Info

Publication number
JP2759360B2
JP2759360B2 JP1324642A JP32464289A JP2759360B2 JP 2759360 B2 JP2759360 B2 JP 2759360B2 JP 1324642 A JP1324642 A JP 1324642A JP 32464289 A JP32464289 A JP 32464289A JP 2759360 B2 JP2759360 B2 JP 2759360B2
Authority
JP
Japan
Prior art keywords
column
pillar
reinforced concrete
supporting member
support member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1324642A
Other languages
Japanese (ja)
Other versions
JPH03183835A (en
Inventor
憲衛 幸村
修一 植野
千博 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP1324642A priority Critical patent/JP2759360B2/en
Publication of JPH03183835A publication Critical patent/JPH03183835A/en
Application granted granted Critical
Publication of JP2759360B2 publication Critical patent/JP2759360B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、鉄筋コンクリート造建物の構築工法に関す
るものである。
The present invention relates to a method of constructing a reinforced concrete building.

[従来の技術] 一般的に、鉄筋コンクリート造建物は鉄骨造りに比べ
て工費が安い等の経済的利点があるものの、工程がかか
り労働生産性が低く、その改善が要請されていた。
[Related Art] In general, reinforced concrete buildings have economic advantages such as lower construction costs than steel frames, but they require more steps and lower labor productivity, and improvements have been demanded.

このため、従来の鉄筋コンクリート造建物において
も、柱等にプレキャスト(PCa)部材を使用して、工期
を短縮することが行われているが、PCa部材が重いばか
りでなく、柱と梁の接合部が複雑で、一体性の確認実験
を必要とする等の問題点があった。
For this reason, even in conventional reinforced concrete buildings, the use of precast (PCa) members for columns and the like has been used to shorten the construction period, but not only is the PCa member heavy, but also the joint between the column and beam However, there are problems such as that the method is complicated and an experiment for confirming the integrity is required.

[発明が解決しようとする課題] 本発明は、上記従来の問題点を解決するためになされ
たもので、その目的とするところは、在来の鉄筋コンク
リート工法を基調としながら、柱の中心部に2層以上の
柱支持部材を接続可能に建込むことにより、同時に2層
以上の柱筋および梁筋工事をなし得るようにし、省力化
および工程の短縮化を図ることのできる鉄筋コンクリー
ト造建物の構築工法を提供することにある。
[Problems to be Solved by the Invention] The present invention has been made to solve the above-mentioned conventional problems, and an object thereof is to use a conventional reinforced concrete construction method while maintaining a central portion of a column. Construction of a reinforced concrete building that allows two or more layers of column and beam reinforcement to be constructed at the same time by connecting two or more layers of column support members so that they can be connected, thereby saving labor and shortening the process. To provide a construction method.

[課題を解決するための手段] 本発明の鉄筋コンクリート造建物の構築工法は、柱の
中心部に建込まれて現場打ちされる柱コンクリート内に
埋め殺しとなる下階の柱支持部材の上部に支柱部材を付
設し、該支柱部材を介して上階の柱支持部材を接続する
工法において、上記柱上に接合される梁の梁筋を貫くよ
うに上記支持部材を形成し、該支柱部材の上端部に取り
付けられた接続板に、上階の柱支持部材の基部に設けた
柱基板を接続固定することを特徴とする。また、上記柱
支持部材が、鋼製パイプ内にコンクリートを充填して構
成されていることも特徴とする。
[Means for Solving the Problems] The method of constructing a reinforced concrete building according to the present invention is a method for constructing a reinforced concrete building at the upper part of a lower column supporting member which is buried in a column concrete which is built in the center of a column and is cast in place. In a method of attaching a column member and connecting a column supporting member on an upper floor via the column member, the supporting member is formed so as to penetrate a beam line of a beam joined on the column, and A pillar substrate provided at the base of a pillar support member on an upper floor is connected and fixed to a connection plate attached to an upper end portion. Further, the present invention is characterized in that the column supporting member is configured by filling concrete in a steel pipe.

[実施例] 以下、本発明の一実施例について図面を参照しながら
説明する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図および第2図において、1は柱支持部材であっ
て、床スラブ2と梁3との間の柱Aの中心にセットされ
るようになっている。
1 and 2, reference numeral 1 denotes a column supporting member, which is set at the center of a column A between the floor slab 2 and the beam 3.

上記柱支持部材1は、第3図および第3A図に示すよう
に、直径200mm程度のスパイラルシース管等を鋼製パイ
プ1aの内部にコンクリート1bを充填して構成されてい
る。この柱支持部材1は現場打ちされる柱コンクリート
内に埋め殺しとなる。
As shown in FIGS. 3 and 3A, the column supporting member 1 is formed by filling a steel pipe 1a with a concrete 1b inside a spiral pipe having a diameter of about 200 mm or the like. This column support member 1 is buried and killed in the column concrete cast in place.

上記柱支持部材1の下端部には柱基板1cが取り付けら
れている。該柱支持部材1の下端部および柱基板1cの中
心部には凹部1dが形成されていて、後述する固定ボルト
の頭が納まるようになっている。(第3B図も参照) 上記柱支持部材1の上部には支柱部材4が一体的に挿
設されている。該支柱部材4は太径鉄筋あるいは鉄パイ
プ等から成る。
A pillar substrate 1c is attached to the lower end of the pillar support member 1. A recess 1d is formed at the lower end of the pillar support member 1 and at the center of the pillar substrate 1c so that the head of a fixing bolt described later can be accommodated therein. (See also FIG. 3B) A column member 4 is integrally inserted above the column supporting member 1. The support member 4 is made of a large-diameter steel bar or an iron pipe.

該支持部材4には梁3の梁筋3aをセットするが、この
梁筋3aを受けるために、仮想線で示すような梁筋受け4a
を設けてもよい。
A beam bar 3a of the beam 3 is set on the support member 4. In order to receive the beam bar 3a, a beam bar 4a shown by a virtual line is received.
May be provided.

第4図(A)(B)に示すように、上記支柱部材4の
上端部には上階の柱支持部材1の柱基板1cに連結するた
めの接続板5が取付けられるようになっている。該接続
板5は固定ボルト等の固定具5aにより上記支柱部材4の
上端部に取付け固定されるようになっている。該接続板
5の上面のコーナー部には連結ボルト5bが植設されてい
る。
As shown in FIGS. 4 (A) and 4 (B), a connection plate 5 for connecting to the pillar substrate 1c of the pillar support member 1 on the upper floor is attached to the upper end of the pillar member 4. . The connection plate 5 is attached and fixed to the upper end of the support member 4 by a fixing tool 5a such as a fixing bolt. A connection bolt 5b is implanted at a corner of the upper surface of the connection plate 5.

尚、6は柱筋、7は桁行PCa部材、および8はPCaバル
コニーである。
6 is a column, 7 is a girder PCa member, and 8 is a PCa balcony.

次に、上記柱支持部材1による構築方法について説明
する。
Next, a construction method using the column support member 1 will be described.

まず、第5図に示すように、下階の柱支持部材1′の
上に、柱支持部材1をセットする。尚、下に柱支持部材
1′がない場合には、床スラブ上にセットする。
First, as shown in FIG. 5, the column supporting member 1 is set on the column supporting member 1 'on the lower floor. In addition, when there is no pillar support member 1 'below, it is set on a floor slab.

柱支持部材1がセットされると、第6図に示すよう
に、該柱支持部材1の周囲に柱筋6を配筋すると共に、
該柱支持部材1の上部に梁筋3aを梁設する。
When the column supporting member 1 is set, as shown in FIG. 6, a column bar 6 is arranged around the column supporting member 1 and
A beam bar 3a is provided on the upper part of the column supporting member 1.

該梁筋3aの架設後またはこれと同時に半PCaスラブ2
を架設する。この半PCaスラブ2の架設は、戸境壁に埋
殺しの支持部材7′あるいは梁型枠(図示せず)に支持
せしめて行う。尚、スラブは上記半PCaスラブの他に、
全PCaスラブあるいは現場打ちであってもよい。
Semi-PCa slab 2 after or simultaneously with erection of the beam reinforcement 3a
Erection. The semi-PCa slab 2 is installed by being supported by a support member 7 ′ buried in a door boundary wall or a beam formwork (not shown). In addition, the slab is in addition to the above semi-PCa slab,
All PCa slabs or cast-in-place may be used.

柱筋6の配筋や梁筋3a等の架設と同時、あるいはこれ
に前後して、第4図に示すように、上記柱支持部材1上
部の支持部材4の上端部に固定具5aにより接続板5を取
り付けると共に、第7図に示すように、その上に、上階
の柱支持部材1″をセットする。該柱支持部材1″のセ
ットは、第3図に示すように、上記柱支持部材1の接続
板5の上に柱支持部材1″の基部に設けられた柱基板1c
を載せて、連結ボルト5bにナツトで締付け固定すること
により行う。
Simultaneously with or before or after the reinforcement of the column reinforcement 6 or the installation of the beam reinforcement 3a, as shown in FIG. 4, it is connected to the upper end of the support member 4 above the column support member 1 by the fixture 5a. The plate 5 is mounted, and the column support member 1 "on the upper floor is set thereon as shown in Fig. 7. The column support member 1" is set as shown in Fig. 3. A pillar substrate 1c provided at the base of the pillar support member 1 ″ on the connection plate 5 of the support member 1
Is carried out and tightened and fixed to the connection bolt 5b with a nut.

上階に柱支持部材1″が接続セットされると、該柱支
持部材1″の周囲に柱筋を配筋すると共に、この柱支持
部材1″の上にも梁筋をセットし、各々型枠を組み付け
て、コンクリートを現場打ちする。
When the column supporting member 1 "is connected and set on the upper floor, a column bar is arranged around the column supporting member 1", and a beam bar is also set on the column supporting member 1 ". Assemble the frame and cast concrete in place.

[発明の効果] (1) 柱の中心部に柱支持部材を建込み、該柱支持部
材の上部に設けた支持部材の上端部に上階の柱支持部材
を接続するようにしたので、2層以上の階において、同
時に柱筋および梁筋の組み付け及び桁行PCa部材の建込
みを行うことができ、省力化および工程の短縮化を図る
ことができる。
[Effects of the Invention] (1) A pillar support member is erected at the center of a pillar, and the upper pillar support member is connected to the upper end of the support member provided above the pillar support member. At the floors above the layer, it is possible to simultaneously assemble the column bars and the beam bars and to build the girder PCa members, thereby saving labor and shortening the process.

(2) 在来の鉄筋コンクリート工法を基調としている
ので、在来工法の経済的な利点を生かすことができる。
(2) Since the conventional reinforced concrete method is used, economic advantages of the conventional method can be utilized.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明工法によるコンクリート造建物の構造
図、第2図はその平面図、第3図は柱支持部材の構造を
示す断面図、第3A図は第3図A−A線に沿った断面図、
第3B図は第3図B−B線に沿った断面図、第4図(A)
(B)は各々接続板の平面および側面を示す図、第5〜
7図は本発明工法の説明図、第8図は柱支持部材と支持
部材の接続説明図である。 1,1′,1″……柱支持部材、1a……鋼製パイプ、1b……
コンクリート、1c,1c″……柱基板、1d,1d″……凹部、
2,2″……床スラブ(半PCaスラブ)、3……梁、3a……
梁筋、4,4′,4″……支柱部材、5……接続板、5a……
固定具、5b……連結ボルト、A……柱。
1 is a structural view of a concrete building according to the method of the present invention, FIG. 2 is a plan view thereof, FIG. 3 is a sectional view showing a structure of a column supporting member, and FIG. 3A is a view taken along line AA in FIG. Cross section,
FIG. 3B is a sectional view taken along the line BB in FIG. 3, FIG. 4 (A)
(B) is a diagram showing a plane and a side surface of the connection plate, respectively.
FIG. 7 is an explanatory view of the method of the present invention, and FIG. 8 is an explanatory view of connection between the column supporting member and the supporting member. 1,1 ′, 1 ″… Pole support member, 1a …… Steel pipe, 1b ……
Concrete, 1c, 1c "... pillar board, 1d, 1d" ... recess,
2,2 ″… Floor slab (semi-PCa slab), 3… Beam, 3a…
Beam reinforcement, 4, 4 ', 4 "... pillar member, 5 ... connecting plate, 5a ...
Fixture, 5b Connection bolt, A Column.

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】柱の中心部に建込まれて現場打ちされる柱
コンクリート内に埋め殺しとなる下階の柱支持部材の上
部に支柱部材を付設し、該支柱部材を介して上階の柱支
持部材を接続する工法において、上記柱上に接合される
梁の梁筋を貫くように上記支柱部材を形成し、該支柱部
材の上端部に取り付けられた接続板に、上階の柱支持部
材の基部に設けた柱基板を接続固定することを特徴とす
る鉄筋コンクリート造建物の構築工法。
1. A pillar member is attached to an upper portion of a pillar supporting member on a lower floor which is buried in a pillar concrete which is built at the center of the pillar and is cast in place, and the pillar member on the upper floor is connected via the pillar member. In the method of connecting a column supporting member, the column member is formed so as to penetrate a beam reinforcement of a beam joined on the column, and a connecting plate attached to an upper end portion of the column member supports a column support of an upper floor. A method for constructing a reinforced concrete building, comprising connecting and fixing a pillar substrate provided at a base of a member.
【請求項2】上記柱支持部材が、鋼製パイプ内にコンク
リートを充填して構成されていることを特徴とする請求
項1に記載の鉄筋コンクリート造建物の構築工法。
2. The method for constructing a reinforced concrete building according to claim 1, wherein said column supporting member is constituted by filling concrete in a steel pipe.
JP1324642A 1989-12-14 1989-12-14 Construction method of reinforced concrete building Expired - Fee Related JP2759360B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1324642A JP2759360B2 (en) 1989-12-14 1989-12-14 Construction method of reinforced concrete building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1324642A JP2759360B2 (en) 1989-12-14 1989-12-14 Construction method of reinforced concrete building

Publications (2)

Publication Number Publication Date
JPH03183835A JPH03183835A (en) 1991-08-09
JP2759360B2 true JP2759360B2 (en) 1998-05-28

Family

ID=18168110

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1324642A Expired - Fee Related JP2759360B2 (en) 1989-12-14 1989-12-14 Construction method of reinforced concrete building

Country Status (1)

Country Link
JP (1) JP2759360B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61196036A (en) * 1985-02-25 1986-08-30 フドウ建研株式会社 Connection of precast pillar and precast beam

Also Published As

Publication number Publication date
JPH03183835A (en) 1991-08-09

Similar Documents

Publication Publication Date Title
JPH09209451A (en) Joint construction of up and down columns with beam and joint method
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
JP2759360B2 (en) Construction method of reinforced concrete building
JP3138981B2 (en) Construction method of reinforced concrete building
JP2000160687A (en) Construction method of mixed structure and precast concrete column
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP2928002B2 (en) Column formwork structure
JPH0781307B2 (en) How to build a skyscraper
JP2002194892A (en) Construction method of building
JP3138982B2 (en) Building with mixed structure and its construction method
JP2780055B2 (en) Construction method of reinforced concrete building
JP2558094Y2 (en) Embedded pillar PCa member for construction of reinforced concrete buildings
JP2000336748A (en) Erection method of two-story house
JP2745238B2 (en) Temporary support for slab half PCa board erection
JP2811211B2 (en) Flat slab construction method
JP3143659B2 (en) Structure of reinforced concrete building
JP2722121B2 (en) Construction method of reinforced concrete building
JPH09256631A (en) Construction method of reinforced concrete wall
JP2984626B2 (en) PC pillar construction method and its PC pillar
JPS5891246A (en) Concrete ramen prefabricating construction
JPH0765368B2 (en) Precast concrete half flat slab
JPH0365451B2 (en)
JPH032435A (en) Construction method for jointing column and steel frame reinforced-concrete beam to each other
JPS6375231A (en) Building housing
JP2832622B2 (en) Semi-PCa column unit for flat slab construction

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees