JPH07208067A - Underground structure and burying method thereof - Google Patents

Underground structure and burying method thereof

Info

Publication number
JPH07208067A
JPH07208067A JP1790294A JP1790294A JPH07208067A JP H07208067 A JPH07208067 A JP H07208067A JP 1790294 A JP1790294 A JP 1790294A JP 1790294 A JP1790294 A JP 1790294A JP H07208067 A JPH07208067 A JP H07208067A
Authority
JP
Japan
Prior art keywords
underground structure
earth
floor slab
pipe roof
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP1790294A
Other languages
Japanese (ja)
Other versions
JP3093555B2 (en
Inventor
Hidekazu Tanaka
秀和 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP06017902A priority Critical patent/JP3093555B2/en
Publication of JPH07208067A publication Critical patent/JPH07208067A/en
Application granted granted Critical
Publication of JP3093555B2 publication Critical patent/JP3093555B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To thicken a soil cover on an upper floor slab of an underground structure replaced by a pipe roof notwithstanding the pipe roof is buried in the shallow ground under a road. CONSTITUTION:Earth retaining walls 3 and 4 are projected to the upper surfaces of both front and rear ends of an upper floor slab 1a of an underground structure 1 to mount earth on the upper surface of the upper floor slab 1a, so that a sub-base course layer 9 reaching the height of the walls is provided. First of all, after a pipe roof 7 mounting an edge cutting plate 8 thereon is buried in a shallow position in the ground between vertical shafts A and B provided on both sides of a rail 6, the front end face side of the earth retaining wall of the upper floor slab of the underground structure 1 is pushed against the rear end of the pipe roof 7 in one shaft A, and the underground structure 1 is driven forward and buried in the other shaft B side while sliding and contacting the upper end face of the earth retaining wall 3 to the lower surface of the edge cutting plate 8. After it is buried, the underground structure 1 is constructed under the rail 6 through the sub-base course layer 9 by removing the edge cutting plate 8.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄道線路下や道路下等の
地中に地下構造物を埋設する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of burying an underground structure in the ground such as under a railway track or under a road.

【0002】[0002]

【従来の技術】従来から、例えば線路下の地中に、該線
路に対して交差する方向に通路等を形成するための地下
構造物を築造するには、図9に示すように線路Cを挟ん
だ両側に立坑A、Bを掘削したのち、上面に平帯板状の
縁切板Dを配設してなる多数本の鋼製角パイプを両立坑
A、B間の地中における計画地下構造物の上床版位置に
並列状態で圧入、埋設してパイプルーフEを形成し、次
いで、このパイプルーフE後端面に、前端側に掘削刃H
を装着している地下構造物Fの上床版fの前端面を当接
させると共に上記各縁切板Dの後端を一方の立坑A側に
固定したのち、地下構造物Fの後端をジャッキGにより
押し進めるか、或いは適宜な牽引手段で牽引することに
より、掘削刃Hで前方の地盤を掘削しながら縁切板Dを
ガイドして地下構造物Fを前進させてパイプルーフEと
置換することにより築造している。
2. Description of the Related Art Conventionally, for example, in order to construct an underground structure for forming a passage or the like in the ground below a track in a direction intersecting with the track, a track C is constructed as shown in FIG. After excavating vertical shafts A and B on both sides of the sandwich, a large number of steel square pipes with flat strip plate-shaped edge cutting plate D arranged on the upper surface are compatible. A pipe roof E is formed by press-fitting and embedding in parallel with the upper floor slab of the structure to form a pipe roof E, and then, on the rear end face of the pipe roof E, a drilling blade H on the front end side.
After abutting the front end face of the upper floor slab f of the underground structure F to which is attached and fixing the rear end of each of the edging plates D to one shaft A side, the rear end of the underground structure F is jacked. G is pushed forward by G or is pulled by an appropriate pulling means to guide the edge cutting plate D while excavating the front ground with the excavating blade H to advance the underground structure F to replace the pipe roof E. Is being built by.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記地
下構造物の築造方法によれば、予め地中の浅い位置にパ
イプルーフEを埋設しておくことによって地下構造物を
できるだけ浅い地中に埋設することができる利点を有す
るが、地下構造物Fの上床版fの上面を地中の浅い位置
に残置させた縁切板Dの下面に摺接させながら地下構造
物Fを埋設しているので、埋設後、縁切板Dを撤去する
と、地下構造物Fの上床版fに対する線路下の土被りG
が浅くなって線路Cの保守点検時にバラストの突き固め
用工具などが地下道構造物Fの上床版fに突き当たって
保守作業の妨げになるばかりでなく充分な突き固めが行
えないという問題点があった。
However, according to the method for constructing an underground structure, the underground structure is buried in the ground as shallow as possible by previously burying the pipe roof E at a shallow position in the ground. Although there is an advantage that the underground structure F is buried while sliding the upper surface of the upper floor slab f of the underground structure F to the lower surface of the edge cutting plate D left at a shallow position in the ground, After the burial, when the edge cutting plate D is removed, the earth cover G under the track with respect to the upper floor slab f of the underground structure F
As the track becomes shallower, a ballast compaction tool or the like hits the upper floor slab f of the underpass structure F during maintenance and inspection of the track C, which not only hinders maintenance work, but also cannot sufficiently compact the track. It was

【0004】このような問題点は、パイプルーフEの埋
設深さを予め深くしておくことによって解消し得るが、
そうするとパイプの推進、埋設時に該パイプが地中に存
在する転石等の障害物に突き当たった場合、地上側から
の掘削による障害物の撤去が困難となる。本発明はこの
ような問題点を解消し得る地下構造物とその埋設方法の
提供を目的とするものである。
Although such a problem can be solved by making the burying depth of the pipe roof E deep in advance,
Then, if the pipe hits an obstacle such as boulders existing in the ground during the propelling or burying of the pipe, it becomes difficult to remove the obstacle by excavation from the ground side. It is an object of the present invention to provide an underground structure and a method of burying it that can solve such problems.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に本発明の請求項1に記載した地下構造物は、上床版の
上面前端縁に一定高さの土砂止め壁を突設し、その突出
高さまで該上床版の上面に土砂を載置するように構成し
ている。また、請求項2に記載した地下構造物は、上記
請求項1に記載した発明において、上床版に積載した土
砂を複数枚の帯板材によって被覆し、該帯板材の前端を
上記土砂止め壁上に固着してなる構造としている。
In order to achieve the above object, the underground structure according to claim 1 of the present invention is such that an earth retaining wall having a constant height is projected from the front end edge of the upper surface of the upper floor slab, and The earth and sand are placed on the upper surface of the upper floor slab up to the protruding height. Further, in the underground structure described in claim 2, in the invention described in claim 1, the earth and sand loaded on the upper floor slab is covered with a plurality of strips, and the front end of the strip is placed on the earth retaining wall. It has a structure that is fixed to.

【0006】さらに、請求項1に記載した地下構造物の
埋設方法は、請求項3に記載しているように、上面に縁
切板を配設した複数本のパイプを地中の浅い位置に地表
に対して平行方向に並列状態に圧入してパイプルーフを
形成したのち、上床版の上面前端縁に一定高さの土砂止
め壁を突設し且つ該土砂止め壁の高さにまで上床版の上
面に土砂を載置してなる地下構造物の土砂止め壁の前面
を上記パイプルーフの後端に対向させ、上記縁切板を地
中に残置させた状態で地下構造物をその前方地盤を掘削
しながらこの縁切板の下面に沿って推進させることによ
りパイプルーフを押し進めながら縁切板の下方に埋設
し、しかるのち縁切板を撤去することを特徴とするもの
である。
Further, according to the method of burying an underground structure described in claim 1, as described in claim 3, a plurality of pipes having an edge cutting plate on the upper surface are placed at a shallow position in the ground. After forming a pipe roof by press-fitting parallel to the ground surface in a parallel state, a sediment retaining wall of a certain height is projected on the front end edge of the upper surface of the upper floor slab, and the upper floor slab reaches the height of the earth retaining wall. The front surface of the earth retaining wall of the underground structure where the earth and sand are placed on the upper surface of the above is opposed to the rear end of the pipe roof, and the underground structure is placed in the front ground with the edge cutting plate left in the ground. It is characterized in that it is buried below the edge cutting plate while pushing the pipe roof by propelling it along the lower surface of the edge cutting plate while excavating the edge cutting plate, and then removing the edge cutting plate.

【0007】また、請求項2に記載した地下構造物の埋
設方法は、請求項4に記載しているように、上記請求項
3に記載した方法において、地中に埋設したパイプルー
フを地下構造物の前端面で押し進めながら縁切板の下面
に地下構造物の上床版上の土砂を被覆した帯板材を摺接
させて推進させることにより地下構造物を縁切板の下方
に埋設し、しかるのち、帯板材と縁切板を撤去すること
を特徴とするものである。
The underground structure burying method according to a second aspect is the method according to the third aspect, as described in the fourth aspect, in which the pipe roof buried underground is underground. While pushing forward with the front end surface of the object, the underground plate is buried under the edge plate by sliding the strip plate material covered with the earth and sand on the upper deck of the underground structure to the lower surface of the edge plate, and propelling it. After that, the strip plate material and the edging plate are removed.

【0008】[0008]

【作用】上床版の前端縁に一定高さの土砂止め壁を突設
している地下構造物をパイプルーフと置換しながら地中
に推進埋設する際に、この地下構造物の上床版の上面に
土砂止め壁の高さに達する土砂を積載しておくと共にパ
イプルーフの上面に載置している縁切板をパイプルーフ
との連結を解き且つ地盤に対して不動状態に固定する。
この状態にして地下構造物を推進してパイプルーフと置
換していくと、地下構造物の上面前端縁に突設している
土砂止め壁の上端面が縁切板の下面に沿って前進し、該
土砂止め壁によって上床版の上面に積載した土砂が前方
の地盤からの影響を受けるのを防止されながら地下構造
物と一体的に地中に推進、埋設される。この際、上床版
の上面に積載した土砂を複数枚の帯板材によって被覆し
ておけば、該土砂が縁切材との摩擦によって後方に移動
するのを確実に阻止し得る。
[Operation] When substituting a pipe roof with an underground structure projecting a sand retaining wall of a certain height at the front edge of the upper floor slab and burying it underground, the upper surface of the upper floor slab of this underground structure The earth and sand reaching the height of the earth and sand stop wall are loaded on the plate, and the edge cutting plate placed on the upper surface of the pipe roof is released from the connection with the pipe roof and fixed immovably to the ground.
When propelling the underground structure and replacing it with the pipe roof in this state, the upper end surface of the earth retaining wall protruding from the front edge of the upper surface of the underground structure moves forward along the lower surface of the edging plate. The earth and sand loaded on the upper surface of the upper floor slab is prevented from being influenced by the ground in front of the earth and sand by the earth and sand retaining wall, and is propelled and buried in the ground integrally with the underground structure. At this time, by covering the earth and sand loaded on the upper surface of the upper floor slab with a plurality of strips, it is possible to reliably prevent the earth and sand from moving backward due to friction with the edge cutting material.

【0009】地下構造物の埋設後において、地中に残置
している縁切板を撤去すると、地下構造物の上面に積載
している土砂が路盤層となり、地下構造物と置換される
パイプルーフを予め地中の浅い位置に埋設しておいて
も、地下構造物が路盤層に厚みだけ地表面から深く埋設
されて地下構造物の上面に所定厚みの土被りを形成する
ことができる。なお、請求項2に記載した地下構造物の
場合には、埋設後、縁切板と共に帯板材も撤去する。
After burying an underground structure, if the edge cutting plate remaining in the ground is removed, the earth and sand loaded on the upper surface of the underground structure will become a roadbed layer and will be replaced with the underground structure. Even if is buried in a shallow position in the ground in advance, the underground structure can be buried deep in the roadbed layer from the ground surface by a thickness to form an earth cover having a predetermined thickness on the upper surface of the underground structure. In the case of the underground structure described in claim 2, the strip plate material is removed together with the edge cutting plate after the burial.

【0010】[0010]

【実施例】本発明の実施例を図面について説明すると、
図3は地下構造物1の一例を示すもので、この地下構造
物1は上下床版1a、1bと両側版1c、1cとで断面四角形状
の函体に形成されてあり、その内部を前後端が開口した
通路2に形成してある。さらに、上床版1aの上面におけ
る前後端部に全幅に亘って一定高さを有する土砂止め壁
3、4を突設してあり、これらの前後土砂止め3、4間
で囲まれた上床版1aの上面空間部を路盤層形成空間部5
としている。
Embodiments of the present invention will now be described with reference to the drawings.
FIG. 3 shows an example of the underground structure 1, which is composed of upper and lower floor slabs 1a and 1b and both side plates 1c and 1c in a box-shaped body having a rectangular cross section. It is formed in the passage 2 having an open end. Further, earth and sand retaining walls 3 and 4 having a constant height over the entire width are projectingly provided at the front and rear ends on the upper surface of the upper floor slab 1a. The upper surface space part of the roadbed layer forming space part 5
I am trying.

【0011】このように構成した地下構造物1を線路6
の下方の地中に埋設して線路6に直交する通路の築造方
法を述べると、まず、図4に示すように線路6を挟んで
該線路6の両側方に築造すべき通路の長さ間隔を存して
立坑A、Bを掘削したのち、上面に鋼板よりなる平帯形
状の縁切板8を載置してなる多数本の鋼製角パイプ7aを
一方の立坑A側から他方の立坑B間に貫通させるように
して線路6直下の地中の浅い部分に並列状態で水平に圧
入、埋設して上記地下構造物1と略同幅のパイプルーフ
7を形成する(図2、図5)。
The underground structure 1 constructed in this manner is used as a line 6
A method of constructing a passage that is buried in the ground below and is orthogonal to the line 6 will be described. First, as shown in FIG. 4, the length intervals of the passages to be built on both sides of the line 6 with the line 6 interposed therebetween. After excavating the vertical shafts A and B, a large number of steel square pipes 7a, each having a flat strip-shaped edge cutting plate 8 made of a steel plate placed on the upper surface thereof, are connected from one vertical shaft A side to the other vertical shaft. The pipe roof 7 having a width substantially the same as that of the underground structure 1 is formed by horizontally press-fitting and embedding in a parallel state in a shallow portion of the ground directly below the line 6 so as to penetrate between the Bs (FIGS. 2 and 5). ).

【0012】角パイプ7aの埋設作業は、公知のようにそ
の内部に配設したオーガスクリューによって前方の地盤
を掘削しながら行い、さらに、隣接する角パイプ7a同士
は互いにその対向側面に突設した断面L字状の係合金具
を互いに係合させながら並列状態に埋設される。この
際、角パイプ7a上に載置している縁切板8の前端を角パ
イプ7aの前端に溶接等によって一体的に固着した状態で
埋設し、パイプルーフ7の形成後、その固着部分を切除
すると共に縁切板8の後端を一方の立坑A側の適所に固
定して縁切板8を不動にする。
The burial work of the square pipes 7a is carried out while excavating the ground in front by an auger screw disposed inside the square pipes 7a, and the adjacent square pipes 7a are protruded from the opposite side surfaces thereof. The engaging fittings having an L-shaped cross section are embedded in parallel while engaging with each other. At this time, the front end of the edging plate 8 placed on the square pipe 7a is embedded in the front end of the square pipe 7a in an integrally fixed state by welding or the like, and after the pipe roof 7 is formed, the fixed portion is fixed. At the same time as cutting, the rear end of the edging plate 8 is fixed at a proper position on the side of one of the shafts A to immobilize the edging plate 8.

【0013】なお、埋設長さが長い場合には角パイプ7a
および縁切板8を長さ方向に複数分割し、先に圧入、埋
設した分割パイプの後端に次の分割パイプをボルト、ナ
ット等で一体的に連結しながら順次埋設すればよい。こ
の時、最初に埋設する分割パイプの前端とその上面に載
置した縁切板の前端とを溶接等によって固着し、以後の
分割パイプ上の縁切板は順次溶接等によって一体に連結
していけばよい。
If the buried length is long, the square pipe 7a
The edge plate 8 may be divided into a plurality of pieces in the lengthwise direction, and the next divided pipe may be sequentially embedded at the rear end of the divided pipe that has been press-fitted and embedded first while integrally connecting the next divided pipe with bolts, nuts and the like. At this time, the front end of the split pipe to be buried first and the front end of the edging plate placed on the upper surface thereof are fixed by welding or the like, and the edging plates on the subsequent split pipes are sequentially connected integrally by welding or the like. Go!

【0014】こうして両立坑A、B間の線路下にパイプ
ルーフ7を形成したのち、一方の立坑A内に地下構造物
1を配設すると共に該地下構造物1の上床版1a上の路盤
層形成空間部5に土砂を前後土砂止め壁3、4の高さに
達するまで積載して路盤層9を形成する。なお、この路
盤層9は単なる土砂以外に砂利や砂に低強度のコンクリ
ートを混合してなるものであってもよい。
After the pipe roof 7 is formed under the track between the compatible shafts A and B in this way, the underground structure 1 is arranged in one of the shafts A and the subbase layer on the upper floor slab 1a of the underground structure 1 is arranged. Earth and sand are loaded in the formation space 5 until the height of the front and rear earth and sand stop walls 3 and 4 is reached to form the roadbed layer 9. The roadbed layer 9 may be gravel or sand mixed with low-strength concrete, in addition to simple earth and sand.

【0015】この地下構造物1の前側土砂止め壁3の前
面を上記パイプルーフ7の後端面に対向させ、図1に示
すように立坑A内において坑壁に反力支持板11を介して
受止させた油圧ジャッキ10のピストンロッドを伸長させ
ることにより地下構造物1を推進させるようにする。こ
の際、パイプルーフ7の後端面に地下構造物1の前側土
砂止め壁3の前面を直接、当接させた状態にすると共に
地下構造物1の開口前端に刃口12を装着して該刃口12に
より前方の地盤を掘削しながら地下構造物1を推進さ
せ、パイプルーフ7を土砂止め壁3で押し進めて地下構
造物1の上床版1aと置換させてもよいが、パイプルーフ
7の後端面と地下構造物1の前端面との間に矩形状の当
枠13を介在させている。
The front surface of the front side debris retaining wall 3 of the underground structure 1 is opposed to the rear end surface of the pipe roof 7, and as shown in FIG. The underground rod 1 is propelled by extending the piston rod of the stopped hydraulic jack 10. At this time, the front surface of the front side debris retaining wall 3 of the underground structure 1 is directly brought into contact with the rear end surface of the pipe roof 7, and a blade opening 12 is attached to the opening front end of the underground structure 1 to cut the blade. The underground structure 1 may be propelled while excavating the ground in front by the mouth 12, and the pipe roof 7 may be pushed forward by the earth retaining wall 3 to replace the upper floor slab 1a of the underground structure 1, but after the pipe roof 7 A rectangular frame 13 is interposed between the end face and the front end face of the underground structure 1.

【0016】この当枠13は、その上枠部13a をパイプル
ーフ7の全幅に亘って該パイプルーフ7の後端面に当接
させる水平枠部に形成していると共に両側枠部13c 、13
c と下枠部13b を地下構造物1の両側版1c、1cと下床版
1bの前端面にそれぞれ当接させる枠部に形成している。
さらに、当枠13の開口前端にはパイプルーフ7の下方地
盤を掘削する矩形状の上記刃口12を一体的に突設してあ
る。
The frame 13 has an upper frame portion 13a formed in a horizontal frame portion which abuts the rear end surface of the pipe roof 7 over the entire width of the pipe roof 7, and both side frame portions 13c, 13c.
c and the lower frame 13b are the two-sided slabs 1c and 1c of the underground structure 1 and the lower floor slab.
It is formed on the frame portion that abuts on the front end surface of 1b.
Further, at the front end of the opening of the frame 13, the rectangular blade 12 for excavating the lower ground of the pipe roof 7 is integrally projected.

【0017】この当枠13をパイプルーフ7と地下構造物
1との間に介在させ、地下構造物1の前側土砂止め壁3
の上端面を縁切板8の後端部下面に摺接させた状態にし
て地下構造物1の後端面を押圧する油圧ジャッキ10のピ
ストンロッドを伸長させることにより地下構造物1を推
進させると、当枠13が一体的に前進してその上枠部13a
によりパイプルーフ7を押し進めると共に刃口12により
前方地盤を掘削する一方、刃口12によって掘削されない
地盤は地下構造物1の内部の通路2を通じて適宜な掘削
具により掘削し、掘削された土砂を立坑A側に排出する
と共に他方の立坑B側に押し出されるパイプルーフ7の
前端部を切り離して撤去する。
The frame 13 is interposed between the pipe roof 7 and the underground structure 1, and the front side sediment retaining wall 3 of the underground structure 1
When the underground structure 1 is propelled by extending the piston rod of the hydraulic jack 10 which presses the rear end surface of the underground structure 1 with the upper end surface of the sliding contact with the lower surface of the rear end portion of the edging plate 8. , The frame 13 integrally moves forward and its upper frame portion 13a
While pushing forward the pipe roof 7 and excavating the front ground by the blade 12, the ground not excavated by the blade 12 is excavated by an appropriate excavator through the passage 2 inside the underground structure 1, and the excavated earth and sand is pitted. The front end of the pipe roof 7 that is discharged to the A side and is pushed to the other vertical shaft B side is separated and removed.

【0018】地下構造物1が一定長、地中に推進、埋入
すると、反力支持板11を継ぎ足す等して油圧ジャッキ10
の位置を前方に移動させ、再び、上記同様にして該油圧
ジャッキ10を作動させることにより地下構造物1を一定
長、推進させる。なお、油圧ジャッキ10の押圧力で地下
構造物1を推進させる方法に替えて、他方の立坑B側か
らの牽引によって推進させてもよく、又、両方を併用し
てもよい。
When the underground structure 1 is propelled and buried in the ground for a certain length, the reaction force support plate 11 is added to the hydraulic jack 10 to replenish it.
Is moved forward and the hydraulic jack 10 is operated again in the same manner as above to propel the underground structure 1 for a certain length. In addition, instead of the method of propelling the underground structure 1 by the pressing force of the hydraulic jack 10, it may be propelled by pulling from the other shaft B side, or both may be used together.

【0019】地下構造物1が推進すると、その上床版1a
の上面に積載している土砂堆積層からなる路盤層9の上
面が縁切板8の下面に摺接しながらパイプルーフ7の埋
設跡に移動する。この際、前後土砂止め壁3、4によっ
て路盤層9が地盤からの影響を受けるのを防止され、地
下構造物1の上床版1a上に積載された状態を維持する。
また、他方の立坑B側に達するパイプルーフ7及び刃口
12を装着した当枠13を撤去する。
When the underground structure 1 is promoted, its upper floor slab 1a
The upper surface of the roadbed layer 9 made of a sediment layer on the upper surface moves to the buried mark of the pipe roof 7 while slidingly contacting the lower surface of the edging plate 8. At this time, the roadbed layer 9 is prevented from being affected by the ground by the front and rear debris retaining walls 3 and 4, and the state of being loaded on the upper floor slab 1a of the underground structure 1 is maintained.
Further, the pipe roof 7 and the blade opening reaching the other shaft B side
This frame 13 with 12 is removed.

【0020】こうして、地下構造物1を両立坑A、B間
に亘って埋設すると、線路6を敷設したバラスト14と地
下構造物1の上床版1aとの間に路盤層9が介在した状態
となり、地下構造物1の埋設後に縁切板8を抜き取り等
により撤去することによって図6に示すように、バラス
ト14が路盤層9上に支持された構造となる。なお、パイ
プルーフ7の埋設時には線路6の両側方に沿って設けら
れている配線用等の側溝15の一部が撤去されるので、縁
切板8の撤去後において、線路6の両側方に露出する路
盤層9の側部に該側溝15を復旧する。
Thus, when the underground structure 1 is buried between the compatible shafts A and B, the roadbed layer 9 is interposed between the ballast 14 on which the track 6 is laid and the upper floor slab 1a of the underground structure 1. As shown in FIG. 6, the ballast 14 is supported on the roadbed layer 9 by removing the edge cutting plate 8 by taking out after the underground structure 1 is buried. When the pipe roof 7 is buried, part of the gutters 15 for wiring etc. provided along both sides of the line 6 are removed, so that after the edge cutting plate 8 is removed, both sides of the line 6 are removed. The side groove 15 is restored on the exposed side portion of the roadbed layer 9.

【0021】図7は本発明地下構造物の別な実施例を示
すもので、上記地下構造物1において、その上床版1aの
上面に積載した土砂よりなる路盤層9を長さが地下構造
物1の長さに略等しい適宜幅を有する複数枚の薄鋼板よ
りなる帯板材16によって被覆してなる構造としている。
即ち、帯板材16を前後土砂止め壁3、4の上面間に架設
状態で並設して路盤層9を被覆し、各帯板材16の前端部
を前側土砂止め壁3の上面に皿螺子等の適宜な固定手段
によって固着してある。
FIG. 7 shows another embodiment of the underground structure of the present invention. In the above-mentioned underground structure 1, a subbase layer 9 made of earth and sand loaded on the upper surface of the upper floor slab 1a is an underground structure having a length. The strip member 16 is made of a plurality of thin steel plates each having an appropriate width substantially equal to the length 1.
That is, the strip plate material 16 is installed side by side between the upper surfaces of the front and rear sediment retaining walls 3 and 4 to cover the roadbed layer 9, and the front end portion of each strip material 16 is set on the upper surface of the front sediment retaining wall 3 with a flat head screw or the like. It is fixed by an appropriate fixing means.

【0022】この地下構造物1を両立坑A、B間の地中
に埋設する方法としては、パイプルーフ7を他方の立坑
側に押し出しながら帯板材16を縁切板8の下面に摺接さ
せ、埋設後に縁切板8と共に帯板材16を撤去する以外は
上記方法と同様である。
As a method of burying the underground structure 1 in the ground between the compatible pits A and B, the strip plate material 16 is slidably contacted with the lower surface of the edging plate 8 while pushing the pipe roof 7 to the other vertical shaft side. The same as the above method except that the strip plate material 16 is removed together with the edge cutting plate 8 after the burying.

【0023】即ち、上記方法において説明したように、
両立坑A、B間の線路下の浅い地中にパイプルーフ7を
形成したのち、一方の立坑A内においてパイプルーフ7
の後端面に地下構造物1の前側土砂止め壁3の前面を直
接、当接させるか或いは当枠13を介して当接させ、油圧
ジャッキ10のピストンロッドを伸長させることにより地
下構造物1を推進させる。この際、パイプルーフ7上の
縁切板8の前端をパイプルーフ7の前端から切り離して
おくと共にその後端を立坑Aの適所に固定しておく。
That is, as described in the above method,
After forming the pipe roof 7 in the shallow ground under the track between the compatible shafts A and B, the pipe roof 7 is formed in one of the shafts A.
The front end of the front side debris retaining wall 3 of the underground structure 1 is directly brought into contact with the rear end face of the underground structure 1, or is brought into contact with the same through the frame 13, and the piston rod of the hydraulic jack 10 is extended to extend the underground structure 1. To promote. At this time, the front end of the edging plate 8 on the pipe roof 7 is separated from the front end of the pipe roof 7, and the rear end thereof is fixed at a proper position on the vertical shaft A.

【0024】地下構造物1の推進させると、当枠13が一
体的に前進してその上枠部13a によりパイプルーフ7を
押し進めると共に刃口12により前方地盤を掘削する一
方、刃口12によって掘削されない地盤は地下構造物1の
内部の通路2を通じて適宜な掘削具により掘削し、掘削
された土砂を立坑A側に排出すると共に他方の立坑B側
に押し出されるパイプルーフ7の前端部を切り離して撤
去する。地下構造物1の推進に従って前後土砂止め壁
3、4の上面間に並設した帯板材16が図8に示すよう
に、縁切板8の下面に摺接しながら地下構造物1と一体
的に前進し、上床版1a上に積載した路盤層が縁切板8と
の摺接により後方に移動するのを阻止する。
When the underground structure 1 is propelled, the frame 13 is integrally advanced to push the pipe roof 7 by the upper frame portion 13a thereof and the front ground is excavated by the blade opening 12, while the excavation is made by the blade opening 12. The ungrounded ground is excavated by an appropriate excavator through the passage 2 inside the underground structure 1, the excavated earth and sand is discharged to the vertical shaft A side, and the front end portion of the pipe roof 7 pushed to the other vertical shaft B side is cut off. To remove. In accordance with the promotion of the underground structure 1, the strip plate material 16 provided in parallel between the upper surfaces of the front and rear debris retaining walls 3 and 4 slides on the lower surface of the edging plate 8 and integrally with the underground structure 1, as shown in FIG. The roadbed layer that moves forward and is loaded on the upper floor slab 1a is prevented from moving rearward by sliding contact with the edge cutting plate 8.

【0025】こうして、地下構造物1を立坑A、B間の
地中に埋設すると、線路6を敷設したバラスト14と地下
構造物1の上床版1aとの間に縁切板8及び帯板材16を介
して路盤層9が介在した状態となり、地下構造物1の埋
設後に縁切板8と帯板材16とを抜き取り等により撤去す
ることによって図6に示すように、バラスト14が路盤層
9上に支持された構造とする。
When the underground structure 1 is buried in the ground between the shafts A and B in this manner, the edge cutting plate 8 and the strip plate 16 are provided between the ballast 14 on which the track 6 is laid and the upper floor slab 1a of the underground structure 1. As shown in FIG. 6, the ballast 14 is placed on the roadbed layer 9 by removing the edge cutting plate 8 and the strip plate material 16 after the underground structure 1 is buried by removing the edgeboard 8 and the strip plate material 16 after the underground structure 1 is buried. The structure is supported by.

【0026】なお、以上の各実施例においては、パイプ
ルーフ7を予め地下構造物1の上床版1aの位置にのみ埋
設したが、地下構造物1の両側版1c、1cや下床版1bの位
置にも埋設しておいてもよく、また、埋設長さが長い場
合には地下構造物1を適宜長さ毎に輪切り状に分割した
構造としておき、順次、直列に接合、連結しながらその
上床版上に土砂を積載したのち埋設してもよい。また、
土砂止め壁は上床版1aの両側縁にも設けて上面四方縁部
に枠状に突設しておいてもよいが、少なくとも上床版1a
の前端縁に突設しておけば、本発明の目的を達成するこ
とができる。
In each of the above embodiments, the pipe roof 7 was previously buried only at the position of the upper floor slab 1a of the underground structure 1, but the two side plates 1c and 1c of the underground structure 1 and the lower floor slab 1b were not embedded. It may be buried in the position, and when the buried length is long, the underground structure 1 is divided into appropriate lengths in a sliced structure, and the structures are sequentially connected and connected in series. It may be buried after loading earth and sand on the upper deck. Also,
The earth and sand retaining walls may be provided on both side edges of the upper floor slab 1a so as to project in a frame shape on the four side edges of the upper surface.
The object of the present invention can be achieved by projecting the front end edge.

【0027】さらに、地下構造物1は上下に二分割した
構造にして上半部分と下半部材とを互いに摺動自在に組
み合わせた状態で推進、埋設してもよく、また、上面の
前後端縁に土砂止め壁を突設してなる上床版1aのみから
なる地下構造物をパイプルーフ7と置換しながら線路下
における地中の浅い位置に埋設したのち、或いは、埋設
しながら、断面U字状の地下構造物の両側版の上端面を
上床版1aの両側部下面に沿わせて埋設するか、又は、上
床版1aの下方地盤を掘削してコンクリートの現場打ちで
地下構造物1を築造してもよい。なお、本発明の地下構
造物の埋設方法は線路下に限らず、道路下においても適
用し得ることは勿論である。
Further, the underground structure 1 may be divided into upper and lower halves and may be propelled and buried in a state where the upper half portion and the lower half member are slidably combined with each other. After substituting the pipe roof 7 with an underground structure consisting only of an upper floor slab 1a with protruding earth and sand retaining walls, it is buried at a shallow position in the ground under the track, or while it is buried, a U-shaped cross section The upper surface of both side plates of the underground structure is buried along the lower surface of both sides of the upper floor slab 1a, or the lower ground of the upper floor slab 1a is excavated and the underground structure 1 is built by in-situ concrete casting. You may. The method for burying an underground structure according to the present invention is not limited to being used under a track, but can be applied under a road.

【0028】[0028]

【発明の効果】以上のように本発明によれば、上床版の
上面四方における少なくとも前端縁に一定高さの土砂止
め壁を突設してなる地下構造物を、予め、線路や道路の
路面下の地中の浅い位置に埋設した上面に縁切板を載置
してなるパイプルーフと置換させる際に、上床版の上面
に土砂止め壁に高さに達する土砂を積載して路盤層を形
成し、上床版を推進させてパイプルーフを押し進めなが
ら土砂止め壁の上面を縁切板の下面に沿って埋設するも
のであるから、推進埋設時には上床版の上面に積載した
路盤層が地盤に影響されることなく上床版と共に縁切板
の下面に沿って一体的に推進させることができ、埋設後
において路面下に所定厚みの路盤層を一体的に形成する
ことができるものである。この際、上床版上の路盤層を
予め複数枚の帯板材によって被覆しておけば、路盤層が
縁切板と直接摺接するのを阻止されて後方に移動するこ
とがない。
As described above, according to the present invention, an underground structure formed by projecting an earth retaining wall having a constant height at least on the front edge on the four sides of the upper surface of the upper floor slab is used in advance. When replacing the pipe roof with an edge plate placed on the upper surface buried in a shallow position in the ground below, load the earth and sand reaching the height to the earth retaining wall on the upper surface of the upper floor slab to form the roadbed layer. It is formed by pushing the upper floor slab and pushing the pipe roof while burying the upper surface of the earth retaining wall along the lower surface of the edge cutting plate. It is possible to integrally propel the upper floor slab along the lower surface of the edging plate without being affected, and it is possible to integrally form a roadbed layer having a predetermined thickness under the road surface after being buried. At this time, if the roadbed layer on the upper floor slab is covered with a plurality of strip plates in advance, the roadbed layer is prevented from directly slidingly contacting the edging plate and does not move backward.

【0029】従って、この路盤層によって地下構造物の
上床版上の土被りを厚くすることができ、路面の保守点
検が円滑に行えると共に上床版が保守点検用工具で損傷
受けるのを防止し得るものである。
Therefore, the roadbed layer can thicken the overburden on the upper floor slab of the underground structure, which enables smooth maintenance and inspection of the road surface and prevents the upper floor slab from being damaged by the maintenance and inspection tool. It is a thing.

【図面の簡単な説明】[Brief description of drawings]

【図1】地下構造物を埋設中の簡略縦断側面図、[Fig. 1] Side view of a simplified vertical section of an underground structure being buried,

【図2】地中に埋設したパイプルーフの簡略縦断正面
図、
FIG. 2 is a simplified vertical sectional front view of a pipe roof buried in the ground,

【図3】地下構造物の斜視図、FIG. 3 is a perspective view of an underground structure,

【図4】線路の両側に立坑を設けた状態の縦断側面図、FIG. 4 is a vertical cross-sectional side view with vertical shafts provided on both sides of the track,

【図5】パイプルーフを埋設した状態の縦断側面図、FIG. 5 is a vertical cross-sectional side view showing a state in which a pipe roof is embedded,

【図6】地下構造物を埋設した状態の縦断側面図、FIG. 6 is a vertical sectional side view showing a state in which an underground structure is buried,

【図7】本発明の別な地下構造物を示す一部切欠斜視
図、
FIG. 7 is a partially cutaway perspective view showing another underground structure of the present invention,

【図8】その埋設状態を示す簡略縦断側面図、FIG. 8 is a simplified vertical sectional side view showing the buried state,

【図9】従来例を示す簡略縦断側面図。FIG. 9 is a simplified vertical sectional side view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 地下構造物 1a 上床版 3、4 土砂止め壁 6 線路 7 パイプルーフ 8 縁切板 9 路盤層 16 帯板材 A、B 立坑 1 Underground structure 1a Upper deck 3, 4 Sedimentation wall 6 Track 7 Pipe roof 8 Edge cut plate 9 Roadbed layer 16 Band material A, B Vertical shaft

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 上床版の上面前端縁に一定高さの土砂止
め壁を突設し、その突出高さまで該上床版の上面に土砂
を載置するように構成したことを特徴とする地下構造
物。
1. An underground structure characterized in that an earth retaining wall having a constant height is projected from the front edge of the upper surface of the upper floor slab, and the earth and sand are placed on the upper surface of the upper floor slab up to the protruding height. object.
【請求項2】 上床版の上面前端縁に一定高さの土砂止
め壁を突設し、その突出高さまで該上床版の上面に土砂
を載置して路盤層を形成し、この路盤層を複数枚の帯板
材によって被覆し、該帯板材の前端を上記土砂止め壁上
に固着してなることを特徴とする地下構造物。
2. A sand retaining wall having a constant height is projected from the front end edge of the upper surface of the upper floor slab, and earth and sand are placed on the upper surface of the upper floor slab to the protruding height to form a roadbed layer. An underground structure characterized in that it is covered with a plurality of strips, and the front end of the strips is fixed on the earth retaining wall.
【請求項3】 上面に縁切板を配設した複数本のパイプ
を地中の浅い位置に地表に対して平行方向に並列状態に
圧入してパイプルーフを形成したのち、上床版の上面前
端縁に一定高さの土砂止め壁を突設し且つ該土砂止め壁
の高さまで上床版の上面に土砂を載置してなる地下構造
物の土砂止め壁の前面を上記パイプルーフの後端に対向
させ、上記縁切板を地中に残置させた状態で地下構造物
をその前方地盤を掘削しながらこの縁切板の下面に沿っ
て推進させることによりパイプルーフを押し進めながら
縁切板の下方に埋設し、しかるのち縁切板を撤去するこ
とを特徴とする地下構造物の埋設方法。
3. A pipe roof is formed by press-fitting a plurality of pipes, each having an edge cutting plate on the upper surface thereof, at a shallow position in the ground in a parallel direction parallel to the surface of the earth, and then forming a pipe roof, and then, the front end of the upper surface of the upper floor slab. The front surface of the earth retaining wall of the underground structure, which is provided with the earth retaining wall of a certain height protruding from the edge and the earth and sand is placed on the upper surface of the upper deck to the height of the earth retaining wall, is the rear end of the pipe roof. Under the edge plate while advancing the pipe roof by propelling the underground structure along the lower surface of this edge plate while excavating the front ground while facing the edge plate and leaving the edge plate left in the ground A method for burying an underground structure, which comprises burying in an underground space and then removing the edge plate.
【請求項4】 上面に縁切板を配設した複数本のパイプ
を地中の浅い位置に地表に対して平行方向に並列状態に
圧入してパイプルーフを形成したのち、上床版の上面前
端縁に一定高さの土砂止め壁を突設し且つ該土砂止め壁
の高さまで上床版の上面に土砂を載置すると共に該土砂
を前端が上記土砂止め壁上に固着した複数枚の並列帯板
材によって被覆してなる地下構造物の土砂止め壁の前面
を上記パイプルーフの後端に対向させ、上記縁切板を地
中に残置させた状態で地下構造物をその前方地盤を掘削
しながらこの縁切板の下面に帯板材を摺接させて推進さ
せることによりパイプルーフを押し進めながら縁切板の
下方に埋設し、しかるのち帯板材と縁切板を撤去するこ
とを特徴とする地下構造物の埋設方法。
4. A pipe roof is formed by press-fitting a plurality of pipes, each having an edge cutting plate on the upper surface thereof, at a shallow position in the ground in parallel with each other in a direction parallel to the surface of the earth, and then forming an upper end of the upper surface of the upper floor slab. A plurality of parallel strips in which an earth retaining wall having a constant height is projected on the edge, and the earth and sand are placed on the upper surface of the upper floor slab up to the height of the earth and retaining wall, and the earth and sand are fixed at the front end on the earth and retaining wall. While excavating the ground in front of the underground structure with the front of the earth retaining wall of the underground structure covered with a plate facing the rear end of the pipe roof and leaving the edge plate left in the ground An underground structure characterized in that the strip plate material is slidably brought into contact with the lower surface of the edging plate so as to push the pipe roof to bury it below the edging plate while pushing the pipe roof, and then the strip plate material and the edging plate are removed. How to bury things.
JP06017902A 1994-01-17 1994-01-17 Underground structure and its burying method Expired - Lifetime JP3093555B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06017902A JP3093555B2 (en) 1994-01-17 1994-01-17 Underground structure and its burying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06017902A JP3093555B2 (en) 1994-01-17 1994-01-17 Underground structure and its burying method

Publications (2)

Publication Number Publication Date
JPH07208067A true JPH07208067A (en) 1995-08-08
JP3093555B2 JP3093555B2 (en) 2000-10-03

Family

ID=11956681

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06017902A Expired - Lifetime JP3093555B2 (en) 1994-01-17 1994-01-17 Underground structure and its burying method

Country Status (1)

Country Link
JP (1) JP3093555B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144377A (en) * 2006-12-06 2008-06-26 Okumura Corp Construction method for underground passage
JP2019015065A (en) * 2017-07-05 2019-01-31 公益財団法人鉄道総合技術研究所 Hollow structure and its embedding method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8850719B2 (en) 2009-02-06 2014-10-07 Nike, Inc. Layered thermoplastic non-woven textile elements

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008144377A (en) * 2006-12-06 2008-06-26 Okumura Corp Construction method for underground passage
JP2019015065A (en) * 2017-07-05 2019-01-31 公益財団法人鉄道総合技術研究所 Hollow structure and its embedding method

Also Published As

Publication number Publication date
JP3093555B2 (en) 2000-10-03

Similar Documents

Publication Publication Date Title
JP6037120B2 (en) How to install the box structure
JP4073428B2 (en) Underground construction method
JP4350113B2 (en) Box roof used in the construction method of underground structures
JPH07208067A (en) Underground structure and burying method thereof
JPH06105025B2 (en) Reconstruction method for existing underground structures
JP2008231863A (en) Widening method for existing underground structure
JP2860752B2 (en) Construction method of underpass formation structure and underpass introduction section
JPH0135160B2 (en)
JPS622116B2 (en)
JP2010150809A (en) Thrust transfer member for caisson, and method for constructing underground structure using the same
JPH02252892A (en) Method for constructing underground structure
JP2860750B2 (en) Underground structure propulsion guide member and underground structure embedding method
JPH0440519B2 (en)
JP4153018B2 (en) Hollow underground structure for burial
JP5027791B2 (en) Construction method of underground structure
JP3245529B2 (en) Method of forming roof for building underground structures
JPS6145034B2 (en)
JP4110195B2 (en) Hollow underground structure for burial
JPH0555679B2 (en)
JP3105744B2 (en) Pipe roof and construction method
JP2004183344A (en) Hollow underground structure for burying
JPH0663421B2 (en) How to build an underground structure
JPH0439558B2 (en)
JPH0439559B2 (en)
JP2005200875A (en) Divided box body and construction method for underground three dimensional intersection

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120728

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120728

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20130728

EXPY Cancellation because of completion of term