JP2023132004A - Temporary installation method for lighting fixture - Google Patents

Temporary installation method for lighting fixture Download PDF

Info

Publication number
JP2023132004A
JP2023132004A JP2022037077A JP2022037077A JP2023132004A JP 2023132004 A JP2023132004 A JP 2023132004A JP 2022037077 A JP2022037077 A JP 2022037077A JP 2022037077 A JP2022037077 A JP 2022037077A JP 2023132004 A JP2023132004 A JP 2023132004A
Authority
JP
Japan
Prior art keywords
lighting fixture
ceiling
bolt
fully threaded
threaded bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022037077A
Other languages
Japanese (ja)
Inventor
力弥 内山
Rikiya Uchiyama
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP2022037077A priority Critical patent/JP2023132004A/en
Publication of JP2023132004A publication Critical patent/JP2023132004A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

To provide a temporary installation method capable of temporarily installing a lighting fixture of a ceiling continuously during a construction period, in a ceiling renewal construction.SOLUTION: A temporary installation method for a lighting fixture during ceiling renewal construction temporarily installing an existing lighting fixture, in which a base or a reflector panel is installed at a position of a ceiling surface of a ceiling board using a hanging bolt, at a position lower than the ceiling surface. Typically, the temporary installation method comprises: preparing a fully threaded bolt, a hanging bolt and a long nut to be screwed onto the fully threaded bolt; removing a lighting fixture from the hanging bolt; connecting a base end side of the fully threaded bolt to a tip of the hanging bolt using the long nut; and temporarily installing the lighting fixture on a tip side of the fully threaded bolt.SELECTED DRAWING: Figure 5

Description

本開示は、照明器具の仮設置方法に係り、特に天井更新工事において、天井の照明器具を仮設置するための方法に関する。 The present disclosure relates to a method for temporarily installing lighting equipment, and particularly to a method for temporarily installing lighting equipment on a ceiling during ceiling renewal work.

特許文献1には、天井に設置される照明器具に関する技術が開示されている。この技術では、天井板に設けられた埋込開口に埋込設置される埋込形照明器具の器具本体は、施設側の構造物つまり上階床スラブに設けられている一対の吊りボルトに取り付けられる。 Patent Document 1 discloses a technology related to a lighting fixture installed on a ceiling. With this technology, the main body of the recessed lighting fixture, which is installed in a recessed opening in the ceiling board, is attached to a pair of hanging bolts installed in the facility structure, that is, the upper floor slab. It will be done.

特開2021-82513号公報JP 2021-82513 Publication

既設事務所ビルの改修工事において、事務所が稼働していない週末等の休日のみを利用して天井を新たに居ながら更新・改修する天井更新工事が行われる場合がある。天井更新工事では、既設天井の建築工事の前に、設備側工事として照明器具の撤去等の電気工事を行う必要がある。これは、専門家である電気工事の職人が照明器具を安全に行う必要があるからである。ただし、天井更新工事が一つの週末だけで終了せず複数週にわたって行われる場合、事務所が稼働する稼働日、つまり平日に備えて休日の最後には照明器具をその都度仮復旧させる必要がある。天井板が落とされて軽量組の下地だけになっていても清掃されていれば、照明さえあれば何とか居室として利用可能だからである。ただし、天井工事は設備工事ではなく、主に大工や内装工、塗装工などの建築側工事であって、電気工事の職人は、照明器具の仮復旧のためだけに毎週末工事をすることとなる。このように、天井更新工事期間中に照明器具の設置及び撤去を複数回行うことは、人工の増加を招いてしまい非効率である。 When renovating an existing office building, ceiling renewal work is sometimes carried out only on weekends and other holidays when the office is not in operation to update or repair the ceiling while the office is in operation. In ceiling renewal work, it is necessary to perform electrical work such as removing lighting fixtures as equipment-side work before starting construction work on the existing ceiling. This is because the lighting equipment must be installed safely by a professional electrician. However, if the ceiling renewal work is not completed in one weekend but is carried out over multiple weeks, it will be necessary to temporarily restore the lighting equipment at the end of each holiday in preparation for the office's working days, that is, weekdays. . This is because even if the ceiling panels were removed and only a lightweight base was left, as long as it was cleaned and there was some lighting, it could still be used as a living room. However, ceiling work is not equipment work, but is mainly construction work performed by carpenters, interior decorators, painters, etc., and electrical work is carried out every weekend just to temporarily restore lighting equipment. Become. In this way, installing and removing lighting fixtures multiple times during the ceiling renewal construction period results in an increase in the number of workers, which is inefficient.

本開示は、上述のような課題に鑑みてなされたもので、天井更新工事において、工事期間中に天井の照明器具を継続的に仮設置することが可能な仮設置方法を提供することを目的とする。 The present disclosure has been made in view of the above-mentioned problems, and the purpose of the present disclosure is to provide a temporary installation method that allows ceiling lighting equipment to be temporarily installed continuously during the construction period in ceiling renewal work. shall be.

上記の課題を解決するため、第1の開示は、吊りボルトを用いて天井ボードの天井面の位置に基台或いは反射板の見切りが設置されている既設の照明器具を天井面よりも低い位置に仮設置するための仮設置方法に適用される。仮設置方法は、全ねじボルトと、吊りボルト及び全ねじボルトに螺合する長ナットと、を準備する準備工程と、照明器具を吊りボルトから取り外す取り外し工程と、長ナットを用いて全ねじボルトの基端側を吊りボルトの先端側に連結する連結工程と、全ねじボルトの先端側に照明器具を仮設置する仮設置工程と、を備える。 In order to solve the above-mentioned problems, the first disclosure uses hanging bolts to move an existing lighting fixture, in which a base or a reflector parting is installed at the ceiling surface of a ceiling board, to a position lower than the ceiling surface. Applies to temporary installation methods for temporary installation. The temporary installation method consists of a preparation process to prepare a fully threaded bolt, a hanging bolt and a long nut to be screwed into the fully threaded bolt, a removal process to remove the lighting fixture from the hanging bolt, and a process to remove the fully threaded bolt using the long nut. and a temporary installation step of temporarily installing the lighting device on the tip side of the fully threaded bolt.

第2の開示は、第1の開示において更に以下の特徴を備える。
全ねじボルトは、吊りボルトと同径及び同ピッチである。
The second disclosure further includes the following features in the first disclosure.
Fully threaded bolts have the same diameter and pitch as the hanging bolts.

第3の開示は、第1又は第2の開示において更に以下の特徴を備える。
全ねじボルトの長さは、仮設置された照明器具の基台或いは反射板の見切りから天井面までの距離が200mm以上400mm以下となる長さである。
The third disclosure further includes the following features in the first or second disclosure.
The length of the fully threaded bolt is such that the distance from the temporarily installed base of the lighting fixture or the end of the reflector to the ceiling surface is 200 mm or more and 400 mm or less.

第4の開示は、第1から第3の何れか1つの開示において更に以下の特徴を備える。
全ねじボルトの長さは、仮設置された照明器具の下端からフロア面までの距離が2m以上となる長さである。
The fourth disclosure further includes the following features in any one of the first to third disclosures.
The length of the fully threaded bolt is such that the distance from the lower end of the temporarily installed lighting fixture to the floor surface is 2 m or more.

第5の開示は、第1から第4の何れか1つの開示において更に以下の特徴を備える。
照明器具の仮設置方法は、
天井ボードの工事が完了した後に、仮設置された照明器具を全ねじボルトから取り外す工程と、
吊りボルトから全ねじボルト及び長ナットを取り外す工程と、
吊りボルトを用いて新規の照明器具を設置する工程と、
を更に含む。
The fifth disclosure further includes the following features in any one of the first to fourth disclosures.
How to temporarily install lighting equipment
After the construction of the ceiling board is completed, the process of removing the temporarily installed lighting fixtures from the fully threaded bolts;
a step of removing a fully threaded bolt and a long nut from a hanging bolt;
The process of installing new lighting equipment using hanging bolts;
further including.

本開示の照明器具の仮設置方法によれば、照明器具を継続的に仮設置した状態で工事期間における天井工事及び事務所稼働期間における事務所業務を進めることができる。 According to the method for temporarily installing a lighting fixture of the present disclosure, ceiling work during the construction period and office work during the office operation period can proceed with the lighting fixture temporarily installed continuously.

実施の形態に適用される照明装置の例を事務所フロア側から見た斜視図である。FIG. 2 is a perspective view of an example of a lighting device applied to the embodiment, viewed from the office floor side. 図中の-Y方向に沿って照明装置を見た部分断面図である。FIG. 3 is a partial cross-sectional view of the illumination device taken along the -Y direction in the figure. 仮設置装置4の構成を説明するための図である。FIG. 4 is a diagram for explaining the configuration of a temporary installation device 4. FIG. 仮設置装置4を照明装置に適用した例を示す斜視図である。FIG. 2 is a perspective view showing an example in which the temporary installation device 4 is applied to a lighting device. 仮設置装置4を用いて照明装置を仮設置した状態を図中の-Y方向に沿って見た部分断面図である。3 is a partial cross-sectional view of the lighting device temporarily installed using the temporary installation device 4 when viewed along the −Y direction in the figure. FIG.

以下、図面を参照して本開示の実施の形態について説明する。ただし、以下に示す実施の形態において各要素の個数、数量、量、範囲等の数に言及した場合、特に明示した場合や原理的に明らかにその数に特定される場合を除いて、その言及した数に、この開示が限定されるものではない。また、以下に示す実施の形態において説明する構造等は、特に明示した場合や明らかに原理的にそれに特定される場合を除いて、この開示に必ずしも必須のものではない。 Embodiments of the present disclosure will be described below with reference to the drawings. However, in the embodiments shown below, when referring to the number, amount, amount, range, etc. of each element, unless it is specifically specified or it is clearly specified to that number in principle, such reference shall be made. This disclosure is not limited to that number. Furthermore, the structures and the like described in the embodiments shown below are not necessarily essential to this disclosure, unless specifically specified or clearly specified in principle.

実施の形態.
1.実施の形態に適用される照明装置の構成
図1は、実施の形態に適用される照明装置の例を事務所フロア側から見た斜視図である。図2は、図中の-Y方向に沿って照明装置を見た部分断面図である。図1では、既設事務所ビルの天井裏の内部構造の一部を透視して示している。照明装置は、複数個の既設の照明器具10を備える。照明器具10は蛍光灯またはLEDの天井付の照明であり、例えば埋設形照明器具では、既設事務所ビルの天井ボード20の矩形の開口部22に、照明器具の基台或いは反射板の見切り(埋設形の場合は反射板の見切り)を開口部縁に接合してそれぞれ設置される。例えばV形照明器具では、基台の見切りを所定の天井板位置に接合してそれぞれ設置される。各照明器具10は、それぞれ一対の吊りボルト12によって建屋の構造体、例えば上階の床スラブから支持される。一対の吊りボルト12は、建物の天井スラブ14から照明器具10を吊り下げるための全ねじボルト(寸切りボルトとも呼ばれる)である。一対の吊りボルト12は、基端側が天井スラブ14に固定され、先端側が照明器具10に固定される。図2では、照明器具10が天井ボード20に埋設された状態(埋設形照明器具)を例示しているが、天井ボード20の天井面に設置する構成の、V形照明器具でも単台器具でもよい。既設事務所ビルの事務所フロアにはこのような照明器具10が間隔を開けて複数個設置されている。なお、図において、X方向は照明器具10の長手方向を示し、Y方向は照明器具10の短手方向を示し、Z方向は高さ方向を示している。
Embodiment.
1. Configuration of the lighting device applied to the embodiment FIG. 1 is a perspective view of an example of the lighting device applied to the embodiment, viewed from the office floor side. FIG. 2 is a partial cross-sectional view of the illumination device taken along the -Y direction in the figure. FIG. 1 shows a part of the internal structure behind the ceiling of an existing office building as seen through. The lighting device includes a plurality of existing lighting fixtures 10. The lighting fixture 10 is a fluorescent lamp or an LED ceiling-mounted light. For example, in the case of a buried lighting fixture, a parting part ( In the case of a buried type, a reflector (parting part of the reflector) is attached to the edge of the opening and installed. For example, V-shaped lighting fixtures are installed by joining the ends of the base to predetermined ceiling board positions. Each lighting fixture 10 is supported from a building structure, such as an upper floor floor slab, by a pair of hanging bolts 12, respectively. The pair of hanging bolts 12 are fully threaded bolts (also called threaded bolts) for suspending the lighting fixture 10 from the ceiling slab 14 of the building. The pair of hanging bolts 12 are fixed to the ceiling slab 14 at their proximal ends, and to the lighting fixture 10 at their distal ends. Although FIG. 2 shows an example in which the lighting fixture 10 is embedded in the ceiling board 20 (embedded lighting fixture), it can also be a V-shaped lighting fixture or a single fixture that is installed on the ceiling surface of the ceiling board 20. good. A plurality of such lighting fixtures 10 are installed at intervals on the office floor of an existing office building. In addition, in the figure, the X direction shows the longitudinal direction of the lighting fixture 10, the Y direction shows the lateral direction of the lighting fixture 10, and the Z direction shows the height direction.

