JPH06257283A - Construction of ceiling - Google Patents

Construction of ceiling

Info

Publication number
JPH06257283A
JPH06257283A JP5043070A JP4307093A JPH06257283A JP H06257283 A JPH06257283 A JP H06257283A JP 5043070 A JP5043070 A JP 5043070A JP 4307093 A JP4307093 A JP 4307093A JP H06257283 A JPH06257283 A JP H06257283A
Authority
JP
Japan
Prior art keywords
ceiling
equipment
pallet
unit
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP5043070A
Other languages
Japanese (ja)
Inventor
Shigeyuki Himeki
茂之 姫木
Takashi Fukumura
貴司 福村
Kenji Nakamura
健二 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Panasonic Electric Works Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp, Matsushita Electric Works Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP5043070A priority Critical patent/JPH06257283A/en
Publication of JPH06257283A publication Critical patent/JPH06257283A/en
Withdrawn legal-status Critical Current

Links

Abstract

PURPOSE:To provide a construction method of a ceiling which is good at workability, high in construction accuracy, and low in cost. CONSTITUTION:A working table 6 comprising a pallet 4 supported by legs 5, 5 is arranged on the floor 2. Ceiling frames 7, 8 are jointed to each other on the pallet 4 of the working table 6. Ceiling facilities such as piping equipment 23, 24, lighting equipment 12, air-conditioning equipment 18, fire extinguishing equipment, etc., are assembled to complete a ceiling unit 1. And the ceiling unit is lifted up together with the pallet 4 to suspend at a specified level where the ceiling 3 is constructed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、一般の建物、高層ビル
等の建築物に適用され、建築仕上げ工事と設備工事とを
一体化し、天井工事を合理化することができる天井の施
工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a ceiling construction method applied to buildings such as general buildings and high-rise buildings, which is capable of rationalizing ceiling construction by integrating construction finishing work and equipment work.

【0002】[0002]

【従来の技術】従来、照明設備、空調設備及び消火設備
等が組み込まれている天井を施工する場合には、複数の
施工業者により各工程の施工が行われていた。すなわ
ち、天井の施工工程には、天井の大枠部を組み込む工
程、照明設備等を組み込む電気設備工程、空調機器、パ
ッケージエアコンを設ける空調設備、排水管や給水管を
設ける衛生設備工程、スプリンクラーや感知器等を設け
る消火・防火設備工程などの工程があり、これらの工程
を異なる施工業者が入れ替わりに行っていた。さらに、
各工程を行う同一の施工業者の中においても、更に細分
化されて異なる施工業者(例えばダクト工事では配管
工、保温工、塗装工)により作業が行われていた。
2. Description of the Related Art Conventionally, when constructing a ceiling in which lighting equipment, air conditioning equipment, fire extinguishing equipment and the like are incorporated, a plurality of contractors have carried out the respective steps. That is, in the ceiling construction process, the process of incorporating the large frame of the ceiling, the electric facility process that incorporates lighting equipment, the air conditioning equipment, the air conditioning facility that provides the package air conditioner, the sanitary facility process that provides the drainage pipe and the water supply pipe, the sprinkler and the sensing process. There were processes such as fire extinguishing and fire prevention equipment processes for installing firearms, etc., and different contractors performed these processes in turn. further,
Even within the same contractor who carries out each process, the work was further subdivided and performed by different contractors (for example, a plumber, a heat insulator, and a painter in duct construction).

【0003】[0003]

【発明が解決しようとする課題】ところが、上記方法に
より天井施工を行う場合には、以下に示す問題が発生し
ていた。 各設備工程を異なる施工業者が段階的に独自の施工
管理で行っていたため、各設備用の専用部品が増えてし
まい、部品点数が多い天井構造となっていた。 取付手間や複雑な工程間の調整の手間がかかるとと
もに、施工業者間(工程間)の調整ミスによる作業の手
直しが発生するおそれがあった。 天井部の狭い空間で各設備の配管接続作業などを行
わなければならず、さらには、天井面となる天井板を床
面位置から引き揚げる作業を頻繁に行わなければなら
ず、作業能率が極めて悪かった。
However, when the ceiling construction is performed by the above method, the following problems occur. Since different contractors performed each equipment process step by step under their own construction management, the number of dedicated parts for each equipment increased, resulting in a ceiling structure with many parts. In addition to the time and effort required for mounting and adjustment between complicated processes, there is a risk that work may be reworked due to an adjustment error between contractors (between processes). It is necessary to perform piping connection work for each equipment in a narrow space in the ceiling, and also to frequently lift the ceiling board, which is the ceiling surface, from the floor surface position. It was

