JPH0144684Y2 - - Google Patents
Info
- Publication number
- JPH0144684Y2 JPH0144684Y2 JP5185083U JP5185083U JPH0144684Y2 JP H0144684 Y2 JPH0144684 Y2 JP H0144684Y2 JP 5185083 U JP5185083 U JP 5185083U JP 5185083 U JP5185083 U JP 5185083U JP H0144684 Y2 JPH0144684 Y2 JP H0144684Y2
- Authority
- JP
- Japan
- Prior art keywords
- support
- formwork
- floor
- erected
- bundle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 claims description 20
- 239000011150 reinforced concrete Substances 0.000 claims description 9
- 239000002184 metal Substances 0.000 claims description 5
- 239000004567 concrete Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【考案の詳細な説明】
この考案は梁、床を一緒に施工しうる梁、床型
枠装置に関するものである。[Detailed description of the invention] This invention relates to a beam and floor formwork device that can construct beams and floors together.
従来の鉄筋コンクリート構造物の梁、床を施工
する型枠は梁部分と床部分とを別体に組立てるの
が普通である。そして梁部分の型枠はその組立解
体が煩雑であり、転用が困難である。また床部分
の型枠は多数の単管サポートで支承するので、建
込階の作業性を阻害し、また解体時に危険性が伴
う等の問題がある。そこで支保工上に梁型枠と床
型枠とを一体に連続構成した大型型枠が開発され
ている。 In conventional formwork for constructing beams and floors of reinforced concrete structures, the beam portion and floor portion are usually assembled separately. The formwork for the beam portion is complicated to assemble and dismantle, making it difficult to repurpose it. Furthermore, since the formwork for the floor portion is supported by a large number of single pipe supports, there are problems such as hindering the workability of the erected floor and creating dangers during dismantling. Therefore, a large formwork has been developed in which a beam formwork and a floor formwork are integrated and continuous on a support.
この考案も梁、床を同時に施工しうる大型型枠
に関するもので、より組立、解体が容易で能率的
に施工しうる装置を提供すべくしたものである。 This invention also relates to a large formwork that can construct beams and floors at the same time, and is intended to provide equipment that is easier to assemble and dismantle and can be constructed more efficiently.
以下この考案を図示した実施例によつて説明す
る。第1図、第2図に示す実施例においては床上
に所定間隔をおいて昇降しうる複数の支保工1を
並列して樹立する。そしてこの支保工1の上部に
は受梁2があり、その受梁2上中央にU形断面の
金属製梁型枠3を必要により根太4を介して設置
し、また支保工1の上部にある受梁2の両側に束
5を介して支持大引6を設置する。なお、梁型枠
3のリブ7と束5間には組立あるいは払用に使用
するターンバツクル8を配置する。 This invention will be explained below with reference to illustrated embodiments. In the embodiment shown in FIGS. 1 and 2, a plurality of supports 1 that can be raised and lowered at predetermined intervals are erected in parallel above the floor. There is a support beam 2 on the top of the support 1, and a metal beam form 3 with a U-shaped cross section is installed at the center of the support beam 2 via a joist 4 as necessary. Support beams 6 are installed on both sides of a certain support beam 2 via bundles 5. Note that a turnbuckle 8 used for assembly or removal is arranged between the rib 7 of the beam formwork 3 and the bundle 5.
次いで、互いに隣り合う支保工1上の梁型枠
3,3の相対向する側壁と側壁とに床厚に相当す
る厚さのプレキヤスト鉄筋コンクリート板9のそ
れぞれの端部が梁型枠の内側に僅かに突出するよ
うに架設し、必要に応じ、プレキヤスト鉄筋コン
クリート板9の中央部を枠組ステージ10によつ
て支承させ、さらに隣り合う支保工1上の相対向
する束5上の支持大引6,6にプレキヤスト鉄筋
コンクリート板9を支承させる。 Next, each end of a precast reinforced concrete plate 9 having a thickness corresponding to the floor thickness is placed between the opposing side walls of the beam formworks 3, 3 on the mutually adjacent shoring structures 1, slightly inside the beam formwork. If necessary, the central part of the precast reinforced concrete plate 9 is supported by a framework stage 10, and the support tensions 6, 6 on the opposing bundles 5 on the adjacent shoring 1 are supported as needed. The precast reinforced concrete plate 9 is supported by the precast reinforced concrete plate 9.
金属製梁型枠3内にはプレキヤスト鉄筋コンク
リート板9の表面と面一となるようにコンクリー
トAを打設して床と一体となつた梁を施工するも
のである。 Concrete A is poured into the metal beam formwork 3 so as to be flush with the surface of the precast reinforced concrete plate 9 to construct a beam that is integrated with the floor.
この考案は以上の構成からなり、梁型枠を支保
工に支持させ、梁型枠とその側方に設けた支持大
引上に、床厚に相当する厚さのプレキヤスト鉄筋
コンクリート板を架設することによつて、サポー
トを全く使用しないか、あるいは一部に枠組ステ
ージを使用するのみで、床と一体となつた梁を施
工することができ、工期の短縮と省力化が図られ
る。また、梁型枠を金属製化することにより、コ
ンクリートの打上がり精度を向上させ得るととも
に繰返し転用することができる。 This idea consists of the above-mentioned structure: the beam formwork is supported by shoring, and precast reinforced concrete plates with a thickness equivalent to the floor thickness are erected on the beam formwork and the support pullouts provided on the sides of the beam formwork. With this, it is possible to construct a beam that is integrated with the floor without using any supports or only using a framework stage in part, shortening the construction period and saving labor. Furthermore, by making the beam formwork metal, it is possible to improve the accuracy of concrete placement and to make it possible to reuse it repeatedly.
第1図は第1実施例の概要を示した断面図、第
2図はその要部の断面図である。
1……支保工、2……受梁、3……梁型枠、4
……根太、5……束、6……支持大引、7……リ
ブ、8……ターンバツクル、9……プレキヤスト
鉄筋コンクリート板、10……枠組ステージ。
FIG. 1 is a sectional view showing an outline of the first embodiment, and FIG. 2 is a sectional view of the main part thereof. 1...Shoring, 2...Beam support, 3...Beam formwork, 4
...joist, 5...bundle, 6...support pull, 7...rib, 8...turnbuckle, 9...precast reinforced concrete plate, 10...framework stage.
Claims (1)
上に並列して樹立し、それぞれの支保工の上部に
ある受梁には中央にU形断面の金属製梁型枠を設
置し、受梁の両側に上端に支持大引を設置した束
を立設すると共に、互いに隣り合う支保工上の金
属製型枠の相対向する側壁と側壁とに床厚に相当
する厚さを有するコンクリート板のそれぞれの端
部が側壁の内側に僅かに突出するように架設し、
前記両側壁間に立設した束上端の支持大引に前記
プレキヤスト鉄筋コンクリート板を支承させてあ
ることを特徴とする梁、床型枠装置。 A plurality of supports that can be raised and lowered are erected in parallel on the floor at predetermined intervals, and a metal beam formwork with a U-shaped cross section is installed in the center of the support beam on top of each support support. At the same time, a bundle of concrete plates with a thickness corresponding to the floor thickness is erected on both sides of the support structure, and the opposite side walls of the metal formwork on the adjacent shoring are installed. It is constructed so that each end slightly protrudes inside the side wall,
A beam and floor formwork device, characterized in that the precast reinforced concrete plate is supported by a support rod at the upper end of the bundle that is erected between the both side walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5185083U JPS59163039U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5185083U JPS59163039U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS59163039U JPS59163039U (en) | 1984-10-31 |
JPH0144684Y2 true JPH0144684Y2 (en) | 1989-12-25 |
Family
ID=30182240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5185083U Granted JPS59163039U (en) | 1983-04-07 | 1983-04-07 | Beam, floor formwork equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS59163039U (en) |
-
1983
- 1983-04-07 JP JP5185083U patent/JPS59163039U/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS59163039U (en) | 1984-10-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3818083A (en) | Building method | |
JPH0144684Y2 (en) | ||
JP3342891B2 (en) | Construction method of horizontal beam erected on columnar structure | |
KR101880813B1 (en) | A sandwitch pc pannel structure and construction method of structure using thereof | |
JPH0144685Y2 (en) | ||
JPH0144686Y2 (en) | ||
KR100361047B1 (en) | Construction mold | |
US7073300B1 (en) | Reinforced concrete part for producing foundations of buildings | |
JPH0312184B2 (en) | ||
KR102028828B1 (en) | Post tension flat slab sturcture construction method using rib type slab and waffle type drop | |
JPS61196035A (en) | Construction of concrete building | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JPH03271465A (en) | Method of construction for placing slab with manhole | |
JPH0528294B2 (en) | ||
JPH06136821A (en) | Construction method for steel frame reinforced concrete structure | |
JPH0332678Y2 (en) | ||
JPH0621469B2 (en) | Multi-story building frame construction method | |
JP3207276B2 (en) | How to build a unit building | |
JP2531045B2 (en) | Construction method for reinforced concrete structure | |
JPH04247127A (en) | Outer wall construction works for underground floor | |
KR20030047483A (en) | Modified rectangular PC beam which include service duct in the dapped end of beam and method for constructing structure using the same | |
JPS5833662A (en) | Constructing of slab structure | |
JPS6349773B2 (en) | ||
JPH0334530B2 (en) | ||
JPH01223248A (en) | Folded plate unit slab construction |