2.実施の形態の仮設置装置の構成
既設事務所ビルの事務所フロアの天井ボード20を改修・更新する天井更新工事が行われる場合がある。天井更新工事は、週末等の特定日に事務所フロアを閉鎖して行われる。天井更新工事では、先ず照明器具等の電気設備を一旦撤去する電気工事を行い、その後に天井更新のための建築工事が行われる。ただし、天井更新工事が複数週にわたって行われる場合、次の週末までの平日期間において、事務所フロアにおいて業務可能な状態である所定の照度を達成できる照明器具を仮復帰させる必要がある。
2. Configuration of Temporary Installation Device of Embodiment Ceiling renewal work to repair and update the ceiling board 20 on the office floor of an existing office building may be performed. Ceiling renewal work will be carried out with office floors closed on specific days such as weekends. In ceiling renewal work, electrical work is first performed to temporarily remove electrical equipment such as lighting fixtures, and then architectural work is carried out to renew the ceiling. However, if the ceiling renewal work is to be carried out over multiple weeks, it will be necessary to temporarily restore lighting fixtures that can achieve a predetermined illuminance for work on the office floor during the weekday period until the next weekend.

ここで、建築工事を行う週末期間の最初に電気設備を撤去し、週末期間の最後に仮復帰させる電気工事を、毎週末行うことを考える。例えば天井更新工事の工期が2カ月の場合、このような電気設備の撤去及び仮復帰のために計16日の電気工事の職人の人工が必要となる。 Now, let us consider that electrical work is carried out every weekend, in which electrical equipment is removed at the beginning of the weekend period during which construction work is performed, and then temporarily restored at the end of the weekend period. For example, if the ceiling renewal work takes two months, a total of 16 days of electrical work will be required to remove and temporarily restore the electrical equipment.

そこで、本実施の形態の仮設置装置4は、天井の建築工事に支障のない位置に照明器具10を仮設置することを目的として考案された装置である。天井の建築工事に支障のない位置とは、例えば、天井ボード20の天井面から鉛直下方への距離が200mm以上300mm以下となる位置である。天井ボード20と照明器具の基台或いは反射板の見切りまでの距離が200mm以上あれば、新規に設置する軽量組の野縁受けや新規の天井ボードとの鉛直距離が十分にとれ、建築工事側の職人の工具などの取り回しおよび設置する材料の取り回しの邪魔にならない。また、照明器具10の仮設置位置は、事務所フロアに居る人が接触しない高さが好ましい。このような高さは、例えば、事務所フロアのフロア面から照明器具10の下端までの鉛直上方への距離が2m以上となる位置である。 Therefore, the temporary installation device 4 of this embodiment is a device devised for the purpose of temporarily installing the lighting fixture 10 at a position on the ceiling that will not interfere with construction work. The position where ceiling construction work is not hindered is, for example, a position where the vertically downward distance from the ceiling surface of the ceiling board 20 is 200 mm or more and 300 mm or less. If the distance between the ceiling board 20 and the base of the lighting equipment or the end of the reflector is 200 mm or more, there will be sufficient vertical distance between the newly installed lightweight frame bracket and the new ceiling board, and construction work will be easier. It does not get in the way of the craftsmen's handling of tools and materials to be installed. Further, the temporary installation position of the lighting fixture 10 is preferably at a height where people on the office floor do not come into contact with it. Such a height is, for example, a position where the vertically upward distance from the floor surface of the office floor to the lower end of the lighting fixture 10 is 2 m or more.

図3は、仮設置装置4の構成を説明するための図である。また、図4は、仮設置装置4を照明装置に適用した例を示す斜視図である。仮設置装置4は、全ねじボルト6と、長ナット8と、を備える。全ねじボルト6のねじ径及びねじピッチは、吊りボルト12と同ねじ径及び同ねじピッチであることが好ましい。例えば、全ねじボルト6のねじ径はW3/8である。これは、天井内設備機器の吊りボルト12に用いられる全ねじボルトのねじ径は、よほど重量物でない限りW3/8であるからである。また、全ねじボルト6の長さは、仮設置位置の上記条件を満たすための長さであり、例えば200mm以上300mm以下である。 FIG. 3 is a diagram for explaining the configuration of the temporary installation device 4. As shown in FIG. Moreover, FIG. 4 is a perspective view showing an example in which the temporary installation device 4 is applied to a lighting device. The temporary installation device 4 includes a fully threaded bolt 6 and a long nut 8. The thread diameter and thread pitch of the fully threaded bolt 6 are preferably the same as those of the suspension bolt 12. For example, the thread diameter of the fully threaded bolt 6 is W3/8. This is because the thread diameter of a fully threaded bolt used for the hanging bolt 12 of equipment in the ceiling is W3/8 unless the item is extremely heavy. Further, the length of the fully threaded bolt 6 is a length that satisfies the above conditions for the temporary installation position, and is, for example, 200 mm or more and 300 mm or less.

長ナット8は、吊りボルト12及び全ねじボルト6と螺合するねじ径及びねじピッチを有する六角ナットである。長ナット8は、一端側から吊りボルト12の先端が捩じ込まれ、他端側から全ねじボルト6の基端が捩じ込まれることで、吊りボルト12と全ねじボルト6とを連結する。例えば、長ナット8のねじ径はW3/8であり、長さは40mmである。 The long nut 8 is a hexagonal nut having a thread diameter and a thread pitch that are screwed into the hanging bolt 12 and the fully threaded bolt 6. The long nut 8 connects the suspension bolt 12 and the fully threaded bolt 6 by screwing the tip of the suspension bolt 12 from one end and screwing the base end of the fully threaded bolt 6 from the other end. . For example, the long nut 8 has a thread diameter of W3/8 and a length of 40 mm.

3.照明装置の仮設置装置を用いた照明器具の仮設置方法
次に、実施の形態の照明装置の仮設置装置を用いた照明器具10の仮設置方法の作業手順について詳細に説明する。図5は、仮設置装置4を用いて照明装置を仮設置した状態を図中の-Y方向に沿って見た部分断面図である。以下、複数の照明器具10のうちの一つの照明器具10の仮設置方法の作業手順について図示するが、他の照明器具10についても同様である。
3. Method for temporarily installing a lighting fixture using a temporary installation device for a lighting device Next, a working procedure of a method for temporarily installing a lighting device 10 using a temporary installation device for a lighting device according to an embodiment will be described in detail. FIG. 5 is a partial cross-sectional view of the lighting device temporarily installed using the temporary installation device 4, as viewed along the -Y direction in the figure. Hereinafter, a work procedure of a temporary installation method for one of the plurality of lighting fixtures 10 will be illustrated, but the same applies to the other lighting fixtures 10.

3-1.準備工程:
照明器具10が天井スラブのインサートなどから吊られた一対の吊りボルト12に設置されている場合、各照明器具10に対してそれぞれ二本の全ねじボルト6と二つの長ナット8を含む仮設置装置4を準備する。
3-1. Preparation process:
If the lighting fixtures 10 are installed on a pair of hanging bolts 12 suspended from an insert in a ceiling slab or the like, a temporary installation including two full-thread bolts 6 and two long nuts 8 for each lighting fixture 10, respectively. Prepare device 4.

3-2.取り外し工程:
照明器具10は吊りボルト12にボルト止めされている。作業員は、照明器具10を吊りボルト12から取り外すとともに、照明器具10の電気配線を取り外す。これにより、天井ボード20の開口部22に吊りボルト12の先端が露出する。
3-2. Removal process:
The lighting fixture 10 is bolted to a hanging bolt 12. The worker removes the lighting fixture 10 from the hanging bolt 12 and also removes the electrical wiring of the lighting fixture 10. As a result, the tips of the hanging bolts 12 are exposed in the openings 22 of the ceiling board 20.

3-3.連結工程:
作業員は、長ナット8の一端側を吊りボルト12の先端に螺合させるとともに、他端側に全ねじボルト6の基端に螺合させる。これにより、吊りボルト12の先端と全ねじボルト6の基端とが一直線状に連結される。
3-3. Connection process:
The worker screws one end of the long nut 8 onto the tip of the suspension bolt 12, and screws the other end into the base end of the fully threaded bolt 6. Thereby, the tip of the suspension bolt 12 and the base end of the fully threaded bolt 6 are connected in a straight line.

3-4.仮設置工程:
作業員は、照明器具10を吊りボルト12に固定するために使用していたボルトを使って、全ねじボルト6の先端に照明器具10を仮設置する。これにより、照明器具10は、全ねじボルト6の長さ分だけ下方の位置に配置される。その結果、照明器具10の下端の天井面からの設置高さh1は、例えば200mm以上300mm以下となり、照明器具10の下端の事務所フロアからの設置高さh2は、例えば2m以上となる。また、作業員は、照明器具10に電気配線を接続する。既設の電気配線は、天井裏において余長が取られていて、基の配電盤から接続されたまま天井レベルよりも下に引き延ばされる。これにより、照明器具10は仮照明として使用可能な状態で仮設置される。
3-4. Temporary installation process:
The worker temporarily installs the lighting fixture 10 on the tip of the fully threaded bolt 6 using the bolt used to fix the lighting fixture 10 to the hanging bolt 12. Thereby, the lighting fixture 10 is placed at a lower position by the length of the fully threaded bolt 6. As a result, the installation height h1 of the lower end of the lighting fixture 10 from the ceiling surface is, for example, 200 mm or more and 300 mm or less, and the installation height h2 of the lower end of the lighting fixture 10 from the office floor is, for example, 2 m or more. The worker also connects electrical wiring to the lighting fixture 10. Existing electrical wiring has extra length in the ceiling, and will be extended below the ceiling level while remaining connected to the base electrical distribution board. Thereby, the lighting fixture 10 is temporarily installed in a state where it can be used as temporary lighting.

