JPH0692669B2 - Frame method using shaped steel for beam with rebar concrete structure - Google Patents
Frame method using shaped steel for beam with rebar concrete structureInfo
- Publication number
- JPH0692669B2 JPH0692669B2 JP14157186A JP14157186A JPH0692669B2 JP H0692669 B2 JPH0692669 B2 JP H0692669B2 JP 14157186 A JP14157186 A JP 14157186A JP 14157186 A JP14157186 A JP 14157186A JP H0692669 B2 JPH0692669 B2 JP H0692669B2
- Authority
- JP
- Japan
- Prior art keywords
- girder
- shaped steel
- concrete
- concrete structure
- frame method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
【発明の詳細な説明】 「産業上の利用分野」 本発明は、鉄筋コンクリート構造の小梁に形鋼を使用す
る架構法に関する。TECHNICAL FIELD The present invention relates to a framing method using shaped steel for a beam of a reinforced concrete structure.
鉄筋コンクリート構造の建築物にあっては、一般に現場
打ちコンクリート工法がとられ、鉄筋コンクリート(以
下RCという)の大梁と小梁が組み合わされ、これらにRC
床版が一体に構築される。For buildings with reinforced concrete structures, the cast-in-place concrete method is generally used, and large and small beams of reinforced concrete (hereinafter referred to as RC) are combined.
The floor slab is built as one.
「発明が解決しようとする問題点」 しかし、この場合、現場にて、躯体全体にわたって、型
枠を組み、配筋するため、大工、鉄筋工等の現場作業の
工程が多くなり、工期が長くなると共に、仮設サポート
が必要であるため、作業動線の確保が困難となる。"Problems to be solved by the invention" However, in this case, since the formwork is assembled and reinforced in the entire building at the site, there are many on-site work processes such as carpentry and reinforcing bar work, and the construction period is long. At the same time, it is difficult to secure work flow lines because temporary support is required.
そこで、本発明は、プレキャストコンクリート(以下PC
aという)の大梁に形鋼の小梁を取付け、床版にデッキ
プレートを使用することにより、現場作業の低減、工期
の短縮、建物の軽量化、仮設サポートの省力化を可能に
し、かつ、鉄骨小梁の加工を減じて、コストダウンを図
ろうとするものである。Therefore, the present invention relates to precast concrete (hereinafter PC
By attaching a small beam of shaped steel to the large beam (a) and using a deck plate for the floor slab, it is possible to reduce on-site work, shorten the construction period, reduce the weight of the building, and save labor for temporary support. It aims to reduce the cost by reducing the processing of steel beam.
「問題点を解決するための手段」 本発明は、梁下まで構築したRC又はPCaの柱に、PCa大梁
を架設し、該大梁には側面適所に予め適宜な欠込みを形
成しておき、該欠込みに、両端を垂直に切断しただけの
形鋼の小梁をその端部にて嵌合させると共に、該欠込み
の残部にコンクリートを充填して大梁に固定し、次い
で、その大梁乃至小梁にデッキプレートを敷き込み、床
版コンクリートを打設する方法である。`` Means for solving the problem '' The present invention, RC or PCa columns constructed up to the bottom of the beam, a PCa girder is erected, the girder is preformed with appropriate notches at appropriate positions on the side, A small beam of shaped steel whose both ends are cut vertically is fitted into the notch at its ends, and the remainder of the notch is filled with concrete to be fixed to the girder. It is a method of laying a deck plate on the beam and placing concrete on the slab.
「作用」 如上の構成であるから、工場生産と現場施工を有効に作
用させることができて、強固な鉄筋コンクリート構造の
建物が得られ、所期の目的を達成できる。"Operation" With the above-mentioned configuration, it is possible to effectively operate factory production and on-site construction, and to obtain a building with a strong reinforced concrete structure and achieve the intended purpose.
「実施例」 図面は、本発明の実施例であり、第1図は、工程を、第
2図乃至第9図は、要部の具体的構造を示している。"Embodiment" The drawings are embodiments of the present invention, in which Fig. 1 shows a process, and Figs. 2 to 9 show a concrete structure of an essential part.
第1図に示す工程を説明すると、 I.現場にて、梁下までRC柱1…を構築する。柱主筋11…
は十分に長いものを用い、これに梁下までフープを組
み、柱コンクリート12…を打設する。Explaining the process shown in Fig. 1, I. Construct RC columns 1 ... under the beam at the site. Pillars 11 ...
Is a sufficiently long one, and a hoop is assembled to the bottom of the beam, and pillar concrete 12 ... is placed.
II.上記RC柱1…にPCa大梁2…を架設する。具体的に
は、第2図、第3図に示すように、PCa大梁の端部を柱
の縁部に載せ、また、下部の梁主筋21…を突出させてお
いて、これを仕口部の柱鉄筋に組み込む。この際、柱鉄
筋では、該部において、突出する柱主筋11…にフープ13
…を組む。PCa大梁は、勿論工場生産によるが、スタラ
ップ22…の上部を露出させた半製品に構成し、両側面の
適所に小梁結合用の欠込み23…を形成させる。II. Build PCa girders 2 ... on the RC columns 1 ... Specifically, as shown in FIGS. 2 and 3, the end of the PCa girder is placed on the edge of the column, and the lower beam main bar 21 ... Incorporate into the column rebar. At this time, in the column rebar, the hoop 13 is attached to the protruding column main bar 11 ...
Build a ... The PCa girders are, of course, produced by the factory, but they are constructed as a semi-finished product with the upper part of the stalaps 22 ... Exposed, and the notches 23 ...
而して、第4図、第5図に示すように、上記欠込み23…
に、両端を垂直に切断しただけのH形鋼の小梁3…をそ
の端部にて嵌合させて組み込むと共に、その欠込みの残
部にコンクリート24…を充填して固定する。当該小梁3
…は、現場で加工し、上面に多数の頭付きスタッドコネ
クター31…を一列に溶接する。なお、小梁3…の端部に
おいて、ウェブに頭付きのスタッドコネクターを溶接
し、或いは、ウェブに透孔を穿設して短い鉄筋を差し込
み、これを欠込み23…に充填するコンクリート24…へ埋
入させるようにしてもよい。As shown in FIGS. 4 and 5, the notch 23 ...
, The beam H of H-section steel whose both ends are just cut vertically is fitted at its ends and incorporated, and the remaining part of the notch is filled with concrete 24 and fixed. The beam 3
... are processed in the field, and a large number of headed stud connectors 31 are welded in a row on the upper surface. At the end of the beam 3, a headed stud connector is welded to the web, or a through hole is bored in the web to insert a short rebar, and the notch 23 is filled with concrete 24. You may make it embed in.
III.上記大梁2…乃至小梁3…上に、デッキプレート4
…を敷き込む。該デッキプレートは、第6図、第7図に
示すように、リブ41…を有するものとし、端部において
そのリブを次第に低くし、該端部を大梁又は小梁の縁部
に係合させる。III. Above the large beam 2 ... to the small beam 3 ..., on the deck plate 4
Lay out ... The deck plate has ribs 41 ... As shown in FIGS. 6 and 7, and the ribs are gradually lowered at the end so that the end is engaged with the edge of the girder or beam. .
IV.上記大梁2…上において、スタラップ22…に大梁上
筋25…を配筋し(第2図、第4図、第5図)、また、デ
ッキプレート4…上に所要の配筋を施し、床版コンクリ
ート5を打設し、全てを一体化させる(第8図、第9
図)。この際には、柱の仕口部にもコンクリートを充填
する。IV. Above the girders 2 ..., the girder upper bars 25 ... are arranged on the stirrup 22 ... (Figs. 2, 4, and 5), and the required bars are arranged on the deck plate 4 ... , Placing the slab concrete 5 and integrating all (Fig. 8, Fig. 9
Figure). At this time, the concrete part of the pillar is also filled with concrete.
「発明の効果」 本発明によれば、小梁が両端を垂直に切断しただけの形
鋼であるから、現場にて簡単に加工でき、加工工数が少
ないため、コストダウンが図れる。そして、その形鋼を
工場で加工する必要がないので、発注から現場取付けま
でを短時間で行える。[Advantages of the Invention] According to the present invention, since the beam is a shaped steel in which both ends are vertically cut, it can be easily processed on site and the number of processing steps is small, so that the cost can be reduced. Further, since it is not necessary to process the shaped steel in the factory, it is possible to carry out from ordering to field installation in a short time.
また、現場での工数、職種、人員を低減でき、工期短縮
が図れ、仮設サポートが不要となるため、現場での作業
性が向上し、残材、不要材の発生が減少し、清掃、片付
けが少なくなる。In addition, the number of man-hours, job types, and personnel at the site can be reduced, the construction period can be shortened, and temporary support is not required, which improves workability at the site, reduces the generation of residual materials and unnecessary materials, and cleans and cleans up. Is less.
更に、建物を軽量化することができる。Further, the weight of the building can be reduced.
図面は、本発明の実施例で、第1図I乃至IVは、工程説
明図、第2図は、柱・梁仕口部の縦断側面図、第3図
は、同横断平面図、第4図は、大梁・小梁仕口部の截断
側面図、第5図は、同縦断正面図、第6図は、小梁・デ
ッキプレートの平面図、第7図は、大梁・デッキプレー
トの平面図、第8図は、小梁・デッキプレート・床版の
断面図、第9図は、大梁・デッキプレート・床版の断面
図である。 1…RC柱、2…PCa大梁 3…H形鋼の小梁、4…デッキプレート 5…床版コンクリートThe drawings are embodiments of the present invention, and FIGS. 1 to IV are process explanatory views, FIG. 2 is a vertical side view of a column / beam joint, and FIG. 3 is a transverse plan view thereof. The figure shows a cross-sectional side view of the girder / girder joint, Fig. 5 shows the same vertical section, Fig. 6 shows the girder / deck plate plan view, and Fig. 7 shows the girder / deck plate plan view. FIG. 8 is a cross-sectional view of a cross beam / deck plate / slab, and FIG. 9 is a cross-sectional view of a cross beam / deck plate / slab. 1 ... RC column, 2 ... PCa large beam 3 ... H-beam small beam, 4 ... Deck plate 5 ... Floor slab concrete
Claims (1)
クリート大梁を架設し、該大梁には側面適所に予め適宜
な欠込みを形成しておき、該欠込みに、両端を垂直に切
断しただけの形鋼の小梁をその端部にて嵌合させると共
に、該欠込みの残部にコンクリートを充填して大梁に固
定し、また、その大梁乃至小梁にデッキプレートを敷き
込み、床版コンクリートを打設することを特徴とする鉄
筋コンクリート構造の小梁に形鋼を使用する架構法1. A precast concrete girder is erected on a pillar constructed up to the bottom of the girder, and appropriate notches are previously formed at appropriate places on the side faces of the girder, and both ends are cut vertically to the notch. The shaped beam of the steel is fitted at its end, the remaining part of the notch is filled with concrete and fixed to the girder, and a deck plate is laid on the girder or the girder. Frame method using shaped steel for beam of reinforced concrete structure characterized by casting
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14157186A JPH0692669B2 (en) | 1986-06-17 | 1986-06-17 | Frame method using shaped steel for beam with rebar concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14157186A JPH0692669B2 (en) | 1986-06-17 | 1986-06-17 | Frame method using shaped steel for beam with rebar concrete structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS62296031A JPS62296031A (en) | 1987-12-23 |
JPH0692669B2 true JPH0692669B2 (en) | 1994-11-16 |
Family
ID=15295075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14157186A Expired - Fee Related JPH0692669B2 (en) | 1986-06-17 | 1986-06-17 | Frame method using shaped steel for beam with rebar concrete structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0692669B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418387A (en) * | 2010-09-28 | 2012-04-18 | 杨峰 | Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof |
-
1986
- 1986-06-17 JP JP14157186A patent/JPH0692669B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102418387A (en) * | 2010-09-28 | 2012-04-18 | 杨峰 | Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof |
Also Published As
Publication number | Publication date |
---|---|
JPS62296031A (en) | 1987-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3069753B2 (en) | Construction method of framed reinforced concrete structure | |
CN112681616B (en) | Stiffening structure for assembling reinforced concrete structure by using section steel to replace part of reinforcing steel bars | |
JP3586121B2 (en) | Mixed structure of reinforced concrete column and steel beam and its construction method | |
JP2000160687A (en) | Construction method for composite structure and precast concrete column | |
JPH0692669B2 (en) | Frame method using shaped steel for beam with rebar concrete structure | |
JPS6195136A (en) | Construction of multistoried building skeletal by precast reinforced concrete unit | |
JPS6157732A (en) | Construction of multilayered building skeletal by precast reinforced concrete unit | |
JPH0781307B2 (en) | How to build a skyscraper | |
JP3187618B2 (en) | How to assemble beam reinforcement | |
JPH07103583B2 (en) | Construction method for large span underground structure | |
JPH0447737B2 (en) | ||
JPH01137032A (en) | Method of lap joint construction of main reinforcement in post and beam joining section | |
JPH0657769A (en) | Underground concrete structure and working method thereof | |
JP2990216B2 (en) | Construction method of reinforced concrete building | |
JPH0598653A (en) | Steel pipe concrete pillar in underground inverter construction method | |
JPH032435A (en) | Construction method for jointing column and steel frame reinforced-concrete beam to each other | |
JP2972955B2 (en) | Column and beam joining method and its structure | |
JP2651506B2 (en) | How to apply underground beams | |
JPH1113141A (en) | Constructing method of composite structure | |
JPH09273317A (en) | Vibration-resistant reinforcing method of existing concrete structure | |
JPH07247557A (en) | Foundation, column mold, and underground beam made of precast reinforced concrete | |
JP2759360B2 (en) | Construction method of reinforced concrete building | |
JP2779346B2 (en) | Building structure | |
JPH0522777B2 (en) | ||
JPH0749680B2 (en) | Construction method of precast steel reinforced concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |