JPH08105604A - Condensing blow device of boiler using electric conductivity in supply water - Google Patents

Condensing blow device of boiler using electric conductivity in supply water

Info

Publication number
JPH08105604A
JPH08105604A JP17196494A JP17196494A JPH08105604A JP H08105604 A JPH08105604 A JP H08105604A JP 17196494 A JP17196494 A JP 17196494A JP 17196494 A JP17196494 A JP 17196494A JP H08105604 A JPH08105604 A JP H08105604A
Authority
JP
Japan
Prior art keywords
blow
electric conductivity
boiler
water
rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17196494A
Other languages
Japanese (ja)
Other versions
JP2853097B2 (en
Inventor
Naoki Obata
直樹 小畑
Yoshiki Maekawa
芳樹 前川
Tomizo Okada
富造 岡田
Yasuhiro Mitsuda
泰啓 満田
Hajime Nakamura
一 中村
Tetsuji Fujita
哲次 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KURITA B M S KK
Samson Co Ltd Japan
Original Assignee
KURITA B M S KK
Samson Co Ltd Japan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KURITA B M S KK, Samson Co Ltd Japan filed Critical KURITA B M S KK
Priority to JP17196494A priority Critical patent/JP2853097B2/en
Publication of JPH08105604A publication Critical patent/JPH08105604A/en
Application granted granted Critical
Publication of JP2853097B2 publication Critical patent/JP2853097B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

PURPOSE: To make it possible to follow up not only the flow rate of supply water but also changes in water quality and maintain an optimum blow rate constantly by inputting the electric conductivity of supply water to a condensing blow device and correcting the input value based on a specified equation and controlling the blow based on the corrected blow rate. CONSTITUTION: A water supply tank 3, a water supply pump 4 and an electric conductivity meter 5 are installed on the way of a water supply pipeline 2 connected to the lower part of a boiler 1. The steam generated in the boiler 1 is vapor-liquid separated and the separated liquid is returned into the boiler 1 by way of a water downcomer 8. A solenoid on-off type condensing blow valve 11 is installed on the way of a blow pipeline 9 connected to the lower part of the water downcomer 8. The electric conductivity of the water supply detected with the electric conductivity meter 5 installed on the way of the water supply system is input into a blow control device 13 which controls the opening of the condensing blow valve 11 where the blow rate is corrected based on the equation preliminarily input in the blow control device 13, thereby controlling the electric conductivity so as to conform to the corrected blow rate.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、給水中の電気伝導度を
利用したボイラーの濃縮ブロー装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concentrating blow device for a boiler which utilizes the electric conductivity of water supply.

【0002】[0002]

【従来の技術】ボイラーの缶水は蒸発に伴い、濃縮され
てキャリオーバを生じ、蒸気乾き度が低下する。そのた
め、缶水の一部を排出する濃縮ブローを行い、濃縮度を
低下させる必要がある。また、ボイラーへ給水される水
は水管の腐食等を防止するために、薬液を注入する場合
がある。ブロー率や薬注率は水質によって異なり、水質
は水源によって大きく異なるため、給水の水質を予め測
定し、水質により決定されるブロー率並びに薬注率をブ
ロー制御装置並びに薬注制御装置へ入力しておき、給水
量に応じて算出した分のブローと薬注を行っている。し
かし、同じ水源からの水であっても水質は変動してお
り、また、ドレン回収を行っておりドレン回収率が変動
する場合、給水水質は大幅に変動し、適切なブロー率や
薬注率も変動する。しかし、実際に行われる制御は最初
に測定された水質のみを基準に行われ、適切な量と実際
に行われる量に差が生じ、無駄なブローや薬注を行った
り、ブローや薬注の不足を招いていた。
2. Description of the Related Art Boiler can water is concentrated as it evaporates, causing carryover, and the dryness of steam decreases. Therefore, it is necessary to perform a concentration blow to discharge a part of the canned water to reduce the degree of concentration. Further, the water supplied to the boiler may be injected with a chemical solution in order to prevent corrosion of the water pipe. Since the blow rate and the chemical injection rate differ depending on the water quality, and the water quality varies greatly depending on the water source, the water quality of the feed water is measured in advance and the blow rate and the chemical injection rate determined by the water quality are input to the blow control device and the chemical injection control device. Aside from that, the amount of blow and the chemical injection calculated according to the amount of water supply are performed. However, even if the water comes from the same water source, the water quality is fluctuating, and if the drain recovery rate varies and the feed water quality fluctuates significantly, the appropriate blow rate and chemical injection rate Also fluctuates. However, the control that is actually performed is based only on the first measured water quality, and there is a difference between the appropriate amount and the amount that is actually used, and wasteful blowing or chemical dosing, or blowing or chemical dosing It was causing a shortage.

【0003】[0003]

【発明が解決しようとする課題】本発明が解決しようと
する課題は、給水の流量のみならず水質変化にも追随
し、常に最適なブロー率を保つことができるブロー装置
の提供にある。
The problem to be solved by the present invention is to provide a blower device capable of always keeping an optimum blow rate by following not only the flow rate of feed water but also the change in water quality.

【0004】[0004]

【課題を解決するための手段】缶水の濃縮状態を演算に
よって算出し、ブロー率に従って濃縮ブロー弁を開閉す
ることで濃縮ブローを行うボイラーにおいて、給水系統
途中に給水の電気伝導度を検出する電気伝導度計を設
け、検出された電気伝導度を、濃縮ブロー弁の開閉を制
御するブロー制御装置に入力し、装置制御装置に予め入
力されていた計算式に基づいてブロー率を補正し、補正
したブロー率になるようブローを行う。
[Means for Solving the Problems] In a boiler that performs a concentrated blow by calculating a concentrated state of canned water by calculation and opening and closing a concentrated blow valve according to a blow rate, the electric conductivity of the supplied water is detected in the middle of a water supply system. An electric conductivity meter is provided, and the detected electric conductivity is input to the blow control device that controls the opening and closing of the concentration blow valve, and the blow rate is corrected based on the formula previously input to the device control device. Blow is performed so as to obtain the corrected blow rate.

【0005】[0005]

【作用】給水の電気伝導度を常時検出し、検出された電
気伝導度によってブロー率を設定することで、変動する
水質に合わせて常に最適なブローを行うことができる。
By constantly detecting the electric conductivity of the feed water and setting the blow rate according to the detected electric conductivity, it is possible to always perform optimum blowing according to the varying water quality.

【0006】[0006]

【実施例】本発明の一実施例を図面を用いて説明する。
図1に示すようにボイラー(1)の下部に接続された給
水配管(2)は途中に給水タンク(3)、給水ポンプ
(4)、電気伝導度計(5)が設けられており、薬注装
置(6)が電気伝導度計よりも上流の給水配管に接続さ
れている。電気伝導度計にて検出された電気伝導度は、
電気伝導度異常検出装置(14)へ送られ、異常の有無
が確認される。また、給水ポンプ、薬注装置、ボイラ
ー、電気伝導度異常検出装置に接続されたボイラー制御
装置(12)は、内部に給水制御部・薬注制御部・燃焼
制御部などを持ち各制御を行う。ボイラー内で発生した
蒸気は蒸気連絡管(10)を通って気水分離器(7)へ
送られ、気液分離されて蒸気のみを取り出し、分離され
た液体は降水管(8)を通ってボイラー内へ戻される。
降水管下部に接続されたブロー配管(9)の途中には電
磁開閉式の濃縮ブロー弁(11)が設けられている。濃
縮ブロー弁の開閉を制御するブロー制御装置(13)
は、濃縮ブロー弁の他に電気伝導度計異常検出装置およ
びボイラー制御装置に接続されている。
An embodiment of the present invention will be described with reference to the drawings.
As shown in FIG. 1, the water supply pipe (2) connected to the lower part of the boiler (1) is provided with a water supply tank (3), a water supply pump (4) and an electric conductivity meter (5) on the way. The injection device (6) is connected to the water supply pipe upstream of the electric conductivity meter. The electric conductivity detected by the electric conductivity meter is
It is sent to the electrical conductivity abnormality detection device (14) and the presence or absence of abnormality is confirmed. Further, the boiler control device (12) connected to the water supply pump, the chemical injection device, the boiler, and the electrical conductivity abnormality detection device has a water supply control unit, a chemical injection control unit, a combustion control unit, etc., and performs each control. . The steam generated in the boiler is sent to the steam-water separator (7) through the steam communication pipe (10) and is separated into gas and liquid to take out only the steam, and the separated liquid passes through the downcomer pipe (8). Returned to the boiler.
An electromagnetic opening / closing type concentration blow valve (11) is provided in the middle of the blow pipe (9) connected to the lower part of the downcomer pipe. Blow control device (13) for controlling the opening and closing of the concentration blow valve
Is connected to an electric conductivity meter abnormality detection device and a boiler control device in addition to the concentration blow valve.

【0007】電気伝導度計は給水の電気伝導度を計測
し、電気伝導度を電気伝導度計異常検出装置へ出力す
る。電気伝導度計異常検出装置には、正常な範囲の電気
伝導度と最初に検出しておいた電気伝導度が記憶されて
おり、電気伝導度計にて検出される電気伝導度が正常範
囲内に有ったとき、電気伝導度計からの値をそのままブ
ロー制御装置、ボイラー制御装置へ、正常範囲内に無か
った時には記憶しておいた電気伝導度をブロー制御装
置、ボイラー制御装置へ出力する。電気伝導度が入力さ
れたブロー制御装置は、予め入力されていた計算式によ
りブロー率を算出し、ボイラー制御装置では薬注率を算
出する。ボイラー制御装置は、ボイラーの燃焼を行った
時、燃焼状況と燃焼時間を計測し、ブロー制御装置へ出
力する。ボイラーへの給水量は燃焼によって蒸発した分
だけ行われ、蒸発量は燃焼時間より求めることができる
ので、燃焼時間より給水量を求めることができ、ブロー
制御装置は算出しておいたブロー率と、燃焼時間より求
めた給水量よりブロー量を算出し、濃縮ブロー弁開閉タ
イミングを決定する。ブロー制御装置は、決定した開閉
タイミングに合わせて濃縮ブロー弁を開閉し、濃縮ブロ
ーを実施する。また、薬注制御についても、ボイラー制
御装置にて算出された薬注率になるよう薬注装置の稼働
制御を行う。
The electrical conductivity meter measures the electrical conductivity of the feed water and outputs the electrical conductivity to the electrical conductivity meter abnormality detection device. The electrical conductivity meter abnormality detection device stores the electrical conductivity within the normal range and the electrical conductivity that was initially detected, and the electrical conductivity detected by the electrical conductivity meter is within the normal range. When it is, the value from the electric conductivity meter is directly output to the blow control device and the boiler control device, and when it is not within the normal range, the stored electric conductivity is output to the blow control device and the boiler control device. . The blow control device to which the electric conductivity is input calculates the blow ratio by the previously input calculation formula, and the boiler control device calculates the chemical injection ratio. The boiler control device measures the combustion state and the combustion time when the boiler is burned, and outputs it to the blow control device. The amount of water supplied to the boiler is equal to the amount evaporated by combustion, and the amount of evaporation can be obtained from the combustion time.Therefore, the amount of water supplied can be obtained from the combustion time. The blow amount is calculated from the water supply amount obtained from the combustion time, and the timing for opening and closing the concentration blow valve is determined. The blow control device opens and closes the concentration blow valve according to the determined opening / closing timing to perform the concentration blow. Also, regarding the chemical injection control, the operation control of the chemical injection device is performed so that the chemical injection rate calculated by the boiler control device is obtained.

【0008】なお、上記実施例にある薬注装置必須では
なく、薬注装置を設けた場合には薬品によって電気伝導
度に影響を与えるため、薬品給水後の給水系統に電気伝
導度計を設け、薬品注入後の給水の電気伝導度を検出す
る。
It should be noted that the chemical injection device in the above embodiment is not essential, and when the chemical injection device is provided, the electrical conductivity is affected by the chemicals. Therefore, an electrical conductivity meter is provided in the water supply system after the chemicals are supplied. , To detect the electric conductivity of water supply after chemical injection.

【0009】[0009]

【発明の効果】本発明は、以上のように給水の電気伝導
度を検出し、水質の変化に合わせてブロー率を補正する
ことによって、常にその時の給水に合ったブロー率を選
定することができ、ブロー不足やブロー過多を起こすこ
との無いブロー制御を行うことができる。また、一定の
ブロー率を保つバックアップ機能を持たせることで、電
気伝導度計に異常が発生しても最適に近い状態での濃縮
ブローを続けることができる。
As described above, according to the present invention, the electric conductivity of the feed water is detected and the blow rate is corrected according to the change in the water quality, so that the blow rate suitable for the water supply at that time can be always selected. Therefore, blow control can be performed without causing insufficient blow or excessive blow. Further, by providing a backup function for maintaining a constant blow rate, it is possible to continue the concentrated blow in a nearly optimal state even if an abnormality occurs in the electric conductivity meter.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施例の概略説明FIG. 1 is a schematic description of an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 ボイラー 2 給水配管 3 給水タンク 4 給水ポンプ 5 電気伝導度計 6 薬注装置 7 気水分離器 8 降水管 9 ブロー配管 10 蒸気連絡管 11 濃縮ブロー弁 12 ボイラー制御装置 13 ブロー制御装置 14 電気伝導度計異常検出装置 1 Boiler 2 Water supply pipe 3 Water supply tank 4 Water supply pump 5 Electric conductivity meter 6 Chemical injection device 7 Steam separator 8 Downcomer pipe 9 Blow pipe 10 Steam connection pipe 11 Concentration blow valve 12 Boiler control device 13 Blow control device 14 Electric conduction Abnormality detector

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岡田 富造 香川県観音寺市八幡町3丁目4番15号 株 式会社サムソン内 (72)発明者 満田 泰啓 東京都新宿区横寺町58番地 クリタ・ビー エムエス株式会社内 (72)発明者 中村 一 東京都新宿区横寺町58番地 クリタ・ビー エムエス株式会社内 (72)発明者 藤田 哲次 東京都新宿区横寺町58番地 クリタ・ビー エムエス株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tomizo Okada 3-4-15 Hachimancho, Kanonji City, Kagawa Prefecture Samson Inc. (72) Inventor Yasunori Mitsuda 58 Yokoteracho, Shinjuku-ku, Tokyo Kurita BMS Co., Ltd. (72) Inventor Hajime Nakamura 58 Yokodera-cho, Shinjuku-ku, Tokyo Kurita BMS Co., Ltd. (72) Inventor Tetsuji Fujita 58, Yokotera-cho, Shinjuku-ku, Tokyo Kurita BMS Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 缶水の濃縮状態を演算によって算出し、
ブロー率に従って濃縮ブロー弁を開閉することで濃縮ブ
ローを行うボイラーにおいて、給水系統途中に給水の電
気伝導度を検出する電気伝導度計を設け、検出された電
気伝導度を濃縮ブロー弁の開閉を制御するブロー制御装
置に入力し、ブロー制御装置に予め入力されていた計算
式に基づいてブロー率を補正し、補正したブロー率によ
ってブロー制御を行うことを特徴とする給水中の電気伝
導度を利用したボイラーの濃縮ブロー装置。
1. A method for calculating the concentration of canned water by calculation,
In a boiler that performs concentration blow by opening and closing the concentration blow valve according to the blow rate, an electric conductivity meter that detects the electrical conductivity of the feed water is installed in the middle of the water supply system, and the detected electrical conductivity is opened and closed. It is input to the blow control device to be controlled, the blow rate is corrected based on the calculation formula previously input to the blow control device, and the blow control is performed by the corrected blow rate. Boiler concentration blower used.
【請求項2】 請求項1に記載の電気伝導度を利用した
濃縮ブロー装置において、薬注後の給水の電気伝導度を
検出することを含むボイラーの濃縮ブロー装置。
2. The concentrating blow device using electric conductivity according to claim 1, wherein the concentrating blow device for a boiler includes detecting the electric conductivity of feed water after chemical injection.
【請求項3】 請求項1、請求項2に記載の電気伝導度
を利用した濃縮ブロー装置において、電気伝導度計の異
常の有無を判断する電気伝導度異常検出装置を設け、電
気伝導度計に異常が生じた場合には電気伝導度による補
正を中止し、予め記憶しておいた正常時の電気伝導度を
用い、一定のブロー率にてブローを行わせるボイラーの
濃縮ブロー装置。
3. The concentration blowing device using electric conductivity according to claim 1, further comprising an electric conductivity abnormality detecting device for determining whether or not there is an abnormality in the electric conductivity meter. When an abnormality occurs in the boiler, the concentration-blow device of the boiler that stops the correction by the electric conductivity and uses the previously stored normal electric conductivity to blow at a constant blow rate.
JP17196494A 1994-06-29 1994-06-29 Concentration blower for boiler using electric conductivity in feed water Expired - Fee Related JP2853097B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17196494A JP2853097B2 (en) 1994-06-29 1994-06-29 Concentration blower for boiler using electric conductivity in feed water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17196494A JP2853097B2 (en) 1994-06-29 1994-06-29 Concentration blower for boiler using electric conductivity in feed water

Publications (2)

Publication Number Publication Date
JPH08105604A true JPH08105604A (en) 1996-04-23
JP2853097B2 JP2853097B2 (en) 1999-02-03

Family

ID=15933029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17196494A Expired - Fee Related JP2853097B2 (en) 1994-06-29 1994-06-29 Concentration blower for boiler using electric conductivity in feed water

Country Status (1)

Country Link
JP (1) JP2853097B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019163883A (en) * 2018-03-19 2019-09-26 栗田工業株式会社 Boiler water concentration magnification measuring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019163883A (en) * 2018-03-19 2019-09-26 栗田工業株式会社 Boiler water concentration magnification measuring device

Also Published As

Publication number Publication date
JP2853097B2 (en) 1999-02-03

Similar Documents

Publication Publication Date Title
CN114431713A (en) Boiling water continuous preparation method based on gas-liquid two-phase substance detection
JPH08105604A (en) Condensing blow device of boiler using electric conductivity in supply water
JP2002364802A (en) Exhaust heat recovery system
JPH08105605A (en) Interlocking chemical injection system of boiler using electric conductivity in water supply
JP4109711B2 (en) Boiler water supply control device that controls proportionally to the amount of canned water used
JP4405640B2 (en) Blow rate calculation method and blow control device for drain recovery boiler
JP3669638B2 (en) Concentration blow control method for boiler
JP3077789B2 (en) Boiler operation concentration blow control method
JP2017004629A (en) Fuel cell power generation device
JPH09236207A (en) Boiler
JP2925497B2 (en) Boiler intermittent blow control method
JP4738587B2 (en) Boiler water supply control device
JP2001141302A (en) Latent heat recovery type hot water supply apparatus
JPH0518507A (en) Method of controlling chemical feeding for boiler
JPH06341602A (en) Pressure reducing boiler type vaporizer and control thereof
JP2768388B2 (en) Decompression boiler type vaporizer and control method thereof
JP2004045023A (en) Concentrated blow control device of boiler
JP2725716B2 (en) Method of detecting non-condensable gas in decompression boiler type vaporizer and method of controlling decompression boiler type vaporizer with detection of non-condensable gas
JP2005201506A (en) Combustion control method for boiler
JPH06323507A (en) Steam supplying device
JP4071369B2 (en) Water supply control device combining ON-OFF control and proportional control
JPH05126305A (en) Control mechanism for concentration blow valve in boiler
JPH06220661A (en) Water quality regulator
JP2000146107A (en) Auxiliary steam apparatus for boiler
KR20200111315A (en) Condensate water drain control system and control method for fuel cell

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees