JPH0790824A - Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure - Google Patents

Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure

Info

Publication number
JPH0790824A
JPH0790824A JP23368993A JP23368993A JPH0790824A JP H0790824 A JPH0790824 A JP H0790824A JP 23368993 A JP23368993 A JP 23368993A JP 23368993 A JP23368993 A JP 23368993A JP H0790824 A JPH0790824 A JP H0790824A
Authority
JP
Japan
Prior art keywords
steel pipe
formwork
sheet pile
pipe sheet
continuous steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23368993A
Other languages
Japanese (ja)
Inventor
Takao Sato
隆夫 佐藤
Akio Furuya
秋夫 古屋
Nobuyuki Suzuki
伸幸 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOSHIKAWA KAIJI KOGYO KK
Original Assignee
YOSHIKAWA KAIJI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOSHIKAWA KAIJI KOGYO KK filed Critical YOSHIKAWA KAIJI KOGYO KK
Priority to JP23368993A priority Critical patent/JPH0790824A/en
Publication of JPH0790824A publication Critical patent/JPH0790824A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To rationalize work to temporarily construct a formwork for concrete lining execution on both of front and back wall surfaces of a continuous steel pipe sheet pile structure and to reduce construction cost. CONSTITUTION:A formwork 11 consisting of a reversal L latter member installing a permanent formwork 15 on the inside of a longitudinal burr 13 free to connect and disconnect is horizontally placed on a continuous steel pipe sheet pile 100 through a jack 16. By inserting and fixing an upper part 31 of a vertical burr formwork 31 installing the permanent formwork 15 and a reused formwork 15 on the inside free to connect and disconnect into and on a forked member 18 on the head end of an upper bracket 12 of the formwork 11, a gate type formwork is formed and temporarily constructed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、連続鋼管矢板からなる
防波堤などの水際鋼構造物の飛沫帯や干満帯の防食およ
び補強を目的として、その両壁面にコンクリートライニ
ングを施工する際の型枠の仮設施工の合理化および施工
コストの軽減を図りうる連続鋼管矢板構造物の両壁面へ
のコンクリート打設用型枠の仮設方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a formwork for constructing concrete linings on both wall surfaces for the purpose of anticorrosion and reinforcement of splash zones and tidal zones of waterside steel structures such as breakwaters made of continuous steel pipe sheet piles. The present invention relates to a method for temporarily installing concrete-casting formwork on both wall surfaces of a continuous steel pipe sheet pile structure capable of rationalizing temporary construction and reducing construction cost.

【0002】[0002]

【従来の技術】港内などの水際に設けられる連続鋼管矢
板構造物においては、特に海水などの飛沫帯や干満帯の
部位で集中腐食と称する激しい局部腐食の発生があり、
従来からその部位に防食および補強の目的でコンクリー
トライニングを施すことが行なわれている。
2. Description of the Related Art In a continuous steel pipe sheet pile structure installed near the water such as in a harbor, there is occurrence of severe local corrosion called concentrated corrosion, especially in a splash zone or a tidal zone such as seawater.
Conventionally, concrete lining has been applied to the part for the purpose of corrosion prevention and reinforcement.

【0003】そこで、上記のごとき連続鋼管矢板構造物
から防波堤などの前面および後面の両壁面の飛沫帯や干
満帯、ならびに水中部に対し、防食および補強の目的で
コンクリートライニングを施すため、その両壁面にコン
クリート打設用の型枠を仮設した後、その型枠内にコン
クリートを打設している。この場合、鋼管矢板の水中両
側壁面に、底板支保材などを水中溶接により取付ける一
方、現場付近の陸上仮ヤードで現場の状態に合せた大組
型枠をクレーンなどで吊り上げて移動し、上記底板支保
材などの上に据付けて固定するなど潜水士による水中組
立作業を長時間行なうことになる。
Therefore, the continuous steel pipe sheet pile structure as described above is subjected to concrete lining for the purpose of anticorrosion and reinforcement for the splash zone and tidal zone on both the front and rear wall surfaces of the breakwater and the underwater portion. After a formwork for concrete placement is temporarily installed on the wall surface, concrete is placed in the formwork. In this case, the bottom plate support materials are attached to both underwater wall surfaces of the steel pipe sheet pile by underwater welding, while at the temporary land yard near the site, the large-scale formwork that suits the condition of the site is lifted with a crane to move the bottom plate. Underwater assembly work by a diver will be carried out for a long time, such as by installing and fixing it on a support material.

【0004】しかしながら、この水中作業環境は視野が
悪く、波浪などの悪条件下の困難な作業となり、作業能
率の面、施工コストの面および作業の安全性の面でも問
題が多い型枠の仮設作業となっていた。以上のごとく、
連続鋼管矢板構造物からなる防波堤などの前面および後
面の両壁面にコンクリートライニングを施すためのコン
クリート打設用型枠の仮設時の、作業能率および安全性
を改善するため、本発明者等が種々検討を行った結果、
このような両側壁面のコンクリート打設用の型枠仮設作
業の合理化をはかるには、両壁面に対して平行な門形の
型枠が有効であることに着目し、さらに、どのような構
成の門形型枠が連続鋼管矢板に対し経済的に仮設可能
で、かつ撤去も容易であるかの検討を重ねた結果、本発
明に到達した。
However, this underwater working environment has a bad field of view and becomes difficult work under adverse conditions such as waves, and temporary construction of the formwork has many problems in terms of work efficiency, construction cost and work safety. It was working. As mentioned above,
In order to improve work efficiency and safety at the time of temporary construction of a concrete placing formwork for applying concrete lining to both front and rear wall surfaces such as a breakwater made of a continuous steel pipe sheet pile structure, the present inventors have various methods. As a result of the examination,
In order to rationalize the temporary work of the formwork for concrete pouring on both side wall surfaces, paying attention to the fact that a gate-shaped formwork parallel to both wall surfaces is effective, and further The present invention has been achieved as a result of repeated studies on whether a portal form can be economically temporarily installed on a continuous steel pipe sheet pile and is easy to remove.

【0005】[0005]

【発明が解決しようとする課題】本発明は、前記従来の
問題点を解決するためになされたものであり、その目的
とするところは、連続鋼管矢板構造物の両壁面にコンク
リートライニングを施工するためのコンクリート打設用
の型枠仮設作業の合理化をはかると共に、施工コストの
低減と、その型枠の撤去作業を容易にすることにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional problems, and an object thereof is to apply concrete lining to both wall surfaces of a continuous steel pipe sheet pile structure. In order to rationalize the temporary work of the formwork for concrete pouring, to reduce the construction cost and to facilitate the work of removing the formwork.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
め、本発明の連続鋼管矢板構造物の両壁面へのコンクリ
ート打設用型枠の仮設方法は、上部ブラケットと縦バリ
とからなる逆L字形部材を横バリで連結し、かつその縦
バリの内側に捨て型枠又は転用型枠を取り付け、連続鋼
管矢板の上に、上記上部ブラケットにジャッキ等を介し
て水平に載置して、上記縦バリを連続鋼管矢板の一方の
壁面に対し下部セパレータを介して平行に固定の後、上
部ブラケットの先端に延設した二股部材等に、内側に捨
て型枠又は転用型枠を取り付けた縦バリ型枠の上部を挿
入固定し、その縦バリ型枠を連続鋼管矢板の他方の壁面
に対し下部セパレータを介して平行に固定することを特
徴とし、連続鋼管矢板の上に、逆L字形部材からなる型
枠を載置の上、その逆L字形部材の上部ブラケットの先
端に縦バリ型枠を挿入固定し、上記型枠と縦バリ型枠と
を連続鋼管矢板の両壁面に対しそれぞれ下部セパレータ
を介して平行に固定することで、容易にコンクリート打
設用の型枠を形成し、仮設することができる。
In order to achieve the above object, a method for temporarily placing a concrete casting formwork on both walls of a continuous steel pipe sheet pile structure according to the present invention is a reverse method comprising an upper bracket and a vertical burr. The L-shaped members are connected by a horizontal burr, and a discard form or a diversion form is attached to the inside of the vertical burr, and placed horizontally on the upper bracket above the continuous steel pipe sheet pile via a jack or the like, After fixing the vertical burr in parallel to one wall surface of the continuous steel pipe sheet pile via the lower separator, a forked member or the like extending to the tip of the upper bracket is attached with a discarding form or a diversion form inside. The upper part of the burr formwork is inserted and fixed, and the vertical burr formwork is fixed in parallel to the other wall surface of the continuous steel pipe sheet pile through the lower separator, and the inverted L-shaped member is formed on the continuous steel pipe sheet pile. Place the formwork consisting of By inserting and fixing a vertical burr form at the tip of the upper bracket of the inverted L-shaped member, and fixing the form and the vertical burr form in parallel to both wall surfaces of the continuous steel pipe sheet pile via lower separators, respectively, A formwork for concrete pouring can be easily formed and temporarily installed.

【0007】また、連続鋼管矢板の頭部に上部工が設け
られている場合には、上記逆L字形部材の上部ブラケッ
トをその上部工の上にジャッキ等を介して載置し、その
後前記と同様の手順でコンクリート打設用の型枠を仮設
することができる。
When the head of the continuous steel pipe sheet pile is provided with a superstructure, the upper bracket of the inverted L-shaped member is placed on the superstructure through a jack or the like, and then A formwork for concrete pouring can be temporarily installed by the same procedure.

【0008】[0008]

【実施例】以下図面を参照して本発明のコンクリート打
設用の型枠の仮設方法を適用して連続鋼管矢板構造物の
前面および後面の両壁面へのコンクリートライニング施
工を行なう各実施例を説明するが、図1は本発明の実施
例1に係る頭部に上部工のない連続鋼管矢板を用いた防
波堤、または護岸などの構造物の前面および後面の両壁
面へのコンクリート打設用の型枠を仮設した状態の側断
面図で、図2は図1の上部ブラケット先端部を示すA−
A方向の平面図、図3は図1の左側の縦バリ型枠の吊り
下げ状態の側面図、そして図4は図3のB−B方向の要
部正面図である。
Embodiments Embodiments in which concrete lining construction is performed on both front and rear wall surfaces of a continuous steel pipe sheet pile structure by applying the method for temporarily placing a concrete formwork of the present invention with reference to the drawings As will be described, FIG. 1 is a concrete breaker for constructing concrete on both the front and rear wall surfaces of a breakwater using a continuous steel pipe sheet pile without a superstructure on the head or a structure such as a seawall according to the first embodiment of the present invention. FIG. 2 is a side sectional view showing a state in which a mold is temporarily installed, and FIG. 2 is a view showing an end portion of the upper bracket in FIG.
3 is a plan view in the A direction, FIG. 3 is a side view of the left vertical burr form in FIG. 1 in a suspended state, and FIG. 4 is a front view of a main part in the BB direction in FIG.

【0009】まず、この型枠は、図9に示すように多数
の鋼管矢板101をそれぞれ継手102で継合して形成
した連続鋼管矢板100からなる防波堤または護岸など
の構造物の矢印Fで示す前面とRで示す後面の両壁面の
水際から水中までの部位に防食および補強の目的でコン
クリートライニングを施すために仮設されるものであ
り、そのコンクリート打設時の逆L字形部材11自体お
よびコンクリート20の重量を、上部ブラケット12と
縦バリ13とからなる逆L字形部材の上下を横バリ14
で連結し、その上部ブラケット12に設けたジャッキ1
6を介して受けるようにしている。
First, this formwork is shown by an arrow F of a structure such as a breakwater or a seawall, which is composed of a continuous steel pipe sheet pile 100 formed by joining a plurality of steel pipe sheet piles 101 with joints 102 as shown in FIG. The front L and the rear wall shown by R are temporarily installed to apply concrete lining to the area from the water to underwater for the purpose of anticorrosion and reinforcement, and the inverted L-shaped member 11 itself and concrete at the time of placing the concrete. 20 is the weight of the inverted L-shaped member consisting of the upper bracket 12 and the vertical burr 13 and the horizontal burr 14
1 attached to the upper bracket 12 by connecting with
I am going to receive it via 6.

【0010】上記型枠11の縦バリ13の内側には連続
鋼管矢板100の前面Fに対向するプレキャストコンク
リートパネルや、樹脂パネル、GRCパネルなどの捨て
型枠15やメタルフォーム板等の転用型枠15が取付ボ
ルトにより着脱可能に取りつけられている。なお、プレ
キャストコンクリートパネルの捨て型枠15の場合に
は、縦バリ13に直接取り付けて建込みが可能である
が、樹脂パネルの捨て型枠15の場合、打設されるコン
クリート20の側圧に耐えるには頑強な厚肉のものが必
要となるため、縦バリ13にメタルフォームを取り付
け、その内側に樹脂パネルを取付けることにより薄肉の
樹脂パネルを捨て型枠15として使用できる。
Inside the vertical burr 13 of the form 11, the precast concrete panel facing the front face F of the continuous steel pipe sheet pile 100, a discard form 15 such as a resin panel or a GRC panel, and a diversion form such as a metal foam plate. 15 is detachably attached by the mounting bolt. In addition, in the case of the waste formwork 15 of the precast concrete panel, it is possible to directly attach it to the vertical burr 13 for building, but in the case of the waste formwork 15 of the resin panel, it withstands the lateral pressure of the concrete 20 to be placed. Since it is necessary to have a strong and thick wall, a thin resin panel can be used as the discarding mold 15 by attaching a metal foam to the vertical burr 13 and attaching a resin panel inside thereof.

【0011】また、上記逆L字形部材11の上部ブラケ
ット12の先端には、図2に示すごとく二股部材18を
溶接により延設し、この二股部材18に、横バリ14で
連結された縦バリ型枠31の上部を固定するように、縦
バリ型枠31の上部には図4で示すような吊りブラケッ
ト32が固設されており、さらに、縦バリ部材31の横
方向の位置を固定するため、くさび形の金矢35が二股
部材18の金矢挿入固定穴に挿入されて、ピン34で固
定されるようになっている。
A bifurcated member 18 is extended by welding at the tip of the upper bracket 12 of the inverted L-shaped member 11 as shown in FIG. 2, and a vertical burr connected to the bifurcated member 18 by a horizontal burr 14. A hanging bracket 32 as shown in FIG. 4 is fixedly installed on the upper portion of the vertical burr mold 31 so as to fix the upper portion of the mold 31. Further, the horizontal position of the vertical burr member 31 is fixed. Therefore, the wedge-shaped gold arrow 35 is inserted into the gold arrow insertion fixing hole of the bifurcated member 18 and fixed by the pin 34.

【0012】また、縦バリ型枠31の内側には連続鋼管
矢板100の後面Rに対向する前記と同様な捨て型枠1
5が着脱可能に取り付けられている。以上の構成からな
る型枠11および縦バリ型枠31をそれぞれをあらかじ
め工場などで大組しておき、クレーンなどを使用してコ
ンクリートライニングを施す構造物まで運送することに
なるが、まず逆L字形部材11を、連続鋼管矢板100
の上に直接、または図1のごとく鋼管矢板頭部通し受台
40の上に、上部ブラケット12にジャッキ16を介し
て水平に載置し、ジャッキ16と鋼管矢板頭部通し受台
40とを連結固定ピン41で固定する。
Further, inside the vertical burr form 31 is disposed the same as the aforesaid form 1 facing the rear surface R of the continuous steel pipe sheet pile 100.
5 is detachably attached. The formwork 11 and the vertical burr formwork 31 having the above-mentioned configurations are assembled in advance in a factory or the like, and they are transported to a structure to be subjected to concrete lining using a crane or the like. The character-shaped member 11 is a continuous steel pipe sheet pile 100.
1 or directly on the steel pipe sheet pile head through pedestal 40 as shown in FIG. 1 and placed horizontally on the upper bracket 12 via the jack 16 to attach the jack 16 and the steel pipe sheet pile head through pedestal 40. It is fixed with the connecting fixing pin 41.

【0013】その際、連続鋼管矢板100の下部に溶接
した水中スタッド25に連結金物26を介して取り付け
た下部スタッド27を、縦バリ13の外側に連結された
横バリ間隙部Cに通して、セパレータ端部ナット28で
締め固定し、後刻、コンクリート打設時の逆L字形部材
11にかかる側圧力を、この逆L字形部材11の縦バリ
13と横バリ14とで支持可能にしている。
At this time, the lower stud 27 attached to the underwater stud 25 welded to the lower portion of the continuous steel pipe sheet pile 100 through the connecting metal 26 is passed through the horizontal burr gap C connected to the outside of the vertical burr 13. The separator end nut 28 is tightened and fixed, and the side pressure applied to the inverted L-shaped member 11 at the time of concrete pouring later can be supported by the vertical burr 13 and the horizontal burr 14 of the inverted L-shaped member 11.

【0014】次に、上記逆L字形部材11の上部ゲラケ
ット12の先端の二股部材18に、ハンガー37を介し
てクレーンにより縦バリ型枠31の上部を挿入の上、吊
りブラケット32を二股部材18上に載置して吊り下
げ、金矢35とピン34で固定する。その際、前記逆L
字形部材11と同様に、この縦バリ型枠31の場合も、
連続鋼管矢板100の後面Rの壁面に対して下部セパレ
ータ27を介して平行に固定し、これにより全体として
門形型枠が仮設される。
Next, the upper part of the vertical burr form 31 is inserted into the bifurcated member 18 at the tip of the upper galleyet 12 of the inverted L-shaped member 11 by the crane via the hanger 37, and the hanging bracket 32 is attached to the bifurcated member 18. It is placed on the top and suspended, and is fixed by the gold arrow 35 and the pin 34. At that time, the reverse L
As with the letter-shaped member 11, in the case of this vertical burr form 31,
The continuous steel pipe sheet pile 100 is fixed in parallel to the wall surface of the rear surface R of the continuous steel pipe sheet 100 through the lower separator 27, whereby a portal form is temporarily installed as a whole.

【0015】次に、逆L字形部材11および縦バリ型枠
31のそれぞれの捨て型枠15の下端部に沿って、その
下端部とチャンネル材17で形成された間隙に、縦バリ
13および縦バリ型枠31と直角方向に差し込み自在に
並べて挿入されている複数の底板形成棒19をそれぞれ
連続鋼管矢板100の両壁面に当接するまで矢印P方向
に押し込み、コンクリート打設用の門形型枠の底部を形
成する。
Next, the vertical burrs 13 and the vertical burrs 13 and the vertical burr 13 are formed along the lower ends of the respective discarding forms 15 of the inverted L-shaped member 11 and the vertical burr form 31 in the gap formed by the lower ends and the channel members 17. A plurality of bottom plate forming rods 19, which are inserted side by side in a direction perpendicular to the burr mold 31 so as to be freely inserted, are pushed in the direction of arrow P until they come into contact with both wall surfaces of the continuous steel pipe sheet pile 100, and a portal form for concrete pouring. Forming the bottom of.

【0016】一方、この門形型枠の左右両側面も、コン
クリート打設用の側面板を設けるが、その場合、それぞ
れ横バリ14の左右両端部に所定の間隙を保って垂直方
向に互い違いに取り付けた3本のチャンネル材の間隙に
側面板を挿入するか、または上記底板形成棒19と同様
に複数の側面板形成棒を上記チャンネル材の間隙に差し
込み自在に積み重ねて挿入しておき、それぞれの壁面に
接当するまで押し込んでもよい。
On the other hand, the left and right side surfaces of the portal form are also provided with side plates for concrete placing. In this case, the lateral burrs 14 are vertically staggered with a predetermined gap at both left and right ends thereof. A side plate is inserted into the gap between the three attached channel members, or a plurality of side plate forming rods are stacked and inserted into the gap between the channel members in the same manner as the bottom plate forming rod 19 and are inserted respectively. You may push it in until it touches the wall surface.

【0017】上記の構成からなる門形型枠を用いて連続
鋼管矢壁のF,Rで示す両壁面にコンクリート20を打
設、養生後、各捨て型枠15の逆L字形部材11および
縦バリ型枠31との取付ボルトを取り外すと共に、下部
セパレータ27の連結金物26を外した上、上部ブラケ
ット12のジャッキ16を下げれば、門形型枠がそれ自
体の重みで降下することになり、打設されたコンクリー
ト20に密着した捨て型枠15およびその底部の面と、
門形型枠側が剥離し、コンクリートライニングの施工が
完了する。
Using the portal form having the above structure, concrete 20 is cast on both wall surfaces of the continuous steel pipe arrow wall indicated by F and R, and after curing, the inverted L-shaped member 11 and the vertical length of each discard form 15 and the vertical direction. If the mounting bolts for the burr form 31 are removed, the connecting metal 26 of the lower separator 27 is removed, and the jack 16 of the upper bracket 12 is lowered, the portal form will descend due to its own weight. A surface of the discarding mold 15 and its bottom part that are in close contact with the cast concrete 20;
The gate formwork side is peeled off and the concrete lining construction is completed.

【0018】なお、切離された門形型枠の金矢35とピ
ン34を抜き、逆L字形部材11と縦バリ型枠31に、
新たな捨て型枠15を取り付ければ、再び次のライニン
グ施工作業に転用することができる。施工されたコンク
リートライニングの表面は、上記プレキャストコンクリ
ートパネルや、樹脂パネルの面になるので、表面仕上り
がきれいであり、脱気の必要もなく、ライニング面の美
観が向上する。
Incidentally, the metal arrow 35 and the pin 34 of the separated gate form are pulled out, and the inverted L-shaped member 11 and the vertical burr form 31 are
If a new discard form 15 is attached, it can be diverted to the next lining construction work again. Since the surface of the constructed concrete lining is the surface of the above-mentioned precast concrete panel or resin panel, the surface finish is clean, deaeration is not required, and the appearance of the lining surface is improved.

【0019】次に、図5は実施例2に係る頭部に上部工
のある連続鋼管矢板を用いた防波堤などの構造物の前後
両壁面へのコンクリートライニング施工を行なう際のコ
ンクリート打設用の門形型枠を仮設した状態の側断面図
で、図6は図5の上部ブラケット先端部を示すD−D方
向の平面図、図7は図5の左側の縦バリ型枠の吊り下げ
状態の側面図、そして図8は図7のE−E方向の要部正
面図である。
Next, FIG. 5 is a diagram for concrete placing when performing concrete lining construction on both front and rear wall surfaces of a structure such as a breakwater using a continuous steel pipe sheet pile with a superstructure on the head according to the second embodiment. FIG. 6 is a side sectional view showing a state in which a portal form is temporarily installed. FIG. 6 is a plan view in the DD direction showing the tip of the upper bracket in FIG. 5, and FIG. 7 is a state in which the vertical burr form on the left side of FIG. FIG. 8 is a front view of a main part of FIG.

【0020】この実施例2の門形型枠は図1から図4ま
でに示した実施例1の門形型枠とほぼ同様な構成と機能
とを有するものであり、それぞれ同じ部品は同じ符号で
示しており、その相違点は、コンクリートライニング施
工される図9に示す連続鋼管矢板100からなる防波堤
などの頭部に、図5に示すようなコンクリートで形成さ
れた上部工2が既設されていることである。
The portal form of the second embodiment has substantially the same structure and function as the portal form of the first embodiment shown in FIGS. 1 to 4, and the same parts respectively have the same reference numerals. The difference is that the superstructure 2 made of concrete as shown in FIG. 5 is already installed on the head of a breakwater or the like made of the continuous steel pipe sheet pile 100 shown in FIG. It is that you are.

【0021】一般に、この種、上部工2は、水陸に対し
て正確に測量されてコンクリート成型されており、その
上部面ラインは高さの基準となり、かつその前後の両側
面ラインもコンクリートライニングの両壁面ラインの基
準とすることができる。そこで、この実施例2では、前
記実施例1と同様な手順でこの門形型枠を連続鋼管矢板
100の上に載置仮設する際に、逆L字形部材11を、
その上部工2の上に、上部ブラケット12にジャッキ1
6を介して載置するか、または図5の実施例2のごとく
段付きの上部工2の場合にはジャッキ台座45を用いた
ジャッキ16を介して載置する。
Generally, this type of superstructure 2 is accurately measured with respect to land and land and is concrete-molded. The upper surface line serves as a height reference, and the front and rear side surface lines are also made of concrete lining. It can be used as a reference for both wall lines. Therefore, in this second embodiment, when the gate formwork is placed and temporarily installed on the continuous steel pipe sheet pile 100 by the same procedure as in the first embodiment, the inverted L-shaped member 11 is
On top of the superstructure 2, jack 1 on the upper bracket 12.
6, or in the case of the stepped superstructure 2 as in the second embodiment of FIG. 5, it is mounted via the jack 16 using the jack pedestal 45.

【0022】[0022]

【発明の効果】以上に説明した本発明のコンクリート打
設用の門形型枠の仮設方法によれば、連続鋼管矢板構造
物からなる防波堤や護岸の前後両側壁面に対し、防食お
よび補強の目的でコンクリートライニングを施工する際
のコンクリート打設用の型枠仮設作業において、従来必
要とされた現場の水中作業などの困難で、かつ危険な作
業を著しく低減でき、型枠仮設作業を容易にし、作業時
間を大幅に短縮できる。
According to the method for temporarily constructing a portal formwork for concrete pouring of the present invention described above, the purpose of anticorrosion and reinforcement on the front and rear wall surfaces of a breakwater or a seawall made of a continuous steel pipe sheet pile structure. In the temporary work of the formwork for concrete placement when constructing the concrete lining with, difficult and dangerous work such as underwater work that was conventionally required on site can be significantly reduced, and the temporary work of the formwork can be facilitated. Work time can be significantly reduced.

【0023】その結果、型枠仮設作業の合理化と施工コ
ストの低減がはかれると共に、作業の安全性が向上し、
しかもコンクリート打設後の型枠の撤去作業も従来に比
べて極めて容易になる。
As a result, the temporary work of the formwork can be rationalized and the construction cost can be reduced, and the work safety can be improved.
Moreover, the work of removing the formwork after the concrete is placed becomes much easier than in the past.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例1に係る上部工のない構造物の
前後両壁面へのコンクリート打設用の門形型枠を仮設し
た状態の側断面図である。
FIG. 1 is a side cross-sectional view of a structure without a superstructure according to a first embodiment of the present invention in which a portal form for concrete placement on both front and rear walls is temporarily installed.

【図2】図1の上部ブラケット先端のA−A方向の平面
図である。
FIG. 2 is a plan view of the tip of the upper bracket in FIG. 1 in the AA direction.

【図3】図1の縦バリ型枠の吊り下げ状態の側面図であ
る。
FIG. 3 is a side view of the vertical burr form in FIG. 1 in a suspended state.

【図4】図3のB−B方向の要部正面図である。FIG. 4 is a front view of a main part in the BB direction of FIG.

【図5】実施例2に係る頭部に上部工のある構造物の前
後両壁面へのコンクリート打設用の門形型枠を仮設した
状態の側断面図である。
FIG. 5 is a side cross-sectional view of a structure in which a portal formwork for placing concrete on the front and rear wall surfaces of a structure having a superstructure on the head thereof according to the second embodiment is temporarily installed.

【図6】図5の上部ブラケット先端部を示すD−D方向
の平面図である。
6 is a plan view in the DD direction showing the tip of the upper bracket of FIG.

【図7】図5の縦バリ型枠の吊り下げ状態の側面図であ
る。
FIG. 7 is a side view of the vertical burr form in FIG. 5 in a suspended state.

【図8】図7のE−E方向の要部正面図である。8 is a front view of the main part in the EE direction of FIG.

【図9】本発明を適用する連続鋼管矢板構造物の要部斜
視図である。
FIG. 9 is a perspective view of a main part of a continuous steel pipe sheet pile structure to which the present invention is applied.

【符号の説明】[Explanation of symbols]

2 上部工 11 逆L字
形部材 12 上部ブラケット 13 縦バリ 14 横バリ 15 捨て型
枠、転用型枠 16 ジャッキ 18 二股部
材 27 下部セパレータ 31 縦バリ
型枠 100 連続鋼管矢板
2 Upper work 11 Reverse L-shaped member 12 Upper bracket 13 Vertical burr 14 Horizontal burr 15 Discarding form, conversion form 16 Jack 18 Bifurcated member 27 Lower separator 31 Vertical burr form 100 Continuous steel pipe sheet pile

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 上部ブラケットと縦バリからなる逆L字
形部材を横バリで連結し、かつその縦バリの内側に捨て
型枠又は転用型枠を取り付け、その逆L字形部材を、連
続鋼管矢板の上に、上記上部ブラケットにジャッキ等を
介して水平に載置して、上記縦バリを連続鋼管矢板の一
方の壁面に対し下部セパレータを介して平行に固定の
後、上部ブラケットの先端に延設した部材に、捨て型枠
又は転用型枠を取り付けた縦バリ型枠の上部を係合固定
し、その縦バリ型枠を連続鋼管矢板の他方の壁面に対し
下部セパレータを介して平行に固定する連続鋼管矢板構
造物の両壁面へのコンクリート打設用型枠の仮設方法。
1. An inverted L-shaped member composed of an upper bracket and a vertical burr is connected by a horizontal burr, and a discarding form or a diversion form is attached to the inside of the vertical burr, and the inverted L-shaped member is connected to a continuous steel pipe sheet pile. On the upper bracket horizontally via a jack, etc., fix the vertical burr parallel to one wall of the continuous steel pipe sheet pile via the lower separator, and then extend it to the tip of the upper bracket. The upper part of a vertical burr form fitted with a discard form or a diversion form is engaged and fixed to the installed member, and the vertical burr form is fixed in parallel to the other wall surface of the continuous steel pipe sheet pile through the lower separator. Method of Temporary Placing Formwork for Placing Concrete on Both Walls of Continuous Steel Pipe Sheet Pile Structure.
【請求項2】 上部ブラケットと縦バリからなる逆L字
形部材を横バリで連結し、かつその縦バリの内側に捨て
型枠又は転用型枠を取り付け、その逆L字形部材を、連
続鋼管矢板の上部工の上に、上記上部ブラケットにジャ
ッキ等を介して載置して、上記縦バリを連続鋼管矢板の
一方の壁面に対し下部セパレータを介して平行に固定の
後、上部ブラケットの先端に延設した部材に、捨て型枠
又は転用型枠を取り付けた縦バリ型枠の上部を係合固定
し、その縦バリ型枠を連続鋼管矢板の他方の壁面に対し
下部セパレータを介して平行に固定する連続鋼管矢板構
造物の両壁面へのコンクリート打設用型枠の仮設方法。
2. An inverted L-shaped member composed of an upper bracket and a vertical burr is connected by a horizontal burr, and a discarding form or a diversion form is attached inside the vertical burr, and the inverted L-shaped member is connected to a continuous steel pipe sheet pile. After placing it on the upper bracket via a jack, etc. on the superstructure of, and fixing the vertical burr parallel to one wall surface of the continuous steel pipe sheet pile via the lower separator, at the tip of the upper bracket. Engage and fix the upper part of the vertical burr form fitted with the discard form or diversion form to the extended member, and make the vertical burr form parallel to the other wall surface of the continuous steel pipe sheet pile through the lower separator. Temporary installation method of concrete casting formwork on both walls of fixed steel pipe sheet pile structure to be fixed.
JP23368993A 1993-09-20 1993-09-20 Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure Pending JPH0790824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23368993A JPH0790824A (en) 1993-09-20 1993-09-20 Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23368993A JPH0790824A (en) 1993-09-20 1993-09-20 Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure

Publications (1)

Publication Number Publication Date
JPH0790824A true JPH0790824A (en) 1995-04-04

Family

ID=16959003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23368993A Pending JPH0790824A (en) 1993-09-20 1993-09-20 Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure

Country Status (1)

Country Link
JP (1) JPH0790824A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016148197A (en) * 2015-02-12 2016-08-18 株式会社 南組 Structure for repairing existing bank body and method for repairing existing bank body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016148197A (en) * 2015-02-12 2016-08-18 株式会社 南組 Structure for repairing existing bank body and method for repairing existing bank body

Similar Documents

Publication Publication Date Title
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
KR100854224B1 (en) Precast half depth cantilever deck and constructing method of such bridge deck
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
CN110644538A (en) Basement side wall extra front and back pouring belt periphery protection structure
JP4669386B2 (en) Reinforcement structure of foundation in existing underwater structure and its reinforcement method
JPH0790824A (en) Temporary construction of formwork for concrete deposition to both wall surfaces of continuous steel pipe sheet pile structure
JPH11241314A (en) Reinforcing construction method of underwater structure
JP2852173B2 (en) Seawall construction using steel sheet piles
KR100394780B1 (en) A Repair ethod and Repair tructure of Bridge Pier Mould Construction
CN114032967A (en) Template device for sealing basement outer wall post-cast strip in advance and template supporting method
CN205875724U (en) Concrete placement formwork support
JP2003064632A (en) Floating girder material for timbering of underwater and waterborne structure
JPH0754371A (en) Method of fitting and temporary-fitting concrete placing form to steel structure revetment wall
JPH03275809A (en) Caisson structure
JP3332595B2 (en) How to make a caisson bottom plate
JP7157682B2 (en) Wave-breaking steel material and caisson repair method
CN219316029U (en) Dry-type node of outer protection system and main body structure of assembled steel structure building
JPH08269912A (en) Fastening method of steel bridge pier to footing
CN213897576U (en) Advanced water stop structure of basement bottom plate
CN217974502U (en) Basement post-cast strip retaining wall structure
CN220013556U (en) Device for repairing breast wall of old wharf
JP2002201649A (en) Work caisson and its installation method
CN211949590U (en) Reusable assembled post-pouring belt template with cover
CN211816455U (en) Pre-closed advanced water stop post-pouring belt for basement outer wall
JPH1171718A (en) Method for reinforcing construction of underwater part of existing bridge pier