【0004】これら問題を解決する手段として、作業性
の良い床レベルにおいて、天井フレームに予め天井面と
なる複数の天井仕上げ材を配置しておくとともに、上述
した各設備を前記天井フレームに組み込み、フォークリ
フト等の重量物の昇降を自在に行うリフターにより天井
フレーム全体を天井レベルまで上げて、天井部に取付け
られた吊り下げ具に天井フレームを接合して吊り下げ、
天井施工の省力化を図ることができる天井のユニット化
工法が開発され、実用されている。
As a means for solving these problems, a plurality of ceiling finishing materials to serve as ceiling surfaces are arranged in advance on the ceiling frame at the floor level with good workability, and the above-mentioned facilities are incorporated into the ceiling frame, Lift the entire ceiling frame to the ceiling level with a lifter that freely lifts and lifts heavy objects such as a forklift, and hangs the ceiling frame by joining the ceiling frame to a hanging tool attached to the ceiling.
A unitized construction method for the ceiling has been developed and put into practical use, which can save labor in ceiling construction.

【0005】しかしながら、上述したユニット化工法に
は次のような課題が存在する。すなわち、上記の天井の
ユニット化工法では、通常1600ミリ角程度の天井フ
レームに天井設備が組み込まれた天井ユニットが使用さ
れており、 天井ユニットに取付けた配管などの接続箇所が多く
なる。 天井ユニットを揚重し、吊り込む回数が多くなる。 等の問題により作業効率が低くならざるを得ず、作業効
率を向上させる何らかの手段が望まれていた。
However, the above-mentioned unitized construction method has the following problems. That is, in the above-described ceiling unit construction method, a ceiling unit in which ceiling equipment is built into a ceiling frame of about 1600 mm square is usually used, and the number of connecting points such as piping attached to the ceiling unit increases. The ceiling unit is hoisted and the number of times of hanging is increased. Due to such problems as above, the work efficiency must be lowered, and some means for improving the work efficiency have been desired.

【0006】この作業効率を向上させる手段として、単
に、天井ユニットを大型化して使用することが考えられ
るが、この場合には、以下のような問題が生じてくる。 設置位置での作業では、作業者の手が届かず、組み
立てに難を生じ、組立場所も大きくとる。 揚重するために大型のリフターが必要となり、その
取り回しも悪くなる。 天井フレームの橈みが大きくなる。 従って、精度の高い天井を効率よく形成することが困難
であった。
As a means for improving the work efficiency, it is conceivable to simply enlarge the ceiling unit for use, but in this case, the following problems occur. The work at the installation position is out of reach of the operator, which causes difficulty in assembling and requires a large assembling place. A large lifter is required to lift it, and its handling becomes poor. The radius of the ceiling frame becomes large. Therefore, it is difficult to efficiently form a highly accurate ceiling.

【0007】この問題の解決手段として、天井フレーム
自体の強度を高めることが考えられるが、部材コストが
上昇し、施工コストが増大してしまう問題がある。
As a means for solving this problem, it is conceivable to increase the strength of the ceiling frame itself, but there is a problem that the cost of members increases and the construction cost also increases.

【0008】本発明は、上記の課題に鑑みてなされたも
ので、作業効率がよく、しかも施工精度が高く、かつ施
工コストを抑さえることができる天井工事の施工方法を
提供することを目的としている。
The present invention has been made in view of the above problems, and an object of the present invention is to provide a construction method for ceiling construction which has high work efficiency, high construction accuracy, and low construction cost. There is.

【0009】[0009]

【課題を解決するための手段】本発明は、床上に脚部材
と該脚部材に支持されたパレットからなる作業台を配置
し、前記パレット上で複数の天井フレームを接続し、こ
れら天井フレームに、配管設備、照明設備、空調設備、
消火設備等の天井設備を組み込んで天井ユニットを作製
し、前記天井ユニットを前記パレットごと揚重し、所定
の天井施工位置に吊設して天井を形成することを特徴と
している。
According to the present invention, a workbench including a leg member and a pallet supported by the leg member is arranged on a floor, a plurality of ceiling frames are connected on the pallet, and the ceiling frames are connected to these ceiling frames. , Plumbing equipment, lighting equipment, air conditioning equipment,
A ceiling unit is manufactured by incorporating ceiling equipment such as fire extinguishing equipment, and the ceiling unit is lifted together with the pallet and suspended at a predetermined ceiling construction position to form a ceiling.

【0010】[0010]

【作用】本発明では、床上に脚部材と該脚部材に支持さ
れたパレットからなる作業台が配置され、前記パレット
上で複数の天井フレームが接続され、これら天井フレー
ムに配管設備、照明設備、空調設備、消火設備などの天
井設備が組み込まれた天井ユニットが作製され、前記天
井ユニットが前記パレットごと揚重され、所定の天井施
工位置に吊設されて天井の形成がなされる。
According to the present invention, a workbench including a leg member and a pallet supported by the leg member is arranged on the floor, and a plurality of ceiling frames are connected on the pallet. Plumbing equipment, lighting equipment, A ceiling unit in which ceiling equipment such as air conditioning equipment and fire extinguishing equipment is incorporated is produced, and the ceiling unit is lifted together with the pallet and hung at a predetermined ceiling construction position to form a ceiling.

【0011】[0011]

【実施例】以下、本発明の実施例を添付図面を参照して
詳細に説明する。図1ないし図3は、本発明の天井の施
工方法において使用される天井ユニットおよびその作業
台の一実施例を示したものである。図において符号1は
天井ユニットであり、2は床、3は天井である。
Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. 1 to 3 show an embodiment of a ceiling unit and its workbench used in the ceiling construction method of the present invention. In the figure, reference numeral 1 is a ceiling unit, 2 is a floor, and 3 is a ceiling.

【0012】図1に示したように、床2上には、矩形の
枠部内に桟部が格子状に設けられたパレット4と、パレ
ット4に着脱自在に設けられパレット4を支持する脚部
材5とからなる作業台6が配置されている。パレット4
の枠部の上面には、天井ユニット1を構成する2基の矩
形の天井フレーム7、8が載置されている。
As shown in FIG. 1, on the floor 2, there is a pallet 4 in which crosspieces are arranged in a grid in a rectangular frame, and a leg member detachably attached to the pallet 4 to support the pallet 4. A workbench 6 composed of 5 and 5 is arranged. Pallet 4
On the upper surface of the frame portion, two rectangular ceiling frames 7 and 8 that constitute the ceiling unit 1 are placed.

【0013】図2に示したように、天井フレーム8に隣
接する天井フレーム7のウェブには、係合金物9がビス
固定されており、この係合金物9を天井フレーム8に設
けられた係合凹部10に係合させることにより天井フレ
ーム7、8の互いに対向する下端フランジがクリアラン
スをもって接続される構成となっている。
As shown in FIG. 2, an engaging metal piece 9 is fixed to the web of the ceiling frame 7 adjacent to the ceiling frame 8 with a screw, and the engaging metal piece 9 is provided on the ceiling frame 8. By engaging the fitting recesses 10, the lower end flanges of the ceiling frames 7 and 8 facing each other are connected with a clearance.

【0014】天井フレーム7の内側の下端フランジ11
には矩形の照明器具12(照明設備)が載置されてい
る。この照明器具12の内側にはフランジ13が設けら
れており、このフランジ13にフレーム材15、…(図
1参照)を介して連接された天井仕上げ材16、…が嵌
め込まれている。
Lower end flange 11 inside ceiling frame 7
A rectangular lighting fixture 12 (lighting equipment) is placed on the. A flange 13 is provided inside the lighting fixture 12, and a ceiling finishing material 16, ... Connected to the flange 13 via a frame material 15, ... (See FIG. 1) is fitted therein.

【0015】また、図1に示したように、天井フレーム
7には、照明器具12の両側に配設されるとともに、集
合ダクト17で接続された吹き出し18、18(空調設
備)が取り付けられている。ここで、天井フレーム7、
8の接続部分における吹き出し18の取り付け構造は、
図2に示すように、吹き出し18の側面に設けた係合凹
部19、19が天井フレーム7、8の上端フランジに係
合するようになっている。そして、吹き出し18の吹出
口20が天井フレーム7、8の下端フランジ間のクリア
ランスに位置するように配置されて取り付けられてい
る。
Further, as shown in FIG. 1, the ceiling frame 7 is provided with blowouts 18, 18 (air conditioning equipment) which are arranged on both sides of the lighting fixture 12 and which are connected by a collecting duct 17. There is. Here, the ceiling frame 7,
The attachment structure of the blow-off 18 at the connection part of 8 is
As shown in FIG. 2, the engagement recesses 19 and 19 provided on the side surfaces of the blow-out 18 engage with the upper end flanges of the ceiling frames 7 and 8. The outlet 20 of the blow-out 18 is arranged and attached so as to be located in the clearance between the lower end flanges of the ceiling frames 7 and 8.

【0016】さらに、図1に示すように、天井フレーム
7には門型の支持金物21、21、22、22が取り付
けられている。支持金物21、21には、天井フレーム
7、8の連なる方向に沿わせて延び、天井ユニット1の
長尺方向の長さ(天井フレーム7、8の接続長さ)に合
わせて設けられたサブダクト23(配管設備)が固定さ
れており、このサブダクト23に集合ダクト17が接続
されている。支持金物22、22には、サブダクト23
に沿って延びる配水管24(配管設備)が固定されてい
る。照明器具12内に嵌め込まれた天井仕上げ材16、
…の中央には、スプリンクラー(消火設備;図示せず)
が取り付けられており、このスプリンクラーに上方へ延
びる配水管25が取り付けられている。そしてこの配水
管25と前記配水管24が接続されている。
Further, as shown in FIG. 1, gate-shaped supporting metal parts 21, 21, 22, 22 are attached to the ceiling frame 7. The sub-ducts that extend along the direction in which the ceiling frames 7 and 8 are connected to the supporting hardware 21 and 21 and that are provided according to the length of the ceiling unit 1 in the longitudinal direction (the connection length of the ceiling frames 7 and 8). 23 (pipe equipment) is fixed, and the collecting duct 17 is connected to the sub-duct 23. The support ducts 22, 22 have a sub-duct 23
A water distribution pipe 24 (pipe facility) extending along is fixed. A ceiling finishing material 16 fitted in the lighting fixture 12,
Sprinkler (fire extinguishing equipment; not shown) in the center of
Is attached, and a water pipe 25 extending upward is attached to this sprinkler. The water pipe 25 and the water pipe 24 are connected.

【0017】また、天井フレーム8の内側の下端フラン
ジにはフレーム材26、…を介して連接された天井仕上
げ材27、…が嵌め込まれている。
Further, ceiling finishing materials 27, ... Connected via frame materials 26, ... Are fitted to the lower end flange inside the ceiling frame 8.

【0018】次に、上記の天井ユニット1を使用した天
井の施工方法について説明する。まず、床2上に脚部材
5と脚部材5に支持されたパレット4からなる作業台6
を配置し、作業台6のパレット4上で2基の天井フレー
ム7、8を係合金物9により接続する。そして、天井フ
レーム7内に照明器具12、吹き出し18、18、吹き
出し18、18に接続される集合ダクト17、サブダク
ト23、スプリンクラー、およびスプリンクラーに接続
される配水管24、25と、天井仕上げ材16、…を嵌
め込むとともに、天井フレーム8内に天井仕上げ材2
7、…を嵌め込んで、天井ユニット1を作製する。
Next, a method of constructing a ceiling using the ceiling unit 1 will be described. First, a workbench 6 including a leg member 5 and a pallet 4 supported by the leg member 5 on the floor 2.
Are arranged, and the two ceiling frames 7 and 8 are connected to each other on the pallet 4 of the work table 6 by the engaging hardware 9. Then, in the ceiling frame 7, the lighting fixture 12, the blowouts 18, 18, the collective duct 17 connected to the blowouts 18, 18, the sub-duct 23, the sprinkler, and the water pipes 24, 25 connected to the sprinkler, and the ceiling finishing material 16 , ... and the ceiling finishing material 2 in the ceiling frame 8
The ceiling unit 1 is manufactured by fitting 7, ...

【0019】次に、作業台6のパレット4の下方にリフ
ターを配置し、図3に示したように、天井ユニット1を
パレット4ごとリフター28で天井高さまで揚重する。
そして、予め天井ユニット1を吊設する位置の躯体29
に吊設治具30、…を取り付けておき、この吊設治具3
0、…と天井ユニット1の天井フレーム7、8の枠部と
を接合して吊り下げ、天井3を形成する。そして、上記
の工程を、サブダクト23、配水管24を接続しながら
繰り返し行い、天井3の施工を完了する。
Next, a lifter is arranged below the pallet 4 on the workbench 6, and the ceiling unit 1 is lifted up to the ceiling height by the lifter 28 together with the pallet 4, as shown in FIG.
Then, the frame 29 at the position where the ceiling unit 1 is suspended in advance.
The suspension jig 30 is attached to the suspension jig 3 ...
0, ... And the frame parts of the ceiling frames 7 and 8 of the ceiling unit 1 are joined and suspended to form the ceiling 3. Then, the above steps are repeated while connecting the sub-duct 23 and the water distribution pipe 24 to complete the construction of the ceiling 3.

【0020】上記の天井の施工方法では、床2上に脚部
材5と脚部材5に支持されたパレット4からなる作業台
6が配置され、作業台6のパレット4上で2基の天井フ
レーム7、8が接続され、これら天井フレーム7、8の
連なる方向に沿わせて配管設備が組み込まれるととも
に、照明器具12、吹き出し18、18、スプリンクラ
ーと天井仕上げ材16、…、27、…が取り付けられた
天井ユニット1が作製され、天井ユニット1がパレット
4ごと揚重されるとともに、所定の天井施工位置に吊設
されて天井3の形成がなされる。
In the above ceiling construction method, the workbench 6 including the leg members 5 and the pallet 4 supported by the leg members 5 is arranged on the floor 2, and two ceiling frames are placed on the pallet 4 of the workbench 6. 7, 8 are connected, piping equipment is installed along the direction in which these ceiling frames 7, 8 are connected, and lighting equipment 12, blowouts 18, 18, sprinklers and ceiling finishing materials 16, ..., 27, ... Are attached. The ceiling unit 1 thus prepared is produced, and the ceiling unit 1 is lifted together with the pallet 4 and is suspended at a predetermined ceiling construction position to form the ceiling 3.

【0021】このように、上記実施例の天井の施工方法
よれば、床2上に配置した作業台のパレット上で2基の
天井フレーム7、8を接続し、これら天井フレーム7、
8に照明器具12、吹き出し18、18、サブダクト2
3、スプリンクラー、配水管24、25、天井仕上げ材
17、…、26、…からなる天井設備を組み込んだ天井
ユニット1を製作するようにしたので、天井設備の組み
込み時の天井フレームおよびそれに組み込まれた各種の
天井設備の変形を抑さえることができる。
As described above, according to the ceiling construction method of the above-described embodiment, the two ceiling frames 7 and 8 are connected on the pallet of the workbench arranged on the floor 2, and the ceiling frames 7 and 8 are connected.
8 lighting equipment 12, blowing 18, 18, sub-duct 2
Since the ceiling unit 1 incorporating the ceiling equipment including 3, the sprinkler, the water distribution pipes 24 and 25, the ceiling finishing material 17, ..., 26, is manufactured, the ceiling frame and the ceiling frame at the time of assembling the ceiling equipment are assembled. It is possible to suppress deformation of various ceiling equipment.

【0022】また、作製した天井ユニット1をパレット
4ごと揚重するので、天井フレーム7、8の強度を高め
ることを要せずに、搬送時の天井ユニット1の変形を抑
さえることができる。
Further, since the produced ceiling unit 1 is hoisted together with the pallet 4, it is possible to suppress the deformation of the ceiling unit 1 during transportation without increasing the strength of the ceiling frames 7 and 8.

【0023】さらに、2基の天井フレームを接続すると
ともに、この長さに合わせてサブダクト23、配水管等
24を組み込んだので、取り回しの困難性もなく、また
サブダクト、配水管24の接続箇所や、天井ユニット1
の揚重の回数を減らすことができ、作業効率を大幅に向
上させることができる。
Furthermore, since the two ceiling frames are connected and the sub-duct 23, the water distribution pipe 24, etc. are incorporated in accordance with this length, there is no difficulty in handling, and the connection points of the sub-duct and the water distribution pipe 24 are , Ceiling unit 1
It is possible to reduce the number of times of lifting, and work efficiency can be significantly improved.

【0024】なお、上記の実施例では、天井フレーム
7、8の連なる方向に沿わせて配管設備を組み込むよう
に構成したが、配管設計の都合上、前記方向に沿わせる
ことができない場合には、配管設備を天井フレーム7、
8からはみ出すように組み込んでもよい。
In the above embodiment, the piping equipment is installed along the direction in which the ceiling frames 7 and 8 are connected. However, when the piping cannot be installed in the above direction due to the piping design. , Plumbing equipment to the ceiling frame 7,
You may incorporate so that it may protrude from 8.

【0025】また、上記の天井の施工方法では、天井フ
レーム7内に照明器具12、吹き出し18、18、吹き
出し18、18に接続される集合ダクト17、サブダク
ト23、スプリンクラー、およびスプリンクラーに接続
される配水管24、25と、天井仕上げ材16、…を嵌
め込むとともに、天井フレーム8内に天井仕上げ材2
7、…を嵌め込んで、天井ユニット1を作製し、この天
井ユニット1を所定の天井施工位置に吊設するようにし
たが、上記の天井ユニット1を天井仕上げ材16、…、
27、…を嵌め込まずに所定の天井施工位置に吊設し、
その後天井仕上げ材16、…、27、…を天井フレーム
7、8に嵌め込んで天井の施工を完了してもよく、この
場合にも、上記と同様の効果を得ることができる。
Further, in the above-described ceiling construction method, the ceiling frame 7 is connected to the luminaire 12, the outlets 18, 18, the collecting duct 17 connected to the outlets 18, 18, the sub-duct 23, the sprinkler, and the sprinkler. The water distribution pipes 24, 25 and the ceiling finishing material 16, ... Are fitted, and the ceiling finishing material 2 is placed in the ceiling frame 8.
The ceiling unit 1 was produced by fitting the ceiling units 1 and 7, and the ceiling unit 1 was hung at a predetermined ceiling construction position.
27, ... Is hung in a predetermined ceiling construction position without fitting,
After that, the ceiling finishing materials 16, ..., 27, ... May be fitted into the ceiling frames 7, 8 to complete the construction of the ceiling. In this case as well, the same effect as described above can be obtained.

【0026】さらに、パレット4上で2基の天井フレー
ム7、8接続させるとともに、これらの天井フレーム
7、8に各天井設備を組み込んで天井ユニット1を作製
したが、パレット4の面積を広げることにより、天井フ
レームの数をさらに増やして接続し、これに配管設備等
の天井設備を組み込んで天井ユニットを作製することも
可能である。この場合、天井フレームに、この接続させ
た天井フレームの連なる方向に沿わせて配管設備を組み
込むことが望ましい。
Further, two ceiling frames 7 and 8 were connected on the pallet 4 and ceiling units 1 were produced by incorporating each ceiling equipment into these ceiling frames 7 and 8 to increase the area of the pallet 4. Thus, it is possible to further increase the number of ceiling frames and connect the ceiling frames, and incorporate ceiling equipment such as piping equipment into the ceiling frame to manufacture a ceiling unit. In this case, it is desirable to install the piping equipment in the ceiling frame along the connecting direction of the connected ceiling frames.

【0027】またさらに、パレットに、予め天井フレー
ムに組み込む各種の天井設備の組み込み位置および天井
ユニットの吊設治具の接合位置を示す目盛りを記してお
き、この目盛りに合わせて天井設備を組み込むととも
に、天井ユニットの吊設を行うことにより、天井ユニッ
トの作製および作業のしづらい天井レベルおける吊設作
業を精度よく、しかも効率よく行うことができる。
Furthermore, the pallets are marked in advance with the scales indicating the mounting positions of various types of ceiling equipment to be installed in the ceiling frame and the joining positions of the hanging jigs of the ceiling unit, and the ceiling equipment is installed according to these scales. By suspending the ceiling unit, it is possible to perform the suspending work on the ceiling level, which is difficult to manufacture and work, with high precision and efficiency.

【0028】なお、天井フレームに、天井仕上げ材、照
明器具、吹き出し、およびスプリンクラー等からなる天
井設備を組み込むようにしたが、天井設備についてはこ
れらの設備に限られず、スピーカー等の音響設備、防火
設備等の設備を組み込んでもよいことは言うまでもな
い。
Although the ceiling frame is provided with the ceiling equipment including the ceiling finishing material, the lighting equipment, the blowing air, the sprinkler, etc., the ceiling equipment is not limited to these equipment, and the acoustic equipment such as the speaker and the fireproofing are installed. It goes without saying that equipment such as equipment may be incorporated.

【0029】[0029]

【発明の効果】本発明の天井の施工方法によれば、床上
に脚部材と該脚部材に支持されたパレットからなる作業
台を配置し、前記パレット上で天井ユニットを作製する
ようにしたので、天井設備の組み込み時の天井フレーム
およびそれに組み込む各種天井設備の変形を抑さえるこ
とができる。また、前記天井ユニットを前記パレットご
と揚重するとともに、所定の天井施工位置に吊設して天
井を形成するようにしたので、天井フレームの強度を高
めることを要せずに、搬出時の天井ユニットの変形を抑
さえることができる。さらに、複数の天井フレームを接
続し、これら天井フレームに配管設備を組み込むように
したので、天井ユニットの揚重作業および配管設備の接
続作業を少なくすることができる。従って、従来に比べ
て、作業効率がよく、しかも施工精度が高く、かつ施工
コストを抑さえた天井の施工を行うことができる。
According to the method of constructing a ceiling of the present invention, a workbench including a leg member and a pallet supported by the leg member is arranged on the floor, and the ceiling unit is manufactured on the pallet. It is possible to suppress the deformation of the ceiling frame when the ceiling equipment is installed and the various types of ceiling equipment installed therein. Further, since the ceiling unit is lifted together with the pallet and is hung at a predetermined ceiling construction position to form the ceiling, it is not necessary to increase the strength of the ceiling frame, and the ceiling during unloading is not required. The deformation of the unit can be suppressed. Furthermore, since a plurality of ceiling frames are connected and the piping equipment is incorporated into these ceiling frames, the lifting work of the ceiling unit and the connecting work of the piping equipment can be reduced. Therefore, it is possible to perform the ceiling construction with higher work efficiency, higher construction accuracy, and lower construction cost than the conventional one.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の天井の施工方法において使用される天
井ユニットの一実施例を示した斜視図である。
FIG. 1 is a perspective view showing an embodiment of a ceiling unit used in a ceiling construction method of the present invention.

【図2】同実施例の天井ユニットにおける天井フレーム
の接続構造を示す要部側断面図である。
FIG. 2 is a side sectional view of an essential part showing the connection structure of the ceiling frame in the ceiling unit of the embodiment.

【図3】同実施例において、天井ユニットをリフターに
より揚重し、天井設置位置に接続した状態を示した側面
図である。
FIG. 3 is a side view showing a state in which the ceiling unit is lifted by a lifter and connected to a ceiling installation position in the embodiment.

【符号の説明】[Explanation of symbols]

1 天井ユニット 2 床 3 天井 4 パレット 5 脚部材 6 作業台 7、8 天井フレーム 12 照明設備 19 空調設備 23、24 配管設備 1 Ceiling Unit 2 Floor 3 Ceiling 4 Pallet 5 Leg Member 6 Work Table 7, 8 Ceiling Frame 12 Lighting Equipment 19 Air Conditioning Equipment 23, 24 Piping Equipment

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 健二 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kenji Nakamura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 床上に脚部材と該脚部材に支持されたパ
レットからなる作業台を配置し、前記パレット上で複数
の天井フレームを接続し、これら天井フレームに、配管
設備、照明設備、空調設備、消火設備等の天井設備を組
み込んで天井ユニットを作製し、前記天井ユニットを前
記パレットごと揚重し、所定の天井施工位置に吊設して
天井を形成することを特徴とする天井の施工方法。
1. A workbench including a leg member and a pallet supported by the leg member is arranged on the floor, a plurality of ceiling frames are connected on the pallet, and the ceiling frame is connected to piping equipment, lighting equipment, and air conditioning. Installation of a ceiling unit by incorporating ceiling equipment such as equipment and fire extinguishing equipment, lifting the ceiling unit together with the pallet, and suspending the ceiling unit at a predetermined ceiling construction position to form a ceiling. Method.
JP5043070A 1993-03-03 1993-03-03 Construction of ceiling Withdrawn JPH06257283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5043070A JPH06257283A (en) 1993-03-03 1993-03-03 Construction of ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5043070A JPH06257283A (en) 1993-03-03 1993-03-03 Construction of ceiling

Publications (1)

Publication Number Publication Date
JPH06257283A true JPH06257283A (en) 1994-09-13

Family

ID=12653600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5043070A Withdrawn JPH06257283A (en) 1993-03-03 1993-03-03 Construction of ceiling

Country Status (1)

Country Link
JP (1) JPH06257283A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019128034A (en) * 2018-01-22 2019-08-01 真 生野 Work bench and construction method using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019128034A (en) * 2018-01-22 2019-08-01 真 生野 Work bench and construction method using the same

Similar Documents

Publication Publication Date Title
JP5208841B2 (en) Installation method of ceiling air conditioner
JP7101540B2 (en) Workbench and construction method using it
JPH06257283A (en) Construction of ceiling
JP2001141263A (en) Outdoor machine unit and method of constructing outdoor machine unit
CN216893670U (en) Modular shelter
JP2023129823A (en) Piping unit, working carriage, and construction method
JP4494059B2 (en) Unit construction method for horizontal duct
JP3261705B2 (en) Simple clean room
JPH0742979A (en) Installation method of fan filter unit
WO2022254476A1 (en) Hanging tool and mounting structure
CN215253891U (en) Large-scale unit type grid ceiling system
JP6738463B1 (en) Refrigerant piping method
JPH0297843A (en) Air conditioning duct
JP7340987B2 (en) Indoor unit hanging tool
JPH05295845A (en) Unifying process of line type ceiling
KR0134732B1 (en) Hanging scaffolds
JPH07158198A (en) Ceiling frame, ceiling structure and execution method of ceiling
JP2018031188A (en) Building unit
JPH0860784A (en) Execution method for ceiling and attic facility
JP2021152304A (en) Method for constructing equipment shelf
JPH0322667Y2 (en)
JPH05156742A (en) Ceiling unit
JP2023132004A (en) Temporary installation method for lighting fixture
JPH06240873A (en) Execution of work for ceiling
JP2003120978A (en) Mounting structure of fan filter unit on system ceiling

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20000509