CN202831624U - Template for deformation joint of shear wall - Google Patents
Template for deformation joint of shear wall Download PDFInfo
- Publication number
- CN202831624U CN202831624U CN 201220501429 CN201220501429U CN202831624U CN 202831624 U CN202831624 U CN 202831624U CN 201220501429 CN201220501429 CN 201220501429 CN 201220501429 U CN201220501429 U CN 201220501429U CN 202831624 U CN202831624 U CN 202831624U
- Authority
- CN
- China
- Prior art keywords
- template
- ribs
- supporting framework
- rib
- panels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a template for deformation joints of a shear wall. The template for the deformation joints of the shear wall comprises a supporting framework and panels, wherein the supporting framework is composed of edge frames and vertical ribs, the vertical ribs are evenly distributed in the edge frames, the panels are arranged on the upper surface of the supporting framework, and cross ribs which are perpendicular to the vertical ribs are arranged on the lower surface of the supporting framework. The panels, the vertical ribs and the cross ribs are connected and fixed through T-shaped bolts. Screw holes which correspond to the T-shaped bolts are formed in the positions, corresponding to the vertical ribs, of the cross ribs. A pair of the cross ribs is used so as to increase the strength of the template and be beneficial for installation and use. The panels, the supporting framework and the cross ribs are connected to form the whole template through the T-shaped bolts, so that the template is simple in structure and convenient to manufacture in batch. When the template is used, a wood board is installed between two templates so as to adapt to requirements of the deformation joints with different widths, and the template is good in generality. Compared with the prior art, repeated labor is reduced and cost of manpower and material resource is saved.
Description
Technical field
The utility model relates to the deformation joint in a kind of shear wall construction, particularly a kind of typified form of shear force wall deformation slit.
Background technology
Current fast development along with building industry; the high-building construction of shear wall structure form is more and more; often can run into the shear force wall deformation slit operation difficult problem about 20 ㎝ in the work progress; selection of construction method is improper; easily cause the concreting leakiness, muscle and running pulp phenomenon occur easily revealing, the concreting rear pattern plate is difficult to remove; template easily sled is mashed, is difficult to guarantee construction quality.
The utility model content
The purpose of this utility model is to provide a kind of construction quality, shear force wall deformation slit formwork simple in structure of improving.
This shear force wall deformation slit formwork that the utility model provides comprises support frame, panel, and support frame is comprised of frame and the perpendicular rib that is distributed in the frame, and the upper surface of support frame has panel, soffit that the cross rib vertical with erecting rib arranged.
Be connected and fixed by tommyhead bolt between described panel, perpendicular rib, the cross rib.
There is the screw corresponding with described tommyhead bolt the position of corresponding perpendicular rib on the described cross rib.
Two of described cross ribs use in pairs, increase the intensity of template, are conducive to install and use.
The utility model is connected to become an integral mold plate by T-shaped bolt with panel, support frame and cross rib three, simple in structure, be convenient to batch making, with the time can adapt to by timber boarding cassette tape between two masterplates the deformation joint demand of different in width, has versatility, compare with prior art, can reduce the duplication of labour, cost uses manpower and material resources sparingly.
Description of drawings
Fig. 1 is elevational schematic view of the present utility model.
Fig. 2 is the plan structure schematic diagram of Fig. 1.
Fig. 3 is the side-looking sectional structure schematic diagram that the utility model uses state.
The specific embodiment
As shown in Figure 1 to Figure 3, this shear force wall deformation slit formwork that the utility model offers, comprise support frame 1, panel 2, support frame 1 is comprised of frame 11 and the perpendicular rib 12 that is distributed in the frame, panel 2 is positioned at the upper surface of support frame 1, and the soffit of support frame 1 has the cross rib 3 vertical with erecting rib 12.Be connected and fixed by tommyhead bolt 4 between panel 2, perpendicular rib 12, the cross rib 3.There is the screw corresponding with tommyhead bolt 4 position of corresponding perpendicular rib 12 on the cross rib 3.3 two of cross ribs use in pairs.
Adopt split bolt 5 fastening location between template in the deformation joint and the both sides concrete wall, at first according to thickness and the quantity of the width of deformation joint and highly definite template, the length and width size of general template all is no more than 3 meters during making.Each template is made by said structure, then arrange auger shell keyhole 6 in the position between the corresponding two adjacent cross ribs 3 on its panel by dislocation, the diameter of bolt hole 6 is greater than the diameter of wall-crossing opposite-drawing bolt 5, and by the band steel 7 that the template two sides adds 80 * 5 mm that is arranged in of bolt hole 6.
During installation, two of the templates in every deformation joint are used in pairs, make the panel 2 of two templates be close to the wall locations place by the thickness of adjusting plank cassette tape 8 between two templates.
Concrete installation process is as follows: measure the unwrapping wire location, and axis, control line, openings position line and the absolute altitude line of shear wall are carried out mark.Respectively lay the reinforcing bar 9 of a φ 25 before template is installed at flooring-0.05m, apart from 0.5m position, shear wall two ends, length is that the deformation joint width adds 50mm * 2, as pedestal and the limit rib of template between deformation joint.Set up timber wedge on reinforcing bar 9, template is positioned on the timber wedge.At first with the lifting of the double template in the deformation joint, wear split bolt 5 when template is installed, bamboo trunk positioning bolt cover 10 is installed, lift again the locating template in the two concrete walls outside; Nut on the split bolt 5 is carried out tightening the first time, and timber boarding cassette tape 8 is made diagonal brace with 48 pipes of φ simultaneously template is proofreaied and correct, proofread and correct qualified after again with nut screwing clamping.Should guarantee the width of deformation joint, guarantee again the physical dimension of body of wall, form joint is tight, not spillage.
Check absolute altitude, the verticality of template after template is installed, absolute altitude should be controlled at ± 5 ㎜ in, verticality is controlled in the 5mm.
Deformation joint both sides shear wall concrete should divide three symmetries to build, and after building, vibrates with the plug-in type vibrating rod at every turn, and the time is no more than 25 seconds, and guarantees that deformation joint both sides shear wall casting and compacting of concrete is even, avoids monolateral form lateral pressure to cause distortion, displacement.
According to weather temperature height, can tear plate in concreting open after 18~36 hours; At first the steel pipe diagonal brace is removed during form removal, the nut on the split bolt 5 is unscrewed, after plank cassette tape 8 is removed, hang out again locating template, remove at last the template in the deformation joint; Should avoid lifting the concrete shear force wall that template is collided just moulding during form removal.Must carry out the concrete residue to the template of removing and remove, brushing release agent after cleaning is clean.Carry out preparation of construction for using next time.
Typified form, split bolt, plank cassette tape and bracing frame pipe etc. are all reusable.
Claims (4)
1. shear force wall deformation slit formwork, it is characterized in that: this template comprises support frame, panel, and support frame is comprised of frame and the perpendicular rib that is distributed in the frame, and the upper surface of support frame has panel, soffit that the cross rib vertical with erecting rib arranged.
2. shear force wall deformation slit formwork as claimed in claim 1 is characterized in that: be connected and fixed by tommyhead bolt between described panel, perpendicular rib, the cross rib.
3. shear force wall deformation slit formwork as claimed in claim 2 is characterized in that: there is the screw corresponding with described tommyhead bolt the position of corresponding perpendicular rib on the described cross rib.
4. shear force wall deformation slit formwork as claimed in claim 1 is characterized in that: two in pairs uses of described cross rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220501429 CN202831624U (en) | 2012-09-28 | 2012-09-28 | Template for deformation joint of shear wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220501429 CN202831624U (en) | 2012-09-28 | 2012-09-28 | Template for deformation joint of shear wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202831624U true CN202831624U (en) | 2013-03-27 |
Family
ID=47943367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220501429 Expired - Lifetime CN202831624U (en) | 2012-09-28 | 2012-09-28 | Template for deformation joint of shear wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202831624U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245907A (en) * | 2016-08-30 | 2016-12-21 | 中国冶集团有限公司 | Narrow and small space body of wall integration mold method |
CN109555310A (en) * | 2018-12-24 | 2019-04-02 | 上海建工二建集团有限公司 | Integral formwork of wall column and construction method thereof |
CN114109027A (en) * | 2021-11-26 | 2022-03-01 | 上海宝冶集团有限公司 | Construction structure and construction method for ultrahigh girder construction joint |
CN114109028A (en) * | 2021-11-26 | 2022-03-01 | 上海宝冶集团有限公司 | Shear wall deformation joint template construction structure and construction method thereof |
-
2012
- 2012-09-28 CN CN 201220501429 patent/CN202831624U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245907A (en) * | 2016-08-30 | 2016-12-21 | 中国冶集团有限公司 | Narrow and small space body of wall integration mold method |
CN109555310A (en) * | 2018-12-24 | 2019-04-02 | 上海建工二建集团有限公司 | Integral formwork of wall column and construction method thereof |
CN109555310B (en) * | 2018-12-24 | 2024-01-02 | 上海建工二建集团有限公司 | Integral template of wall column and construction method thereof |
CN114109027A (en) * | 2021-11-26 | 2022-03-01 | 上海宝冶集团有限公司 | Construction structure and construction method for ultrahigh girder construction joint |
CN114109028A (en) * | 2021-11-26 | 2022-03-01 | 上海宝冶集团有限公司 | Shear wall deformation joint template construction structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100469995C (en) | Construction method for after-pouring band beam-slab template | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN110984562B (en) | Double-shear wall long and narrow deformation joint and construction method | |
CN110509396B (en) | Laminated slab, laminated slab production equipment and laminated slab production method | |
CN202831624U (en) | Template for deformation joint of shear wall | |
CN104196231A (en) | Concrete floor aluminum alloy template and construction method thereof | |
CN108678193B (en) | Post-cast strip and construction method thereof | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN204960950U (en) | Two grommets in tunnel bury fixed combination steel mould of open and flat butt clamp of formula waterstop in to | |
CN109797969B (en) | Construction method of post-cast strip tool type advanced formwork lifting system | |
CN104153573B (en) | V-type cylinder concrete pour mould and construction method | |
CN204983649U (en) | Big inclination cylinder steel form | |
CN211396591U (en) | Concrete shear wall root reinforcing apparatus | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN219080981U (en) | Non-support fixing device for post-pouring strip of superimposed sheet | |
CN204510817U (en) | Hole to be provided regularization adjustable steel frame template | |
CN208072956U (en) | Concrete shear force wall root bracing means | |
CN201539098U (en) | Detachable convenient support device of steel structure building template | |
CN110984568A (en) | Water stop ridge platform template device and construction method | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN208294080U (en) | Formwork root leakproof sizing device | |
CN114368696A (en) | Pre-buried construction method for tower crane wall-attached wall-connecting piece | |
CN110118014B (en) | Exterior wall template system free of exterior scaffold and construction method thereof | |
CN204001714U (en) | The concrete mould of building of V-type cylinder | |
CN109914571B (en) | Basement drainage ditch formwork system, pouring system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130327 |