JPS6349773B2 - - Google Patents

Info

Publication number
JPS6349773B2
JPS6349773B2 JP9096082A JP9096082A JPS6349773B2 JP S6349773 B2 JPS6349773 B2 JP S6349773B2 JP 9096082 A JP9096082 A JP 9096082A JP 9096082 A JP9096082 A JP 9096082A JP S6349773 B2 JPS6349773 B2 JP S6349773B2
Authority
JP
Japan
Prior art keywords
floor
formwork
fixed
steel frame
receiving piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP9096082A
Other languages
Japanese (ja)
Other versions
JPS58207455A (en
Inventor
Masayoshi Kaneko
Minoru Ootsuka
Michio Kimura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP9096082A priority Critical patent/JPS58207455A/en
Publication of JPS58207455A publication Critical patent/JPS58207455A/en
Publication of JPS6349773B2 publication Critical patent/JPS6349773B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明は、梁と床PC部材やオムニヤ板などを
一体的にコンクリート打設する合成床の施工法に
関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a composite floor in which a beam, a floor PC member, an omniar board, etc. are integrally poured into concrete.

一般に、壁、床等にPC板を使用するSRC造に
おいて、床PC部材を梁鉄骨に一体的にコンクリ
ート打設する場合は、第1図に示すように、下段
床10を施工後、支保工11を床面10と、上階
の梁鉄骨12の所定高さとの間に仮設して、上記
支保工11の上面に床PC板13を載せて、梁鉄
骨12の周囲の枠組と一体にコンクリートを打設
してなる工法、或いは、梁鉄骨の周囲に枠組した
梁型枠により床PC板を支持してコンクリートを
打設するなどの工法が採られている。
In general, in SRC construction where PC boards are used for walls, floors, etc., when the floor PC members are concreted integrally with the beam steel frame, as shown in Figure 1, after the lower floor 10 is constructed, the shoring is 11 is temporarily installed between the floor surface 10 and a predetermined height of the beam steel frame 12 on the upper floor, a floor PC board 13 is placed on the top surface of the support beam 11, and the concrete is integrated with the framework around the beam steel frame 12. Construction methods include pouring concrete, or supporting the floor PC boards with beam formwork framed around steel beams and pouring concrete.

しかしながら、上述した従来の工法では、下階
のコンクリートを打設して所定の期間経過後に、
支保工を建てるか、梁の鉄筋型枠工事完了後に床
PC板の建方を行なうものであり、建方工期が長
くなるとともに、クレーン等の選びが多くなり、
効率的な作業ができないという離点があつた。
However, in the conventional construction method described above, after a predetermined period of time has elapsed after pouring concrete for the lower floor,
Erect the shoring or install the floor after the reinforcement formwork work for the beam is completed.
This involves erecting PC boards, and as the construction period becomes longer, there are more cranes to choose from.
There was a point where I was unable to work efficiently.

すなわち、従来の工法では、支保工や、梁の鉄
筋型枠の組付等、先行施工を必要とし、鉄筋型枠
組工等の労務量が変動して、現場作業の生産性が
劣る等の欠点があつた。
In other words, the conventional construction method requires advance construction such as shoring and assembling the reinforcing bar formwork for the beam, which has disadvantages such as fluctuations in the amount of labor required for the reinforcing bar formwork and lower productivity on site. It was hot.

本発明は、上述した従来工法による問題点を解
決するためになされたもので、梁鉄骨に受けピー
スを固設し、これに床PC部材等を支持する受け
材を固定し、梁と床PC部材とを一体的にコンク
リート打設した後、梁側型枠脱型時に、上記受け
材を受けピースから離脱させ、上階へ転用するこ
とができようにした合成床の施工法を提供するも
のである。
The present invention has been made in order to solve the problems with the conventional construction method described above.A receiving piece is fixed to a beam steel frame, a receiving member for supporting floor PC members, etc. is fixed to this, and the beam and floor PC To provide a construction method for a composite floor in which the receiving material can be separated from the receiving piece and used for the upper floor when demolding the beam side formwork after concrete is poured integrally with the members. It is.

以下、本発明による実施例を第2図ないし第5
図の工程図及び第6図の全体説明図にもとづいて
詳細に説明する。
Embodiments according to the present invention will be described below with reference to FIGS. 2 to 5.
A detailed explanation will be given based on the process diagram in the figure and the overall explanatory diagram in FIG.

第2図は本発明による仮受け工法の要部を示す
第一工程図であり、所定の階において柱鉄骨間に
は、I型断面を有する梁鉄骨1が固設されてお
り、この梁鉄骨1の片側又は両側には、受けピー
ス2が所定間隔毎に溶接等により固着されてい
る。上記受けピース2の端面には、床PC部材3
等の支持辺が載置される型、型、鋼材、又は
構造的に強度の出る木材等からなる受け材4が着
脱自在にボルト締め等により固定される。
FIG. 2 is a first process drawing showing the main part of the temporary support method according to the present invention. A beam steel frame 1 having an I-shaped cross section is fixed between the column steel frames on a predetermined floor. Receiving pieces 2 are fixed to one or both sides of 1 at predetermined intervals by welding or the like. A floor PC member 3 is attached to the end surface of the receiving piece 2.
A support member 4 made of a mold, mold, steel material, structurally strong wood, etc., on which the supporting sides are placed, is removably fixed by bolting or the like.

上記受けピース2に固定された受け材4の上面
には、第3図に示すようにデツキプレート、オム
ニア板、或いは床PC部材3がクレーン等により
吊り下げられて載置されるとともに、第4図に示
すように、梁鉄骨1の周囲に配筋5が施され、梁
型枠6で枠組される。上記梁型枠6は、配筋5を
囲む吊り型枠7、側型枠8等で構成され、梁鉄骨
1、床PC部材3が一体にコンクリート9が打設
される。こうして、コンクリート打設して、所定
強度が得られるまで存置された後、第5図に示す
ように、梁側型枠6が離型される。
As shown in FIG. 3, a deck plate, omnia board, or floor PC member 3 is suspended and placed on the upper surface of the receiving member 4 fixed to the receiving piece 2 by a crane, etc. As shown in the figure, reinforcement 5 is provided around the beam steel frame 1 and framed with beam forms 6. The beam formwork 6 is composed of a hanging formwork 7 surrounding the reinforcing reinforcement 5, a side formwork 8, etc., and concrete 9 is poured into the beam steel frame 1 and the floor PC member 3 integrally. After concrete is placed and left until a predetermined strength is obtained, the beam side formwork 6 is released as shown in FIG. 5.

このとき、梁鉄骨1に固設された受けピース2
は、梁コンクリート内に埋設されるが、受けピー
ス2に固定された受け材4は、梁側型枠6と同時
に取り外されて上階の工法に転用される。
At this time, the receiving piece 2 fixed to the beam steel frame 1
is buried in the beam concrete, but the receiving material 4 fixed to the receiving piece 2 is removed at the same time as the beam side formwork 6 and used for the construction method of the upper floor.

従つて、本発明による合成床の施工法によれ
ば、第6図に示すように、下段床部より順次上階
に施工していくものであり、支柱の配筋、梁型枠
6の枠組み作業、及び床PC部材3の仮受け、コ
ンクリート打設、梁側型枠6の離型作業が順次連
続的に行なわれる。
Therefore, according to the method of constructing a composite floor according to the present invention, construction is carried out sequentially from the lower floor to the upper floors, as shown in FIG. The work, temporary receiving of the floor PC member 3, concrete pouring, and demolding of the beam side formwork 6 are successively performed.

以上詳細に説明したように、本発明による合成
床の施工法は、梁鉄骨に受けピースを固設してお
き、上記受けピースに床PC部材を載置する受け
材を固定し、この受け材に床PC部材を載せて、
コンクリート打設を行なう工法であり、上記受け
材により、下階のコンクリート打設とは無関係に
建方を先行させることができる。
As explained in detail above, the method of constructing a composite floor according to the present invention is to fix a receiving piece to a beam steel frame, fix a receiving member on which a floor PC member is placed on the receiving piece, and fix the receiving piece to the receiving piece. Place the floor PC parts on the
This is a construction method that involves pouring concrete, and the above-mentioned support material allows construction to proceed in advance, regardless of concrete pouring for the lower floor.

また、床PC部材の建方に支保工や梁の型枠の
先行施工を必要とせず、躯体コンクリートの工程
にかかわりなく、独立して先行させることができ
るので、建方クレーンの稼動が効率よく、建方期
間が短縮される。
In addition, the erection of floor PC members does not require prior construction of shoring or beam formwork, and can be carried out independently regardless of the concrete structure process, making the operation of erection cranes more efficient. , the construction period is shortened.

さらに、鉄筋、型枠工等の労務が常に一定の人
数で効率よく作業できるものであり、また、工法
に使用する現場作業の生産性が向上する。
Furthermore, labor such as reinforcing bars and form work can be performed efficiently with a constant number of people at all times, and the productivity of on-site work used in the construction method is improved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の実施例を示す要部の断面図、第
2図ないし第5図は本発明による施工工程の実施
例を示す要部の断面図、第6図は本発明による実
施例を示す全体説明図である。 1……梁鉄骨、2……受けピース、3……床
PC部材、4……受け材、5……配筋、6……梁
側型枠、7……吊り型枠、8……側型枠、9……
コンクリート。
Fig. 1 is a sectional view of the main part showing a conventional embodiment, Figs. 2 to 5 are sectional views of the main part showing an embodiment of the construction process according to the present invention, and Fig. 6 is a sectional view of the main part showing an embodiment of the construction process according to the present invention. FIG. 1... Steel beam, 2... Support piece, 3... Floor
PC member, 4... Supporting material, 5... Reinforcement, 6... Beam side formwork, 7... Hanging formwork, 8... Side formwork, 9...
concrete.

Claims (1)

【特許請求の範囲】[Claims] 1 床PC部材等を梁鉄骨に一体的にコンクリー
ト打設する合成床工法において、柱鉄骨間に固設
された梁鉄骨の片側、または両側に受けピースを
固着し、上記受けピースの端面に床PC部材を載
置する受け材を着脱自在にボルト締め等により固
定し、上記梁鉄骨の周囲に配筋を囲む吊り型枠、
側型枠等による梁型枠を枠組してコンクリート打
設した後、上記梁側型枠の離型と同時に上記受け
ピースに固定した受け材を取り外すようにしてな
る合成床の施工法。
1 In the composite floor construction method in which floor PC members, etc. are concreted integrally with the beam steel frame, a receiving piece is fixed to one or both sides of the beam steel frame fixed between the column steel frames, and the floor is attached to the end face of the receiving piece. A suspension formwork in which the support material on which the PC member is placed is removably fixed by bolting, etc., and the reinforcement is surrounded around the beam steel frame;
A method of constructing a composite floor comprising constructing a beam formwork using side formwork or the like and pouring concrete, and then removing the receiving material fixed to the receiving piece at the same time as releasing the beam side formwork.
JP9096082A 1982-05-28 1982-05-28 Construction of synthetic floor Granted JPS58207455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9096082A JPS58207455A (en) 1982-05-28 1982-05-28 Construction of synthetic floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9096082A JPS58207455A (en) 1982-05-28 1982-05-28 Construction of synthetic floor

Publications (2)

Publication Number Publication Date
JPS58207455A JPS58207455A (en) 1983-12-02
JPS6349773B2 true JPS6349773B2 (en) 1988-10-05

Family

ID=14013057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9096082A Granted JPS58207455A (en) 1982-05-28 1982-05-28 Construction of synthetic floor

Country Status (1)

Country Link
JP (1) JPS58207455A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2569885Y2 (en) * 1991-12-05 1998-04-28 東急建設株式会社 Structure of steel truss beam for SRC beam

Also Published As

Publication number Publication date
JPS58207455A (en) 1983-12-02

Similar Documents

Publication Publication Date Title
JPH0657956A (en) Construction of concrete structure
JPS6349773B2 (en)
JPH0312184B2 (en)
JP2928002B2 (en) Column formwork structure
JP2000160687A (en) Construction method for composite structure and precast concrete column
JPS61196035A (en) Construction of concrete building
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
US3779505A (en) Apparatus for simultaneously precasting a plurality of structural members
JPH0144686Y2 (en)
JPH0144685Y2 (en)
JP2651506B2 (en) How to apply underground beams
JPS5830459B2 (en) Construction method of precast reinforced concrete structure
JPH0144684Y2 (en)
JPH0715177B2 (en) How to build a reinforced concrete structure
JPH0673780A (en) Construction of steel framed reinforced concrete structure
JPS58204243A (en) Construction of reinforced concrete building
JPS62182329A (en) Construction of concrete structure
JPH09256631A (en) Construction method of building reinforced concrete wall
JPH04149365A (en) Construction method of beam
JPH01223248A (en) Folded plate unit slab construction
JPS615132A (en) Construction of wall floor
JPH0414221B2 (en)
JPH0470458B2 (en)
JPS6041181B2 (en) Construction method of composite slab
JPH0469694B2 (en)