Method for casting cast product with hanger for pulling up

Info

Publication number
JPH0639522A
JPH0639522A JP21850892A JP21850892A JPH0639522A JP H0639522 A JPH0639522 A JP H0639522A JP 21850892 A JP21850892 A JP 21850892A JP 21850892 A JP21850892 A JP 21850892A JP H0639522 A JPH0639522 A JP H0639522A
Authority
JP
Japan
Prior art keywords
casting
cast product
sand mold
pulling
pull
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21850892A
Other languages
Japanese (ja)
Other versions
JP2933252B2 (en
Inventor
Shigeaki Yamamoto
茂昭 山本
Tokiya Terabe
斗紀也 寺部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sintokogio Ltd
Original Assignee
Sintokogio Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sintokogio Ltd filed Critical Sintokogio Ltd
Priority to JP21850892A priority Critical patent/JP2933252B2/en
Publication of JPH0639522A publication Critical patent/JPH0639522A/en
Application granted granted Critical
Publication of JP2933252B2 publication Critical patent/JP2933252B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PURPOSE:To simply cast a cast product having the configuration which can separate various kinds of the cast products from a sand mold by pulling up. CONSTITUTION:The sand mold 4 arranging two or more of risers 7, feeder heads or sprues reaching to the upper end surface of the sand mold in the suitable interval at the upper part of a cavity 5 for casting product is prepared and a part of hanger 10 for pulling up is inserted and set into the upper part of the riser 7, etc. Thereafter, molten metal is poured so as to insert the inserting part of the hanger 10 for pulling up, by which the molten metal rises in the riser 7, etc., through a sprue 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鋳造品を砂鋳型から抜
き出すための抜上げ吊手を付属させた鋳造品の鋳造方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for casting a cast product with a lifting hook for pulling the cast product from a sand mold.

【0002】[0002]

【従来技術と問題点】従来鋳造品を砂鋳型から抜き上げ
るには砂鋳型の中にある鋳造品の湯口、揚り、あるいは
押湯等の首部近辺にホ−クを突き刺しこのホ−クを上昇
させて湯口、揚り、あるいは押湯に係合させて抜き出す
ようにしている。一方近年大量生産鋳造ラインにおいて
も湯口、揚りあるいは押湯等の取付位置が異なる何種類
かの製品を鋳造するようになってきている。このように
1つの鋳造ラインで何種類かの鋳造品を鋳造する場合
は、異なる位置にある湯口、揚り、あるいは押湯等の首
部近辺にホ−クを対応させて突き刺すことが困難とな
り、鋳造品の抜き上げによる砂鋳型との分離は行なわれ
ないようになってきている。
2. Description of the Related Art Conventionally, in order to pull out a cast product from a sand mold, a hawk is pierced near the neck of a cast product in the sand mold such as a sprue, a lifter or a riser It is raised to engage with the sprue, lift, or riser for withdrawal. On the other hand, in recent years, some mass-production casting lines have begun to cast several kinds of products having different mounting positions such as a sprue, a lift or a riser. As described above, when casting several kinds of castings on one casting line, it becomes difficult to pierce the forks at different positions such as a sprue, a lifter, or a riser in the vicinity of the neck with a fork. Separation from the sand mold by pulling up the casting has become difficult.

【0003】しかし鋳造品を抜き上げにより砂鋳型から
分離する方法は、鋳造品を保持した状態で抜き上げるこ
とからその後の鋳造品の後処理のために位置決めをして
搬送をする場合等に非常に有利であり、1つの鋳造ライ
ンにおいて何種類かの鋳造品を鋳造する場合においても
抜き上げにより鋳造品を砂鋳型から分離し得る方式に適
応可能な方策の出現が望まれているところである。本発
明は上記に鑑みて成されたもので各種の鋳造品を抜き上
げにより砂鋳型から分離し得る構成の鋳造品を鋳造する
方法を提供することを目的とするものである。
However, the method of separating the cast product from the sand mold by pulling up the cast product is very important when the cast product is pulled out while it is held and then the cast product is positioned and transported for post-treatment. Therefore, it is desired to develop a method capable of separating the casting product from the sand mold by pulling up even when casting several kinds of casting products in one casting line. The present invention is made in view of the above, and an object of the present invention is to provide a method for casting a cast product having a structure in which various cast products can be separated from a sand mold by pulling out.

【0004】[0004]

【問題解決のための手段】本発明者逹は各種の鋳造品に
対し、砂鋳型から抜上げ分離を可能にする方策として、
鋳造品に抜上げ用の吊手を砂鋳型の上部において一体的
に溶着させ、この抜上げ用の吊手にワイヤ−あるいは鎖
をフック掛けし、このワイヤ−あるいは鎖を機械的に引
上げることにより一部手作業が介在するにしても実現可
能になることを見い出した。
[Means for Solving the Problem] The inventors of the present invention have found that various castings can be pulled out from a sand mold and separated as a measure.
To integrally pull up the lifting hook on the cast product at the top of the sand mold, hook the wire or chain on the lifting hook, and mechanically pull up the wire or chain. Therefore, it was found that even if some manual work is involved, it can be realized.

【0005】[0005]

【作用】本発明は上記のような抜上げによる鋳造品の砂
鋳型からの分離を可能にする抜上げ吊手付鋳造品の鋳造
方法であって、鋳造品キャビティ−の上部に砂型の上端
面に達する揚りあるいは押湯または湯口を2本以上適宜
の間隔をおいて設けた砂鋳型を準備し、前記揚りあるい
は押湯または湯口の上部に鋳造品の抜上げ吊手の一部を
挿入配置し、その後溶湯を湯口を介して該溶湯が揚りあ
るいは押湯または湯口を上昇して前記抜上げ吊手の挿入
部を鋳包むまで注入することを特徴とするものである。
The present invention is a method of casting a cast product with a pull-up handle, which enables the cast product to be separated from the sand mold by pulling out as described above, in which the upper end face of the sand mold is provided on the upper part of the cast product cavity. Prepare a sand mold with at least two lifts or feeders or sprues provided at appropriate intervals, and insert a part of the lifter for castings into the upper part of the lifts or feeders or sprues. After that, the molten metal is poured through the sprue until the molten metal is lifted or raised or the sprue is raised and the insertion portion of the pull-up lifting hand is cast and wrapped.

【0006】[0006]

【作用】本発明は上記のような構成を採用することによ
り砂鋳型の上部に露出して取付けられた抜上げ吊手にワ
イヤ−あるいは鎖をフック掛けして、このワイヤ−ある
いは鎖を機械的に引き上げるようにすることにより各種
の鋳造品に対応して砂鋳型からの抜上げ分離ができるよ
うになる。
According to the present invention, by adopting the above-mentioned structure, the wire or chain is hooked on the pulling-out lifting hand which is exposed and attached to the upper part of the sand mold, and the wire or chain is mechanically attached. By pulling it up, it becomes possible to pull out and separate from the sand mold corresponding to various cast products.

【0007】[0007]

【実施例】【Example】

(実施例1)第1の実施例を図1及び図2により詳しく
説明するに、レ−ル1上には定盤台車2が走行自在に配
置されており、該定盤台車2の上部には鋳枠3.3付の
水平割砂鋳型4が載置されている。該砂鋳型4の内部に
は鋳造品キャビティ−5が構成されており、該鋳造品キ
ャビティ−5の型合せ面位置には湯口6に通じる湯道が
連通されている。また該鋳造品キャビティ−5の上端部
には該砂鋳型4の上端に達する2本の揚り7.7が適当
な間隔をおいて形成されている。
(Embodiment 1) A first embodiment will be described in detail with reference to FIGS. 1 and 2. A platen truck 2 is movably arranged on a rail 1 and is mounted on an upper portion of the platen truck 2. Is mounted with a horizontal sand mold 4 with a casting frame 3.3. A casting product cavity 5 is formed inside the sand casting mold 4, and a runner communicating with the sprue 6 is communicated with a position of the casting product cavity 5 on the mold matching surface. Further, at the upper end portion of the casting product cavity-5, two lifts 7.7 reaching the upper end of the sand mold 4 are formed at appropriate intervals.

【0008】このような鋳枠3.3付の砂鋳型4を準備
した状態(以上の構成は第2、第3実施例においても同
じ構成である。)で前記各揚り7.7の上部に、その上
部にリンク8を取り付けると共に中間部にセツト座9を
設けた抜上げ吊手10の下部突出片11を挿入してセッ
トし(図1参照)、さらに砂鋳型4の上部にリンク8.
8に対応する凹部12及び湯口6に連通する貫通孔13
を設けた重り14を載置した後、湯口6から溶湯を該溶
湯が鋳造品キャビティ−5から揚り7.7を上昇して抜
上げ吊手10の挿入されている下部突出片11を鋳包む
まで注入する。その後溶湯が凝固して揚り7と抜上げ吊
手10が溶着一体化され図2の状態になる。鋳造品を砂
鋳型4から抜上げ分離するには図2の状態で重り14を
取り除いた後リンク8.8にワイヤ−をフック掛けし、
このワイヤ−を機械的に引き上げることにより行なわれ
る。
In a state where the sand mold 4 with such a casting mold 3.3 is prepared (the above-mentioned constitution is the same constitution in the second and third embodiments), the upper part of each of the above-mentioned frying 7.7. Then, the link 8 is attached to the upper part thereof and the lower projecting piece 11 of the lifting and lowering hand 10 provided with the set seat 9 in the middle is inserted and set (see FIG. 1), and further the link 8 is attached to the upper part of the sand mold 4. .
8 corresponding to the recess 12 and the through hole 13 communicating with the sprue 6
After mounting the weight 14 provided with the above, the molten metal is lifted from the casting hole cavity -5 by raising the molten metal from the sprue 6 and casting the lower projecting piece 11 into which the hanging hand 10 is inserted. Inject until wrapped. After that, the molten metal is solidified, and the lift 7 and the lifting lifter 10 are welded and integrated into the state shown in FIG. In order to pull out and separate the cast product from the sand mold 4, after removing the weight 14 in the state of FIG. 2, hook the wire on the link 8.8,
This is done by mechanically lifting the wire.

【0009】(実施例2)第2の実施例を図3から図5
により説明すると、鋳枠3.3付の砂鋳型4を準備する
構成は前記実施例1と全く同じである。この状態で前記
揚り、7.7の上部に、その下面をセット座とすると共
に上面を取付座とした座板9Aの下部に突出片11Aを
取付けた抜上げ吊手補助具10Aの突出片11Aを挿入
してセットし(図3参照)、さらに砂鋳型4の上部に湯
口6に連通する貫通孔13Aを設けた重り14Aを載置
した後、実施例1と同様にして溶湯の注入を行ない、溶
湯が凝固して揚り7と抜上げ吊手補助具10Aが溶着一
体化され図4の状態になる。次に重り14Aを取り除い
た後リンク8Aを溶接等の手段により前記座板9Aの上
面に取付けて図5の状態にする。尚鋳造品を砂鋳型4か
ら抜上げ分離するのは実施例1と同様にして行なう。
(Embodiment 2) A second embodiment is shown in FIGS.
The structure for preparing the sand mold 4 with the flask 3.3 is exactly the same as in the first embodiment. In this state, the projecting piece of the hoisting aid 10A in which the projecting piece 11A is attached to the lower part of the seat plate 9A having the lower surface as a set seat and the upper surface as a mounting seat in the upper part of the lifting and 7.7. 11A was inserted and set (see FIG. 3), and a weight 14A having a through hole 13A communicating with the sprue 6 was placed on the upper part of the sand mold 4, and then the molten metal was injected in the same manner as in Example 1. When the molten metal is solidified, the lift 7 and the lifting lifting aid 10A are welded and integrated into the state shown in FIG. Next, after removing the weight 14A, the link 8A is attached to the upper surface of the seat plate 9A by means such as welding to obtain the state of FIG. The casting is pulled out of the sand mold 4 and separated in the same manner as in the first embodiment.

【0010】(実施例3)第3の実施例を図6及び図7
により説明すると、この方法は重りを必要としない砂鋳
型4に対して実施するものであって鋳枠3.3付の砂鋳
型4を準備する構成は前記実施例1及び実施例2と全く
同じである。この状態で前記揚り7.7の上部に、ロボ
ット15のハンドにより吊り下げ支持したハンガ−体1
6の両下端部を挿入してその状態を保持し(図6参
照)、湯口から溶湯を該溶湯が揚り7.7に挿入されて
いるハンガ−体16の両下端部を鋳包むまで注入し溶湯
が凝固するまで保持する。溶湯が凝固してハンガ−体1
6と揚り部が溶着一体化されるとロボット15のハンド
を抜き出して図7の状態になる。尚鋳造品を砂鋳型4か
ら抜上げ分離するにはハンガ−体16にワイヤ−をフッ
ク掛けし、このワイヤ−を機械的に引上げることにより
行なわれる。
(Embodiment 3) Third Embodiment FIGS. 6 and 7
In order to explain by this, this method is carried out for the sand mold 4 which does not require a weight, and the structure for preparing the sand mold 4 with the casting frame 3.3 is exactly the same as that of the first and second embodiments. Is. In this state, the hanger body 1 suspended and supported by the hand of the robot 15 on the upper part of the lifting 7.7.
Both lower ends of 6 are inserted and kept in that state (see FIG. 6), and molten metal is poured from the sprue until the molten metal is lifted and both lower ends of the hanger body 16 inserted in 7.7 are cast and wrapped. Hold until the molten metal solidifies. Molten metal solidifies and hanger body 1
When 6 and the lifting portion are integrated by welding, the hand of the robot 15 is pulled out and the state shown in FIG. 7 is obtained. The cast product is pulled out from the sand mold 4 and separated by hooking a wire on the hanger body 16 and mechanically pulling up the wire.

【0011】尚上記実施例においては揚り7.7を利用
して吊手10、吊手補助具10A、ハンガ−体16を溶
着させるようにしているが押湯あるいは湯口を利用して
もよい。さらにこれら揚り7.7は2本形成してあるが
吊り下げ状態を安定させるために3〜4本設けてもよ
い。また吊手10、吊補助具10A、ハンガ−体16へ
のワイヤ−のフック掛けは、ワイヤ−を鎖にしてもよ
い。
In the above embodiment, the lift 7.7 is used to weld the hanger 10, the hanger aid 10A, and the hanger body 16, but a feeder or sprue may be used. . Further, although two of these lifting 7.7 are formed, three or four of them may be provided to stabilize the suspended state. Further, when hooking the wire on the hanger 10, the lifting aid 10A, and the hanger body 16, the wire may be chained.

【0012】[0012]

【発明の効果】本発明は上記の説明からも明らかなよう
に、鋳造品の種類に変更がある場合においても砂鋳型か
らの抜き出しによる分離を行ない得る抜上げ吊手付鋳造
品を容易に鋳造することができるようになり、鋳造品の
後処理のための位置き決め等にきわめて有利であり、鋳
造プラントの構築において寄与する効果は著大である。
As is apparent from the above description, the present invention easily casts a cast product with a pull-up handle that can be separated by extracting from the sand mold even when the type of the cast product is changed. Since it is possible to do so, it is extremely advantageous for deciding the position for post-treatment of cast products and the effect of contributing to the construction of a casting plant is significant.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例1の鋳造工程を示すものにして溶湯注入
前の状態を示す縦断面図である。
FIG. 1 is a vertical cross-sectional view showing a casting process of Example 1 and showing a state before molten metal injection.

【図2】同溶湯の注入完了状態を示す縦断面図である。FIG. 2 is a vertical cross-sectional view showing a state where injection of the molten metal is completed.

【図3】実施例2の鋳造工程を示すものにして溶湯注入
前の状態を示す縦断面図である。
FIG. 3 is a vertical cross-sectional view showing a casting process of Example 2 and showing a state before pouring molten metal.

【図4】同溶湯の注入完了状態を示す縦断面図である。FIG. 4 is a vertical cross-sectional view showing a state where injection of the molten metal is completed.

【図5】同吊手補助具にリンクを溶着した状態を示す縦
断面図である。
FIG. 5 is a vertical cross-sectional view showing a state in which a link is welded to the lifting hand assisting tool.

【図6】実施例3の鋳造工程の示すものにして溶湯注入
前の状態を示す縦断面図である。
FIG. 6 is a vertical cross-sectional view showing a state before injection of molten metal as shown in a casting process of Example 3.

【図7】同溶湯の注入完了状態からロボットのハンドを
取り除いた状態を示す縦断面図である。
FIG. 7 is a vertical cross-sectional view showing a state in which the robot hand has been removed from the state where the molten metal has been completely injected.

【符号の説明】[Explanation of symbols]

4 砂鋳型 5 鋳造品キャビティ− 6 湯口 7 揚り 10 抜上げ吊手 10A 抜上げ吊手補助具 15 ロボット 16 ハンガ−体 4 Sand Mold 5 Cavity Cavity 6 Gate 7 Lifting 10 Lifting Lifter 10A Lifting Lifter Aid 15 Robot 16 Hanger Body

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 鋳造品キャビティ−の上部に砂型の上端
面に達する揚りあるいは押湯または湯口を2本以上適宜
の間隔をおいて設けた砂鋳型を準備し、前記揚りあるい
は押湯または湯口の上部に、鋳造品の抜上げ吊手の一部
を挿入配置し、その後溶湯を湯口を介して該溶湯が揚り
あるいは押湯または湯口を上昇して前記抜上げ吊手の挿
入部を鋳包むまで注入することを特徴とする抜上げ吊手
付鋳造品の鋳造方法。
1. A sand mold provided with two or more lifts or risers reaching the upper end surface of a sand mold at the upper part of a cast product cavity at appropriate intervals, and the above-mentioned lifts or risers or At the upper part of the sprue, a part of the lifting hook of the cast product is inserted and arranged, and then the molten metal is lifted through the sprue or rises at the riser or the spout and the insertion part of the lifting hoist is inserted. A casting method for a cast product with a pull-up handle, which is characterized by pouring until casting.
【請求項2】 前記抜上げ吊が独立した個々のリンク付
吊手になっていることを特徴とする請求項1記載の抜上
げ吊手付鋳造品の鋳造方法。
2. The method for casting a cast product with a pull-up handle according to claim 1, wherein the pull-up suspension is an independent link-attached lifter.
【請求項3】 前記抜上げ吊手が独立した個々のリンク
取付座になっていることを特徴とする請求項1記載の抜
上げ吊手付鋳造品の鋳造方法。
3. The method for casting a cast product with a pull-up lift according to claim 1, wherein the pull-up lift is an independent individual link attachment seat.
【請求項4】 前記抜上げ吊手が一本のハンガ−に構成
されその両端が前記揚りあるいは押湯または湯口の上部
に挿入されることを特徴とする請求項1記載の抜上げ吊
手付鋳造品の鋳造方法。
4. The lifter according to claim 1, wherein the lifter is constructed as a single hanger, and both ends of the lifter are inserted into the upper part of the lifting or feeder or the sprue. Casting method for castings.
JP21850892A 1992-07-24 1992-07-24 Casting method for cast products Expired - Fee Related JP2933252B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21850892A JP2933252B2 (en) 1992-07-24 1992-07-24 Casting method for cast products

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21850892A JP2933252B2 (en) 1992-07-24 1992-07-24 Casting method for cast products

Publications (2)

Publication Number Publication Date
JPH0639522A true JPH0639522A (en) 1994-02-15
JP2933252B2 JP2933252B2 (en) 1999-08-09

Family

ID=16721029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21850892A Expired - Fee Related JP2933252B2 (en) 1992-07-24 1992-07-24 Casting method for cast products

Country Status (1)

Country Link
JP (1) JP2933252B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009297767A (en) * 2008-06-16 2009-12-24 Yokohama Rubber Co Ltd:The Method for carrying casting
CN111545730A (en) * 2020-06-24 2020-08-18 通裕重工股份有限公司 Box opening method for megawatt high-tonnage wind power casting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009297767A (en) * 2008-06-16 2009-12-24 Yokohama Rubber Co Ltd:The Method for carrying casting
CN111545730A (en) * 2020-06-24 2020-08-18 通裕重工股份有限公司 Box opening method for megawatt high-tonnage wind power casting

Also Published As

Publication number Publication date
JP2933252B2 (en) 1999-08-09

Similar Documents

Publication Publication Date Title
US4154289A (en) Gating system
JPH0639522A (en) Method for casting cast product with hanger for pulling up
US6446698B1 (en) Investment casting with exothermic material
JP2656510B2 (en) Molten forging
CN113618025A (en) Casting sand core positioning device and positioning method thereof
CN204413123U (en) Swage carries out sand casting case unpacker
EP0356659A3 (en) Countergravity casting apparatus and process for casting thinwalled parts
JP2560356B2 (en) Vacuum suction precision casting method
CN106670403A (en) Sand mould casting stripping device
CN221047294U (en) Casting pot hand rack
CN218174369U (en) Novel ladle cover taking and placing mechanism
CN110395656A (en) Half hanging wall construction sand core suspender of one kind and its handling method
US6520243B1 (en) Mold riding shot blocker
JP5056606B2 (en) Casting method
CN214456141U (en) Device for processing pouring interruption of tundish
JPH02155533A (en) Casting device
CN211161801U (en) Mould cover
CN220178162U (en) Tundish steel slag lifting device
JPS632203Y2 (en)
JPS647016Y2 (en)
KR960001354Y1 (en) Removal device of tundish residual metal
JPH0231243Y2 (en)
JP2571455B2 (en) Method of preventing air vent clogging of die for vertical die casting machine and structure for preventing clogging
JPH0133266Y2 (en)
US1680872A (en) Ingot mold

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090528

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090528

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100528

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110528

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees