JPH06240637A - Mounting method of molding frame - Google Patents

Mounting method of molding frame

Info

Publication number
JPH06240637A
JPH06240637A JP4716593A JP4716593A JPH06240637A JP H06240637 A JPH06240637 A JP H06240637A JP 4716593 A JP4716593 A JP 4716593A JP 4716593 A JP4716593 A JP 4716593A JP H06240637 A JPH06240637 A JP H06240637A
Authority
JP
Japan
Prior art keywords
steel pipes
steel pipe
fixed
type frame
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4716593A
Other languages
Japanese (ja)
Inventor
Yuji Fukuda
福田雄二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP4716593A priority Critical patent/JPH06240637A/en
Publication of JPH06240637A publication Critical patent/JPH06240637A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE:To facilitate desorption and enhance the working efficiency by spanning a wale member to each head of steel pipes arranged on a row and mounting a bottom type frame to the lower part of a hanging material which projects and suspends a hanging material to the side of the steel pipes. CONSTITUTION:Steel pipes 1 having a joint 2 are buried into a ground one after another where the joints 2 are connected with each other, thereby building up a wall surface. In this case, the cutting ends of the steel pipes 1 are oriented at the sea side while a holding material 3 is laid out thereon and one end of the hanging material 5 is bolted on and fixed with the upper end of the steel pipes 1 and it is also fixed horizontally with the holding material 3 and a post 4 on the way. The other end of the hanging material 5 is suspended by fixing a hanging material 6 with a bolt while a bottom type frame support material 7 is preliminarily mounted to the lower part of the hanging material 6. Then, a hoot iron with a nut 10 is fixed with the upper part of the joint 2 and a bottom type frame support material stopper 8 is threaded into a nut while the other end and fixed with nut on the end of a bottom frame 11 on the bottom type frame support material 7. A wall type frame 12 is installed to the sea side while a wall type frame 13 is installed on sub-slab concrete 15 on the land side and fixed with a separator at a specified span, thereby building up a buried bank with the holding material after it is cast.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鋼管矢板式岸壁などの
鋼管上部にコンクリートを打設する際に用いられる底型
枠の取付け方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for mounting a bottom formwork used for placing concrete on the upper portion of a steel pipe such as a steel pipe sheet pile type quay wall.

【0002】[0002]

【従来の技術】従来、鋼管矢板式岸壁の上部コンクリー
トを打設する場合、干潮が最も大きい時に、作業船また
は潜水夫によって、底型枠を取り付けていた。
2. Description of the Related Art Conventionally, when placing an upper concrete of a steel pipe sheet pile type quay, a bottom formwork has been attached by a work boat or a diver when the low tide is the highest.

【0003】[0003]

【発明が解決しようとする問題点】しかし、従来の方法
では、次のような問題点がある。 <イ>底型枠の取付け位置が、干潮時の水面より例えば
50cm上部にするために、潮位により時間の制約を受
け、作業能率が悪かった。 <ロ>支保工受けブラケットのレベル決めに手間が掛か
っていた。 <ハ>ブラケットの取り外しの際、支保工の下での作業
となり、落下の危険があり、また、潜水夫の作業を必要
としていた。 <ニ>鋼管間の底型枠の形状が複雑となり、現場合わせ
で固定するため、埋殺し部分が出ていた。
However, the conventional method has the following problems. <A> The bottom formwork was mounted at a position, for example, 50 cm above the water surface at low tide, so the time was restricted by the tide level and work efficiency was poor. <B> It took a lot of time to decide the level of the support bracket. <C> When removing the bracket, work was performed under the support work, and there was a risk of falling, and work by the diver was required. <D> The shape of the bottom formwork between the steel pipes became complicated, and because it was fixed at the site, there was a buried portion.

【0004】[0004]

【本発明の目的】本発明は、鋼管矢板式岸壁など鋼管の
上部のコンクリート打設時に用いられる底型枠の取付け
方法を提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a method for mounting a bottom formwork which is used when concrete is placed on the upper portion of a steel pipe such as a steel pipe sheet pile type quay wall.

【0005】[0005]

【問題点を解決するための手段】本発明は、複数の鋼管
頭部に連なって打設されるコンクリートの底型枠の取付
け方法において、該鋼管の下部を地盤に埋設し、複数の
該鋼管を一列に配列し、隣接する該鋼管を継手により連
接し、該鋼管の各頭部に連なるように腹起し材を掛け渡
し、該鋼管頭部と該腹起し材を利用して吊り材を該鋼管
の側面に突出させ、該吊り材の端部に吊り下げ材を吊り
下げ、該吊り下げ材の下部に底型枠支持材を固定し、該
継手に底型枠止め具を取り付け、該底型枠支持材と該底
型枠止め具で該底型枠を保持することを特徴とする底型
枠の取付け方法にある。
DISCLOSURE OF THE INVENTION The present invention is a method for mounting a concrete bottom formwork, which is continuously cast on a plurality of steel pipe heads, in which the lower part of the steel pipe is buried in the ground to form a plurality of the steel pipes. Are arranged in a line, the adjacent steel pipes are connected by a joint, and a rapture member is laid so as to be continuous with each head of the steel pipe, and a suspension member using the steel pipe head and the rapture member. To the side surface of the steel pipe, suspend the suspending material at the end of the suspending material, fix the bottom formwork support material to the lower part of the suspending material, and attach the bottom formwork stopper to the joint, There is provided a method for mounting a bottom mold, characterized in that the bottom mold is held by the bottom mold support and the bottom mold stopper.

【0006】[0006]

【実施例】以下、図面を用いて本発明の実施例を説明す
る。 <イ>鋼管矢板式岸璧の施工概要 複数の鋼管1を海岸に沿って一列に配列する。隣接する
鋼管は相互に継手2により連接され、壁面が構築され
る。通常、壁面の一方が海側で水面に面し、他方は陸に
面し海岸となっている。この壁面の頭部、即ち、複数の
鋼管の頭部にコンクリートを連なって打設し、岸壁を構
築する。この岸壁は、上部を道路として利用することが
できる。このコンクリートを打設するための型枠、特に
底型枠11を鋼管の上部に取り付ける必要がある。その
ために、鋼管の上部外周に底型枠を吊り下げ、鋼管を挟
むように、両側に側面の型枠12、13を取付ける。こ
れら型枠で包囲された空間にコンクリートを打設して岸
壁を構築する。コンクリート打設後、使用された型枠を
簡単に取り外すことができる。
Embodiments of the present invention will be described below with reference to the drawings. <B> Outline of construction of steel pipe sheet pile type quay wall Multiple steel pipes 1 are arranged in a line along the coast. Adjacent steel pipes are connected to each other by a joint 2 to construct a wall surface. Usually, one of the walls faces the water on the sea side, and the other faces the land, facing the coast. Concrete is continuously cast into the head of this wall surface, that is, the heads of a plurality of steel pipes to construct a quay. The upper part of this quay can be used as a road. It is necessary to attach the formwork for pouring this concrete, especially the bottom formwork 11 to the upper part of the steel pipe. For that purpose, a bottom formwork is hung on the outer periphery of the upper part of the steel pipe, and side face formwork 12, 13 is attached so as to sandwich the steel pipe. The quay is constructed by placing concrete in the space surrounded by these forms. After pouring concrete, the used formwork can be easily removed.

【0007】<ロ>鋼管1 岸壁を構築する予定の地盤に鋼管1を一列に打ち込み、
隣接する鋼管を継手2により相互に連結する。その結
果、鋼管と継手により壁面が形成される。鋼管の上部は
段差を有し、一部切断端部が設けられている。鋼管の切
断端部が海に向かうように、鋼管を配置する。
<B> Steel pipe 1 Steel pipes 1 are driven in a line on the ground where a quay is to be constructed,
Adjacent steel pipes are connected to each other by a joint 2. As a result, a wall surface is formed by the steel pipe and the joint. The upper part of the steel pipe has a step and a partially cut end is provided. Arrange the steel pipe so that the cut end of the steel pipe faces the sea.

【0008】<ハ>吊り材5 鋼管1の切断端部の上に保持材(腹起し材)3を載置
し、タイロットなどで連結し本体構造とする。保持材
(腹起し材)3としては、例えば、上下2重のチャンネ
ル、またはH鋼が用いられる。吊り材5の一端を鋼管の
上端部に止めボルトで止め、吊り材5の途中を腹起し材
3の上部で支柱4を介して支持する。そして、吊り材の
他端は、鋼管1の側面まで延びている。吊り材5の他端
に吊り下げ材6を吊り下げる。吊り下げ材6は、吊り材
5からほぼ鋼管1の側面に吊り下げられる。吊り下げ材
6の下端に底型枠支持材(ブラケット)7を固定する。
底型枠支持材(ブラケット)7は、底型枠11を支持す
るために、鋼管の横方向に横棒が伸び、この横棒を支え
るようにV字型の枠が横棒の下部に取り付けられる。
<C> Suspension Material 5 A holding material (raising material) 3 is placed on the cut end of the steel pipe 1 and connected by a tie lot to form a main body structure. As the holding material (raising material) 3, for example, upper and lower double channels or H steel is used. One end of the suspending member 5 is fastened to the upper end of the steel pipe with a stop bolt, and the suspending member 5 is agitated and supported on the upper portion of the suspending member 3 via the support column 4. Then, the other end of the suspending material extends to the side surface of the steel pipe 1. The suspending member 6 is suspended from the other end of the suspending member 5. The suspending member 6 is suspended from the suspending member 5 substantially on the side surface of the steel pipe 1. A bottom formwork support material (bracket) 7 is fixed to the lower end of the suspension material 6.
The bottom form supporting member (bracket) 7 has a horizontal bar extending in the lateral direction of the steel pipe to support the bottom form 11, and a V-shaped frame is attached to the lower part of the horizontal bar so as to support the horizontal bar. To be

【0009】<ニ>底型枠止め具8 底型枠支持材(ブラケット)7とともに、底型枠11を
支持するために、底型枠止め具8が設けられる。底型枠
止め具8の一端はアングル9と継手2の上部からナット
付き帯鉄10により吊り下げられる。この固定方法とし
ては、ナット付き鉄帯10の下部に固定されているナッ
トに底型枠止め具8のネジ状の一端をネジ込む。底型枠
止め具8の他端は、底型枠11の内部を横方向に通り、
端部で固定される。
<D> Bottom Form Stopper 8 A bottom form stop 8 is provided to support the bottom form support 11 (bracket) and the bottom form 11. One end of the bottom mold stopper 8 is suspended from the angle 9 and the upper portion of the joint 2 by a band iron 10 with a nut. As a fixing method, a threaded end of the bottom formwork stopper 8 is screwed into a nut fixed to the lower portion of the iron strip 10 with a nut. The other end of the bottom mold stopper 8 passes through the inside of the bottom mold 11 in the lateral direction,
Fixed at the ends.

【0010】<ホ>底型枠11 底型枠支持材(ブラケット)7上に底型枠11を配置す
る。底型枠11は、鋼管1と継手2の側面に沿うような
形状に形成される。この形状は、コンクリートが底型枠
11と鋼管1と継手2の間隙から漏れないように密閉し
て形成される。
<E> Bottom Formwork 11 The bottom formwork 11 is arranged on the bottom formwork support (bracket) 7. The bottom formwork 11 is formed in a shape along the side surfaces of the steel pipe 1 and the joint 2. This shape is formed by hermetically sealing the concrete so that it does not leak from the gap between the bottom formwork 11, the steel pipe 1 and the joint 2.

【0011】<ヘ>壁型枠12 壁型枠12は、底型枠11の上部に配置される。また、
陸側の壁型枠13は、地面上に設けられた捨てコンクリ
ート14上に配置される。これら型枠で囲まれた空間に
コンクリートを打設することにより、鋼管1の列の上部
にコンクリートの堤防を構築することができる。
<F> Wall Formwork 12 The wall formwork 12 is disposed above the bottom formwork 11. Also,
The land-side wall formwork 13 is placed on abandoned concrete 14 provided on the ground. By pouring concrete in the space surrounded by these formwork, a concrete embankment can be constructed in the upper part of the row of the steel pipes 1.

【0012】以下に、型枠の構築と除去の手順を説明す
る。 <イ>型枠の構築 継手2を有する鋼管1を地盤に順に埋め込む。隣接する
鋼管1の継手2は連結され、壁面が構築される。鋼管1
の上端は、上端部と切断端部の段部を有し、切断端部が
海側に向くように埋め込まれる。この鋼管1の切断端部
上に保持材(腹起し材)3が配置される。吊り材5は、
一端が鋼管の上端部にボルトで固定され、途中を保持材
(腹起し材)3と支柱4で水平に固定される。吊り材5
の他端は、吊り下げ材6がボルトで固定して、吊り下げ
られる。吊り下げ材6の下部には底型枠支持材7が予め
取り付けられている。ナット付き帯鉄10を継手2の上
部に固定する。底型枠支持材(ブラケット)7の上に底
型枠11を配置する。ナット付き鉄帯10のナットに底
型枠止め具8の一端をネジ込み、他端を底型枠11の端
でナットで固定する。底型枠11が配置されれば、壁型
枠12を海側に配置する。陸側には捨てコンクリート上
に壁型枠13を設け、両壁型枠12、13をセパレータ
で一定の間隔に固定し、型枠内にコンクリートを打設し
て、保持材(腹起し材)3は埋め込まれ、堤防が構築さ
れる。
The procedure for constructing and removing the formwork will be described below. <A> Construction of Formwork The steel pipe 1 having the joint 2 is sequentially embedded in the ground. The joints 2 of the adjacent steel pipes 1 are connected and a wall surface is constructed. Steel pipe 1
Has an upper end and a cut end step, and is embedded so that the cut end faces the sea side. A holding material (raising material) 3 is arranged on the cut end of the steel pipe 1. Hanging material 5,
One end is fixed to the upper end of the steel pipe with a bolt, and the middle is horizontally fixed by a holding member (raising member) 3 and a support column 4. Hanging material 5
At the other end, the suspending member 6 is fixed by a bolt and is suspended. A bottom formwork support member 7 is attached to the lower portion of the hanging member 6 in advance. The band iron 10 with nut is fixed to the upper part of the joint 2. The bottom formwork 11 is arranged on the bottom formwork support (bracket) 7. One end of the bottom mold stopper 8 is screwed into the nut of the iron strip 10 with a nut, and the other end is fixed with the nut at the end of the bottom mold 11. When the bottom mold 11 is arranged, the wall mold 12 is arranged on the sea side. On the land side, a wall formwork 13 is provided on discarded concrete, both wall formwork 12 and 13 are fixed at a constant interval with a separator, and concrete is placed in the formwork to hold a holding material (raising material). ) 3 is buried and a levee is constructed.

【0013】<ロ>型枠の除去 セパレータの固定部を外して壁型枠12、13を取り除
く。底型枠止め具8をネジで取り外す。底型枠支持材7
(ブラケット)を吊り下げ材6から外すとともに、底型
枠11の一部を徐々に除去する。この様に、簡単に型枠
を取り外すことができる。
<B> Removal of Formwork The fixed parts of the separator are removed and the wall formwork 12, 13 is removed. Remove the bottom formwork stop 8 with screws. Bottom formwork support 7
While removing the (bracket) from the suspending member 6, a part of the bottom mold 11 is gradually removed. In this way, the form can be easily removed.

【0014】[0014]

【発明の効果】本発明は、次のような格別な効果を得る
ことができる。 <イ>吊り下げ材が鋼管上部から吊り下げられ、底型枠
が吊り下げ材により支持されるので、底型枠を簡単に鋼
管前面に設置できる。 <ロ>従来、最干潮時に底型枠の下に潜込みブラケット
を切断していたのに対し、底型枠の設置をボルト止めで
行っているため、取り外しが容易となり、アセ切断がな
くなる。 <ハ>底型枠の設置や解体の作業が潮位に左右されず、
クレーン作業の合間に行うことが可能となる。 <ニ>吊り下げ材をボルトで吊ることにより、高さの微
調整が可能になり施工精度が向上する。 <ホ>支保工と鋼製底型枠をチェーンで結束することが
でき、支保工の取外しと一緒に回収ができ、転用が可能
となる。
According to the present invention, the following special effects can be obtained. <B> Since the suspending material is suspended from the upper portion of the steel pipe and the bottom formwork is supported by the suspending material, the bottom formwork can be easily installed on the front surface of the steel pipe. <B> Conventionally, the underlay bracket was cut under the bottom formwork at the lowest tide, but the bottom formwork is installed by bolts, so it is easy to remove and there is no need to cut the bottom. <C> Installation of bottom formwork and dismantling work is not affected by tide level,
It becomes possible to perform it during the crane work. <D> By suspending the suspending material with bolts, the height can be finely adjusted and the construction accuracy is improved. <E> Supporting work and steel bottom formwork can be bound by a chain, and can be recovered together with the removal of the supporting work, and can be diverted.

【図面の簡単な説明】[Brief description of drawings]

【図1】鋼管上の底型枠の斜視図FIG. 1 is a perspective view of a bottom mold on a steel pipe.

【図2】鋼管上の底型枠の平面図FIG. 2 is a plan view of a bottom formwork on a steel pipe.

【図3】鋼管上の底型枠のIII-III の断面図FIG. 3 is a sectional view of the bottom form III-III on the steel pipe.

【図4】鋼管上の底型枠のIV-IV の断面図[Fig. 4] Sectional view of IV-IV of bottom formwork on steel pipe

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】複数の鋼管頭部に連なって打設されるコン
クリートの底型枠の取付け方法において、 該鋼管の下部を地盤に埋設し、複数の該鋼管を一列に配
列し、 隣接する該鋼管を継手により連接し、 該鋼管の各頭部に連なるように腹起し材を掛け渡し、 該鋼管頭部と該腹起し材を利用して吊り材を該鋼管の側
面に突出させ、 該吊り材の端部に吊り下げ材を吊り下げ、 該吊り下げ材の下部に底型枠支持材を固定し、 該継手に底型枠止め具を取り付け、 該底型枠支持材と該底型枠止め具で該底型枠を保持する
ことを特徴とする、 底型枠の取付け方法。
1. A method of mounting a concrete bottom formwork, which is continuously cast into a plurality of steel pipe heads, wherein a lower portion of the steel pipes is buried in the ground, the plurality of steel pipes are arranged in a line, and the adjacent steel pipes are arranged adjacent to each other. The steel pipes are connected by a joint, and the reentrant is spanned so as to be connected to the respective heads of the steel pipe, and the suspension member is projected to the side surface of the steel pipe by utilizing the steel pipe head and the reentrant. A suspending material is suspended at an end of the suspending material, a bottom formwork support material is fixed to a lower portion of the suspending material, a bottom formwork stopper is attached to the joint, the bottom formwork support material and the bottom A method for mounting a bottom mold, wherein the bottom mold is held by a mold stopper.
JP4716593A 1993-02-15 1993-02-15 Mounting method of molding frame Pending JPH06240637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4716593A JPH06240637A (en) 1993-02-15 1993-02-15 Mounting method of molding frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4716593A JPH06240637A (en) 1993-02-15 1993-02-15 Mounting method of molding frame

Publications (1)

Publication Number Publication Date
JPH06240637A true JPH06240637A (en) 1994-08-30

Family

ID=12767464

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4716593A Pending JPH06240637A (en) 1993-02-15 1993-02-15 Mounting method of molding frame

Country Status (1)

Country Link
JP (1) JPH06240637A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528459A (en) * 2019-09-11 2019-12-03 中交第四航务工程局有限公司 A kind of beam type bed die of caisson wharf cast-in-situ creast wall
JP2021156129A (en) * 2020-03-30 2021-10-07 日鉄建材株式会社 Steel sheet pile wall and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528459A (en) * 2019-09-11 2019-12-03 中交第四航务工程局有限公司 A kind of beam type bed die of caisson wharf cast-in-situ creast wall
JP2021156129A (en) * 2020-03-30 2021-10-07 日鉄建材株式会社 Steel sheet pile wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN101289867B (en) Construction process for removing foundation ditch in water
JPH06240637A (en) Mounting method of molding frame
JP2003064632A (en) Floating girder material for timbering of underwater and waterborne structure
JPH11117225A (en) Reinforcing method and device for mooring pile of floating pier
JP3117385B2 (en) Fixing method of steel pier and footing
JP2868725B2 (en) Seawall repair method
JPH08277514A (en) Suspension supporting device and construction of pier
JP2001140221A (en) Repair method for overhanging floor slab, and support construction for form
JP4602840B2 (en) Method of forming a calm water area for work
CN202175935U (en) Sea reclamation novel building
JP2001303580A (en) Temporary shuttering method and structure using caisson
JP2815470B2 (en) Buoyancy-adjustable movable support construction method
JP3311226B2 (en) Construction method of wave-break water-permeable breakwater
JP2657478B2 (en) Seawall revetment using Kasagi block
JP2657477B2 (en) Seawall revetment using Kasagi block
JP2003253648A (en) Coping concrete application method for sheet pile wall for bank protection, coping concrete block and height adjusting bolt
JPS6149026A (en) Construction work of structure such as caisson on sea
JP2980003B2 (en) Floating formwork and construction method using floating formwork for quay construction
JP2560598B2 (en) RC reverse construction method
JPS5865810A (en) Timbering method and apparatus for constructing concrete structure on water surface
JP3170670B2 (en) Construction method for floating structures
JPH05339919A (en) Construction of landing pier
JP3308493B2 (en) Construction method of shade concrete of steel sheet pile wall
JPS63233110A (en) Setting of formwork for water surface concrete structure
JPH0790824A (en) Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure