JP3022736B2 - Bag and method of filling gap between ridge and wall using this bag - Google Patents

Bag and method of filling gap between ridge and wall using this bag

Info

Publication number
JP3022736B2
JP3022736B2 JP6247876A JP24787694A JP3022736B2 JP 3022736 B2 JP3022736 B2 JP 3022736B2 JP 6247876 A JP6247876 A JP 6247876A JP 24787694 A JP24787694 A JP 24787694A JP 3022736 B2 JP3022736 B2 JP 3022736B2
Authority
JP
Japan
Prior art keywords
bag
belly
gap
main body
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6247876A
Other languages
Japanese (ja)
Other versions
JPH08109633A (en
Inventor
英蔵 金古
泰三 枡見
辰一 川島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Taiyo Kogyo Co Ltd
Original Assignee
Obayashi Corp
Taiyo Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Taiyo Kogyo Co Ltd filed Critical Obayashi Corp
Priority to JP6247876A priority Critical patent/JP3022736B2/en
Publication of JPH08109633A publication Critical patent/JPH08109633A/en
Application granted granted Critical
Publication of JP3022736B2 publication Critical patent/JP3022736B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、山留壁と腹起こしと
の隙間にモルタル,コンクリートなどの固化材を充填し
て該隙間を詰めるのに用いて好適な袋体、およびこの
体を用いた山留壁と腹起こしとの隙間詰め方法に関す
る。
BACKGROUND OF THE INVENTION This invention, mortar in the gap between the raised pile Tomekabe and abdomen, with filling the solidifying material such as concrete for packing the said gap suitable bag, and the bag
The present invention relates to a method of filling a gap between a mountain retaining wall and a belly using a body .

【0002】[0002]

【従来の技術】比較的深い根堀りの山留工にあっては、
対面する山留壁のそれぞれの壁面に沿ってH型鋼やI型
鋼柱、或いは鋼矢板を垂設するとともに、該鋼柱或いは
鋼矢板の内側に腹起こしを横設し、対面する腹起こし間
にこれと直交して切梁を掛け渡してなるものが一般的で
あり、対面する山留壁のそれぞれの周囲の地盤から作用
する土水圧を鋼柱或いは鋼矢板、腹起こしを介して切梁
が突っ張り支持することにより土水圧に耐え得る構成と
なっている。
2. Description of the Related Art In a relatively deep digging work,
H-shaped steel or I-shaped steel columns or steel sheet piles are erected along each wall face of the facing retaining wall, and a belly is laid horizontally on the inside of the steel pillar or steel sheet pile. It is common to cross the beams perpendicularly to this, and to apply the soil water pressure acting from the ground around each of the facing retaining walls, the steel beams or the sheet piles, It has a structure that can withstand the soil water pressure by supporting it in tension.

【0003】ところで、実際にはこの山留壁の壁面は不
定形であるため、山留壁の壁面と腹起こしとの間には不
定形の隙間が開いている場合が多く、この場合には土水
圧の支持が不安定になるので、従来は、山留壁と腹起こ
しとの間に生じている隙間にキャンバーと称される楔を
打ち込んだり、モルタル,コンクリートなどの固化材を
打設充填して固結させ、この固結体を通じて山留壁に作
用する土水圧を確実に支持させるようにしている。
[0003] Incidentally, since the wall surface of this retaining wall is actually irregular, an irregular-shaped gap is often opened between the wall surface of the retaining wall and the bulge. Conventionally, the support of the water pressure becomes unstable. Conventionally, a wedge called a camber is driven into a gap formed between the retaining wall and the belly, or a solidifying material such as mortar or concrete is poured and filled. The solidified body is used to reliably support the soil pressure acting on the retaining wall through the solidified body.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、楔では
対応しきれないほど大きな隙間が形成されている場合に
は、固化材を打設充填するために腹起こしの下部に当て
型枠を組付けたり金網を敷いて固化材の洩れ防止処置を
行なう必要があるため、次のような問題があった。
However, if the wedge has such a large gap that the wedge cannot cope with it, it is necessary to attach a contact form to the lower part of the upset to cast and solidify the solidified material. Since it is necessary to lay a wire mesh and take measures to prevent the solidified material from leaking, the following problems arise.

【0005】型枠の組立作業を狭隘な場所で行わねば
ならず、手間がかかり作業性が悪い。 隙間の幅寸法が場所ごとに一定ではなく、その都度異
なる大きさの型枠を形成しなければならない。 山留壁の壁面形状が不定形なので、固化材の洩れを確
実に防止することが困難であり汚れが生じやすい。 支保工の撤去時に固結した固化材をはつる必要があ
り、手間がかかる。 固化材が山留壁のボルトその他の各部に付着し、清掃
などに手間がかかる。
[0005] The assembling work of the mold must be performed in a narrow place, which is troublesome and poor in workability. The width dimension of the gap is not constant at each location, and a mold having a different size must be formed each time. Since the wall shape of the retaining wall is indefinite, it is difficult to reliably prevent the leakage of the solidified material, and dirt is easily generated. It is necessary to peel off the solidified material that was solidified when the shoring was removed, which is troublesome. The solidified material adheres to bolts and other parts of the retaining wall, and it takes time to clean.

【0006】この発明は以上の問題を解決するものであ
って、面倒な型枠や金網の組立作業を行うことなく固化
材の打設時における洩れを防止することができながら、
撤去時には固結した固結体を容易に除去できるととも
に、各部に対する固結材の付着を防止できるようにした
山留壁と腹起こしの隙間詰め方法に用いて好適な袋体お
よびこの袋体を用いた山留壁と腹起こしとの隙間詰め方
を提供することを目的としている。
The present invention has been made to solve the above problems, and it is possible to prevent leakage at the time of placing a solidified material without performing a troublesome assembling work of a formwork or a wire mesh.
At the time of removal, it is possible to easily remove the solidified compact and to prevent the adhesion of the solidifying material to each part .
And how to fill the gap between the retaining wall and the belly using this bag
It is intended to provide law .

【0007】[0007]

【0008】[0008]

【課題を解決するための手段】前記目的を達成するた
め、この発明は、腹起こしの背面に沿って添設され、か
つ両端を溶着された初期状態では偏平な可撓性袋体から
なる本体部と、該本体部の一側部から突設されて本体部
内側に連通する一または複数の注入口と、前記本体部の
上縁に沿って一体化され、かつ長手方向両端が開口した
チューブ状の吊下部とを備え、該吊下部の両端を貫通す
る単管を適宣の支持手段により前記腹起こし上に固定す
ることによって前記本体部が前記腹起こしの背面に沿っ
て吊下支持されるようにしてなることを特徴とする(請
求項1)。
In order to achieve the above-mentioned object, the present invention is provided along the back of a belly,
In the initial state where both ends are welded, a flat flexible bag
A main body, and a main body protruding from one side of the main body.
One or more inlets communicating with the inside, and
Integrated along the upper edge and open at both longitudinal ends
And a tube-shaped suspension, penetrating both ends of the suspension
A single tube on the belly by appropriate support means.
The main body along the back of the belly
It characterized Rukoto such so as to be suspended supporting Te (claim 1).

【0009】またこの発明方法は、山留壁の壁面と腹起
こしの背面との間に形成された隙間に沿って請求項1に
記載の袋体を差し込み保持し、該袋体の内部に連通する
注入口に、モルタル,コンクリートなどからなる固化材
注入用ホースの筒先を連結し、該ホースを通じて前記袋
体の内部に固化材を注入充填することで、前記袋体を隙
間形状に沿って膨脹させ、該膨脹状態で前記固化材を固
結させることを特徴とする(請求項2)。
The method according to the present invention is characterized in that, along the gap formed between the wall surface of the retaining wall and the back surface of the belly ,
The bag body described above is inserted and held, and the tip of a hose for injecting a solidified material made of mortar, concrete, or the like is connected to an injection port communicating with the inside of the bag body, and the solidified material is inserted into the bag body through the hose. By filling and injecting, the bag body is expanded along the gap shape, and the solidified material is solidified in the expanded state (claim 2).

【0010】[0010]

【作用】この発明による袋体によれば、単管に吊下支持
され、単管を適宣の位置に固定しておけば、袋体の位置
決めがなされ、また腹起こし撤去時における脱落も防止
される。
According to the bag body of the present invention, the single tube is suspended and supported.
If the single tube is fixed at the appropriate position, the position of the bag
Decision made, also prevents falling off when removing a belly
Is done.

【0011】またこの発明による隙間詰め方法によれ
ば、袋体の隙間への差し込みと注入用ホースの接続作業
により注入準備作業が完了する。固化材注入により袋体
は隙間形状に追随して膨脹し、隙間を詰める。固結体は
袋体の内部に包囲された状態であるため、各部と直接接
触することがなく、支保工の撤去時には袋体ごと除去す
ることができる。
Also , according to the gap filling method according to the present invention,
For example, insert the bag into the gap and connect the injection hose.
This completes the injection preparation work. Bag body by solidification material injection
Expands following the gap shape and fills the gap. The consolidated body
Because it is surrounded by the inside of the bag,
Do not touch it and remove the bag when removing the shoring.
Can be

【0012】[0012]

【実施例】以下、本発明の一実施例を図面を用いて詳細
に説明する。図1はこの発明方法が適用される山留壁と
腹起こしとの関係を示すもので、地山Eの掘削面に沿っ
てH形鋼からなる複数の杭1が鉛直かつ適宣間隔をおい
て建て込まれ、各杭1の内側にはこれと交差して同じく
H形鋼からなる腹起こし2が横設され、その下部をブラ
ケット2aを介して各杭1に連結している。そして、各
杭1の間に落とし込まれた図示しない堰板を型枠として
コンクリートが打設されることにより各杭1の間に山留
壁3が形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows a relationship between a retaining wall to which the method of the present invention is applied and a bulge. A plurality of piles 1 made of H-section steel are vertically and appropriately spaced along an excavation surface of a ground pile E. The piles 1 are erected, and inside each of the piles 1, a bulge 2, which is also made of H-shaped steel, is laid transversely, and the lower part thereof is connected to each of the piles 1 via a bracket 2 a. And concrete is cast using a not-shown weir plate dropped between the piles 1 as a formwork, so that the retaining wall 3 is formed between the piles 1.

【0013】この山留壁3の壁面と腹起こし2との間に
は隙間dが形成されており、この隙間dにこの発明によ
る袋体4が差し込まれる。袋体4はポリエステル樹脂シ
ートなどの引っ張りや引き裂きに対する耐久性の高い可
撓性シートを加工して得られたもので、図1および図2
に拡大して示すごとく両端を溶着5aされた初期状態が
偏平なチューブ状の本体部5と、本体部5の一側部の両
側2箇所に突設されて本体部内側に連通する筒状の注入
口6と、本体部の上縁に沿って溶着7aにより一体化さ
れ、かつ長手方向両端開口したチューブ状の吊下部7を
備えている。この袋体4の長さはモルタル注入の能率等
を考慮して設定され、おおよそ5m程度、各部の幅は腹
起こし2の幅や吊り下げ高さを考慮して設定される。
A gap d is formed between the wall of the retaining wall 3 and the belly 2 and the bag 4 according to the present invention is inserted into the gap d. The bag 4 is obtained by processing a flexible sheet such as a polyester resin sheet having high durability against pulling and tearing.
As shown in the enlarged view, a tubular main body 5 having both ends welded 5a is initially flat, and a tubular main body 5 protruding from two sides of one side of the main body 5 and communicating with the inside of the main body. The injection port 6 is provided with a tube-shaped hanging part 7 which is integrated by welding 7a along the upper edge of the main body and is opened at both ends in the longitudinal direction. The length of the bag body 4 is set in consideration of the efficiency of mortar injection and the like, and is about 5 m, and the width of each part is set in consideration of the width of the belly 2 and the hanging height.

【0014】なお、各注入口6の外周にはアクリルテー
プ8が設けられ、後述するモルタル注入用ホースの筒先
をこれに嵌合した状態でこのテープ8を緊縛することに
よりホースの脱落を防止できるようにしている。また、
一方の注入口6はモルタル注入用、他方は空気抜きとし
て機能し、場合によりいずれかをホースに連結し他方を
空気抜きとすれば良く、注入後はテープ8で口先を縛り
漏洩を防止する。なお、注入口は3箇所以上設けても良
く、空気抜きを別途設けても良いことは勿論である。
Acrylic tape 8 is provided on the outer periphery of each injection port 6, and it is possible to prevent the hose from dropping off by tightening the tape 8 in a state in which a tube tip of a mortar injection hose described later is fitted thereto. Like that. Also,
One inlet 6 functions for mortar injection, and the other functions as air release. In some cases, one of them may be connected to a hose and the other may be used for air release. After injection, the mouth 8 is tied up with a tape 8 to prevent leakage. In addition, it is needless to say that three or more injection ports may be provided and an air vent may be separately provided.

