JPH07237888A - Method and device for automatically projecting and housing auxiliary jib for crane - Google Patents

Method and device for automatically projecting and housing auxiliary jib for crane

Info

Publication number
JPH07237888A
JPH07237888A JP6052734A JP5273494A JPH07237888A JP H07237888 A JPH07237888 A JP H07237888A JP 6052734 A JP6052734 A JP 6052734A JP 5273494 A JP5273494 A JP 5273494A JP H07237888 A JPH07237888 A JP H07237888A
Authority
JP
Japan
Prior art keywords
boom
jib
auxiliary jib
rotating bracket
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6052734A
Other languages
Japanese (ja)
Other versions
JP3090393B2 (en
Inventor
Seishiro Takebe
誠市郎 武部
Teruhiko Ishida
輝彦 石田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Komatsu MEC Corp
Original Assignee
Komatsu Ltd
Komatsu MEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd, Komatsu MEC Corp filed Critical Komatsu Ltd
Priority to JP06052734A priority Critical patent/JP3090393B2/en
Priority to TW085215623U priority patent/TW345195U/en
Priority to CN95191934A priority patent/CN1143353A/en
Priority to EP95909954A priority patent/EP0747315A4/en
Priority to KR1019960704490A priority patent/KR970701150A/en
Priority to PCT/JP1995/000252 priority patent/WO1995023111A1/en
Publication of JPH07237888A publication Critical patent/JPH07237888A/en
Application granted granted Critical
Publication of JP3090393B2 publication Critical patent/JP3090393B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/702Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic with a jib extension boom
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/16Applications of indicating, registering, or weighing devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/84Slewing gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/03Cranes with arms or jibs; Multiple cranes
    • B66C2700/0321Travelling cranes
    • B66C2700/0357Cranes on road or off-road vehicles, on trailers or towed vehicles; Cranes on wheels or crane-trucks

Abstract

PURPOSE:To securely, safely and quickly project and house an auxiliary jib by projecting an auxiliary jib with the force generated between a boom and the auxiliary jib at the time of projecting the auxiliary jib, and thereafter, taking measures to engage the auxiliary jib with the side surface side near the tip of the boom. CONSTITUTION:An automatic projecting and housing device 10 is formed of a rotating bracket part 30 for bringing an auxiliary jib 6 near a top boom 5 and for separating them, a lateral holding device 20 to be driven by a hydraulic device to oscillate the auxiliary jib 6 in the lateral direction, plural lock devices 40, 60 for locking the top boom 5 with the rotating bracket 30, and a rotating device 50 for rotating the rotating bracket part 30 to the boom. At the time of projecting the auxiliary jib 6, the auxiliary jib 6 is projected by the force generated between the boom 5 and the auxiliary jib 6, and thereafter, the auxiliary jib 6 is engaged with the side surface side near the tip of the boom at the time of parallel arrangement. The rotating bracket part 30 is projected forward of the boom by the turning force to the boom to engage the auxiliary jib 6 with the side surface side far from the tip of the boom.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、車両搭載クレーンにお
けるブーム装置の補ジブ張り出し、格納方法および格納
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an auxiliary jib projecting and retracting method for a boom device in a vehicle-mounted crane and a retracting device.

【0002】[0002]

【従来の技術】図1は車両搭載用クレーン(ラフテレン
クレーン)の走行姿勢の側面図であり、図2は平面図で
ある。車体1に搭載された、運転室3を備えた上部旋回
体2には、多段に伸縮するブーム4が起伏自在に装着さ
れており、走行姿勢においてはブーム4はほぼ水平かあ
るいは少し前傾している。このとき、ブーム4のトップ
ブーム5の先端に装着される補ジブ6はブーム4の側面
に並列に格納されている。作業時には図3に示すよう
に、補ジブ6をトップブーム5の先端に張り出し、ブー
ム4を任意に伸縮、起伏させて作業を行う。補ジブ6の
張り出し、格納方法については各種の方法があるが、一
例として特公平4−6640がある。この提案によれ
ば、格納されている補ジブを張り出す場合に、まず格納
ピンを抜き、つぎに補ジブを外側に振り出し、つぎに支
点ピンを挿入し、つぎに伸長側セットピンをフリーに
し、つぎにブームを所定の起伏角にし、つぎに補ジブを
支点ピンの軸芯とほぼ平行になる位置までチルトし、つ
ぎに補巻きウインチにより補ジブを回動させ、つぎに連
結ピンを挿入して張り出し作業が終了するようになって
いる。
2. Description of the Related Art FIG. 1 is a side view of a traveling posture of a vehicle-mounted crane (rough terrain crane), and FIG. 2 is a plan view thereof. An upper swing body 2 equipped with a driver's cab 3 mounted on a vehicle body 1 is provided with a boom 4 that expands and contracts in multiple stages so that it can be raised and lowered. ing. At this time, the auxiliary jib 6 attached to the tip of the top boom 5 of the boom 4 is stored in parallel with the side surface of the boom 4. At the time of work, as shown in FIG. 3, the auxiliary jib 6 is extended to the tip of the top boom 5, and the boom 4 is arbitrarily expanded and contracted and undulated to perform the work. There are various methods for projecting and storing the supplementary jib 6, and as an example, there is JP-B-4-6640. According to this proposal, when the stored auxiliary jib is extended, the storage pin is first pulled out, then the auxiliary jib is swung out, the fulcrum pin is inserted, and then the extension set pin is free. Next, set the boom to a predetermined hoisting angle, then tilt the auxiliary jib to a position almost parallel to the axis of the fulcrum pin, then rotate the auxiliary jib with an auxiliary winding winch, and then insert the connecting pin. Then, the overhanging work is completed.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記方
法によれば、補ジブの回動を補巻きウインチを用いてワ
イヤによって行うようにしたため、事前に補巻きロープ
の掛け換えをしなければならず、準備に多くの工数と、
時間とを必要とする。また、補ジブの横方向への揺動、
支点ピンの挿入、伸長側セットピンのフリー化、およ
び、連結ピンの挿入は人手によるため、力が必要であ
り、ピン穴位置の確認等、作業が面倒で時間を要し、作
業者の疲労も大きい。また、誤操作による各部の干渉、
あるいは危険が発生する恐れもある。
However, according to the above method, since the auxiliary jib is rotated by the wire using the auxiliary winding winch, it is necessary to change the auxiliary winding rope in advance. , A lot of man-hours to prepare,
Need time and. Also, swinging the supplementary jib in the lateral direction,
Insertion of the fulcrum pin, freeing of the extension side set pin, and insertion of the connecting pin require manual work, which requires force, and work such as checking the pin hole position is troublesome and time-consuming, resulting in operator fatigue. Is also big. Also, interference of each part due to erroneous operation,
Or danger may occur.

【0004】本発明は上記の問題点に着目してなされた
もので、ブーム装置の補ジブ張り出し、格納方法および
格納装置に係わり、特には、準備工数が少なく、人手作
業が少なくて、容易に、確実に、安全に、短時間で補ジ
ブの張り出し、格納操作が行えるクレーン用補ジブの自
動張り出し、格納方法および装置を提供することを目的
としている。
The present invention has been made in view of the above problems, and relates to an auxiliary jib extension of a boom device, a storage method, and a storage device. SUMMARY OF THE INVENTION It is an object of the present invention to provide a method and an apparatus for automatically projecting and storing a supplementary jib for a crane, which can surely and safely extend and store the supplementary jib in a short time.

【0005】[0005]

【課題を解決するための手段】上記の目的達成のため、
本発明に係るクレーン用補ジブの自動張り出し方法およ
び装置の第1の発明においては、車両に起伏自在に装着
され、多段に伸縮するブームの先端に、ブームに着脱さ
れる回転ブラケット部と、回転ブラケット部に起伏自在
の補ジブを設け、回転ブラケット部をブームに対して回
動させることにより、作業時には前記ブームの前方に張
り出し、格納時には前記ブームの側面に並設して格納す
る、補ジブ張り出し、格納装置を備えたクレーン用補ジ
ブの張り出し、格納方法において、補ジブの張り出し時
に、ブームと補ジブとの間の力により補ジブを所定位置
に横方向に揺動させて張り出し、この張り出し後に並設
時のブーム先端近傍側面側と補ジブとを係合し、次に、
ブームに対する旋回力により回転ブラケット部をブーム
の前方に張り出し、並設時のブーム先端遠方側面側と補
ジブとを係合する。
[Means for Solving the Problems] To achieve the above object,
In a first aspect of a method and a device for automatically extending a supplementary jib for a crane according to the present invention, there is provided a rotating bracket portion attached to and detached from the boom at a tip end of a boom which is mounted on a vehicle so as to be capable of elevating and lowering, and which expands and contracts in multiple stages. By providing an undulating auxiliary jib on the bracket part and rotating the rotating bracket part with respect to the boom, the auxiliary jib is projected in front of the boom during work and is stored side by side on the side surface of the boom during storage. In the method of overhanging and retracting a supplementary jib for a crane equipped with an overhanging and retracting device, at the time of overhanging the auxiliary jib, the force between the boom and the auxiliary jib causes the auxiliary jib to swing laterally to a predetermined position and overhangs. After protruding, engage the side surface near the boom tip and the auxiliary jib when installed side by side, then
The rotating bracket portion is projected to the front of the boom by the turning force with respect to the boom, and the side surface on the far side of the boom tips and the auxiliary jib when engaged in parallel are engaged with each other.

【0006】第2の発明においては、補ジブの格納時
に、並設時のブーム先端遠方側面側と補ジブとを離脱
し、次にブームの前方に張り出している回転ブラケット
部をブームに対する旋回力により回動し、所定位置への
回動後に並設時のブーム先端近傍側面側と補ジブとを離
脱し、離脱後にブームと補ジブとの間の力により補ジブ
を横方向に揺動させて所定位置に格納する。
According to the second aspect of the present invention, when the auxiliary jib is stored, the side surface of the distal end of the boom which is juxtaposed and the auxiliary jib are separated from each other, and the rotating bracket portion projecting to the front of the boom is swung against the boom. The auxiliary jib is disengaged from the side surface near the tip of the boom and the auxiliary jib when they are installed in parallel after turning to a predetermined position, and the auxiliary jib is swung laterally by the force between the boom and the auxiliary jib after the separation. And store it in a predetermined position.

【0007】第3の発明においては、補ジブの張り出し
時に、前記の第1発明に対してブームを所定量だけ起立
した後に、ブームと補ジブとの間の力により補ジブを所
定位置に横方向に揺動させて張り出し並設時のブーム先
端近傍側面側と補ジブとを係合し、次に補ジブを下方に
チルトさせ、さらに、ブームに対する旋回力により回転
ブラケット部をブームの前方に張り出し、並設時のブー
ム先端遠方側面側と補ジブとを係合する。
According to a third aspect of the present invention, when the auxiliary jib is extended, the boom is raised by a predetermined amount with respect to the first aspect of the invention, and then the auxiliary jib is moved to a predetermined position by a force between the boom and the auxiliary jib. The auxiliary jib with the side of the boom near the tip of the boom when they are juxtaposed, and then tilt the auxiliary jib downward. Engage the auxiliary jib with the side surface on the far side of the boom tip when overhanging and installed side by side.

【0008】第4の発明においては、補ジブの格納時
に、前記の第2発明に対してブームを所定量だけ起立し
た後に補ジブを下方にチルトさせ、次に並設時のブーム
先端遠方側面側と補ジブとを離脱し、離脱後にブームの
前方に張り出している回転ブラケット部をブームに対す
る旋回力により回動し、所定位置への回動後に補ジブを
ブームと並列位置に戻し、さらに、並設時のブーム先端
近傍側面側と補ジブとを離脱し、離脱後にブームと補ジ
ブとの間の力により補ジブを横方向に揺動させて所定位
置に格納する。
In the fourth invention, when the auxiliary jib is retracted, the auxiliary jib is tilted downward after the boom is raised by a predetermined amount with respect to the second invention, and then the boom distal end side surface when juxtaposed. Side and the auxiliary jib are separated, and after the separation, the rotating bracket portion projecting to the front of the boom is rotated by the turning force with respect to the boom, and after the rotation to a predetermined position, the auxiliary jib is returned to the parallel position with the boom. The side surface near the tip of the boom and the auxiliary jib when separated are separated from each other, and after separation, the auxiliary jib is laterally swung by the force between the boom and the auxiliary jib and stored in a predetermined position.

【0009】第5の発明においては、補ジブの張り出し
時に、(1)トップブームが所定の短縮位置にあること
を検出手段が検出したのち、補ジブを横方向に揺動させ
て、補ジブの基端部に装着された回転ブラケット部の後
端の左右方向の一側に設けられた溝と、前記トップブー
ムの先端の左右方向の一側に固着されたトップブームピ
ンとの係合作業を開始し、(2)回転ブラケットの溝と
トップブームピンとが係合したことを検出手段が検出し
たのち、前記回転ブラケットと前記トップブームピンと
をロックし、(3)第1ロック装置のロックが完了した
ことを検出手段が検出したのち、トップブームを伸長
し、(4)トップブームが予め定めた長さまで伸長した
ことを検出手段が検出したのち、回転ブラケットを張り
出し、(5)回転ブラケットが予め定められた位置まで
回転したことを検出手段が検出したのち、トップブーム
の先端の左右方向の他側と、回転ブラケットの後端の左
右方向の他側とをピンによりロックする各工程を有す
る。
In the fifth aspect of the present invention, when the supplementary jib is extended, (1) after the detection means detects that the top boom is at a predetermined shortened position, the supplemental jib is swung laterally to make the supplementary jib. For engaging work between a groove provided on one side in the left-right direction at the rear end of the rotary bracket attached to the base end of the top boom pin fixed to one side in the left-right direction at the tip of the top boom. (2) The rotation bracket and the top boom pin are locked after the detection means detects that the groove of the rotation bracket is engaged with the top boom pin, and (3) the locking of the first locking device is completed. After the detection means detects that the top boom has been extended, (4) After the detection means detects that the top boom has extended to a predetermined length, the rotation bracket is extended and (5) the rotation block is extended. After the detecting means detects that the racket has rotated to a predetermined position, each step of locking the other side in the left-right direction of the tip of the top boom and the other side in the left-right direction of the rear end of the rotating bracket with a pin Have.

【0010】第6の発明においては、補ジブの格納時
に、(1)トップブームが予め定めた長さに到達したこ
とを検出手段が検出したのち、トップブームの先端の左
右方向の他側と、回転ブラケットの後端の左右方向の他
側とをピンによりロックする第2ロック装置のロックを
解除し、(2)第2ロック装置のロック解除が完了した
ことを検出手段が検出したのち、回転ブラケットを格納
し、(3)回転ブラケットが予め定められた位置まで回
転したことを検出手段が検出したのち、トップブームを
短縮し、(4)トップブームが予め定められた位置まで
短縮したことを検出手段が検出したのち、トップブーム
の先端の左右方向の一側に固着されたトップブームピン
を、回転ブラケットの後端の左右方向の一側の溝に係合
させてロックする第1ロック装置のロックを解除し、
(5)第1ロック装置のロック解除が完了したことを検
出手段が検出したのち、補ジブの格納を開始する各工程
を有する。
In the sixth aspect of the present invention, when the auxiliary jib is stored, (1) after the detection means detects that the top boom has reached a predetermined length, the top boom is connected to the other side in the left-right direction. After unlocking the second locking device that locks the rear end of the rotation bracket with the other side in the left-right direction with a pin, and (2) after the detection means detects that the unlocking of the second locking device is completed, (3) The top boom is shortened after the rotation bracket is stored, and (3) the detection means detects that the rotation bracket has rotated to a predetermined position, and (4) the top boom is shortened to a predetermined position. After the detection means detects, the top boom pin fixed to one side in the left-right direction at the tip of the top boom is locked by engaging the groove on the one side in the left-right direction at the rear end of the rotating bracket. Unlock the locking device,
(5) After the detection means detects that the unlocking of the first lock device is completed, the method includes the steps of starting the storage of the auxiliary jib.

【0011】第7の発明においては、車両に起伏自在に
装着され、多段に伸縮するブームの先端に、ブームに着
脱される回転ブラケット部と、回転ブラケット部に起伏
自在の補ジブを設け、回転ブラケット部をブームに対し
て回動させることにより、作業時には前記ブームの前方
に張り出し、格納時には前記ブームの側面に並設して格
納する、補ジブ張り出し、格納装置を備えたクレーン用
補ジブの張り出し装置において、補ジブを横方向に揺動
する横抱き装置と、補ジブとトップブームとを離脱ある
いは連結する回転ブラケット部と、トップブームと回転
ブラケット部とをロックする第1ロック装置および第2
ロック装置と、ブームに対して回転ブラケット部を回転
する回転装置とからなる。
According to the seventh aspect of the invention, a rotating bracket portion attached to and detached from the boom is provided at the tip of a boom which is mounted on the vehicle so as to be freely movable and expands and contracts in multiple stages. By rotating the bracket portion with respect to the boom, the auxiliary jib for the crane equipped with a device for overhanging the auxiliary jib, which overhangs in front of the boom during work and is stored side by side on the side of the boom during storage. In the overhanging device, a horizontal holding device that swings the auxiliary jib laterally, a rotating bracket portion that separates or connects the auxiliary jib and the top boom, and a first locking device and a second locking device that locks the top boom and the rotating bracket portion.
It consists of a locking device and a rotating device that rotates the rotating bracket part with respect to the boom.

【0012】第7の発明を主体とする第8の発明におい
ては、トップブームと回転ブラケット部とをロックする
第1ロック装置および第2ロック装置とが、回転ブラケ
ット部の左右方向の一側に設けた溝と、トップブームの
左右方向の一側に固着したトップブームピンとを係合さ
せてロックする第1ロック装置と、回転ブラケット部の
左右方向の他側と、トップブームの左右方向の他側とを
ピンによりロックする第2ロック装置とを具備する。
In an eighth aspect of the invention, which is mainly based on the seventh aspect, the first locking device and the second locking device for locking the top boom and the rotating bracket part are provided on one side in the left-right direction of the rotating bracket part. A first locking device that engages and locks the provided groove with a top boom pin fixed to one side of the top boom in the left-right direction, the other side of the rotation bracket in the left-right direction, and the other side of the top boom in the left-right direction. And a second locking device that locks the side with a pin.

【0013】第7の発明を主体とする第9の発明におい
ては、横抱き装置が、補ジブの一位置に固着されたピン
に係合する溝を有し、ブームの一位置に揺動自在に装着
されたリンクと、ブームとリンクとを連結する横抱きシ
リンダと、補ジブの他位置に固着されたピンに係合する
溝を有し、ブームの他位置に固着されたブラケットと、
ブラケットに揺動自在に装着され、ピンに係合するフッ
クと、リンクとフックとを連結するロッドとを備えてい
る。
In a ninth aspect of the invention, which is mainly based on the seventh aspect, the lateral holding device has a groove that engages with a pin fixed to one position of the auxiliary jib, and is swingable to one position of the boom. A mounted link, a horizontal holding cylinder that connects the boom and the link, a bracket that has a groove that engages with a pin that is fixed to another position of the auxiliary jib, and a bracket that is fixed to the other position of the boom,
The bracket is swingably mounted, and includes a hook that engages with the pin and a rod that connects the link and the hook.

【0014】第7の発明を主体とする第10の発明にお
いては、回転ブラケット部が、その基端の左右の一側
に、トップブームの先端の左右の一側に垂直方向に固着
されたトップブームピンに係合する溝を備え、その基端
の左右の他側に、トップブームの先端の左右の他側と垂
直方向の連結ピンにより連結するピン穴を備え、先端に
補ジブを起伏自在に装着するピン穴を備え、上部にブー
ムに対して回転ブラケット部を回動する回転シリンダ装
着用のピンとを備えている。
In a tenth aspect of the invention, which is mainly based on the seventh aspect, a top of a rotary bracket is vertically fixed to one of the left and right sides of the base end of the top boom. A groove that engages with the boom pin is provided, and a pin hole that connects to the other side of the tip of the top boom by a connecting pin in the vertical direction is provided on the other side of the base end, and the auxiliary jib can be undulated at the tip. And a pin for mounting a rotating cylinder for rotating the rotating bracket portion with respect to the boom.

【0015】第7の発明あるいは第8の発明を主体とす
る第11の発明においては、第1ロック装置が、回転ブ
ラケット部に揺動自在に装着され、トップブームピンを
回転ブラケット部の溝とともに挾持するロックリンク
と、回転ブラケット部に装着され、ロックリンクを作動
する第1ロックシリンダとを備えている。
In the eleventh invention mainly consisting of the seventh invention or the eighth invention, the first locking device is swingably mounted on the rotary bracket portion, and the top boom pin is provided together with the groove of the rotary bracket portion. It is provided with a lock link that is held and a first lock cylinder that is mounted on the rotating bracket portion and that operates the lock link.

【0016】第7の発明を主体とする第12の発明にお
いては、回転装置が、回転ブラケット部の後端部の上面
に固着されたピンに、一端を回転自在に軸着した第1レ
バーと、一端を第1レバーの他端に回転自在に装着さ
れ、他端にトップブームに固着された回転支持ピンに係
合する溝を有する第2レバーと、第1レバーと回転ブラ
ケットとを連結する回転シリンダとを備えている。
In a twelfth aspect of the invention, which is mainly based on the seventh aspect, the rotating device includes a pin fixed to the upper surface of the rear end of the rotating bracket portion, and a first lever having one end rotatably attached to the pin. , A second lever having one end rotatably attached to the other end of the first lever and a groove at the other end that engages with a rotation support pin fixed to the top boom, and the first lever and the rotation bracket are connected to each other. And a rotating cylinder.

【0017】第7の発明あるいは第8の発明を主体とす
る第13の発明においては、第2ロック装置が、トップ
ブームと回転ブラケット部とを連結する上下2個の連結
ピンと、中央部を回転ブラケットに揺動自在に軸着され
たレバーと、レバーと回転ブラケット部とを連結する第
2ロックシリンダと、レバーの両端と連結ピンとを連結
する2個のリンクとを備えている。
In the thirteenth invention mainly based on the seventh invention or the eighth invention, the second locking device rotates the central part with two upper and lower connecting pins for connecting the top boom and the rotating bracket part. The lever includes a lever pivotally attached to the bracket, a second lock cylinder that connects the lever and the rotating bracket portion, and two links that connect both ends of the lever and the connecting pin.

【0018】第7の発明を主体とする第14の発明にお
いては、ブームとトップブームとの位置を検出する検出
手段と、補ジブを横方向に揺動する横抱き装置の位置を
検出する検出手段と、補ジブとトップブームとを離脱あ
るいは連結する回転ブラケット部の離脱あるいは連結を
検出する検出手段と、トップブームと回転ブラケット部
とをロックおよびロック解除する第1ロック装置および
第2ロック装置のロックおよびロック解除を検出する検
出手段と、ブームに対して回転ブラケット部を回転する
回転装置の回転位置を検出する回転位置検出手段と、と
からなる。
According to a fourteenth aspect of the invention, which is mainly based on the seventh aspect, the detecting means for detecting the positions of the boom and the top boom and the detecting means for detecting the position of the horizontal holding device for swinging the auxiliary jib in the lateral direction. A detection means for detecting detachment or connection of the rotary bracket portion for detaching or connecting the supplementary jib and the top boom, and a first locking device and a second locking device for locking and unlocking the top boom and the rotating bracket portion. It comprises a detecting means for detecting locking and unlocking, and a rotational position detecting means for detecting the rotational position of the rotating device that rotates the rotating bracket portion with respect to the boom.

【0019】第14の発明を主体とする第15の発明に
おいては、検出手段の検出結果を表示する表示手段と
を、運転室内に備えている。
In a fifteenth aspect of the invention, which is mainly based on the fourteenth aspect, the display means for displaying the detection result of the detection means is provided in the cab.

【0020】第7の発明を主体とする第16の発明にお
いては、ブームを予め定めた角度起立させ、補ジブを予
め定めた位置までチルトし、回転ブラケット部を回転す
るときに、補ジブの重心位置が、ほぼ、回転ブラケット
部の回転軸の中心を通る垂線上にある。
In a sixteenth aspect of the present invention, which is mainly based on the seventh aspect, the boom is erected at a predetermined angle, the auxiliary jib is tilted to a predetermined position, and when the rotary bracket portion is rotated, the auxiliary jib is rotated. The position of the center of gravity is approximately on the perpendicular line passing through the center of the rotation axis of the rotation bracket portion.

【0021】第17の発明においては、車両に起伏自在
に装着され、多段に伸縮するブームの先端に、ブームに
着脱される回転ブラケット部と、回転ブラケット部に起
伏自在の補ジブを設け、回転ブラケット部をブームに対
して回動させることにより、作業時には前記ブームの前
方に張り出し、格納時には前記ブームの側面に並設して
格納する、補ジブ張り出し、格納装置を備えたクレーン
用補ジブの張り出し装置において、補ジブの起伏操作を
行うチルトレバーと、チルトレバーにより操作される方
向切換弁と、チルト操作回路と、横抱き操作回路との切
り換えを行う第1電磁切換弁と、横抱きシリンダ用電磁
操作弁と、チルト操作回路と、第1ロック、第2ロッ
ク、および回転操作回路との切り換えを行う第2電磁切
換弁と、第1ロックシリンダ用電磁操作弁と、第2ロッ
クシリンダ用電磁操作弁と、回転シリンダ用電磁操作弁
とを備えている。
In the seventeenth aspect of the present invention, the boom is mounted on the vehicle so that it can be raised and lowered, and a rotating bracket portion that is attached to and detached from the boom is provided at the tip of a boom that expands and contracts in multiple stages. By rotating the bracket portion with respect to the boom, the auxiliary jib for the crane equipped with a device for overhanging the auxiliary jib, which overhangs in front of the boom during work and is stored side by side on the side of the boom during storage. In the overhanging device, a tilt lever for performing an up-and-down operation of a supplementary jib, a direction switching valve operated by the tilt lever, a first electromagnetic switching valve for switching between a tilt operating circuit and a horizontal holding operation circuit, and a horizontal holding cylinder electromagnetic valve. Operation valve, tilt operation circuit, first lock, second lock, second electromagnetic switching valve for switching between rotation operation circuit, and first lock Includes a solenoid operated valve cylinder, a solenoid operated valve for the second lock cylinder, and a solenoid operated valve for the rotating cylinder.

【0022】第17の発明を主体とする第18の発明に
おいては、チルトレバーにより操作される方向切換弁
と、横抱きシリンダ用電磁操作弁とを接続する回路の一
方に、および、チルトレバーにより操作される方向切換
弁と、第2ロックシリンダ用電磁操作弁とを接続する回
路の一方に、一方向弁を介装している。
In the eighteenth aspect of the invention, which is mainly based on the seventeenth aspect, one of the circuits connecting the directional control valve operated by the tilt lever and the electromagnetic operating valve for the horizontal holding cylinder and the one operated by the tilt lever are used. The one-way valve is provided in one of the circuits connecting the directional control valve and the second lock cylinder solenoid operated valve.

【0023】第17の発明を主体とする第19の発明に
おいては、第1ロックシリンダ用電磁操作弁と、回転シ
リンダ用電磁操作弁と、第2ロックシリンダ用電磁操作
弁と、第2電磁切換弁とを、回転ブラケットに装着して
いる。
In a nineteenth aspect of the invention, which is mainly based on the seventeenth aspect, a first lock cylinder solenoid operated valve, a rotary cylinder solenoid operated valve, a second lock cylinder solenoid operated valve, and a second solenoid switch. The valve and are mounted on a rotating bracket.

【0024】第17の発明あるいは第19の発明を主体
とする第20の発明においては、第1ロックシリンダ用
電磁操作弁と、回転シリンダ用電磁操作弁と、第2ロッ
クシリンダ用電磁操作弁と、第2電磁切換弁とを、シリ
ーズ回路により接続している。
In the twentieth aspect of the invention, which is mainly composed of the seventeenth aspect or the nineteenth aspect, a first lock cylinder solenoid operated valve, a rotary cylinder solenoid operated valve, and a second lock cylinder solenoid operated valve are provided. , And the second electromagnetic switching valve are connected by a series circuit.

【0025】[0025]

【作用】上記構成によれば、クレーン用補ジブの張り出
し、格納装置に、回転ブラケットと、油圧装置により作
動される、補ジブを横方向に揺動する横抱き装置と、ト
ップブームと回転ブラケットとをロックする第1、第2
ロック装置と、回転ブラケットの回転装置とを設けた。
そして、それぞれの作動完了を検出するリミットスイッ
チを設け、チルト用油圧回路と、張り出し、格納操作用
油圧回路との切換を行う電磁切換弁、および、それぞれ
の油圧シリンダ用の電磁操作弁と接続し、順次切り換え
ることにより補ジブの張り出し、格納作業を行うように
したため、張り出し、格納操作は自動的に行われる。ま
た、運転室に張り出し、格納操作の切換スイッチと、作
動検出結果の表示手段とを設けたため、運転室において
オペレータが検出結果を確認しながら、切換スイッチ
と、チルトレバーとを操作することにより、張り出し、
および、格納操作を行うことができる。
According to the above structure, the auxiliary jib for the crane is extended and stored, the rotating bracket, the lateral holding device for laterally swinging the auxiliary jib, which is operated by the hydraulic device, the top boom and the rotating bracket. Locking the 1st, 2nd
A locking device and a rotating device for the rotating bracket were provided.
A limit switch for detecting the completion of each operation is provided, and is connected to the tilt hydraulic circuit and the electromagnetic switching valve that switches between the hydraulic circuit for overhanging and retracting operation, and the electromagnetic operating valve for each hydraulic cylinder. Since the auxiliary jib is extended and stored by sequentially switching, the protruding and storing operations are automatically performed. In addition, since the operator is provided with a changeover switch for storing operation and a display means for displaying the operation detection result in the cab, by operating the changeover switch and the tilt lever while the operator confirms the detection result in the cab, Overhang,
And the storage operation can be performed.

【0026】補ジブの格納状態からの張り出し操作で
は、補ジブのブームから離れる横方向への揺動操作を行
なうと、続いて第1ロック装置がロック作動し、つぎ
に、オペレータがトップブームの伸長を所定量行うと、
続いて回転ブラケットが張り出し回転し、続いて第2ロ
ック装置がロック作動するという操作が、自動的に行わ
れる。補ジブの張り出し状態からの格納操作では、トッ
プブームを所定の長さにすると、続いて第2ロック装置
がロック解除作動し、続いて回転ブラケットが格納回転
し、つぎに、オペレータがトップブームを短縮すると、
続いて第1ロック装置がロック解除作動し、続いて補ジ
ブの格納作動をするという操作が、自動的に行われる。
In the extension operation from the retracted state of the supplementary jib, when the supplementary jib is oscillated in a lateral direction away from the boom, the first locking device is subsequently locked and the operator then moves the top boom. When a predetermined amount of expansion is performed,
Then, the rotating bracket is extended and rotated, and subsequently, the operation of locking the second lock device is automatically performed. In the retracting operation from the extended state of the supplementary jib, when the top boom is set to a predetermined length, the second locking device is subsequently unlocked, the rotating bracket is retracted and rotated, and then the operator moves the top boom. When shortened,
Subsequently, the operation of unlocking the first locking device and subsequently storing the auxiliary jib is automatically performed.

【0027】また、チルト操作油圧回路上に、張り出
し、格納回路との切換弁を介装し、横抱きシリンダ用操
作弁とチルト用の方向切換弁との間に、一方向弁を設け
たため、チルトレバーでで張り出し、格納操作が可能で
ある。さらに、チルトレバーを一方向に操作して、張り
出し、格納作動が行えるので、操作上安全が増大してい
る。さらに、回転装置、第1、および第2ロック装置の
電磁弁をブームと回転ブラケットの旋回する先端側の回
転ブラケットに装着したため、油圧ホースのリールが2
個のみとなり、回転ブラケットにおける油圧配管が少な
くなっている。さらにまた、ブームを所定の角度起立さ
せ、補ジブをチルトさせた場合、回転ブラケットの回転
軸の中心を通る垂線上に、ほぼ、補ジブの重心がくるた
め、回転ブラケットの回転トルクが少なくてすむととも
に、ブームを所定量の角度起立させたままで自動的に張
出が行えるので狭い道路等での張り出しが容易に、安全
に行える。
Further, the tilt operation hydraulic circuit is provided with a switching valve for overhanging and storing the circuit, and a one-way valve is provided between the operating valve for the horizontal holding cylinder and the directional switching valve for tilting. The lever can be used to extend it and store it. Further, since the tilt lever can be operated in one direction to extend and retract, the operational safety is increased. Further, since the electromagnetic valves of the rotating device and the first and second locking devices are attached to the rotating bracket on the tip end side where the boom and the rotating bracket rotate, the reel of the hydraulic hose can be installed in two.
There is only one, and there is less hydraulic piping in the rotating bracket. Furthermore, when the boom is erected at a predetermined angle and the auxiliary jib is tilted, the center of gravity of the auxiliary jib is almost on the perpendicular line passing through the center of the rotation axis of the rotation bracket, so the rotation torque of the rotation bracket is small. At the same time, the boom can be automatically extended with the boom kept upright at a predetermined angle, so that it can be easily and safely extended on a narrow road.

【0028】[0028]

【実施例】以下に、本発明に係るクレーン用補ジブの自
動張り出し、格納方法および装置の実施例について、図
面を参照して詳述する。図4は本発明の自動張り出し、
格納装置10を用いた車両搭載クレーンの平面図であ
り、車体1に旋回自在に搭載された、運転室3を備えた
上部旋回体2には、伸縮自在な多段ブーム4が起伏自在
に装着されている。本図は走行状態を示し、側面から見
た走行姿勢においてはブーム4はほぼ水平かあるいは少
し前傾している。自動張り出し、格納装置10は、補ジ
ブとトップブームとを離脱あるいは連結する回転ブラケ
ット部30と、油圧装置により作動される、補ジブを横
方向に揺動する横抱き装置20と、トップブーム5と回
転ブラケット部30とをロックする第1ロック装置40
および第2ロック装置60と、ブームに対して回転ブラ
ケット部30を回転する回転装置50から構成されてい
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of a method and an apparatus for automatically projecting and storing a crane auxiliary jib according to the present invention will be described below in detail with reference to the drawings. FIG. 4 shows the automatic overhang of the present invention,
FIG. 1 is a plan view of a vehicle-mounted crane that uses a storage device 10. An expandable multi-stage boom 4 is rotatably mounted on an upper revolving structure 2 that is mounted on a vehicle body 1 and that is equipped with a cab 3. ing. This figure shows a traveling state, and in the traveling posture viewed from the side, the boom 4 is almost horizontal or slightly tilted forward. The automatic overhanging and retracting device 10 includes a rotating bracket portion 30 for disconnecting or connecting the auxiliary jib and the top boom, a horizontal holding device 20 which is actuated by a hydraulic device and swings the auxiliary jib laterally, and a top boom 5. First locking device 40 that locks with the rotating bracket portion 30
And a second locking device 60 and a rotating device 50 for rotating the rotating bracket portion 30 with respect to the boom.

【0029】ブーム4のトップブーム5の先端に、回転
ブラケット部30を介して装着される補ジブ6は、走行
状態においてはブーム4に並設して格納され、格納ピン
7によりブーム4に固定されている。この格納時には、
横抱き装置20に支持されている。また、ブーム4に固
設されたブラケット4aにより保持されている。このブ
ラケット4aには、好ましくは張り出しが容易に行われ
るように摺動抵抗を低減する図示しないローラ、軸受け
等が付設されている。張り出し時には、補ジブ6は横抱
き装置20により2点鎖線に示すように、横方向(図示
のW方向)に揺動する。すなわち、振り出すようになっ
ている。
The auxiliary jib 6 mounted on the tip of the top boom 5 of the boom 4 through the rotating bracket portion 30 is stored in parallel with the boom 4 in a running state, and is fixed to the boom 4 by the storage pin 7. Has been done. During this storage,
It is supported by the horizontal holding device 20. Further, it is held by a bracket 4a fixed to the boom 4. The bracket 4a is preferably provided with rollers (not shown), bearings, etc., which reduce sliding resistance so that the bracket 4a can be easily projected. At the time of overhanging, the auxiliary jib 6 swings in the lateral direction (W direction in the drawing) by the horizontal holding device 20 as shown by the chain double-dashed line. That is, it is designed to be drawn out.

【0030】図5は横抱き装置20の構成を示す平面図
であり、図5は補ジブ6を図4の2点鎖線のように振り
出し、トップブーム5を所定の長さだけ伸長してブーム
4と補ジブ6との後述する係合部を解放し、回転ブラケ
ット部30とともに補ジブ6を回転可能な状態にした場
合を示している。振り出しは横抱き装置20の後述する
油圧シリンダ25の収縮により行われる。ブーム4の一
位置(図示の上側)には溝15を有するブラケット14
が固着され、このブラケット14には横抱きシリンダ2
5のボトム側が装着されている。また、ブラケット14
には、補ジブ6の一位置に固着された係止ピン21に係
合する溝23を一端に有するレバー22が、中央部をピ
ン24により揺動自在に装着されている。レバー22の
他端22aは横抱きシリンダ25のロッド側に装着さ
れ、レバー22とブーム4とを横抱きシリンダ25によ
り連結している。
FIG. 5 is a plan view showing the structure of the horizontal holding device 20, and FIG. 5 shows the auxiliary jib 6 being swung out as shown by the chain double-dashed line in FIG. 4 and the top boom 5 being extended by a predetermined length. 2 shows a case where the engaging portion between the auxiliary jib 6 and the auxiliary jib 6 described later is released, and the auxiliary jib 6 can be rotated together with the rotating bracket portion 30. The swinging out is performed by contraction of a hydraulic cylinder 25 of the horizontal holding device 20 described later. A bracket 14 having a groove 15 at one position (upper side in the drawing) of the boom 4
Is secured to the bracket 14, and the horizontal holding cylinder 2 is attached to the bracket 14.
The bottom side of 5 is attached. Also, the bracket 14
A lever 22 having at one end a groove 23 that engages with a locking pin 21 fixed to one position of the auxiliary jib 6 is swingably mounted on the central portion by a pin 24. The other end 22a of the lever 22 is attached to the rod side of the horizontal holding cylinder 25, and connects the lever 22 and the boom 4 with the horizontal holding cylinder 25.

【0031】ブーム4の他位置(図示の下側)には、溝
17を有するブラケット16が固着されている。このブ
ラケット16には係止ピン26に係合するフック27が
ピン16aにより揺動自在に装着されている。レバー2
2の他端22aとフック27とはロッド28により連結
されている。この張り出し時の状態では、補ジブ6は回
転ブラケット部30の後述する溝31a、31bが第1
ロック装置40のトップブームピン11に係合して保持
されている。
A bracket 16 having a groove 17 is fixed to another position of the boom 4 (lower side in the drawing). A hook 27 that engages with the locking pin 26 is swingably attached to the bracket 16 by a pin 16a. Lever 2
The other end 22a of 2 and the hook 27 are connected by a rod 28. In this extended state, the auxiliary jib 6 has the grooves 31a and 31b of the rotary bracket portion 30 which will be described later in the first position.
It is held by being engaged with the top boom pin 11 of the lock device 40.

【0032】図5の状態でトップブーム5を所定の長さ
だけ短縮すると、図6に示すように補ジブ6はX矢印方
向に平行に移動し、ピン21はレバー22の溝23に係
合し、ピン26はブラケット16の溝17に係合する。
この図6の状態は横抱き装置20の油圧シリンダ25の
E方向の収縮により補ジブ6は振り出しのみが行われた
のを示している。また、この状態は格納可能な状態であ
る。図6の状態で横抱きシリンダ25を伸長(E方向の
反対方向)すると、図7に示すように、レバー22はピ
ン24を中心として回動し、補ジブ6はピン26を中心
として揺動してブーム4側に引き寄せられ、ピン21は
ブラケット14の溝15に係合し、フック27もロッド
28によって揺動してピン26を固定する。この状態が
格納状態である。この格納状態で図4に示すようにピン
7を挿入することにより安全な走行状態にすることがで
きる。
When the top boom 5 is shortened by a predetermined length in the state of FIG. 5, the auxiliary jib 6 moves parallel to the X arrow direction as shown in FIG. 6, and the pin 21 engages with the groove 23 of the lever 22. Then, the pin 26 engages with the groove 17 of the bracket 16.
The state of FIG. 6 shows that the auxiliary jib 6 is only swung out due to the contraction of the hydraulic cylinder 25 of the horizontal holding device 20 in the E direction. Also, this state is a storable state. When the horizontal holding cylinder 25 is extended (opposite to the E direction) in the state of FIG. 6, the lever 22 rotates about the pin 24 and the auxiliary jib 6 swings about the pin 26, as shown in FIG. Is pulled toward the boom 4 side, the pin 21 engages with the groove 15 of the bracket 14, and the hook 27 also swings by the rod 28 to fix the pin 26. This state is the storage state. By inserting the pin 7 in this stored state as shown in FIG. 4, a safe traveling state can be achieved.

【0033】図8は回転ブラケット部30の平面図であ
り、図9は図8の矢印Aより見た一側の側面図であり、
図10は矢印Bより見た他側の側面図であり、いずれ
も、補ジブ6をトップブーム5の前方に張り出した状態
を示している。トップブーム5の先端の左右方向の一
側、即ち、補ジブとブームとの並設時のブーム先端遠方
側面側にはトップブームピン11と、回転支持ピン12
とが固着されており、他側、即ち、補ジブとブームとの
並設時のブーム先端近傍側面側には上下にピン穴13
a、13bが穿設されている。回転ブラケット部30の
一側側面(図9、補ジブとブームとの並設時のブーム先
端近傍側面側)には第1ロック装置40が装着されてお
り、上面(図8)には回転装置50が装着されており、
他側側面(図10、補ジブとブームとの並設時のブーム
先端遠方側面側)には第2ロック装置60が装着されて
いる。図11は回転ブラケット部30の斜視図、図12
は回転装置50の斜視図、図13は第1ロック装置40
の斜視図である。
FIG. 8 is a plan view of the rotary bracket portion 30, and FIG. 9 is a side view of one side seen from the arrow A in FIG.
FIG. 10 is a side view of the other side as seen from the arrow B, and each shows a state in which the auxiliary jib 6 is projected to the front of the top boom 5. A top boom pin 11 and a rotation support pin 12 are provided on one side in the left and right direction of the tip of the top boom 5, that is, on the side surface on the far side of the boom tip when the auxiliary jib and the boom are juxtaposed.
Are fixed to each other, and pin holes 13 are vertically provided on the other side, that is, on the side surface near the boom tip when the auxiliary jib and the boom are juxtaposed.
a and 13b are provided. A first locking device 40 is mounted on one side surface of the rotating bracket portion 30 (FIG. 9, a side surface near the boom tip when the auxiliary jib and the boom are juxtaposed with each other), and an upper surface (FIG. 8) includes a rotating device. 50 is installed,
A second locking device 60 is attached to the other side surface (FIG. 10, the side surface on the far side of the boom tip when the auxiliary jib and the boom are juxtaposed). FIG. 11 is a perspective view of the rotating bracket portion 30, FIG.
Is a perspective view of the rotating device 50, and FIG. 13 is the first locking device 40.
FIG.

【0034】以下に各装置の詳細を説明する。回転ブラ
ケット部30は図11に示すように、後端側の左右方向
の一側にはトップブームピン11に係合する溝31a、
31bが設けられ、他側にはトップブーム5のピン穴1
3a、13bに適合するピン穴32a、32bが設けら
れている。また、先端側には図9に示すように補ジブ6
がピン30aにより起伏自在に装着され、下部にはブラ
ケット30bが設けられ、ブラケット30bに装着され
たピン30cには補ジブ6を起伏自在に作動させるチル
トシリンダ8が装着されている。上部にはブーム4に対
して回転ブラケット部30をトップブームピン11を中
心として回動する回転シリンダ55装着用のピン34を
備えている。
The details of each device will be described below. As shown in FIG. 11, the rotary bracket portion 30 has a groove 31a that engages with the top boom pin 11 on one side in the left-right direction on the rear end side.
31b is provided, and the pin hole 1 of the top boom 5 is provided on the other side.
Pin holes 32a and 32b are provided to fit 3a and 13b. In addition, as shown in FIG.
Is movably mounted by a pin 30a, a bracket 30b is provided in the lower portion, and a tilt cylinder 8 for movably operating the auxiliary jib 6 is mounted on the pin 30c mounted on the bracket 30b. The upper portion is provided with a pin 34 for mounting a rotary cylinder 55 that rotates the rotary bracket portion 30 with respect to the boom 4 about the top boom pin 11.

【0035】第1ロック装置40については、図9と、
図13、図14および図15により合わせて説明する。
回転ブラケット部30の後端側の一側側面に固着された
ブラケット32には、トップブームピン11に係合する
凹部42を有するロックリンク41がピン43を中心と
して揺動自在に軸着されている。第1ロックシリンダ4
4のロッド部はロックリンク41に、第1ロックシリン
ダ44のボトム部は回転ブラケット部30に接続され、
ロックリンク41は第1ロックシリンダ44により回転
ブラケット部30と連結されている。第1ロックシリン
ダ44を短縮すると図14に示すロック解除となり、第
1ロックシリンダ44を伸長するとロックリンク41は
図15に示すようにピン42を中心として揺動し、凹部
42はトップブーム5のトップブームピン11に係合
し、回転ブラケット部30の溝31a、31bとともに
トップブームピン11を挾持してロックする。
The first locking device 40 is shown in FIG.
The description will be made with reference to FIGS. 13, 14 and 15.
A lock link 41 having a recess 42 that engages with the top boom pin 11 is pivotally attached to the bracket 32 fixed to one side surface on the rear end side of the rotary bracket portion 30 so as to be swingable around a pin 43. There is. First lock cylinder 4
The rod portion of 4 is connected to the lock link 41, and the bottom portion of the first lock cylinder 44 is connected to the rotating bracket portion 30,
The lock link 41 is connected to the rotating bracket portion 30 by the first lock cylinder 44. When the first lock cylinder 44 is shortened, the lock is released as shown in FIG. 14, and when the first lock cylinder 44 is extended, the lock link 41 swings around the pin 42 as shown in FIG. The top boom pin 11 is engaged, and the top boom pin 11 is clamped and locked together with the grooves 31a and 31b of the rotary bracket portion 30.

【0036】回転装置50は図8、図12、図16およ
び図17に示すように、回転ブラケット部30の後端側
の1側近傍に固着されたピン33に第1レバー51の一
端51aを回転自在に軸着する。第1レバー51の他端
51bには第2レバー52の一端52aを回転自在に軸
着する。第2レバー52の他端にはトップブーム5に固
着された回転支持ピン12に係合する溝53を設ける。
第1レバー51と第2レバー52とはばね54により連
結する。トップブーム5には、第2レバー52の溝53
が旋回時に所定の位置以外ではピン12から外れないよ
うに抜け止め板5jが固設されている。回転ブラケット
部30に固着されたピン34と第1レバー51の中央部
とを、回転シリンダ55により連結する。回転シリンダ
55を伸縮すると回転ブラケット部30は、トップブー
ムピン11を中心として回転する。
As shown in FIG. 8, FIG. 12, FIG. 16 and FIG. 17, the rotating device 50 attaches one end 51a of the first lever 51 to the pin 33 fixed near the one side on the rear end side of the rotating bracket portion 30. It is rotatably attached. One end 52a of the second lever 52 is rotatably attached to the other end 51b of the first lever 51. A groove 53 that engages with the rotation support pin 12 fixed to the top boom 5 is provided at the other end of the second lever 52.
The first lever 51 and the second lever 52 are connected by a spring 54. The top boom 5 has a groove 53 of the second lever 52.
A retaining plate 5j is fixedly installed so that the pin does not come off from the pin 12 except at a predetermined position during turning. The rotating cylinder 55 connects the pin 34 fixed to the rotating bracket portion 30 and the central portion of the first lever 51. When the rotary cylinder 55 is expanded and contracted, the rotary bracket portion 30 rotates about the top boom pin 11.

【0037】図8は回転シリンダ55を伸長し、張り出
し回転を完了した状態を示し、図16は回転シリンダ5
5を短縮し、格納回転完了した状態を示す。補ジブ格納
時には図7に示すように、横抱き装置20により補ジブ
6をブーム5に平行にするが、その場合には、図14お
よび図17に示すように、第1ロック装置40のロック
リンク41は開いてロック解除し、回転ブラケット部3
0の溝31a、31bはトップブームピン11から離脱
し、第2レバー52の溝53もトップブーム5の回転支
持ピン12から同時に離脱する。このとき、第2レバー
52の溝53は抜け止め板5jに干渉しない方向に収縮
する。
FIG. 8 shows the state in which the rotary cylinder 55 is extended and the overhanging rotation is completed, and FIG. 16 shows the rotary cylinder 5
5 is shortened to show the state where the storage rotation is completed. When the supplementary jib is stored, the supplementary jib 6 is made parallel to the boom 5 by the horizontal holding device 20 as shown in FIG. 7. In that case, as shown in FIGS. 14 and 17, the lock link of the first locking device 40 is used. 41 is opened and unlocked, and the rotary bracket portion 3
The 0 grooves 31a and 31b are separated from the top boom pin 11, and the groove 53 of the second lever 52 is also separated from the rotation support pin 12 of the top boom 5 at the same time. At this time, the groove 53 of the second lever 52 contracts in a direction that does not interfere with the retaining plate 5j.

【0038】第2ロック装置60は図10に示す。図1
0はロック状態を示しており、回転ブラケット部30の
ピン穴32a、32bと、トップブーム5のピン穴13
a、13bとは連結ピン61a、61bにより連結(ロ
ック)されている。回転ブラケット部30にはレバー6
2が中央部のピン62aを中心として回転自在に軸着さ
れており、レバー62の一端62bはリンク63aを介
して連結ピン61aと、また、レバー62の他端62c
はリンク63bを介して連結ピン61bと連結してい
る。レバー62の他端側の端部62dと回転ブラケット
部30とは第2ロックシリンダ64により連結されてお
り、第2ロックシリンダ64を伸長することにより図1
0のように、レバー62が中央部のピン62aを中心と
して回動してロック状態となり、短縮することにより図
18に示すように、連結ピン61a、61bはトップブ
ーム5のピン穴13a、13bから抜け出し、ロック解
除状態になる。レバー62の他端近傍にはロックピン6
5が設けられており、図10に示すようなロック状態に
おいて、ロックピン65を挿入してレバー62の回動を
停止し、連結ピン61a、61bがトップブーム5のピ
ン穴13a、13bから抜け出さないようにロックす
る。これにより、補ジブ6がブーム4の先端に張り出さ
れて固定され、吊り荷作業が安全に行われる。
The second locking device 60 is shown in FIG. Figure 1
0 indicates a locked state, and the pin holes 32a and 32b of the rotating bracket portion 30 and the pin hole 13 of the top boom 5 are shown.
It is connected (locked) to a and 13b by connecting pins 61a and 61b. The rotation bracket 30 has a lever 6
2 is rotatably mounted around a center pin 62a, one end 62b of the lever 62 is connected to a connecting pin 61a via a link 63a, and the other end 62c of the lever 62 is connected.
Is connected to the connecting pin 61b via a link 63b. The end portion 62d on the other end side of the lever 62 and the rotating bracket portion 30 are connected by a second lock cylinder 64, and by extending the second lock cylinder 64, as shown in FIG.
As shown in FIG. 18, the lever 62 pivots around the center pin 62a to be in a locked state, and when the lever 62 is shortened, the connecting pins 61a and 61b are connected to the pin holes 13a and 13b of the top boom 5 as shown in FIG. It comes out of and comes to the unlocked state. A lock pin 6 is provided near the other end of the lever 62.
5 is provided, and in the locked state as shown in FIG. 10, the lock pin 65 is inserted to stop the rotation of the lever 62, and the connecting pins 61a and 61b are pulled out from the pin holes 13a and 13b of the top boom 5. Lock it to prevent it. As a result, the supplementary jib 6 is projected and fixed to the tip of the boom 4, and the lifting work is performed safely.

【0039】図19は本発明の補ジブの自動張り出し、
格納装置の油圧回路図であり、70は運転室3に備えら
れたチルトレバー、71はチルトレバー70によりパイ
ロット操作される方向切換弁、72は油圧ポンプ、7
3、74はリール、8は補ジブ6の起伏のチルトシリン
ダである。一方の方向切換弁71からチルトシリンダ8
へのチルト操作回路75上には、順次に、第1電磁切換
弁77と、リール74と、第2電磁切換弁82と、カウ
ンタバランス弁86が配設されている。他方のチルト操
作回路76上には、順次に、リール73と、パイロット
操作逆止弁87が配設されている。
FIG. 19 shows the automatic extension of the auxiliary jib of the present invention.
3 is a hydraulic circuit diagram of the storage device, 70 is a tilt lever provided in the operator's cab 3, 71 is a direction switching valve pilot-operated by the tilt lever 70, 72 is a hydraulic pump, 7
Reference numerals 3 and 74 are reels, and 8 is a tilt cylinder for undulating the auxiliary jib 6. From one direction switching valve 71 to the tilt cylinder 8
A first electromagnetic switching valve 77, a reel 74, a second electromagnetic switching valve 82, and a counter balance valve 86 are sequentially arranged on the tilt operation circuit 75. A reel 73 and a pilot operation check valve 87 are sequentially arranged on the other tilt operation circuit 76.

【0040】第1電磁切換弁77は油圧ポンプ72から
の圧油をチルト操作回路へ、又は、横抱き操作回路への
切り換えを行い、チルト操作回路では次のリール74へ
行き、横抱き操作回路では、横抱きシリンダの伸縮の切
り換えを行う電磁操作弁78を介して横抱きシリンダ2
5へ行く。また、電磁操作弁78と他方のチルト操作回
路76とは戻り回路80により接続され、回路80には
一方向弁81が介装されている。これにより、横抱きシ
リンダ25からの戻りの油は戻り回路80、他方のチル
ト操作回路76を経てタンク88に戻る。
The first electromagnetic switching valve 77 switches the pressure oil from the hydraulic pump 72 to the tilt operation circuit or to the horizontal embracing operation circuit. In the tilt operating circuit, it goes to the next reel 74, and in the horizontal embracing operation circuit, The horizontal holding cylinder 2 via an electromagnetically operated valve 78 for switching the expansion and contraction of the horizontal holding cylinder.
Go to 5. Further, the electromagnetic operation valve 78 and the other tilt operation circuit 76 are connected by a return circuit 80, and a one-way valve 81 is interposed in the circuit 80. As a result, the oil returned from the horizontal holding cylinder 25 returns to the tank 88 via the return circuit 80 and the other tilt operation circuit 76.

【0041】第2電磁切換弁82は油圧ポンプ72から
の圧油をチルト操作回路へ、又は、第1ロック装置4
0、回転装置50、若しくは、第2ロック装置60用の
回路への切り換えを行い、チルト操作回路では次のカウ
ンタバランス弁86へ行き、他の回路では順次、第1ロ
ック装置40の第1ロックシリンダ44用の電磁操作弁
85、回転装置50の回転シリンダ55用の電磁操作弁
84、若しくは、第2ロック装置60の第2ロックシリ
ンダ64用の電磁操作弁83へとシリーズ回路で行く。
また、第2ロックシリンダ64用の電磁操作弁83と他
方のチルト操作回路76とは回路89により接続され、
回路89には一方向弁81aが介装されている。
The second electromagnetic switching valve 82 transfers the pressure oil from the hydraulic pump 72 to the tilt operation circuit or the first locking device 4
0, the rotation device 50, or the circuit for the second lock device 60 is switched to, the tilt operation circuit goes to the next counter balance valve 86, and the other circuits sequentially go to the first lock of the first lock device 40. A series circuit goes to the solenoid operated valve 85 for the cylinder 44, the solenoid operated valve 84 for the rotating cylinder 55 of the rotating device 50, or the solenoid operated valve 83 for the second lock cylinder 64 of the second lock device 60.
Further, the electromagnetic operation valve 83 for the second lock cylinder 64 and the other tilt operation circuit 76 are connected by a circuit 89,
A one-way valve 81a is interposed in the circuit 89.

【0042】チルト操作回路75上に第1、第2電磁切
換弁77、82を介装し、チルト操作回路76と電磁操
作弁78との接続回路80上に一方向弁81を介装した
ため、第1、第2電磁切換弁がイ位置にある場合には、
チルトレバー70を操作し、方向切換弁71を切り換え
てチルトシリンダ8を伸縮し、補ジブ6を起伏する。第
1電磁切換弁77をロ位置に切り換え、方向切換弁71
をイ位置にすると横抱き操作回路に圧油が供給され、電
磁操作弁78を操作することにより横抱きシリンダ25
は伸縮して、補ジブ6の張り出し、格納を行う。またこ
のとき、方向切換弁71をハ位置に切り換えた場合には
作動しないので、チルトレバー70を一方向に操作し
て、補ジブ6の張り出し、格納が行える。
Since the first and second electromagnetic switching valves 77 and 82 are provided on the tilt operating circuit 75, and the one-way valve 81 is provided on the connecting circuit 80 between the tilt operating circuit 76 and the electromagnetic operating valve 78. When the first and second solenoid operated directional control valves are in position a,
By operating the tilt lever 70 and switching the direction switching valve 71, the tilt cylinder 8 is expanded and contracted, and the auxiliary jib 6 is undulated. The first electromagnetic switching valve 77 is switched to the b position, and the directional switching valve 71
Is set to the a position, pressure oil is supplied to the horizontal holding operation circuit, and the electromagnetic holding valve 78 is operated to operate the horizontal holding cylinder 25.
Expands and contracts to extend and store the auxiliary jib 6. Further, at this time, since it does not operate when the direction switching valve 71 is switched to the c position, the tilt lever 70 can be operated in one direction so that the auxiliary jib 6 can be extended and stored.

【0043】同様に、第2電磁切換弁82をロ位置に切
り換え、方向切換弁71をイ位置にすると第1ロック、
第2ロックおよび回転操作回路に圧油が供給され、電磁
操作弁83、84、85を操作することにより、それぞ
れ第2ロックシリンダ64、回転シリンダ55、第1ロ
ックシリンダ44が伸縮する。このとき、電磁操作弁8
3、84、85を順次操作することにより、補ジブ6の
第1ロック、回転、第2ロックが順次自動的に行える。
またこのときも同様に、方向切換弁71をハ位置に切り
換えた場合には作動しないので、チルトレバー70を一
方向に操作して、補ジブ6の張り出し、格納が行える。
Similarly, when the second electromagnetic switching valve 82 is switched to the b position and the direction switching valve 71 is set to the a position, the first lock,
By supplying pressure oil to the second lock and rotation operation circuit and operating the electromagnetic operation valves 83, 84, 85, the second lock cylinder 64, the rotation cylinder 55, and the first lock cylinder 44 expand and contract, respectively. At this time, the solenoid operated valve 8
By sequentially operating 3, 84, and 85, the first lock, rotation, and second lock of the auxiliary jib 6 can be sequentially and automatically performed.
Also at this time, similarly, since the operation does not occur when the direction switching valve 71 is switched to the c position, the tilt lever 70 can be operated in one direction to extend and store the auxiliary jib 6.

【0044】本案においては、図19の二点鎖線で示す
第2電磁切換弁82と、電磁操作弁83、84および8
5とを回転ブラケット部30に装着したために、油圧ホ
ース用のリールは73、74の2個のみで、回転ブラケ
ット30における配管の本数が少なくてすむ。
In the present invention, the second solenoid operated directional control valve 82 and the solenoid operated valves 83, 84 and 8 shown by the chain double-dashed line in FIG.
Since 5 and 5 are attached to the rotating bracket portion 30, the number of reels for the hydraulic hose is only 73 and 74, and the number of pipes in the rotating bracket 30 can be small.

【0045】図20は本発明の補ジブの自動張り出し、
格納装置の電気配線図である。図20において、運転室
3には張り出し、格納用の切り換えを行う切換スイッチ
90が設けられており、イ位置は張り出し作業時の位
置、ロ位置は格納作業時の位置である。91a、91b
は、張り出し作業時のブーム4に対するトップブーム5
の位置を検出するトップブーム5の伸縮位置検出用のリ
ミットスイッチであり、91aは図5に示すトップブー
ム5が所定量伸長完了したことを検出し、91bは図6
に示すトップブーム5が所定量縮小完了したことを検出
する。92a、92bは、格納作業時(ブーム4に対す
るトップブーム5の位置でピン21、26の抜けしろ量
を検出)のトップブーム5の伸縮位置検出用のリミット
スイッチである。92aは図5に示すトップブーム5が
所定量伸長完了したことを検出し、92bは図6に示す
トップブーム5が所定量縮小完了したことを検出する。
FIG. 20 shows the automatic extension of the auxiliary jib of the present invention.
It is an electrical wiring diagram of a storage device. In FIG. 20, the operator's cab 3 is provided with a changeover switch 90 for switching between overhanging and storing, and the position a is the position during overhanging work, and the position b is the position during storing work. 91a, 91b
Is the top boom 5 against the boom 4 during overhanging work
Is a limit switch for detecting the expansion / contraction position of the top boom 5 for detecting the position of the top boom 5. 91a detects that the top boom 5 shown in FIG.
It is detected that the top boom 5 shown in FIG. Numerals 92a and 92b are limit switches for detecting the expansion / contraction position of the top boom 5 at the time of storage work (the amount of removal of the pins 21, 26 is detected at the position of the top boom 5 with respect to the boom 4). Reference numeral 92a detects that the top boom 5 shown in FIG. 5 has completed extension by a predetermined amount, and 92b detects that the top boom 5 shown in FIG. 6 has completed reduction by a predetermined amount.

【0046】93a、93bは、横抱き装置20による
補ジブ6の振り出し位置検出用のリミットスイッチであ
り、93aは図7に示す振り出し完了状態、すなわち、
図17に示すトップブームピン11と溝31a、31b
との係合が解除したことを検出し、93bは図6に示す
格納完了状態、すなわち、図16に示すトップブームピ
ン11と溝31a、31bとが係合したことを検出す
る。94a、94bは、第2ロック装置60のロック、
およびロック解除位置検出用のリミットスイッチであ
り、94aは図10に示すロック完了したことを検出
し、94bは図17に示すロック解除完了したことを検
出する。
Numerals 93a and 93b are limit switches for detecting the starting position of the auxiliary jib 6 by the horizontal holding device 20, and 93a is the ending position shown in FIG.
The top boom pin 11 and the grooves 31a and 31b shown in FIG.
Detecting that the engagement with and has been released, 93b detects the completion state of storage shown in FIG. 6, that is, the engagement between the top boom pin 11 and the grooves 31a and 31b shown in FIG. 94a and 94b are locks of the second lock device 60,
And a limit switch for detecting an unlock position, 94a detects completion of locking shown in FIG. 10, and 94b detects completion of unlocking shown in FIG.

【0047】95a、95bは、回転装置50の張り出
し回転、および格納回転位置検出用のリミットスイッチ
であり、95aは図8に示す張り出し回転完了したこと
を検出し、95bは図16に示す格納回転完了したこと
を検出する。96a、96bは、第1ロック装置40の
ロック、およびロック解除位置検出用のリミットスイッ
チであり、96aは図15に示すロック完了したことを
検出し、96bは図14に示すロック解除完了したこと
を検出する。
Numerals 95a and 95b are limit switches for overhanging rotation of the rotating device 50 and detection of the retracted rotation position. 95a detects that the overhanging rotation shown in FIG. 8 is completed, and 95b indicates the retracting rotation shown in FIG. Detects completion. 96a and 96b are limit switches for locking and unlocking the first locking device 40, and 96a detects that the lock is completed as shown in FIG. 15, and 96b shows that the lock is released as shown in FIG. To detect.

【0048】97a、97b、97c、97dは運転室
3内に設けられた検出結果表示手段であるパイロットラ
ンプである。パイロットランプ97aは、補ジブ張り出
し時に、トップブーム5が短縮完了し、横抱き装置20
が振り出し完了し、第1ロツク装置40がロック完了す
ると点灯する。パイロットランプ97bは、補ジブ張り
出し時に、トップブーム5が伸長完了し、回転ブラケッ
ト30が張り出し回転完了し、第2ロック装置60がロ
ック完了すると点灯する。パイロットランプ97cは、
補ジブ格納時に、トップブーム5が伸長完了し、第2ロ
ック装置60がロック解除完了し、回転ブラケットが格
納回転完了すると点灯する。パイロットランプ97d
は、補ジブ格納時に、トップブーム5が短縮完了し、第
1ロック装置40がロック解除完了し、横抱き装置20
が格納完了すると点灯する。98はダイオードである。
Reference numerals 97a, 97b, 97c and 97d denote pilot lamps provided in the cab 3 as detection result display means. The pilot lamp 97a is configured such that the top boom 5 has been shortened when the auxiliary jib is extended and
Lights up when the first lock device 40 is completely locked and the first lock device 40 is locked. The pilot lamp 97b is turned on when the top boom 5 is completely extended, the rotary bracket 30 is completely extended and rotated, and the second lock device 60 is completely locked when the auxiliary jib is extended. The pilot lamp 97c is
When the supplemental jib is stored, the top boom 5 is completely extended, the second lock device 60 is completely unlocked, and the rotation bracket is lit when the storage rotation is completed. Pilot lamp 97d
When the auxiliary jib is stored, the top boom 5 has been shortened, the first lock device 40 has been unlocked, and the horizontal holding device 20
Lights up when is stored. Reference numeral 98 is a diode.

【0049】図21、図22は本発明の補ジブの自動張
り出し、格納装置のリミットスイッチの取り付けの一例
を示す図である。図21、図22ではブームに対するト
ップブーム5の位置を、さらに、図22では補ジブ6の
張り出し、格納を検出するリミットスイッチの取り付け
を示している。他のリミットスイッチも同様に該当する
制御部材の近傍に配置されている。
21 and 22 are views showing an example of automatic extension of the auxiliary jib of the present invention and attachment of a limit switch of the storage device. 21 and 22, the position of the top boom 5 with respect to the boom is shown, and further, FIG. 22 shows the attachment of a limit switch for detecting the extension and storage of the auxiliary jib 6. The other limit switches are likewise arranged in the vicinity of the relevant control member.

【0050】図21において、トップブーム5の伸長位
置検出用のリミットスイッチ91a、92aであり、リ
ミットスイッチ91a、92aはブーム4に装着され、
トップブーム5のブラケット5mの位置を検出して、ト
ップブーム5が所定位置に伸長したのを検出している。
また、このとき、リミットスイッチ91a、92aを逆
にトップブーム5に、ブラケット5mをブーム4に装着
しても良い。図22において、トップブーム5の縮小位
置検出用のリミットスイッチ91b、92bであり、リ
ミットスイッチ91b、92bはブーム4に固設された
ブラケット16(図5に示す)に装着され、係止ピン2
6の位置を検出している。また、補ジブ6の格納の終了
を検出する振り出し位置検出用のリミットスイッチ93
bと、補ジブ6の横抱きから張り出しへの移動終了を検
出する振り出し位置検出用のリミットスイッチ93aと
は、ブーム4に固設されたブラケット14に装着され、
ロッド28の移動位置を検出している。この場合に、横
抱きシリンダ25の移動位置を検出しても良い。なお、
上記において、位置検出にリミットスイッチを用いた
が、シリンダのロッドに位置を検出する位置検出付きの
シリンダを用いても良い。
In FIG. 21, there are limit switches 91a and 92a for detecting the extended position of the top boom 5, the limit switches 91a and 92a being mounted on the boom 4.
The position of the bracket 5m of the top boom 5 is detected to detect that the top boom 5 has extended to a predetermined position.
At this time, the limit switches 91a and 92a may be installed on the top boom 5 and the bracket 5m may be installed on the boom 4 in reverse. 22, the limit switches 91b and 92b for detecting the contracted position of the top boom 5 are attached to the bracket 16 (shown in FIG. 5) fixed to the boom 4 and the locking pins 2 are attached.
Position 6 is detected. Further, a limit switch 93 for detecting a starting position for detecting the end of storage of the auxiliary jib 6
b and a limit switch 93a for detecting a swinging position that detects the end of the movement of the auxiliary jib 6 from the horizontal holding to the overhang are mounted on the bracket 14 fixed to the boom 4.
The moving position of the rod 28 is detected. In this case, the moving position of the horizontal holding cylinder 25 may be detected. In addition,
Although the limit switch is used for position detection in the above, a cylinder with position detection for detecting the position may be used for the rod of the cylinder.

【0051】つぎに、補ジブ張り出し方法について、図
23に示すフローチャートにしたがって、図4、図1
9、図20を用いて説明する。 (1)ステップ101で、オペレータは格納ピン7(図
4に示す)を取り外す。 (2)ステップ102で、オペレータは切換スイッチ9
0(図20に示す)をイの張り出し位置に切り換える。 (3)ステップ103で、オペレータはチルトレバー7
0(図19に示す)を操作して方向切換弁71をイ位置
に切り換える。 (4)ステップ104で、リミットスイッチ91bはト
ップブーム5が短縮位置にあることを検出し、第1電磁
切換弁77をロ位置に、および電磁操作弁78をイ位置
に切り換えて横抱き装置20の横抱きシリンダ25を作
動させ、補ジブ6を振り出す(図4のW方向)。これに
より、トップブームピン11と回転ブラケット部30の
溝31a、31bとは係合し、トップブーム5の回転支
持ピン12と回転装置50の第2レバー52の溝53と
は係合する。 (5)ステップ105で、リミットスイッチ93aは補
ジブ6が振り出し完了したことを検出し、第1電磁切換
弁77をイ位置に、また、電磁切換弁78をロ位置に戻
して横抱きシリンダ25を停止する。また、第2電磁切
換弁82をロ位置に、および電磁操作弁85をイ位置に
切り換えて第1ロック装置40の第1ロックシリンダ4
4を作動させ、トップブームピン11をロックする。 (6)ステップ106で、リミットスイッチ96aは第
1ロック装置40がロック完了したことを検出し、電磁
操作弁85をロ位置に戻すとともに、パイロットランプ
97aを点灯させる。
Next, the method of projecting the auxiliary jib will be described with reference to FIGS.
This will be described with reference to FIG. (1) In step 101, the operator removes the storage pin 7 (shown in FIG. 4). (2) In step 102, the operator selects the changeover switch 9
0 (shown in FIG. 20) is switched to the overhang position. (3) In step 103, the operator operates the tilt lever 7
0 (shown in FIG. 19) is operated to switch the direction switching valve 71 to the a position. (4) In step 104, the limit switch 91b detects that the top boom 5 is in the shortened position, switches the first electromagnetic switching valve 77 to the b position, and switches the electromagnetic operation valve 78 to the a position to shift the side holding device 20. The horizontal holding cylinder 25 is actuated to swing out the auxiliary jib 6 (W direction in FIG. 4). As a result, the top boom pin 11 engages with the grooves 31a and 31b of the rotating bracket portion 30, and the rotation support pin 12 of the top boom 5 engages with the groove 53 of the second lever 52 of the rotating device 50. (5) In step 105, the limit switch 93a detects that the supplementary jib 6 has been swung out, and returns the first electromagnetic switching valve 77 to the a position and the electromagnetic switching valve 78 to the b position to move the horizontal holding cylinder 25. Stop. In addition, the second electromagnetic switching valve 82 is switched to the b position and the electromagnetic operation valve 85 is switched to the a position to switch the first lock cylinder 4 of the first locking device 40.
4 to lock the top boom pin 11. (6) In step 106, the limit switch 96a detects that the first lock device 40 is completely locked, returns the electromagnetically operated valve 85 to the position b, and lights the pilot lamp 97a.

【0052】(7)ステップ107で、オペレータはパ
イロットランプ97aの点灯を確認し、図示しないブー
ム用バルブを切り換え、レバー22の溝23から係止ピ
ン21が抜ける位置まで所定量トップブーム5を伸長さ
せる。この時、パイロットランプ97aは一度消灯し、
所定位置に達すると再び点灯する。 (8)ステップ108で、リミットスイッチ91aはト
ップブーム5が伸長完了したことを検出し、電磁操作弁
84をイ位置に切り換えて回転装置50の回転シリンダ
55を作動させ、回転ブラケット30を張り出し回転さ
せる。 (9)ステップ109で、リミットスイッチ95aは回
転ブラケット部30が張り出し回転完了したことを検出
し、電磁操作弁83を切り換えて第2ロック装置60の
第2ロックシリンダ64を作動させ、トップブーム5と
回転ブラケット部30とに、連結ピン61aをピン穴1
3aに、連結ピン61bをピン穴13bに挿入しロック
する。 (10)ステップ110で、リミットスイッチ94aは
第2ロック装置60がロック完了したことを検出し、パ
イロットランプ97bを点灯する。 (11)ステップ111で、オペレータはパイロットラ
ンプ97bの点灯を確認し、チルトレバー70を戻し、
第2ロック装置60のロックピン65(図10に示す)
を装着する。 フローチャ−ト中の2重に囲った部分は自動的に作動す
る部分である。なお、各シリンダの動きの速さの制御お
よび動作、停止はチルトレバー70により行われる。
(7) In step 107, the operator confirms the lighting of the pilot lamp 97a, switches the boom valve (not shown), and extends the top boom 5 by a predetermined amount to the position where the locking pin 21 comes out of the groove 23 of the lever 22. Let At this time, the pilot lamp 97a is turned off once,
When it reaches a predetermined position, it lights up again. (8) In step 108, the limit switch 91a detects that the top boom 5 is completely extended, switches the electromagnetic operation valve 84 to the a position, operates the rotary cylinder 55 of the rotary device 50, and extends the rotary bracket 30 to rotate it. Let (9) In step 109, the limit switch 95a detects that the rotating bracket portion 30 has overhanged and completed rotation, switches the electromagnetically operated valve 83 to operate the second lock cylinder 64 of the second lock device 60, and the top boom 5 Connect the connecting pin 61a to the rotary bracket 30 and the pin hole 1
3a, the connecting pin 61b is inserted into the pin hole 13b and locked. (10) In step 110, the limit switch 94a detects that the second lock device 60 is locked, and turns on the pilot lamp 97b. (11) In step 111, the operator confirms that the pilot lamp 97b is turned on and returns the tilt lever 70,
Lock pin 65 of the second lock device 60 (shown in FIG. 10)
Put on. The doubly enclosed part in the flow chart is the part that operates automatically. It should be noted that the tilt lever 70 controls the speed of movement of each cylinder, and the operation and stop thereof.

【0053】なお、上記実施例においては、リミットス
イッチ91bがトップブーム5が短縮位置にあることを
検出し、横抱きシリンダ25の張り出しにより補ジブ6
を揺動させ、トップブームピン11と回転ブラケット部
30の溝31a、31bを係合させたが、まず、トップ
ブーム5をトップブームピン11と回転ブラケット部3
0の溝31a、31bが係合する位置まで所定量伸長さ
せた後に、横抱きシリンダ25の張り出しにより補ジブ
6を揺動させて係合させ、その後に、再度レバー22の
溝23から係止ピン21が抜ける位置まで所定量トップ
ブーム5を伸長させても良い。これにより、係合位置が
正確になり係合が確実になる。
In the above embodiment, the limit switch 91b detects that the top boom 5 is in the shortened position, and the lateral holding cylinder 25 overhangs to extend the auxiliary jib 6.
The top boom pin 11 and the grooves 31a and 31b of the rotary bracket portion 30 were engaged with each other.
0 is extended by a predetermined amount to the position where the grooves 31a and 31b of 0 are engaged, and then the auxiliary holding jib 6 is swung to engage the auxiliary jib 6 by the overhanging cylinder 25. The top boom 5 may be extended by a predetermined amount to a position where 21 is removed. As a result, the engagement position becomes accurate and the engagement is ensured.

【0054】さらに、上記実施例では、レバー22の溝
23から係止ピン21が抜ける位置まで所定量だけトッ
プブーム5を伸長させたが、トップブーム5をその位置
に停止しておき、レバー22側を、スライドあるいは揺
動させて係止を外しても良い。
Further, in the above-described embodiment, the top boom 5 is extended by a predetermined amount to the position where the locking pin 21 comes out from the groove 23 of the lever 22, but the top boom 5 is stopped at that position and the lever 22 is stopped. The side may be slid or swung to release the lock.

【0055】以上の説明を纏めると、補ジブの張り出し
時には、ブーム4と補ジブ6との間の横抱きシリンダ2
5の力により補ジブ6を所定位置に横方向に揺動させて
張り出し、この張り出し後に、補ジブ6とブーム4との
並設時のブーム4の先端近傍側面側と補ジブ6とを第1
ロック装置40で係合し、次に、ブーム4に対する回転
装置50の回転シリンダ55の旋回力により回転ブラケ
ット部30をブーム4の前方に張り出し、補ジブ6とブ
ーム4との並設時のブーム4の先端遠方側面側と補ジブ
6とを第2ロック装置60で係合する。
To summarize the above description, the lateral holding cylinder 2 between the boom 4 and the auxiliary jib 6 when the auxiliary jib is extended.
The auxiliary jib 6 is laterally oscillated to a predetermined position by the force of 5 and overhangs, and after this overhang, the side surface near the tip of the boom 4 and the auxiliary jib 6 when the auxiliary jib 6 and the boom 4 are juxtaposed with each other. 1
The locking device 40 is engaged, and then the rotating bracket portion 30 is extended toward the front of the boom 4 by the turning force of the rotating cylinder 55 of the rotating device 50 with respect to the boom 4, and the boom when the auxiliary jib 6 and the boom 4 are juxtaposed. A second locking device 60 engages the distal end side surface of 4 and the auxiliary jib 6.

【0056】つぎに補ジブ格納方法について、図24の
フローチャートにしたがって説明する。 (1)ステップ201で、オペレータは第2ロック装置
60のロックピン65を取り外す。 (2)ステップ202で、オペレータは切換スイッチ9
0(図20に示す)をロの格納位置に切り換える。 (3)ステップ203で、オペレータはチルトレバー7
0(図19に示す)を張り出しと同じ方向に操作して方
向切換弁71をイ位置に切り換える。 (4)ステップ204で、リミットスイッチ92aはト
ップブーム5が伸長位置にあることを確認し、第2電磁
切換弁82をロの位置に、および電磁操作弁83をハの
位置に切り換えて第2ロック装置60の第2ロックシリ
ンダ64を縮小作動させ、トップブーム5と回転ブラケ
ット30との連結ピン61a、61bをピン穴13a、
13bから抜き、ロックを解除する。 (5)ステップ205で、リミットスイッチ92bは第
2ロック装置60が解除完了したことを検出し、電磁操
作弁84をハの位置に切り換えて回転装置50の回転シ
リンダ55を縮小作動させ、回転ブラケット部30を格
納回転させる。
Next, the method of storing the supplementary jib will be described with reference to the flowchart of FIG. (1) In step 201, the operator removes the lock pin 65 of the second lock device 60. (2) In step 202, the operator selects the changeover switch 9
0 (shown in FIG. 20) is switched to the storage position b. (3) In step 203, the operator operates the tilt lever 7
0 (shown in FIG. 19) is operated in the same direction as the overhang to switch the direction switching valve 71 to the a position. (4) In step 204, the limit switch 92a confirms that the top boom 5 is in the extended position, switches the second electromagnetic switching valve 82 to the b position, and the electromagnetic operation valve 83 to the c position to shift the second position. The second lock cylinder 64 of the lock device 60 is contracted, and the connecting pins 61a and 61b of the top boom 5 and the rotary bracket 30 are connected to the pin holes 13a.
Remove from 13b and unlock. (5) In step 205, the limit switch 92b detects that the second lock device 60 has been completely released, switches the electromagnetically operated valve 84 to the position c, and causes the rotary cylinder 55 of the rotary device 50 to contract, thereby rotating the rotary bracket. The part 30 is stored and rotated.

【0057】(6)ステップ206で、リミットスイッ
チ95bは格納回転が完了したことを検出し、パイロッ
トランプ97cを点灯させる。 (7)ステップ207で、オペレータはパイロットラン
プ97cが点灯したことを確認し、図示しないブーム用
の切換弁を切り換えてトップブーム5を所定量短縮す
る。このとき、パイロットランプ97cは一度消灯し、
所定位置に達すると再び点灯する。 (8)ステップ208で、リミットスイッチ92bはト
ップブーム5が短縮完了したことを検出し、電磁操作弁
85をハ位置に切り換えて第1ロック装置40の第1ロ
ックシリンダ44を縮小作動させ、トップブームピン1
1のロックを解除する。 (9)ステップ209で、リミットスイッチ96bは第
1ロック解除完了したことを検出し、第1電磁切換弁7
7をロ位置に、および電磁操作弁78をハ位置に切り換
えて横抱き装置20の横抱きシリンダ25を伸長作動さ
せ、補ジブ6を格納する。 (10)ステップ210で、リミットスイッチ93bは
補ジブ6が格納完了したことを検出し、パイロットラン
プ97dを点灯する。 (11)ステップ211で、オペレータはパイロットラ
ンプ97dが点灯したことを確認し、チルトレバー70
を戻し、格納ピン7(図4に示す)を装着する。
(6) In step 206, the limit switch 95b detects that the storage rotation is completed, and turns on the pilot lamp 97c. (7) In step 207, the operator confirms that the pilot lamp 97c is turned on, and switches the boom switching valve (not shown) to shorten the top boom 5 by a predetermined amount. At this time, the pilot lamp 97c is turned off once,
When it reaches a predetermined position, it lights up again. (8) In step 208, the limit switch 92b detects that the top boom 5 has been shortened, switches the electromagnetically operated valve 85 to the c position, and causes the first lock cylinder 44 of the first lock device 40 to contract, thereby reducing the top position. Boom pin 1
Unlock 1 (9) In step 209, the limit switch 96b detects that the first lock release is completed, and the first electromagnetic switching valve 7
7 is switched to the b position and the electromagnetic operation valve 78 is switched to the c position to extend the lateral holding cylinder 25 of the lateral holding device 20 to store the auxiliary jib 6. (10) In step 210, the limit switch 93b detects that the auxiliary jib 6 is completely stored, and turns on the pilot lamp 97d. (11) In step 211, the operator confirms that the pilot lamp 97d is turned on, and the tilt lever 70
Back, and attach the storage pin 7 (shown in FIG. 4).

【0058】以上の説明を纏めると、補ジブの格納時に
は、ブーム4と補ジブ6との並設時のブーム4の先端遠
方側面側と補ジブ6との第2ロック装置60を離脱し、
次にブーム4の前方に張り出している回転ブラケット部
30をブーム4に対する回転装置50の回転シリンダ5
5の旋回力により回動し、所定位置への回動後に補ジブ
6とブーム4との並設時のブーム4の先端近傍側面側と
補ジブ6との第1ロック装置40を離脱し、離脱後にブ
ーム4と補ジブ6との間の横抱きシリンダ25の力によ
り補ジブ6を横方向に揺動させて所定位置に格納する。
To summarize the above description, when the auxiliary jib is retracted, the second locking device 60 between the auxiliary jib 6 and the distal side surface of the boom 4 when the boom 4 and the auxiliary jib 6 are juxtaposed is disengaged,
Next, the rotary bracket portion 30 projecting in front of the boom 4 is attached to the rotary cylinder 5 of the rotary device 50 with respect to the boom 4.
When the auxiliary jib 6 and the boom 4 are juxtaposed, the first locking device 40 between the side surface near the tip end of the boom 4 and the auxiliary jib 6 is disengaged. After detachment, the auxiliary jib 6 is laterally swung by the force of the horizontal holding cylinder 25 between the boom 4 and the auxiliary jib 6 and stored in a predetermined position.

【0059】上記の実施例では平地で補ジブ6の旋回半
径が充分に取れる場合であるが、狭隘な場所で補ジブ6
の張り出し、あるいは格納作業を行う場合、図25に示
すように、ブーム4を起立させ、補ジブ6をチルトさせ
た状態で回転ブラケット部30を回動させることがあ
る。その場合、ブーム4の起立角度αは24°〜26°
であり、その状態でチルトシリンダ8を最短にすると、
補ジブ6は2点鎖線の位置から矢印方向にチルトし実線
の位置に移動する。このとき、補ジブ6の重心位置G
は、ほぼ、回転ブラケット30の回転軸であるトップブ
ームピン11の中心位置Cを通る垂線Y−Y上にある。
そのため、回転ブラケット30の回動作業をする場合、
回転トルクが少なくてすむ。
In the above embodiment, the turning radius of the supplementary jib 6 can be sufficiently obtained on a flat ground, but the supplementary jib 6 can be placed at a narrow place.
When performing the overhanging or storing operation of the rotating bracket portion 30, the boom 4 may be erected and the rotating bracket portion 30 may be rotated while the auxiliary jib 6 is tilted, as shown in FIG. In that case, the standing angle α of the boom 4 is 24 ° to 26 °.
Then, if the tilt cylinder 8 is made the shortest in that state,
The complementary jib 6 is tilted in the arrow direction from the position indicated by the chain double-dashed line and moved to the position indicated by the solid line. At this time, the center of gravity G of the auxiliary jib 6
Is almost on a perpendicular line Y-Y passing through the center position C of the top boom pin 11 which is the rotation axis of the rotation bracket 30.
Therefore, when rotating the rotating bracket 30,
It requires less rotation torque.

【0060】以上において、狭隘な場所で補ジブ6の張
り出しの一例として、ブーム4を所定量だけ起立した後
に、ブーム4と補ジブ6との間の横抱きシリンダ25の
力により補ジブ6を所定位置に横方向に揺動させて張り
出し、補ジブとブームとの並設時のブーム4の先端近傍
側面側と補ジブ6とを第1ロック装置40で係合し、次
に補ジブ6をチルトシリンダ8の縮小により下方にチル
トさせ、さらに、ブーム4に対する回転装置50の回転
シリンダ55の旋回力により回転ブラケット部30をブ
ーム4の前方に張り出し、ブーム4と補ジブ6との並設
時のブーム4の先端遠方側面側と補ジブ6とを第2ロッ
ク装置60で係合する。
In the above description, as an example of the extension of the supplementary jib 6 in a narrow space, after raising the boom 4 by a predetermined amount, the auxiliary jib 6 is preset by the force of the horizontal holding cylinder 25 between the boom 4 and the supplemental jib 6. When the auxiliary jib and the boom are juxtaposed, the side surface near the tip of the boom 4 and the auxiliary jib 6 are engaged by the first locking device 40, and then the auxiliary jib 6 is moved to the position. When the tilt cylinder 8 is tilted downward by contraction, and further, the rotating bracket portion 30 is projected to the front of the boom 4 by the turning force of the rotating cylinder 55 of the rotating device 50 with respect to the boom 4, and the boom 4 and the auxiliary jib 6 are installed side by side. The second locking device 60 engages the distal side surface side of the boom 4 with the auxiliary jib 6.

【0061】また、格納作業の一例として、ブーム4を
所定量だけ起立した後に補ジブ6をチルトシリンダ8の
縮小により下方にチルトさせ、次にブーム4と補ジブ6
との並設時のブーム4の先端遠方側面側と補ジブ6との
第2ロック装置60を離脱し、離脱後にブーム4の前方
に張り出している回転ブラケット部30をブーム4に対
する回転装置50の回転シリンダ55の旋回力により回
動し、所定位置への回動後にチルトシリンダ8の伸長し
て補ジブ6をブーム4と並列位置に戻し、さらに、補ジ
ブ6とブーム4との並設時のブーム4の先端近傍側面側
と補ジブ6との第1ロック装置40を離脱し、離脱後に
ブーム4と補ジブ6との間の横抱きシリンダ25の力に
より補ジブ6を横方向に揺動させて所定位置に格納す
る。
As an example of the storing operation, after the boom 4 is erected by a predetermined amount, the auxiliary jib 6 is tilted downward by reducing the tilt cylinder 8, and then the boom 4 and the auxiliary jib 6 are moved.
The second locking device 60 between the distal side surface of the boom 4 and the auxiliary jib 6 when being installed side by side is disengaged, and after the disengagement, the rotating bracket portion 30 projecting forward of the boom 4 is attached to the rotating device 50 for the boom 4. When the tilt cylinder 8 is rotated by the turning force of the rotary cylinder 55 to a predetermined position, the tilt cylinder 8 is extended to return the auxiliary jib 6 to the parallel position with the boom 4, and when the auxiliary jib 6 and the boom 4 are arranged side by side. The first locking device 40 between the side surface near the tip of the boom 4 and the auxiliary jib 6 is disengaged, and after the disengagement, the force of the lateral holding cylinder 25 between the boom 4 and the auxiliary jib 6 swings the auxiliary jib 6 laterally. And store it in a predetermined position.

【0062】[0062]

【発明の効果】以上詳述したように、本発明は下記のよ
うな効果を奏する。 (1)本発明は、多段に伸縮するブームの先端に補ジブ
を有する車両搭載クレーンの、補ジブの張り出し、格納
装置を、補ジブの振り出し、格納を行う横抱き装置と、
トップブームと補ジブとを連結する回転ブラケットと、
回転ブラケット回転装置と、トップブームの一側と、回
転ブラケットの一側とを連結するトップブームピンをロ
ックする第1ロック装置と、トップブームの他側と、回
転ブラケットの他側とを連結する第2ロック装置とを備
えた。また、各装置を作動させる油圧シリンダと、それ
ぞれの油圧シリンダを制御する電磁弁とを備えた油圧装
置と、各装置の作動位置を検出し、油圧装置のそれぞれ
の電磁弁を作動させるリミットスイッチを有する電気装
置とを備えた。そして、作動位置の検出結果を表示する
表示装置を運転室に設けるとともに、張り出し、あるい
は格納操作を、前工程の作動完了を確認しつつ順次行う
ようにした。そのため、補ジブの張り出し、あるいは格
納操作はオペレータが運転室で表示装置を確認しつつ、
切換スイッチ操作と、ブーム操作と、チルトレバー操作
とを行うだけで自動的に行われ、準備工数は少なく、短
時間で、容易に、疲労することなく、誤操作による各部
の干渉の恐れも少ない。
As described in detail above, the present invention has the following effects. (1) The present invention relates to a vehicle-mounted crane having a complementary jib at the tip of a boom that expands and contracts in multiple stages, and a horizontal hugging device for extending and retracting the auxiliary jib and storing the auxiliary jib.
A rotating bracket that connects the top boom and auxiliary jib,
A first locking device that locks a top boom pin that connects the rotating bracket rotating device, one side of the top boom, and one side of the rotating bracket, and connects the other side of the top boom and the other side of the rotating bracket. And a second locking device. In addition, a hydraulic device equipped with a hydraulic cylinder that operates each device, and a solenoid valve that controls each hydraulic cylinder, and a limit switch that detects the operating position of each device and operates each solenoid valve of the hydraulic device. And an electric device having. Then, a display device for displaying the detection result of the operating position is provided in the operator's cab, and the overhanging or storing operation is sequentially performed while confirming the completion of the operation of the previous process. Therefore, while the operator is checking the display device in the operator's cab when projecting or retracting the supplementary jib,
The changeover switch operation, the boom operation, and the tilt lever operation are performed automatically, and the number of preparation steps is small, and in a short time, there is little fatigue, and there is little risk of interference of each part due to erroneous operation.

【0063】(2)チルト操作油圧回路上に、張り出
し、格納回路との切換弁を介装し、横抱きシリンダ用操
作弁とチルト用の方向切換弁との間に、一方向弁を設け
たため、チルトレバーで張り出し、格納操作が可能であ
るとともに、チルトレバーを一方向に操作したときの
み、張り出し、格納作動が行われ、操作上安全である。 (3)回転装置、第1、第2ロック装置の電磁弁を回転
ブラケットに装着したため、油圧ホースのリールが2個
のみとなり、回転ブラケットにおける油圧配管が少なく
てすむ。 (4)ブームを所定の角度起立させ、補ジブをチルトさ
せた場合、回転ブラケットの回転軸の中心を通る垂線上
に、ほぼ、補ジブの重心がくるため、回転ブラケットの
回転トルクが少なくてすむ。
(2) Since a switching valve for overhanging and storing circuit is provided on the tilt operating hydraulic circuit, and a one-way valve is provided between the operating valve for the horizontal holding cylinder and the directional switching valve for tilting, The tilt lever can be extended and stored, and only when the tilt lever is operated in one direction, the extension and storage operations are performed, which is safe for operation. (3) Since the rotating device and the solenoid valves of the first and second locking devices are mounted on the rotating bracket, the number of reels of the hydraulic hose is only two, and the hydraulic pipe in the rotating bracket can be reduced. (4) When the boom is erected at a predetermined angle and the auxiliary jib is tilted, the rotational torque of the rotating bracket is small because the center of gravity of the auxiliary jib is almost on the perpendicular line passing through the center of the rotating shaft of the rotating bracket. I'm sorry.

【図面の簡単な説明】[Brief description of drawings]

【図1】車両搭載クレーンの走行姿勢の側面図である。FIG. 1 is a side view of a traveling posture of a vehicle-mounted crane.

【図2】車両搭載クレーンの走行姿勢の平面図である。FIG. 2 is a plan view of a traveling posture of a vehicle-mounted crane.

【図3】車両搭載クレーンの作業姿勢を示す側面図であ
る。
FIG. 3 is a side view showing a work posture of a vehicle-mounted crane.

【図4】本発明の補ジブ張り出し、格納装置を搭載した
クレーン車の平面図である。
FIG. 4 is a plan view of a crane vehicle equipped with the auxiliary jib overhanging and storing device of the present invention.

【図5】本発明の横抱き装置の、補ジブと横抱き装置と
の係合解除状態を示す平面図である。
FIG. 5 is a plan view showing a disengaged state between the auxiliary jib and the horizontal holding device of the horizontal holding device of the present invention.

【図6】本発明の横抱き装置の、補ジブ振り出し状態を
示す平面図である。
FIG. 6 is a plan view showing the horizontal holding device of the present invention in a state where the supplementary jib is extended.

【図7】本発明の横抱き装置の、補ジブ格納状態を示す
平面図である。
FIG. 7 is a plan view showing a state in which a supplementary jib is stored in the horizontal holding device of the present invention.

【図8】本発明の回転装置の補ジブ張り出し回転完了状
態を示す平面図である。
FIG. 8 is a plan view showing a state in which the auxiliary jib overhanging rotation of the rotating device of the present invention is completed.

【図9】本発明の第1ロック装置のロック完了状態を示
す側面図である
FIG. 9 is a side view showing a locked state of the first locking device of the present invention.

【図10】本発明の第2ロック装置のロック完了状態を
示す側面図である。
FIG. 10 is a side view showing a locked state of the second locking device of the present invention.

【図11】本発明の回転ブラケットの構成を示す斜視図
である
FIG. 11 is a perspective view showing a configuration of a rotation bracket of the present invention.

【図12】本発明の回転装置の構成を示す斜視図であるFIG. 12 is a perspective view showing a configuration of a rotating device of the present invention.

【図13】本発明の第1ロック装置の構成を示す斜視図
である
FIG. 13 is a perspective view showing a configuration of a first locking device of the present invention.

【図14】本発明の第1ロック装置のロック解除完了状
態を示す平面図である。
FIG. 14 is a plan view showing the unlocked state of the first locking device of the present invention.

【図15】本発明の第1ロック装置のロック完了状態を
示す平面図である。
FIG. 15 is a plan view showing a locked state of the first locking device of the present invention.

【図16】本発明の回転装置の格納回転完了状態を示す
平面図である。
FIG. 16 is a plan view showing a state in which the rotating device according to the present invention is completely stored and rotated.

【図17】本発明の回転装置の補ジブ格納完了状態を示
す平面図である。
FIG. 17 is a plan view showing a state in which the rotating device of the present invention has been stored in the auxiliary jib.

【図18】本発明の第2ロック装置のロック解除完了状
態を示す側面図である。
FIG. 18 is a side view showing the unlocked state of the second locking device of the present invention.

【図19】本発明の補ジブ張り出し、格納装置の油圧回
路図である。
FIG. 19 is a hydraulic circuit diagram of the auxiliary jib overhanging and storing device of the present invention.

【図20】本発明の補ジブ張り出し、格納装置の電気系
統図である。
FIG. 20 is an electrical system diagram of the auxiliary jib overhanging and storing device of the present invention.

【図21】本発明のリミットスイッチ装着の一例を示す
図である。
FIG. 21 is a diagram showing an example of mounting the limit switch of the present invention.

【図22】本発明のリミットスイッチ装着の他の箇所の
一例を示す図である。
FIG. 22 is a view showing an example of another place where the limit switch of the present invention is mounted.

【図23】本発明の補ジブ張り出し方法のフローチャー
トである。
FIG. 23 is a flow chart of a method for projecting a complementary jib according to the present invention.

【図24】本発明の補ジブ格納方法のフローチャートで
ある。
FIG. 24 is a flowchart of a method for storing a complementary jib according to the present invention.

【図25】本発明の補ジブ張り出し、格納装置の、回転
ブラケット回転作業時に、ブームを起立させ、補ジブを
チルトさせた場合の説明図である。
FIG. 25 is an explanatory view of a case where the boom is erected and the auxiliary jib is tilted during the rotating bracket rotating work of the auxiliary jib overhanging and storing device of the present invention.

【符号の説明】[Explanation of symbols]

5 トップブーム、 6 補ジブ、 7 格納
ピン、8 チルトシリンダ、 11 トップブーム
ピン、12 回転支持ピン、 20 横抱き装置、
22、62 レバー、 25 横抱きシリンダ、2
7 フック、 28 ロッド、30 回転ブ
ラケット部、 40 第1ロック装置、41 ロックリ
ンク、 44 第1ロックシリンダ、50 回転装
置、 51 第1レバー、52 第2レバー、
55 回転シリンダ、60 第2ロック装置、
61a、61b 連結ピン、63a、63b リン
ク、 64 第2ロックシリンダ、70 チルトレバ
ー、 71 方向切換弁、77 第1電磁切換弁、
78、83、84、85 電磁操作弁、81 一方向
弁、82 第2電磁切換弁、 90 切換スイッチ、
91〜96 リミットスイッチ、97 パイロットラン
プ、
5 top boom, 6 auxiliary jib, 7 storage pin, 8 tilt cylinder, 11 top boom pin, 12 rotation support pin, 20 horizontal holding device,
22, 62 lever, 25 horizontal holding cylinder, 2
7 hooks, 28 rods, 30 rotation bracket parts, 40 first lock device, 41 lock link, 44 first lock cylinder, 50 rotation device, 51 first lever, 52 second lever,
55 rotating cylinder, 60 second locking device,
61a, 61b Connection pin, 63a, 63b Link, 64 Second lock cylinder, 70 Tilt lever, 71 Direction switching valve, 77 First solenoid switching valve,
78, 83, 84, 85 solenoid operated valve, 81 one-way valve, 82 second solenoid selector valve, 90 selector switch,
91-96 limit switch, 97 pilot lamp,

Claims (20)

【特許請求の範囲】[Claims] 【請求項1】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの張り出し時に、ブームと補ジ
ブとの間の力により補ジブを所定位置に横方向に揺動さ
せて張り出し、この張り出し後に並設時のブーム先端近
傍側面側と補ジブとを係合し、次に、ブームに対する旋
回力により回転ブラケット部をブームの前方に張り出
し、並設時のブーム先端遠方側面側と補ジブとを係合す
ることを特徴とするクレーン用補ジブの自動張り出し、
格納方法。
1. A rotary bracket part which is mounted on a vehicle so as to be capable of undulating, and which is attached to and detached from the boom at the tip of a boom that expands and contracts in multiple stages, and an undulating complementary jib is provided on the rotary bracket part.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. When the auxiliary jib is extended, the force of the boom and the auxiliary jib causes the auxiliary jib to swing laterally to the specified position and to extend, and after the extension, the side surface near the tip of the boom when juxtaposed. And a supplementary jib, and then, the rotating bracket portion is projected to the front of the boom by the turning force with respect to the boom, and the side face farthest from the tip of the boom and the supplementary jib are engaged with each other during parallel installation. Automatic extension of supplementary jib for
Storage method.
【請求項2】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの格納時に、並設時のブーム先
端遠方側面側と補ジブとを離脱し、次にブームの前方に
張り出している回転ブラケット部をブームに対する旋回
力により回動し、所定位置への回動後に並設時のブーム
先端近傍側面側と補ジブとを離脱し、離脱後にブームと
補ジブとの間の力により補ジブを横方向に揺動させて所
定位置に格納することを特徴とするクレーン用補ジブの
自動張り出し、格納方法。
2. A rotating bracket part which is mounted on a vehicle so as to be capable of being raised and lowered and which is capable of expanding and contracting in multiple stages.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. When the auxiliary jib is retracted, when the auxiliary jib is retracted, the side surface on the far side of the boom tip is removed from the auxiliary jib, and then the rotating bracket that extends in front of the boom is rotated by the pivoting force against the boom. Then, after rotating to the predetermined position, the side surface near the boom tip and the auxiliary jib when separated side by side are separated from each other, and after separation, the force between the boom and the auxiliary jib causes the auxiliary jib to swing laterally to the specified position. A method of automatically projecting and storing a supplementary jib for a crane, which is characterized in that
【請求項3】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの張り出し時に、ブームを所定
量だけ起立した後に、ブームと補ジブとの間の力により
補ジブを所定位置に横方向に揺動させて張り出し並設時
のブーム先端近傍側面側と補ジブとを係合し、次に補ジ
ブを下方にチルトさせ、さらに、ブームに対する旋回力
により回転ブラケット部をブームの前方に張り出し、並
設時のブーム先端遠方側面側と補ジブとを係合すること
を特徴とするクレーン用補ジブの自動張り出し、格納方
法。
3. A rotating bracket part which is mounted on a vehicle so as to be capable of undulating, and which is attached to and detached from the boom at the tip of a boom which expands and contracts in multiple stages, and an undulating auxiliary jib is provided on the rotating bracket part.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. When the auxiliary jib is extended, the boom is erected by a predetermined amount and then the force between the boom and the auxiliary jib causes the auxiliary jib to swing laterally to a predetermined position. Engage the side surface near the boom tip with the auxiliary jib, then tilt the auxiliary jib downward, and further project the rotating bracket part to the front of the boom by the turning force on the boom. And a supplementary jib are engaged with each other.
【請求項4】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの格納時に、ブームを所定量だ
け起立した後に補ジブを下方にチルトさせ、次に並設時
のブーム先端遠方側面側と補ジブとを離脱し、離脱後に
ブームの前方に張り出している回転ブラケット部をブー
ムに対する旋回力により回動し、所定位置への回動後に
補ジブをブームと並列位置に戻し、さらに、並設時のブ
ーム先端近傍側面側と補ジブとを離脱し、離脱後にブー
ムと補ジブとの間の力により補ジブを横方向に揺動させ
て所定位置に格納することを特徴とするクレーン用補ジ
ブの自動張り出し、格納方法。
4. A rotary bracket part which is mounted on a vehicle so as to be capable of undulating, and which is attached to and detached from the boom at the tip of a boom that expands and contracts in multiple stages, and an undulating complementary jib is provided on the rotary bracket part.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. When the auxiliary jib is stored, the auxiliary jib is tilted downward after standing up the boom by a predetermined amount when the auxiliary jib is retracted, and then the side of the boom tip far side when side-by-side and the auxiliary jib are separated, and after the separation. The rotating bracket that extends in front of the boom is rotated by the pivoting force with respect to the boom, and after rotating to the specified position, the auxiliary jib is returned to the parallel position with the boom. An automatic extension of a supplementary jib for a crane, characterized in that the auxiliary jib is separated from the jib, and after the separation, the auxiliary jib is laterally swung by the force between the boom and the auxiliary jib and stored in a predetermined position. Storage method.
【請求項5】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの張り出し時に、(1)トップ
ブームが所定の短縮位置にあることを検出手段が検出し
たのち、補ジブを横方向に揺動させて、補ジブの基端部
に装着された回転ブラケット部の後端の左右方向の一側
に設けられた溝と、前記トップブームの先端の左右方向
の一側に固着されたトップブームピンとの係合作業を開
始し、(2)回転ブラケットの溝とトップブームピンと
が係合したことを検出手段が検出したのち、前記回転ブ
ラケットと前記トップブームピンとをロックし、(3)
第1ロック装置のロックが完了したことを検出手段が検
出したのち、トップブームを伸長し、(4)トップブー
ムが予め定めた長さまで伸長したことを検出手段が検出
したのち、回転ブラケットを張り出し、(5)回転ブラ
ケットが予め定められた位置まで回転したことを検出手
段が検出したのち、トップブームの先端の左右方向の他
側と、回転ブラケットの後端の左右方向の他側とをピン
によりロックする各工程を有することを特徴とするクレ
ーン用補ジブの自動張り出し、格納方法。
5. A rotating bracket part which is mounted on a vehicle so as to be capable of undulating, and which is attached to and detached from the boom at a tip end of a boom which expands and contracts in multiple stages, and an undulating complementary jib is provided on the rotating bracket part.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. In the overhanging and storing method of the auxiliary jib, (1) after the detection means detects that the top boom is at a predetermined shortened position, the auxiliary jib is oscillated laterally, and the base end of the auxiliary jib is moved. A groove provided on one side in the left-right direction of the rear end of the rotary bracket attached to the section, and the engagement work of the top boom pin fixed to one side in the left-right direction of the tip of the top boom is started, (2) After the detection means detects that the groove of the rotary bracket and the top boom pin are engaged, the rotary bracket and the top boom pin are locked, and (3)
The top boom is extended after the detection means detects that the locking of the first lock device is completed, and (4) the rotation bracket is extended after the detection means detects that the top boom has extended to a predetermined length. (5) After the detection means detects that the rotating bracket has rotated to a predetermined position, the other side of the top end of the top boom and the other side of the rear end of the rotating bracket are pinned. A method for automatically overhanging and storing a supplementary jib for a crane, characterized in that it has respective steps of locking by means of
【請求項6】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し、格
納方法において、補ジブの格納時に、(1)トップブー
ムが予め定めた長さに到達したことを検出手段が検出し
たのち、トップブームの先端の左右方向の他側と、回転
ブラケットの後端の左右方向の他側とをピンによりロッ
クする第2ロック装置のロックを解除し、(2)第2ロ
ック装置のロック解除が完了したことを検出手段が検出
したのち、回転ブラケットを格納し、(3)回転ブラケ
ットが予め定められた位置まで回転したことを検出手段
が検出したのち、トップブームを短縮し、(4)トップ
ブームが予め定められた位置まで短縮したことを検出手
段が検出したのち、トップブームの先端の左右方向の一
側に固着されたトップブームピンを、回転ブラケットの
後端の左右方向の一側の溝に係合させてロックする第1
ロック装置のロックを解除し、(5)第1ロック装置の
ロック解除が完了したことを検出手段が検出したのち、
補ジブの格納を開始する各工程を有することを特徴とす
るクレーン用補ジブの自動張り出し、格納方法。
6. A rotating bracket part which is mounted on a vehicle so as to be movable up and down and expands and contracts in multiple stages.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. In the overhanging and retracting method of (1), when the auxiliary jib is retracted, (1) after the detection means detects that the top boom has reached a predetermined length, the other side of the top boom tip in the left-right direction and the rotating bracket. After unlocking the second locking device that locks the other end of the rear end with the other side in the left-right direction with a pin, and (2) the detection means detects that the unlocking of the second locking device has been completed, the rotation bracket is removed. After storing, (3) the detection means detects that the rotation bracket has rotated to a predetermined position, the top boom is shortened, and (4) the top boom is predetermined. After the detection means detects that the top boom has been shortened to the retracted position, the top boom pin fixed to one side in the left and right direction of the tip of the top boom is engaged with the groove in the one side in the left and right direction at the rear end of the rotating bracket. 1st to let and lock
After unlocking the lock device, and (5) after detecting that the unlocking of the first lock device is completed,
A method for automatically projecting and storing a supplementary jib for a crane, which comprises steps for starting storage of the supplementary jib.
【請求項7】 車両に起伏自在に装着され、多段に伸縮
するブームの先端に、ブームに着脱される回転ブラケッ
ト部と、回転ブラケット部に起伏自在の補ジブを設け、
回転ブラケット部をブームに対して回動させることによ
り、作業時には前記ブームの前方に張り出し、格納時に
は前記ブームの側面に並設して格納する、補ジブ張り出
し、格納装置を備えたクレーン用補ジブの張り出し装置
において、補ジブを横方向に揺動する横抱き装置と、補
ジブとトップブームとを離脱あるいは連結する回転ブラ
ケット部と、トップブームと回転ブラケット部とをロッ
クする第1ロック装置および第2ロック装置と、ブーム
に対して回転ブラケット部を回転する回転装置とからな
ることを特徴とするクレーン用補ジブの自動張り出し、
格納装置。
7. A rotating bracket part which is mounted on a vehicle so as to be capable of undulating, and which is attached to and detached from the boom at a tip end of a boom which expands and contracts in multiple stages, and an undulating complementary jib is provided on the rotating bracket part.
By rotating the rotating bracket part with respect to the boom, the auxiliary jib for a crane is provided with a supplementary jib overhanging and retracting device that projects forward in front of the boom during work and is stored side by side on the side face of the boom during storage. In the overhanging device, a horizontal holding device that swings the auxiliary jib laterally, a rotating bracket portion that separates or connects the auxiliary jib and the top boom, a first locking device that locks the top boom and the rotating bracket portion, and a first locking device. 2 A locking device and a rotating device for rotating the rotating bracket part with respect to the boom, which automatically extends the auxiliary jib for a crane,
Storage device.
【請求項8】 トップブームと回転ブラケット部とをロ
ックする第1ロック装置および第2ロック装置とが、回
転ブラケット部の左右方向の一側に設けた溝と、トップ
ブームの左右方向の一側に固着したトップブームピンと
を係合させてロックする第1ロック装置と、回転ブラケ
ット部の左右方向の他側と、トップブームの左右方向の
他側とをピンによりロックする第2ロック装置とを具備
する請求項7記載のクレーン用補ジブの自動張り出し、
格納装置。
8. A groove provided on one side of the rotating bracket portion in the left-right direction and a first locking device and a second locking device for locking the top boom and the rotating bracket portion, and one side of the top boom in the left-right direction. A first locking device that locks by engaging a top boom pin that is fixed to the second locking device, and a second locking device that locks the other side of the rotating bracket part in the left-right direction and the other side of the top boom in the left-right direction by a pin. An automatic extension of the auxiliary jib for a crane according to claim 7,
Storage device.
【請求項9】 横抱き装置が、補ジブの一位置に固着さ
れたピンに係合する溝を有し、ブームの一位置に揺動自
在に装着されたリンクと、ブームとリンクとを連結する
横抱きシリンダと、補ジブの他位置に固着されたピンに
係合する溝を有し、ブームの他位置に固着されたブラケ
ットと、ブラケットに揺動自在に装着され、ピンに係合
するフックと、リンクとフックとを連結するロッドとを
備えた請求項7記載のクレーン用補ジブの自動張り出
し、格納装置。
9. A lateral holding device has a groove that engages with a pin fixed to one position of the auxiliary jib, and connects the link swingably attached to one position of the boom and the boom to the link. A horizontal holding cylinder, a bracket that has a groove that engages with a pin that is fixed to another position of the auxiliary jib, and that is fixed to another position of the boom, and a hook that is swingably attached to the bracket and that engages with the pin. The automatic projecting and retracting device for the auxiliary jib for a crane according to claim 7, further comprising: a rod connecting the link and the hook.
【請求項10】 回転ブラケット部が、その基端の左右
の一側に、トップブームの先端の左右の一側に垂直方向
に固着されたトップブームピンに係合する溝を備え、そ
の基端の左右の他側に、トップブームの先端の左右の他
側と垂直方向の連結ピンにより連結するピン穴を備え、
先端に補ジブを起伏自在に装着するピン穴を備え、上部
にブームに対して回転ブラケット部を回動する回転シリ
ンダ装着用のピンとを備えた請求項7記載のクレーン用
補ジブの自動張り出し、格納装置。
10. The rotating bracket portion is provided with a groove on one of the left and right sides of the base end thereof that engages with a top boom pin that is vertically fixed to one of the left and right sides of the tip end of the top boom. On the other side of the left and right of, there is a pin hole that connects with the other side of the left and right of the tip of the top boom by a connecting pin in the vertical direction,
8. An automatic projecting jib for a crane according to claim 7, wherein the tip has a pin hole for undulatingly mounting the auxiliary jib, and the upper part has a pin for mounting a rotary cylinder for rotating the rotary bracket part with respect to the boom. Storage device.
【請求項11】 第1ロック装置が、回転ブラケット部
に揺動自在に装着され、トップブームピンを回転ブラケ
ット部の溝とともに挾持するロックリンクと、回転ブラ
ケット部に装着され、ロックリンクを作動する第1ロッ
クシリンダとを備えた請求項7あるいは請求項8記載の
クレーン用補ジブの自動張り出し、格納装置。
11. A first locking device is swingably mounted on a rotating bracket part and holds a top boom pin together with a groove of the rotating bracket part, and a locking link mounted on the rotating bracket part to operate the locking link. The automatic projecting and retracting device for the auxiliary jib for a crane according to claim 7 or 8, further comprising a first lock cylinder.
【請求項12】 回転装置が、回転ブラケット部の後端
部の上面に固着されたピンに、一端を回転自在に軸着し
た第1レバーと、一端を第1レバーの他端に回転自在に
装着され、他端にトップブームに固着された回転支持ピ
ンに係合する溝を有する第2レバーと、第1レバーと回
転ブラケットとを連結する回転シリンダとを備えた請求
項7記載のクレーン用補ジブの自動張り出し、格納装
置。
12. A rotating device, wherein a first lever having one end rotatably attached to a pin fixed to an upper surface of a rear end portion of a rotating bracket portion and one end rotatably attached to the other end of the first lever. The crane according to claim 7, further comprising: a second lever attached to the other end, the second lever having a groove for engaging a rotation support pin fixed to the top boom, and a rotation cylinder connecting the first lever and the rotation bracket. Automatic extension and storage device for supplementary jib.
【請求項13】 第2ロック装置が、トップブームと回
転ブラケット部とを連結する上下2個の連結ピンと、中
央部を回転ブラケットに揺動自在に軸着されたレバー
と、レバーと回転ブラケット部とを連結する第2ロック
シリンダと、レバーの両端と連結ピンとを連結する2個
のリンクとを備えた請求項7あるいは請求項8記載のク
レーン用補ジブ自動張り出し、格納装置。
13. The second locking device comprises: two upper and lower connecting pins for connecting the top boom and the rotating bracket portion; a lever having a central portion swingably attached to the rotating bracket; and a lever and the rotating bracket portion. 9. The auxiliary jib automatic overhanging and storing device for a crane according to claim 7 or 8, further comprising a second lock cylinder for connecting the lever and two links for connecting both ends of the lever and the connecting pin.
【請求項14】 ブームとトップブームとの位置を検出
する検出手段と、補ジブを横方向に揺動する横抱き装置
の位置を検出する検出手段と、補ジブとトップブームと
を離脱あるいは連結する回転ブラケット部の離脱あるい
は連結を検出する検出手段と、トップブームと回転ブラ
ケット部とをロックおよびロック解除する第1ロック装
置および第2ロック装置のロックおよびロック解除を検
出する検出手段と、ブームに対して回転ブラケット部を
回転する回転装置の回転位置を検出する回転位置検出手
段と、とからなる請求項7記載のクレーン用補ジブの自
動張り出し、格納装置。
14. A detecting means for detecting the positions of the boom and the top boom, a detecting means for detecting the position of a lateral holding device for horizontally swinging the auxiliary jib, and a connecting or disconnecting the auxiliary jib and the top boom. A detecting means for detecting detachment or connection of the rotating bracket portion; a detecting means for detecting locking and unlocking of the first locking device and the second locking device for locking and unlocking the top boom and the rotating bracket portion; The automatic projecting and retracting device for a crane auxiliary jib according to claim 7, further comprising: a rotational position detecting means for detecting a rotational position of a rotating device that rotates the rotating bracket portion.
【請求項15】 請求項14において、検出手段の検出
結果を表示する表示手段とを、運転室内に備えたクレー
ン用補ジブの自動張り出し、格納装置。
15. A device for automatically projecting and storing a supplementary jib for a crane, comprising display means for displaying a detection result of the detection means in a driver's cab according to claim 14.
【請求項16】 ブームを予め定めた角度起立させ、補
ジブを予め定めた位置までチルトし、回転ブラケット部
を回転するときに、補ジブの重心位置が、ほぼ、回転ブ
ラケット部の回転軸の中心を通る垂線上にある請求項7
記載のクレーン用補ジブ自動張り出し、格納装置。
16. When the boom is erected at a predetermined angle, the auxiliary jib is tilted to a predetermined position, and the rotating bracket is rotated, the center of gravity of the auxiliary jib is almost the same as that of the rotating shaft of the rotating bracket. 8. A perpendicular line passing through the center.
Automatic extension and storage device for the auxiliary jib for the described crane.
【請求項17】 車両に起伏自在に装着され、多段に伸
縮するブームの先端に、ブームに着脱される回転ブラケ
ット部と、回転ブラケット部に起伏自在の補ジブを設
け、回転ブラケット部をブームに対して回動させること
により、作業時には前記ブームの前方に張り出し、格納
時には前記ブームの側面に並設して格納する、補ジブ張
り出し、格納装置を備えたクレーン用補ジブの張り出し
装置において、補ジブの起伏操作を行うチルトレバー
と、チルトレバーにより操作される方向切換弁と、チル
ト操作回路と、横抱き操作回路との切り換えを行う第1
電磁切換弁と、横抱きシリンダ用電磁操作弁と、チルト
操作回路と、第1ロック、第2ロック、および回転操作
回路との切り換えを行う第2電磁切換弁と、第1ロック
シリンダ用電磁操作弁と、第2ロックシリンダ用電磁操
作弁と、回転シリンダ用電磁操作弁とを備えたことを特
徴とするクレーン用補ジブ自動張り出し、格納装置。
17. A rotating bracket part which is mounted on a vehicle so as to be capable of being raised and lowered, and which is attached to and detached from the boom at a tip of a boom which expands and contracts in multiple stages, and an undulating complementary jib is provided on the rotating bracket part. The auxiliary jib overhanging device, which overhangs in front of the boom during work and is stored side by side on the side face of the boom during storage, is provided in the projecting device of the auxiliary jib for a crane equipped with a retracting device. A tilt lever for performing an up / down operation of a jib, a direction switching valve operated by the tilt lever, a tilt operation circuit, and a lateral holding operation circuit
Electromagnetic switching valve, electromagnetic holding valve for horizontal holding cylinder, tilt operating circuit, second lock valve for switching between first lock, second lock, and rotation operating circuit, and first lock cylinder solenoid operating valve And a second lock cylinder electromagnetically operated valve and a rotary cylinder electromagnetically operated valve.
【請求項18】チルトレバーにより操作される方向切換
弁と、横抱きシリンダ用電磁操作弁とを接続する回路の
一方に、および、チルトレバーにより操作される方向切
換弁と、第2ロックシリンダ用電磁操作弁とを接続する
回路の一方に、一方向弁を介装した請求項17記載のク
レーン用補ジブ自動張り出し、格納装置。
18. A direction switching valve operated by a tilt lever and a solenoid valve for a horizontal holding cylinder, and a direction switching valve operated by a tilt lever, and a solenoid for a second lock cylinder. The automatic jib automatic extension and storage device for a crane according to claim 17, wherein a one-way valve is provided in one of the circuits connecting to the operation valve.
【請求項19】 第1ロックシリンダ用電磁操作弁と、
回転シリンダ用電磁操作弁と、第2ロックシリンダ用電
磁操作弁と、第2電磁切換弁とを、回転ブラケットに装
着したことを特徴とする請求項17記載のクレーン用補
ジブ自動張り出し、格納装置。
19. A solenoid valve for a first lock cylinder,
The auxiliary jib automatic extension and storage device for a crane according to claim 17, wherein the rotary cylinder electromagnetic operation valve, the second lock cylinder electromagnetic operation valve, and the second electromagnetic switching valve are mounted on a rotary bracket. .
【請求項20】 第1ロックシリンダ用電磁操作弁と、
回転シリンダ用電磁操作弁と、第2ロックシリンダ用電
磁操作弁と、第2電磁切換弁とを、シリーズ回路により
接続した請求項17あるいは請求項19記載のクレーン
用補ジブ自動張り出し、格納装置。
20. A solenoid valve for a first lock cylinder,
20. The automatic auxiliary jib extension and storage device for a crane according to claim 17 or 19, wherein the electromagnetic operation valve for the rotary cylinder, the electromagnetic operation valve for the second lock cylinder, and the second electromagnetic switching valve are connected by a series circuit.
JP06052734A 1994-02-25 1994-02-25 Method and apparatus for automatically extending and storing crane auxiliary jib Expired - Fee Related JP3090393B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP06052734A JP3090393B2 (en) 1994-02-25 1994-02-25 Method and apparatus for automatically extending and storing crane auxiliary jib
TW085215623U TW345195U (en) 1994-02-25 1995-02-16 Automatic expansion, contractable apparatus for auxiliary hoisting arm of crane
CN95191934A CN1143353A (en) 1994-02-25 1995-02-22 Method and device for automatically stretching and storing a sub-jib for a crane
EP95909954A EP0747315A4 (en) 1994-02-25 1995-02-22 Method and device for automatically stretching and storing a sub-jib for a crane
KR1019960704490A KR970701150A (en) 1994-02-25 1995-02-22 METHOD AND DEVICE FOR AUTOMATICALLY STRETCHING AND STORING A SUB-JIB FOR ACRANE
PCT/JP1995/000252 WO1995023111A1 (en) 1994-02-25 1995-02-22 Method and device for automatically stretching and storing a sub-jib for a crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06052734A JP3090393B2 (en) 1994-02-25 1994-02-25 Method and apparatus for automatically extending and storing crane auxiliary jib

Publications (2)

Publication Number Publication Date
JPH07237888A true JPH07237888A (en) 1995-09-12
JP3090393B2 JP3090393B2 (en) 2000-09-18

Family

ID=12923167

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06052734A Expired - Fee Related JP3090393B2 (en) 1994-02-25 1994-02-25 Method and apparatus for automatically extending and storing crane auxiliary jib

Country Status (6)

Country Link
EP (1) EP0747315A4 (en)
JP (1) JP3090393B2 (en)
KR (1) KR970701150A (en)
CN (1) CN1143353A (en)
TW (1) TW345195U (en)
WO (1) WO1995023111A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09301682A (en) * 1996-05-09 1997-11-25 Kato Works Co Ltd Boom head housing mechanism of mobile crane
JP2017095221A (en) * 2015-11-20 2017-06-01 株式会社タダノ Adaptor
JP2020180008A (en) * 2015-11-20 2020-11-05 株式会社タダノ adapter

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11199177A (en) * 1998-01-09 1999-07-27 Kobe Steel Ltd Crane jib overhang and storage method and its device
CN102701087B (en) * 2012-06-12 2014-05-21 北京市三一重机有限公司 Arm frame and engineering machinery
DE102016009038B4 (en) * 2016-07-25 2018-02-08 Liebherr-Werk Ehingen Gmbh Folding tip linkage and method for assembling a folding tip

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49100360U (en) * 1972-12-20 1974-08-29
JPS5123961U (en) * 1974-08-09 1976-02-21
JPS52137469U (en) * 1976-04-13 1977-10-19
JPS55106991A (en) * 1979-02-05 1980-08-16 Shin Meiwa Ind Co Ltd Structure of connected portion of folded boom
JPS58144590U (en) * 1982-03-25 1983-09-29 日本車輌製造株式会社 Crane load calculation device display panel
JPS62103595U (en) * 1985-12-19 1987-07-01
JPH046640B2 (en) * 1986-07-21 1992-02-06 Tadano Kk
JPH0595981U (en) * 1992-05-29 1993-12-27 株式会社タダノ Jib turning device for crane with jib

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2661665B1 (en) * 1990-05-03 1992-09-04 Ppm Sa HANDLING BOOM COMPRISING A MAIN BOOM AND A COMPLEMENTARY BOOM.
JPH06239582A (en) * 1993-02-18 1994-08-30 Kobe Steel Ltd Wheel type crane
JP2583846Y2 (en) * 1993-04-02 1998-10-27 住友建機株式会社 Jib swing-out and storage device in the crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS49100360U (en) * 1972-12-20 1974-08-29
JPS5123961U (en) * 1974-08-09 1976-02-21
JPS52137469U (en) * 1976-04-13 1977-10-19
JPS55106991A (en) * 1979-02-05 1980-08-16 Shin Meiwa Ind Co Ltd Structure of connected portion of folded boom
JPS58144590U (en) * 1982-03-25 1983-09-29 日本車輌製造株式会社 Crane load calculation device display panel
JPS62103595U (en) * 1985-12-19 1987-07-01
JPH046640B2 (en) * 1986-07-21 1992-02-06 Tadano Kk
JPH0595981U (en) * 1992-05-29 1993-12-27 株式会社タダノ Jib turning device for crane with jib

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09301682A (en) * 1996-05-09 1997-11-25 Kato Works Co Ltd Boom head housing mechanism of mobile crane
JP2017095221A (en) * 2015-11-20 2017-06-01 株式会社タダノ Adaptor
JP2020180008A (en) * 2015-11-20 2020-11-05 株式会社タダノ adapter

Also Published As

Publication number Publication date
JP3090393B2 (en) 2000-09-18
EP0747315A1 (en) 1996-12-11
KR970701150A (en) 1997-03-17
TW345195U (en) 1998-11-11
CN1143353A (en) 1997-02-19
WO1995023111A1 (en) 1995-08-31
EP0747315A4 (en) 1997-06-04

Similar Documents

Publication Publication Date Title
JP2841016B2 (en) Operation control method and device for reach tower crane
CN1332872C (en) Crane with self-raising mast
CN110790165B (en) Safe hoisting operation method for drilling derrick
JPS6327396A (en) Jib extended to expansion boom
JPH07237888A (en) Method and device for automatically projecting and housing auxiliary jib for crane
KR100283237B1 (en) Jib protrusion, containment and method of crane
JP5117786B2 (en) Crane with jib
CN110821413B (en) Lifting system of drilling derrick
KR101981340B1 (en) Sub-boom device for high-lift working vehicle
JP2007238262A (en) Winch removal method for crane and revolving super structure
JP6559605B2 (en) Auxiliary lifting device and work machine with auxiliary lifting device
CN211081719U (en) Lifting system of drilling derrick
JP2834411B2 (en) Jib overhang and storage device for wheel crane
JP3100115B2 (en) Crane jib overhang, containment device
JPH10195927A (en) Fixing device telescopic cylinder for raising/lowering counterweight
CA2020112C (en) Delimber boom
JP6830513B2 (en) Auxiliary lifting device and hydraulic cylinder
JP4288106B2 (en) Safety equipment for aerial work platforms
JP2823065B2 (en) Auger screw attachment and detachment method for multi-axis auger machine
JP2022068772A (en) Hydraulic equipment control device
JP2828911B2 (en) Jib overhanging and retracting method of wheel type crane and apparatus therefor
JP3482363B2 (en) Work machine coupling device such as telescopic arm
JP2007175350A (en) Operation tool storage device
JP2001303613A (en) Connector and method of controlling connector
JP3841966B2 (en) Hose car lifting device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees