CN205875724U - Concrete placement formwork support - Google Patents
Concrete placement formwork support Download PDFInfo
- Publication number
- CN205875724U CN205875724U CN201620560329.8U CN201620560329U CN205875724U CN 205875724 U CN205875724 U CN 205875724U CN 201620560329 U CN201620560329 U CN 201620560329U CN 205875724 U CN205875724 U CN 205875724U
- Authority
- CN
- China
- Prior art keywords
- template
- filler strip
- concrete
- support
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a concrete placement formwork support, th, filler strip and support, frame shape is built into to the support, at the top of support a plurality of filler strip of having kept flat, it forms the plane to have placed a plurality of template concatenations at the top surface of filler strip, the edge that the template is spliced has mutually seted up the groove, edge at the groove place that sinks has seted up the through hole, the connecting piece is placed in the groove that sinks, the bottom of connecting piece has set up the couple, the couple passes the through hole, joint spare has been set up below the filler strip, the spring upper end articulates on the couple, the spring lower extreme passes through the pothook card on joint spare. The utility model discloses assembly and disassembly is convenient efficient, and operation labour saving and time saving can not lead to the fact destruction to template and filler strip, and template and filler strip can a lot of used repeatedly, and reduction construction cost effectively guarantees the planar planarization that the template splices, and the concreted structure who builds has good planarization.
Description
Technical field
This utility model relates to concreting technical field, particularly relates to a kind of concrete-pouring template support.
Background technology
Current China enters the national economy high-speed developing period, and capital construction scale unprecedentedly expands, the skill to construction
Art and management are had higher requirement, and in Civil Engineering Construction, scaffold and falsework are because setting up and remove the most square
Just, it is widely used flexibly.Concreting is concreting to be entered mould until plasticizing forming, should be by template before pouring
In rubbish, earth, the eliminating impurities such as the greasy dirt on reinforcing bar is clean, and checks that the cement mortar filler strip of reinforcing bar, plastic cushion (of tie bar) are
No pad is well.Make template moisten as watered when using plank sheathing.The cast of concrete beam and board generally uses and builds falsework
Enforcement pours, first mounting bracket, then lays template on support, then that reinforcing bar binding is in place, then pacifies around reinforcing bar
Dress side form, then casting concrete in the cavity formed, last health preserving form removal falls frame.
Traditional concrete-pouring template support is in order to ensure structural stability, it is to avoid occur subsiding in casting process
Accident, when building falsework by dead by spike connected nail between template and filler strip, installation effectiveness is low, wastes time and energy,
And it is difficult to ensure the planarization of the template of splicing, thus causes the concrete pouring molding to there is rough situation, sternly
Ghost image rings pouring quality, the floating difficulty of later stage concrete surface, the difficulty of template and filler strip dismounting simultaneously, removes that spike is time-consuming to be taken
Power, and template and filler strip can be damaged, template is short with the service life of filler strip, needs often to change, and construction cost is high.
Utility model content
The technical assignment of technical problem to be solved in the utility model and proposition is to improve prior art, it is provided that
A kind of concrete-pouring template support, solves the concrete-pouring template support efficiency of loading and unloading traditional in current technology low, time-consuming
Arduously, it is impossible to ensure flatness, template and filler strip, the problem that construction cost is high during dismounting, can be destroyed.
For solving above technical problem, the technical solution of the utility model is:
A kind of concrete-pouring template support, including template, filler strip and support, it is characterised in that described support is built
Becoming frame-like, kept flat some filler strips at the top of support, the end face at filler strip placed some template splicings and formed flat
Face, the edge that template is spliced mutually has offered time deep gouge, and the edge at lower deep gouge place has offered through hole, and connector is placed
In lower deep gouge, the bottom of connector is provided with hook, and hook, through through hole, is provided with shackle member, spring below filler strip
Upper end is articulated on hook, and lower spring end is stuck in shackle member by grab, utilizes the elastic force of spring to make template proximate at pad
On bar, ensure the planarization of the plane of template splicing one-tenth.Concrete-pouring template supporting structure described in the utility model is simple,
Easy to use, it is not necessary to tapping installation nail can be by fixing for template splicing on filler strip, and packaging efficiency is high, saves man-hour, at mould
Connector only need to be placed in lower deep gouge after being spliced into plane by plate, is then articulated on the hook below connector by spring,
Then pull downward on grab to be stuck in shackle member by grab, assembly operation can be completed, time saving and energy saving, and template is effectively ensured
The planarization of the plane being spliced into so that water, at template upper surface, the concrete built up and there is even curface, improve and pour matter
Amount, it is to avoid the operation that follow-up increase is floating, improves efficiency of construction.Concrete-pouring template support the most described in the utility model
Convenient disassembly, efficiency are high, and it is time saving and energy saving to operate, and grab only need to pull downward on abjection shackle member can be decoupled template, filler strip,
Template and filler strip will not be caused damage, thus template and filler strip can repeatedly use, reduce construction cost, improve economy
Benefit.
Further, described lower deep gouge is provided with several in the edge of template along edge length direction is spaced apart, protects
Barrier ceiling edge connects smooth, it is to avoid the situation of Local warping occur, improves the planarization of the plane that template splicing becomes, and improves mixed
Solidifying soil pouring quality.
Further, the sinking breach that the described edge entirety that lower deep gouge is template is offered, through hole is adjacent forms
Marginal gap connector formed in the whole edge of template and connect band, Stability Analysis of Structures, the flat of template splicing can be effectively improved
Whole property.
Further, the shape of described connector is mated with sinking groove shape, the thickness of connector and sinking groove depth
Identical, when connecting component apparatus is in lower deep gouge, connector end face and template either flush form complete plane, carry further
The planarization of high splicing, it is to avoid shaggy block occur, improves concreting surface quality.
Further, described shackle member main body takes the shape of the letter U groove structure, and two filler strips are positioned at U-lag structure, improves and connects
Stability, it is to avoid owing to vibrations or other reasons cause shackle member to be deviate from below filler strip, it is to avoid in the process of casting concrete
Middle template loses the lower pulling force of spring and the situation of warpage occurs, ensures that watering the concrete surface built up has good smooth
Property.
Further, described shackle member being provided with socket, be provided with cross bar in socket, grab is stuck in horizontal stroke through socket
On bar, clamping good stability, it is to avoid grab excessively rocks and causes threading off, it is ensured that template is pressed on filler strip by stable, thus
Ensure the planarization of template splicing plane.
Further, described grab is sawtooth card article vertically, and sawtooth card article vertically has multiple
The sawtooth of differing heights, such that it is able to the filler strip for different-thickness is connected on the sawtooth of differing heights, or is connected to
Different spring straining power is produced, it is ensured that template splicing is smooth on the sawtooth of differing heights.
Further, the lower end of described grab is provided with hand draw ring, makes more convenient to operate laborsaving.
Further, described filler strip is rectangular slat, and filler strip is more steady to the support of backing plate, and structure is more stable,
Avoid casting process occurring get loose, improve the planarization of template splicing plane.
Further, described filler strip, template use timber to make, and lightweight, cost of manufacture is low, and connector is metal
Part, structural strength is high, is not susceptible to fracture, and service life is long, and the outer wall of filler strip is also enclosed with iron sheet, and the structure improving filler strip is strong
Degree, prevents filler strip from rupturing, and is effectively improved the corrosion resistance of filler strip simultaneously, extends the service life of filler strip, reduces construction cost.
Compared with prior art, this utility model advantage is:
Concrete-pouring template bracket assembled convenient disassembly efficiency described in the utility model is high, saves man-hour, and operation saves
Shi Shengli, only need to pull downward on grab and template, filler strip fastening or partition can will not be damaged template and filler strip,
Template and filler strip can repeatedly use, and reduce construction cost, increase economic efficiency;Plane that template splicing become is effectively ensured
Planarization so that water, at template upper surface, the concrete built up and there is even curface, improve pouring quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of a kind of embodiment of template;
Fig. 3 is the structural representation of the another kind of embodiment of template.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
A kind of concrete-pouring template support disclosed in this utility model embodiment, the efficiency of loading and unloading is high, time saving and energy saving, will not
Damaging template and filler strip, reusable, construction cost is low.
As shown in Figure 1 to Figure 3, a kind of concrete-pouring template support, including template 1, filler strip 2 and support 3, filler strip 2, mould
Plate 1 uses timber to make, and filler strip 2 is rectangular slat, and the outer wall of filler strip 2 is also enclosed with iron sheet, and support 3 is built by steel pipe scaffold
Becoming frame-like, kept flat some filler strips 2 at the top of support 3, the end face at filler strip 2 placed some templates 1 and splices shape
Becoming plane, the edge of template 1 phase splicing to offer time deep gouge 4, the edge at lower deep gouge 4 place has offered through hole 5,
Placing connector 6 in lower deep gouge 4, connector 6 is metalwork, and structural strength is high, and not easy fracture, service life is long, connector 6
Bottom is provided with hook 7, and hook 7, through through hole 5, is provided with shackle member 8 below filler strip 2, and spring 9 upper end is articulated in hook
On 7, spring 9 lower end is stuck in shackle member 8 by grab 10, utilizes the elastic force of spring 9 that template 1 is close on filler strip 2, protects
The planarization of the plane that barrier template 1 is spliced into.
As shown in Figures 2 and 3, the structure of a kind of lower deep gouge 4 is spaced apart along edge length direction in the edge of template 1
It is provided with several so that the edge multiple spot of template 1 fastens, ensures the interconnective planarization of template 1;Another kind of lower deep gouge
The sinking breach that the edge entirety that 4 is template 1 is offered, through hole 5 is the marginal gap of adjacent forms 1, and connector 6 covers whole
The edge of individual template 1, equally ensures the planarization that template 1 connects.Simultaneously in order to improve planarization further, need
Connector 6 end face is set to concordant with template 1 end face, thus forms complete plane, it is to avoid shaggy block or burr occur, from
And connector 6 is shaped to and lower deep gouge 4 form fit, the thickness of connector 6 is identical with lower deep gouge 4 degree of depth, thus
Guarantee that connector 6 device flushes with template 1 end face after entering lower deep gouge 4.
In order to avoid during pouring, shackle member 8 is from 2 abjections of filler strip, take the shape of the letter U groove structure by shackle member 8 main body,
Two filler strips 2 are positioned at U-lag structure, such that it is able to be prevented effectively from vibration or other reasons causes shackle member 8 to take off from filler strip 2
Go out, it is ensured that have stable downward spring force template 1 to be close in filler strip 2, it is ensured that the splicing end face of template 1 is always smooth
Plane.Meanwhile, grab 10 is operated for convenience, it is to avoid grab 10 rocks excessive and the situation threaded off occurs, and sets in shackle member 8
Having put socket 11, be provided with cross bar 12 in socket 11, grab 10 is stuck on cross bar 12 through socket 11, and socket 11 is to grab 10
To the effect guided, avoiding grab 10 to rock excessive, only need to laterally move less distance can be stuck in grab 10 simultaneously
Deviate from from cross bar 12 on cross bar 12 or by grab 10;Grab 10 is sawtooth card article vertically, and sawtooth card article is along vertically
Direction has the sawtooth of multiple differing heights, thus realizes different tightening forces, and is applicable to the filler strip 2 of different-thickness, card
The lower end of hook 10 is provided with hand draw ring 13, more convenient to operate laborsaving.
Below it is only preferred implementation of the present utility model, it is noted that above-mentioned preferred implementation should not regard
For to restriction of the present utility model, protection domain of the present utility model should be as the criterion with claim limited range.For
For those skilled in the art, without departing from spirit and scope of the present utility model, it is also possible to make some
Improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (10)
1. a concrete-pouring template support, including template (1), filler strip (2) and support (3), it is characterised in that described props up
Frame (3) is built into frame-like, has kept flat some filler strips (2) at the top of support (3), at filler strip (2) if end face placed
Dry template (1) is spliced to form plane, and the edge that template (1) is spliced mutually has offered time deep gouge (4), at lower deep gouge (4) place
Edge offered through hole (5), connector (6) is placed in lower deep gouge (4), and the bottom of connector (6) is provided with hook
(7), hook (7), through through hole (5), is provided with shackle member (8) in filler strip (2) lower section, and spring (9) upper end is articulated in hook
(7), on, spring (9) lower end is stuck in shackle member (8) by grab (10), utilizes the elastic force of spring (9) that template (1) is close to
On filler strip (2), the planarization of the plane that guarantee template (1) is spliced into.
Concrete-pouring template support the most according to claim 1, it is characterised in that described lower deep gouge (4) is in template
(1) edge is provided with several along edge length direction is spaced apart.
Concrete-pouring template support the most according to claim 1, it is characterised in that described lower deep gouge (4) is template
(1) the sinking breach that edge entirety is offered, through hole (5) is the marginal gap of adjacent forms (1).
Concrete-pouring template support the most according to claim 1, it is characterised in that the shape of described connector (6)
With lower deep gouge (4) form fit, the thickness of connector (6) is identical with lower deep gouge (4) degree of depth, and connector (6) device is at lower deep gouge
(4), time in, connector (6) end face and template (1) either flush form complete plane.
Concrete-pouring template support the most according to claim 1, it is characterised in that described shackle member (8) main body is U
Shape groove structure, two filler strips (2) are positioned at U-lag structure.
Concrete-pouring template support the most according to claim 5, it is characterised in that described shackle member (8) is upper to be arranged
Socket (11), are provided with cross bar (12) in socket (11), grab (10) is stuck on cross bar (12) through socket (11).
Concrete-pouring template support the most according to claim 1, it is characterised in that described grab (10) is along vertically
The sawtooth card article in direction.
Concrete-pouring template support the most according to claim 1, it is characterised in that the lower end of described grab (10)
It is provided with hand draw ring (13).
Concrete-pouring template support the most according to claim 1, it is characterised in that described filler strip (2) is that rectangle is long
Bar.
Concrete-pouring template support the most according to claim 9, it is characterised in that described filler strip (2), template (1)
Employing timber is made, and connector (6) is metalwork, and the outer wall of filler strip (2) is also enclosed with iron sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620560329.8U CN205875724U (en) | 2016-06-08 | 2016-06-08 | Concrete placement formwork support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620560329.8U CN205875724U (en) | 2016-06-08 | 2016-06-08 | Concrete placement formwork support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875724U true CN205875724U (en) | 2017-01-11 |
Family
ID=57690403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620560329.8U Expired - Fee Related CN205875724U (en) | 2016-06-08 | 2016-06-08 | Concrete placement formwork support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875724U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952154A (en) * | 2016-06-08 | 2016-09-21 | 刘深思 | Concrete pouring template support |
-
2016
- 2016-06-08 CN CN201620560329.8U patent/CN205875724U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105952154A (en) * | 2016-06-08 | 2016-09-21 | 刘深思 | Concrete pouring template support |
CN105952154B (en) * | 2016-06-08 | 2018-06-22 | 刘深思 | A kind of concrete-pouring template stent |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105952154B (en) | A kind of concrete-pouring template stent | |
CN202441391U (en) | End template device for mounting waterstop in tunnel secondary lining concrete | |
CN205875734U (en) | Concrete placement splices template | |
CN110306774B (en) | Method and device for installing socket type cantilever scaffold | |
CN104196231A (en) | Concrete floor aluminum alloy template and construction method thereof | |
CN208534025U (en) | Floor slab back casting band separate support formwork erecting structure | |
CN209482709U (en) | A kind of in-situ concrete wall subsiding crack typified form | |
CN205875724U (en) | Concrete placement formwork support | |
CN206942138U (en) | Cast template splices bridge plate | |
CN106760173B (en) | Prefabricated plate at post-pouring zone of basement outer wall | |
CN202596148U (en) | Reusable cantilever scaffold anchoring compression ring | |
CN202831624U (en) | Template for deformation joint of shear wall | |
CN211850804U (en) | Shear force wall settlement joint steel wood combines template to prop up establishes device | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN208152107U (en) | A kind of rubber watertight strip mounting device | |
CN204059940U (en) | A kind of concrete floor aluminum alloy mould plate | |
CN110439257A (en) | A kind of high turnover rate fashioned iron of sectional-film coating plywood light-type template system construction method | |
CN206408924U (en) | A kind of repeatable pre-buried ring of the suspension scaffold utilized | |
CN205476468U (en) | Non - design, can all rotary die plate bodys be prefabricated staircase bench template | |
CN109853948A (en) | The integrated template system and mold method of the cast-in-place overhanging windowsill of secondary structure | |
CN210483023U (en) | A template strutting arrangement for roof beam board post-cast strip | |
CN211473410U (en) | Template assembling structure of vertical structural member free of hole opening | |
CN210596877U (en) | Assembled concrete structural slab of interim road of foundation ditch | |
CN207484961U (en) | A kind of novel wall column steel form | |
CN208517965U (en) | A kind of readily removable reserved bolt deep holes template removed, can be used in turn |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210608 |
|
CF01 | Termination of patent right due to non-payment of annual fee |