仮設置工程において照明器具10が仮設置された後の事務所フロアでは、事務所休日に天井の建築工事が行われ、事務所稼働日に事務所の通常業務が行われる。仮設置された照明器具10は、事務所フロアの仮照明として使用される。 On the office floor after the lighting equipment 10 has been temporarily installed in the temporary installation process, ceiling construction work is performed on office holidays, and normal office operations are performed on office work days. The temporarily installed lighting fixture 10 is used as temporary lighting for the office floor.

3-5.撤去工程:
天井の建築工事が完了すると、作業員は、仮設置されていた照明器具10及び仮設置装置4を撤去する。ここでは、仮設置工程及び連結工程の逆の手順で照明器具10及び仮設置装置4が取り外される。
3-5. Removal process:
When the ceiling construction work is completed, the worker removes the temporarily installed lighting fixture 10 and temporary installation device 4. Here, the lighting fixture 10 and the temporary installation device 4 are removed by performing the reverse procedure of the temporary installation process and the connection process.

3-6.新規照明器具の設置工程:
作業員は、新規の照明器具に電気配線を接続するともに、吊りボルト12に新規照明器具を固定する。同型の照明器具であれば既設の開口部22と同一寸法の新規開口部22に対して照明器具の基台或いは反射板の見切りがきれいに接合される。また、既設の旧式の蛍光灯照明器具を省エネルギー性の高いLED照明に変更しやすくするため、照明器具メーカでは同様の照度が得られるよう同形状の置換用LED照明器具を製作しており、この置換用LED照明器具であれば、既設の開口部22と同一寸法の新規開口部22に対して照明器具の基台或いは反射板の見切りがきれいに接合される。
3-6. Installation process for new lighting equipment:
The worker connects the electrical wiring to the new lighting fixture and fixes the new lighting fixture to the hanging bolt 12. If the lighting equipment is of the same type, the base of the lighting equipment or the parting part of the reflector plate will be neatly joined to the new opening 22 which has the same size as the existing opening 22. In addition, in order to make it easier to replace existing old-style fluorescent lighting fixtures with highly energy-saving LED lighting, lighting equipment manufacturers are producing replacement LED lighting fixtures with the same shape to provide the same illuminance. In the case of a replacement LED lighting fixture, the base of the lighting fixture or the parting part of the reflector plate is neatly joined to the new opening 22 having the same dimensions as the existing opening 22.

4.照明器具の仮設置方法の作用及び効果
以上のような仮設置装置4を用いた仮設置方法によれば、以下の作用及び効果が得られる。
4. Functions and Effects of Temporary Installation Method for Lighting Equipment According to the temporary installation method using the temporary installation device 4 as described above, the following functions and effects can be obtained.

仮設置装置4によって天井面よりも低い位置に仮設置された照明器具10は、工事中及び事務所フロアの稼働中に仮照明として機能させることができる。これにより、天井の建築工事が事務所稼働日をまたいで行われる場合であっても、照明器具10をその都度脱着する手間が省ける。特に、照明器具10の仮設置位置は、天井面から200mmから300mm下方となる高さに仮設置することで、天井の建築工事に支障が生じることを防ぐことができる。これにより、特に工事期間のための仮設照明は必要なく既設品のリユースが図れる。また、照明器具10は、事務所フロア面から照明器具10の下端までの距離が2m以上となるように仮設置することで、事務所フロアに居る人が照明器具10に接触することを防ぐことができる。 The lighting fixture 10 temporarily installed at a position lower than the ceiling surface by the temporary installation device 4 can function as temporary lighting during construction and during operation of the office floor. Thereby, even if the construction work on the ceiling is carried out over the office working days, the trouble of attaching and detaching the lighting fixture 10 each time can be saved. In particular, by temporarily installing the lighting fixture 10 at a height of 200 mm to 300 mm below the ceiling surface, it is possible to prevent interference with ceiling construction work. This eliminates the need for temporary lighting especially during the construction period and allows for the reuse of existing equipment. In addition, the lighting fixture 10 is temporarily installed so that the distance from the office floor surface to the bottom end of the lighting fixture 10 is 2 m or more to prevent people on the office floor from coming into contact with the lighting fixture 10. I can do it.

仮設置装置4の全ねじボルト6は吊りボルト12と同ねじ径及び同ねじピッチのものが使用される。これにより、照明器具10は、吊りボルト12への固定と同方法によって全ねじボルト6に固定することができる。また、廃棄予定の既設の照明器具10を仮設置する照明として流用することができるため、工事期間中の照明器具10の汚れや傷等を気にする必要がない。 The fully threaded bolt 6 of the temporary installation device 4 has the same thread diameter and the same thread pitch as the hanging bolt 12. Thereby, the lighting fixture 10 can be fixed to the fully threaded bolt 6 by the same method as that used for fixing it to the hanging bolt 12. Further, since the existing lighting fixture 10 scheduled for disposal can be used as temporary lighting, there is no need to worry about stains, scratches, etc. on the lighting fixture 10 during the construction period.

仮設置装置4によって仮設置されている照明器具10は、天井工事において新たに設置する新規の照明器具のための新開口の目安になる。 The lighting fixture 10 temporarily installed by the temporary installation device 4 serves as a guide for a new opening for a new lighting fixture to be newly installed during ceiling construction.

仮設置装置4の全ねじボルト6及び長ナット8は、他の工事において再利用することができる。 The fully threaded bolts 6 and long nuts 8 of the temporary installation device 4 can be reused in other construction work.

5.照明器具の仮設置方法の変形例
実施の形態の照明器具の仮設置方法は、以下のように変形した態様を適用してもよい。
5. Modified Example of Temporary Installation Method for Lighting Fixtures The method for temporarily installing lighting fixtures according to the embodiment may be modified as follows.

仮設置装置4の全ねじボルト6及び長ナット8の寸法に限定はない。すなわち、全ねじボルト6の長さは、事務所ビルの天井面の高さに応じて適宜設定することができる。また、全ねじボルト6のネジ径又はねじピッチについても、必ずしも吊りボルト12のそれと同じである必要はない。ただし、全ねじボルト6のネジ径又はねじピッチが吊りボルト12のそれと異なる場合、長ナット8は、一端側から半分が全ねじボルト6に螺合し、他端側から半分が吊りボルト12に螺合するように、2種のネジ径又はねじピッチが組み合わさったナットとして構成されていればよい。 There are no limitations on the dimensions of the fully threaded bolt 6 and long nut 8 of the temporary installation device 4. That is, the length of the fully threaded bolt 6 can be set as appropriate depending on the height of the ceiling surface of the office building. Further, the thread diameter or thread pitch of the fully threaded bolt 6 does not necessarily need to be the same as that of the hanging bolt 12. However, if the thread diameter or thread pitch of the fully threaded bolt 6 is different from that of the hanging bolt 12, half of the long nut 8 from one end is screwed into the fully threaded bolt 6, and half from the other end is screwed into the hanging bolt 12. The nut may be configured as a combination of two types of thread diameters or thread pitches so as to be screwed together.

また、今回の天井は軽天天井、つまり従来の軽量鉄骨スタッドによる野縁、野縁受け及びボード天井を想定して開口などを述べたが、これに限らず、正方形の天井パネルをTバーの野縁受けなどにはめ込むシステム天井においても同様に構成することが可能である。 In addition, the ceiling this time is a light ceiling, in other words, the openings etc. are assumed to be a conventional light ceiling with light steel studs, a field edge holder, and a board ceiling, but this is not limited to this. A similar configuration can be applied to a system ceiling that is fitted into a field fence or the like.

4 仮設置装置
6 全ねじボルト
8 長ナット
10 照明器具
12 吊りボルト
14 天井スラブ
20 天井ボード
22 開口部
4 Temporary installation device 6 Fully threaded bolt 8 Long nut 10 Lighting fixture 12 Hanging bolt 14 Ceiling slab 20 Ceiling board 22 Opening

Claims (5)

吊りボルトを用いて天井ボードの天井面の位置に基台或いは反射板の見切りが設置されている既設の照明器具を天井面よりも低い位置に仮設置するための仮設置方法であって、
全ねじボルトと、前記吊りボルト及び前記全ねじボルトに螺合する長ナットと、を準備する準備工程と、
前記照明器具を前記吊りボルトから取り外す取り外し工程と、
前記長ナットを用いて前記全ねじボルトの基端側を前記吊りボルトの先端側に連結する連結工程と、
前記全ねじボルトの先端側に前記照明器具を仮設置する仮設置工程と、
を備えることを特徴とする照明器具の仮設置方法。
A temporary installation method for temporarily installing an existing lighting fixture in which a base or a reflector part is installed at a position on the ceiling surface of a ceiling board at a position lower than the ceiling surface using hanging bolts, the method comprising:
a preparation step of preparing a fully threaded bolt and a long nut that is threaded onto the hanging bolt and the fully threaded bolt;
a removal step of removing the lighting fixture from the hanging bolt;
a connecting step of connecting the proximal end side of the fully threaded bolt to the distal end side of the hanging bolt using the long nut;
a temporary installation step of temporarily installing the lighting fixture on the tip side of the fully threaded bolt;
A method for temporarily installing a lighting fixture, comprising:
前記全ねじボルトは、前記吊りボルトと同径及び同ピッチであることを特徴とする請求項1に記載の照明器具の仮設置方法。 2. The method for temporarily installing a lighting fixture according to claim 1, wherein the fully threaded bolt has the same diameter and the same pitch as the hanging bolt. 前記全ねじボルトの長さは、仮設置された前記照明器具の基台或いは反射板の見切りから天井面までの距離が200mm以上400mm以下となる長さであることを特徴とする請求項1又は請求項2に記載の照明器具の仮設置方法。 1. The length of the fully threaded bolt is such that the distance from the temporarily installed base of the lighting fixture or the end of the reflector to the ceiling surface is 200 mm or more and 400 mm or less. The method for temporarily installing a lighting fixture according to claim 2. 前記全ねじボルトの長さは、仮設置された前記照明器具の下端からフロア面までの距離が2m以上となる長さであることを特徴とする請求項1から請求項3の何れか1項に記載の照明器具の仮設置方法。 Any one of claims 1 to 3, wherein the length of the fully threaded bolt is such that the distance from the lower end of the temporarily installed lighting fixture to the floor surface is 2 m or more. How to temporarily install lighting equipment as described in . 前記天井ボードの工事が完了した後に、仮設置された前記照明器具を前記全ねじボルトから取り外す工程と、
前記吊りボルトから前記全ねじボルト及び前記長ナットを取り外す工程と、
前記吊りボルトを用いて新規の照明器具を設置する工程と、
を更に含むことを特徴とする請求項1から請求項4の何れか1項に記載の照明器具の仮設置方法。
After the construction of the ceiling board is completed, removing the temporarily installed lighting fixture from the fully threaded bolt;
removing the fully threaded bolt and the long nut from the hanging bolt;
installing a new lighting fixture using the hanging bolt;
The method for temporarily installing a lighting fixture according to any one of claims 1 to 4, further comprising: .
JP2022037077A 2022-03-10 2022-03-10 Temporary installation method for lighting fixture Pending JP2023132004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022037077A JP2023132004A (en) 2022-03-10 2022-03-10 Temporary installation method for lighting fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022037077A JP2023132004A (en) 2022-03-10 2022-03-10 Temporary installation method for lighting fixture

Publications (1)

Publication Number Publication Date
JP2023132004A true JP2023132004A (en) 2023-09-22

Family

ID=88065948

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022037077A Pending JP2023132004A (en) 2022-03-10 2022-03-10 Temporary installation method for lighting fixture

Country Status (1)

Country Link
JP (1) JP2023132004A (en)

Similar Documents

Publication Publication Date Title
JP2023132004A (en) Temporary installation method for lighting fixture
CN215106473U (en) Assembled suspended ceiling leveling system
KR20230011695A (en) Ceiling recessed light with turning appear type installing bracket and the installing method thereof
CN220827132U (en) Inspection shaft climbing rack
JPH10227094A (en) Fitting for double ceiling finish panel material
CN213065714U (en) Clean lamp with replaceable inner container
CN111377374A (en) Hoisting tool
CN210777286U (en) Engineering type building electrical construction technology training platform
CN213542387U (en) Concatenation formula molding lamp
CN112252566B (en) Wall corner suspended ceiling structure for interior decoration
JPH06123442A (en) Ceiling cassette type air conditioner
KR20080108790A (en) Lighting device having fixed bracket and assembling method for the same
JPH04217725A (en) Installing device for air conditioner
CN220714607U (en) Hanging type smoke blocking hanging wall mounting structure
JP4343046B2 (en) Mounting method of replacement ballast and replacement ballast unit in existing ceiling-buried lighting fixture
JPS62296040A (en) Ceiling construction method
JP2024015469A (en) LED lighting device with lifting function
KR200352245Y1 (en) Apparatus for constructing finishing panels of ceiling or wall
CN105546284A (en) Connection device and equipment fixing method
JPS5923310Y2 (en) ceiling structure
JPH10103759A (en) Air conditioner embedded in ceiling
JP2002109945A (en) Light-weighted, and job saving lighting equipment
JPH07113329A (en) Presetting method of installed apparatus on ceiling
JP2020107599A (en) Method for attaching lamp, lamp and method for constructing architectural structure
CN116623862A (en) Assembled furred ceiling structure