JPH08109633A - Space filling method between earth retaining wall and wale and bag body used therefor - Google Patents

Space filling method between earth retaining wall and wale and bag body used therefor

Info

Publication number
JPH08109633A
JPH08109633A JP24787694A JP24787694A JPH08109633A JP H08109633 A JPH08109633 A JP H08109633A JP 24787694 A JP24787694 A JP 24787694A JP 24787694 A JP24787694 A JP 24787694A JP H08109633 A JPH08109633 A JP H08109633A
Authority
JP
Japan
Prior art keywords
main body
bag
gap
mortar
abdomen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24787694A
Other languages
Japanese (ja)
Other versions
JP3022736B2 (en
Inventor
Eizo Kaneko
英蔵 金古
Taizou Masumi
泰三 枡見
Tatsuichi Kawashima
辰一 川島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Taiyo Kogyo Co Ltd
Original Assignee
Obayashi Corp
Taiyo Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Taiyo Kogyo Co Ltd filed Critical Obayashi Corp
Priority to JP6247876A priority Critical patent/JP3022736B2/en
Publication of JPH08109633A publication Critical patent/JPH08109633A/en
Application granted granted Critical
Publication of JP3022736B2 publication Critical patent/JP3022736B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: To easily remove the consolidation body consolidated when a hardening material is eliminated while making it possible to prevent leakage when a hardening material is cast without carrying out assembly work of a troublesome form or a wire net and, at the same time, to enable the prevention of adherence of the hardening material to every section. CONSTITUTION: A main body section 5 of a flat and flexible bag body 4 is inserted along a space (d) formed between the wall surface of an earth retaining wall 3 and the rear of a wale 2, and the main body section 5 is hold by providing a bracket 11 to single pipe 9 with a hanging section 7 inserted. An injection port 6 communicating with the inside of the main body section 5 is connected to the tip of a mortar injection hose 14. The main body section 5 is expanded along a space-shape by injecting mortar M inside to fill the main body section 5 through the hose 14, and the mortar M is solidified in a expansion state.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、山留壁と腹起こしと
の隙間にモルタル,コンクリートなどの固化材を充填し
て該隙間を詰める上で好適な方法、およびこの隙間詰め
方法に用いられる袋体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method suitable for filling a gap between a mountain retaining wall and an abdomen with a solidifying material such as mortar or concrete to fill the gap, and a bag used for this gap filling method. Regarding the body

【0002】[0002]

【従来の技術】比較的深い根堀りの山留工にあっては、
対面する山留壁のそれぞれの壁面に沿ってH型鋼やI型
鋼柱、或いは鋼矢板を垂設するとともに、該鋼柱或いは
鋼矢板の内側に腹起こしを横設し、対面する腹起こし間
にこれと直交して切梁を掛け渡してなるものが一般的で
あり、対面する山留壁のそれぞれの周囲の地盤から作用
する土水圧を鋼柱或いは鋼矢板、腹起こしを介して切梁
が突っ張り支持することにより土水圧に耐え得る構成と
なっている。
2. Description of the Related Art For a relatively deep root mower,
H-shaped steel and I-shaped steel columns or steel sheet piles are hung along the respective wall surfaces of the facing mountain retaining walls, and a bellows is horizontally installed inside the steel columns or steel sheet piles, and between the facing bellows. It is common to cross the crossbeams at right angles to this, and the groundwater that acts from the ground around each facing mountain retaining wall is applied to the crossbeams via steel columns or steel sheet piles and upsets. It is constructed so that it can withstand the earth's water pressure by supporting it with tension.

【0003】ところで、実際にはこの山留壁の壁面は不
定形であるため、山留壁の壁面と腹起こしとの間には不
定形の隙間が開いている場合が多く、この場合には土水
圧の支持が不安定になるので、従来は、山留壁と腹起こ
しとの間に生じている隙間にキャンバーと称される楔を
打ち込んだり、モルタル,コンクリートなどの固化材を
打設充填して固結させ、この固結体を通じて山留壁に作
用する土水圧を確実に支持させるようにしている。
Actually, since the wall surface of the Yamadome wall is indefinite, an irregular space is often formed between the wall surface of the Yamadome wall and the abdomen. Since the support of water pressure becomes unstable, conventionally, a wedge called camber is driven into the gap formed between the mountain retaining wall and the abdomen uplifting, or a solidifying material such as mortar or concrete is poured and filled. It is solidified to ensure that the soil water pressure acting on the mountain retaining wall is supported through this solidified body.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、楔では
対応しきれないほど大きな隙間が形成されている場合に
は、固化材を打設充填するために腹起こしの下部に当て
型枠を組付けたり金網を敷いて固化材の洩れ防止処置を
行なう必要があるため、次のような問題があった。
However, when a large gap is formed which cannot be dealt with by the wedge, a padding frame may be attached to the lower part of the abdomen to pour and fill the solidified material. There is the following problem because it is necessary to lay wire mesh and take measures to prevent the solidified material from leaking.

【0005】型枠の組立作業を狭隘な場所で行わねば
ならず、手間がかかり作業性が悪い。 隙間の幅寸法が場所ごとに一定ではなく、その都度異
なる大きさの型枠を形成しなければならない。 山留壁の壁面形状が不定形なので、固化材の洩れを確
実に防止することが困難であり汚れが生じやすい。 支保工の撤去時に固結した固化材をはつる必要があ
り、手間がかかる。 固化材が山留壁のボルトその他の各部に付着し、清掃
などに手間がかかる。
The work of assembling the formwork has to be performed in a narrow space, which is troublesome and the workability is poor. The width dimension of the gap is not constant in each place, and it is necessary to form molds of different sizes each time. Since the wall shape of the Yamadome wall is indefinite, it is difficult to reliably prevent the solidified material from leaking and stains easily occur. Since it is necessary to put the solidified material that has solidified when the support work is removed, it takes time and effort. The solidified material adheres to the bolts and other parts of the mountain retaining wall, and cleaning takes time.

【0006】この発明は以上の問題を解決するものであ
って、面倒な型枠や金網の組立作業を行うことなく固化
材の打設時における洩れを防止することができながら、
撤去時には固結した固結体を容易に除去できるととも
に、各部に対する固結材の付着を防止できるようにした
山留壁と腹起こしの隙間詰め方法を提供することを目的
としている。
The present invention is intended to solve the above-mentioned problems, and it is possible to prevent leakage at the time of placing a solidified material without performing a troublesome assembling work of a mold and a wire mesh.
It is an object of the present invention to provide a method for filling a gap between a mountain retaining wall and an abdominal wall that can easily remove a solidified body that has been solidified upon removal and can prevent the solidifying material from adhering to each part.

【0007】またこの発明は、以上の詰め方法に用いて
好適な袋体を提供することを他の目的としている。
Another object of the present invention is to provide a bag body suitable for use in the above packing method.

【0008】[0008]

【課題を解決するための手段】前記目的を達成するた
め、この発明方法は、山留壁の壁面と腹起こしの背面と
の間に形成された隙間に沿って可撓性袋体を差し込み保
持し、該袋体の内部に連通する注入口に、モルタル,コ
ンクリートなどからなる固化材注入用ホースの筒先を連
結し、該ホースを通じて前記袋体の内部に固化材を注入
充填することで、前記袋体を隙間形状に沿って膨脹さ
せ、該膨脹状態で前記固化材を固結させることを特徴と
する(請求項1)。
To achieve the above object, the method of the present invention inserts and holds a flexible bag along a gap formed between a wall surface of a mountain retaining wall and a back surface of an abdomen. , The injection port communicating with the inside of the bag is connected to the tip of a hose for injecting a solidifying material made of mortar, concrete or the like, and the solidifying material is injected and filled into the inside of the bag through the hose to form the bag. The body is expanded along the shape of the gap, and the solidifying material is solidified in the expanded state (claim 1).

【0009】またこの発明方法に用いられる袋体は、腹
起こしの背面に沿って添設され、かつ両端を溶着された
初期状態では偏平な可撓性袋体からなる本体部と、該本
体部の一側部から突設されて本体部内側に連通する一ま
たは複数の注入口と、前記本体部の上縁に沿って一体化
され、かつ長手方向両端が開口したチューブ状の吊下部
とを備え、該吊下部の両端を貫通する単管を適宣の支持
手段により前記腹起こし上に固定することによって前記
本体部が前記腹起こしの背面に沿って吊下支持されるよ
うにしてなることを特徴とする(請求項2)。
Further, the bag body used in the method of the present invention is attached along the back surface of the abdomen and has a main body made of a flexible bag body which is flat in the initial state with both ends welded, and the main body portion. One or a plurality of injection ports protruding from one side and communicating with the inside of the main body, and a tubular hanging part that is integrated along the upper edge of the main body and has both longitudinal ends open. And a single pipe penetrating both ends of the suspension portion is fixed on the abdomen by suitable supporting means so that the main body is suspended and supported along the back surface of the abdomen. (Claim 2).

【0010】[0010]

【作用】以上の隙間詰め方法によれば、袋体の隙間への
差し込みと注入用ホースの接続作業により注入準備作業
が完了する。固化材注入により袋体は隙間形状に追随し
て膨脹し、隙間を詰める。固結体は袋体の内部に包囲さ
れた状態であるため、各部と直接接触することがなく、
支保工の撤去時には袋体ごと除去することができる。
According to the above gap filling method, the injection preparation work is completed by inserting the bag body into the gap and connecting the injection hose. By injecting the solidifying material, the bag follows the shape of the gap and expands to fill the gap. Since the solidified body is surrounded by the inside of the bag, there is no direct contact with each part,
When removing the support work, the entire bag can be removed.

【0011】またこの発明による袋体は、単管に吊下支
持され、単管を適宣の位置に固定しておけば、袋体の位
置決めがなされ、また腹起こし撤去時における脱落も防
止される。
Further, the bag according to the present invention is hung and supported by a single pipe, and if the single pipe is fixed at an appropriate position, the bag is positioned and prevented from falling off when the belly is lifted and removed. It

【0012】[0012]

【実施例】以下、本発明の一実施例を図面を用いて詳細
に説明する。図1はこの発明方法が適用される山留壁と
腹起こしとの関係を示すもので、地山Eの掘削面に沿っ
てH形鋼からなる複数の杭1が鉛直かつ適宣間隔をおい
て建て込まれ、各杭1の内側にはこれと交差して同じく
H形鋼からなる腹起こし2が横設され、その下部をブラ
ケット2aを介して各杭1に連結している。そして、各
杭1の間に落とし込まれた図示しない堰板を型枠として
コンクリートが打設されることにより各杭1の間に山留
壁3が形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows the relationship between a mountain retaining wall to which the method of the present invention is applied and an abdomen upset. A plurality of piles 1 made of H-shaped steel are vertically and appropriately spaced along the excavation surface of the ground E. A built-in ridge 2 which is also made of H-shaped steel is horizontally installed inside each pile 1 so as to intersect with the pile 1 and the lower portion thereof is connected to each pile 1 via a bracket 2a. Then, the pile retaining wall 3 is formed between the piles 1 by placing concrete using the dam plate (not shown) dropped between the piles 1 as a formwork.

【0013】この山留壁3の壁面と腹起こし2との間に
は隙間dが形成されており、この隙間dにこの発明によ
る袋体4が差し込まれる。袋体4はポリエステル樹脂シ
ートなどの引っ張りや引き裂きに対する耐久性の高い可
撓性シートを加工して得られたもので、図1および図2
に拡大して示すごとく両端を溶着5aされた初期状態が
偏平なチューブ状の本体部5と、本体部5の一側部の両
側2箇所に突設されて本体部内側に連通する筒状の注入
口6と、本体部の上縁に沿って溶着7aにより一体化さ
れ、かつ長手方向両端開口したチューブ状の吊下部7を
備えている。この袋体4の長さはモルタル注入の能率等
を考慮して設定され、おおよそ5m程度、各部の幅は腹
起こし2の幅や吊り下げ高さを考慮して設定される。
A gap d is formed between the wall surface of the mountain retaining wall 3 and the bellows 2, and the bag body 4 according to the present invention is inserted into the gap d. The bag body 4 is obtained by processing a flexible sheet such as a polyester resin sheet having a high durability against pulling and tearing, and FIGS.
As shown in the enlarged view of FIG. 2, the tubular main body 5 is welded at both ends 5a and has a flat initial state, and the tubular main body 5 is provided at two positions on both sides of one side of the main body 5 so as to communicate with the inside of the main body. It is provided with a pouring port 6 and a tube-shaped hanging part 7 which is integrated by welding 7a along the upper edge of the main body and is open at both ends in the longitudinal direction. The length of the bag body 4 is set in consideration of the efficiency of mortar injection, etc., and is about 5 m, and the width of each part is set in consideration of the width of the bellows 2 and the hanging height.

【0014】なお、各注入口6の外周にはアクリルテー
プ8が設けられ、後述するモルタル注入用ホースの筒先
をこれに嵌合した状態でこのテープ8を緊縛することに
よりホースの脱落を防止できるようにしている。また、
一方の注入口6はモルタル注入用、他方は空気抜きとし
て機能し、場合によりいずれかをホースに連結し他方を
空気抜きとすれば良く、注入後はテープ8で口先を縛り
漏洩を防止する。なお、注入口は3箇所以上設けても良
く、空気抜きを別途設けても良いことは勿論である。
An acrylic tape 8 is provided on the outer periphery of each injection port 6, and the hose can be prevented from falling off by tightly binding the tape 8 while the tube end of the mortar injection hose described later is fitted to this. I am trying. Also,
One injection port 6 functions as a mortar injection port, and the other functions as an air vent. Depending on the case, one of them may be connected to a hose and the other port may be vented. After injection, the tip of the mouth is tied with a tape 8 to prevent leakage. Needless to say, the injection port may be provided at three or more places, and the air vent may be provided separately.

【0015】吊下部7にはその両端を貫通して単管9が
挿通され、この単管9によって袋体4が吊下状態に支持
される。単管9の支持構造は、図1に示すように腹起こ
し2の背面側上部に適宣間隔をおいて立設状態に溶接さ
れたアングルプレート10に設けたコ字形ブラケット1
1によっており、このブラケット11に単管9を設置す
ることで単管9は腹起こし2の背面上部に平行に位置決
め固定される。
A single tube 9 is inserted through the both ends of the hanging portion 7, and the bag 4 is supported by the single tube 9 in a suspended state. As shown in FIG. 1, the supporting structure for the single pipe 9 is a U-shaped bracket 1 provided on an angle plate 10 which is welded in an upright state on the upper part of the back side of the abdomen 2 at an appropriate interval.
1, the single pipe 9 is installed on the bracket 11 so that the single pipe 9 is agitated and positioned and fixed parallel to the upper part of the back surface of the back plate 2.

【0016】次に以上の袋体4を用いた隙間詰め方法を
図3を用いて説明する。
Next, a gap filling method using the above bag body 4 will be described with reference to FIG.

【0017】まず(a)に示すように、吊下部7を挿通
した単管9をブラケット11上に設置し、本体部5を腹
起こし2の背面と山留壁3との間に形成された隙間dに
差し込む。次いで、地上部に設置されたモルタルポンプ
12に接続したモルタル注入用ホース14の筒先を注入
口6に嵌合し、周囲をテープ8で緊縛すれば注入準備が
完了する。
First, as shown in (a), a single pipe 9 having a hanging portion 7 inserted therein is set on a bracket 11, and the main body portion 5 is raised and formed between the rear surface of the body 2 and the mountain retaining wall 3. Insert into the gap d. Next, the tube tip of the mortar injecting hose 14 connected to the mortar pump 12 installed on the ground portion is fitted into the injecting port 6 and the periphery is tightly bound with the tape 8 to complete the injecting preparation.

【0018】その後、ポンプ12を稼動し、ホース14
先端に接続されたバルブ15を開ければモルタルMは本
体部5の内部に注入充填され、本体部5はその注入圧力
によって(b)に示すように隙間dの形状に応じた形状
に膨脹する。
Thereafter, the pump 12 is operated and the hose 14
When the valve 15 connected to the tip is opened, the mortar M is injected and filled in the main body portion 5, and the main body portion 5 is expanded by the injection pressure into a shape corresponding to the shape of the gap d as shown in (b).

【0019】なお、モルタルMの荷重により本体部5は
膨脹しつつ垂下され、その荷重は当初吊下部7全体に加
わるが、吊り下げ部7は本体部5の全長に亘っているた
め、十分な引っ張り抵抗で荷重を支持する。その後、本
体部5の両側面が腹起こし2および山留壁3に当接し、
これを圧することで荷重が分散されることになる。
It should be noted that the load of the mortar M causes the main body portion 5 to hang down while expanding, and the load is initially applied to the entire hanging portion 7, but since the hanging portion 7 extends over the entire length of the main body portion 5, it is sufficient. Supports load with tensile resistance. After that, both side surfaces of the main body portion 5 are agitated and abut on the mountain retaining wall 3 and
By pressing this, the load will be dispersed.

【0020】注入充填作業の終了はその膨脹度合いを考
慮して行うか、注入圧力が平衡状態となった時点を見極
めるか、或いは別途設置したセンサーなどにより検出
し、バルブ15を閉じポンプ12を停止する。
The injection and filling work is completed in consideration of the degree of expansion, or the time when the injection pressure reaches the equilibrium state is determined, or it is detected by a sensor installed separately, and the valve 15 is closed and the pump 12 is stopped. To do.

【0021】その後は注入口6をテープ8で縛り、内部
を密封した状態でモルタルMを固結させれば詰め作業を
完了する。モルタルMの固結後は山留壁3に加わる土水
圧は固結体を通じて腹起こし2およびこれを含む支保工
側に確実に伝達されることになる。
After that, the filling port 6 is bound with the tape 8 and the mortar M is solidified while the inside is sealed to complete the filling operation. After the mortar M is solidified, the soil water pressure applied to the mountain retaining wall 3 will be angulated up through the solidified body 2 and be surely transmitted to the supporting work side including the ridge 2.

【0022】また、後日腹起こし2を撤去する際にはモ
ルタルMを充填した袋体4も同時に除去されることにな
り、単管9を引き抜いた後に袋体4ごと除去することが
できる。
Further, when removing the agitated body 2 at a later date, the bag body 4 filled with the mortar M is also removed at the same time, and the bag body 4 can be removed together with the single pipe 9 after being pulled out.

【0023】[0023]

【発明の効果】以上実施例で説明したように、この発明
にかかる山留壁と腹起こしの隙間詰め方法によれば、次
の効果を奏する。 袋体の隙間への差し込みと注入用ホースの接続作業に
より注入準備作業が完了するため、従来の作業に比べて
準備作業が簡単である。 固化材注入により袋体は隙間形状に追随して膨脹し、
隙間を完全に詰め、また周囲への洩れがないため、汚れ
がなく、材料の無駄もない。 固結体は袋体の内部に包囲された状態であるため、各
部と直接接触することがなく、袋体ごと除去することが
でき、従来のような撤去時のハツリ作業や清掃作業が不
要となる。
As described in the above embodiments, the method of filling the gap between the mountain retaining wall and the abdomen according to the present invention has the following effects. Since the injection preparation work is completed by inserting the bag into the gap and connecting the injection hose, the preparation work is easier than the conventional work. By injecting the solidifying material, the bag expands following the gap shape,
The gap is completely filled and there is no leakage to the surroundings, so there is no dirt and no waste of material. Since the solidified body is surrounded by the inside of the bag, it does not come into direct contact with each part and can be removed together with the bag, eliminating the need for conventional chipping and cleaning work during removal. Become.

【0024】また、この発明の隙間詰め方法に用いられ
る袋体によれば、次の利点がある。 単管に吊下支持され、単管を適宣の位置に固定してお
けば、袋体の位置決めがなされるため、セット作業を簡
略化できる。 腹起こし撤去時における脱落も防止されるため、十分
な安全性を確保できる。
The bag body used in the gap filling method of the present invention has the following advantages. If the single tube is suspended and supported and the single tube is fixed at an appropriate position, the bag body is positioned, so that the setting work can be simplified. Sufficient safety can be ensured because falling off is prevented when the patient is abdominated and removed.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明方法が適用される山留壁と腹起こしと
の関係を示す断面斜視図である。
FIG. 1 is a cross-sectional perspective view showing a relationship between a mountain retaining wall to which the method of the present invention is applied and an abdominal rising.

【図2】この発明方法に用いる袋体および単管を示す斜
視図である。
FIG. 2 is a perspective view showing a bag and a single tube used in the method of the present invention.

【図3】(a),(b)は同袋体を用いた隙間詰め手順
を示す部分断面図である。
3A and 3B are partial cross-sectional views showing a gap filling procedure using the bag body.

【符号の説明】[Explanation of symbols]

2 腹起こし 3 山留壁 4 袋体 5 本体部 6 注入口 9 単管 11 ブラケット(単管固定手段) 12 モルタルポンプ 14 モルタル注入用ホース d 隙間 M モルタル(固化材) 2 Upset 3 Yamadome wall 4 Bag 5 Main body 6 Injection port 9 Single pipe 11 Bracket (single pipe fixing means) 12 Mortar pump 14 Mortar injection hose d Gap M Mortar (solidifying material)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 川島 辰一 東京都世田谷区池尻2−33−16 太陽工業 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Tatsuichi Kawashima 2-33-16 Ikejiri, Setagaya-ku, Tokyo Taiyo Kogyo Co., Ltd.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 山留壁の壁面と腹起こしの背面との間に
形成された隙間に沿って可撓性袋体を差し込み保持し、
該袋体の内部に連通する注入口に、モルタル,コンクリ
ートなどからなる固化材注入用ホースの筒先を連結し、
該ホースを通じて前記袋体の内部に固化材を注入充填す
ることで、前記袋体を隙間形状に沿って膨脹させ、該膨
脹状態で前記固化材を固結させることを特徴とする山留
壁と腹起こしとの隙間詰め方法。
1. A flexible bag is inserted and held along a gap formed between the wall surface of the Yamadome wall and the back surface of the abdomen,
An injection port communicating with the inside of the bag is connected with a tip of a hose for injecting a solidifying material made of mortar, concrete or the like,
By filling and injecting a solidifying material into the bag body through the hose, the bag body is expanded along the shape of the gap, and the solidified material is solidified in the expanded state. How to fill the gap with the wake.
【請求項2】 腹起こしの背面に沿って添設され、かつ
両端を溶着された初期状態では偏平な可撓性袋体からな
る本体部と、該本体部の一側部から突設されて本体部内
側に連通する一または複数の注入口と、前記本体部の上
縁に沿って一体化され、かつ長手方向両端が開口したチ
ューブ状の吊下部とを備え、該吊下部の両端を貫通する
単管を適宣の支持手段により前記腹起こし上に固定する
ことによって前記本体部が前記腹起こしの背面に沿って
吊下支持されるようにしてなることを特徴とする山留壁
と腹起こしとの隙間詰めに用いられる袋体。
2. A main body made of a flexible bag body which is attached along the back surface of the abdomen and is flat in the initial state with both ends welded, and the main body is projected from one side of the main body. One or a plurality of inlets communicating with the inside of the main body portion and a tubular suspension part that is integrated along the upper edge of the main body part and has both longitudinal ends open are provided, and both ends of the suspension part are penetrated. By fixing the single pipe to the upper part of the abdomen by a proper supporting means, the main body part is suspended and supported along the back surface of the abdomen riser. A bag used to fill the gap between
JP6247876A 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag Expired - Lifetime JP3022736B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6247876A JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6247876A JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Publications (2)

Publication Number Publication Date
JPH08109633A true JPH08109633A (en) 1996-04-30
JP3022736B2 JP3022736B2 (en) 2000-03-21

Family

ID=17169932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6247876A Expired - Lifetime JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Country Status (1)

Country Link
JP (1) JP3022736B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476838B1 (en) * 2002-08-02 2005-03-17 최춘식 Grouting method using rift pack in construction of underground continuous wall
KR100973601B1 (en) * 2008-05-19 2010-08-02 (주) 아이제이컨티넨탈엔지니어링 Braket for supporting wale beam of soil retaining wall and excavation method using the same
CN104631471A (en) * 2015-01-22 2015-05-20 安徽省城建设计研究院 Support used for reinforced concrete and with lateral expansion type prestress and application method thereof
JP6200550B1 (en) * 2016-05-27 2017-09-20 鹿島建設株式会社 Temporary deadline method, temporary deadline structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476838B1 (en) * 2002-08-02 2005-03-17 최춘식 Grouting method using rift pack in construction of underground continuous wall
KR100973601B1 (en) * 2008-05-19 2010-08-02 (주) 아이제이컨티넨탈엔지니어링 Braket for supporting wale beam of soil retaining wall and excavation method using the same
CN104631471A (en) * 2015-01-22 2015-05-20 安徽省城建设计研究院 Support used for reinforced concrete and with lateral expansion type prestress and application method thereof
JP6200550B1 (en) * 2016-05-27 2017-09-20 鹿島建設株式会社 Temporary deadline method, temporary deadline structure

Also Published As

Publication number Publication date
JP3022736B2 (en) 2000-03-21

Similar Documents

Publication Publication Date Title
JPH08109633A (en) Space filling method between earth retaining wall and wale and bag body used therefor
JP3848917B2 (en) Hybrid structure box construction method
JP3697525B2 (en) Pipeline repair and rehabilitation method
JP3696294B2 (en) Hollow foundation foundation method using air bag
JPH0344815Y2 (en)
JPH0813494A (en) Fixing method of earth retaining wall and timbering
JP3729028B2 (en) Water stop method for joints in steel pipe sheet piles
JP2981632B2 (en) Construction method of joint of underground wall
JPH09144000A (en) Method and device for retaining earth
JP3509066B2 (en) Pipe burial method
JPS62236922A (en) Method of reinforcing sheet pile-wall structure
JP2003041549A (en) Joint repair construction method for caisson
JP3245732B2 (en) Permanent formwork mounting method for revetment structures
JP2004332368A (en) Construction method of concrete foundation
JPH01235715A (en) Underground continuous impermeable wall method
JP3332507B2 (en) How to build underground structures
JP2005060925A (en) Construction method of structure and bag body used therefor
JPS62202120A (en) Removal of aperture between pile and waling member
JPH0786229B2 (en) Impermeable wall using impermeable sheet, construction method thereof, and impermeable sheet used for impermeable wall
JP3240404B2 (en) Permanent formwork mounting method for revetment structures
JP2002285555A (en) Underwater concrete placing method and underwater concrete placing apparatus
JPH03244711A (en) Preventing ground sinking due to extraction of earth holding member
JPS61196016A (en) Joining method for cut-off sheet
JPH09279610A (en) Method for constructing retaining wall and equipment therefor
JPH04140313A (en) Interlocking pipe structure in underground continuous wall construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080114

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090114

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110114

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120114

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term