2) with concrete cast-out formwork laid by placing concrete on the three-dimensional welded reinforcing bar (21)
A step of forming a lining plate by being integrated.
JP20134799A 1999-07-15 1999-07-15 Construction method of gutter lining plate on farm road Expired - Fee Related JP3874576B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20134799A JP3874576B2 (en) 1999-07-15 1999-07-15 Construction method of gutter lining plate on farm road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20134799A JP3874576B2 (en) 1999-07-15 1999-07-15 Construction method of gutter lining plate on farm road

Publications (2)

Publication Number Publication Date
JP2001026975A true JP2001026975A (en) 2001-01-30
JP3874576B2 JP3874576B2 (en) 2007-01-31

Family

ID=16439539

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20134799A Expired - Fee Related JP3874576B2 (en) 1999-07-15 1999-07-15 Construction method of gutter lining plate on farm road

Country Status (1)

Country Link
JP (1) JP3874576B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166229A (en) * 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
JP6424314B1 (en) * 2017-08-02 2018-11-21 エムシー産業株式会社 Permanent form, gutter lid using the same, and method for constructing the same
CN115162278A (en) * 2022-07-14 2022-10-11 凌志环保股份有限公司 Ecological prefabricated ditch

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017166229A (en) * 2016-03-16 2017-09-21 ジオスター株式会社 Box culvert
JP6424314B1 (en) * 2017-08-02 2018-11-21 エムシー産業株式会社 Permanent form, gutter lid using the same, and method for constructing the same
JP2019027222A (en) * 2017-08-02 2019-02-21 エムシー産業株式会社 Permanent form, ditch cover body using the same and construction method thereof
CN115162278A (en) * 2022-07-14 2022-10-11 凌志环保股份有限公司 Ecological prefabricated ditch

Also Published As

Publication number Publication date
JP3874576B2 (en) 2007-01-31

Similar Documents

Publication Publication Date Title
KR101379305B1 (en) Wall structure manufacturing method using precast front wall panel and precast back wall panel
KR102243984B1 (en) Non-supporting formwork system for retaining wall using self-supporting form and construction method thereof
KR101645462B1 (en) Precast crossing beam manufacturing method for bridge and precast crossing beam construction method for bridge
CN109403367B (en) Assembled box transformer foundation and field construction method thereof
JP2001295298A (en) Foundation for columnar structure and its work execution method
KR101727745B1 (en) Retaining wall construction method in which the vertical precast structures utilizing this structure
JP3881135B2 (en) Connecting structure of floor slabs using concrete truss with concrete slab in bridge girder
JP3429459B2 (en) Construction method of bridge deck haunch
JP2001026975A (en) Construction method for lining plate for side ditch on farm road
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
KR100612938B1 (en) A construction system of the wall/dome and the the method thereof it
JPH0782753A (en) Constructing method for continuous footing
JP2959325B2 (en) Construction method of steel frame reinforced concrete structure
JPH1136229A (en) Construction method for reinforced concrete bridge pier
JP2864906B2 (en) Precast wall joining method
JP2000257078A (en) Construction method of mat foundation to use pc foundation beam member and pc support frame for pc foundation beam member
JP2004197347A (en) Construction method of cross girder-integrated concrete floor slab
JP2001342639A (en) Buried form
JP3319709B2 (en) Construction method of prestressed concrete steel beam
JP2000355909A (en) Construction method for bridge floor
JP3312945B2 (en) Construction method of concrete structure
JP3512737B2 (en) Precast concrete board and its installation method
JP2836409B2 (en) Construction method of reinforced concrete wall using PC version
JPH03271465A (en) Method of construction for placing slab with manhole
CN114293657A (en) Assembly type building frame and assembling method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040312

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060523

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060606

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061003

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061024

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091102

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121102

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees