JPH11199177A - Crane jib overhang and storage method and its device - Google Patents

Crane jib overhang and storage method and its device

Info

Publication number
JPH11199177A
JPH11199177A JP334098A JP334098A JPH11199177A JP H11199177 A JPH11199177 A JP H11199177A JP 334098 A JP334098 A JP 334098A JP 334098 A JP334098 A JP 334098A JP H11199177 A JPH11199177 A JP H11199177A
Authority
JP
Japan
Prior art keywords
jib
boom
axis
center axis
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP334098A
Other languages
Japanese (ja)
Inventor
Hiroshi Miyazawa
洋 宮沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP334098A priority Critical patent/JPH11199177A/en
Priority to EP99100087A priority patent/EP0928770A1/en
Publication of JPH11199177A publication Critical patent/JPH11199177A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • B66C23/701Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic
    • B66C23/702Jibs constructed of sections adapted to be assembled to form jibs or various lengths telescopic with a jib extension boom

Abstract

PROBLEM TO BE SOLVED: To reduce a working labor burden by inclining a jib oscillation central shaft and a jib distortional rotation central line shaft against a shaft orthogonal with a boom shaft center and setting them roughly in parallel with each other so that they respectively become roughly vertical in a boom angle state in a jib trailing process. SOLUTION: A jib 2 is oscillated around a jib oscillation central shaft 7 as its center until a jib foot 17 of the jib 2 is overlapped with a jib installation bracket 11 of a boom 1 and they match with each other in the vertical direction by removing a jib head end fixing pin 10. In this state, a jib distortional rotation central shaft is inserted into a jib foot hole 17a and a jib installation hole 11a by straddling on them. Thereafter, a jib main body 13 is hung down around a horizontal shaft 14 as its center through a boom standing cylinder of the boom 1 and a jib standing cylinder 20 after removing an intermediate fixing pin 8. The installation pin is inserted in respective jib fitting hole 16a and jib installation hole 12a by straddling them by distortionally rotating the jib distortional rotation central shaft by roughly 180 deg. as its center and putting a jib fit 16 on a jib installation bracket 12 of the boom 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はホイールクレーン、
トラッククレーン等のクレーンにおいてジブを不使用時
にはブームの側面に格納し、使用時にブームの先端に張
出すジブ張出し、格納方法および同装置に関するもので
ある。
The present invention relates to a wheel crane,
The present invention relates to a jib overhang, a storage method, and an apparatus for storing a jib on a side surface of a boom when the jib is not used, and extending the jib to a tip of the boom when not in use.

【0002】[0002]

【従来の技術】従来、クレーンのジブ張出し、格納方法
として、伸縮ブームの側面に、基端部(所謂ジブフッ
ト)がブーム先端側を向く状態で格納したジブを、次の
各工程を経てブーム先端に張出し、これと逆の手順によ
って格納する方法が公知である。
2. Description of the Related Art Conventionally, as a method of extending and storing a jib of a crane, a jib in which a base end (a so-called jib foot) is stored on a side surface of a telescopic boom with the base end thereof facing the boom tip side is subjected to the following steps. It is known that the data is stored by the reverse procedure.

【0003】なお、ジブは、ブームの側面に、基端部が
ブームの伸縮作動の邪魔にならないようにブーム先端部
に対し側方に離れた状態で、中間部および先端部がブー
ム側面に固定されて格納される。
[0003] The jib is fixed to the side surface of the boom, with the base end portion being laterally away from the boom tip so that the base end does not hinder the extension and retraction of the boom. Is stored.

【0004】 ブーム水平状態で、ジブを、中間固定
部分に設けられたジブ揺動中心軸を中心として、基端部
一側がブーム先端部に重なり合う位置まで左右方向に揺
動させるジブ揺動工程。
A jib swinging step of swinging the jib in a horizontal direction around a jib swing center axis provided at an intermediate fixed portion to a position where one side of the base end overlaps the tip of the boom in a horizontal state of the boom.

【0005】 上記ジブ基端部一側をブーム先端部に
連結した状態で、ブームを起こして、ジブを、ジブ先端
部が地上面から離間する状態でブーム先端下方に垂下さ
せるジブ垂下工程。
[0005] A jib hanging process in which the boom is raised with the one side of the jib base end connected to the boom tip, and the jib is hung down below the boom tip with the jib tip separated from the ground surface.

【0006】 この垂下状態で、ジブの基端部他側が
ブーム先端部に連結可能な状態までジブをほぼ180°
捻転させるジブ捻転工程。
In this hanging state, the jib is rotated by approximately 180 ° until the other end of the jib can be connected to the boom tip.
A jib twisting process for twisting.

【0007】このジブ捻転後、ジブをブーム前方に起こ
してジブの張出しが完了する。
After twisting the jib, the jib is raised in front of the boom to complete the extension of the jib.

【0008】この従来技術においては、上記のジブ捻
転工程での捻転中心軸がブーム軸心と直交して設定され
ているため、この捻転中心軸が、ブーム水平状態では鉛
直となるが、ジブ捻転に当ってブームを起こした状態で
は後倒れに傾斜した状態となる。
In this prior art, the torsion center axis in the above-mentioned jib twisting step is set perpendicular to the boom axis, so that the torsion center axis is vertical when the boom is in a horizontal state. In a state where a boom is caused by hitting, a state of inclining backward is obtained.

【0009】従って、ジブを捻転させるときにジブの上
下移動を伴うため、大きな操作力を要し、作業員の労力
負担が大きくなるという問題があった。
Therefore, when the jib is twisted, the jib is moved up and down, so that a large operation force is required and there is a problem that the labor burden of the operator is increased.

【0010】そこで、この点の対策として、特開平9−
67087号公報に示されているように、ジブ捻転に当
ってブームを起こした状態でジブ捻転中心軸が鉛直とな
るように、同中心軸をブーム軸心と直交する軸に対して
傾斜する状態に設定することにより、ジブ捻転工程での
ジブの上下移動を無くしたものが提案された。
Therefore, as a countermeasure against this point, Japanese Unexamined Patent Publication No.
As shown in Japanese Patent No. 67087, a state in which the jib torsion is inclined with respect to an axis orthogonal to the boom axis so that the jib torsion center axis is vertical in a state where the boom is raised by hitting the jib torsion. , The vertical movement of the jib in the jib twisting step has been eliminated.

【0011】[0011]

【発明が解決しようとする課題】ところが、この公知技
術によると、次のような問題があった。
However, according to this known technique, there are the following problems.

【0012】ジブは、前記したようにジブ揺動工程で中
間固定機構に設けられた揺動中心軸を中心として揺動操
作される。
As described above, the jib is swung about the swing center axis provided in the intermediate fixing mechanism in the jib swinging step.

【0013】公知技術においては、このジブ中間固定機
構として、ジブ側およびブーム側にそれぞれ中間固定ブ
ラケットを設け、中間固定ピンをこの両側中間ブラケッ
トの穴にブーム軸心と平行(前後方向水平)に挿入し、
このピン挿入部分を揺動支点としている。
In the prior art, as the jib intermediate fixing mechanism, an intermediate fixing bracket is provided on each of the jib side and the boom side, and an intermediate fixing pin is inserted into a hole of each of the intermediate brackets on both sides so as to be parallel to the boom axis (horizontal direction). Insert
This pin insertion portion is used as a swing fulcrum.

【0014】しかし、この構成によると、ジブ捻転中心
軸を、ブーム軸心と直交する軸に対して傾斜(ブーム水
平状態で側面から見て前傾)させ、前後面から見て鉛直
にした場合、この捻転中心線上に配置されたジブ側の上
下の穴(以下、捻転中心穴という)の揺動による移動距
離が異なるため、ジブ揺動状態で、ブーム側とジブ側の
捻転中心穴が一致せず、捻転中心軸を挿入できなくな
る。
However, according to this configuration, the jib torsion center axis is inclined with respect to an axis orthogonal to the boom axis (forward inclined when viewed from the side in the horizontal state of the boom), and is made vertical when viewed from the front and rear surfaces. However, since the upper and lower holes on the jib arranged on the torsion center line (hereinafter referred to as torsion center holes) have different movement distances due to the swing, the torsion center holes on the boom side and the jib coincide in the jib swing state. Without this, the torsion center axis cannot be inserted.

【0015】なお、この場合、ジブ側およびブーム側の
捻転中心穴の径寸法を捻転中心軸よりもかなり大きく設
定すれば、捻転中心軸の挿入そのものは可能となるが、
強固なピン結合状態が要求されるブームとジブの結合に
は不都合である。
In this case, if the diameter of the torsion center holes on the jib side and the boom side is set to be considerably larger than the torsion center axis, the insertion of the torsion center axis itself becomes possible.
This is inconvenient for the connection between the boom and the jib, which requires a strong pin connection state.

【0016】また、捻転中心軸を、シリンダ軸心と直交
する軸に対して側面視で傾斜させ、前後面視でも傾斜さ
せれば上下の捻転中心穴を一致させることは可能である
が、捻転中心軸を鉛直にできず、結果、捻転時にジブの
上下移動が生じるため、この上下移動を無くするという
所期の目的が達成できない。
The upper and lower torsion center holes can be aligned by inclining the torsion center axis with respect to an axis orthogonal to the cylinder axis in a side view and also in an anteroposterior view. Since the center axis cannot be made vertical, and as a result, the jib moves up and down when twisting, the intended purpose of eliminating this up and down movement cannot be achieved.

【0017】さらに、中間固定ピンを縦軸(ブーム軸心
と直角)としても上記問題は解決できず、結局、上記公
知技術は現実には実施困難となる。
Further, even if the intermediate fixing pin is set to the vertical axis (perpendicular to the boom axis), the above-mentioned problem cannot be solved.

【0018】本発明は上記の事情に鑑み、ジブ捻転中心
軸を、ジブ垂下状態でほぼ鉛直となるようにブーム軸心
と直交する軸に対して傾斜させる構成を前提として、ジ
ブ揺動工程で捻転中心軸が挿入されるジブ側とブーム側
の上下の捻転中心穴を捻転中心線上で一致させることが
できるクレーンのジブ張出し、格納方法および同装置を
提供するものである。
In view of the above circumstances, the present invention is based on the premise that the jib torsion center axis is inclined with respect to an axis orthogonal to the boom axis so that the jib torsion axis is substantially vertical when the jib is suspended. An object of the present invention is to provide a crane jib extension and storage method and a crane that can align upper and lower torsion center holes on a jib side into which a torsion center axis is inserted and a boom side on a torsion center line.

【0019】[0019]

【課題を解決するための手段】請求項1の発明(ジブ張
出し、格納方法)は、伸縮自在なブームの側面に格納し
たジブを、下記(i)〜(iii)の各工程を経てブーム先端に
張出し、これと逆の工程を経て格納するクレーンのジブ
張出し、格納方法において、ジブ揺動工程におけるジブ
揺動中心軸、およびジブ捻転工程におけるジブ捻転中心
線軸を、それぞれジブ垂下工程でのブーム角度状態でほ
ぼ鉛直となるように、ブーム軸心と直交する軸に対して
傾斜してかつ互いにほぼ平行に設定したものである。
According to a first aspect of the present invention, there is provided a method for extending and storing a jib, comprising the steps of: In the method of extending and retracting the jib of the crane that stores the jib through the reverse process, the jib swing center axis in the jib swing process and the jib torsion center line axis in the jib twisting process are respectively set in the boom in the jib hanging process. It is set so as to be substantially vertical in the angled state, inclined with respect to an axis orthogonal to the boom axis and substantially parallel to each other.

【0020】(i) ジブの基端部一側がブーム先端部に
対して側方に離れた状態から連結可能な状態となるまで
ジブをジブ揺動中心軸を中心として左右方向に揺動させ
るジブ揺動工程。
(I) A jib for swinging the jib in the left-right direction about the jib swing center axis until one side of the base end of the jib is separated from the side of the boom to a state in which the jib can be connected. Swing process.

【0021】(ii) 上記ジブ基端部一側をブーム先端部
に連結した状態で、ブームを起こして、ジブを、ジブ先
端部が地上面から離間する状態でブーム先端下方に垂下
させるジブ垂下工程。
(Ii) A jib drooping in which the boom is raised and the jib is hung below the boom tip with the jib tip separated from the ground surface with the one end of the jib proximal end connected to the boom tip. Process.

【0022】(iii) このジブ垂下状態で、ジブ基端部
の他側がブーム先端部に連結可能な状態までジブを捻転
させるジブ捻転工程。
(Iii) A jib twisting step of twisting the jib in this hanging state until the other end of the jib base end can be connected to the boom tip.

【0023】請求項2の発明(ジブ張出し、格納装置)
は、伸縮自在なブームの側面に格納したジブを、下記
(i)〜(iii)の各工程を経てブーム先端に張出し、これと
逆の工程を経て格納するようにしたクレーンのジブ張出
し、格納装置において、ジブ揺動工程におけるジブ揺動
中心軸、およびジブ捻転工程におけるジブ捻転中心軸
を、それぞれジブ垂下工程でのブーム角度状態でほぼ鉛
直となるように、ブーム軸心と直交する軸に対して傾斜
してかつ互いにほぼ平行に設定したものである。
The invention according to claim 2 (jib overhang, storage device)
The jib stored on the side of the telescopic boom,
(i) to (iii) overhang to the end of the boom through the process, the jib overhang of the crane was stored through the reverse process, in the storage device, jib swing center axis in the jib swing process, and The jib torsion center axis in the jib torsion step is set to be inclined with respect to an axis orthogonal to the boom axis and to be substantially parallel to each other so that the jib torsion center axis is substantially vertical in a boom angle state in the jib hanging step. .

【0024】(i) ジブの基端部一側がブーム先端部に
対して側方に離れた状態から連結可能な状態となるまで
ジブをジブ揺動中心軸を中心として左右方向に揺動させ
るジブ揺動工程。
(I) A jib for swinging the jib in the left-right direction around the jib swing center axis until one side of the base end of the jib is separated from the side of the boom tip to a connectable state. Swing process.

【0025】(ii) 上記ジブ基端部一側をブーム先端部
に連結した状態で、ブームを起こして、ジブを、ジブ先
端部が地上面から離間する状態でブーム先端下方に垂下
させるジブ垂下工程。
(Ii) A jib drooping in which the boom is raised with the one side of the jib base end connected to the boom tip and the jib is hung down below the boom tip with the jib tip separated from the ground surface. Process.

【0026】(iii) このジブ垂下状態で、ジブ基端部
の他側がブーム先端部に連結可能な状態までジブを捻転
させるジブ捻転工程。
(Iii) A jib twisting step of twisting the jib in this hanging state until the other end of the jib base end can be connected to the boom tip.

【0027】請求項3の発明は、請求項2の構成におい
て、ジブが、ジブ本体と、このジブ本体の基端部にジブ
垂下工程でのジブ垂下中心軸まわりに回動可能に連結さ
れたジブブラケットとによって構成され、上記ジブブラ
ケットに、ジブ捻転工程でジブ捻転中心軸によってブー
ム先端部に連結されるブーム連結部が設けられたもので
ある。
According to a third aspect of the present invention, in the configuration of the second aspect, the jib is connected to the jib body and the base end of the jib body so as to be rotatable around the jib hanging center axis in the jib hanging process. The jib bracket is provided with a boom connecting portion connected to the boom tip by a jib torsion center axis in the jib torsion process.

【0028】請求項4の発明は、請求項2または3の構
成において、ジブおよびこのジブが格納されるブーム側
面に、ジブ垂下工程でジブ捻転中心軸まわりの回動を阻
止する係合手段が設けられたものである。
According to a fourth aspect of the present invention, in the configuration of the second or third aspect, the jib and the engaging means for preventing rotation about the jib torsion center axis in the jib hanging process are provided on the side surface of the boom in which the jib is stored. It is provided.

【0029】上記方法および装置によると、ジブ揺動工
程での揺動中心軸がジブ捻転中心軸とほぼ平行に設定さ
れているため、捻転中心軸をブーム軸心と直交する軸に
対して傾斜させる構成をとりながら、ジブ揺動によるジ
ブ側の上下の捻転中心穴の移動距離が等しくなり、この
ジブ側捻転中心穴をブーム側捻転中心穴に一致させるこ
とができる。
According to the above method and apparatus, since the swing center axis in the jib swing step is set substantially parallel to the jib twist center axis, the twist center axis is inclined with respect to the axis orthogonal to the boom axis. With this configuration, the movement distances of the upper and lower torsion center holes on the jib due to the jib swing become equal, and the jib-side torsion center holes can be made to coincide with the boom-side torsion center holes.

【0030】これにより、捻転中心軸をブーム軸心と直
交する軸に対して傾斜させる構成をとることが現実に可
能となる。
Thus, it is actually possible to adopt a configuration in which the torsion center axis is inclined with respect to an axis orthogonal to the boom axis.

【0031】また、請求項4の構成によると、ジブ垂下
工程中にジブが捻転中心軸を中心としてブーム側方に回
動(傾いたり倒れたり)するおそれがなくなる。
Further, according to the structure of the fourth aspect, the jib does not rotate (tilt or fall) around the torsion center axis toward the boom side during the jib hanging process.

【0032】[0032]

【発明の実施の形態】本発明の実施形態を図によって説
明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described with reference to the drawings.

【0033】各図において、1はブーム、2はジブであ
る。
In each figure, 1 is a boom and 2 is a jib.

【0034】また、図1において3はブーム1がブーム
フットピン4まわりに起伏自在に取付られたクレーン上
部旋回体の旋回フレームである。
In FIG. 1, reference numeral 3 denotes a revolving frame of a crane upper revolving unit in which the boom 1 is attached to the boom foot pin 4 so as to be able to move up and down.

【0035】ブーム1は、基本ブーム1aと、一乃至複
数段の中間ブーム1bと、先端ブーム1cとによって伸
縮自在に構成されている。
The boom 1 is configured to be extendable and contractable by a basic boom 1a, one or more intermediate booms 1b, and a tip boom 1c.

【0036】ジブ2は、不使用時には図1,2に示すよ
うにブーム1(基本ブーム1c)の左側面(旋回フレー
ム3側から見た左側面。以下でいう左右の方向性につい
て同じ)に格納され、使用時にブーム1(先端ブーム1
c)の先端に張出される。
When not used, the jib 2 is located on the left side of the boom 1 (basic boom 1c) as shown in FIGS. 1 and 2 (the left side as viewed from the revolving frame 3; the same applies to the left and right directions described below). It is stored and used when the boom 1 (tip boom 1)
It protrudes to the tip of c).

【0037】ブーム1には、ジブ2を格納するための構
成として、基本ブーム1aの左側面における中間部先端
寄りの位置に中間固定ブラケット5、基端部に先端固定
ブラケット6がそれぞれ設けられている。
The boom 1 is provided with a middle fixing bracket 5 at a position near the front end of the middle portion on the left side surface of the basic boom 1a, and a front end fixing bracket 6 at the base end as a structure for storing the jib 2. I have.

【0038】中間固定ブラケット5は、基本ブーム1a
に対しジブ揺動中心軸7まわりに回動可能に取付けら
れ、ジブ2がこの中間固定ブラケット5にブーム水平状
態での下側から嵌まり込んで左右方向水平な中間固定ピ
ン8で固定される。
The intermediate fixing bracket 5 is provided with the basic boom 1a.
The jib 2 is rotatably mounted around a jib swing center axis 7, and the jib 2 is fitted into the intermediate fixing bracket 5 from below in a boom horizontal state and is fixed by a horizontal horizontal fixing pin 8 in the left-right direction. .

【0039】先端固定ブラケット6は、図8に示すよう
に上側にブーム側方に長く突出する上側突片6a、下側
に短い下側突片6bをそれぞれ有し、ジブ2が両側突片
6a,6b間に位置する状態で、両側突片6a,6b
と、ジブ2に設けられたジブ側ブラケット9とに跨って
先端固定ピン10が差し込まれることによってジブ先端
部がブーム側面に固定される。
As shown in FIG. 8, the distal end fixing bracket 6 has an upper protruding piece 6a protruding long to the side of the boom, and a short lower protruding piece 6b on the lower side, and the jib 2 has both side protruding pieces 6a. , 6b, the two projecting pieces 6a, 6b
The jib tip is fixed to the boom side by inserting the tip fixing pin 10 across the jib side bracket 9 provided on the jib 2.

【0040】また、ブーム1には、ジブ2を張出すため
の構成として、先端ブーム1cの先端部左右両側にそれ
ぞれ上下一対のジブ取付ブラケット11,11,12,
12が側方に突出してかつ上下平行に設けられている。
The boom 1 is provided with a pair of upper and lower jib mounting brackets 11, 11, 12, 12 on the left and right sides of the distal end of the distal boom 1c, respectively, as a structure for extending the jib 2.
Numerals 12 protrude laterally and are provided vertically parallel.

【0041】この両側ジブ取付ブラケット11,11,
12,12には、それぞれジブ取付穴11a,11a,
12a,12aが設けられている。
The two jib mounting brackets 11, 11,
Jib mounting holes 11a, 11a,
12a are provided.

【0042】一方、ジブ2は、ジブ本体13と、このジ
ブ本体13の基端部に、ジブ垂下中心軸とジブ起伏中心
軸を兼ねる左右方向の水平軸14まわりに回動可能に連
結されたジブブラケット15とによって構成されてい
る。
On the other hand, the jib 2 is connected to the jib body 13 and a base end portion of the jib body 13 so as to be rotatable around a horizontal axis 14 in the horizontal direction which also serves as a jib hanging center axis and a jib up / down center axis. And a jib bracket 15.

【0043】ジブブラケット15には、格納状態での左
側上下にブーム連結部としての左側ジブフット16,1
6、右側上下に同右側ジブフット17,17がそれぞれ
設けられ、この両側ジブフット16,16,17,17
に、ジブ張出し時にブーム側ジブ取付ブラケット11,
11,12,12のジブ取付穴11a,11a,12
a,12aに一致するジブフット穴16a,16a,1
7a,17aが設けられている。
The jib bracket 15 has left and upper left and right jib feet 16 and 1 as a boom connecting portion in the retracted state.
6. The right side jib feet 17, 17 are provided on the upper and lower right sides, respectively, and these two side jib feet 16, 16, 17, 17 are provided.
When the jib is extended, the boom-side jib mounting bracket 11,
11, 12, 12 jib mounting holes 11a, 11a, 12
Jib foot holes 16a, 16a, 1 corresponding to a, 12a
7a and 17a are provided.

【0044】また、基本ブーム1aの先端部左側面に、
上端から下端までに亘って円弧状のガイドレール18が
設けられる一方、ジブ2の中間基端部寄りの位置にこの
ガイドレール18に沿って転動しうるガイドローラ19
(図4,5参照)が設けられている。
On the left side of the tip of the basic boom 1a,
An arcuate guide rail 18 is provided from the upper end to the lower end, and a guide roller 19 that can roll along the guide rail 18 at a position near the middle base end of the jib 2.
(See FIGS. 4 and 5).

【0045】また、ジブ2の中間部とジブブラケット1
5との間に、ジブ張出しシリンダを兼ねるジブ起伏シリ
ンダ(油圧シリンダ)20が設けられている。
The middle part of the jib 2 and the jib bracket 1
5, a jib hoisting cylinder (hydraulic cylinder) 20 also serving as a jib overhang cylinder is provided.

【0046】ジブ2は、格納状態では、図2,4に示す
ように、右側ジブフット17,17がブーム1の左側ジ
ブ取付ブラケット11,11に対して左側方に離れた位
置にある。
In the retracted state, as shown in FIGS. 2 and 4, the jib 2 is located at a position where the right jib foot 17, 17 is leftwardly separated from the left jib mounting brackets 11, 11 of the boom 1.

【0047】また、ジブ側のガイドローラ19も、ブー
ム側のガイドレール18に対して左側方に外れた位置に
ある。
The jib-side guide roller 19 is also located at a position deviated leftward from the boom-side guide rail 18.

【0048】さらに、図1に示すようにジブ起伏シリン
ダ20は伸長した状態となっている。
Further, as shown in FIG. 1, the jib hoist cylinder 20 is in an extended state.

【0049】ジブ2は、この状態から次の各工程を経て
張出される。
The jib 2 is extended from this state through the following steps.

【0050】(i) ジブ揺動工程 ジブ先端固定ピン10を取外す。(I) Jib swinging step The jib tip fixing pin 10 is removed.

【0051】図3,5に示すように、ジブ2の右側ジブ
フット17,17がブーム1の左側ジブ取付ブラケット
11,11に重なり合って互いのジブフット穴17a,
17aとジブ取付穴11a,11aが上下方向に一致す
るまで、ジブ2をジブ揺動中心軸7を中心として図4矢
印イ方向に揺動させる。
As shown in FIGS. 3 and 5, the right jib foot 17, 17 of the jib 2 overlaps the left jib mounting bracket 11, 11 of the boom 1 so that the jib foot holes 17a, 17a of each other.
The jib 2 is swung about the jib swing center shaft 7 in the direction indicated by the arrow in FIG. 4 until the jig mounting holes 11a and 11a coincide with the vertical direction.

【0052】この状態で、ジブ捻転中心軸21(前記し
たジブ先端固定ピン10を転用することができる)を上
記ジブフット穴17a,17aとジブ取付穴11a,1
1aとに跨って挿入する。
In this state, the jib torsion center shaft 21 (the jib tip fixing pin 10 can be diverted) is connected to the jib foot holes 17a, 17a and the jib mounting holes 11a, 1a.
1a.

【0053】(ii) ジブ垂下工程 中間固定ピン8を外した後、ブーム1を図示しないブー
ム起伏シリンダによって起こし、かつ、ジブ起伏シリン
ダ20を縮小させることにより、図6実線および図7の
二点鎖線で示すようにジブ本体13を水平軸14を中心
として垂下させる。
(Ii) Jib hanging process After the intermediate fixing pin 8 is removed, the boom 1 is raised by a boom hoist cylinder (not shown), and the jib hoist cylinder 20 is reduced, so that the two points shown by the solid line in FIG. The jib body 13 is hung around the horizontal axis 14 as shown by a chain line.

【0054】このときのブーム角度は、ジブ2の下端が
地上面から少し離間する角度とする。
The boom angle at this time is an angle at which the lower end of the jib 2 is slightly separated from the ground surface.

【0055】また、ジブ側のガイドローラ19は、ジブ
揺動操作によってガイドレール18に上方から臨み、ジ
ブ垂下初期にガイドレール18に係合した後、ジブ垂下
とともにガイドレール18に沿って転動する。
The jib-side guide roller 19 faces the guide rail 18 from above by a jib swing operation, engages with the guide rail 18 at the initial stage of jib hanging, and rolls along the jib hanging along the guide rail 18. I do.

【0056】これにより、ジブ垂下中にジブ本体13が
ジブ捻転軸21まわりにブーム側方に回動して傾いたり
倒れたりすることが防止される。
Thus, the jib body 13 is prevented from rotating around the jib torsion shaft 21 to the side of the boom and tilting or falling down during the hanging of the jib.

【0057】(iii) ジブ捻転工程 ジブ垂下後、図7実線および図5の二点鎖線で示すよう
に、ジブ2をジブ捻転中心軸21を中心として図5矢印
ロ方向にほぼ180°捻転させ、左側ジブフット16を
ブーム1の右側ジブ取付ブラケット12に重ね合わせ、
互いのジブフット穴16a,16aとジブ取付穴12
a,12aとに跨って右側ジブ取付ピン(図示しない)
を挿入する。
(Iii) Jib twisting step After the jib drooping, the jib 2 is twisted approximately 180 ° in the direction of arrow B in FIG. 5 about the jib twisting central axis 21 as shown by the solid line in FIG. 7 and the two-dot chain line in FIG. , The left jib foot 16 is superimposed on the right jib mounting bracket 12 of the boom 1,
The jib foot holes 16a, 16a of each other and the jib mounting holes 12
right jib mounting pin (not shown)
Insert

【0058】なお、この右側ジブ取付ピンは、図示しな
い油圧シリンダの遠隔操作によって挿入するようにして
もよいし、この後に行われるジブ起こし操作後、ブーム
1およびジブ2を倒伏させた状態で手動で挿入するよう
にしてもよい。
The right jib mounting pin may be inserted by remote operation of a hydraulic cylinder (not shown), or after the jib raising operation performed thereafter, the boom 1 and the jib 2 are manually turned down. May be inserted.

【0059】これにより、ジブ2の基端部がブーム先端
部に連結され、この後、ジブ起伏シリンダ20を伸長さ
せることにより、図7の一点鎖線で示すようにジブ2を
起こしてブーム前方に張出す。
As a result, the base end of the jib 2 is connected to the tip of the boom. After that, the jib up / down cylinder 20 is extended to raise the jib 2 as shown by the one-dot chain line in FIG. Overhang.

【0060】一方、ジブ2の格納は上記と逆の手順によ
って行う。
On the other hand, the storage of the jib 2 is performed in the reverse procedure.

【0061】ここで、 上記(i)のジブ揺動工程におけるジブ揺動中心と
なるジブ揺動中心軸7、 上記(iii)のジブ捻転工程におけるジブ捻転中心と
なるジブ捻転中心軸21 は、図6および図7の二点鎖線で示すジブ垂下状態でほ
ぼ鉛直(完全な鉛直またはこれにごく近い状態)となる
ように、ブーム軸心に直交する軸X(図6に示す)に対
して傾斜してかつ互いに平行に設定されている。
Here, the jib swing center axis 7 serving as the jib swing center in the jib swing step (i) and the jib twist center axis 21 serving as the jib torsion center in the jib twist step (iii) are as follows. An axis X (shown in FIG. 6) perpendicular to the boom axis is substantially vertical (complete vertical or very close to this) in a jib hanging state shown by a two-dot chain line in FIGS. 6 and 7. They are inclined and set parallel to each other.

【0062】なお、ここでいう「平行」は、完全平行だ
けでなく、これにごく近い状態をも含む。
The term "parallel" used herein includes not only completely parallel but also a state very close to this.

【0063】こうすれば、図4矢印方向のジブ揺動によ
るジブ2の右側上下のジブフット穴(ジブ側捻転中心
穴)17a,17aの移動距離が等しくなり、捻転中心
軸21をブーム軸心に直交する軸Xに対して傾斜させる
構成をとりながら、このジブ側捻転中心穴17a,17
aをブーム側捻転中心穴(左側ジブフット穴)11a,
11aに一致させることができる。
In this way, the moving distances of the jib foot holes (jib side torsion center holes) 17a, 17a on the right and upper sides of the jib 2 due to the jib swinging in the direction of the arrow in FIG. 4 become equal, and the torsion center axis 21 is set to the boom axis. The jib side torsion center holes 17a, 17 are tilted with respect to the orthogonal axis X.
a to the boom-side torsion center hole (left jib foot hole) 11a,
11a.

【0064】これにより、捻転中心軸21をブーム軸心
と直交する軸Xに対して傾斜させる構成をとることが現
実に可能となる。
As a result, it is actually possible to adopt a configuration in which the torsion center axis 21 is inclined with respect to the axis X orthogonal to the boom axis.

【0065】なお、図1に示すようにジブ先端固定ピン
10もジブ揺動軸7とほぼ平行に配置されている。
As shown in FIG. 1, the jib tip fixing pin 10 is also arranged substantially parallel to the jib swing shaft 7.

【0066】ところで、上記実施形態では、ジブ起伏シ
リンダ20を利用してジブ2を垂下させ、かつ、捻転後
に前方に起こすようにしたが、このジブ垂下およびジブ
起こし手段として、クレーン本体に搭載されたウィンチ
の巻上ロープを利用してもよい。
In the above embodiment, the jib 2 is hung down using the jib up / down cylinder 20 and is raised forward after the torsion. However, the jib 2 is mounted on the crane main body as the jib drooping and jib raising means. A winch hoisting rope may be used.

【0067】[0067]

【発明の効果】上記のように本発明によるときは、ジブ
揺動工程での揺動中心軸、およびジブ捻転工程における
ジブ捻転中心軸を、それぞれジブ垂下工程でのブーム角
度状態でほぼ鉛直となるように、ブーム軸心と直交する
軸に対して傾斜してかつ互いにほぼ平行に設定したか
ら、捻転中心軸をブーム軸心と直交する軸に対して傾斜
させる構成をとりながら、ジブ揺動によるジブ側の上下
の捻転中心穴の移動距離が等しくなり、このジブ側捻転
穴をブーム側捻転穴に一致させることができる。
As described above, according to the present invention, the swing center axis in the jib swinging step and the jib torsion center axis in the jib twisting step are substantially vertical in the boom angle state in the jib hanging down step. So that it is inclined with respect to the axis perpendicular to the boom axis and substantially parallel to each other. The movement distance of the upper and lower torsion center holes on the jib side becomes equal, and the jib side torsion holes can be matched with the boom side torsion holes.

【0068】これにより、捻転中心軸をブーム軸心と直
交する軸に対して傾斜させること、すなわち、ジブをほ
ぼ鉛直軸まわりに捻転させることが現実に可能となる。
As a result, it becomes practically possible to incline the torsion center axis with respect to the axis perpendicular to the boom axis, that is, to twist the jib about a substantially vertical axis.

【0069】また、請求項4の発明によると、ジブ垂下
工程中にジブが捻転軸を中心としてブーム側方に回動す
るおそれがなくなる。
Further, according to the fourth aspect of the present invention, there is no possibility that the jib rotates around the torsion axis toward the boom side during the jib hanging process.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態を示すジブ格納状態の概略側
面図である。
FIG. 1 is a schematic side view of a jib retracted state showing an embodiment of the present invention.

【図2】同平面図である。FIG. 2 is a plan view of the same.

【図3】ジブを図2の状態から揺動させた状態を示す概
略平面図である。
FIG. 3 is a schematic plan view showing a state where the jib is swung from the state shown in FIG. 2;

【図4】図2の状態の一部拡大図である。FIG. 4 is a partially enlarged view of the state of FIG. 2;

【図5】図3の状態の一部拡大図である。FIG. 5 is a partially enlarged view of the state of FIG. 3;

【図6】ジブを図3,5の状態から垂下させた状態を示
す概略側面図である。
FIG. 6 is a schematic side view showing a state where the jib is suspended from the state shown in FIGS.

【図7】ジブを垂下後に捻転させた状態を示す概略側面
図である。
FIG. 7 is a schematic side view showing a state in which the jib is twisted after hanging.

【図8】図1のVIII−VIII線拡大断面図である。FIG. 8 is an enlarged sectional view taken along line VIII-VIII of FIG. 1;

【符号の説明】[Explanation of symbols]

1 ブーム 2 ジブ 13 ジブ本体 15 ジブブラケット 14 ジブ垂下中心となる水平軸 16,16 ジブブラケットの左側ジブフット(ブーム
連結部) 17,17 同右側ジブフット(ブーム連結部) 17a,17a 右側ジブフット穴(ジブ側捻転中心
穴) 11,11 ブームの左側ジブ取付ブラケット 11a,11a ジブ取付穴(ブーム側捻転中心穴) 12,12 同右側ジブ取付ブラケット 7 ジブ揺動中心軸 21 ジブ捻転中心軸
1 boom 2 jib 13 jib body 15 jib bracket 14 horizontal axis which becomes the jib hanging center 16, 16 left jib foot (boom connection part) 17, 17 right jib foot (boom connection part) 17a, 17a right jib foot hole (jib) 11, 11a Left jib mounting bracket for the boom 11a, 11a Jib mounting hole (boom side torsion center hole) 12, 12 Right jib mounting bracket for the boom 7 Jib swing center axis 21 Jib torsion center axis

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 伸縮自在なブームの側面に格納したジブ
を、下記(i)〜(iii)の各工程を経てブーム先端に張出
し、これと逆の工程を経て格納するクレーンのジブ張出
し、格納方法において、ジブ揺動工程におけるジブ揺動
中心軸、およびジブ捻転工程におけるジブ捻転中心線軸
を、それぞれジブ垂下工程でのブーム角度状態でほぼ鉛
直となるように、ブーム軸心と直交する軸に対して傾斜
してかつ互いにほぼ平行に設定したことを特徴とするク
レーンのジブ張出し、格納方法。 (i) ジブの基端部一側がブーム先端部に対して側方に
離れた状態から連結可能な状態となるまでジブをジブ揺
動中心軸を中心として左右方向に揺動させるジブ揺動工
程。 (ii) 上記ジブ基端部一側をブーム先端部に連結した状
態で、ブームを起こして、ジブを、ジブ先端部が地上面
から離間する状態でブーム先端下方に垂下させるジブ垂
下工程。 (iii) このジブ垂下状態で、ジブ基端部の他側がブー
ム先端部に連結可能な状態までジブを捻転させるジブ捻
転工程。
1. A crane jib extension and storage in which a jib stored on a side surface of a telescopic boom is extended to the end of the boom through the following steps (i) to (iii), and stored in a reverse process. In the method, the jib swing center axis in the jib swing step, and the jib torsion center line axis in the jib torsion step, respectively, are substantially perpendicular to the boom angle state in the jib hanging step, so as to be perpendicular to the boom axis. A crane jib overhanging and retracting method characterized by being inclined with respect to and substantially parallel to each other. (i) A jib swinging step of swinging the jib in the left-right direction about the jib swing center axis until one side of the jib proximal end is separated from the side of the boom tip to a connectable state. . (ii) A jib hanging down step in which the boom is raised with the one side of the jib base end connected to the boom tip, and the jib is hung down below the boom tip with the jib tip separated from the ground surface. (iii) A jib twisting step of twisting the jib in the hanging state of the jib until the other end of the jib base end can be connected to the boom tip.
【請求項2】 伸縮自在なブームの側面に格納したジブ
を、下記(i)〜(iii)の各工程を経てブーム先端に張出
し、これと逆の工程を経て格納するようにしたクレーン
のジブ張出し、格納装置において、ジブ揺動工程におけ
るジブ揺動中心軸、およびジブ捻転工程におけるジブ捻
転中心軸を、それぞれジブ垂下工程でのブーム角度状態
でほぼ鉛直となるように、ブーム軸心と直交する軸に対
して傾斜してかつ互いにほぼ平行に設定したことを特徴
とするクレーンのジブ張出し、格納装置。 (i) ジブの基端部一側がブーム先端部に対して側方に
離れた状態から連結可能な状態となるまでジブをジブ揺
動中心軸を中心として左右方向に揺動させるジブ揺動工
程。 (ii) 上記ジブ基端部一側をブーム先端部に連結した状
態で、ブームを起こして、ジブを、ジブ先端部が地上面
から離間する状態でブーム先端下方に垂下させるジブ垂
下工程。 (iii) このジブ垂下状態で、ジブ基端部の他側がブー
ム先端部に連結可能な状態までジブを捻転させるジブ捻
転工程。
2. A jib for a crane, wherein the jib stored on the side surface of the telescopic boom is extended to the end of the boom through the following steps (i) to (iii) and stored in the reverse step. In the overhang and storage device, the jib swing center axis in the jib swinging step and the jib torsion center axis in the jib twisting step are each orthogonal to the boom axis so that they are substantially vertical in the boom angle state in the jib hanging down step. A crane jib overhanging and retracting device which is set to be inclined with respect to an axis to be rotated and substantially parallel to each other. (i) A jib swinging step of swinging the jib in the left-right direction about the jib swing center axis until one side of the jib proximal end is separated from the side of the boom to a connectable state. . (ii) A jib hanging down step in which the boom is raised with the one side of the jib base end connected to the boom tip, and the jib is hung down below the boom tip with the jib tip separated from the ground surface. (iii) A jib twisting step of twisting the jib in the hanging state of the jib until the other end of the jib base end can be connected to the boom tip.
【請求項3】 請求項2記載のクレーンのジブ張出し、
格納装置において、ジブが、ジブ本体と、このジブ本体
の基端部にジブ垂下工程でのジブ垂下中心軸まわりに回
動可能に連結されたジブブラケットとによって構成さ
れ、上記ジブブラケットに、ジブ捻転工程でジブ捻転中
心軸によってブーム先端部に連結されるブーム連結部が
設けられたことを特徴とするクレーンのジブ張出し、格
納装置。
3. The crane according to claim 2, wherein:
In the storage device, the jib includes a jib body and a jib bracket rotatably connected to a base end of the jib body around a jib hanging center axis in a jib hanging process. A jib extension and storage device for a crane, wherein a boom connecting portion connected to a boom tip by a jib torsion center axis in a twisting step is provided.
【請求項4】 請求項2または3記載のクレーンのジブ
張出し、格納装置において、ジブおよびこのジブが格納
されるブーム側面に、ジブ垂下工程でジブ捻転中心軸ま
わりの回動を阻止する係合手段が設けられたことを特徴
とするクレーンのジブ張出し、格納装置。
4. A jib extension and storage device according to claim 2, wherein the jib and a side surface of the boom in which the jib is stored are engaged with each other to prevent the jib from turning around a jib torsion center axis in a jib hanging process. A crane jib overhang and storage device, characterized in that means are provided.
JP334098A 1998-01-09 1998-01-09 Crane jib overhang and storage method and its device Pending JPH11199177A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP334098A JPH11199177A (en) 1998-01-09 1998-01-09 Crane jib overhang and storage method and its device
EP99100087A EP0928770A1 (en) 1998-01-09 1999-01-05 Method of projecting and housing jib of crane and apparatus thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP334098A JPH11199177A (en) 1998-01-09 1998-01-09 Crane jib overhang and storage method and its device

Publications (1)

Publication Number Publication Date
JPH11199177A true JPH11199177A (en) 1999-07-27

Family

ID=11554640

Family Applications (1)

Application Number Title Priority Date Filing Date
JP334098A Pending JPH11199177A (en) 1998-01-09 1998-01-09 Crane jib overhang and storage method and its device

Country Status (2)

Country Link
EP (1) EP0928770A1 (en)
JP (1) JPH11199177A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7337912B1 (en) * 2007-02-08 2008-03-04 Manitowoc Crane Companies, Inc. Automatically deployable boom extension and method of deploying same
CN102701087B (en) * 2012-06-12 2014-05-21 北京市三一重机有限公司 Arm frame and engineering machinery
CN109279549B (en) * 2017-07-20 2023-10-24 成都凯天电子股份有限公司 Folding, transporting and indexing connecting mechanism for aerial working platform

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6327396A (en) * 1986-07-21 1988-02-05 株式会社タダノ Jib extended to expansion boom
JP3258472B2 (en) * 1993-11-08 2002-02-18 株式会社小松製作所 Horizontal boom overhang, containment device
JP3090393B2 (en) * 1994-02-25 2000-09-18 株式会社小松製作所 Method and apparatus for automatically extending and storing crane auxiliary jib
JP3622798B2 (en) * 1995-08-30 2005-02-23 株式会社小松製作所 Jib overhang, storage device and method of mobile crane

Also Published As

Publication number Publication date
EP0928770A1 (en) 1999-07-14

Similar Documents

Publication Publication Date Title
JPH046640B2 (en)
JP2922778B2 (en) Counterweight removal equipment for work equipment
JPH11199177A (en) Crane jib overhang and storage method and its device
JP3299195B2 (en) Slope work vehicle
EP0728695A1 (en) Device for extending and storing horizontal boom
JP2781637B2 (en) Jib support rod mounting device for crane
JP4467691B2 (en) Aerial work platform
JP2018048014A (en) Method for assembling mobile crane
JP4191955B2 (en) Jib storage mechanism of crane equipment
JP2000191282A (en) Mobile crane device with auxiliary jib
JP5532838B2 (en) Work machine
JP3837655B2 (en) Tunnel wall covering method and tunnel concrete spraying apparatus
JP4420487B2 (en) Mobile crane device with auxiliary jib
JP2004314793A (en) Working machine
JP2000027225A (en) Working portion mounting/demounting device for working machine
JP3310937B2 (en) Slope work vehicle
JPH11270267A (en) Pile-driver
JPH0439296A (en) Crane jib overhanging and storing and its device
JP3366602B2 (en) Front attachment support device for ground excavator
JP2007137343A (en) Support device for working vehicle
JPH05263581A (en) Double pipe rod handling device
JPS5928699B2 (en) Pile driver assembly/storage device
JP3031883U (en) Auxiliary sheave device for crane
JPS6141748Y2 (en)
JPH1111877A (en) Jib accommodating device for on-vehicle crane

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20040918

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20041215