- Publication number
- CN105952154A CN105952154A CN201610409115.5A CN201610409115A CN105952154A CN 105952154 A CN105952154 A CN 105952154A CN 201610409115 A CN201610409115 A CN 201610409115A CN 105952154 A CN105952154 A CN 105952154A
- Authority
- CN
- China
- Prior art keywords
- template
- support
- concrete
- filler strip
- deep gouge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G19/00—Auxiliary treatment of forms, e.g. dismantling; Cleaning devices
Abstract
The invention discloses a concrete pouring template support. The concrete pouring template support comprises templates, filler strips and a support, wherein the support is built to be in a frame shape, a plurality of filler strips are placed on the top of the support flatwise, a plurality of templates are placed on the top surfaces of the filler strips to form a plane, sink grooves are formed in the edges where the templates are spliced, penetration holes are formed in the edges where the sink grooves are located, connecting pieces are placed in the sink grooves, and hooks are arranged on the bottom portions of the connecting pieces and penetrate through the penetration holes; clamping pieces are arranged under the filler strips, the upper ends of springs are hung on the hooks, and the lower ends of the springs are clamped to the clamping pieces through clamp hooks. According to the concrete pouring template support, assembly and disassembly are convenient and efficient, time and labor are saved in operation, damage to the templates and the filler strips is avoided, the templates and the filler strips can be repeatedly used, construction cost is reduced, the flatness of the plane spliced by the templates is effectively guaranteed, and the flatness of a poured concrete surface is high.
Description
Technical field
The present invention relates to concreting technical field, particularly relate to a kind of concrete-pouring template support.
Background technology
Current China enters the national economy high-speed developing period, and capital construction scale unprecedentedly expands, the skill to construction
Art and management are had higher requirement, and in Civil Engineering Construction, scaffold and falsework are because setting up and removing
Very convenient, be widely used flexibly.Concreting is concreting to be entered mould until plasticizing forming,
Should be by the rubbish in template, earth before pouring, the eliminating impurities such as the greasy dirt on reinforcing bar is clean, and checks the water of reinforcing bar
Whether cement mortar filler strip, plastic cushion (of tie bar) pad.Make template moisten as watered when using plank sheathing.Beams of concrete,
The cast of plate generally uses builds falsework and implements to pour, first mounting bracket, then lays mould on support
Plate, then that reinforcing bar binding is in place, then side form is installed around reinforcing bar, then in the cavity formed, pour coagulation
Soil, last health preserving form removal falls frame.
Traditional concrete-pouring template support is in order to ensure structural stability, it is to avoid occur subsiding in casting process
Accident, will be dead by spike connected nail between template and filler strip when building falsework, installation effectiveness is low,
Waste time and energy, and be difficult to ensure the planarization of the template of splicing, thus it is recessed to cause the concrete pouring molding to exist
The situation of convex injustice, has a strong impact on pouring quality, and the floating difficulty of later stage concrete surface, template is torn open with filler strip simultaneously
Unloading difficulty, removing spike wastes time and energy, and can damage template and filler strip, template and the use longevity of filler strip
Ordering short, need often to change, construction cost is high.
Summary of the invention
The technical assignment of the technical problem to be solved and proposition is to improve prior art, it is provided that one
Plant concrete-pouring template support, solve the concrete-pouring template support efficiency of loading and unloading traditional in current technology low,
Waste time and energy, it is impossible to ensure flatness, template and filler strip, the problem that construction cost is high during dismounting, can be destroyed.