【0015】吊下部7にはその両端を貫通して単管9が
挿通され、この単管9によって袋体4が吊下状態に支持
される。単管9の支持構造は、図1に示すように腹起こ
し2の背面側上部に適宣間隔をおいて立設状態に溶接さ
れたアングルプレート10に設けたコ字形ブラケット1
1によっており、このブラケット11に単管9を設置す
ることで単管9は腹起こし2の背面上部に平行に位置決
め固定される。
A single tube 9 is inserted through both ends of the hanging portion 7, and the bag 4 is supported by the single tube 9 in a suspended state. As shown in FIG. 1, the support structure for the single tube 9 is a U-shaped bracket 1 provided on an angle plate 10 which is welded to the upper part on the rear side of the belly 2 at an appropriate distance and is erected.
By installing the single tube 9 on the bracket 11, the single tube 9 is positioned and fixed in parallel to the upper part of the back of the belly 2.

【0016】次に以上の袋体4を用いた隙間詰め方法を
図3を用いて説明する。
Next, a method for filling a gap using the above-described bag body 4 will be described with reference to FIG.

【0017】まず(a)に示すように、吊下部7を挿通
した単管9をブラケット11上に設置し、本体部5を腹
起こし2の背面と山留壁3との間に形成された隙間dに
差し込む。次いで、地上部に設置されたモルタルポンプ
12に接続したモルタル注入用ホース14の筒先を注入
口6に嵌合し、周囲をテープ8で緊縛すれば注入準備が
完了する。
First, as shown in FIG. 1A, a single pipe 9 into which a hanging portion 7 is inserted is set on a bracket 11, and a main body 5 is erected and formed between the back of 2 and the retaining wall 3. Insert into gap d. Then, the tip of the mortar injection hose 14 connected to the mortar pump 12 installed on the ground is fitted into the injection port 6 and the periphery is tied up with the tape 8 to complete the injection preparation.

【0018】その後、ポンプ12を稼動し、ホース14
先端に接続されたバルブ15を開ければモルタルMは本
体部5の内部に注入充填され、本体部5はその注入圧力
によって(b)に示すように隙間dの形状に応じた形状
に膨脹する。
Thereafter, the pump 12 is operated and the hose 14
When the valve 15 connected to the tip is opened, the mortar M is injected and filled into the main body 5, and the main body 5 expands to a shape corresponding to the shape of the gap d as shown in FIG.

【0019】なお、モルタルMの荷重により本体部5は
膨脹しつつ垂下され、その荷重は当初吊下部7全体に加
わるが、吊り下げ部7は本体部5の全長に亘っているた
め、十分な引っ張り抵抗で荷重を支持する。その後、本
体部5の両側面が腹起こし2および山留壁3に当接し、
これを圧することで荷重が分散されることになる。
The mortar M causes the main body 5 to hang down while expanding, and the load is initially applied to the entire hanging portion 7. However, since the hanging portion 7 extends over the entire length of the main body 5, it is sufficient. Support the load with tensile resistance. After that, both side surfaces of the main body 5 abut on the belly 2 and the retaining wall 3,
Pressing this disperses the load.

【0020】注入充填作業の終了はその膨脹度合いを考
慮して行うか、注入圧力が平衡状態となった時点を見極
めるか、或いは別途設置したセンサーなどにより検出
し、バルブ15を閉じポンプ12を停止する。
The filling and filling operation is completed in consideration of the degree of expansion, or when the filling pressure reaches an equilibrium state, or is detected by a sensor installed separately, and the valve 15 is closed and the pump 12 is stopped. I do.

【0021】その後は注入口6をテープ8で縛り、内部
を密封した状態でモルタルMを固結させれば詰め作業を
完了する。モルタルMの固結後は山留壁3に加わる土水
圧は固結体を通じて腹起こし2およびこれを含む支保工
側に確実に伝達されることになる。
Thereafter, the filling port 6 is tied with a tape 8 and the mortar M is consolidated while the inside is sealed, thereby completing the filling operation. After consolidation of the mortar M, the soil water pressure applied to the retaining wall 3 is reliably transmitted to the belly 2 and the support side including the bulge 2 through the consolidated body.

【0022】また、後日腹起こし2を撤去する際にはモ
ルタルMを充填した袋体4も同時に除去されることにな
り、単管9を引き抜いた後に袋体4ごと除去することが
できる。
Further, when the belly 2 is removed at a later date, the bag 4 filled with the mortar M is also removed at the same time, and the bag 4 can be removed after the single tube 9 is pulled out.

【0023】[0023]

【発明の効果】以上実施例で説明したように、この発明
にかかる袋体によれば、次の利点がある。 単管に吊
下支持され、単管を適宣の位置に固定しておけば、袋体
の位置決めがなされるため、セット作業を簡略化でき
る。 腹起こし撤去時における脱落も防止されるた
め、十分な安全性を確保できる。
As described above, the bag according to the present invention has the following advantages. Hang on a single tube
If it is supported below and the single tube is fixed in the proper position, the bag
Positioning can be performed, simplifying the setting operation.
You. It also prevents falling off when removing the belly
Therefore, sufficient safety can be secured.

【0024】また、この発明にかかる山留壁と腹起こし
の隙間詰め方法によれば、次の効果を奏する。 袋体
の隙間への差し込みと注入用ホースの接続作業により注
入準備作業が完了するため、従来の作業に比べて準備作
業が簡単である。 固化材注入により袋体は隙間形状
に追随して膨脹し、隙間を完全に詰め、また周囲への洩
れがないため、汚れがなく、材料の無駄もない。 固
結体は袋体の内部に包囲された状態であるため、各部と
直接接触することがなく、袋体ごと除去することがで
き、従来のような撤去時のハツリ作業や清掃作業が不要
となる。
Further, the retaining wall according to the present invention and the belly upright are provided.
According to the gap filling method, the following effects can be obtained. Bag
Into the gap and connect the injection hose.
Preparation work is completed, so preparation work is
The work is simple. The bag body has a gap shape by solidification material injection
Expands to completely close the gap, and leaks to the surrounding area.
There is no dirt and no waste of material. Solid
Since the unity is surrounded by the inside of the bag,
It can be removed together with the bag without direct contact.
Eliminates the need for conventional scraping and cleaning work during removal
Becomes

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明方法が適用される山留壁と腹起こしと
の関係を示す断面斜視図である。
FIG. 1 is a cross-sectional perspective view showing the relationship between a retaining wall to which the method of the present invention is applied and a belly.

【図2】この発明方法に用いる袋体および単管を示す斜
視図である。
FIG. 2 is a perspective view showing a bag and a single tube used in the method of the present invention.

【図3】(a),(b)は同袋体を用いた隙間詰め手順
を示す部分断面図である。
FIGS. 3A and 3B are partial cross-sectional views showing a procedure for filling a gap using the bag.

【符号の説明】[Explanation of symbols]

2 腹起こし 3 山留壁 4 袋体 5 本体部 6 注入口 9 単管 11 ブラケット(単管固定手段) 12 モルタルポンプ 14 モルタル注入用ホース d 隙間 M モルタル(固化材) 2 Belly upset 3 Mountain retaining wall 4 Bag 5 Main body 6 Inlet 9 Single pipe 11 Bracket (single pipe fixing means) 12 Mortar pump 14 Mortar injection hose d Gap M Mortar (solidified material)

フロントページの続き (72)発明者 川島 辰一 東京都世田谷区池尻2−33−16 太陽工 業株式会社内 (56)参考文献 特開 平3−36317(JP,A) 特開 平6−108469(JP,A) 特開 平6−263154(JP,A) 実開 昭60−169337(JP,U) 特公 平3−78454(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E02D 17/04 Continuation of the front page (72) Inventor Tatsuichi Kawashima 2-33-16 Ikejiri, Setagaya-ku, Tokyo Taiyo Kogyo Co., Ltd. (56) References JP-A-3-36317 (JP, A) JP-A-6-108469 (JP, A) JP-A-6-263154 (JP, A) JP-A-60-169337 (JP, U) JP-B 3-78454 (JP, B2) (58) Fields investigated (Int. Cl. 7) , DB name) E02D 17/04

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 腹起こしの背面に沿って添設され、かつ
両端を溶着された初期状態では偏平な可撓性袋体からな
る本体部と、該本体部の一側部から突設されて本体部内
側に連通する一または複数の注入口と、前記本体部の上
縁に沿って一体化され、かつ長手方向両端が開口したチ
ューブ状の吊下部とを備え、該吊下部の両端を貫通する
単管を適宣の支持手段により前記腹起こし上に固定する
ことによって前記本体部が前記腹起こしの背面に沿って
吊下支持されるようにしてなることを特徴とする山留壁
と腹起こしとの隙間詰めに用いられる袋体。
1. A main body comprising a flat flexible bag in an initial state in which both ends are welded together along a back surface of a belly and a projecting part protruding from one side of the main body. One or more inlets communicating with the inside of the main body, and a tube-shaped hanging portion integrated along the upper edge of the main body and open at both ends in the longitudinal direction, penetrating both ends of the hanging portion The main body portion is suspended and supported along the back of the belly upright by fixing the single pipe to the belly upset by a suitable support means. Bag used to close the gap with
【請求項2】 山留壁の壁面と腹起こしの背面との間に
形成された隙間に沿って請求項1に記載の袋体を差し込
み保持し、該袋体の内部に連通する注入口に、モルタ
ル,コンクリートなどからなる固化材注入用ホースの筒
先を連結し、該ホースを通じて前記袋体の内部に固化材
を注入充填することで、前記袋体を隙間形状に沿って膨
脹させ、該膨脹状態で前記固化材を固結させることを特
徴とする山留壁と腹起こしとの隙間詰め方法。
2. The bag according to claim 1, which is inserted and held along a gap formed between a wall surface of the mountain retaining wall and a back surface of the belly, and an injection port communicating with the inside of the bag, By connecting the tip of a hose for injecting a solidified material made of mortar, concrete, or the like, and injecting and filling the solidified material into the inside of the bag through the hose, the bag is expanded along the gap shape, and the expanded state is maintained. A method of filling a gap between a retaining wall and a belly by solidifying the solidified material.
JP6247876A 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag Expired - Lifetime JP3022736B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6247876A JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6247876A JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Publications (2)

Publication Number Publication Date
JPH08109633A JPH08109633A (en) 1996-04-30
JP3022736B2 true JP3022736B2 (en) 2000-03-21

Family

ID=17169932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6247876A Expired - Lifetime JP3022736B2 (en) 1994-10-13 1994-10-13 Bag and method of filling gap between ridge and wall using this bag

Country Status (1)

Country Link
JP (1) JP3022736B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476838B1 (en) * 2002-08-02 2005-03-17 최춘식 Grouting method using rift pack in construction of underground continuous wall
KR100973601B1 (en) * 2008-05-19 2010-08-02 (주) 아이제이컨티넨탈엔지니어링 Braket for supporting wale beam of soil retaining wall and excavation method using the same
CN104631471B (en) * 2015-01-22 2016-03-02 安徽省城建设计研究总院有限公司 For steel concrete, there is the prestressed support of side expanding and applying method thereof
JP6200550B1 (en) * 2016-05-27 2017-09-20 鹿島建設株式会社 Temporary deadline method, temporary deadline structure

Also Published As

Publication number Publication date
JPH08109633A (en) 1996-04-30

Similar Documents

Publication Publication Date Title
JP3022736B2 (en) Bag and method of filling gap between ridge and wall using this bag
CN107489102A (en) Combined steel sheet-pile cofferdam high water level difference cushion cap and construction method
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
JPH10183624A (en) Reinforcing fill-up wall employing retaining wall block
JP3194192B2 (en) Open shield method
JPH09158174A (en) Water stopping mechanism and method between case bodies of underground continuous wall
JP3332507B2 (en) How to build underground structures
JP2981632B2 (en) Construction method of joint of underground wall
JPH0813494A (en) Fixing method of earth retaining wall and timbering
JP3697525B2 (en) Pipeline repair and rehabilitation method
JP2665801B2 (en) Locking box for the middle reading wall
JP3729028B2 (en) Water stop method for joints in steel pipe sheet piles
JPH0344815Y2 (en)
JP2764252B2 (en) Underground concrete structure repair material and repair method
JPH08239850A (en) Execution method and device for retaining wall
JPH06980B2 (en) How to place steel sheet pile concrete
JP3245732B2 (en) Permanent formwork mounting method for revetment structures
JPH01235715A (en) Underground continuous impermeable wall method
JP2002081056A (en) Steel pipe sheet pile wall construction method
JP3076720B2 (en) Underground diaphragm wall
JPH08253927A (en) Joint structure in underground continuous wall
JP3080840B2 (en) How to remove underground pipes
JPS62236922A (en) Method of reinforcing sheet pile-wall structure
JP3240404B2 (en) Permanent formwork mounting method for revetment structures
JPS63122817A (en) Construction of cut-off wall using water-impermeable sheet and water-impermeable sheet therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080114

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090114

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100114

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110114

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120114

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130114

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term