For solving above technical problem, the technical scheme is that
A kind of concrete-pouring template support, including template, filler strip and support, it is characterised in that described support
Being built into frame-like, kept flat some filler strips at the top of support, the end face at filler strip placed some templates
Being spliced to form plane, the edge that template is spliced mutually has offered time deep gouge, and the edge at lower deep gouge place offers
Through hole, connector is placed in lower deep gouge, and the bottom of connector is provided with hook, links up with through through hole,
Being provided with shackle member below filler strip, spring upper end is articulated on hook, and lower spring end is stuck in shackle member by snap fit,
The elastic force utilizing spring makes template proximate on filler strip, ensures the planarization of the plane of template splicing one-tenth.The present invention
Described concrete-pouring template supporting structure is simple, easy to use, it is not necessary to tapping installation nail can be solid by template
Fixed splicing is on filler strip, and packaging efficiency is high, saves man-hour, only need to be placed by connector after template splicing becomes plane
In lower deep gouge, then spring is articulated on the hook below connector, then pulls downward on snap fit by snap fit card
In shackle member, assembly operation can be completed, time saving and energy saving, and plane that template splicing become flat is effectively ensured
Whole property so that water, at template upper surface, the concrete built up and there is even curface, improve pouring quality, it is to avoid after
The operation that continuous increase is floating, improves efficiency of construction.Concrete-pouring template support dismounting side the most of the present invention
Just, efficiency high, it is time saving and energy saving to operate, and snap fit only need to pull downward on abjection shackle member can be divided template, filler strip
Tearing open, template and filler strip will not cause damage, thus template and filler strip can repeatedly use, reduction is constructed into
This, increase economic efficiency.
Further, described lower deep gouge is provided with several in the edge of template along edge length direction is spaced apart,
Ensure that ceiling edge connects smooth, it is to avoid the situation of Local warping occurs, improve the smooth of the plane that template splicing becomes
Property, improve concrete pouring quality.
Further, the sinking breach that the described edge entirety that lower deep gouge is template is offered, through hole is adjacent
The marginal gap connector of template forms connection band, Stability Analysis of Structures in the whole edge of template, can be effectively improved mould
The planarization of plate splicing.
Further, the shape of described connector is mated with sinking groove shape, the thickness of connector and sinking groove depth
Spending identical, when connecting component apparatus is in lower deep gouge, connector end face and template either flush form complete plane,
Improve the planarization of splicing further, it is to avoid shaggy block occurs, improve concreting surface quality.
Further, described shackle member main body takes the shape of the letter U groove structure, and two filler strips are positioned at U-lag structure, carry
High connective stability, it is to avoid owing to vibrations or other reasons cause shackle member to be deviate from below filler strip, it is to avoid pouring
During concrete, template loses the lower pulling force of spring and the situation of warpage occurs, ensures and waters the concrete table built up
Mask has good planarization.
Further, described shackle member being provided with socket, be provided with cross bar in socket, snap fit passes socket card
On cross bar, clamping good stability, it is to avoid snap fit excessively rocks and causes threading off, it is ensured that template is pressed in by stable
On filler strip, thus ensure the planarization of template splicing plane.
Further, described snap fit is sawtooth card article vertically, and sawtooth card article vertically has many
The sawtooth of individual differing heights, such that it is able to the filler strip for different-thickness is connected on the sawtooth of differing heights, or
It is to be connected on the sawtooth of differing heights produce different spring straining power, it is ensured that template splicing is smooth.
Further, the lower end of described snap fit is provided with hand draw ring, makes more convenient to operate laborsaving.
Further, described filler strip is rectangular slat, and filler strip is more steady to the support of backing plate, and structure is more steady
Fixed, it is to avoid casting process to occur get loose, improve the planarization of template splicing plane.
Further, described filler strip, template use timber to make, and lightweight, cost of manufacture is low, and connector is
Metalwork, structural strength is high, is not susceptible to fracture, and service life is long, and the outer wall of filler strip is also enclosed with iron sheet, carries
The structural strength of high filler strip, prevents filler strip from rupturing, and is effectively improved the corrosion resistance of filler strip simultaneously, extends making of filler strip
With the life-span, reduce construction cost.
Compared with prior art, the invention has the advantages that:
Concrete-pouring template bracket assembled convenient disassembly efficiency of the present invention is high, saves man-hour, and operation saves time
Laborsaving, only snap fit need to be pulled downward on and template and filler strip will not can be caused by template, filler strip fastening or partition
Destroying, template and filler strip can repeatedly use, and reduce construction cost, increase economic efficiency;Mould is effectively ensured
The planarization of the plane that plate is spliced into so that water, at template upper surface, the concrete built up and there is even curface, carry
High pouring quality.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of a kind of embodiment of template;
Fig. 3 is the structural representation of the another kind of embodiment of template.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear,
It is fully described by, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole realities
Execute example.Based on the embodiment in the present invention, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of protection of the invention.
A kind of concrete-pouring template support disclosed in the embodiment of the present invention, the efficiency of loading and unloading is high, time saving and energy saving, will not
Damaging template and filler strip, reusable, construction cost is low.
As shown in Figure 1 to Figure 3, a kind of concrete-pouring template support, including template 1, filler strip 2 and support 3,
Filler strip 2, template 1 use timber to make, and filler strip 2 is rectangular slat, and the outer wall of filler strip 2 is also enclosed with iron sheet,
Support 3 is built into frame-like by steel pipe scaffold, has kept flat some filler strips 2 at the top of support 3, at filler strip 2
End face placed some templates 1 and be spliced to form plane, the edge of template 1 phase splicing has offered time deep gouge 4,
Edge at lower deep gouge 4 place has offered through hole 5, places connector 6, connector 6 in lower deep gouge 4
For metalwork, structural strength is high, not easy fracture, and service life is long, and the bottom of connector 6 is provided with hook 7,
Hook 7, through through hole 5, is provided with shackle member 8 below filler strip 2, and spring 9 upper end is articulated on hook 7,
Spring 9 lower end is stuck in shackle member 8 by snap fit 10, utilizes the elastic force of spring 9 to make template 1 be close to filler strip
On 2, the planarization of the plane that guarantee template 1 is spliced into.
As shown in Figures 2 and 3, the structure of a kind of lower deep gouge 4 is along edge length direction in the edge of template 1
Spaced apart it is provided with several so that the edge multiple spot of template 1 fastens, ensures that template 1 is interconnective smooth
Property;The sinking breach that the edge entirety that another kind descends deep gouge 4 to be template 1 is offered, through hole 5 is adjacent forms
The marginal gap of 1, connector 6 covers the edge of whole template 1, equally ensures what template 1 connected
Planarization.Simultaneously in order to improve planarization further, need to be set to put down with template 1 end face by connector 6 end face
Together, thus form complete plane, it is to avoid shaggy block or burr occur, thus connector 6 are shaped to
With lower deep gouge 4 form fit, the thickness of connector 6 is identical with lower deep gouge 4 degree of depth, so that it is guaranteed that connector 6 fills
Flush with template 1 end face after inserting lower deep gouge 4.
In order to avoid during pouring, shackle member 8 is from 2 abjections of filler strip, take the shape of the letter U groove by shackle member 8 main body
Structure, two filler strips 2 are positioned at U-lag structure, such that it is able to be prevented effectively from vibration or other reasons cause clamping
Part 8 is from 2 abjections of filler strip, it is ensured that have stable downward spring force template 1 to be close in filler strip 2, it is ensured that mould
The splicing end face of plate 1 is always smooth plane.Meanwhile, snap fit 10 is operated for convenience, it is to avoid snap fit 10 shakes
Move excessive and the situation threaded off occur, shackle member 8 is provided with socket 11, in socket 11, is provided with cross bar 12,
Snap fit 10 is stuck on cross bar 12 through socket 11, and snap fit 10 is played the effect of guiding by socket 11, avoids simultaneously
Snap fit 10 rocks excessive, only need to laterally move less distance and can be stuck on cross bar 12 by snap fit 10 maybe by card
Hook 10 to deviate from from cross bar 12;Snap fit 10 is sawtooth card article vertically, and sawtooth card article vertically has
There is the sawtooth of multiple differing heights, thus realize different tightening forces, and be applicable to the filler strip 2 of different-thickness,
The lower end of snap fit 10 is provided with hand draw ring 13, more convenient to operate laborsaving.
Below it is only the preferred embodiment of the present invention, it is noted that above-mentioned preferred implementation is not construed as
Limitation of the present invention, protection scope of the present invention should be as the criterion with claim limited range.For this skill
For the those of ordinary skill in art field, without departing from the spirit and scope of the present invention, it is also possible to make some changing
Entering and retouch, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (10)
1. a concrete-pouring template support, including template (1), filler strip (2) and support (3), it is special
Levying and be, described support (3) is built into frame-like, has kept flat some filler strips (2) at the top of support (3),
End face at filler strip (2) placed some templates (1) and is spliced to form plane, the edge that template (1) is spliced mutually
Place has offered time deep gouge (4), and the edge at lower deep gouge (4) place has offered through hole (5), connector (6)
Being placed in lower deep gouge (4), the bottom of connector (6) is provided with hook (7), and hook (7) is through running through
Hole (5), is provided with shackle member (8) in filler strip (2) lower section, and spring (9) upper end is articulated on hook (7),
Spring (9) lower end is stuck in shackle member (8) by snap fit (10), utilizes the elastic force of spring (9) to make template
(1) it is close on filler strip (2), the planarization of the plane that guarantee template (1) is spliced into.
Concrete-pouring template support the most according to claim 1, it is characterised in that described lower deep gouge (4)
Edge in template (1) is provided with several along edge length direction is spaced apart.
Concrete-pouring template support the most according to claim 1, it is characterised in that described lower deep gouge (4)
The sinking breach offered for the edge entirety of template (1).
Concrete-pouring template support the most according to claim 1, it is characterised in that described connector (6)
Shape and lower deep gouge (4) form fit, the thickness of connector (6) is identical with lower deep gouge (4) degree of depth, connection
When part (6) device is in lower deep gouge (4), connector (6) end face and template (1) either flush are formed completely
Plane.
Concrete-pouring template support the most according to claim 1, it is characterised in that described shackle member (8)
Main body takes the shape of the letter U groove structure, and two filler strips (2) are positioned at U-lag structure.
Concrete-pouring template support the most according to claim 5, it is characterised in that described shackle member (8)
On be provided with socket (11), be provided with cross bar (12) in socket (11), snap fit (10) pass socket (11)
It is stuck on cross bar (12).
Concrete-pouring template support the most according to claim 1, it is characterised in that described snap fit (10)
For sawtooth card article vertically.
Concrete-pouring template support the most according to claim 1, it is characterised in that described snap fit (10)
Lower end be provided with hand draw ring (13).
Concrete-pouring template support the most according to claim 1, it is characterised in that described filler strip (2)
For rectangular slat.
Concrete-pouring template support the most according to claim 9, it is characterised in that described filler strip (2),
Template (1) uses timber to make, and connector (6) is metalwork, and the outer wall of filler strip (2) is also enclosed with iron sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610409115.5A CN105952154B (en) | 2016-06-08 | 2016-06-08 | A kind of concrete-pouring template stent |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610409115.5A CN105952154B (en) | 2016-06-08 | 2016-06-08 | A kind of concrete-pouring template stent |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105952154A true CN105952154A (en) | 2016-09-21 |
CN105952154B CN105952154B (en) | 2018-06-22 |
Family
ID=56908805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610409115.5A Expired - Fee Related CN105952154B (en) | 2016-06-08 | 2016-06-08 | A kind of concrete-pouring template stent |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105952154B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130797A (en) * | 2017-06-29 | 2017-09-05 | 张志通 | A kind of clamping device of building template |
CN108279150A (en) * | 2018-03-28 | 2018-07-13 | 王珍珍 | A kind of small-sized flexural strength sample preparation box structure |
CN108827718A (en) * | 2018-04-08 | 2018-11-16 | 王珍珍 | A kind of novel small-sized compression strength sample preparation box structure |
CN108871889A (en) * | 2018-03-28 | 2018-11-23 | 王珍珍 | A kind of small-sized flexural strength sample preparation box structure |
CN108952155A (en) * | 2018-07-27 | 2018-12-07 | 重庆华硕建设有限公司 | Concrete-pouring template bracket |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3050516B2 (en) * | 1995-12-14 | 2000-06-12 | マックス株式会社 | Prevention mechanism of wire dumping in binding machine |
CN1355365A (en) * | 2000-12-01 | 2002-06-26 | 王杏林 | Formwork erection method for ring beams of building made of hollow building blocks and its formworks and formwork supports |
CN203547137U (en) * | 2013-11-05 | 2014-04-16 | 中建八局第二建设有限公司 | Adjustable support tray of rear supporting bottom die |
CN104481144A (en) * | 2014-12-10 | 2015-04-01 | 山东天齐置业集团股份有限公司 | Beam-bottom form erection system of straightly inserted disk and pin-joined formwork support and construction method thereof |
CN104831756A (en) * | 2015-05-20 | 2015-08-12 | 山东三箭建设工程管理有限公司 | Formwork jacking tool for constructing post-cast strip of cast-in-place slab and formwork supporting construction method |
CN205134940U (en) * | 2015-08-30 | 2016-04-06 | 惠玉清 | A cast -in -place reinforced concrete floor mode structure |
CN205875724U (en) * | 2016-06-08 | 2017-01-11 | 刘深思 | Concrete placement formwork support |
-
2016
- 2016-06-08 CN CN201610409115.5A patent/CN105952154B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3050516B2 (en) * | 1995-12-14 | 2000-06-12 | マックス株式会社 | Prevention mechanism of wire dumping in binding machine |
CN1355365A (en) * | 2000-12-01 | 2002-06-26 | 王杏林 | Formwork erection method for ring beams of building made of hollow building blocks and its formworks and formwork supports |
CN203547137U (en) * | 2013-11-05 | 2014-04-16 | 中建八局第二建设有限公司 | Adjustable support tray of rear supporting bottom die |
CN104481144A (en) * | 2014-12-10 | 2015-04-01 | 山东天齐置业集团股份有限公司 | Beam-bottom form erection system of straightly inserted disk and pin-joined formwork support and construction method thereof |
CN104831756A (en) * | 2015-05-20 | 2015-08-12 | 山东三箭建设工程管理有限公司 | Formwork jacking tool for constructing post-cast strip of cast-in-place slab and formwork supporting construction method |
CN205134940U (en) * | 2015-08-30 | 2016-04-06 | 惠玉清 | A cast -in -place reinforced concrete floor mode structure |
CN205875724U (en) * | 2016-06-08 | 2017-01-11 | 刘深思 | Concrete placement formwork support |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130797A (en) * | 2017-06-29 | 2017-09-05 | 张志通 | A kind of clamping device of building template |
CN108279150A (en) * | 2018-03-28 | 2018-07-13 | 王珍珍 | A kind of small-sized flexural strength sample preparation box structure |
CN108871889A (en) * | 2018-03-28 | 2018-11-23 | 王珍珍 | A kind of small-sized flexural strength sample preparation box structure |
CN108827718A (en) * | 2018-04-08 | 2018-11-16 | 王珍珍 | A kind of novel small-sized compression strength sample preparation box structure |
CN108952155A (en) * | 2018-07-27 | 2018-12-07 | 重庆华硕建设有限公司 | Concrete-pouring template bracket |
Also Published As
Publication number | Publication date |
---|---|
CN105952154B (en) | 2018-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105952154A (en) | Concrete pouring template support | |
CN202441391U (en) | End template device for mounting waterstop in tunnel secondary lining concrete | |
JP4875775B1 (en) | Removal method of bridge deck | |
CN205875734U (en) | Concrete placement splices template | |
CN104264984A (en) | Formwork for concrete structure pouring and pouring construction method | |
KR101639009B1 (en) | In ceiling mold using truss girder type deck panels, flowing down pour concrete fluid-resistant filler and ceiling mold structure using there of | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN205875724U (en) | Concrete placement formwork support | |
CN202831624U (en) | Template for deformation joint of shear wall | |
CN202596148U (en) | Reusable cantilever scaffold anchoring compression ring | |
CN110439257A (en) | A kind of high turnover rate fashioned iron of sectional-film coating plywood light-type template system construction method | |
CN202214983U (en) | Hole reservation mould | |
CN206408924U (en) | A kind of repeatable pre-buried ring of the suspension scaffold utilized | |
CN109057322A (en) | A kind of cast-in-place concrete early-dismantling formwork system and its construction method | |
CN211473410U (en) | Template assembling structure of vertical structural member free of hole opening | |
CN204530749U (en) | A kind of fixed structure of power press with fixed bed base | |
CN210483023U (en) | A template strutting arrangement for roof beam board post-cast strip | |
CN211143327U (en) | I-steel fixing device encorbelments | |
CN208517965U (en) | A kind of readily removable reserved bolt deep holes template removed, can be used in turn | |
CN207484961U (en) | A kind of novel wall column steel form | |
CN206111205U (en) | Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with | |
CN106808564B (en) | Three-word buckle type box girder end sealing template and box girder end sealing method | |
CN104846753A (en) | Bridge deck opening maintaining method | |
CN220100669U (en) | Old template leakage-proof easy-to-disassemble template patch board | |
CN105756341B (en) | A kind of installation steps of hoistway formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180622 |